createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1718277522981
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2700.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-06-2024 17:00:00
tenderQueryClose24-06-2024 16:00:00
technicalBidOpen27-06-2024 17:00:01
publishedDate15-06-2024 16:53:24
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls1
preBidMeetingDate21-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnTrue
emdBankGuarantee100000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1718277523039
version6
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT10733
titleConstruction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud
descriptionConstruction of New KarnatakaKGBV TYPE-I Dormitory at 18th Cross, RP Road,Nanjangud
categoryWORKS
categoryTextWorks
ecv10796776.90
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount10800000.0
groupOverheadTotal0.0
fileNumberPWD/DOR/KGBV/23-24/NANJANGUD
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud8831521.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285554114128NoneP.No.8I.No.1.12 PWDSR2023-24V-1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depthnot exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth P.No.8 & I.No.1.12 PWD SR 2023-24V-1 & As Directed by engineer in charge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum115.46115.46121.0FalseNoneNoneFalseNoneFalse13970.660
3285555114128NoneP.No.8 & I.No.1.14.1 PWD SR 2023-24V-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m P.No.8 & I.No.1.14.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.47123.47321.95FalseNoneNoneFalseNoneFalse39751.16650
3285556114128NoneP.No.5 & I.No.4.1 PWD SR 2023-24V-2Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. Lindane 20% E.C. @ 3.19 lm2 including cost of chemical, diluting in water to one percent concentration, P.No.5 & I.No.4.1 PWD SR 2023-24V-2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm143.42143.42336.0FalseNoneNoneFalseNoneFalse48189.120
3285557114128NoneP.No.6 & I.No.1.15.2 PWD SR 2023-24V-1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. Depth exceeding 1.5 m, but not exceeding 3 m P.No.6 & I.No.1.15.2 PWD SR 2023-24V-1 & As Directed by engineer in charge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum516.55516.5547.63FalseNoneNoneFalseNoneFalse24603.27650
3285558114128NonePage No.15, Item No.2.1.2 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates Page No.15, Item No.2.1.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6884.026884.0265.79FalseNoneNoneFalseNoneFalse452899.67580
3285559114128NonePage No.9, Item No.5.4 PWD SR 2023-24V2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Page No.9, Item No.5.4 PWD SR 2023-24V2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7765.197765.1981.46FalseNoneNoneFalseNoneFalse632552.37740
3285560114128NonePage No.44, Item No.8.19.1 PWD SR 2023-24V2Providing Flush Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. Page No.44, Item No.8.19.1 PWD SR 2023-24V2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm309.93309.9368.42FalseNoneNoneFalseNoneFalse21205.41060
3285561114128NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Foundation works. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7641.217641.2154.8FalseNoneNoneFalseNoneFalse418738.3080
3285562114128NonePage No.07, Item No.1.9 PWD SR 2023-24V-1Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Page No.07, Item No.1.9 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum323.3323.3321.95FalseNoneNoneFalseNoneFalse104086.4350
3285563114128NonePage No.07, Item No.1.11 PWD SR 2023-24V-1Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Page No.07, Item No.1.11 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum526.27526.27184.49FalseNoneNoneFalseNoneFalse97091.55230
3285564114128NonePage No.16, Item No.2.4.3 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Page No.16, Item No.2.4.3 PWD SR 2023-24V-1) & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7700.777700.773.73FalseNoneNoneFalseNoneFalse28723.87210
3285565114128NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The anitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8316.988316.9896.06FalseNoneNoneFalseNoneFalse798929.09880
3285566114128NonePage No.16, Item No.2.5.1 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codesmachine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.1 PWD SR 2023-24V-1Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8058.18058.16.28FalseNoneNoneFalseNoneFalse50604.8680
3285567114128NonePage No.18, Item No.2.11.a PWD SR 2023-24V-1Supplying, fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials, achinery, labour, cleaning, straightening, cutting, bending, hooking, lapingwelding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 2023-24V-1) & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne108726.03108726.0316.26FalseNoneNoneFalseNoneFalse1767885.24780
3285568114128NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for sub structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge Column Footing For Formwork 8% Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 Qty same as vide item no.8 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum611.3611.354.8FalseNoneNoneFalseNoneFalse33499.240
3285569114128NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for sub structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge : Plinth Beam For Formwork 50% Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3820.63820.620.32FalseNoneNoneFalseNoneFalse77634.5920
3285570114128NonePage No.16, Item No.2.5.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :chejja Page No.16, Item No.2.5.1 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3626.143626.141.84FalseNoneNoneFalseNoneFalse6672.09760
3285571114128NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :columns For Formwork 70% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5821.885821.8813.41FalseNoneNoneFalseNoneFalse78071.41080
3285572114128NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :lintels and beams For Formwork 60% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4990.194990.1924.85FalseNoneNoneFalseNoneFalse124006.22150
3285573114128NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall b e carried out as per technical detailed specifications and as per directons of engineer in charge :staircase For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4158.494158.494.49FalseNoneNoneFalseNoneFalse18671.62010
3285574114128NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4158.494158.4933.89FalseNoneNoneFalseNoneFalse140931.22610
3285575114128NonePage No 14 Item No.6.8 PWD SR 2023-24V-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of Page No 14 Item No.6.8 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9685.529685.5294.42FalseNoneNoneFalseNoneFalse914506.79840
3285576114128NonePage No 14 Item No.6.15 PWD SR 2023-24V-2Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Page No 14 Item No.6.15 PWD SR 2023-24,V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum1255.511255.5170.11FalseNoneNoneFalseNoneFalse88023.80610
3285577114128NonePage No 43 Item No.8.10 PWD SR 2023-24V-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Page No 43 Item No.8.10 PWD SR 2023-24V-2 , Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm256.45256.45268.18FalseNoneNoneFalseNoneFalse68774.7610
3285578114128NonePage No 43 Item No.8.16.2 PWD SR 2023-24V-2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gm2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment .Plaster mesh 150mm wide Page No 43 Item No.8.16.2 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m46.1946.19360.0FalseNoneNoneFalseNoneFalse16628.40
3285579114128NonePage No 41 Item No.8.1.1 PWD SR 2023-24V-2Providing 12 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Page No 41 Item No.8.1.1 PWD SR 2023-24V-2 , Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm309.93309.93566.93FalseNoneNoneFalseNoneFalse175708.61490
3285580114128NonePage No 44 Item No.8.21 PWD SR 2023-24V-2Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Page No 44 Item No.8.21 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm31.631.6835.11FalseNoneNoneFalseNoneFalse26389.4760
3285581114128NonePage No 41 Item No.8.2.2 PWD SR 2023-24V2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Page No 41 Item No.8.2.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm339.1339.1619.5FalseNoneNoneFalseNoneFalse210072.450
3285582114128NonePage No 51 Item No.8.55.2 PWD SR 2023-24V2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 gL as per specifications and as per directions of Engineer in charge. Page No 51 Item No.8.55.2 PWD SR 2023-24V2,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm64.4264.42566.93FalseNoneNoneFalseNoneFalse36521.63060
3285583114128NonePage No 50 Item No.8.54.2 PWD SR 2023-24V2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 gL of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Page No 50 Item No.8.54.2 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm133.69133.69449.51FalseNoneNoneFalseNoneFalse60094.99190
3285584114128NonePage No 46 Item No.8.30 PWD SR 2023-24V2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L10 m² over and including priming coat of exterior primer applied @ 2.20 kg10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Page No 46 Item No.8.30 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.48211.48619.5FalseNoneNoneFalseNoneFalse131011.860
3285585114128NonePage No 84 Item No11.25.2 PWD SR 2023-24V2Providing and fixing Steel work welded in built up sections framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. Page No 84 Item No11.25.2 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg165.29165.29196.68FalseNoneNoneFalseNoneFalse32509.23720
3285586114128NonePage No 100 Item No 12.13.2 PWD SR 2023-24V2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Page No 100 Item No 12.13.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum121053.84121053.842.12FalseNoneNoneFalseNoneFalse256634.14080
3285587114128NonePage No 112 Item No 12.94.1 PWD SR 2023-24V2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powderrice huskwheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kgm3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 Nmm2 , modulus of elasticity 850 Nmm2 and resistance to spread of flame of Class A category with property of being termiteborer proof, watermoisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Page No 112 Item No 12.94.1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4235.674235.6741.28FalseNoneNoneFalseNoneFalse174848.45760
3285588114128NonePage No 104 Item No 12.51 PWD SR 2023-24V2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Page No 104 Item No 12.51 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1234.851234.8516.0FalseNoneNoneFalseNoneFalse19757.60
3285589114128NonePage No 47 Item No 8.34.1 PWD SR 2023-24V2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Page No 47 Item No 8.34.1 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm64.4264.42159.3FalseNoneNoneFalseNoneFalse10262.1060
3285590114128NonePage No 46 Item No 8.33.2 PWD SR 2023-24V2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L10 m² over an under coat of primer applied @0.75 L10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Page No 46 Item No 8.33.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm167.73167.73159.3FalseNoneNoneFalseNoneFalse26719.3890
3285591114128NonePage No 86 Item No 11.34.B PWD SR 2023-24V2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc.Page No 86 Item No 11.34.B PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg222.42222.42884.52FalseNoneNoneFalseNoneFalse196734.93840
3285592114128NonePage No 103 Item No 12.42 PWD SR 2023-24V2Providing and fixing in position windows half paneled shutters at bottom and half glazed at top for window shutters with Honne wood stiles and rails of 30mm. thick, 75mm wide in two halves with panels filled with MDF of 18mm thick, 3mm thick reeded glass for top panels fixed with wooden beading including cost of materials, labour charges, usage charges complete as per specifications. excluding cost of fixtures Page No 103 Item No 12.42 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6215.566215.5632.4FalseNoneNoneFalseNoneFalse201384.1440
3285593114128NonePage No 103 Item No 12.49 PWD SR 2023-24V2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per pecifications.excluding cost of fixtures Page No 103 Item No 12.49 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm7928.057928.059.72FalseNoneNoneFalseNoneFalse77060.6460
3285594114128NonePage No 64 Item No 9.30 PWD SR 2023-24V2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. Page No 64 Item No 9.30 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6475.656475.6537.59FalseNoneNoneFalseNoneFalse243419.68350
3285595114128NonePage No 61 Item No 9.17.5 PWD SR 2023-24V2Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x1200 mm Page No 61 Item No 9.17.5 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1633.51633.5165.72FalseNoneNoneFalseNoneFalse270703.620
3285596114128NonePage No 60 Item No 9.9 PWD SR 2023-24V2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kgm2 including pointing the joints with white cement and matching pigment etc., complete. Page No 60 Item No 9.9 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1307.771307.7752.47FalseNoneNoneFalseNoneFalse68618.69190
