createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1718447137251
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd43000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose24-06-2024 17:00:00
tenderQueryClose21-06-2024 17:30:00
technicalBidOpenNone
publishedDate16-06-2024 11:53:19
publishedByPostPWD_EE_DIV_CKD
publishedByUserKPE15950 - SUNILKUMAR N BALOL
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShri.Sunilkumar N Balol EE PWD Division Chikodi
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber8338273859
mobileNumber8338273859
tenderSupplierListNone
tenderSchedule
createdTs1718447137283
version12
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT10958
titleCONSTRUCTION OF SINGLE CLASS ROOM FOR GOVT. KANNADA LOWER PRIMARY SCHOOL AT SAVADI DARGA IN ATHANI TALUKA OF BELAGAVI DISTRICT.UNDER 4059-80-051-0-29-386 DEPARTMENT BUILDINGS.
descriptionCONSTRUCTION OF SINGLE CLASS ROOM FOR GOVT. KANNADA LOWER PRIMARY SCHOOL AT SAVADI DARGA IN ATHANI TALUKA OF BELAGAVI DISTRICT.UNDER 4059-80-051-0-29-386 DEPARTMENT BUILDINGS.
categoryWORKS
categoryTextWorks
ecv1710777.80
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1686
locationNamePWD Division Office Chikkodi
provisionalAmount1800000.0
groupOverheadTotal0.0
fileNumberKPWD/ATN/4059/KLPS/SAVADIDARGA/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17184471370000NoneNoneBuildingsCONSTRUCTION OF SINGLE CLASS ROOM FOR GOVT. KANNADA LOWER PRIMARY SCHOOL AT SAVADI DARGA IN ATHANI TALUKA OF BELAGAVI DISTRICT.UNDER 4059-80-051-0-29-386 DEPARTMENT BUILDINGS.1652897.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3294581114612NoneVol.1, P.No.8,I.No.1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter includingdressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage ofmachinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ( Vol.1, P.No.8,I.No.1.12) ---- including cost of all materials, labor ,HOM,lCum117.71117.719.03FalseNoneNoneFalseNoneFalse1062.92130
3294582114612NoneVol.1, P.No.8,I.No.1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications,including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( Vol.1, P.No.8,I.No.1.14.1) ---- including cost of all materials, labor ,HOM,lCum126.38126.3813.8FalseNoneNoneFalseNoneFalse1744.0440
3294583114612NoneVol.1, P.No.15,I.No.2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Formwork included and (The cost of steel reinforcement shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.15,I.No.2.1.3) ---- including cost of all materials, labor ,HOM,lCum7420.377420.377.71FalseNoneNoneFalseNoneFalse57211.05270
3294584114612NoneVol.2, P.No.5,I.No.4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ( Vol.2, P.No.5,I.No.4.1) ---- including cost of all materials, labor ,HOM,lSqm146.2146.258.93FalseNoneNoneFalseNoneFalse8615.5660
3294585114612NoneVolume 1 Page No 15-Item No 2.2.3Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (The cost of steel reinforcement & formwork to be paid separately) (Volume 1 Page No 15-Item No 2.2.3) ---- including cost of all materials, labor ,HOM,lCum7850.37850.33.38FalseNoneNoneFalseNoneFalse26534.0140
3294586114612NoneVol.1, P.No.111, S.No.1aFormwark for Footings Isolated @ 8% (Vol.1, P.No.111, S.No.1a) ---- including cost of all materials, labor ,HOM,lCum628.02628.023.38FalseNoneNoneFalseNoneFalse2122.70760
3294587114612NoneVol.1, P.No.17, I.No.2.2.3Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Formwork included (The cost of steel reinforcement to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labor ,HOM,lCum7850.37850.32.92FalseNoneNoneFalseNoneFalse22922.8760
3294588114612NoneVol.1, P.No.111, S.No.2Formwark for Plinth beams of Buildings @ 50% (Vol.1, P.No.111, S.No.2) ---- including cost of all materials, labor ,HOM,lCum3925.153925.152.92FalseNoneNoneFalseNoneFalse11461.4380
