createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1717846456441
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd564000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose29-06-2024 16:00:00
tenderQueryClose25-06-2024 16:00:00
technicalBidOpen01-07-2024 16:30:00
publishedDate15-06-2024 16:29:08
publishedByPostPWD_EE_DIV_KPL
publishedByUserKPE15981 - P HEMANTHARAJ
bidValidityPeriod90
noOfCalls1
preBidMeetingDate17-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonP HEMANTHARAJ
splitEmdRequiredYnTrue
emdBankGuarantee464000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9448021564
tenderSupplierListNone
tenderSchedule
createdTs1717846456490
version13
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT9505
titleConstruction of VVIP Guest House at Kanakagiri in Kanakagiri Taluk Koppal District (H/A - Appendix e 4059 PWD Buildings )
descriptionConstruction of VVIP Guest House at Kanakagiri in Kanakagiri Taluk Koppal District (H/A - Appendix e 4059 PWD Buildings )
categoryWORKS
categoryTextWorks
ecv37557952.88
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1696
locationNamePWD Division Office Koppala
provisionalAmount45000000.0
groupOverheadTotal0.0
fileNumberGVT2023-24/23
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17178464560000NoneNoneBuildingsElectrical Estimate2181956.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251559112580NonePWD Ele SR 2 23-24, (Page No- 1 Vol-6)Concealed Conduit System Supplying heavy gauge PVC conduit pipe ……mm dia .mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. ---- Including cost of all materials, labour, HOM, I m81.981.9750.0FalseNoneNoneFalseNoneFalse61425.00
3251560112580NonePWD Ele SR 2 23-24, (Page No- 1 Vol-6)Supplying heavy gauge PVC Conduit Pipe.dia.mm thick with suitable size bends,metal junction boxes adhesive paste etc.,by groove cutting in the wall and fixing by bracing U or J hook sand cement plastering upto the wall surface and run with 18SWG GI fish wire run through out the conduit wherever necessary. ---- Including cost of all materials, labour, HOM, I m82.9582.95600.0FalseNoneNoneFalseNoneFalse49770.00
3251561112580NonePWD Ele SR 2 23-24, (Page No- 3 Vol-6)Supplying and fixing PVC/metal conduit Deep junction box ---- Including cost of all materials, labour, HOM, I 1 EACH58.858.830.0FalseNoneNoneFalseNoneFalse1764.00
3251562112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Including cost of all materials, labour, HOM, I 1 EACH185.85185.8528.0FalseNoneNoneFalseNoneFalse5203.80
3251563112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Including cost of all materials, labour, HOM, I 1 EACH274.05274.0517.0FalseNoneNoneFalseNoneFalse4658.850
3251564112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Including cost of all materials, labour, HOM, I 1 EACH334.95334.9512.0FalseNoneNoneFalseNoneFalse4019.40
3251565112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall ---- Including cost of all materials, labour, HOM, I 1 EACH425.25425.254.0FalseNoneNoneFalseNoneFalse1701.00
3251566112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. ---- Including cost of all materials, labour, HOM, I 1 EACH169.05169.0528.0FalseNoneNoneFalseNoneFalse4733.40
3251567112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. ---- Including cost of all materials, labour, HOM, I 1 EACH298.2298.217.0FalseNoneNoneFalseNoneFalse5069.40
3251568112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. ---- Including cost of all materials, labour, HOM, I 1 EACH361.2361.212.0FalseNoneNoneFalseNoneFalse4334.40
3251569112580NonePWD Ele SR 2 23-24, (Page No- 8 Vol-6)Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. ---- Including cost of all materials, labour, HOM, I 1 EACH479.85479.854.0FalseNoneNoneFalseNoneFalse1919.40
3251570112580NonePWD Ele SR 2 23-24, (Page No- 3 Vol-6)Extra for Groove cutting in brick wall/CC floor to the suitable depth for concealing of Conduit/GI pipe and plastering, finishing upto wall surface complete. ---- Including cost of all materials, labour, HOM, I m30.4530.45400.0FalseNoneNoneFalseNoneFalse12180.00
3251571112580NonePWD Ele SR 2 23-24, (Page No- 4 Vol-6)Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost of all materials, labour, HOM, I No.122.85122.8530.0FalseNoneNoneFalseNoneFalse3685.50
3251572112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- Including cost of all materials, labour, HOM, I Point282.45282.4580.0FalseNoneNoneFalseNoneFalse22596.00
3251573112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- Including cost of all materials, labour, HOM, I Point397.95397.9580.0FalseNoneNoneFalseNoneFalse31836.00
3251574112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Point wiring Copper without switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing usingf 1100v Grade , COPPER conductor flexible multistrand FRLS PVC insulated., 2x1.5 Sqm. Cable confirming to the GTP without switch, the other end of the wires shall be terminated with sufficient loose length in a wood /PVC round block. Complete for each outlet(5/2.3) Group ---- Including cost of all materials, labour, HOM, I Point582.75582.7580.0FalseNoneNoneFalseNoneFalse46620.00
3251575112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m19.9519.951800.0FalseNoneNoneFalseNoneFalse35910.00
3251576112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m27.327.35400.0FalseNoneNoneFalseNoneFalse147420.00
3251577112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m44.144.13600.0FalseNoneNoneFalseNoneFalse158760.00
3251578112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m66.1566.152200.0FalseNoneNoneFalseNoneFalse145530.00
3251579112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m96.696.6640.0FalseNoneNoneFalseNoneFalse61824.00
3251580112580NonePWD Ele SR 2 23-24, (Page No- 5 Vol-6)Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I m175.35175.35120.0FalseNoneNoneFalseNoneFalse21042.00
3251581112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each107.1107.1230.0FalseNoneNoneFalseNoneFalse24633.00
3251582112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each174.3174.330.0FalseNoneNoneFalseNoneFalse5229.00
3251583112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each179.55179.5560.0FalseNoneNoneFalseNoneFalse10773.00
3251584112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each374.85374.8530.0FalseNoneNoneFalseNoneFalse11245.50
3251585112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each163.8163.810.0FalseNoneNoneFalseNoneFalse1638.00
3251586112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each189.0189.030.0FalseNoneNoneFalseNoneFalse5670.00
3251587112580NonePWD Ele SR 2 23-24, (Page No- 09 Vol-6)Supplyingandfixingofmodularswitch&connectedaccessoriesonexisting modular switch plate as per IS 3854 and IS 1293. ---- Including cost of all materials, labour, HOM, I Each247.8247.830.0FalseNoneNoneFalseNoneFalse7434.00
3251588112580NonePWD Ele SR 2 23-24, (Page No- 10 Vol-6)Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board ---- Including cost of all materials, labour, HOM, I No81.981.9200.0FalseNoneNoneFalseNoneFalse16380.00
3251589112580NonePWD Ele SR 2 23-24, (Page No- 10 Vol-6)Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board ---- Including cost of all materials, labour, HOM, I No74.5574.5580.0FalseNoneNoneFalseNoneFalse5964.00
3251590112580NonePWD Ele SR 2 23-24, (Page No- 10 Vol-6)Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board ---- Including cost of all materials, labour, HOM, I No77.777.7120.0FalseNoneNoneFalseNoneFalse9324.00
3251591112580NonePWD Ele SR 2 23-24, (Page No- 43 Vol-6) Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V 50/60Hz & Power factor .0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- Including cost of all materials, labour, HOM, I Each724.5724.560.0FalseNoneNoneFalseNoneFalse43470.00
3251592112580NonePWD Ele SR 2 23-24, (Page No- 44 Vol-6)Supply of round/square recess/surface mounted rolling type LED Down light with .W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition ---- Including cost of all materials, labour, HOM, I Each929.25929.2562.0FalseNoneNoneFalseNoneFalse57613.50
3251593112580NonePWD Ele SR 2 23-24, (Page No- 44 Vol-6)Supplying of recess mounting non integral type . LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clA, Power LEDs with CCT 6500 degree K, CRI 70%. efficacy 100 lumen per W, 120degree beam spread, life 25000 burning hours and Compliance to IS 10322 IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- Including cost of all materials, labour, HOM, I Each3294.93294.920.0FalseNoneNoneFalseNoneFalse65898.00
3251594112580NonePWD Ele SR 2 23-24, (Page No- 47 Vol-6)Supplying and fixing of slim patty fitting, made out of CRCA Sheet metal body with locking type holder completely wired.Excluding Ballast & Fluorescent Tube. ---- Including cost of all materials, labour, HOM, I Each282.45282.4560.0FalseNoneNoneFalseNoneFalse16947.00
3251595112580NonePWD Ele SR 2 23-24, (Page No- 30 Vol-6)Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 4.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification,Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty." ---- Including cost of all materials, labour, HOM, I Each2810.852810.8530.0FalseNoneNoneFalseNoneFalse84325.50
3251596112580NonePWD Ele SR 2 23 24 Page No 30 Vol-6Supplying of 1440rpm heavy duty exhaust fan with bracketblades suitable to operate on 230V 50Hz, AC Supply complete. ---- Including cost of all materials, labour, HOM, I Each3117.453117.4510.0FalseNoneNoneFalseNoneFalse31174.50
3251597112580NonePWD Ele SR 2 23-24, (Page No- 31 Vol-6)Supplying 1.5 Ton capacity TR split Air conditioners suitable for operation on A/C supply single phase 50 Hz 230 V with hermetically sealed compressor with air cooled condenser, motor capacitor and start run capacitors, relay and over load protector internal unit, with one indoor and one outdoor unit The condenser unit will be placed outside the room on the terrace to avoid noise including standard length of suitable size copper tubing covered with insulation tube. (High wall chorded /cordless) suitable capacity 3 core sheathed/ PVC copper cable and a battery operated wireless remote uni ---- Including cost of all materials, labour, HOM, I Each50067.1550067.158.0FalseNoneNoneFalseNoneFalse400537.20
3251598112580NonePWD Ele SR 2 23-24, (Page No- 34 Vol-6)Supplying 25 litres capacity vertical/horizontal type wall mounting Electrical water heater with 22 SWG copper/SS sheet metal inner Container tinned inside and anticorrosive paint outside and 20 SWG M.S. sheet metal outer cover filled with glass wool between inner and outer container for thermal insulation complete. The inlet and outlet pipes so arranged that water flow inside results in water to flow out from the inner container without turbulence. The Inner container shall have direct immersion type copper tube nickel plate. 2kW capacity element with a neon indicator fitted with 20A capacity 25 to 85 degree Centigrade range thermostat. The water heater shall completely be wired with 40/0.0076 inch 3 core copper flexible wire of 1.5 meters length and the outer container provided with heavy gauge brackets for wall mounting. ---- Including cost of all materials, labour, HOM, I Each10754.110754.17.0FalseNoneNoneFalseNoneFalse75278.70
3251599112580NonePWD Ele SR 2 23-24, (Page No- 38 Vol-6)Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete. ---- Including cost of all materials, labour, HOM, I Each41892.941892.91.0FalseNoneNoneFalseNoneFalse41892.90
3251600112580NonePWD Ele SR 2 23-24, (Page No- 56 Vol-6)Fixing all types and all capacities of fluorescent / false ceiling / spot light / CFL / LED fittings indoor on the wall / ceiling / rafters / girders using 23/0.0076” twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Including cost of all materials, labour, HOM, I Each128.1128.1145.0FalseNoneNoneFalseNoneFalse18574.50
3251601112580NonePWD Ele SR 2 23-24, (Page No- 57 Vol-6)Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary c lA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- Including cost of all materials, labour, HOM, I Each330.75330.7530.0FalseNoneNoneFalseNoneFalse9922.50
3251602112580NonePWD Ele SR 2 23-24, (Page No- 57 Vol-6)Fixing one exhaust fan after making a suitable notch in thewall and finishing with cement mortar and colouring to matchthe existing wall or brackets, with bolts and nuts and a 5 A,ceiling rose with sufficient length of 23 / 0.0076 inch PVCinsulated twin core wire of approved make with wire meshand wooden frame ---- Including cost of all materials, labour, HOM, I Each742.35742.3510.0FalseNoneNoneFalseNoneFalse7423.50