3285597114128NonePage No 65 Item No 9.39 PWD SR 2023-24V2Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Page No 65 Item No 9.39 PWD SR 2023-24V2 and as per directions of Engineer-in-charge,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1761.111761.11117.42FalseNoneNoneFalseNoneFalse206789.53620
3285598114128NonePage No 107 Item No 12.74.1 PWD SR 2023-24V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 125x64x1.90mm Page No 107 Item No 12.74.1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each123.97123.9764.0FalseNoneNoneFalseNoneFalse7934.080
3285599114128NonePage No 107 Item No 12.74.3 PWD SR 2023-24V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 75x47x1.80mm Page No 107 Item No 12.74.3 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each87.5187.5154.0FalseNoneNoneFalseNoneFalse4725.540
3285600114128NonePage No 105 Item No 12.62 PWD SR 2023-24V2Providing and fixing chromium plated brass handles of 100125 mm with necessary screws etc. complete Page No 105 Item No 12.62,PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each288.05288.0528.0FalseNoneNoneFalseNoneFalse8065.40
3285601114128NonePage No 107 Item No 12.76.3 PWD SR 2023-24V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :150*10 mm Page No 107 Item No 12.76.3 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each351.25351.2530.0FalseNoneNoneFalseNoneFalse10537.50
3285602114128NonePage No 107 Item No 12.76.4 PWD SR 2023-24V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :100*10 mm Page No 107 Item No 12.76.4 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each239.43239.4324.0FalseNoneNoneFalseNoneFalse5746.320
3285603114128NonePage No 218 Item No 22.15.3 PWD SR 2023-24V2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 200 mm Page No 218 Item No 22.15.3 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each364.62364.6216.0FalseNoneNoneFalseNoneFalse5833.920
3285604114128NonePage No149, Item No 15.1,PWD SR 2023-24V2Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terraceChajjasSunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kgm2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 gm2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. Page No.149, Item No15,1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum992.98992.98225.95FalseNoneNoneFalseNoneFalse224363.8310
3285605114128NonePage No 77 Item No 11.3 PWD SR 2023-24V2Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Page No 77 Item No 11.3 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm10058.6510058.657.2FalseNoneNoneFalseNoneFalse72422.280
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangudfirst floor440658.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285606114129NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The anite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8400.158400.157.99FalseNoneNoneFalseNoneFalse67117.19850
3285607114129NonePage No.18, Item No.2.11.a PWD SR 202324-V1Supplying, fitting and placing TMT FE 550 - 550D Steel Reinforcement including cost of all materials, achinery, labour, cleaning, straightening, cutting, bending, hooking, laping-welding joints, tying with binding wire - soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 202324-V1) & As Directed by engineer incharge., Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne109813.3109813.31.06FalseNoneNoneFalseNoneFalse116402.0980
3285608114129NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :columns For Formwork 70% Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5880.115880.112.48FalseNoneNoneFalseNoneFalse14582.67280
3285609114129NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :lintels and beams For Formwork 60% Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5040.095040.092.64FalseNoneNoneFalseNoneFalse13305.83760
3285610114129NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 202324-V1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4200.084200.082.87FalseNoneNoneFalseNoneFalse12054.22960
3285611114129NonePage No 14 Item No.6.8 PWD SR 202324-V2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of Page No 14 Item No.6.8 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9782.389782.3811.25FalseNoneNoneFalseNoneFalse110051.7750
3285612114129NonePage No 43 Item No.8.10 PWD SR 202324-V2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface - ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge.Page No 43 Item No.8.10 PWD SR 202324-V2,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm259.01259.0114.95FalseNoneNoneFalseNoneFalse3872.19950
3285613114129NonePage No 43 Item No.8.16.2 PWD SR 202324-V2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g-m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment .Plaster mesh 150mm wide Page No 43 Item No.8.16.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m46.6546.6572.0FalseNoneNoneFalseNoneFalse3358.80
3285614114129NonePage No 41 Item No.8.1.1 PWD SR 202324-V2Providing 12 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge. Page No 41 Item No.8.1.1 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm313.03313.0360.7FalseNoneNoneFalseNoneFalse19000.9210
3285615114129NonePage No 44 Item No.8.21 PWD SR 202324-V2Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineerincharge. Page No 44 Item No.8.21 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm31.9231.9275.65FalseNoneNoneFalseNoneFalse2414.7480
3285616114129NonePage No 41 Item No.8.2.2 PWD SR 202324-V2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge. Page No 41 Item No.8.2.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm342.49342.4965.87FalseNoneNoneFalseNoneFalse22559.81630
3285617114129NonePage No 51 Item No.8.55.2 PWD SR 202324-V2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g-L as per specifications and as per directions of Engineer in charge. Page No 51 Item No.8.55.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm65.0665.0660.7FalseNoneNoneFalseNoneFalse3949.1420
3285618114129NonePage No 50 Item No.8.54.2 PWD SR 202324-V2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g-L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Page No 50 Item No.8.54.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm135.03135.0360.7FalseNoneNoneFalseNoneFalse8196.3210
3285619114129NonePage No 46 Item No.8.30 PWD SR 202324-V2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L-10 m² over and including priming coat of exterior primer applied @ 2.20 kg-10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineerincharge. Page No 46 Item No.8.30 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm213.59213.5965.87FalseNoneNoneFalseNoneFalse14069.17330
3285620114129NonePage No 100 Item No 12.13.2 PWD SR 202324-V2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Page No 100 Item No 12.13.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum122264.37122264.370.11FalseNoneNoneFalseNoneFalse13449.08070
3285621114129NonePage No 112 Item No 12.94.1 PWD SR 202324-V2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 5860 (Suspension Grade), calcium carbonate and natural fibers (wood powder-rice husk-wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg-m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N-mm2 , modulus of elasticity 850 N-mm2 and resistance to spread of flame of Class A category with property of being termite-borer proof, water-moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Page No 112 Item No 12.94.1 PWD SR 202324-V2 and as per directions of Engineerincharge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4278.034278.032.88FalseNoneNoneFalseNoneFalse12320.72640
3285622114129NonePage No 104 Item No 12.51 PWD SR 202324-V2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Page No 104 Item No 12.51 PWD SR 202324-V2 and as per directions of Engineer incharge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1247.191247.191.0FalseNoneNoneFalseNoneFalse1247.190
3285623114129NonePage No 47 Item No 8.34.1 PWD SR 202324-V2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineerincharge.Page No 47 Item No 8.34.1 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm65.0665.063.9FalseNoneNoneFalseNoneFalse253.7340
3285624114129NonePage No 46 Item No 8.33.2 PWD SR 202324-V2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L-10 m² over an under coat of primer applied @0.75 L-10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineerincharge.Page No 46 Item No 8.33.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm169.4169.43.9FalseNoneNoneFalseNoneFalse660.660
3285625114129NonePage No 107 Item No 12.74.1 PWD SR 202324-V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 125x64x1.90mm Page No 107 Item No 12.74.1 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each125.21125.214.0FalseNoneNoneFalseNoneFalse500.840
3285626114129NonePage No 107 Item No 12.74.3 PWD SR 202324-V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 75x47x1.80mm Page No 107 Item No 12.74.3 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each290.93290.932.0FalseNoneNoneFalseNoneFalse581.860
3285627114129NonePage No 107 Item No 12.76.3 PWD SR 202324-V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :150*10 mm Page No 107 Item No 12.76.3 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each354.76354.762.0FalseNoneNoneFalseNoneFalse709.520
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud watersupply149769.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285628114130NonePage No 122 Item No.13.32.3 PWD SR 2023-24-V2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 25 mm nominal dia pipes Page No 122 Item No.13.32.3 PWD SR 2023-24/V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m579.74579.74150.0FalseNoneNoneFalseNoneFalse86961.00
3285629114130NonePage No.122 Item No 13.32.2 PWD SR 2023-24-V2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes ( Page No122 Item No.13.32.2 PWD SR 2023-24/V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m460.63460.6370.0FalseNoneNoneFalseNoneFalse32244.10
3285630114130NonePage No 117 Item No.13.5.3 PWD SR 2023-24-V2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore, ( Page No 117 Item No.13.5.3 PWD SR 2023-24/V2)as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each403.51403.513.0FalseNoneNoneFalseNoneFalse1210.530
3285631114130NonePage No 115 Item No.13.2.2 PWD SR 2023-24-V2Providing and fixing brass bib cock of approved quality :20 mm nominal bore ( Page No 115 Item No.13.2.2 PWD SR 2023-24/V2),as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each370.7370.720.0FalseNoneNoneFalseNoneFalse7414.00
3285632114130NonePage No123 Item No.13.34 PWD SR 2023-24-V2Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.as per direction of Engineer in Charge' Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Ltr10.9710.972000.0FalseNoneNoneFalseNoneFalse21940.00
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud -sanitary300370.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285633114131NonePage No 114 Item No 10.2.4 PWD SR 2023-24-V5Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for:Pipes of SN4, 160mm diaPage No 114 Item No 10.2.4 PWD SR 2023-24-V5 As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr700.07700.07120.0FalseNoneNoneFalseNoneFalse84008.40
3285634114131NonePage No.43, Item No.10.1.7 2023-24 pwd SR-V5Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 110mm dia., 6 kg-sqcm & class 3Page No.43, Item No.10.1.7 2023-24 SR-V-5) As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr499.53499.5350.0FalseNoneNoneFalseNoneFalse24976.50
3285635114131NonePage No 114 Item No 10.2.1 PWD SR 2023-24-V5 Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for:Pipes of SN4, 75 mm diaPage No 114 Item No 10.2.1 PWD SR 2023-24-V5 As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr263.74263.7430.0FalseNoneNoneFalseNoneFalse7912.20
3285636114131NonePageNo 191 Item No 16.9 PWD SR 2023-24-V5Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover Page No 191 Item No 16.9 PWD SR 2023-24-V5 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos.6628.796628.798.0FalseNoneNoneFalseNoneFalse53030.320
3285637114131NonePage No 85 Item No 7.3 PWD SR 2023-24-V5Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. Page No 85 Item No 7.3 PWD SR 2023-24-V5, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos2600.962600.968.0FalseNoneNoneFalseNoneFalse20807.680
3285638114131NonePage No 123 Item No 13.38 PWD SR 2023-24-V2Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber 100mm x 100mm size P type with Non Modular common burnt clay bricks of designation 3.5& water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design:Page No 123 Item No 13.38 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos3077.993077.997.0FalseNoneNoneFalseNoneFalse21545.930
3285639114131NonePage No 43 Item No.8.10 PWD SR 202324-V2Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing. 150 mm dia. pipes Page No 187 Item No 16.1.2 PWD SR 2023-24, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr706.15706.1530.0FalseNoneNoneFalseNoneFalse21184.50