3294589114612NoneVol.1,P.No.7, I.No.1.9Filling available excavated earth (excluding rock) in trenches, plinth,sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( Vol.1,P.No.7, I.No.1.9) ---- including cost of all materials, labor ,HOM,lCum329.57329.5724.55FalseNoneNoneFalseNoneFalse8090.94350
3294590114612NoneVol.1, P.No.16,I.No.2.5.2Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.16,I.No.2.5.2) ---- including cost of all materials, labor ,HOM,lCum8478.488478.4817.29FalseNoneNoneFalseNoneFalse146592.91920
3294591114612NoneVol.1, P.No.111, S.No.9Formwark for Columns @ 70% (Vol.1, P.No.111, S.No.9) ---- including cost of all materials, labor ,HOM,lCum5934.935934.933.73FalseNoneNoneFalseNoneFalse22137.28890
3294592114612NoneVol.1, P.No.112, S.No.14Formwark for Beams & Lintels of Building @ 60% (Vol.1, P.No.112, S.No.14) ---- including cost of all materials, labor ,HOM,lCum5087.095087.093.58FalseNoneNoneFalseNoneFalse18211.78220
3294593114612NoneVol.1, P.No.112, S.No.15Formwark for Roof Slab of Building @ 50% (Vol.1, P.No.112, S.No.15) ---- including cost of all materials, labor ,HOM,lCum4239.244239.248.84FalseNoneNoneFalseNoneFalse37474.88160
3294594114612NoneVol.1, P.No.112, S.No.1Formwark for Chejjas, Canopy & Other Architectural projections of minor sections @ 45% (Vol.1, P.No.112, S.No.1 ---- including cost of all materials, labor ,HOM,lCum3815.313815.311.15FalseNoneNoneFalseNoneFalse4387.60650
3294595114612NoneVol.1, P.No.16, I.No.2.4.1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ( Vol.1, P.No.16, I.No.2.4.1) ---- including cost of all materials, labor ,HOM,lCum7934.567934.560.93FalseNoneNoneFalseNoneFalse7379.14080
3294596114612NoneVol.1, P.No.18,I.No.2.11aProviding Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately ---- including cost of all materials, labor ,HOM,lKg110.84110.843071.3FalseNoneNoneFalseNoneFalse340422.8920
3294597114612NoneVol.2 P.No.14, I. No. 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Vol.2 P.No.14, I. No. 6.8) ---- including cost of all materials, labor ,HOM,lCum9873.599873.5922.0FalseNoneNoneFalseNoneFalse217218.980
3294598114612NoneVolume 2 Page No 99 Item No 12.11Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(Volume 2 Page No 99 Item No 12.11) ---- including cost of all materials, labor ,HOM,lCum171073.69171073.690.101FalseNoneNoneFalseNoneFalse17278.442690
3294599114612NoneVol. 2, P. No.105, I.No.12.57.8Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 40 mm thick one side teak and one side commercial ---- including cost of all materials, labor ,HOM,lSqm5327.75327.75.04FalseNoneNoneFalseNoneFalse26851.6080
3294600114612NoneVol. 2, P.No. 63, I. No.9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent (Vol. 2, P.No. 63, I. No.9.24) ---- including cost of all materials, labor ,HOM,lSqm3533.633533.635.31FalseNoneNoneFalseNoneFalse18763.57530
3294601114612NoneVol. 2, P.No.108, I.No.12.84Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6 PHR with TPE (Thermo Plastic Elastomer) and lead free, gaskets -grey color having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 44mm width x 40mmheight with reinforcement of 1mm thickness and Sash with overall size of 27mm X 53mm with UPVC honeycomb structure inside in lieu of GI reinforcement. Coextruded Glazing bead for fixing of glass shall be of size 9.5mm x 21.5mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with Crescent Locks. Wall thickness of frame & sash shall be of 2 mm.Maximum possible size 1219mm x 1219mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made (Vol. 2, P.No.108, I.No.12.84) ---- including cost of all materials, labor ,HOM,lSqm6223.56223.54.32FalseNoneNoneFalseNoneFalse26885.520
3294602114612NoneVol. 2 Material component S.No.394, P.No. A-24Galvanised wire mesh of average width of aperture 1.4 mm and nominal dia of wire 0.63 mm ---- including cost of all materials, labor ,HOM,lSqm330.4330.46.48FalseNoneNoneFalseNoneFalse2140.9920