3251603112580NonePWD Ele SR 2 23-24, (Page No- 18 Vol-6Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. ---- Including cost of all materials, labour, HOM, I Each5187.05187.05.0FalseNoneNoneFalseNoneFalse25935.00
3251604112580NonePWD Ele SR 2 23-24, (Page No- 17 Vol-6)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- Including cost of all materials, labour, HOM, I Each435.75435.7538.0FalseNoneNoneFalseNoneFalse16558.50
3251605112580NonePWD Ele SR 2 23-24, (Page No- 17 Vol-6)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- Including cost of all materials, labour, HOM, I Each775.95775.9513.0FalseNoneNoneFalseNoneFalse10087.350
3251606112580NonePWD Ele SR 2 23-24, (Page No- 17 Vol-6)Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- Including cost of all materials, labour, HOM, I Each3196.23196.25.0FalseNoneNoneFalseNoneFalse15981.00
3251607112580NonePWD Ele SR 2 23-24, (Page No- 17 Vol-6)Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. ---- Including cost of all materials, labour, HOM, I Each9027.99027.91.0FalseNoneNoneFalseNoneFalse9027.90
3251608112580NoneELE SR 2023-24, (Page No- 20 PWD Ele SR Part-2 ,)Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. ---- Including cost of all materials, labour, HOM, I Sq CM0.530.53160000.0FalseNoneNoneFalseNoneFalse84800.00
3251609112580NoneELE SR 2023-24, (Page No- 20 PWD Ele SR 2 ,) Vol Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. ---- Including cost of all materials, labour, HOM, I m414.75414.7514.0FalseNoneNoneFalseNoneFalse5806.50
3251610112580NoneELE SR 2023-24,, (Page No- 20, Pwd Part-I ,)Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. ---- Including cost of all materials, labour, HOM, I m2588.252588.258.0FalseNoneNoneFalseNoneFalse20706.00
3251611112580NoneELE SR 2023-24,, (Page No- 20, Pwd Part-I ,)Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. ---- Including cost of all materials, labour, HOM, I m3606.753606.756.0FalseNoneNoneFalseNoneFalse21640.50
3251612112580NoneELE SR 2023-24, (Page No- 19, Pwd Vol_6 ,)Supplying of multi function digital meter with three line back light LC type display for voltage, Current, frequency,Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy. ---- Including cost of all materials, labour, HOM, I Each9780.759780.751.0FalseNoneNoneFalseNoneFalse9780.750
3251613112580NoneELE SR 2023-24, (Page No- 19, Pwd Vol_6 ,)Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired ---- Including cost of all materials, labour, HOM, I Each4609.54609.51.0FalseNoneNoneFalseNoneFalse4609.50
3251614112580NoneELE SR 2023-24, (Page No- 15, Pwd Vol_6 ,)Supplying of on load change over switches 4 poles, AC- 23A Duty, 415V, 50Hz, AC Supply. With all accessories. (SM Enclosure Sheet Metal Execution) ---- Including cost of all materials, labour, HOM, I Each8960.78960.71.0FalseNoneNoneFalseNoneFalse8960.70
3251615112580NoneELE SR 2023-24, (Page No- 19, Pwd Vol-6 ,)Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound ---- Including cost of all materials, labour, HOM, I Each590.1590.11.0FalseNoneNoneFalseNoneFalse590.10
3251616112580NonePWD Ele SR 2-23-24, (Page No- 13, Vol-6 ,)Supplying, fixing and wiring 50/5 to 400/5A 5VA burden Current Transformer Class 0.5 accuracy with Tape Wound ---- Including cost of all materials, labour, HOM, I Km146526.45146526.450.15FalseNoneNoneFalseNoneFalse21978.96750
3251617112580NonePWD SR 2-23-24, (Page No- 13, Vol-1 ,)Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work ---- Including cost of all materials, labour, HOM, I m508.2508.2100.0FalseNoneNoneFalseNoneFalse50820.00
3251618112580NoneELE SR 2023-24, (Page No- 52, ESCOMs SR 2023-24 ,Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. ---- Including cost of all materials, labour, HOM, I Km21930.321930.30.15FalseNoneNoneFalseNoneFalse3289.5450
3251619112580NonePWD Ele SR 2-23-24, (Page No- 14, Vol-6 ,)Supplying & fixing of Porcelain fuse channel with cut out onexisting wooden/panel using necessary nuts, bolts andwashers. ---- Including cost of all materials, labour, HOM, I Each725.55725.556.0FalseNoneNoneFalseNoneFalse4353.30
3251620112580NoneELE SR 2023-24, (Page No- 54 PWD Ele SR 2,) Vol 6Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Including cost of all materials, labour, HOM, I No3685.53685.55.0FalseNoneNoneFalseNoneFalse18427.50
3251621112580NoneEle1Gescom Deposit ---- Including cost of all materials, labour, HOM, I Rs25000.025000.01.0FalseNoneNoneFalseNoneFalse25000.00
3251622112580NonePWD Ele SR 2 23-24 (PAGE NO 38 VOL-6)Supplying, erecting, testing and commissioning of voltage stabilizer suitable for 170 to 270 v input and load variation from no load to full load, with over load protection, spike suppression, operating at 00 C to 400 C. Range etc., complete. ---- Including cost of all materials, labour, HOM, I Each5031.65031.68.0FalseNoneNoneFalseNoneFalse40252.80
17178464570000NoneNoneBuildingsSanitary157403.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251623112581NoneSR 2023-24 Item No : 1.4,1 , Page No 5 : Vol 1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m.SR 2023-24 Item No : 1.4,1 , Page No 5 : Vol 1 ---- Including cost of all materials, labour, HOM, I Cum254.1254.129.2FalseNoneNoneFalseNoneFalse7419.720
3251624112581NoneSR 2023-24 Item No : 16.9 , Page No : 191 Vol 5)Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. ( SR 2023-24 / Item No : 16.9 , Page No : 191 Vol 5) ---- Including cost of all materials, labour, HOM, I Each5726.75726.76.0FalseNoneNoneFalseNoneFalse34360.20
3251625112581NonePWD SR 2023-24 Ballari Circle Item No.7.3 Page No.Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. (PWD SR 2023-24 Ballari Circle Item No.7.3 Page No.85 Vol 5) ---- Including cost of all materials, labour, HOM, I Each2247.02247.06.0FalseNoneNoneFalseNoneFalse13482.00
3251626112581NoneSR 2023-24 Item No 9.1.4 Page No 95 Vol 5.Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 80 PN 6.0 HDPE Grade PE80-PN6.0,110mm dia ( SR 2023-24 / Item No : 9.1.4 , Page No : 95 Vol 5) ---- Including cost of all materials, labour, HOM, I m492.45492.45195.0FalseNoneNoneFalseNoneFalse96027.750
3251627112581NoneSR 2023-24 , Item No : 1.9 , Page No : 34 , Vol 1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ( SR 2023-24 , Item No : 1.9 , Page No : 34 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum279.3279.321.89FalseNoneNoneFalseNoneFalse6113.8770
17178464570000NoneNoneBuildingsWater supply509653.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251628112582NoneSR 2023-24 Item No 14.44 Page No138 Vol 2Providing and fixing white vitreous china extended wall mounting water closet of size 780x370x690 mm of approved shape including providing & fixing white vitreous china cistern with dual flush fitting, of flushing capacity 3 litre/ 6 litre (adjustable to 4 litre/ 8 litres), including seat cover, and cistern fittings, nuts, bolts and gasket etc complete. ( SR 2023-24 / Item No : 14.44 Page No138 Vol 2) ---- Including cost of all materials, labour, HOM, I Each11785.211785.25.0FalseNoneNoneFalseNoneFalse58926.00
3251629112582NoneSR 2023-24 Item No :14.1.1 , Page No :131 Vol 2)Providing and fixing water closet squatting pan (Indian type W.C. pan ) with 100 mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever) conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required: White Vitreous china Orissa pattern W.C. pan of size 580x440 mm with integral type foot rests (SR 2023-24 Item No :14.1.1 , Page No :131 Vol 2) ---- Including cost of all materials, labour, HOM, I Each5128.25128.23.0FalseNoneNoneFalseNoneFalse15384.60
3251630112582NoneSR 2023-24 Item No :14.25.1 ,Page No : 135 Vol 2)Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings Flat back wash basin of size 630x450 mm. (SR 2023-24 Item No :14.25.1 ,Page No : 135 Vol 2) ---- Including cost of all materials, labour, HOM, I Each1035.31035.312.0FalseNoneNoneFalseNoneFalse12423.60
3251631112582NoneSR 2023-24Item No : 13.27.2 , Page No : 121 Vol 2Providing and fixing unplasticised P.V.C. connection pipe with PTMT Nuts, collar and bush of approved quality and colour. 15 mm nominal bore with 450 mm length (SR 2023-24Item No : 13.27.2 , Page No : 121 Vol 2) ---- Including cost of all materials, labour, HOM, I Each121.8121.88.0FalseNoneNoneFalseNoneFalse974.40
3251632112582NoneSR 2023-24 Item No :14.28.1.1 ,Page No : 136 Vol 2Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete.32 mm dia (SR 2023-24 Item No :14.28.1.1 ,Page No : 136 Vol 2) ---- Including cost of all materials, labour, HOM, I Each79.879.812.0FalseNoneNoneFalseNoneFalse957.60
3251633112582NoneSR 2023-24 Item No :13.14 , Page No :119 Vol 2Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and weighing not less than 690 g. (SR 2023-24 Item No :13.14 , Page No :119 Vol 2) ---- Including cost of all materials, labour, HOM, I Nos888.3888.320.0FalseNoneNoneFalseNoneFalse17766.00
3251634112582NoneSR 2023-24 Item No : 13.16 , Page No : 119 Vol 2)Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (SR 2023-24 Item No : 13.16 , Page No : 119 Vol 2) ---- Including cost of all materials, labour, HOM, I Nos651.0651.012.0FalseNoneNoneFalseNoneFalse7812.00
3251635112582NoneSR 2023-24 Item No :13.22.2 ,Page No : 120 Vol 2)Providing and fixing PTMT grating of approved quality and colour. Rectangular type with openable circular lid (SR 2023-24 Item No :13.22.2 ,Page No : 120 Vol 2) ---- Including cost of all materials, labour, HOM, I Nos212.0212.015.0FalseNoneNoneFalseNoneFalse3180.00
3251636112582NoneSR 2023-24 Item No : 13.6.1.1 Page No : 117 Vol 2Providing and fixing gun metal non- return valve of approved quality (screwed end) : 25 mm nominal bore Horizontal SR 2023-24 Item No : 13.6.1.1 Page No : 117 Vol 2) ---- Including cost of all materials, labour, HOM, I Nos651.0651.08.0FalseNoneNoneFalseNoneFalse5208.00
3251637112582NoneSR 2023-24 Item No : 13.5.3 , Page No :117 Vol 2Providing and fixing ball valve (brass) of approved quality, High or low pressure, with plastic floats complete : 25 mm nominal bore (SR 2023-24 Item No : 13.5.3 , Page No :117 Vol 2) ---- Including cost of all materials, labour, HOM, I Nos348.6348.66.0FalseNoneNoneFalseNoneFalse2091.60
3251638112582NoneSR 2023-24 Item No : 14.38 , Page No :137 Vol 2Providing and fixing PTMT liquid soap container 109 mm wide, 125 mm high and 112 mm distance from wall of standard shape with bracket of the same materials with snap fittings of approved quality and colour, weighing not less than 105 g. (SR 2023-24 Item No : 14.38 , Page No :137 Vol 2) ---- Including cost of all materials, labour, HOM, I Each152.25152.2510.0FalseNoneNoneFalseNoneFalse1522.50
3251639112582NoneSR 2023-24 Item No : 13.33.6 ,Page No :123 Vol 2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 50 mm nominal dia Pipes (SR 2023-24 Item No : 13.33.6 ,Page No :123 Vol 2) ---- Including cost of all materials, labour, HOM, I m757.05757.05200.0FalseNoneNoneFalseNoneFalse151410.00
3251640112582NoneSR 2023-24 Item No :13.32.3 , Page No : 122 Vol 2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc. (SR 2023-24 Item No :13.32.3 , Page No : 122 Vol 2) ---- Including cost of all materials, labour, HOM, I m500.85500.85350.0FalseNoneNoneFalseNoneFalse175297.50
3251641112582NoneSR 2023-24 Item No : 13.34 , Page No : 123 Vol 2Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (SR 2023-24 Item No : 13.34 , Page No : 123 Vol 2) ---- Including cost of all materials, labour, HOM, I Ltr9.459.456000.0FalseNoneNoneFalseNoneFalse56700.00
17178464570001NoneNoneBuildingsSump647049.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251642112583NoneSR 2023-24 Item No 1.14.1 Page No 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( SR 2023-24 / Item No : 1.14.1 , Page No : 8 Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum107.1107.1122.13FalseNoneNoneFalseNoneFalse13080.1230
3251643112583NoneSR 2023-24 Item No : 2.1.3 , Page No :15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (SR 2023-24 Item No : 2.1.3 , Page No :15 Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6288.456288.456.11FalseNoneNoneFalseNoneFalse38422.42950
3251644112583NoneSR 2023-24 , Item No : 2.4.3 ,Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (SR 2023-24 , Item No : 2.4.3 ,Page No : 16 , Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.84.45FalseNoneNoneFalseNoneFalse29604.960