3285640114131NonePage No 126 Item No 13.52 PWD SR 2023-24-V2)Constructing brick masonry manhole in cement mortar 1:4 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) With common burnt clay (non modular) bricks of class designation 3.5 Page No 126 Item No 13.52 PWD SR 2023-24-V2)as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos12841.9212841.921.0FalseNoneNoneFalseNoneFalse12841.920
3285641114131NonePage No 131 Item No 14.1.1 PWD SR 2023-24-V2Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Page No 131 Item No 14.1.1 PWD SR 2023-24-V2), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5936.015936.013.0FalseNoneNoneFalseNoneFalse17808.030
3285642114131NonePage No 131 Item No 14.3.1 PWD SR 2023-24-V2Providing and fixing white vitreous china pedestal type water closet European type with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lidPage No 131 Item No 14.3.1 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each7264.457264.452.0FalseNoneNoneFalseNoneFalse14528.90
3285643114131NonePage No 132 Item No 14.7.1 PWD SR 2023-24-V2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar tapsPage No 132 Item No 14.7.1 PWD SR 2023-24-V2), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit3745.863745.862.0FalseNoneNoneFalseNoneFalse7491.720
3285644114131NonePage No 136 Item No 14.32.4 PWD SR 2023-24-V2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 1500x450 mm( Page No 136 Item No 14.32.4 PWD SR 2023-24/V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit2097.782097.782.0FalseNoneNoneFalseNoneFalse4195.560
3285645114131NonePage No 127 Item No 13.59 PWD SR 2023-24-V2Providing and fixing PVC (S.W.R) Nahani Trap 10cms x 10cms with all fitting arrangements & all necessary accessories complete Page No 127 Item No 13.59 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit267.39267.3915.0FalseNoneNoneFalseNoneFalse4010.850
3285646114131NonePage No 137 Item No 14.40.2 PWD SR 2023-24-V2Providing and fixing PTMT towel rail complete with brackets fixed towooden cleats with CP brass screws with concealed fittings arrangementof approved quality and colour.600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. Page No 137 Item No 14.40.2 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit602.84602.8410.0FalseNoneNoneFalseNoneFalse6028.40
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud BOREWELL-417371.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285647114132NonePageNo140 Item No.12.4 PWDSR 2023-24-V5Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete. ( Page No 140 Item No.12.4 PWD 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5446.645446.642.0FalseNoneNoneFalseNoneFalse10893.280
3285648114132NonePageNo139 Item No.12.1.1 PWDSR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 0 to 50 Mtrs ( Page No 139 Item No.12.1.1 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m449.7449.750.0FalseNoneNoneFalseNoneFalse22485.00
3285649114132NonePageNo139 Item No.12..1.2 PWDSR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 50 to 100 Mtrs ( Page No 139 Item No.12.1.2 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m563.95563.9550.0FalseNoneNoneFalseNoneFalse28197.50
3285650114132NonePage No 139 Item No.12..1.3 USR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 100 to 150 Mtrs ( Page No 139 Item No.12.1.3 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m599.19599.1920.0FalseNoneNoneFalseNoneFalse11983.80
3285651114132NonePage No 143 Item No.12.32 USR 2023-24-V5Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ( Page No 143 Item No.12.32 USR 2023-24/V5),as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m2349.372349.3730.0FalseNoneNoneFalseNoneFalse70481.10
3285652114132NonePage No 143 Item No.12.34 USR 2023-24-V5Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge( Page No 143 Item No.12.34 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each199.33199.331.0FalseNoneNoneFalseNoneFalse199.330
3285653114132NonePage No 05 Item No.1.4.1 USR 2023-24-V1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m( Page No 05 Item No.1.4.1 USR 2023-24/V1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum294.13294.1327.0FalseNoneNoneFalseNoneFalse7941.510
3285654114132NonePage No 127 Item No.11.2.6 USR 2023-24-V5Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)Medium Duty GI pipe of 50mm dia( Page No 127 Item No.11.2.6 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m709.79709.79100.0FalseNoneNoneFalseNoneFalse70979.00
3285655114132NonePage No 15 Item No.2.6.5 USR 2023-24-V5Labour charges for laying and jointing GI pipes with earth work including fixing collars, elbows, tees, bends, gland cocks and other fittings with cuts and threads, white lead paints wherever necessary, conveying the materials from office to workspot and retuning the surplus materials from workspot to stores etc complete.50mm dia. GI pipes & specials. ( Page No 15 Item No.2.6.5 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m38.8938.89100.0FalseNoneNoneFalseNoneFalse3889.00
3285656114132NonePage No117 ItemNo.13.4.4 PWDSR 2023-24-V2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 50 mm nominal bore ( Page No 15 Item No.2.6.5 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1039.171039.171.0FalseNoneNoneFalseNoneFalse1039.170
3285657114132NonePage No 118 Item No13.6.4.1 PWDSR 2023-24-V2Providing and fixing gun metal non- return valve of approved quality (screwed end) :50 mm nominal bore Horizontal ( Page No 15 Item No.2.6.5 CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1645.161645.162.0FalseNoneNoneFalseNoneFalse3290.320
3285658114132NonePage No 123 Item No.13.33.6 PWDSR2023-24-V5)Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work ( Page No 122 Item No.2.6.5CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m876.3876.360.0FalseNoneNoneFalseNoneFalse52578.00
3285659114132NonePageNo 07 Item No.1.10CSR 2023-24-V1Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications( Page No 07 Item No.1.10CSR 2023-24/V1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum194.46194.4627.0FalseNoneNoneFalseNoneFalse5250.420
3285660114132NonePageNo152 ItemNo.13.15.7CSR 2023-24-V5Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete.7.50 HP - 90 LPM @ 165 m = 16 STG Outlet Dia - 2.00" ( Page No 152 Item No.13.15.7CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each49600.4749600.471.0FalseNoneNoneFalseNoneFalse49600.470
3285661114132NonePage No 154 Item No.13.22.3CSR 2023-24-V5)Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x4 Sqm ( Page No 154 Item No.13.22.3CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m164.08164.08150.0FalseNoneNoneFalseNoneFalse24612.00
3285662114132NonePageNo21 Item No.5.44.4CSR 2023-24-V6Supply and Installation / Fixing / Provision of Outdoor type Thermoplastic Modular Panel enclosure with transparent Polycarbonate Lid, shock proof, IP65 (Weather Proof), rust proof, dust proof, water proof, corrosion proof having internally Embedde gasket on both lid and flap suitable to fix Single Phase / Three Phase Energy Meter in suitable base plate and having a provision for Fuse / MCB cut-out with suitable transparent hinged flap opening for operating MCB along with complete tamper proof SEALING facility. 600 mm x 600 mm x 170 mm ( Page No 21 Item No.5.44.4CSR 2023-24/V6), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each17647.6117647.611.0FalseNoneNoneFalseNoneFalse17647.610
3285663114132NonePage No.156, Item No.13.32 PWDSR 2023-24-V5)Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.( Page No156 Item No.13.32CSR 2023-24/V6), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Job7900.17900.11.0FalseNoneNoneFalseNoneFalse7900.10
3285664114132NonePage No 128 Item No.11.3.5CSR 2023-24-V5)Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)Heavy Duty GI pipe of 40mm dia( Page No 128 Item No.11.3.5CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m605.27605.2715.0FalseNoneNoneFalseNoneFalse9079.050
3285665114132NonePage No 155 Item No.13.23.3CSR 2023-24-V5Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete.6 to 15 HP pumps ( Page No 155 Item No.13.23.3CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m19324.8619324.861.0FalseNoneNoneFalseNoneFalse19324.860
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud -sump339423.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285666114133Nonepage 8 slno 1.14.1 Vol-1PWD SR2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to completethe work.( page 8 slno 1.14.1 Vol-1PWD SR2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.97123.9758.5FalseNoneNoneFalseNoneFalse7252.2450
3285667114133Nonepage 15 slno 2.1.2 Vol-1 PWD SR 2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (page 15 slno 2.1.2 Vol-1 PWD SR 2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6884.36884.34.39FalseNoneNoneFalseNoneFalse30222.0770
3285668114133Nonepage 16 slno 2.3.1 Vol-1 PWD SR 2023-24Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (page 16 slno 2.3.1 Vol-1 PWD SR 2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7684.977684.978.66FalseNoneNoneFalseNoneFalse66551.84020
3285669114133Nonepage 13 slno 6.2 Vol-2 PWD SR 2023-24)Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (page 13 slno 6.2 Vol-2 PWD SR 2023-24), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9696.469696.468.65FalseNoneNoneFalseNoneFalse83874.3790
3285670114133NonePage No.18 Item No.2.11.a PWD SR 2023-24-V-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 2023-24/V-1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne108726.04108726.040.69FalseNoneNoneFalseNoneFalse75020.96760
3285671114133NonePage No.41, Item No.8.2.2 PWD SR 2023-24-V-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.( Page No.41, Item No.8.2.2 PWD SR 2023-24/V-2), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm339.1339.176.0FalseNoneNoneFalseNoneFalse25771.60
3285672114133NoneItem No.2.11.a PWD SR 2023-24-V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs ( Page No.18, Item No.2.11.a PWD SR 2023-24/V-1)Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3842.493842.495.74FalseNoneNoneFalseNoneFalse22055.89260
3285673114133NonePage No.43, Item No.8.12 PWD SR 2023-24-V-2Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineer-in- Charge. ( Page No.43, Item No.8.12 PWD SR 2023-24/V-2)Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm77.7977.7980.0FalseNoneNoneFalseNoneFalse6223.20
3285674114133NonePageNo.221,ItemNo.18.3PWD SR 2023-24-V-5Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. ( Page No.221, Item No.18.3 PWD SR 2023-24/V-5), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2384.612384.611.0FalseNoneNoneFalseNoneFalse2384.610
3285675114133NonePage No.150, Item No.13.8.1 PWD SR 2023-24-V-5Providing, Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications, to work site with testing of as per instructions of engineer incharge of work and latest amendments etc. complete. 2.00 HP/1.5KW 6 STG ( Page No.150, Item No.13.8.1 PWD SR 2023-24/V-5), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each20066.2520066.251.0FalseNoneNoneFalseNoneFalse20066.250
17182775230001NoneNoneBuildingsDetailed estimate for Construction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud Electrical estimate317661.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3285676114134Nonecode01Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary.Vol-6 P.No 2 SL No 1.2.2 25mm dia 2mm thick and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr94.894.8300.0FalseNoneNoneFalseNoneFalse28440.00
3285677114134Nonecode0232mm dia 2mm thickVol-6 P.No 2 SL No 1.2.2 and as directed by the engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr125.18125.18150.0FalseNoneNoneFalseNoneFalse18777.00
3285678114134Nonecode03Supplying heavy gauge PVC Conduit Pipe ….dia ….mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. Vol-6 P.No 2 SL No 1.3.2 25mm dia 2mm thick and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr96.0196.01300.0FalseNoneNoneFalseNoneFalse28803.00
3285679114134Nonecode0432mm dia 2mm thickVol-6 P.No 2 SL No 1.3.3 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr120.32120.32100.0FalseNoneNoneFalseNoneFalse12032.00
3285680114134Nonecode05Supplying and fixing PVC/metal conduit accessories.Vol-6 P.No 3 SL No 1.5.2deep junction box 25mm junction box and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each68.0668.0625.0FalseNoneNoneFalseNoneFalse1701.50
3285681114134Nonecode06Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall Vol-6 P.No 8 SL No 3.4.1 1-3Way and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each167.73167.734.0FalseNoneNoneFalseNoneFalse670.920
3285682114134Nonecode07Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 8 way Vol-6 P.No 8 SL No 3.4.5 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each317.21317.216.0FalseNoneNoneFalseNoneFalse1903.260
3285683114134Nonecode08Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall Vol-6 P.No 8 SL No 3.4.610-12Way,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each387.71387.716.0FalseNoneNoneFalseNoneFalse2326.260
3285684114134Nonecode09Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.1 1 to 2 Module and as directed by the engineer incharge., as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each166.5166.54.0FalseNoneNoneFalseNoneFalse666.00
3285685114134Nonecode10Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.5 8 Module and as directed by the engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each345.17345.176.0FalseNoneNoneFalseNoneFalse2071.020