3294603114612NoneVol.2, P.No.86, I.No.11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc (Vol.2, P.No.86, I.No.11.34B) ---- including cost of all materials, labor ,HOM,lKgs226.74226.7464.8FalseNoneNoneFalseNoneFalse14692.7520
3294604114612NoneVol.2, P.No.61, I.No.9.12.2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming toIS: 15622, of approved make, in all colours and shades, laid on 20mm thickcement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cementslurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- including cost of all materials, labor ,HOM,lSqm1455.831455.8338.24FalseNoneNoneFalseNoneFalse55670.93920
3294605114612NoneVol.2, P.No.41, I.No.8.1.1Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding,including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge (Vol.2, P.No.41, I.No.8.1.1) ---- including cost of all materials, labor ,HOM,lSqm315.95315.95112.3FalseNoneNoneFalseNoneFalse35481.1850
3294606114612NoneVol.2, P.No.50, I.No.8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Vol.2, P.No.50, I.No.8.51) ---- including cost of all materials, labor ,HOM,lSqm123.9123.9124.23FalseNoneNoneFalseNoneFalse15392.0970
3294607114612NoneVol.2, P.No.42, I.No.8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol.2, P.No.42, I.No.8.8 ) ---- including cost of all materials, labor ,HOM,lSqm459.67459.67151.65FalseNoneNoneFalseNoneFalse69708.95550
3294608114612NoneVol.2, P.No.64, I.No.9.36Providing flooring with 25mm thick polished Cuddapah slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab , including cost of materials, labour, curing, polishing complete as per specifications. (Vol.2, P.No.64, I.No.9.36) ---- including cost of all materials, labor ,HOM,lSqm2044.352044.352.97FalseNoneNoneFalseNoneFalse6071.71950
3294609114612NoneVol.2, P.No.47, I.No.8.33.3Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (Vol.2, P.No.47, I.No.8.33.3) ---- including cost of all materials, labor ,HOM,lSqm172.22172.224.32FalseNoneNoneFalseNoneFalse743.99040
3294610114612NoneVol.2, P.No.46, I.No.8.33.2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge (Vol.2, P.No.46, I.No.8.33.2) ---- including cost of all materials, labor ,HOM,lSqm170.98170.988.07FalseNoneNoneFalseNoneFalse1379.80860
3294611114612NoneVol.2, P.No.46, I.No.8.30Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.30) ---- including cost of all materials, labor ,HOM,lSqm215.59215.59192.44FalseNoneNoneFalseNoneFalse41488.13960
3294612114612NoneVol.2, P.No.46, I.No.8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Vol.2, P.No.46, I.No.8.33.1) ---- including cost of all materials, labor ,HOM,lSqm195.76195.76124.23FalseNoneNoneFalseNoneFalse24319.26480
3294613114612NoneVol.2,P. No.105, I.No.12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.(Vol.2,P. No.105, I.No.12.51) ---- including cost of all materials, labor ,HOM,lNos1258.821258.822.0FalseNoneNoneFalseNoneFalse2517.640
3294614114612NoneVol.5,P.No.125,I.No.13.48Providing and fixing on the wall face unplastisized rigid PVC rain water pipes confirmimg to IS:13592 Type A including jointing with seal ring confirmimg to IS:5382, leaving 10mm gap for thermal expansion, single socketed pipes 100mm diameter. ( Vol.5,P.No.125,I.No.13.48) ---- including cost of all materials, labor ,HOM,lm360.55360.558.0FalseNoneNoneFalseNoneFalse2884.40
3294615114612NoneVol.2, P.No.84, I.No.11.26.1Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge. (Vol.2, P.No.84, I.No.11.26.1) ---- including cost of all materials, labor ,HOM,lKgs170.98170.98162.5FalseNoneNoneFalseNoneFalse27784.250
3294616114612NoneVol.2, P.No.149, I.No.15.1Polyurethane based Single Component for New Surface: Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (Vol.2, P.No.149, I.No.15.1) ---- including cost of all materials, labor ,HOM,lSqm1012.261012.2659.55FalseNoneNoneFalseNoneFalse60280.0830
3294617114612NoneQuotation rateProviding and fixing Green board for class room (Quotation rate) ---- including cost of all materials, labor ,HOM,lEach9600.489600.482.0FalseNoneNoneFalseNoneFalse19200.960