3251645112583NoneSR 2023-24, Addendum I , Page No :111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding (SR 2023-24, Addendum I , Page No :111 , Vol 1. ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3326.43326.44.5FalseNoneNoneFalseNoneFalse14968.80
3251646112583NoneSR 2023-24 ,Item No : 2.4.3 ,Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (SR 2023-24 ,Item No : 2.4.3 ,Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.810.55FalseNoneNoneFalseNoneFalse70187.040
3251647112583NoneSR 2023-24 , Addendum I ,Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding (SR 2023-24 , Addendum I ,Page No : 111 , Vol 1. ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3326.43326.410.55FalseNoneNoneFalseNoneFalse35093.520
3251648112583NoneSR 2023-24 , Item No : 2.4.3 ,Page No :16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. (SR 2023-24 , Item No : 2.4.3 ,Page No :16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.814.76FalseNoneNoneFalseNoneFalse98195.3280
3251649112583NoneSR 2023-24 , Addendum I ,Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding (SR 2023-24 , Addendum I ,Page No : 111 , Vol 1. ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum665.28665.2814.76FalseNoneNoneFalseNoneFalse9819.53280
3251650112583NoneSR 2023-24 ,Item No : 2.11 a, Page No : 18 ,Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings (SR 2023-24 ,Item No : 2.11 a, Page No : 18 ,Vol 1 ) ---- Including cost of all materials, labour, HOM, I t93929.8593929.853.22FalseNoneNoneFalseNoneFalse302454.1170
3251651112583NoneCOMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No.34Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No.34) ---- Including cost of all materials, labour, HOM, I Cum279.3279.328.62FalseNoneNoneFalseNoneFalse7993.5660
3251652112583NonePWD SR 2023-24 Item No.7.3 Page No.Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. (PWD SR 2023-24 Item No.7.3 Page No.85 Vol 5) ---- Including cost of all materials, labour, HOM, I Each2247.02247.01.0FalseNoneNoneFalseNoneFalse2247.00
3251653112583NonePWD SR 2023-24 Ballari Circle Item No.7.1 Page No.Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre, with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: MS angle of 65 x 65 x 8mm (PWD SR 2023-24 Ballari Circle Item No.7.1 Page No.85 Vol 5) ---- Including cost of all materials, labour, HOM, I m4595.854595.854.0FalseNoneNoneFalseNoneFalse18383.40
3251654112583NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I CUBIC METER6652.86652.80.62FalseNoneNoneFalseNoneFalse4124.7360
3251655112583NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I CUBIC METER3991.683991.680.62FalseNoneNoneFalseNoneFalse2474.84160
17178464570001NoneNoneBuildingsSeptic tank267199.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251656112584NoneSR 2023-24 Item No 1.14.1 Page No 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost of all materials, labour, HOM, I Cum107.1107.1123.93FalseNoneNoneFalseNoneFalse13272.9030
3251657112584NoneSR 2023-24 Item No:2.1.3 ,Page No:15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labour, HOM, I Cum6288.456288.455.19FalseNoneNoneFalseNoneFalse32637.05550
3251658112584NoneSR 2023-24 ,Item No:2.4.3 Page No:16 Vol1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Including cost of all materials, labour, HOM, I Cum6652.86652.83.39FalseNoneNoneFalseNoneFalse22552.9920
3251659112584NoneSR 2023-24 , Addendum I , Page No : 111 , Vol1 Percentage Additionalities for Formwork, Centering & Scaffolding (SR 2023-24 , Addendum I , Page No : 111 , Vol1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3326.43326.43.39FalseNoneNoneFalseNoneFalse11276.4960
3251660112584NoneSR 2023-24 , Item No : 2.11 a, Page No : 18 , VoSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ---- Including cost of all materials, labour, HOM, I t93929.8593929.850.29FalseNoneNoneFalseNoneFalse27239.65650
3251661112584NonePWD SR 2023-24, Item no.6.32, Page No.17 Vol 2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (PWD SR 2023-24, Item no.6.32, Page No.17 Vol 2) ---- Including cost of all materials, labour, HOM, I Cum1375.51375.559.81FalseNoneNoneFalseNoneFalse82268.6550
3251662112584NoneSR 2023-24,Vol-2,SL.No. 8.3.2, P.No.41Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Including cost of all materials, labour, HOM, I Cum349.65349.65116.0FalseNoneNoneFalseNoneFalse40559.40
3251663112584NoneSR 2023-24 Item No.7.3 Page NoProviding and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. ---- Including cost of all materials, labour, HOM, I Nos2247.02247.01.0FalseNoneNoneFalseNoneFalse2247.00
3251664112584NoneSR 2023-24 Ballari Circle Item No.10.14.8 PagProviding and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges,handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc. complete.110mm(weight of pipe -1.894 kg) ---- Including cost of all materials, labour, HOM, I m466.2466.216.0FalseNoneNoneFalseNoneFalse7459.20
3251665112584NonePWD SR 2023-24, Item no.6.33, Page No.17 Vol 2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x150x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. (PWD SR 2023-24, Item no.6.33, Page No.17 Vol 2) ---- Including cost of all materials, labour, HOM, I CUBIC METER1292.551292.5521.42FalseNoneNoneFalseNoneFalse27686.4210
17178464570000NoneNoneBuildingsElevation1014938.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251666112585NoneSR 2023-24 Item No : 8.29 , Page No : 45 Vol 2Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 ltr/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ( SR 2023-24 Item No : 8.29 , Page No : 45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm297.15297.15288.0FalseNoneNoneFalseNoneFalse85579.20
3251667112585NoneSR 2023-24 Item No : 10.15.1, Page No : 71 Vol 2Providing and fixing of Aluminium composite panel of approved make and colour for wall cladding for Brick/Rcc/stone walls & coloumns/ beams with necessary aluminium frame works at required level made out of 50x25x4mm C section or equivalent. The panel should consist of 3mm thick non-halogenated FR grade mineral based polymer ( 2hrs fire resistance as per ASTM E119-12 and clause B, S1, do as per ENT 13501-1sandwiched between 0.50 skins thick aluminium sheet making a total panel thickness of 4mm. The surfaces will be finished with PVDF based coating on topsides and service coating on reverse sides would be in polyester paint. The system shall be fixed using GI brackets, aluminium L cleats and stainless steel bolts and nuts complete with spring washer and cap nuts and all other necessary accessories, sealing shall be done with necessary rods etc., complete For Straight Portion ( SR 2023-24 Item No : 10.15.1, Page No : 71 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm4188.454188.4540.0FalseNoneNoneFalseNoneFalse167538.00
3251668112585NoneSR 2023-24 Item No.10.18, Page No.71 Vol 2Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 (1 cement : 3 coarse sand) proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including cost of all materials, mortar, labour, curing etc., complete. (PWD SR 2023-24 Item No.10.18, Page No.71 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm3526.953526.95216.0FalseNoneNoneFalseNoneFalse761821.20
17178464570000NoneNoneBuildingsBore well297370.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251669112586None2023-2024 PWD SR (Vol-5) Sl No.12.4 P.No.140Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geologicalformation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and rojection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test.(Commom 2023-2024 PWD SR (Vol-5) Sl No.12.4 P.No.140) ---- Including cost of all materials, labour, HOM, I Each5552.45552.41.0FalseNoneNoneFalseNoneFalse5552.40
3251670112586None2023-2024 PWD SR (Vol-5) Sl No.12.1.1 TO 12.1.4 P.Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimumworking of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.1.1 TO 12.1.4 P.No.139) ---- Including cost of all materials, labour, HOM, I Rmtr388.5388.550.0FalseNoneNoneFalseNoneFalse19425.00
3251671112586None2023-2024PWD SR(Vol-5) Sl No12.1.1 12.1.4 P.139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimumworking of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.1.1 TO 12.1.4 P.No.139) ---- Including cost of all materials, labour, HOM, I Rmtr487.2487.250.0FalseNoneNoneFalseNoneFalse24360.00
3251672112586None2023-2024 PWD SR (Vol-5) Sl No.12.1.1 12.1.4 P.139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimumworking of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.1.1 TO 12.1.4 P.No.139) ---- Including cost of all materials, labour, HOM, I Rmtr517.65517.6550.0FalseNoneNoneFalseNoneFalse25882.50
3251673112586None2023-2024 PWD SR (Vol-5) Sl No.12.1.1 12.1.4 P.139Sinking of Borewell of 165mm dia clear using super fast hydraulic rig ofcapacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimumworking of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.1.1 TO 12.1.4 P.No.139) ---- Including cost of all materials, labour, HOM, I Rmtr600.6600.650.0FalseNoneNoneFalseNoneFalse30030.00
3251674112586None2023-2024 PWD SR (Vol-5) Sl No.10.1.10 P.No.113Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 200mm dia., 6 kg/sqcm & class 3 (Commom 2023-2024 PWD SR (Vol-5) Sl No.10.1.10 P.No.113) ---- Including cost of all materials, labour, HOM, I Rmtr1170.751170.7550.0FalseNoneNoneFalseNoneFalse58537.50
3251675112586None2023-2024 PWD SR (Vol-5) Sl No.12.33 P.No.143Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.33 P.No.143) ---- Including cost of all materials, labour, HOM, I Each157.5157.51.0FalseNoneNoneFalseNoneFalse157.50
3251676112586None2023-2024 PWD SR (Vol-5) Sl No.12.34 P.No.143Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge (Commom 2023-2024 PWD SR (Vol-5) Sl No.12.34 P.No.143) ---- Including cost of all materials, labour, HOM, I Each172.2172.21.0FalseNoneNoneFalseNoneFalse172.20
3251677112586None2023-2024 PWD SR (Vol-5) Sl No.13.11.3 P.No.151Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete 3.00 HP - 135 LPM @ 56 m = 8 STG Outlet Dia - 2.00 6 to 15 HP pumps (Commom 2023-2024 PWD SR (Vol-5) Sl No.13.11.3 P.No.151) ---- Including cost of all materials, labour, HOM, I Each27205.527205.51.0FalseNoneNoneFalseNoneFalse27205.50
3251678112586None2023-2024 PWD SR (Vol-5) Sl No.13.23.3 P.No.155Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter 6 to 15 HP pumps (Commom 2023-2024 PWD SR (Vol-5) Sl No.13.23.3 P.No.155) ---- Including cost of all materials, labour, HOM, I Each16695.016695.01.0FalseNoneNoneFalseNoneFalse16695.00
3251679112586None2023-2024 PWD SR (Vol-5) Sl No.11.3.5 P.No.128Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: Heavy Duty GI pipe of 40mm dia (Commom 2023-2024 PWD SR (Vol-5) Sl No.11.3.5 P.No.128) ---- Including cost of all materials, labour, HOM, I Rmtr522.9522.980.0FalseNoneNoneFalseNoneFalse41832.00
3251680112586None2023-2024 PWD SR (Vol-5) Sl No.11.7.5 P.No.129)Supply and delivery at site wrought middle steel (galvanized) GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for:For 40 mm dia GI elbow (Commom 2023-2024 PWD SR (Vol-5) Sl No.11.7.5 P.No.129) ---- Including cost of all materials, labour, HOM, I Each216.3216.33.0FalseNoneNoneFalseNoneFalse648.90
3251681112586None2023-2024 PWD SR (Vol-5) Sl No.13.32 P.No.163Labour charges for Erection, Electrification and commissioning of Pumpsets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.(Commom 2023-2024 PWD SR (Vol-5) Sl No.13.32 P.No.163) ---- Including cost of all materials, labour, HOM, I Job6825.06825.01.0FalseNoneNoneFalseNoneFalse6825.00
3251682112586None2023-2024 PWD SR (Vol-6) Sl No.2.6.4 P.No.7Supplying and drawing 3 core flat PVC sheathed submersible pump cable manufactured with electrolytic grade copper with flexible copper with low resistance conductor confirming to 13:8130-1984 and virgin grade PVC insulation and powder coating extruded PVC sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990. (Commom 2023-2024 PWD SR (Vol-6) Sl No.2.6.4 P.No.7) ---- Including cost of all materials, labour, HOM, I Rmtr433.65433.6580.0FalseNoneNoneFalseNoneFalse34692.00
3251683112586None2023-2024 PWD SR (Vol-5) Sl No.13.33 P.No.156Labour charges for erection of indoor type panel board and meter boardunits with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work. (Commom 2023-2024 PWD SR (Vol-5) Sl No.13.33 P.No.156) ---- Including cost of all materials, labour, HOM, I Job1417.51417.51.0FalseNoneNoneFalseNoneFalse1417.50