3285686114134Nonecode11Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.610-12Moudule, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each418.09418.096.0FalseNoneNoneFalseNoneFalse2508.540
3285687114134Nonecode12Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. Vol-6 P.No 9 SL No 3.6.1 6Amps one way. and as directed by the engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each123.97123.97120.0FalseNoneNoneFalseNoneFalse14876.40
3285688114134Nonecode13Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No 3.6.36A Three Way socket and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each207.83207.8320.0FalseNoneNoneFalseNoneFalse4156.60
3285689114134Nonecode14Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 Vol-6 P.No 9 SL No 3.6.4 Stepped Fan Regulator Two Module and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each433.89433.8920.0FalseNoneNoneFalseNoneFalse8677.80
3285690114134Nonecode15Supplying and fixing of modular switch & onnected accessories on existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No 3.6.9 32A DP Switchand as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each396.22396.228.0FalseNoneNoneFalseNoneFalse3169.760
3285691114134Nonecode16Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No3.6.10 6/16A Universal Socket and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each286.83286.8310.0FalseNoneNoneFalseNoneFalse2868.30
3285692114134Nonecode17Supplyin and Fixing Metal Fan Box with Round Hook.Vol-6 P.No 4 SL No 1.12 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No194.46194.4624.0FalseNoneNoneFalseNoneFalse4667.040
3285693114134Nonecode18Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.1 Short point up to 3Mtr from tapping point to out let via switch and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point326.94326.9416.0FalseNoneNoneFalseNoneFalse5231.040
3285694114134Nonecode19Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.2 Medium point above 3mtr up to 6Mtr from tapping point to out let via switch and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point460.64460.6416.0FalseNoneNoneFalseNoneFalse7370.240
3285695114134Nonecode20Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.3Long point above 6Mtr up to 10Mtr from tapping point to out let via switch box and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point674.54674.5415.0FalseNoneNoneFalseNoneFalse10118.10
3285696114134Nonecode21Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments Vol-6 P.No5 SL No 2.3.2 1.5 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr31.631.6200.0FalseNoneNoneFalseNoneFalse6320.00
3285697114134Nonecode22Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments Vol-6 P.No5 SL No 2.3.3 2.5 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr51.0451.04600.0FalseNoneNoneFalseNoneFalse30624.00
3285698114134Nonecode23Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments . Vol-6 P.No5 SL No2.3.44 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr76.5776.5780.0FalseNoneNoneFalseNoneFalse6125.60
3285699114134Nonecode24Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws.Vol-6 P.No 9 SL No 3.10.2 90mm and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No12.1512.1520.0FalseNoneNoneFalseNoneFalse243.00
3285700114134Nonecode25Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. Vol-6 P.No 17 SL No 5.18.46-32 Amps DP and as directed by the engineer incharge.,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each898.18898.182.0FalseNoneNoneFalseNoneFalse1796.360
3285701114134Nonecode26Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. Vol-6 P.No 18 SL No 5.18.950-63 Amps TPN and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3753.153753.151.0FalseNoneNoneFalseNoneFalse3753.150
3285702114134Nonecode27Supplying, fixing and wiring Residual current circuit breaker RCCB 240/450V upto 300mA sensitivity on existing wood/ panel board. 63 Amps 4 pole Vol-6 P.No 18 SL No5.20.8 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each6255.666255.661.0FalseNoneNoneFalseNoneFalse6255.660
3285703114134Nonecode28Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. Vol-6 P.No 18 SL No 5.19.11 III- Double Door 4Way TP &N and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4907.784907.781.0FalseNoneNoneFalseNoneFalse4907.780
3285704114134Nonecode29Fabricating supplying and mounting MS box made out SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc. complete.18SWGVol-6 P.No19 SL No 5.42.3 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sq CM0.460.461000.0FalseNoneNoneFalseNoneFalse460.00
3285705114134Nonecode30Supplying and fixing angle iron frame work fabricated out of M.S.angleironand M.S. Flatwith bolts, washers etc.,and painted with 2 coats of red oxide and then two coats of approved paint. 50x50x6mmVol-6 P.No 19 SL No 5.41.2and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr480.08480.083.0FalseNoneNoneFalseNoneFalse1440.240
3285706114134Nonecode31Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.Vol-6 P.No 54 SL No 12.57 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No5172.745172.742.0FalseNoneNoneFalseNoneFalse10345.480
3285707114134Nonecode32GI/Copper strips for grounding connections, using necessary fixing materials as required. Vol-6 P.No 54 SL No 12.58.225x3 mm GI Strip and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr155.57155.5720.0FalseNoneNoneFalseNoneFalse3111.40
3285708114134Nonecode34Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete.12" Sweep 300mmVol-6 P.No 30 SL No 6.2.1 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3608.523608.524.0FalseNoneNoneFalseNoneFalse14434.080
3285709114134Nonecode35Fixing all types and all capacities of fluorescent /False ceiling/spot light /CFL/LED fittings indoor on the wall/ ceiling/rafters/girders using 23/0.0076' twin twisted PVC insulated wires, required Nos of round blocks and clamps. Vol-6 P.No 56 SL No 13.7.1On wall / ceiling /Rafter / Girders, Ras per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each148.27148.2730.0FalseNoneNoneFalseNoneFalse4448.10
3285710114134Nonecode36Fixing a Ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook wisth fan regulator to the existing board together wisth wupplying and fixing 5amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. Vol-6 P.No 57 SL No 13.10and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each207.83207.8320.0FalseNoneNoneFalseNoneFalse4156.60
3285711114134Nonecode37Extra length of GI pipe of class B 19mm dia for down rod. Vol-6 P.No 57 SL No 13.12 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr239.43239.4320.0FalseNoneNoneFalseNoneFalse4788.60
3285712114134Nonecode38Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. ceiling rose with ufficient length of 23 / 0.0076 inch PVC insulated twin core wire.Vol-6 P.No 57 SL No 13.14 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each597.97597.976.0FalseNoneNoneFalseNoneFalse3587.820
3285713114134Nonecode39Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work Vol I P.No 79 SL No 1.5.1 In ordinary/soft rock without blasting upto 1.5 m depth 0.5*0.75*30 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum472.79472.7911.25FalseNoneNoneFalseNoneFalse5318.88750
3285714114134Nonecode40Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings excluding the cost of fittings with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. contractor will make his own arrangements for procuring water for testing For:Heavy Duty GI Pipe etc. complete.Vol -5 Water Supply P.No 128 SL No 11.3.6 Heavy Duty GI pipe of 50mm dia and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr825.25825.254.0FalseNoneNoneFalseNoneFalse3301.00
3285715114134Nonecode41Aluminium End Terminal Lug ESCOM P.No 27 SL No 471/60.03 95 Sqmm and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each18.2318.238.0FalseNoneNoneFalseNoneFalse145.840
3285716114134Noneitemcode.33Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 percent Rated current As per IS:374/79, Rated power factor 0.9 laggingmin, Rated speed 350 10percent RPM, Rated air delivery 210 +/- 10percent Cubic Meter Minimum, Rated service value 4.2 CMM / Watt, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification Motor winding.Temp riseShall not exceed 75 deg C over and ambient of 40C by esistance method at 245 Volts, Insulation resistanceShall not be less than Two Mega Ohms 2M Ohms, Leakage current Should not exceed 210 Micro Amp, Power input, watt& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty.Vol-6 P.No30 SL No 6.4.256 Sweep 1200mm and as directed by the engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4562.614562.619.0FalseNoneNoneFalseNoneFalse41063.490
17183657760000NoneNoneBuildingsConstruction of New Karnataka KGBV TYPE-I Dormitory at 18th Cross, RP Road, Nanjangud10796776.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3290779114397Nonecode01Concealed Conduit System Supplying heavy PVC condiuit pipe ……mm dia mm thick confirming to IS 2509 woth suitable size bends, metal/PVC junction boxes adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures. run with 18SWG GI fish wire wherever necessary.Vol-6 P.No 2 SL No 1.2.2 25mm dia 2mm thick and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr94.894.8300.0FalseNoneNoneFalseNoneFalse28440.00
3290657114397NoneP.No.8I.No.1.12 PWDSR2023-24V-1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depthnot exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth P.No.8 & I.No.1.12 PWD SR 2023-24V-1 & As Directed by engineer in charge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum115.46115.46121.0FalseNoneNoneFalseNoneFalse13970.660
3290769114397Nonepage 8 slno 1.14.1 Vol-1PWD SR2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to completethe work.( page 8 slno 1.14.1 Vol-1PWD SR2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.97123.9758.5FalseNoneNoneFalseNoneFalse7252.2450
3290736114397NonePage No 114 Item No 10.2.4 PWD SR 2023-24-V5Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for:Pipes of SN4, 160mm diaPage No 114 Item No 10.2.4 PWD SR 2023-24-V5 As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr700.07700.07120.0FalseNoneNoneFalseNoneFalse84008.40
3290731114397NonePage No 122 Item No.13.32.3 PWD SR 2023-24-V2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 25 mm nominal dia pipes Page No 122 Item No.13.32.3 PWD SR 2023-24/V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m579.74579.74150.0FalseNoneNoneFalseNoneFalse86961.00
3290709114397NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The anite-trap-basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8400.158400.157.99FalseNoneNoneFalseNoneFalse67117.19850
3290750114397NonePageNo140 Item No.12.4 PWDSR 2023-24-V5Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete. ( Page No 140 Item No.12.4 PWD 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5446.645446.642.0FalseNoneNoneFalseNoneFalse10893.280
3290780114397Nonecode0232mm dia 2mm thickVol-6 P.No 2 SL No 1.2.2 and as directed by the engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr125.18125.18150.0FalseNoneNoneFalseNoneFalse18777.00
3290658114397NoneP.No.8 & I.No.1.14.1 PWD SR 2023-24V-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m P.No.8 & I.No.1.14.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum123.47123.47321.95FalseNoneNoneFalseNoneFalse39751.16650
3290770114397Nonepage 15 slno 2.1.2 Vol-1 PWD SR 2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (page 15 slno 2.1.2 Vol-1 PWD SR 2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6884.36884.34.39FalseNoneNoneFalseNoneFalse30222.0770
3290732114397NonePage No.122 Item No 13.32.2 PWD SR 2023-24-V2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. 20 mm nominal dia pipes ( Page No122 Item No.13.32.2 PWD SR 2023-24/V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m460.63460.6370.0FalseNoneNoneFalseNoneFalse32244.10
3290710114397NonePage No.18, Item No.2.11.a PWD SR 202324-V1Supplying, fitting and placing TMT FE 550 - 550D Steel Reinforcement including cost of all materials, achinery, labour, cleaning, straightening, cutting, bending, hooking, laping-welding joints, tying with binding wire - soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 202324-V1) & As Directed by engineer incharge., Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne109813.3109813.31.06FalseNoneNoneFalseNoneFalse116402.0980
3290737114397NonePage No.43, Item No.10.1.7 2023-24 pwd SR-V5Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for PVC pipes 110mm dia., 6 kg-sqcm & class 3Page No.43, Item No.10.1.7 2023-24 SR-V-5) As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr499.53499.5350.0FalseNoneNoneFalseNoneFalse24976.50
3290751114397NonePageNo139 Item No.12.1.1 PWDSR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 0 to 50 Mtrs ( Page No 139 Item No.12.1.1 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m449.7449.750.0FalseNoneNoneFalseNoneFalse22485.00
3290781114397Nonecode03Supplying heavy gauge PVC Conduit Pipe ….dia ….mm thick with suitable size bends, metal junction boxes adhesive paste etx., by groove cutting in the wall and fixing by using U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. Vol-6 P.No 2 SL No 1.3.2 25mm dia 2mm thick and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr96.0196.01300.0FalseNoneNoneFalseNoneFalse28803.00