3294618114612NoneVol.2, P.No.200, I.No.20.34.1Providing and fixing chromium plated brass butt hinges with necessary chromium plated brass screws etc. complete.125x70x4 mm (ordinary type) (Vol.2, P.No.200, I.No.20.34.1) ---- including cost of all materials, labor ,HOM,lNo210.63210.634.0FalseNoneNoneFalseNoneFalse842.520
3294619114612NoneVol.2, P.No.A-25, S.No.444Hold fasts (Vol.2, P.No.A-25, S.No.444) ---- including cost of all materials, labor ,HOM,lNos59.059.06.0FalseNoneNoneFalseNoneFalse354.00
3294620114612NoneVol.2, P.No.107, I.No.12.73.1Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete 125mm (Vol.2, P.No.107, I.No.12.73.1) ---- including cost of all materials, labor ,HOM,lNo54.5254.522.0FalseNoneNoneFalseNoneFalse109.040
3294621114612NoneVol.2, P.No.105, I.No.12.60Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete.(Vol.2, P.No.105, I.No.12.60) ---- including cost of all materials, labor ,HOM,lNo1303.431303.431.0FalseNoneNoneFalseNoneFalse1303.430
3294622114612NoneVol.2, P.No.107, I.No.12.63Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868) transparent or dyed to required colour or shade, with necessary screws etc. complete (Vol.2, P.No.107, I.No.12.63) ---- including cost of all materials, labor ,HOM,lNos161.07161.072.0FalseNoneNoneFalseNoneFalse322.140
3294623114612NoneVolume 2 Page No 64 Item No. 9.30Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent ---- including cost of all materials, labor ,HOM,lSqm6601.396601.3918.04FalseNoneNoneFalseNoneFalse119089.07560
3294624114612NoneSR 2018-19 P.No. 272 I.No. 37.63.2Providing two bulb underreemed pile foundation upto maximum 5m depth including hire charges of machineries digging the pile holes, labour charges and laying 20mm and down size jelly RCC M 20 keeping the reinforcement edge cutting etc., complete as per specifications. - - 30 cm dia - including cost of all materials, labour,HOM,l & UL, curing with all leads and lifts etc. complete as per specifications & as directed by Engineer-in-charge of the work. ---- including cost of all materials, labor ,HOM,lCum1862.441862.4460.0FalseNoneNoneFalseNoneFalse111746.40
3294625114612NoneVolume 2 Page No 84 Item No 11.31Providing and fixing angle iron frames for doors, windows and ventilators of mild steel Angle sections of size 35x35x5 mm, joints mitred and welded by angle iron 35x35x5 mm or 35x 5 mm flat pieces to the existing T-iron frame or to the wall with dash fastener, including fixing of necessary butt hinges and screws and applying a priming coat of approved steel primer, all complete as per the direction of Engineer-Incharge including cost of materials, labour, usage charges of machinery complete as per specifications ---- including cost of all materials, labor ,HOM,lKg142.49142.4921.6FalseNoneNoneFalseNoneFalse3077.7840
3294626114612NoneVolume 2 Page No 84 Item No 11.30.1)Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- including cost of all materials, labor ,HOM,lSqm1129.971129.972.16FalseNoneNoneFalseNoneFalse2440.73520
3294627114612NoneVolume 2 Page No 69 Item No. 10.2)Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. ---- including cost of all materials, labor ,HOM,lm406.39406.3925.8FalseNoneNoneFalseNoneFalse10484.8620
17184471370000NoneNoneBuildingsFurnitures Chair5392.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3294628114613NoneKSFIC.DWD 071Peacock Chair : (Standard company) Seat, and Back half cushion with Cloth or Rexin. ---- including cost of all materials, labor ,HOM,lNo5392.65392.61.0FalseNoneNoneFalseNoneFalse5392.60
17184471370000NoneNoneBuildingsELECTRICAL ESTIMATE52487.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3294629114614None1.8.2Supplying and fixing of PVC casing and capping on the wall or ceilingusing necessary materials like bends, junction box, elbows, screws at an interval of 300 mm as required. ---- including cost of all materials, labor ,HOM,lMtr41.341.380.0FalseNoneNoneFalseNoneFalse3304.00