3251684112586None2023-2024 PWD SR (Vol-5) Sl No.13.39 P.No.157Earthing: Supplying and fixing and wiring earth electrode for groundingcircuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. (Commom 2023-2024 PWD SR (Vol-5) Sl No.13.39 P.No.157) ---- Including cost of all materials, labour, HOM, I Job3937.53937.51.0FalseNoneNoneFalseNoneFalse3937.50
17178464570000NoneNoneBuildingsRo Unit605850.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251685112587NoneSR 2021-22 VOLUME 5 CODE NO - 21.1.2 PAGE NO 247Water purification plants: Supplying, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailed specification enclosed seperatly). Note:- 1.The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI /NFS standards,with BSI / NFS mark . 3. Tenders to be invited for procurement. 4. No direct payment should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge. Note : Refer the ANNEXURE : F for Detailed Specification of Each components (SR 2021-22 VOLUME 5 CODE NO - 21.1.2 PAGE NO 247) ---- Including cost of all materials, labour, HOM, I Each343350.0343350.01.0FalseNoneNoneFalseNoneFalse343350.00
3251686112587NoneSR 2021-22 VOLUME 5 CODE NO -21.1.6 & 21.1.7 PAGE Water purification plants: Supplying, Installation and Commissioning of automatic Water purification plant (RO+UF) with all accessories piping, product water tank on single phase power supply as per the enclosed detailed Technical Specifications including cost of material, loading and unloading and as directed by the Engineer in charge. (Ref- detailed specification enclosed seperatly). Note:- 1.The above rates mentioned are only for the preparation of estimate purpose. 2. All items are to be of BSI /NFS standards,with BSI / NFS mark . 3. Tenders to be invited for procurement. 4. No direct payment should be made under any situation or condition or on any account. 5. After commissioning of plant necessary testing to be done for the satisfactory of Engineer Incharge. Note : Refer the ANNEXURE : F for Detailed Specification of Each components (SR 2021-22 VOLUME 5 CODE NO -21.1.6 & 21.1.7 PAGE NO 247) ---- Including cost of all materials, labour, HOM, I Each262500.0262500.01.0FalseNoneNoneFalseNoneFalse262500.00
17178464570000NoneNoneBuildingsSolar light450634.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251687112588NoneSR 2021-22 Item No : 1.4.1 , Page No 5: Vol 1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. . In all kinds of soils Depth upto 1.5 m( SR 2021-22 / Item No : 1.4.1 , Page No 5: Vol 1 ) ---- Including cost of all materials, labour, HOM, I CUBIC METER254.1254.120.28FalseNoneNoneFalseNoneFalse5153.1480
3251688112588NoneSR 2023-24 Item No : 2.1.3 , Page No : 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- Including cost of all materials, labour, HOM, I CUBIC METER6288.456288.451.69FalseNoneNoneFalseNoneFalse10627.48050
3251689112588NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , VolProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I CUBIC METER6652.86652.82.75FalseNoneNoneFalseNoneFalse18295.20
3251690112588NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I CUBIC METER532.22532.222.75FalseNoneNoneFalseNoneFalse1463.6050
3251691112588NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , VolProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I CUBIC METER6652.86652.82.59FalseNoneNoneFalseNoneFalse17230.7520
3251692112588NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I CUBIC METER4656.964656.962.59FalseNoneNoneFalseNoneFalse12061.52640
3251693112588NoneSR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Tonne93929.8593929.850.68FalseNoneNoneFalseNoneFalse63872.2980
3251694112588NoneSR 2023-2024 PWD Ele SR-2 SR (Vol-6) Sl No. 4.3 P.Supplyanderectionof14FeetHeightStreetLightPole14FeetHeight StreetLightPoleonsuitablecementconcretefoundationwith2.5Feet height dia95mmcast irondecorative roundpedestal asper design weighingnotlessthan37Kgs, thepedestalshallbefittedwithClass'C' G.I.Pipe7Feet height 75mmouter diaand7 feet height toppiece outer diaof65mmfixedbymeasureof threading/welding/coupling complete. (excluding foundation). (SR 2023-2024 PWD Ele SR-2 SR (Vol-6) Sl No. 4.3 P.No-12) ---- Including cost of all materials, labour, HOM, I Each21630.021630.010.0FalseNoneNoneFalseNoneFalse216300.00
3251695112588NoneSR 2023-2024 PWD Ele SR-2 SR (Vol-6) Sl No. 11.8.5Supply of LED Street light luminaire with pressure diecast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded poly carbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @Lumen Maintenanceof70%, maximumlightintensityshouldbebetween 60degrees to 70degrees. CCT5500K, IP66optical andelectrical compartment &impact resistanceof complete luminaire IK08. Power Factor 0.9 withmains, SurgeProtection-Min5KValongwithOver voltage/Overload, short circuit/ miss-wiring protection. Compatibleforpolemountingwithouterdiaof40mmto 50mm.UniversalVoltagedriver tooperatewidevoltage range from100Vto 270V50/60Hz application. Compliance to IS 10322/IEC60598,LM79& LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site locationwith minimized minimal tools. LED Light fixture with .WSystem Power consumption. LED Efficiency1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facilityaccredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO9001:2008. Housingwith supplierwordmark/name shallbe Engraved /Embossing on thediecast housing/ Bodypart.Warrantyof2Years againstanymanufacturing defectworkingunderstandardelectricalconditionsas mentioned above should be given by LEDmanufacturer &Cree/Nichia/ Lumileds/Osram make LED Source.(SR 2023-2024 PWD Ele SR-2 SR (Vol-6) Sl No. 11.8.5 P.No-12 ---- Including cost of all materials, labour, HOM, I Each10563.010563.010.0FalseNoneNoneFalseNoneFalse105630.00
17178464570000NoneNoneBuildingsDesiel Genarator Set534835.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251696112589NonePWD Ele SR 2-23-24 (Page No- 42, V6) 10.1.4Supplying, installing, testing and commissioning of Diesel Generator set with following specifications. Power rating as per standard reference condition as per-BS 5514/ISO 3046/ ISO 8528 & IS 1002/ISO 3046 Generator set specifications. ---- Including cost of all materials, labour, HOM, I Each457067.0457067.01.0FalseNoneNoneFalseNoneFalse457067.00
3251697112589NonePWD Ele SR 2-23-24 (Page No- 42, V6) 10.2.3Supply, Erection, testing and commissioning of AMF panel suitable for .kVA DG set. The panel is of cubical type base/floor mounting control panel with hinged doors, undrilled bottom gland plate, aluminium Bus Bar with the accommodation for .A 4 pole contactor for alternator with thermal O/L relay,. A 4 pole contactor for mains, HRC fuse for short circuit protection, Microprocessor based AMF module with supply failure timer, Restoration timer, 3 impulse automatic engine start/stop logic, Mains/generator voltage, .capacity bypass switch and frequency sensing, PCC 1301controller with water temperature/Lube oil pressure/ engine speed, Voltage/ampere/Frequency/ kVA, Running-hour count, No of starts, Fault indication, over / under speed, Fails to start, Low oil pleasure, High engine temperature, Under/over voltage, over current, Earth fault relay, with indications for Mains on, Load on Mains, Battery charger on Push buttons AMF module by pass Mode, Battery charger unit with inbuilt Auto/Manual and Flat/Boost facility. The complete set shall have sufficient safety and adhere to NEC, NBC 2016, IEC, CPWD specifications, PCB norms and KSGEI Acts and Rules. ---- Including cost of all materials, labour, HOM, I Each77768.077768.01.0FalseNoneNoneFalseNoneFalse77768.00
17178464570001NoneNoneBuildingsParking Shed572281.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251698112590NoneSR 2023-24 Item No : 1.14.1 , Page No : 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( SR 2023-24 / Item No : 1.14.1 , Page No : 8 Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum107.1107.132.4FalseNoneNoneFalseNoneFalse3470.040
3251699112590NoneSR 2023-24 Item No : 2.1.3 , Page No : 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6288.456288.452.7FalseNoneNoneFalseNoneFalse16978.8150
3251700112590NoneSR 2023-24 Item No : 2.4.3 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.83.17FalseNoneNoneFalseNoneFalse21089.3760
3251701112590NoneSR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum532.22532.223.17FalseNoneNoneFalseNoneFalse1687.13740
3251702112590NoneSR 2023-24 Item No : 2.4.3 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.82.96FalseNoneNoneFalseNoneFalse19692.2880
3251703112590NoneSR 2021-22 , Appendix 1 , Page No : 115 , Vol 1Additionalities for Formwork, Centering & Scaffolding ( SR 2021-22 , Appendix 1 , Page No : 115 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4656.964656.962.96FalseNoneNoneFalseNoneFalse13784.60160
3251704112590NoneSR 2023-24 Item No : 2.11 a, Page No : 18 , Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I t93929.8593929.850.68FalseNoneNoneFalseNoneFalse63872.2980
3251705112590NoneSR 2023-24,Vol-1 SL.No. 1.9, P. No. 34Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34) ---- Including cost of all materials, labour, HOM, I Cum279.3279.313.66FalseNoneNoneFalseNoneFalse3815.2380
3251706112590NoneSR 2023-24 Item No : 2.1.3 , Page No : 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6288.456288.457.2FalseNoneNoneFalseNoneFalse45276.840
3251707112590NoneSR 2023-24 Item No.8.27, Page No.45 Vol 2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.27, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm55.6555.656.48FalseNoneNoneFalseNoneFalse360.6120
3251708112590NoneSR 2023-24 Item No.8.28, Page No.45 Vol 2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.28, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm93.4593.456.48FalseNoneNoneFalseNoneFalse605.5560
3251709112590NoneSR 2023-24, Vol-2, Page No. 82. SL.No. 11.16.2Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge (COMMON SR 2023-24, Vol-2, Page No. 82. SL.No. 11.16.2) ---- Including cost of all materials, labour, HOM, I Kg154.35154.352173.2FalseNoneNoneFalseNoneFalse335433.420
3251710112590NoneCOMMON SR 2023-24, Vol-2, Page No. 26. SL.No. 7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 g/m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineerin- charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.(COMMON SR 2023-24, Vol-2, Page No. 26. SL.No. 7.38) ---- Including cost of all materials, labour, HOM, I Sqm596.4596.477.49FalseNoneNoneFalseNoneFalse46215.0360
17178464570000NoneNoneBuildingsGround floor10515645.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251711112591NoneSR 2023-24 Item No : 1.14.1 , Page No : 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( ) ---- Including cost of all materials, labour, HOM, I Cum107.1107.1444.88FalseNoneNoneFalseNoneFalse47646.6480
3251712112591NoneSR 2023-24 Item No 2.1.3 Page No15Vol1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates () ---- Including cost of all materials, labour, HOM, I Cum6288.456288.4557.43FalseNoneNoneFalseNoneFalse361145.68350
3251713112591NoneCOMMON SR 2023-24,Vol-2, SL.No. 5.3, p. No.9Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) () ---- Including cost of all materials, labour, HOM, I Cum6515.256515.2576.83FalseNoneNoneFalseNoneFalse500566.65750
3251714112591NoneSR 2023-24, Vol-2 SL.No. 5.4, P. No. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ()" ---- Including cost of all materials, labour, HOM, I Cum6708.456708.4576.04FalseNoneNoneFalseNoneFalse510110.5380
3251715112591NoneSR 2023-24, Vol-2,SL.No. 8.3.1, P. No.41Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. () ---- Including cost of all materials, labour, HOM, I Sqm371.7371.781.34FalseNoneNoneFalseNoneFalse30234.0780
3251716112591NoneSR 2023-24 Item No : 2.4.3 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.865.14FalseNoneNoneFalseNoneFalse433363.3920
3251717112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum532.22532.2265.14FalseNoneNoneFalseNoneFalse34668.81080
3251718112591NoneSR 2023-24 Item No : 2.4.3 , Page No : 16 , Vol -1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.88.47FalseNoneNoneFalseNoneFalse56349.2160
3251719112591NoneR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4656.964656.968.47FalseNoneNoneFalseNoneFalse39444.45120
3251720112591NoneSR 2023-24, Item No : 2.4.3 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.819.18FalseNoneNoneFalseNoneFalse127600.7040
3251721112591NoneR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3326.43326.419.18FalseNoneNoneFalseNoneFalse63800.3520
3251722112591NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.1512.24FalseNoneNoneFalseNoneFalse87946.2360
3251723112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum5029.615029.6112.24FalseNoneNoneFalseNoneFalse61562.42640
3251724112591NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.177185.176.97FalseNoneNoneFalseNoneFalse50080.63490
3251725112591NoneR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4311.94311.96.97FalseNoneNoneFalseNoneFalse30053.9430
3251726112591NoneSR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.1516.02FalseNoneNoneFalseNoneFalse115106.1030
3251727112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4311.094311.0916.02FalseNoneNoneFalseNoneFalse69063.66180
3251728112591NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.1562.13FalseNoneNoneFalseNoneFalse446413.36950
3251729112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3592.583592.5862.13FalseNoneNoneFalseNoneFalse223206.99540
3251730112591NoneSR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.154.26FalseNoneNoneFalseNoneFalse30608.7390
3251731112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3233.323233.324.26FalseNoneNoneFalseNoneFalse13773.94320
3251732112591NoneSR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24,Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.153.25FalseNoneNoneFalseNoneFalse23351.73750
3251733112591NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3592.583592.583.26FalseNoneNoneFalseNoneFalse11711.81080
3251734112591NoneSR 2023-24 , Item No : 2.1.4 , Page No : 15 , Vol Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the\ work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.1.4 , Page No : 15 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6527.856527.854.14FalseNoneNoneFalseNoneFalse27025.2990
3251735112591NoneSR 2023-24, Item No : 2.11 a, Page No : 18 , Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I t93929.8593929.8522.92FalseNoneNoneFalseNoneFalse2152872.1620
3251736112591NoneCOMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34) ---- Including cost of all materials, labour, HOM, I Cum279.3279.3199.11FalseNoneNoneFalseNoneFalse55611.4230
3251737112591NoneCOMMON SR 2023-24, Vol-1, SI.No.1.8, P.No -33Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage & all other appurtenaces required to complete the work (COMMON SR 2023-24, Vol-1, SI.No.1.8, P.No -33) ---- Including cost of all materials, labour, HOM, I Cum497.7497.7281.99FalseNoneNoneFalseNoneFalse140346.4230
3251738112591NoneSR 2023-24 Item No : 2.1.3 , Page No : 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6288.456288.4535.13FalseNoneNoneFalseNoneFalse220913.24850
3251739112591NoneCOMMON SR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13) ---- Including cost of all materials, labour, HOM, I Cum8376.98376.9134.83FalseNoneNoneFalseNoneFalse1129457.4270
3251740112591NoneCOMMON SR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14) ---- Including cost of all materials, labour, HOM, I Cum1024.81024.823.8FalseNoneNoneFalseNoneFalse24390.240
3251741112591NonePWD SR 2023-24 Item No.12.13.2, Page No.100 Vol 2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (PWD SR 2023-24 Item No.12.13.2, Page No.100 Vol 2) ---- Including cost of all materials, labour, HOM, I Cum104580.0104580.01.12FalseNoneNoneFalseNoneFalse117129.60
3251742112591NonePWD SR 2023-24 Item No.12.57.1., Page No.105 vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (PWD SR 2023-24 Item No.12.57.1., Page No.105 vol 2) ---- Including cost of all materials, labour, HOM, I Cum4245.154245.1532.62FalseNoneNoneFalseNoneFalse138476.7930
3251743112591NonePWD SR 2023-24 Item No.12.93.1., Page No.111 Vol 2Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm (PWD SR 2023-24 Item No.12.93.1., Page No.111 Vol 2) ---- Including cost of all materials, labour, HOM, I m737.1737.124.0FalseNoneNoneFalseNoneFalse17690.40
3251744112591NonePWD SR 2023-24 Item No.12.94.1., Page No.112 Vol 2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness (PWD SR 2023-24 Item No.12.94.1., Page No.112 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm3659.253659.257.56FalseNoneNoneFalseNoneFalse27663.930
3251745112591NonePWD SR 2023-24 Item No.12.90, Page No.110 Vol 2Providing fixing of 3 track 2 panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame The outer frame having an overall size of 108mm width 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware Multi point locking system with touch lock. Wall thickness of frame sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor T Ps shall not be made PWD SR 2023-24 Item No.12.90, Page No.110 Vol 2 ---- Including cost of all materials, labour, HOM, I Sqm7070.77070.744.2FalseNoneNoneFalseNoneFalse312524.940
3251746112591NonePWD SR 2023-24 Item No.12.85, Page No.109 Vol 2Providing fixing of louvered ventilator made out of multi chambered UPVC Matching to RAL-9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free with gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the ventilator frame. The frame having overall size of 39mm 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm. The cost is inclusive of all fixtures and separate charges for minor T P s shall not be made PWD SR 2023-24 Item No.12.85, Page No.109 Vol 2 ---- Including cost of all materials, labour, HOM, I Sqm6004.956004.9518.6FalseNoneNoneFalseNoneFalse111692.070
3251747112591NonePWD SR 2023-24 Item No.11.34B, Page No.85 Vol 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD SR 2023-24 Item No.11.34B, Page No.85 Vol 2) ---- Including cost of all materials, labour, HOM, I Kg192.15192.151105.0FalseNoneNoneFalseNoneFalse212325.750
3251748112591NonePWD SR 2023-24 Item No.8.6.1, Page No.42 Vol 2Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerin- charge. (PWD SR 2023-24 Item No.8.6.1, Page No.42 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm339.15339.15971.27FalseNoneNoneFalseNoneFalse329406.22050
3251749112591NonePWD SR 2023-24 Item No.8.9, Page No.42 Vol 2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Item No.8.9, Page No.42 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm404.25404.25246.23FalseNoneNoneFalseNoneFalse99538.47750
3251750112591NonePWD SR 2023-24 Item No. 9.24, Page No.63 Vol 2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. (PWD SR 2023-24 Item No. 9.24, Page No.63 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm2994.62994.6245.08FalseNoneNoneFalseNoneFalse733916.5680
3251751112591NonePWD SR 2023-24 Item No.9.12.2, Page No.60 Vol 2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm (PWD SR 2023-24 Item No.9.12.2, Page No.60 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm1202.251202.25186.23FalseNoneNoneFalseNoneFalse223895.01750
3251752112591NonePWD SR 2023-24 Item No.9.11, Page No.60 Vol 2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. (PWD SR 2023-24 Item No.9.11, Page No.60 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm933.45933.4526.38FalseNoneNoneFalseNoneFalse24624.4110
3251753112591NonePWD SR 2023-24 Item No.10.14, Page No.71 Vol 2Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD SR 2023-24 Item No.10.14, Page No.71 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm1161.31161.3128.67FalseNoneNoneFalseNoneFalse149424.4710
3251754112591NoneSR 2023-24 Item No.8.51, Page No.50 Vol 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (SR 2023-24 Item No.8.51, Page No.50 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm105.0105.01301.6FalseNoneNoneFalseNoneFalse136668.00
3251755112591NoneSR 2023-24 Item No.8.54.2, Page No.50 Vol 2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. (SR 2023-24 Item No.8.54.2, Page No.50 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm115.5115.51301.6FalseNoneNoneFalseNoneFalse150334.80
3251756112591NoneSR 2023-24 Item No.8.27, Page No.45 Vol 2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.27, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm55.6555.651547.84FalseNoneNoneFalseNoneFalse86137.2960
3251757112591NoneSR 2023-24 Item No.8.28, Page No.45 Vol 2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.28, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm93.4593.45246.24FalseNoneNoneFalseNoneFalse23011.1280
3251758112591NonePWD SR 2023-24 Item No.8.41, Page No.48 vol 2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Item No.8.41, Page No.48 vol 2) ---- Including cost of all materials, labour, HOM, I Sqm175.35175.3544.2FalseNoneNoneFalseNoneFalse7750.470
3251759112591NoneCOMMON SR 2023-24, SL No 8.34.1, VOL-2, P.No .47Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SR 2023-24, SL No 8.34.1, VOL-2, P.No .47) ---- Including cost of all materials, labour, HOM, I Sqm55.6555.6532.62FalseNoneNoneFalseNoneFalse1815.3030
3251760112591NonePWD SR 2023-24 Item No.11.28, Page No.85 vol 2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24 Item No.11.28, Page No.85 vol 2) ---- Including cost of all materials, labour, HOM, I Kg593.25593.25727.2FalseNoneNoneFalseNoneFalse431411.40
3251761112591NoneSR 2023-24 ,Item No.8.16.3, Page No.43 Vol 2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment.Plaster mesh 100mm wide(PWD SR 2023-24 ,Item No.8.16.3, Page No.43 Vol 2) ---- Including cost of all materials, labour, HOM, I m46.246.2758.8FalseNoneNoneFalseNoneFalse35056.560
3251762112591NoneSR 2023-24 Item No.10.2, Page No.69 Vol 2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. (PWD SR 2023-24 Item No.10.2, Page No.69 Vol 2) ---- Including cost of all materials, labour, HOM, I m344.4344.477.6FalseNoneNoneFalseNoneFalse26725.440
17178464570001NoneNoneBuildingsFirst Floor8775561.07
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251763112592NoneSR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.011.81FalseNoneNoneFalseNoneFalse85705.170
3251764112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum5079.95079.911.81FalseNoneNoneFalseNoneFalse59993.6190
3251765112592NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.06.67FalseNoneNoneFalseNoneFalse48404.190
3251766112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4354.24354.26.67FalseNoneNoneFalseNoneFalse29042.5140
3251767112592NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.015.95FalseNoneNoneFalseNoneFalse115749.150
3251768112592NoneSR 2023-24 Addendum I , Page No : 111 , Vol1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4354.24354.215.95FalseNoneNoneFalseNoneFalse69449.490
3251769112592NoneSR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24, Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.057.22FalseNoneNoneFalseNoneFalse415245.540
3251770112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3628.53628.557.22FalseNoneNoneFalseNoneFalse207622.770
3251771112592NoneSR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.02.42FalseNoneNoneFalseNoneFalse17561.940
3251772112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3265.653265.652.42FalseNoneNoneFalseNoneFalse7902.8730
3251773112592NoneSR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7257.07257.03.26FalseNoneNoneFalseNoneFalse23657.820
3251774112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3265.653265.653.26FalseNoneNoneFalseNoneFalse10646.0190
3251775112592NoneSR 2023-24 Item No : 2.1.4 , Page No : 15 , Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the\ work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 Item No : 2.1.4 , Page No : 15 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6593.136593.133.52FalseNoneNoneFalseNoneFalse23207.81760
3251776112592NoneSR 2023-24 Item No : 2.11 a, Page No : 18 , Vol 1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I t94869.1594869.1514.77FalseNoneNoneFalseNoneFalse1401217.34550
3251777112592NoneSR 2023-24 Vol-2, SL.No. 6.2, Pg. No. 13Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24 Vol-2, SL.No. 6.2, Pg. No. 13) ---- Including cost of all materials, labour, HOM, I Cum8460.678460.67320.22FalseNoneNoneFalseNoneFalse2709275.74740
3251778112592NoneSR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in foundations and plinth in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.13, Pg. No. 14) ---- Including cost of all materials, labour, HOM, I Sqm1035.051035.0510.71FalseNoneNoneFalseNoneFalse11085.38550
3251779112592NonePWD SR 2023-24 Item No.12.13.2, Page No.100 Vol 2Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. (PWD SR 2023-24 Item No.12.13.2, Page No.100 Vol 2) ---- Including cost of all materials, labour, HOM, I Cum105625.8105625.81.07FalseNoneNoneFalseNoneFalse113019.6060
3251780112592NonePWD SR 2023-24 Item No.12.57.1., Page No.105 vol 2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (PWD SR 2023-24 Item No.12.57.1., Page No.105 vol 2) ---- Including cost of all materials, labour, HOM, I Sqm4287.64287.630.12FalseNoneNoneFalseNoneFalse129142.5120
3251781112592NonePWD SR 2023-24 Item No.12.93.1., Page No.111 Vol 2Providing and fixing factory made single extruded WPC (Wood Polymer Composite) solid door/window/Clerestory windows & other Frames/ Chowkhat comprising of virgin PVC polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibres (wood powder/rice husk/ wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) fabricated with miter joints after applying PVC solvent cement and screwed with full body threaded star headed SS screws having minimum frame density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) & 1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus of elasticity 900 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixed in position with M.S hold fast/lugs/SS dash fasteners of required dia and length complete as per direction of Engineer-InCharge. (Fixtures shall be paid for separately) Size 62 x 100mm (PWD SR 2023-24 Item No.12.93.1., Page No.111 Vol 2) ---- Including cost of all materials, labour, HOM, I m744.47744.4724.0FalseNoneNoneFalseNoneFalse17867.280
3251782112592NonePWD SR 2023-24 Item No.12.94.1., Page No.112 Vol 2Providing and fixing factory made Green certified, Anti Termite, UV resistant, high water absorbant single extruded WPC (Wood PolymerComposite) solid plain flush door shutter of required size comprising of virgin polymer of K value 58-60 (Suspension Grade), calcium carbonate and natural fibers (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for 100 g) having minimum density of 650 kg/m3 and screw withdrawal strength of 1800 N (Face) & 900 N (Edge), minimum compressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 and resistance to spread of flame of Class A category with property of being termite/borer proof, water/moisture proof and fire retardant and fixing with stainless steel butt hinges of required size with necessary full body threaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to be paid separately) 30 mm thickness (PWD SR 2023-24 Item No.12.94.1., Page No.112 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm3695.843695.847.56FalseNoneNoneFalseNoneFalse27940.55040
3251783112592NonePWD SR 2023-24 Item No.12.90, Page No.110 Vol 2Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm 2200mm The cost is inclusive of all fixtures and separate charges for minor T Ps shall not be made PWD SR 2023-24 Item No.12.90, Page No.110 Vol 2 ---- Including cost of all materials, labour, HOM, I Sqm7141.417141.4151.5FalseNoneNoneFalseNoneFalse367782.6150
3251784112592NonePWD SR 2023-24 Item No.12.85, Page No.109 Vol 2Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (PWD SR 2023-24 Item No.12.85, Page No.109 Vol 2 ---- Including cost of all materials, labour, HOM, I Sqm6065.06065.04.8FalseNoneNoneFalseNoneFalse29112.00
3251785112592NonePWD SR 2023-24 Item No.11.34B, Page No.85 Vol 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD SR 2023-24 Item No.11.34B, Page No.85 Vol 2) ---- Including cost of all materials, labour, HOM, I Kg194.07194.07787.5FalseNoneNoneFalseNoneFalse152830.1250
3251786112592NonePWD SR 2023-24 ,Item No.8.16.3, Page No.43 Vol 2Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment.Plaster mesh 100mm wide(PWD SR 2023-24 ,Item No.8.16.3, Page No.43 Vol 2) ---- Including cost of all materials, labour, HOM, I m46.6646.66758.8FalseNoneNoneFalseNoneFalse35405.6080
3251787112592NonePWD SR 2023-24 Item No.8.6.1, Page No.42 Vol 2Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineerin- charge. (PWD SR 2023-24 Item No.8.6.1, Page No.42 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm342.54342.54849.52FalseNoneNoneFalseNoneFalse290994.58080
3251788112592NonePWD SR 2023-24 Item No.8.9, Page No.42 Vol 2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Item No.8.9, Page No.42 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm408.29408.29650.18FalseNoneNoneFalseNoneFalse265461.99220
3251789112592NonePWD SR 2023-24 Item No. 9.24, Page No.63 Vol 2Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent. (PWD SR 2023-24 Item No. 9.24, Page No.63 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm3024.553024.55135.31FalseNoneNoneFalseNoneFalse409251.86050
3251790112592NonePWD SR 2023-24 Item No.9.12.2, Page No.60 Vol 2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm (PWD SR 2023-24 Item No.9.12.2, Page No.60 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm1214.271214.27241.51FalseNoneNoneFalseNoneFalse293258.34770
3251791112592NonePWD SR 2023-24 Item No.9.11, Page No.60 Vol 2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. (PWD SR 2023-24 Item No.9.11, Page No.60 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm942.78942.7819.26FalseNoneNoneFalseNoneFalse18157.94280
3251792112592NonePWD SR 2023-24 Item No.10.14, Page No.71 Vol 2Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. (PWD SR 2023-24 Item No.10.14, Page No.71 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm1172.911172.9166.42FalseNoneNoneFalseNoneFalse77904.68220
3251793112592NonePWD SR 2023-24 Item No.10.2, Page No.69 Vol 2Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. (PWD SR 2023-24 Item No.10.2, Page No.69 Vol 2) ---- Including cost of all materials, labour, HOM, I m347.84347.8444.2FalseNoneNoneFalseNoneFalse15374.5280
3251794112592NoneSR 2023-24 Item No.8.51, Page No.50 Vol 2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (SR 2023-24 Item No.8.51, Page No.50 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm106.05106.051206.41FalseNoneNoneFalseNoneFalse127939.78050
3251795112592NoneSR 2023-24 Item No.8.54.2, Page No.50 Vol 2Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 g/L of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge. (SR 2023-24 Item No.8.54.2, Page No.50 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm116.66116.661206.41FalseNoneNoneFalseNoneFalse140739.79060
3251796112592NoneSR 2023-24 Item No.8.27, Page No.45 Vol 2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.27, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm56.2156.211856.59FalseNoneNoneFalseNoneFalse104358.92390
3251797112592NoneSR 2023-24 Item No.8.28, Page No.45 Vol 2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.28, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm94.3894.38650.18FalseNoneNoneFalseNoneFalse61363.98840
3251798112592NonePWD SR 2023-24 Item No.8.41, Page No.48 vol 2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Item No.8.41, Page No.48 vol 2) ---- Including cost of all materials, labour, HOM, I Sqm177.1177.151.5FalseNoneNoneFalseNoneFalse9120.650
3251799112592NoneSR 2023-24, SL No 8.34.1, VOL-2, P.No .47Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (COMMON SR 2023-24, SL No 8.34.1, VOL-2, P.No .47) ---- Including cost of all materials, labour, HOM, I Sqm56.2156.2128.5FalseNoneNoneFalseNoneFalse1601.9850
3251800112592NonePWD SR 2023-24 Item No.11.28, Page No.85 vol 2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (PWD SR 2023-24 Item No.11.28, Page No.85 vol 2) ---- Including cost of all materials, labour, HOM, I Kg599.18599.18831.3FalseNoneNoneFalseNoneFalse498098.3340
3251801112592NoneSR 2023-24, Vol-2, Page No. 149. SL.No. 15.1Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (COMMON SR 2023-24, Vol-2, Page No. 149. SL.No. 15.1) ---- Including cost of all materials, labour, HOM, I Sqm866.43866.43381.45FalseNoneNoneFalseNoneFalse330499.72350
3251802112592NoneSR 2023-24 ITEAM NO 2.1.3 Page no 15 V 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates. (SR 2023-24 ITEAM NO 2.1.3 Page no 15 V 1) ---- Including cost of all materials, labour, HOM, I Cum6351.336351.332.09FalseNoneNoneFalseNoneFalse13274.27970
3251803112592NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4445.934445.932.09FalseNoneNoneFalseNoneFalse9291.99370
17178464570001NoneNoneBuildingsENTRANCE ARCH990158.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251804112593NoneSR 2023-24 Vol-2, P.NO -163, SL.No -19.9.1Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineerin-charge. In lime mortar (COMMON SR 2023-24 Vol-2, P.NO -163, SL.No -19.9.1) ---- Including cost of all materials, labour, HOM, I Cum831.6831.63.89FalseNoneNoneFalseNoneFalse3234.9240
3251805112593NoneCOMMON SR 2023-24 Vol-2, P.NO -193, SL.No -19.57Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials to the appropriate disposal area stacking serviceable and unserviceable material separately including cutting reinforcement bars.(COMMON SR 2023-24 Vol-2, P.NO -193, SL.No -19.57) ---- Including cost of all materials, labour, HOM, I Cum2466.452466.450.75FalseNoneNoneFalseNoneFalse1849.83750
3251806112593NoneSR 2023-24 Vol-2, P.NO -187, SL.No -19.7.3Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.In cement mortar (COMMON SR 2023-24 Vol-2, P.NO -187, SL.No -19.7.3) ---- Including cost of all materials, labour, HOM, I Cum1080.451080.457.2FalseNoneNoneFalseNoneFalse7779.240
3251807112593NoneSR 2023-24 Item No : 1.14.1 , Page No : 8 Vol 1 Earth work excavation for Foundation by mechanical means for all works depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m SR 2023-24 Item No 1.14.1 , Page No 8 Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum107.1107.177.17FalseNoneNoneFalseNoneFalse8264.9070
3251808112593NoneSR 2023-24 Item No : 2.1.3 , Page No : 15 Vol 1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ( SR 2023-24 / Item No : 2.1.3 , Page No : 15 Vol 1) ---- Including cost of all materials, labour, HOM, I Cum6288.456288.4533.27FalseNoneNoneFalseNoneFalse209216.73150
3251809112593NoneSR 2023-24 Item No : 5.1.1 , Page No :9 Vol 2Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ( SR 2023-24 Item No : 5.1.1 , Page No :9 Vol 2) ---- Including cost of all materials, labour, HOM, I Cum5891.555891.552.53FalseNoneNoneFalseNoneFalse14905.62150
3251810112593NoneSR 2023-24, Vol-2 SL.No. 5.4, P. No. 9Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (SR 2023-24, Vol-2 SL.No. 5.4, P. No. 9). ---- Including cost of all materials, labour, HOM, I Cum6708.456708.452.5FalseNoneNoneFalseNoneFalse16771.1250
3251811112593NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.89.33FalseNoneNoneFalseNoneFalse62070.6240
3251812112593NoneSR 2023-24 ,Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum532.22532.229.33FalseNoneNoneFalseNoneFalse4965.61260
3251813112593NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.81.53FalseNoneNoneFalseNoneFalse10178.7840
3251814112593NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4656.964656.961.53FalseNoneNoneFalseNoneFalse7125.14880
3251815112593NoneSR 2023-24 , Item No : 2.4.3 , Page No : 16 , VolProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ( SR 2023-24 , Item No : 2.4.3 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum6652.86652.81.38FalseNoneNoneFalseNoneFalse9180.8640
3251816112593NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum3326.43326.41.38FalseNoneNoneFalseNoneFalse4590.4320
3251817112593NoneSR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 , Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.153.22FalseNoneNoneFalseNoneFalse23136.1830
3251818112593NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum5029.615029.613.22FalseNoneNoneFalseNoneFalse16195.34420
3251819112593NoneSR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.150.42FalseNoneNoneFalseNoneFalse3017.7630
3251820112593NoneSR 2023-24 , Addendum I , Page No : 111 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 111 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4311.094311.090.42FalseNoneNoneFalseNoneFalse1810.65780
3251821112593NoneSR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( SR 2023-24 Item No : 2.5.2 , Page No : 16 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum7185.157185.152.39FalseNoneNoneFalseNoneFalse17172.50850
3251822112593NoneSR 2023-24 AddendumI Page No112 , Vol 1Percentage Additionalities for Formwork, Centering & Scaffolding ( SR 2023-24 , Addendum I , Page No : 112 , Vol 1 . ) Percentage on finished rate of concrete per m3 ---- Including cost of all materials, labour, HOM, I Cum4311.094311.092.39FalseNoneNoneFalseNoneFalse10303.50510
3251823112593NoneSR 2023-24 Item No : 2.11 a, Page No : 18 , Vol1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification, a. Buildings ( SR 2023-24 , Item No : 2.11 a, Page No : 18 , Vol 1 ) ---- Including cost of all materials, labour, HOM, I t93929.8593929.852.05FalseNoneNoneFalseNoneFalse192556.19250
3251824112593NoneSR 2023-24,Vol-1 SL.No. 1.9, P. No. 34Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (COMMON SR 2023-24,Vol-1 SL.No. 1.9, P. No. 34) ---- Including cost of all materials, labour, HOM, I Cum279.3279.341.02FalseNoneNoneFalseNoneFalse11456.8860
3251825112593NoneSR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (COMMON SR 2023-24, Vol-2, SL.No. 6.2, Pg. No. 13) ---- Including cost of all materials, labour, HOM, I Cum8376.98376.96.17FalseNoneNoneFalseNoneFalse51685.4730
3251826112593NoneSR 2023-24 Ballari Circle Item No.8.9, Page No.42Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Ballari Circle Item No.8.9, Page No.42 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm404.25404.25144.65FalseNoneNoneFalseNoneFalse58474.76250
3251827112593NoneSR 2023-24 Ballari Item No.8.28, Page No.45 Vol 2Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Ballari Circle Item No.8.27, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm55.6555.65144.65FalseNoneNoneFalseNoneFalse8049.77250
3251828112593NoneSR 2023-24 Item No.8.28, Page No.45 Vol 2Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR 2023-24 Item No.8.28, Page No.45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm93.4593.4588.0FalseNoneNoneFalseNoneFalse8223.60
3251829112593NoneSR 2023-24 Item No.11.34B, Page No.85 Vol 2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. (PWD SR 2023-24 Item No.11.34B, Page No.85 Vol 2) ---- Including cost of all materials, labour, HOM, I Kg192.15192.15529.2FalseNoneNoneFalseNoneFalse101685.780
3251830112593NoneSR 2023-24 Item No.8.41, Page No.48 vol 2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (PWD SR 2023-24 Item No.8.41, Page No.48 vol 2) ---- Including cost of all materials, labour, HOM, I Sqm175.35175.3525.2FalseNoneNoneFalseNoneFalse4418.820
3251831112593NoneSR 2023-24 Item No : 8.29 , Page No : 45 Vol 2Finishing walls with textured exterior paint of required shade :New work (Two coats applied @ 3.28 L/10 m²) over and including priming coat of exterior primer applied @ 2.20kg/10 m² to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ( SR 2023-24 Item No : 8.29 , Page No : 45 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm297.15297.1556.75FalseNoneNoneFalseNoneFalse16863.26250
3251832112593NonePWD SR 2023-24 Item No.11.57.1, Page No.95 Vol 2Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire (PWD SR 2023-24 Item No.11.57.1, Page No.95 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm18.918.91600.0FalseNoneNoneFalseNoneFalse30240.00
3251833112593NoneSR 2023-24 Item No.10.15.2 Page No.71 Vol 2Providing and fixing of Aluminium composite panel of approved make and colour for wall cladding for Brick/Rcc/stone walls & coloumns/beams with necessary aluminium frame works at required level made out of 50x25x4mm C section or equivalent. The panel should consist of 3mm thick non-halogenated FR grade mineral based polymer ( 2 hrs fire resistance as per ASTM E119-12 and clause B, S1, do as per ENT 13501-1sandwiched between 0.50 skins thick aluminium sheet making a total panel thickness of 4mm. The surfaces will be finished with PVDF based coating on topsides and service coating on reverse sides would be in polyester paint. The system shall be fixed using GI brackets, aluminium L cleats and stainless steel bolts and nuts complete with spring washer and cap nuts and all other necessary accessories, sealing shall be done with necessary rods etc., complete For Curved Portion (PWD SR 2023-24 Item No.10.15.2 Page No.71 Vol 2) ---- Including cost of all materials, labour, HOM, I Sqm4981.24981.27.5FalseNoneNoneFalseNoneFalse37359.00
3251834112593NoneSR 2023-24 Item No.11.57.2, Page No.95 Vol 2Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete. (PWD SR 2023-24 Item No.11.57.2, Page No.95 Vol 2) ---- Including cost of all materials, labour, HOM, I Kg118.65118.65315.0FalseNoneNoneFalseNoneFalse37374.750
17178464570001NoneNoneBuildingsPaver and CCroad9124020.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251835112594NoneSR 2023-24 Item No : 1.14.1 , Page No : 8 Vol 1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ( SR 2023-24 / Item No : 1.14.1 , Page No : 8 Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum107.1107.12462.96FalseNoneNoneFalseNoneFalse263783.0160
3251836112594NoneSR 2023-24 Item No : 3.7 MORTH 305.3.4 Page No3Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( SR 2023-24 Item No : 3.7 / MORTH 305.3.4 , Page No : 17, Vol 3 ) ---- Including cost of all materials, labour, HOM, I Cum110.25110.25820.1FalseNoneNoneFalseNoneFalse90416.0250
3251837112594NoneSR 2023-24 , Vol-3 Sl.No.4.1.A.(v) ,P.No - 19A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (SR 2023-24 , Vol-3 Sl.No.4.1.A.(v) ,P.No - 19) ---- Including cost of all materials, labour, HOM, I Cum2611.352611.35820.1FalseNoneNoneFalseNoneFalse2141568.1350
3251838112594NoneSR 2023-24 Vol-3 Sl.No.4.27 ,P.No - 26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in (SR 2023-24 Vol-3 Sl.No.4.27 ,P.No - 26.) ---- Including cost of all materials, labour, HOM, I Cum2686.952686.95820.1FalseNoneNoneFalseNoneFalse2203567.6950
3251839112594NoneSR 2023-24 Vol-2, Sl.No. 6.8.2 ,P.No - 51Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (SR 2023-24 Vol-2, Sl.No. 6.8.2 ,P.No - 51) ---- Including cost of all materials, labour, HOM, I Sqm1219.051219.052917.35FalseNoneNoneFalseNoneFalse3556395.51750
3251840112594NoneSR 2023-24 Item No : 1.4.1 , Page No : 5 Vol 1Earth work excavation by manual means for drains,canals, waste weir,draft, approach channels, key trenches, foundation of bridges andsuch simillar works in all kinds of soils , as per drawing and technicalspecifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter,excavated surface leveled and sides neatly dressed disposing off theexcavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (SR 2023-24 Item No : 1.4.1 , Page No : 5 Vol 1 ) ---- Including cost of all materials, labour, HOM, I Cum254.1254.1202.5FalseNoneNoneFalseNoneFalse51455.250
3251841112594NoneSR 2023-24 Item No : 3.7 , Page No : 17, Vol 3Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (SR 2023-24 Item No : 3.7 , Page No : 17, Vol 3 ) ---- Including cost of all materials, labour, HOM, I Cum110.25110.2567.5FalseNoneNoneFalseNoneFalse7441.8750
3251842112594NoneSR 2023-24 , Vol-3 Sl.No.4.1.A.(v) ,P.No - 19A Plant Mix Method Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 (v) For Grading -V Material (SR 2023-24 , Vol-3 Sl.No.4.1.A.(v) ,P.No - 19) ---- Including cost of all materials, labour, HOM, I Cum2611.352611.3567.5FalseNoneNoneFalseNoneFalse176266.1250
3251843112594NoneSR 2023-24 , Vol-3 Sl.No.4.27 ,P.No - 26Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in (SR 2023-24 , Vol-3 Sl.No.4.27 ,P.No - 26) ---- Including cost of all materials, labour, HOM, I Cum2686.952686.9567.5FalseNoneNoneFalseNoneFalse181369.1250
3251844112594NoneSR 2023-24 , Vol-3, Sl.No. 16.27 P.No - 148Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.(COMMON SR SR 2023-24 , Vol-3, Sl.No. 16.27 P.No - 148) ---- Including cost of all materials, labour, HOM, I Cum6692.76692.767.5FalseNoneNoneFalseNoneFalse451757.250
17178464570001NoneNoneBuildingsHighmast446875.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251845112595NonePWD Common SR 2023-24, (Page No- 6 Vol-1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth ---- Including cost of all materials, labour, HOM, I Cum313.95313.958.16FalseNoneNoneFalseNoneFalse2561.8320
3251846112595NonePWD Common SR 2023-24, (Page No- 15 Vol-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost of all materials, labour, HOM, I Cum6288.456288.450.98FalseNoneNoneFalseNoneFalse6162.6810
3251847112595NonePWD Common SR 2023-24, (Page No- 16 Vol-1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Including cost of all materials, labour, HOM, I Cum6652.86652.81.94FalseNoneNoneFalseNoneFalse12906.4320
3251848112595None2.43Addendum I Additionalities for Formwork, Centering & Scaffolding -SI.No.1-Foundation upto Plinth-a.Isolated 8percent (Pg No:111) ---- Including cost of all materials, labour, HOM, I Cum532.22532.221.94FalseNoneNoneFalseNoneFalse1032.50680
3251849112595NonePWD Common SR 2023-24, (Page No- 16 Vol-1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Including cost of all materials, labour, HOM, I Cum6652.86652.80.59FalseNoneNoneFalseNoneFalse3925.1520
3251850112595None2.43Addendum I Additionalities for Formwork, Centering & Scaffolding -RCC Columns / Shaft (Slip Centering) 70percent (Pg No:111 ---- Including cost of all materials, labour, HOM, I Cum4656.964656.960.59FalseNoneNoneFalseNoneFalse2747.60640
3251851112595NonePWD Common SR 2023-24, Page No- 18 Vol-1 i.no 2.11Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Including cost of all materials, labour, HOM, I t93929.8593929.850.22FalseNoneNoneFalseNoneFalse20664.5670
3251852112595NoneVol-1 Sl no1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Including cost of all materials, labour, HOM, I Cum279.3279.31.89FalseNoneNoneFalseNoneFalse527.8770
3251853112595NoneELE SR 2023-24 Page No-11 PWD Ele SR 2 Vol-6 4.5.6Fabrication, Supplying, Erection, Testing and Commissioning of. ms long Polygon high mast with Single/Multiple telescopic sections having, (minimum overlap distance of 1.5 times of top section) thickness as per BSEN 10025 grades 355 JO/ASTM A572-50 steel sheet plate for shaft suitable to withstand a wind velocity of 47 m/s as per IS 875 part 3(as per GA Drawing). Base plate as per IS 2062/ASTM A572-50. The mast shall be Galvanized in single Hot-dip as per BSEN ISO 1461/ASTM A123 with an average 70 microns as per IS 2629, and welded as per BS 5135 Single L-Seam joint The mast shall have 2 Way head frame with die cast LM-6 pulleys, stainless steel axle, Phosphorus Bronze bearing bush press-fitted with separate guides for 2 runs of 5 mm dia, stainless steel wire rope of AISI 304grade 7/19-core, (Factor of Safety as per TR no-7). 2.5 mm2 EPR insulated PCP sheathed trailing power cable housed inside the bottom shaft of mast with door having locking arrangement The mast shall have manual/power tool The mast shall have lantern of 2 segments, suitable dia with max load carrying capacity as per IS 1239. The mast shall be erected on existing RCC footing. The mast shall be supplied with 3 mm thick template, lightning arrester of 1.2m length galvanized pipe with top arrow fitted on top of the head frame cover and GLS type aviation twin l A fitting with wiring complete. (excluding foundation) as per technical data. 12 m/12.5 m - Top 100 mm and Bottom 310 mm dia ---- Including cost of all materials, labour, HOM, I Each137550.0137550.01.0FalseNoneNoneFalseNoneFalse137550.00
3251854112595NoneELE SR 2023-24 Page No- 46 PWD Ele SR 2 Vol611.9.6Supply of LED floodlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate/clear glass material, delivering superior light output Rated life Burning Hrs 50000hr @ Lumen Maintenance of 70%, CCT 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mauling with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100 V to 270V 50/60Hz application. Compliance to IS 10322/ IEC 60598, LM 79 LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with . W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in- house facility accredited by NABL / CPRI any Government certified agency & Design Development facility certified by ISO 9001:2008. Housing with supplier word mark name shall be Engraved Embossing on the die cast housing Body part Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ LED Floodlight 200W ---- Including cost of all materials, labour, HOM, I Each19510.0519510.056.0FalseNoneNoneFalseNoneFalse117060.30
3251855112595NoneELE SR 2023-24 Page No17 PWD Ele SR 2 Vol6 5.18.9Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. ---- Including cost of all materials, labour, HOM, I Each3242.43242.41.0FalseNoneNoneFalseNoneFalse3242.40
3251856112595NoneELE SR 2023-24 Page No-18 PWD Ele SR 2 Vol 65.20.1Supplying,fixing and wiring Residual current circuit breaker(RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board ---- Including cost of all materials, labour, HOM, I Each5822.255822.251.0FalseNoneNoneFalseNoneFalse5822.250
3251857112595NoneELE SR 2023-24Page No20 PWD Ele SR 2 Vol 6sl5.40.1Supplying . amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete. ---- Including cost of all materials, labour, HOM, I m2588.252588.252.0FalseNoneNoneFalseNoneFalse5176.50
3251858112595NoneELE SR 2023-24Page No-54 PWD Ele SR 2Vol 6sl12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Including cost of all materials, labour, HOM, I No3685.53685.52.0FalseNoneNoneFalseNoneFalse7371.00
3251859112595NoneELE 2023-24Pg No-20 PWD Ele SR Part-2vol6sl5.42.1Fabricating supplying and mounting MS box made out … SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. ---- Including cost of all materials, labour, HOM, I Sq CM0.530.5336000.0FalseNoneNoneFalseNoneFalse19080.00
3251860112595NoneELE SR 2023-24PgN13 SR 2023-24 sl32.071.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 ---- Including cost of all materials, labour, HOM, I Km146526.45146526.450.08FalseNoneNoneFalseNoneFalse11722.1160
3251861112595NoneELE SR 2023-24PgNo52 SR 2023-24 slLabour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required. ---- Including cost of all materials, labour, HOM, I Km21930.321930.30.08FalseNoneNoneFalseNoneFalse1754.4240
3251862112595NoneSR 2023-24, Page No- 06 Vol-1Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work ---- Including cost of all materials, labour, HOM, I Mtr508.2508.260.0FalseNoneNoneFalseNoneFalse30492.00
3251863112595NoneELE SR 2023-24, Page No- 20 PWD Ele SR 2 ,Vol Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. ---- Including cost of all materials, labour, HOM, I Mtr414.75414.758.0FalseNoneNoneFalseNoneFalse3318.00
3251864112595NoneELE SR 2023-24, Page No- 05 PWD Ele SR 2 ,Vol Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. ---- Including cost of all materials, labour, HOM, I Mtr44.144.140.0FalseNoneNoneFalseNoneFalse1764.00
3251865112595NoneELE SR 2023-24, Page No- 06 PWD Ele SR 2, Vol 6Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100 Volts as per IS-694:1990 ---- Including cost of all materials, labour, HOM, I Mtr155.4155.430.5FalseNoneNoneFalseNoneFalse4739.70
3251866112595NoneELE SR 2023-24, Page No- 16 PWD Ele SR 2, VolSupply and fixing of 3pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts,nuts,washer sand wiring etc., complete with AC-3 Rating and as per IS-13947 ---- Including cost of all materials, labour, HOM, I Mtr9476.259476.251.0FalseNoneNoneFalseNoneFalse9476.250
3251867112595NoneELE SR 2023-24, Page No- 21 PWD Ele SR 2 , Vol Supplying and fixing Microprocessor Based Astronomical timer Switch with using necessary bolts, nuts and washers ---- Including cost of all materials, labour, HOM, I Mtr5085.155085.151.0FalseNoneNoneFalseNoneFalse5085.150
3251868112595NoneELE SR 2023-24, Page No- 56 PWD Ele SR 2 ,) Vol Supplying,and fixing of Hot dip Galvanized M.S.Bracket suitable for outdoor luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. ---- Including cost of all materials, labour, HOM, I Mtr2835.02835.03.0FalseNoneNoneFalseNoneFalse8505.00
3251869112595NoneELE SR 2023-24, Page No- 14 PWD Ele SR 2,) Vol 6Supplying and fixing of porcelain fuse channel with cut out on existing wooden/ pannel using necessary nuts, bolts and washers etc complete. ---- Including cost of all materials, labour, HOM, I Each725.55725.553.0FalseNoneNoneFalseNoneFalse2176.650
3251870112595NoneELE SR 2023-24, (Page No- 14 PWD Ele SR 2,) Vol 6Supplying,fixing and wiring Electronic Trivector Meter(ETV )5to32/63A three phase 4wire whole current class-1 Accuracy Energy Meter ---- Including cost of all materials, labour, HOM, I Each5990.255990.251.0FalseNoneNoneFalseNoneFalse5990.250
3251871112595NoneELE SR 2023-24, Page No- 56 PWD Ele SR 2 ,) Vol Fixing halogen/metal halide/SVL/IL/LED flood light fitting over existing pole/wall ceiling including clamps,bolts,nuts and wiring using suitable capacity wires ---- Including cost of all materials, labour, HOM, I Each170.1170.16.0FalseNoneNoneFalseNoneFalse1020.60
3251872112595Noneitem no-1gescom charges ---- Including cost of all materials, labour, HOM, I Rs15000.015000.01.0FalseNoneNoneFalseNoneFalse15000.00
17178464570000NoneNoneBuildings11 KVA line from taping point to metering station466521.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3251873112596Noneitem no 111 KVA line from tapping point to 63 kva TC ---- Including cost of all materials, labour, HOM, I Each466521.0466521.01.0FalseNoneNoneFalseNoneFalse466521.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17178464590000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17178464590000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17178464590001NoneNoneELIGIBILITYBidders shall ensure upload of relevant documentNone
17178464590000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17178464590000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17178464850000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17178464950000NoneNoneELIGIBILITYThe agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules.None
17178465100000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The depatment is not responsible for any delay in accessing KPP portal.None
17178465210000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17178465310000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17178465410000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17178465520000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17178465660000NoneNoneELIGIBILITYThe Item Rates quoted shall include cost of Royalty charges on constructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall be executed as directed by the Engineer-in-charge of the work.None
17178465760000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification.None
17178465850000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17178465990000NoneNoneELIGIBILITYThe tenderer shall scan Original Ownership documents/ Lease/Hire commitment Agreement for the required machineries and attach the scanned file to the Bid. The original documents shall be produced at the time of opening of technical bids for physical verification.None
17178466090000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17178466190000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification.None
17178466410000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder.None
17178466520000NoneNoneELIGIBILITYAll materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the work.None
17178466640000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theronNone
17178466760000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply.None
17178466860000NoneNoneELIGIBILITYIf the office happens to be closed on the dates notified, next working day will holds good.None
17178467090000NoneNoneELIGIBILITYThe field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalizedNone
17178467200000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964.None
17178467360000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17178467480000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any law as concerned.None
17178467600000NoneNoneELIGIBILITY18%GST shall be paid to the tendered amount separately.None
17178467690000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17178467810000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17178467920000NoneNoneELIGIBILITYThe tenderers shall note that as per the Government Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for purchases, but not for works.None
17178468030000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsible.None
17178468150000NoneNoneELIGIBILITYThe construction materials (Minerals Metal, Sand and Murom, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013.None
17178468340000NoneNoneELIGIBILITYThe defect liability period is one year from the date of actual completion of workNone
17178468470000NoneNoneELIGIBILITYFinancial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2024-25 in the technical qualification criteriaNone
17178468580000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17178468680000NoneNoneELIGIBILITYThe tender period for completion of work is 11 (Eleven) Calendar months. (Including monsoon period)None
17178468790000NoneNoneELIGIBILITYThe Earnest Money Deposit Rs. 5,64,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option(CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 4,64,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids.None
17178468920000NoneNoneELIGIBILITYit is obligatory for the contractor to use the required machineries for various activities involved in construction as per Morth specificationNone
17178469240000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17178469360000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17178469470000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008None
17178469670000NoneNoneELIGIBILITYThe Tenderers who meet the specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value of amount put to tenderNone
17178471120000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearance from Fire Services, Electrical Inspectorate, Air pollution, GESCOM Power Supply etc., before commencement of the work.None
17178471260000NoneNoneELIGIBILITYThe Tenderer or his identified sub contractor sholud possess required valid electrical license for executing building electrification works and also Tenderer or his identified sub contractor sholud possess valid license for executing water supply/Sanitary engineering works.None
17178471500000NoneNoneELIGIBILITYThe awarded Contractor has to submit his bills through e-MB for payment. (Billing is through e-Mb i.e., Contractor has to produce Soft copy and hard Copy of RA or Final bill for payments), as per the G.O. No. FD 56 Pro. Cell 2004, Bangalore Dated 18th January 2005.None
17178471640000NoneNoneELIGIBILITYEstimate rates are excluding GST and the prevailing GST 18 percent of APT is added in the form of Lumpsum in santioned estimate as per the guidelines in common SR 2021-22 GO PWD51 RDF 2019 Bengaluru dt 18-03-2022. Therefore, APT or ECV is excluding GST. In kppp portal there is no option to add GST separately over and above APT during DTS process. Hence even through the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence GST will be paid separately for the quoted amount as per the Govt. circular no FD/447/expenditure/12/2022/dt -30-07-2022. Therefore GST declaration certificate must be uploaded mandatory by the prospective bidders.None
17178471740000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20,2020-21,2021-22,2022-23 & 2023-24 satisfactorily completed as prime contractor, at least one similar work such as Building Work not less than Rs. 187.79 LakhsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24, executed in any one year, the following minimum quantities of work (a)Earthwork/Embankment : 3044.00 cum (b)PCC/RCC:470.00 cum (c)Steel:36.00 tonnes (d)SSM/BBM/solid concrete blocks:560.00 cum (e)Plastering :2447.00 sqm (f) GSB: 710.00cum (g)WMM:710.00 cum (h)flooring :839.00sqm (i) Woodwork : 2.00 cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.3(a) & (b) To qualify for award of this contract,Tenderer should further demonstrate 1)Self Loading concrete mixer 1 No. Own/Lease/Hire 2) Tippers 4 Nos-2Nos Own & 2Nos Own/Hire/ Lease 3) Exacavator -2 Nos-1 No Own & 1 No Own/Hire/ Lease 4)Water Tankers 2 Nos-1 No Own & 1No Own/Hire/Lease 5) Centering/Shuttering :880.00 Sqm- 440.00 sqm Own & 440.00 sqm Own/Hire/ LeaseCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Related documents
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs. 751.16 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Annual Turnover Certificate with UDIN issued by CA
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of not less than Rs. 102.43 Lakhs (estimated cash flow for 3 months of peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneRegistration CertificateOthersRegistration Certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNonePrincipal Place of BusinessOthersPrincipal Place of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Contractors letter
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersExisting committment or ongoing work
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Forms and Formats
NoneNoneNoneNoneinformation of LOA receivedOthersLOA received
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Forms and Formats
NoneNoneNoneNoneinformation of submitted tendersOthersSubmitted tenders
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Forms and Formats
NoneNoneNoneNoneInformation of Litigations involvedOthersLitigations involved
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Forms and Formats
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Registration CertificateTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718178407000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD Divison Koppal
streetNone
cityKoppal
stateKarnataka
pin583231
tenderRecallDTONone