3290659114397NoneP.No.5 & I.No.4.1 PWD SR 2023-24V-2Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. Lindane 20% E.C. @ 3.19 lm2 including cost of chemical, diluting in water to one percent concentration, P.No.5 & I.No.4.1 PWD SR 2023-24V-2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm143.42143.42336.0FalseNoneNoneFalseNoneFalse48189.120
3290771114397Nonepage 16 slno 2.3.1 Vol-1 PWD SR 2023-24Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (page 16 slno 2.3.1 Vol-1 PWD SR 2023-24), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7684.977684.978.66FalseNoneNoneFalseNoneFalse66551.84020
3290738114397NonePage No 114 Item No 10.2.1 PWD SR 2023-24-V5 Providing UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. complete for:Pipes of SN4, 75 mm diaPage No 114 Item No 10.2.1 PWD SR 2023-24-V5 As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr263.74263.7430.0FalseNoneNoneFalseNoneFalse7912.20
3290733114397NonePage No 117 Item No.13.5.3 PWD SR 2023-24-V2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore, ( Page No 117 Item No.13.5.3 PWD SR 2023-24/V2)as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each403.51403.513.0FalseNoneNoneFalseNoneFalse1210.530
3290711114397NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :columns For Formwork 70% Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5880.115880.112.48FalseNoneNoneFalseNoneFalse14582.67280
3290752114397NonePageNo139 Item No.12..1.2 PWDSR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 50 to 100 Mtrs ( Page No 139 Item No.12.1.2 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m563.95563.9550.0FalseNoneNoneFalseNoneFalse28197.50
3290782114397Nonecode0432mm dia 2mm thickVol-6 P.No 2 SL No 1.3.3 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr120.32120.32100.0FalseNoneNoneFalseNoneFalse12032.00
3290660114397NoneP.No.6 & I.No.1.15.2 PWD SR 2023-24V-1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. Depth exceeding 1.5 m, but not exceeding 3 m P.No.6 & I.No.1.15.2 PWD SR 2023-24V-1 & As Directed by engineer in charge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum516.55516.5547.63FalseNoneNoneFalseNoneFalse24603.27650
3290772114397Nonepage 13 slno 6.2 Vol-2 PWD SR 2023-24)Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (page 13 slno 6.2 Vol-2 PWD SR 2023-24), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9696.469696.468.65FalseNoneNoneFalseNoneFalse83874.3790
3290734114397NonePage No 115 Item No.13.2.2 PWD SR 2023-24-V2Providing and fixing brass bib cock of approved quality :20 mm nominal bore ( Page No 115 Item No.13.2.2 PWD SR 2023-24/V2),as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each370.7370.720.0FalseNoneNoneFalseNoneFalse7414.00
3290753114397NonePage No 139 Item No.12..1.3 USR 2023-24-V5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 100 to 150 Mtrs ( Page No 139 Item No.12.1.3 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m599.19599.1920.0FalseNoneNoneFalseNoneFalse11983.80
3290712114397NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :lintels and beams For Formwork 60% Page No.16, Item No.2.5.2 PWD SR 202324-V1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5040.095040.092.64FalseNoneNoneFalseNoneFalse13305.83760
3290739114397NonePageNo 191 Item No 16.9 PWD SR 2023-24-V5Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover Page No 191 Item No 16.9 PWD SR 2023-24-V5 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos.6628.796628.798.0FalseNoneNoneFalseNoneFalse53030.320
3290783114397Nonecode05Supplying and fixing PVC/metal conduit accessories.Vol-6 P.No 3 SL No 1.5.2deep junction box 25mm junction box and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each68.0668.0625.0FalseNoneNoneFalseNoneFalse1701.50
3290754114397NonePage No 143 Item No.12.32 USR 2023-24-V5Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ( Page No 143 Item No.12.32 USR 2023-24/V5),as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m2349.372349.3730.0FalseNoneNoneFalseNoneFalse70481.10
3290740114397NonePage No 85 Item No 7.3 PWD SR 2023-24-V5Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. Page No 85 Item No 7.3 PWD SR 2023-24-V5, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos2600.962600.968.0FalseNoneNoneFalseNoneFalse20807.680
3290661114397NonePage No.15, Item No.2.1.2 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates Page No.15, Item No.2.1.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum6884.026884.0265.79FalseNoneNoneFalseNoneFalse452899.67580
3290713114397NonePage No.16, Item No.2.5.2 PWD SR 202324-V1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 202324-V1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4200.084200.082.87FalseNoneNoneFalseNoneFalse12054.22960
3290773114397NonePage No.18 Item No.2.11.a PWD SR 2023-24-V-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 2023-24/V-1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne108726.04108726.040.69FalseNoneNoneFalseNoneFalse75020.96760
3290735114397NonePage No123 Item No.13.34 PWD SR 2023-24-V2Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.as per direction of Engineer in Charge' Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Ltr10.9710.972000.0FalseNoneNoneFalseNoneFalse21940.00
3290784114397Nonecode06Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall Vol-6 P.No 8 SL No 3.4.1 1-3Way and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each167.73167.734.0FalseNoneNoneFalseNoneFalse670.920
3290741114397NonePage No 123 Item No 13.38 PWD SR 2023-24-V2Providing and fixing square-mouth S.W. gully trap class SP-1 complete with C.I. grating brick masonry chamber 100mm x 100mm size P type with Non Modular common burnt clay bricks of designation 3.5& water tight C.I. cover with frame of 300 x300 mm size (inside) the weight of cover to be not less than 4.50 kg and frame to be not less than 2.70 kg as per standard design:Page No 123 Item No 13.38 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos3077.993077.997.0FalseNoneNoneFalseNoneFalse21545.930
3290714114397NonePage No 14 Item No.6.8 PWD SR 202324-V2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of Page No 14 Item No.6.8 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9782.389782.3811.25FalseNoneNoneFalseNoneFalse110051.7750
3290755114397NonePage No 143 Item No.12.34 USR 2023-24-V5Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge( Page No 143 Item No.12.34 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each199.33199.331.0FalseNoneNoneFalseNoneFalse199.330
3290774114397NonePage No.41, Item No.8.2.2 PWD SR 2023-24-V-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.( Page No.41, Item No.8.2.2 PWD SR 2023-24/V-2), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm339.1339.176.0FalseNoneNoneFalseNoneFalse25771.60
3290662114397NonePage No.9, Item No.5.4 PWD SR 2023-24V2Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) Page No.9, Item No.5.4 PWD SR 2023-24V2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7765.197765.1981.46FalseNoneNoneFalseNoneFalse632552.37740
3290785114397Nonecode07Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall. 8 way Vol-6 P.No 8 SL No 3.4.5 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each317.21317.216.0FalseNoneNoneFalseNoneFalse1903.260
3290775114397NoneItem No.2.11.a PWD SR 2023-24-V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs ( Page No.18, Item No.2.11.a PWD SR 2023-24/V-1)Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3842.493842.495.74FalseNoneNoneFalseNoneFalse22055.89260
3290756114397NonePage No 05 Item No.1.4.1 USR 2023-24-V1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m( Page No 05 Item No.1.4.1 USR 2023-24/V1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum294.13294.1327.0FalseNoneNoneFalseNoneFalse7941.510
3290715114397NonePage No 43 Item No.8.10 PWD SR 202324-V2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface - ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge.Page No 43 Item No.8.10 PWD SR 202324-V2,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm259.01259.0114.95FalseNoneNoneFalseNoneFalse3872.19950
3290742114397NonePage No 43 Item No.8.10 PWD SR 202324-V2Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing. 150 mm dia. pipes Page No 187 Item No 16.1.2 PWD SR 2023-24, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr706.15706.1530.0FalseNoneNoneFalseNoneFalse21184.50
3290663114397NonePage No.44, Item No.8.19.1 PWD SR 2023-24V2Providing Flush Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. Page No.44, Item No.8.19.1 PWD SR 2023-24V2 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm309.93309.9368.42FalseNoneNoneFalseNoneFalse21205.41060
3290786114397Nonecode08Supplying and flush mounting powder coated metal / galvanised metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall Vol-6 P.No 8 SL No 3.4.610-12Way,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each387.71387.716.0FalseNoneNoneFalseNoneFalse2326.260
3290743114397NonePage No 126 Item No 13.52 PWD SR 2023-24-V2)Constructing brick masonry manhole in cement mortar 1:4 1 cement : 4 coarse sand ) with R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:4:8 mix (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand) finished with floating coat of neat cement and making channels in cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement complete as per standard design : Inside size 90x80 cm and 45 cm deep including C.I. cover with frame (light duty) 455x610 mm internal dimensions, total weight of cover and frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg) With common burnt clay (non modular) bricks of class designation 3.5 Page No 126 Item No 13.52 PWD SR 2023-24-V2)as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Nos12841.9212841.921.0FalseNoneNoneFalseNoneFalse12841.920
3290757114397NonePage No 127 Item No.11.2.6 USR 2023-24-V5Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)Medium Duty GI pipe of 50mm dia( Page No 127 Item No.11.2.6 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m709.79709.79100.0FalseNoneNoneFalseNoneFalse70979.00
3290716114397NonePage No 43 Item No.8.16.2 PWD SR 202324-V2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g-m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment .Plaster mesh 150mm wide Page No 43 Item No.8.16.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m46.6546.6572.0FalseNoneNoneFalseNoneFalse3358.80
3290664114397NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Foundation works. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7641.217641.2154.8FalseNoneNoneFalseNoneFalse418738.3080
3290776114397NonePage No.43, Item No.8.12 PWD SR 2023-24-V-2Extra for providing and mixing water proofing material in cement plaster work in proportion recommended by the manufacturers including cost of material etc as per specifications and as per directions of the Engineer-in- Charge. ( Page No.43, Item No.8.12 PWD SR 2023-24/V-2)Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm77.7977.7980.0FalseNoneNoneFalseNoneFalse6223.20
3290787114397Nonecode09Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.1 1 to 2 Module and as directed by the engineer incharge., as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each166.5166.54.0FalseNoneNoneFalseNoneFalse666.00
3290744114397NonePage No 131 Item No 14.1.1 PWD SR 2023-24-V2Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required:White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests Page No 131 Item No 14.1.1 PWD SR 2023-24-V2), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each5936.015936.013.0FalseNoneNoneFalseNoneFalse17808.030
3290758114397NonePage No 15 Item No.2.6.5 USR 2023-24-V5Labour charges for laying and jointing GI pipes with earth work including fixing collars, elbows, tees, bends, gland cocks and other fittings with cuts and threads, white lead paints wherever necessary, conveying the materials from office to workspot and retuning the surplus materials from workspot to stores etc complete.50mm dia. GI pipes & specials. ( Page No 15 Item No.2.6.5 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m38.8938.89100.0FalseNoneNoneFalseNoneFalse3889.00
3290717114397NonePage No 41 Item No.8.1.1 PWD SR 202324-V2Providing 12 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge. Page No 41 Item No.8.1.1 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm313.03313.0360.7FalseNoneNoneFalseNoneFalse19000.9210
3290665114397NonePage No.07, Item No.1.9 PWD SR 2023-24V-1Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. Page No.07, Item No.1.9 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum323.3323.3321.95FalseNoneNoneFalseNoneFalse104086.4350
3290777114397NonePageNo.221,ItemNo.18.3PWD SR 2023-24-V-5Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. ( Page No.221, Item No.18.3 PWD SR 2023-24/V-5), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2384.612384.611.0FalseNoneNoneFalseNoneFalse2384.610
3290788114397Nonecode10Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.5 8 Module and as directed by the engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each345.17345.176.0FalseNoneNoneFalseNoneFalse2071.020
3290745114397NonePage No 131 Item No 14.3.1 PWD SR 2023-24-V2Providing and fixing white vitreous china pedestal type water closet European type with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lidPage No 131 Item No 14.3.1 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each7264.457264.452.0FalseNoneNoneFalseNoneFalse14528.90
3290718114397NonePage No 44 Item No.8.21 PWD SR 202324-V2Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineerincharge. Page No 44 Item No.8.21 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm31.9231.9275.65FalseNoneNoneFalseNoneFalse2414.7480
3290666114397NonePage No.07, Item No.1.11 PWD SR 2023-24V-1Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Page No.07, Item No.1.11 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum526.27526.27184.49FalseNoneNoneFalseNoneFalse97091.55230
3290778114397NonePage No.150, Item No.13.8.1 PWD SR 2023-24-V-5Providing, Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications, to work site with testing of as per instructions of engineer incharge of work and latest amendments etc. complete. 2.00 HP/1.5KW 6 STG ( Page No.150, Item No.13.8.1 PWD SR 2023-24/V-5), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each20066.2520066.251.0FalseNoneNoneFalseNoneFalse20066.250
3290759114397NonePage No117 ItemNo.13.4.4 PWDSR 2023-24-V2Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 50 mm nominal bore ( Page No 15 Item No.2.6.5 USR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1039.171039.171.0FalseNoneNoneFalseNoneFalse1039.170
3290789114397Nonecode11Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.Vol-6 P.No 8 SL No 3.5.610-12Moudule, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each418.09418.096.0FalseNoneNoneFalseNoneFalse2508.540
3290760114397NonePage No 118 Item No13.6.4.1 PWDSR 2023-24-V2Providing and fixing gun metal non- return valve of approved quality (screwed end) :50 mm nominal bore Horizontal ( Page No 15 Item No.2.6.5 CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1645.161645.162.0FalseNoneNoneFalseNoneFalse3290.320
3290746114397NonePage No 132 Item No 14.7.1 PWD SR 2023-24-V2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar tapsPage No 132 Item No 14.7.1 PWD SR 2023-24-V2), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit3745.863745.862.0FalseNoneNoneFalseNoneFalse7491.720
3290719114397NonePage No 41 Item No.8.2.2 PWD SR 202324-V2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerincharge. Page No 41 Item No.8.2.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm342.49342.4965.87FalseNoneNoneFalseNoneFalse22559.81630
3290667114397NonePage No.16, Item No.2.4.3 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Page No.16, Item No.2.4.3 PWD SR 2023-24V-1) & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7700.777700.773.73FalseNoneNoneFalseNoneFalse28723.87210
3290790114397Nonecode12Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293. Vol-6 P.No 9 SL No 3.6.1 6Amps one way. and as directed by the engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each123.97123.97120.0FalseNoneNoneFalseNoneFalse14876.40
3290761114397NonePage No 123 Item No.13.33.6 PWDSR2023-24-V5)Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work ( Page No 122 Item No.2.6.5CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m876.3876.360.0FalseNoneNoneFalseNoneFalse52578.00
3290747114397NonePage No 136 Item No 14.32.4 PWD SR 2023-24-V2Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing :Rectangular shape 1500x450 mm( Page No 136 Item No 14.32.4 PWD SR 2023-24/V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit2097.782097.782.0FalseNoneNoneFalseNoneFalse4195.560
3290720114397NonePage No 51 Item No.8.55.2 PWD SR 202324-V2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 g-L as per specifications and as per directions of Engineer in charge. Page No 51 Item No.8.55.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm65.0665.0660.7FalseNoneNoneFalseNoneFalse3949.1420
3290668114397NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The anitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8316.988316.9896.06FalseNoneNoneFalseNoneFalse798929.09880
3290791114397Nonecode13Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No 3.6.36A Three Way socket and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each207.83207.8320.0FalseNoneNoneFalseNoneFalse4156.60
3290748114397NonePage No 127 Item No 13.59 PWD SR 2023-24-V2Providing and fixing PVC (S.W.R) Nahani Trap 10cms x 10cms with all fitting arrangements & all necessary accessories complete Page No 127 Item No 13.59 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit267.39267.3915.0FalseNoneNoneFalseNoneFalse4010.850
3290721114397NonePage No 50 Item No.8.54.2 PWD SR 202324-V2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g-L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Page No 50 Item No.8.54.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm135.03135.0360.7FalseNoneNoneFalseNoneFalse8196.3210
3290669114397NonePage No.16, Item No.2.5.1 PWD SR 2023-24V-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granitetrapbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codesmachine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Page No.16, Item No.2.5.1 PWD SR 2023-24V-1Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8058.18058.16.28FalseNoneNoneFalseNoneFalse50604.8680
3290762114397NonePageNo 07 Item No.1.10CSR 2023-24-V1Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications( Page No 07 Item No.1.10CSR 2023-24/V1), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum194.46194.4627.0FalseNoneNoneFalseNoneFalse5250.420
3290792114397Nonecode14Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 Vol-6 P.No 9 SL No 3.6.4 Stepped Fan Regulator Two Module and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each433.89433.8920.0FalseNoneNoneFalseNoneFalse8677.80
3290749114397NonePage No 137 Item No 14.40.2 PWD SR 2023-24-V2Providing and fixing PTMT towel rail complete with brackets fixed towooden cleats with CP brass screws with concealed fittings arrangementof approved quality and colour.600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g. Page No 137 Item No 14.40.2 PWD SR 2023-24-V2, as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Unit602.84602.8410.0FalseNoneNoneFalseNoneFalse6028.40
3290722114397NonePage No 46 Item No.8.30 PWD SR 202324-V2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L-10 m² over and including priming coat of exterior primer applied @ 2.20 kg-10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineerincharge. Page No 46 Item No.8.30 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm213.59213.5965.87FalseNoneNoneFalseNoneFalse14069.17330
3290670114397NonePage No.18, Item No.2.11.a PWD SR 2023-24V-1Supplying, fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials, achinery, labour, cleaning, straightening, cutting, bending, hooking, lapingwelding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ( Page No.18, Item No.2.11.a PWD SR 2023-24V-1) & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne108726.03108726.0316.26FalseNoneNoneFalseNoneFalse1767885.24780
3290763114397NonePageNo152 ItemNo.13.15.7CSR 2023-24-V5Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete.7.50 HP - 90 LPM @ 165 m = 16 STG Outlet Dia - 2.00" ( Page No 152 Item No.13.15.7CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each49600.4749600.471.0FalseNoneNoneFalseNoneFalse49600.470
3290793114397Nonecode15Supplying and fixing of modular switch & onnected accessories on existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No 3.6.9 32A DP Switchand as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each396.22396.228.0FalseNoneNoneFalseNoneFalse3169.760
3290723114397NonePage No 100 Item No 12.13.2 PWD SR 202324-V2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Page No 100 Item No 12.13.2 PWD SR 202324-V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum122264.37122264.370.11FalseNoneNoneFalseNoneFalse13449.08070
3290764114397NonePage No 154 Item No.13.22.3CSR 2023-24-V5)Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x4 Sqm ( Page No 154 Item No.13.22.3CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m164.08164.08150.0FalseNoneNoneFalseNoneFalse24612.00
3290671114397NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for sub structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge Column Footing For Formwork 8% Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 Qty same as vide item no.8 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum611.3611.354.8FalseNoneNoneFalseNoneFalse33499.240
3290794114397Nonecode16Supplying and fixing of modular switch & onnected accessorieson existing modular switch plate as per IS 3854 and IS 1293 Vol-6 P.No 9 SL No3.6.10 6/16A Universal Socket and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each286.83286.8310.0FalseNoneNoneFalseNoneFalse2868.30
3290724114397NonePage No 112 Item No 12.94.1 PWD SR 202324-V2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 5860 (Suspension Grade), calcium carbonate and natural fibers (wood powder-rice husk-wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg-m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N-mm2 , modulus of elasticity 850 N-mm2 and resistance to spread of flame of Class A category with property of being termite-borer proof, water-moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Page No 112 Item No 12.94.1 PWD SR 202324-V2 and as per directions of Engineerincharge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4278.034278.032.88FalseNoneNoneFalseNoneFalse12320.72640
3290672114397NonePage No.15, Item No.2.2.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for sub structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge : Plinth Beam For Formwork 50% Page No.15, Item No.2.2.1 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3820.63820.620.32FalseNoneNoneFalseNoneFalse77634.5920
3290765114397NonePageNo21 Item No.5.44.4CSR 2023-24-V6Supply and Installation / Fixing / Provision of Outdoor type Thermoplastic Modular Panel enclosure with transparent Polycarbonate Lid, shock proof, IP65 (Weather Proof), rust proof, dust proof, water proof, corrosion proof having internally Embedde gasket on both lid and flap suitable to fix Single Phase / Three Phase Energy Meter in suitable base plate and having a provision for Fuse / MCB cut-out with suitable transparent hinged flap opening for operating MCB along with complete tamper proof SEALING facility. 600 mm x 600 mm x 170 mm ( Page No 21 Item No.5.44.4CSR 2023-24/V6), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each17647.6117647.611.0FalseNoneNoneFalseNoneFalse17647.610
3290795114397Nonecode17Supplyin and Fixing Metal Fan Box with Round Hook.Vol-6 P.No 4 SL No 1.12 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No194.46194.4624.0FalseNoneNoneFalseNoneFalse4667.040
3290725114397NonePage No 104 Item No 12.51 PWD SR 202324-V2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Page No 104 Item No 12.51 PWD SR 202324-V2 and as per directions of Engineer incharge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1247.191247.191.0FalseNoneNoneFalseNoneFalse1247.190
3290766114397NonePage No.156, Item No.13.32 PWDSR 2023-24-V5)Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.( Page No156 Item No.13.32CSR 2023-24/V6), Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Job7900.17900.11.0FalseNoneNoneFalseNoneFalse7900.10
3290673114397NonePage No.16, Item No.2.5.1 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :chejja Page No.16, Item No.2.5.1 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum3626.143626.141.84FalseNoneNoneFalseNoneFalse6672.09760
3290796114397Nonecode18Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.1 Short point up to 3Mtr from tapping point to out let via switch and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point326.94326.9416.0FalseNoneNoneFalseNoneFalse5231.040
3290767114397NonePage No 128 Item No.11.3.5CSR 2023-24-V5)Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)Heavy Duty GI pipe of 40mm dia( Page No 128 Item No.11.3.5CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m605.27605.2715.0FalseNoneNoneFalseNoneFalse9079.050
3290726114397NonePage No 47 Item No 8.34.1 PWD SR 202324-V2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineerincharge.Page No 47 Item No 8.34.1 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm65.0665.063.9FalseNoneNoneFalseNoneFalse253.7340
3290674114397NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :columns For Formwork 70% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge. Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum5821.885821.8813.41FalseNoneNoneFalseNoneFalse78071.41080
3290797114397Nonecode19Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.2 Medium point above 3mtr up to 6Mtr from tapping point to out let via switch and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point460.64460.6416.0FalseNoneNoneFalseNoneFalse7370.240
3290768114397NonePage No 155 Item No.13.23.3CSR 2023-24-V5Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete.6 to 15 HP pumps ( Page No 155 Item No.13.23.3CSR 2023-24/V5), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m19324.8619324.861.0FalseNoneNoneFalseNoneFalse19324.860
3290727114397NonePage No 46 Item No 8.33.2 PWD SR 202324-V2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L-10 m² over an under coat of primer applied @0.75 L-10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineerincharge.Page No 46 Item No 8.33.2 PWD SR 202324-V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm169.4169.43.9FalseNoneNoneFalseNoneFalse660.660