3294630114614None1.6.5Supplying and flush mounting teak wooden box without front plank, made of not less than 12 mm thick wood, after due groove cutting, finishing with necessary cement plastering complete ---- including cost of all materials, labor ,HOM,lEach87.3287.328.0FalseNoneNoneFalseNoneFalse698.560
3294631114614None2.1.2Point wiring using Copper wire with switch: Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- including cost of all materials, labor ,HOM,lPoint464.92464.924.0FalseNoneNoneFalseNoneFalse1859.680
3294632114614None2.1.3Long point above 6Mtr upto 10Mtr from tapping point to out let via switch ---- including cost of all materials, labor ,HOM,lPoint672.6672.64.0FalseNoneNoneFalseNoneFalse2690.40
3294633114614None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010.1.5MSQM ---- including cost of all materials, labor ,HOM,lMtr30.6830.68125.0FalseNoneNoneFalseNoneFalse3835.00
3294634114614None2.3.3Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010.2.5MSQM ---- including cost of all materials, labor ,HOM,lMtr49.5649.5615.0FalseNoneNoneFalseNoneFalse743.40
3294635114614None2.3.4Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010.4MSQM ---- including cost of all materials, labor ,HOM,lMtr74.3474.3475.0FalseNoneNoneFalseNoneFalse5575.50
3294636114614None3.4.1Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.1.2 WAY ---- including cost of all materials, labor ,HOM,lEach162.84162.843.0FalseNoneNoneFalseNoneFalse488.520
3294637114614None3.4.5Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 WAY ---- including cost of all materials, labor ,HOM,lMtr307.98307.981.0FalseNoneNoneFalseNoneFalse307.980
3294638114614None3.4.6Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 10-12 WAY ---- including cost of all materials, labor ,HOM,lEach376.42376.425.0FalseNoneNoneFalseNoneFalse1882.10
3294639114614None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 1 TO 2 MODULE ---- including cost of all materials, labor ,HOM,lEach161.66161.663.0FalseNoneNoneFalseNoneFalse484.980
3294640114614None3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.8 MOUDULE ---- including cost of all materials, labor ,HOM,lEach335.12335.121.0FalseNoneNoneFalseNoneFalse335.120
3294641114614None3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 10-12 MOUDULE ---- including cost of all materials, labor ,HOM,lEach405.92405.922.0FalseNoneNoneFalseNoneFalse811.840
3294642114614None3.6.1Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6A one way switch ---- including cost of all materials, labor ,HOM,lEach120.36120.3616.0FalseNoneNoneFalseNoneFalse1925.760
3294643114614None3.6.4Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. stepped fan regulator two moudule ---- including cost of all materials, labor ,HOM,lEach421.26421.262.0FalseNoneNoneFalseNoneFalse842.520
3294644114614None3.6.7Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.16A one way switch ---- including cost of all materials, labor ,HOM,lEach212.4212.46.0FalseNoneNoneFalseNoneFalse1274.40
3294645114614None3.6.9Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.32A DP switch ---- including cost of all materials, labor ,HOM,lEach384.68384.682.0FalseNoneNoneFalseNoneFalse769.360
3294646114614None3.6.10Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6/16A universal socket ---- including cost of all materials, labor ,HOM,lEach278.48278.484.0FalseNoneNoneFalseNoneFalse1113.920
3294647114614None3.6.3Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293 6 threeway socket ---- including cost of all materials, labor ,HOM,lEach201.78201.784.0FalseNoneNoneFalseNoneFalse807.120
3294648114614None11.3.2Supplying of .feet -PVC Batten with integrated LED tube W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED LIGHT FITTING ---- including cost of all materials, labor ,HOM,lEach814.2814.28.0FalseNoneNoneFalseNoneFalse6513.60