3290675114397NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :lintels and beams For Formwork 60% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1 & As Directed by engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4990.194990.1924.85FalseNoneNoneFalseNoneFalse124006.22150
3290798114397Nonecode20Point wiring using Copper wire without switch.Supplying and wiring adopting loop system in existing PVC Conduit/casing capping using 1100V Grade, COPPER conductor flexible multistrand FRLS PVC insulated, 2x1.5 Sq.mm Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose lenght in a wood/PVC round block. complete for each outlet.Vol-6 P.No 5 SL No 2.2.3Long point above 6Mtr up to 10Mtr from tapping point to out let via switch box and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Point674.54674.5415.0FalseNoneNoneFalseNoneFalse10118.10
3290728114397NonePage No 107 Item No 12.74.1 PWD SR 202324-V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 125x64x1.90mm Page No 107 Item No 12.74.1 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each125.21125.214.0FalseNoneNoneFalseNoneFalse500.840
3290676114397NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall b e carried out as per technical detailed specifications and as per directons of engineer in charge :staircase For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4158.494158.494.49FalseNoneNoneFalseNoneFalse18671.62010
3290799114397Nonecode21Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments Vol-6 P.No5 SL No 2.3.2 1.5 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr31.631.6200.0FalseNoneNoneFalseNoneFalse6320.00
3290729114397NonePage No 107 Item No 12.74.3 PWD SR 202324-V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 75x47x1.80mm Page No 107 Item No 12.74.3 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each290.93290.932.0FalseNoneNoneFalseNoneFalse581.860
3290677114397NonePage No.16, Item No.2.5.2 PWD SR 2023-24V-1Additionalities for formwork, centering & scaffolding for super structure including cost and conveyance of all materials, Labour, hire charges of machineries and equipment lead and lift , loading and unloading charges transportation and all other incidental charges etc. complete work shall be carried out as per technical detailed specifications and as per directons of engineer in charge :slabs For Formwork 50% Page No.16, Item No.2.5.2 PWD SR 2023-24V-1,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum4158.494158.4933.89FalseNoneNoneFalseNoneFalse140931.22610
3290800114397Nonecode22Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments Vol-6 P.No5 SL No 2.3.3 2.5 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr51.0451.04600.0FalseNoneNoneFalseNoneFalse30624.00
3290730114397NonePage No 107 Item No 12.76.3 PWD SR 202324-V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :150*10 mm Page No 107 Item No 12.76.3 PWD SR 202324-V2 and as per directions of Engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each354.76354.762.0FalseNoneNoneFalseNoneFalse709.520
3290678114397NonePage No 14 Item No.6.8 PWD SR 2023-24V-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of Page No 14 Item No.6.8 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum9685.529685.5294.42FalseNoneNoneFalseNoneFalse914506.79840
3290801114397Nonecode23Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments . Vol-6 P.No5 SL No2.3.44 mm2 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr76.5776.5780.0FalseNoneNoneFalseNoneFalse6125.60
3290679114397NonePage No 14 Item No.6.15 PWD SR 2023-24V-2Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Page No 14 Item No.6.15 PWD SR 2023-24,V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum1255.511255.5170.11FalseNoneNoneFalseNoneFalse88023.80610
3290802114397Nonecode24Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws.Vol-6 P.No 9 SL No 3.10.2 90mm and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No12.1512.1520.0FalseNoneNoneFalseNoneFalse243.00
3290680114397NonePage No 43 Item No.8.10 PWD SR 2023-24V-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Page No 43 Item No.8.10 PWD SR 2023-24V-2 , Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm256.45256.45268.18FalseNoneNoneFalseNoneFalse68774.7610
3290803114397Nonecode25Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. Vol-6 P.No 17 SL No 5.18.46-32 Amps DP and as directed by the engineer incharge.,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each898.18898.182.0FalseNoneNoneFalseNoneFalse1796.360
3290681114397NonePage No 43 Item No.8.16.2 PWD SR 2023-24V-2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gm2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment .Plaster mesh 150mm wide Page No 43 Item No.8.16.2 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m46.1946.19360.0FalseNoneNoneFalseNoneFalse16628.40
3290804114397Nonecode26Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' cure, indicator ON/OFF, energy cross-3 with Short circuit breaking cappacity of 10K and complete wiring as required. Confirming to IEC 60898. Vol-6 P.No 18 SL No 5.18.950-63 Amps TPN and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3753.153753.151.0FalseNoneNoneFalseNoneFalse3753.150
3290682114397NonePage No 41 Item No.8.1.1 PWD SR 2023-24V-2Providing 12 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Page No 41 Item No.8.1.1 PWD SR 2023-24V-2 , Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm309.93309.93566.93FalseNoneNoneFalseNoneFalse175708.61490
3290805114397Nonecode27Supplying, fixing and wiring Residual current circuit breaker RCCB 240/450V upto 300mA sensitivity on existing wood/ panel board. 63 Amps 4 pole Vol-6 P.No 18 SL No5.20.8 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each6255.666255.661.0FalseNoneNoneFalseNoneFalse6255.660
3290683114397NonePage No 44 Item No.8.21 PWD SR 2023-24V-2Providing White washing with lime to give an even shade :New work (three coats) with lime of approved quality, including cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Page No 44 Item No.8.21 PWD SR 2023-24V-2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm31.631.6835.11FalseNoneNoneFalseNoneFalse26389.4760
3290806114397Nonecode28Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. Vol-6 P.No 18 SL No 5.19.11 III- Double Door 4Way TP &N and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4907.784907.781.0FalseNoneNoneFalseNoneFalse4907.780
3290684114397NonePage No 41 Item No.8.2.2 PWD SR 2023-24V2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. Page No 41 Item No.8.2.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm339.1339.1619.5FalseNoneNoneFalseNoneFalse210072.450
3290807114397Nonecode29Fabricating supplying and mounting MS box made out SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc. complete.18SWGVol-6 P.No19 SL No 5.42.3 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sq CM0.460.461000.0FalseNoneNoneFalseNoneFalse460.00
3290685114397NonePage No 51 Item No.8.55.2 PWD SR 2023-24V2Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With water thinnable cement primer on wall surface having VOC content less than 50 gL as per specifications and as per directions of Engineer in charge. Page No 51 Item No.8.55.2 PWD SR 2023-24V2,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm64.4264.42566.93FalseNoneNoneFalseNoneFalse36521.63060
3290808114397Nonecode30Supplying and fixing angle iron frame work fabricated out of M.S.angleironand M.S. Flatwith bolts, washers etc.,and painted with 2 coats of red oxide and then two coats of approved paint. 50x50x6mmVol-6 P.No 19 SL No 5.41.2and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr480.08480.083.0FalseNoneNoneFalseNoneFalse1440.240
3290686114397NonePage No 50 Item No.8.54.2 PWD SR 2023-24V2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 gL of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. Page No 50 Item No.8.54.2 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm133.69133.69449.51FalseNoneNoneFalseNoneFalse60094.99190
3290809114397Nonecode31Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.Vol-6 P.No 54 SL No 12.57 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No5172.745172.742.0FalseNoneNoneFalseNoneFalse10345.480
3290687114397NonePage No 46 Item No.8.30 PWD SR 2023-24V2Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67L10 m² over and including priming coat of exterior primer applied @ 2.20 kg10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Page No 46 Item No.8.30 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm211.48211.48619.5FalseNoneNoneFalseNoneFalse131011.860
3290810114397Nonecode32GI/Copper strips for grounding connections, using necessary fixing materials as required. Vol-6 P.No 54 SL No 12.58.225x3 mm GI Strip and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr155.57155.5720.0FalseNoneNoneFalseNoneFalse3111.40
3290688114397NonePage No 84 Item No11.25.2 PWD SR 2023-24V2Providing and fixing Steel work welded in built up sections framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-inCharge. Page No 84 Item No11.25.2 PWD SR 2023-24V2 Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg165.29165.29196.68FalseNoneNoneFalseNoneFalse32509.23720
3290811114397Nonecode34Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete.12" Sweep 300mmVol-6 P.No 30 SL No 6.2.1 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each3608.523608.524.0FalseNoneNoneFalseNoneFalse14434.080
3290689114397NonePage No 100 Item No 12.13.2 PWD SR 2023-24V2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. Page No 100 Item No 12.13.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum121053.84121053.842.12FalseNoneNoneFalseNoneFalse256634.14080
3290812114397Nonecode35Fixing all types and all capacities of fluorescent /False ceiling/spot light /CFL/LED fittings indoor on the wall/ ceiling/rafters/girders using 23/0.0076' twin twisted PVC insulated wires, required Nos of round blocks and clamps. Vol-6 P.No 56 SL No 13.7.1On wall / ceiling /Rafter / Girders, Ras per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each148.27148.2730.0FalseNoneNoneFalseNoneFalse4448.10
3290690114397NonePage No 112 Item No 12.94.1 PWD SR 2023-24V2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powderrice huskwheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kgm3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 Nmm2 , modulus of elasticity 850 Nmm2 and resistance to spread of flame of Class A category with property of being termiteborer proof, watermoisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness Page No 112 Item No 12.94.1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm4235.674235.6741.28FalseNoneNoneFalseNoneFalse174848.45760
3290813114397Nonecode36Fixing a Ceiling / Wall mounting fan of all capacities and all types to the existing 'S' hook wisth fan regulator to the existing board together wisth wupplying and fixing 5amps. Ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. Vol-6 P.No 57 SL No 13.10and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each207.83207.8320.0FalseNoneNoneFalseNoneFalse4156.60
3290691114397NonePage No 104 Item No 12.51 PWD SR 2023-24V2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications.Page No 104 Item No 12.51 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No1234.851234.8516.0FalseNoneNoneFalseNoneFalse19757.60
3290814114397Nonecode37Extra length of GI pipe of class B 19mm dia for down rod. Vol-6 P.No 57 SL No 13.12 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr239.43239.4320.0FalseNoneNoneFalseNoneFalse4788.60
3290692114397NonePage No 47 Item No 8.34.1 PWD SR 2023-24V2Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Page No 47 Item No 8.34.1 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm64.4264.42159.3FalseNoneNoneFalseNoneFalse10262.1060
3290815114397Nonecode38Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 amps. ceiling rose with ufficient length of 23 / 0.0076 inch PVC insulated twin core wire.Vol-6 P.No 57 SL No 13.14 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each597.97597.976.0FalseNoneNoneFalseNoneFalse3587.820
3290693114397NonePage No 46 Item No 8.33.2 PWD SR 2023-24V2Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90L10 m² over an under coat of primer applied @0.75 L10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Page No 46 Item No 8.33.2 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm167.73167.73159.3FalseNoneNoneFalseNoneFalse26719.3890
3290816114397Nonecode39Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works,as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatlydressed disposing off or leveling the excavated stuff or sorting & stacking theselected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work Vol I P.No 79 SL No 1.5.1 In ordinary/soft rock without blasting upto 1.5 m depth 0.5*0.75*30 and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum472.79472.7911.25FalseNoneNoneFalseNoneFalse5318.88750
3290694114397NonePage No 86 Item No 11.34.B PWD SR 2023-24V2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc.Page No 86 Item No 11.34.B PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Kg222.42222.42884.52FalseNoneNoneFalseNoneFalse196734.93840
3290817114397Nonecode40Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings excluding the cost of fittings with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. contractor will make his own arrangements for procuring water for testing For:Heavy Duty GI Pipe etc. complete.Vol -5 Water Supply P.No 128 SL No 11.3.6 Heavy Duty GI pipe of 50mm dia and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Mtr825.25825.254.0FalseNoneNoneFalseNoneFalse3301.00
3290695114397NonePage No 103 Item No 12.42 PWD SR 2023-24V2Providing and fixing in position windows half paneled shutters at bottom and half glazed at top for window shutters with Honne wood stiles and rails of 30mm. thick, 75mm wide in two halves with panels filled with MDF of 18mm thick, 3mm thick reeded glass for top panels fixed with wooden beading including cost of materials, labour charges, usage charges complete as per specifications. excluding cost of fixtures Page No 103 Item No 12.42 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6215.566215.5632.4FalseNoneNoneFalseNoneFalse201384.1440
3290818114397Nonecode41Aluminium End Terminal Lug ESCOM P.No 27 SL No 471/60.03 95 Sqmm and as directed by the engineer incharge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each18.2318.238.0FalseNoneNoneFalseNoneFalse145.840
3290696114397NonePage No 103 Item No 12.49 PWD SR 2023-24V2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per pecifications.excluding cost of fixtures Page No 103 Item No 12.49 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm7928.057928.059.72FalseNoneNoneFalseNoneFalse77060.6460
3290819114397Noneitemcode.33Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 percent Rated current As per IS:374/79, Rated power factor 0.9 laggingmin, Rated speed 350 10percent RPM, Rated air delivery 210 +/- 10percent Cubic Meter Minimum, Rated service value 4.2 CMM / Watt, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification Motor winding.Temp riseShall not exceed 75 deg C over and ambient of 40C by esistance method at 245 Volts, Insulation resistanceShall not be less than Two Mega Ohms 2M Ohms, Leakage current Should not exceed 210 Micro Amp, Power input, watt& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty.Vol-6 P.No30 SL No 6.4.256 Sweep 1200mm and as directed by the engineer incharge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each4562.614562.619.0FalseNoneNoneFalseNoneFalse41063.490
3290697114397NonePage No 64 Item No 9.30 PWD SR 2023-24V2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. Page No 64 Item No 9.30 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm6475.656475.6537.59FalseNoneNoneFalseNoneFalse243419.68350
3290698114397NonePage No 61 Item No 9.17.5 PWD SR 2023-24V2Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x1200 mm Page No 61 Item No 9.17.5 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1633.51633.5165.72FalseNoneNoneFalseNoneFalse270703.620
3290699114397NonePage No 60 Item No 9.9 PWD SR 2023-24V2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kgm2 including pointing the joints with white cement and matching pigment etc., complete. Page No 60 Item No 9.9 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1307.771307.7752.47FalseNoneNoneFalseNoneFalse68618.69190
3290700114397NonePage No 65 Item No 9.39 PWD SR 2023-24V2Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. Page No 65 Item No 9.39 PWD SR 2023-24V2 and as per directions of Engineer-in-charge,Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1761.111761.11117.42FalseNoneNoneFalseNoneFalse206789.53620
3290701114397NonePage No 107 Item No 12.74.1 PWD SR 2023-24V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 125x64x1.90mm Page No 107 Item No 12.74.1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each123.97123.9764.0FalseNoneNoneFalseNoneFalse7934.080
3290702114397NonePage No 107 Item No 12.74.3 PWD SR 2023-24V2Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 12.74.1 75x47x1.80mm Page No 107 Item No 12.74.3 PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each87.5187.5154.0FalseNoneNoneFalseNoneFalse4725.540
3290703114397NonePage No 105 Item No 12.62 PWD SR 2023-24V2Providing and fixing chromium plated brass handles of 100125 mm with necessary screws etc. complete Page No 105 Item No 12.62,PWD SR 2023-24V2 and as per directions of Engineer-in-charge Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each288.05288.0528.0FalseNoneNoneFalseNoneFalse8065.40
3290704114397NonePage No 107 Item No 12.76.3 PWD SR 2023-24V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :150*10 mm Page No 107 Item No 12.76.3 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each351.25351.2530.0FalseNoneNoneFalseNoneFalse10537.50
3290705114397NonePage No 107 Item No 12.76.4 PWD SR 2023-24V2Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :100*10 mm Page No 107 Item No 12.76.4 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each239.43239.4324.0FalseNoneNoneFalseNoneFalse5746.320
3290706114397NonePage No 218 Item No 22.15.3 PWD SR 2023-24V2Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 200 mm Page No 218 Item No 22.15.3 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each364.62364.6216.0FalseNoneNoneFalseNoneFalse5833.920
3290707114397NonePage No149, Item No 15.1,PWD SR 2023-24V2Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terraceChajjasSunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kgm2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 gm2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. Page No.149, Item No15,1 PWD SR 2023-24V2 and as per directions of Engineer-in-charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum992.98992.98225.95FalseNoneNoneFalseNoneFalse224363.8310
3290708114397NonePage No 77 Item No 11.3 PWD SR 2023-24V2Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. Page No 77 Item No 11.3 PWD SR 2023-24V2, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm10058.6510058.657.2FalseNoneNoneFalseNoneFalse72422.280
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17182775240000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17182775240000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17182775240000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17182775240000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17182775240000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17182775860000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of TenderProcessing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submission.None
17182775980000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computerwell in advance to the last date and time for receipt of tenders. Thedepartments shall not be responsible for non-accessibility of KPP Portaldue to internet connectivity issues and technical glitches at bidders endNone
17182776060000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17182776130000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contracthas been issued to bidderNone
17182776190000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPP Portal on or before the last date and time of bid submissionNone
17182776250000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17182776340000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17182776410000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundableNone
17182776470000NoneNoneELIGIBILITYContractors should be registered as KPWD Class III and Above Civil ContractorNone
17182776530000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17182776590000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17182776660000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approvalNone
17182776710000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasonsNone
17182776760000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at theaccepted tender rates irrespective of the cost of the workNone
17182776820000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the prescribed form in the favour of the Executive Engineer, PWD Division, Mysore Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of ContractNone
17182776870000NoneNoneELIGIBILITYContractor should carryout additional test required to test the suitability of materialsNone
17182776920000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, refectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extentNone
17182776980000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own costNone
17182777040000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own costNone
17182777110000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as per the clause 3.5 of STD tender document AttachedNone
17182777170000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specifcation and direction of Engineer - in -charge of this workNone
17182777230000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private propertiesNone
17182777280000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the clientNone
17182777350000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour actNone
17182777390000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defning all the procedure including the policies before execution of the projectNone
17182777460000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectifed at his own risk and costNone
17182779910001NoneNoneELIGIBILITYRs 1,00,000/-of the EMD should be paid through e-payment as specifed in e procurement portal and the remaining balance amount of EMD Shall be produced in the form of Bank Guarantee by uploading the scan copy of the Bank GuaranteeNone
17182780020000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17182780080000NoneNoneELIGIBILITYThe employer reserves the rights to Cancel or Withdraw any or all the tenders without Giving any reasons & Any TimeNone
17182780140000NoneNoneELIGIBILITYBankers E-mail ID & Contact Number must be Up loadedNone
17182780200000NoneNoneELIGIBILITYThe tenderer should maintain the executed works during the defective liability period for 1 yearNone
17182780250000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Mysore Division, Mysore during ofce hours on all working daysNone
17182780320000NoneNoneELIGIBILITYAs per the clause 13 of KW-4 (Conditions of contract) after the award of the tender The contractor shall prior to commencing the works, effect and there after maintain insurances, in the joint names of the employer and the contractor, (cover from the frst working day after the start date to the end of defects liability period) in the amounts stated in the contract dataNone
17182780520000NoneNoneELIGIBILITYRegarding Appealing aggrieved contractors may appeal to the prescribed (Appellant) authority within 30 days as per KTTP and appeal should be through e-proc only as per Govt. order No: pwd/572/CRM-2020(E) Bangalore DT.09-10-2020. The same will not be considered if appeal through LettersNone
17182780580001NoneNoneELIGIBILITYEstimate Item rates are inclusive of GST. Hence GST will not be paid separately for the quoted amount accordingly.None
17182780680000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of ContractNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNone3.2(b)Satisfactory completed(at least 90% of the contract value),as a prime contractor for at least one similar work such as Construction of Building work of value not less than Rs.53.98 Lakhs (usually not less than 50% estimated value of contract)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 (c) Executed in any one year, the following minimum quantities of work usually 80% of the peak annual rate of construction 1)PCC/RCC-195.00 CUM 2)SSM/BBM-157.00 Cum 3)REINFORCEMENT STEEL-13.85 TONNE 5)PLASTERING-1326.00 SQM 6)FLOORING-299.00 SQMPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs.1.59 LAKHS (not less than 50% of electrical works) in any one yearPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs.2.25 LAKHS (not less than 50% of water supply / sanitary engineering works ) in any one year.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- key technical and management personnel
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. 2019-20 to 2023-24. (a) achieved in at least two financial years a Minimum financial turn over (in all classes of civil engineering construction works only) of Rs. 215.94 lakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNone3.3(b)Liquid assets and /or availability of credit facilities of no less than Rs.36.00 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing work
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing work
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tenders already submitted
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CA and Profit & loss statementsTrueTechnical Bid
KPWD Registration Certificate-CLASS-III & ABOVETrueTechnical Bid
Work Done Certificate for Similar nature work, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
List of works for which tenders already submittedTrueTechnical Bid
List of existing commitments and ongoing worksTrueTechnical Bid
Banker Certificate - Line of Credit in the prescribed formatTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718434097000
version0
createdDateNone
modifiedDateNone
blockNumberO/O EXECUTIVE ENGINEER, PWD DIVISION, VINOBA ROAD, MYSORE
streetNone
cityMYSURU
stateKarnataka
pin570005
tenderRecallDTONone