3294649114614None5.7.2Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 32AMPS ---- including cost of all materials, labor ,HOM,lEach284.38284.381.0FalseNoneNoneFalseNoneFalse284.380
3294650114614None5.18.1Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 a SP ---- including cost of all materials, labor ,HOM,lEach489.7489.71.0FalseNoneNoneFalseNoneFalse489.70
3294651114614None5.18.4Supplying & fixing miniature circuit breakers on existing MCBdistribution boards using necessary fixing materials and 'C' Typecurve, indicator ON/OFF, energy cross-3 with Short circuit breakingcapacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP ---- including cost of all materials, labor ,HOM,lEach872.0872.01.0FalseNoneNoneFalseNoneFalse872.00
3294652114614None5.19.6Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. II Double door ---- including cost of all materials, labor ,HOM,lEach1798.31798.31.0FalseNoneNoneFalseNoneFalse1798.30
3294653114614None12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia. ---- including cost of all materials, labor ,HOM,lNo4141.84141.81.0FalseNoneNoneFalseNoneFalse4141.80
3294654114614None6.3.2Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 56 sweep(1400mm) Regular ---- including cost of all materials, labor ,HOM,lEach3576.63576.62.0FalseNoneNoneFalseNoneFalse7153.20
3294655114614None5.6.1Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 8*6*1.5 ---- including cost of all materials, labor ,HOM,lEach102.7102.71.0FalseNoneNoneFalseNoneFalse102.70
3294656114614None5.6.4Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 12*12*2 ---- including cost of all materials, labor ,HOM,lEach213.6213.61.0FalseNoneNoneFalseNoneFalse213.60
3294657114614None13.7.1Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. on wall/ceiling/Rafter ---- including cost of all materials, labor ,HOM,lEach144.0144.05.0FalseNoneNoneFalseNoneFalse720.00
3294658114614None13.1Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing S hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- including cost of all materials, labor ,HOM,lEach201.8201.82.0FalseNoneNoneFalseNoneFalse403.60
3294659114614None1.9.1Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely. 20mm ---- including cost of all materials, labor ,HOM,lMtr22.422.42.0FalseNoneNoneFalseNoneFalse44.80
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17184471380000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17184471380000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17184471380001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17184471380000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17184471380000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17184471380001NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17184471380001NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17184471380001NoneNoneELIGIBILITYAs per karnataka state government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Govt letter No.PW/134/BMS /2007/dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17184471380001NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17184471380001NoneNoneELIGIBILITYAll the documents to be uploaded shall be neatly scanned and the documents scanned shall be in original.None
17184476930000NoneNoneELIGIBILITYAny discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected.None
17184477050000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner. ( section 3 & 4 of the bid document ) and shall be uploaded properly, signed by Tenderer . Necessary Certificates shall be uploaded along with the formats wherever required. General documents Section can be used for this purpose.None
17184477160000NoneNoneELIGIBILITYEarnest Money Deposit will have to be in any one of the forms as per the instructions in the financial bid document and shall have to be valid for 45 days beyond the validity of the tender.None
17184477320000NoneNoneELIGIBILITYTenderers are requested to read the Bid Documents before submission of their bid.None
17184477450000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17184477550000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17184477670000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing KPPP Portal.None
17184477820000NoneNoneELIGIBILITYThe Employer reserves the rights reject one or all tender without assigning any reasons.None
17184477960000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWD Division Chikodi during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17184478090000NoneNoneELIGIBILITYThe Tenderer are should be present during opening of the tender and also submit the uploaded documents duly attested by the Gazetted Officer not below the Rank of Executive Engineer.None
17184478220000NoneNoneELIGIBILITYContractors should Registered in KPWD and copy should be uploaded in KPPP Attested by the Gazzeted officers not below the rank of Executive Engineer.None
17184478520000NoneNoneELIGIBILITYThe Increase in G.S.T shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17184478730000NoneNoneELIGIBILITYWork Completion/Execution Period : 3 months Including Mansoon.None
17184478940000NoneNoneELIGIBILITYThe Project Completion period is 3 months and the Tenderer should maintain work during the defect liability period, which is (1) One year after successful completion of the work.None
17184486030000NoneNoneELIGIBILITYDifference amount should submit at the time of Agreement.None
17184486150000NoneNoneELIGIBILITYFinancial turover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25 in the Technical Qualification Criteria mentioned in the next sectionNone
17184486240000NoneNoneELIGIBILITYIf no bid received auto extension will be done by KPPP Portal itself for 2 daysNone
17184486300000NoneNoneELIGIBILITYThe cost of steel reinforcement & formwork shall be paid separately for concrete items onlyNone
17184486370000NoneNoneELIGIBILITYUnique Document Identification Number (UDIN) form practicing Chartered Account is preferredNone
17184486860000NoneNoneELIGIBILITYThe Tenderer shall achieved in at least two financial years an average annual financial turnover from financial year 2019-20 to 2023-24 of Rs.17.10 Lakhs (not less than the estimated cost under this contract)None
17184487170000NoneNoneELIGIBILITYThe Tenderer shall obtain similar the workdone certificate from financial year 2019-20 to 2023-24 (50% of the Amount Put to Tender i.e., Rs.8.55 Lakhs) in the prescribed format from the Competent Authority not below the rank of Executive Engineer(District Level Officer)and scan the Original Certificate and attach the scanned file to the Bid.None
17184487290000NoneNoneELIGIBILITYThe EMD of Rs.43,000.00/- shall be paid in full through e-payment in favour of Executive Engineer, PWD, Chikodi Dn, ChikodiNone
17184508570000NoneNoneELIGIBILITYThe items quoted shall include cost of Royalty charges on constructive materials and other taxes (including GST)as per the rates prevailing Govt Orders at the time of execution and including all the cost and conveyance of all materials, curing, loading and unloading with all lead and lifts, labour, hire charges of machinary and equipments, etc., complete and all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17184509310001NoneNoneELIGIBILITYThe items Rates are inclusive of GSTNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors KPWD Civil Registration CertificateTrueTechnical Bid
Annual Turn Over Certificate from 2019-20 to 2023-24TrueTechnical Bid
Similar Financial Work Done Certificate 50percentage of APTTrueTechnical Bid
Ongoing work detailsTrueTechnical Bid
GST RegistratationTrueTechnical Bid
Any other related documentsTrueTechnical Bid
UDIN form practicing Chartered Account is preferredTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone