tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1710314126000 | 1 | None | None | Buildings | Proposed Construction of Laboratories and Classrooms in Govt. Boys Pre-University College building at Tiptur in Tumkur District | 13988539.32 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3031705 | 102162 | None | Vol-I, Page No.5, Item No.1.1 | Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 107.38 | 107.38 | 525.0 | False | None | None | False | None | False | 56374.5 | 0 | 3031706 | 102162 | None | Vol-II, Page No.5, Item No.4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 139.24 | 139.24 | 525.0 | False | None | None | False | None | False | 73101.0 | 0 | 3031707 | 102162 | None | Vol-I, Page No.8, Item No.1.14 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 120.36 | 120.36 | 375.14 | False | None | None | False | None | False | 45151.8504 | 0 | 3031708 | 102162 | None | Vol-I, Page No.5, Item No.1.4.2 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 305.62 | 305.62 | 125.05 | False | None | None | False | None | False | 38217.781 | 0 | 3031709 | 102162 | None | Vol-I, Page No.15, Item No.2.1.2 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6683.52 | 6683.52 | 74.44 | False | None | None | False | None | False | 497521.2288 | 0 | 3031710 | 102162 | None | Vol-I, Page No.7, Item No.1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 313.88 | 313.88 | 500.2 | False | None | None | False | None | False | 157002.776 | 0 | 3031711 | 102162 | None | Vol-II, Page No.9, Item No.5.1.1 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6620.98 | 6620.98 | 54.52 | False | None | None | False | None | False | 360975.8296 | 0 | 3031712 | 102162 | None | Vol-II, Page No.9, Item No.5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 7539.02 | 7539.02 | 34.65 | False | None | None | False | None | False | 261227.043 | 0 | 3031713 | 102162 | None | PWD SR 2021-22, VOLUME-1, Page No. 16, SI No.2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 7476.48 | 7476.48 | 70.89 | False | None | None | False | None | False | 530007.6672 | 0 | 3031714 | 102162 | None | PWD SR 2021-22, VOLUME-1, Page No. 16, SI No.2.4.3 | ADD Centering upto Plinth level, Percentage on finished rate of concrete per m3 Charges at 8% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 598.12 | 598.12 | 70.88 | False | None | None | False | None | False | 42394.7456 | 0 | 3031715 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 9.6 | False | None | None | False | None | False | 77517.504 | 0 | 3031716 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 25.66 | False | None | None | False | None | False | 207197.8284 | 0 | 3031717 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Plinth Beams of Building Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4037.37 | 4037.37 | 25.67 | False | None | None | False | None | False | 103639.2879 | 0 | 3031718 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 26.26 | False | None | None | False | None | False | 212042.6724 | 0 | 3031719 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4844.84 | 4844.84 | 26.25 | False | None | None | False | None | False | 127177.05 | 0 | 3031720 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 48.59 | False | None | None | False | None | False | 392351.6166 | 0 | 3031721 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4037.37 | 4037.37 | 48.59 | False | None | None | False | None | False | 196175.8083 | 0 | 3031722 | 102162 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | t | 105559.26 | 105559.26 | 18.55 | False | None | None | False | None | False | 1958124.273 | 0 | 3031723 | 102162 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 1545.8 | 1545.8 | 450.81 | False | None | None | False | None | False | 696862.098 | 0 | 3031724 | 102162 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 300.9 | 300.9 | 596.88 | False | None | None | False | None | False | 179601.192 | 0 | 3031725 | 102162 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 248.98 | 248.98 | 242.11 | False | None | None | False | None | False | 60280.5478 | 0 | 3031726 | 102162 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 437.78 | 437.78 | 326.97 | False | None | None | False | None | False | 143140.9266 | 0 | 3031727 | 102162 | None | Vol-II, Page No.42, Item No.8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 411.82 | 411.82 | 41.75 | False | None | None | False | None | False | 17193.485 | 0 | 3031728 | 102162 | None | Vol-II, Page No.50, Item No.8.51) | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 118.0 | 118.0 | 596.97 | False | None | None | False | None | False | 70442.46 | 0 | 3031729 | 102162 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 129.8 | 129.8 | 596.97 | False | None | None | False | None | False | 77486.706 | 0 | 3031730 | 102162 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 105.02 | 105.02 | 329.96 | False | None | None | False | None | False | 34652.3992 | 0 | 3031731 | 102162 | None | Vol-II, Page No.100, Item No.12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 116601.7 | 116601.7 | 0.36 | False | None | None | False | None | False | 41976.612 | 0 | 3031732 | 102162 | None | Vol-II, Page No.100, Item No.12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 8793.92 | 8793.92 | 11.85 | False | None | None | False | None | False | 104207.952 | 0 | 3031733 | 102162 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1873.84 | 1873.84 | 8.61 | False | None | None | False | None | False | 16133.7624 | 0 | 3031734 | 102162 | None | Vol-II, Page No.104, Item No.12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 1198.88 | 1198.88 | 4.0 | False | None | None | False | None | False | 4795.52 | 0 | 3031735 | 102162 | None | Item 11.34 A Page No 86, vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 198.24 | 198.24 | 892.8 | False | None | None | False | None | False | 176988.672 | 0 | 3031736 | 102162 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mmX1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6360.2 | 6360.2 | 50.4 | False | None | None | False | None | False | 320554.08 | 0 | 3031737 | 102162 | None | Vol-II, Page No.49, Item No.8.47 | Polishing on wood work with ready mixed wax polish of approved brand and manufacture : New work to give an even surface including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 159.3 | 159.3 | 15.48 | False | None | None | False | None | False | 2465.964 | 0 | 3031738 | 102162 | None | Vol-II, Page No.84, Item No.11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 162.84 | 162.84 | 864.0 | False | None | None | False | None | False | 140693.76 | 0 | 3031739 | 102162 | None | Item 11.3 Page No 77, vol-2 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 9765.68 | 9765.68 | 5.04 | False | None | None | False | None | False | 49219.0272 | 0 | 3031740 | 102162 | None | Vol-II, Page No.60, Item No.9.12.2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1351.1 | 1351.1 | 224.91 | False | None | None | False | None | False | 303875.901 | 0 | 3031741 | 102162 | None | Vol-II, Page No.63, Item No.9.24 | Providing and laying flooring and steps machine cut granite slabs 40 mm
thick on cement mortar bed 1:6, 25 mm thick, and pointed with cement
mortar 1:3 over existing cement concrete bed , including cost of materials, mortar labour, curing complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 5049.22 | 5049.22 | 22.5 | False | None | None | False | None | False | 113607.45 | 0 | 3031742 | 102162 | None | Vol-II, Page No.60, Item No.9.10 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1305.08 | 1305.08 | 20.67 | False | None | None | False | None | False | 26976.0036 | 0 | 3031743 | 102162 | None | Vol-II, Page No.65, Item No.9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1642.56 | 1642.56 | 85.46 | False | None | None | False | None | False | 140373.1776 | 0 | 3031744 | 102162 | None | Vol-II, Page No.131, Item No.14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and bracke ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 7052.86 | 7052.86 | 5.0 | False | None | None | False | None | False | 35264.3 | 0 | 3031745 | 102162 | None | Vol-II, Page No.134, Item No.14.16A | Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1metre long with S.S. triangular plate to Eureopean type W.C. of quality'and make as approved by Engineer - in - charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 320.96 | 320.96 | 5.0 | False | None | None | False | None | False | 1604.8 | 0 | 3031746 | 102162 | None | Vol-II, Page No.125, Item No.14.7B | Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2709.28 | 2709.28 | 4.0 | False | None | None | False | None | False | 10837.12 | 0 | 3031747 | 102162 | None | Vol-II, Page No.134, Item No.14.11.2 | Providing and fixing white vitreous china laboratory sink with C.I. brackets, C.P. brass chain with rubber plug, 40 mm C.P brass waste and 40mm C.P. brass trap with necessary C.P. brass unions complete, including painting of fittings and brackets, cutting and making good the wall wherever required :600x450x200 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5996.76 | 5996.76 | 10.0 | False | None | None | False | None | False | 59967.6 | 0 | 3031748 | 102162 | None | Vol-II, Page No.136, Item No.14.32.4 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2036.68 | 2036.68 | 3.0 | False | None | None | False | None | False | 6110.04 | 0 | 3031749 | 102162 | None | Vol-II, Page No.117, Item No.13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bor ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 647.82 | 647.82 | 5.0 | False | None | None | False | None | False | 3239.1 | 0 | 3031750 | 102162 | None | Vol-II, Page No.117, Item No.13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 359.9 | 359.9 | 5.0 | False | None | None | False | None | False | 1799.5 | 0 | 3031751 | 102162 | None | Vol-II, Page No.A-32, SL No.664 | PTMT Bottle Trap 31/32MM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 295.0 | 295.0 | 5.0 | False | None | None | False | None | False | 1475.0 | 0 | 3031752 | 102162 | None | Vol-II, Page No.120, Item No.13.17.4 | Providing and fixing PTMT bib cock of approved quality and colour ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 285.56 | 285.56 | 5.0 | False | None | None | False | None | False | 1427.8 | 0 | 3031753 | 102162 | None | I.No.20.29.3, P.No. 200, vol-II | Providing and fixing bright finished brass hard drawn hooks and eyes : 200 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 84.96 | 84.96 | 20.0 | False | None | None | False | None | False | 1699.2 | 0 | 3031754 | 102162 | None | I.No. 13.3.2, P.No. 117,, vol-II | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 359.9 | 359.9 | 30.0 | False | None | None | False | None | False | 10797.0 | 0 | 3031755 | 102162 | None | SOR P090C Page No.149, I.No.13.6.2, vol-V | Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments 1.0HP/0.75KW 10 STG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 16413.8 | 16413.8 | 1.0 | False | None | None | False | None | False | 16413.8 | 0 | 3031756 | 102162 | None | Vol II, Sl No 13.33.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes, Having thermal stability for hot & cold water suply including all CPVC plain & brass threaded fittings This Includes Jointing of Pipes & fittings with one step CPVC solvent Cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge external work. Corregundum Issue - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 349.28 | 349.28 | 100.0 | False | None | None | False | None | False | 34928.0 | 0 | 3031757 | 102162 | None | Vol II, Sl No 13.33.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes, Having thermal stability for hot & cold water suply including all CPVC plain & brass threaded fittings This Includes Jointing of Pipes & fittings with one step CPVC solvent Cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge external work. - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 438.96 | 438.96 | 100.0 | False | None | None | False | None | False | 43896.0 | 0 | 3031758 | 102162 | None | Vol-V, Page No.134, SL No.10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 484.98 | 484.98 | 150.0 | False | None | None | False | None | False | 72747.0 | 0 | 3031759 | 102162 | None | Vol-V, Page No.134, SL No.10.1.3 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 50mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 119.18 | 119.18 | 50.0 | False | None | None | False | None | False | 5959.0 | 0 | 3031760 | 102162 | None | Page 191, Sl no 16.9, Vol V | Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 6435.72 | 6435.72 | 5.0 | False | None | None | False | None | False | 32178.6 | 0 | 3031761 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5652.32 | 5652.32 | 9.61 | False | None | None | False | None | False | 54318.7952 | 0 | 3031762 | 102162 | None | Vol-II, Page No.109, Item No.12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6748.42 | 6748.42 | 5.4 | False | None | None | False | None | False | 36441.468 | 0 | 3031763 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 9.6 | False | None | None | False | None | False | 78292.704 | 0 | 3031764 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5708.84 | 5708.84 | 9.61 | False | None | None | False | None | False | 54861.9524 | 0 | 3031765 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 25.26 | False | None | None | False | None | False | 206007.6774 | 0 | 3031766 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4893.29 | 4893.29 | 25.25 | False | None | None | False | None | False | 123555.5725 | 0 | 3031767 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 49.7 | False | None | None | False | None | False | 405327.853 | 0 | 3031768 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4077.74 | 4077.74 | 49.7 | False | None | None | False | None | False | 202663.678 | 0 | 3031769 | 102162 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 106614.85 | 106614.85 | 9.56 | False | None | None | False | None | False | 1019237.966 | 0 | 3031770 | 102162 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 1561.26 | 1561.26 | 345.19 | False | None | None | False | None | False | 538931.3394 | 0 | 3031771 | 102162 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol-II, Page No.41, Item No.8.1.1) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 303.91 | 303.91 | 490.13 | False | None | None | False | None | False | 148955.4083 | 0 | 3031772 | 102162 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 251.47 | 251.47 | 242.11 | False | None | None | False | None | False | 60883.4017 | 0 | 3031773 | 102162 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 442.16 | 442.16 | 331.56 | False | None | None | False | None | False | 146602.5696 | 0 | 3031774 | 102162 | None | Vol-II, Page No.42, Item No.8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 415.94 | 415.94 | 42.96 | False | None | None | False | None | False | 17868.7824 | 0 | 3031775 | 102162 | None | Vol-II, Page No.50, Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 119.18 | 119.18 | 490.29 | False | None | None | False | None | False | 58432.7622 | 0 | 3031776 | 102162 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 131.1 | 131.1 | 490.29 | False | None | None | False | None | False | 64277.019 | 0 | 3031777 | 102162 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 106.07 | 106.07 | 331.55 | False | None | None | False | None | False | 35167.5085 | 0 | 3031778 | 102162 | None | Vol-II, Page No.100, Item No.12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 117767.72 | 117767.72 | 0.25 | False | None | None | False | None | False | 29441.93 | 0 | 3031779 | 102162 | None | Vol-II, Page No.100, Item No.12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 8219.84 | 8219.84 | 7.35 | False | None | None | False | None | False | 60415.824 | 0 | 3031780 | 102162 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1892.58 | 1892.58 | 6.72 | False | None | None | False | None | False | 12718.1376 | 0 | 3031781 | 102162 | None | Vol-II, Page No.104, Item No.12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 1210.87 | 1210.87 | 3.0 | False | None | None | False | None | False | 3632.61 | 0 | 3031782 | 102162 | None | Item 11.34 A Page No 84, vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 200.82 | 200.82 | 504.0 | False | None | None | False | None | False | 101213.28 | 0 | 3031783 | 102162 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6423.8 | 6423.8 | 26.1 | False | None | None | False | None | False | 167661.18 | 0 | 3031784 | 102162 | None | Vol-II, Page No.109, Item No.12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6815.9 | 6815.9 | 5.4 | False | None | None | False | None | False | 36805.86 | 0 | 3031785 | 102162 | None | Vol-II, Page No.49, Item No.8.47 | Polishing on wood work with ready mixed wax polish of approved brand and manufacture : New work to give an even surface including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 160.89 | 160.89 | 9.9 | False | None | None | False | None | False | 1592.811 | 0 | 3031786 | 102162 | None | Vol-II, Page No.84, Item No.11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 164.47 | 164.47 | 1012.02 | False | None | None | False | None | False | 166446.9294 | 0 | 3031787 | 102162 | None | Vol-II, Page No.60, Item No.9.12.2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1364.61 | 1364.61 | 217.01 | False | None | None | False | None | False | 296134.0161 | 0 | 3031788 | 102162 | None | Vol-II, Page No.60, Item No.9.10 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching shade complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1318.13 | 1318.13 | 19.02 | False | None | None | False | None | False | 25070.8326 | 0 | 3031789 | 102162 | None | Vol-II, Page No.65, Item No.9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1658.99 | 1658.99 | 81.68 | False | None | None | False | None | False | 135506.3032 | 0 | 3031790 | 102162 | None | Vol-II, Page No.131, Item No.14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and bracket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No. | 7123.39 | 7123.39 | 4.0 | False | None | None | False | None | False | 28493.56 | 0 | 3031791 | 102162 | None | Vol-II, Page No.127, Item No.14.16A | Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1 metre long with S.S. triangular plate to Eureopean type W.C. of quality and make as approved by Engineer - in - charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 324.17 | 324.17 | 4.0 | False | None | None | False | None | False | 1296.68 | 0 | 3031792 | 102162 | None | Vol-II, Page No.131, Item No.14.4.1 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5308.28 | 5308.28 | 4.0 | False | None | None | False | None | False | 21233.12 | 0 | 3031793 | 102162 | None | Vol-II, Page No.133, Item No.14.7B | Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2736.37 | 2736.37 | 4.0 | False | None | None | False | None | False | 10945.48 | 0 | 3031794 | 102162 | None | Vol-II, Page No.136, Item No.14.32.4 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2057.05 | 2057.05 | 4.0 | False | None | None | False | None | False | 8228.2 | 0 | 3031795 | 102162 | None | Vol-II, Page No.115, Item No.13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 654.3 | 654.3 | 4.0 | False | None | None | False | None | False | 2617.2 | 0 | 3031796 | 102162 | None | Vol-II, Page No.115, Item No.13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 363.5 | 363.5 | 4.0 | False | None | None | False | None | False | 1454.0 | 0 | 3031797 | 102162 | None | Vol-II, Page No.A-32, SL No.664 | PTMT Bottle Trap 31/32MM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 297.95 | 297.95 | 4.0 | False | None | None | False | None | False | 1191.8 | 0 | 3031798 | 102162 | None | Vol II, Sl No 13.31.3 Pg. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 378.99 | 378.99 | 60.0 | False | None | None | False | None | False | 22739.4 | 0 | 3031799 | 102162 | None | Vol-V, SL No.11.15.1 | Supply and delivery at site GM (copper alloy) gate valves confirming to Class-I as per IS 778 with latest amendments, 1 No. screwed in bonnet inside screw, rising spring spindle integral seat screwed females ends confirming to IS 554/ 1990 body hydraulically tested 1.5HP seat standard tested 1 HP with IS mark. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No. | 768.71 | 768.71 | 10.0 | False | None | None | False | None | False | 7687.1 | 0 | 3031800 | 102162 | None | Vol-2, page no 117, SL No.13.6.1.1 | Providing and fixing gun metal non- return valve of approved quality ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 738.92 | 738.92 | 4.0 | False | None | None | False | None | False | 2955.68 | 0 | 3031801 | 102162 | None | Vol II, Sl No 13.32.4 Pg. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 663.83 | 663.83 | 60.0 | False | None | None | False | None | False | 39829.8 | 0 | 3031802 | 102162 | None | Vol-V, Page No.113, SL No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest
amendments and conveying to worksite, rolling and lowering into
trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 489.83 | 489.83 | 60.0 | False | None | None | False | None | False | 29389.8 | 0 | 3031803 | 102162 | None | Vol-II, Page No.149, Item No.15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation,
making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 973.7 | 973.7 | 302.78 | False | None | None | False | None | False | 294816.886 | 0 | 3031804 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.95 | False | None | None | False | None | False | 32533.1085 | 0 | 3031805 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5765.36 | 5765.36 | 3.94 | False | None | None | False | None | False | 22715.5184 | 0 | 3031806 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.07 | False | None | None | False | None | False | 25285.2261 | 0 | 3031807 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4941.74 | 4941.74 | 3.06 | False | None | None | False | None | False | 15121.7244 | 0 | 3031808 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.89 | False | None | None | False | None | False | 32038.9347 | 0 | 3031809 | 102162 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4118.12 | 4118.12 | 3.89 | False | None | None | False | None | False | 16019.4868 | 0 | 3031810 | 102162 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 107670.45 | 107670.45 | 1.23 | False | None | None | False | None | False | 132434.6535 | 0 | 3031811 | 102162 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1576.72 | 1576.72 | 164.47 | False | None | None | False | None | False | 259323.1384 | 0 | 3031812 | 102162 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 306.92 | 306.92 | 62.87 | False | None | None | False | None | False | 19296.0604 | 0 | 3031813 | 102162 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 253.96 | 253.96 | 25.92 | False | None | None | False | None | False | 6582.6432 | 0 | 3031814 | 102162 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 446.54 | 446.54 | 258.67 | False | None | None | False | None | False | 115506.5018 | 0 | 3031815 | 102162 | None | Vol-II, Page No.50, Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 120.36 | 120.36 | 62.87 | False | None | None | False | None | False | 7567.0332 | 0 | 3031816 | 102162 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 132.4 | 132.4 | 62.87 | False | None | None | False | None | False | 8323.988 | 0 | 3031817 | 102162 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 107.12 | 107.12 | 258.67 | False | None | None | False | None | False | 27708.7304 | 0 | 3031818 | 102162 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1911.32 | 1911.32 | 2.2 | False | None | None | False | None | False | 4204.904 | 0 | 3031819 | 102162 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 2.5 mm. Maximum possible size 1819mm x 1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6487.4 | 6487.4 | 2.7 | False | None | None | False | None | False | 17515.98 | 0 | 3031820 | 102162 | None | Vol-II, Page No.77, SL No.11.2 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 136.01 | 136.01 | 480.0 | False | None | None | False | None | False | 65284.8 | 0 | 3031821 | 102162 | None | Vol-II, Page No.123, SL No.13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Ltr | 10.83 | 10.83 | 2000.0 | False | None | None | False | None | False | 21660.0 | 0 |
| 1710314126000 | 1 | None | None | Buildings | Proposed Construction of Laboratories and Classrooms in Govt. Boys Pre-University College building at Tiptur in Tumkur District-ELECTRICAL | 1104766.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3031822 | 102163 | None | 1.2.1 ELEC SR | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 77.88 | 77.88 | 350.0 | False | None | None | False | None | False | 27258.0 | 0 | 3031823 | 102163 | None | 1.2.2 ELEC SR | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 92.04 | 92.04 | 150.0 | False | None | None | False | None | False | 13806.0 | 0 | 3031824 | 102163 | None | 1.3.2 ELEC | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 93.22 | 93.22 | 225.0 | False | None | None | False | None | False | 20974.5 | 0 | 3031825 | 102163 | None | 1.4 ELEC | Supplying and fixing sheet Metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 410.64 | 410.64 | 6.0 | False | None | None | False | None | False | 2463.84 | 0 | 3031826 | 102163 | None | 1.5.1 ELEC | Supplying and fixing PVC/metal conduit Deep junction box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 57.82 | 57.82 | 50.0 | False | None | None | False | None | False | 2891.0 | 0 | 3031827 | 102163 | None | 1.5.2 ELEC | Supplying and fixing PVC/metal conduit Deep junction box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 66.08 | 66.08 | 52.0 | False | None | None | False | None | False | 3436.16 | 0 | 3031828 | 102163 | None | 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 138.06 | 138.06 | 24.0 | False | None | None | False | None | False | 3313.44 | 0 | 3031829 | 102163 | None | 1.9.1 ELEC | Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 22.42 | 22.42 | 8.0 | False | None | None | False | None | False | 179.36 | 0 | 3031830 | 102163 | None | 1.9.2 ELEC | Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 25.96 | 25.96 | 14.0 | False | None | None | False | None | False | 363.44 | 0 | 3031831 | 102163 | None | 3.4.1 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 162.84 | 162.84 | 4.0 | False | None | None | False | None | False | 651.36 | 0 | 3031832 | 102163 | None | 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 259.6 | 259.6 | 2.0 | False | None | None | False | None | False | 519.2 | 0 | 3031833 | 102163 | None | 3.4.5 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 307.98 | 307.98 | 4.0 | False | None | None | False | None | False | 1231.92 | 0 | 3031834 | 102163 | None | 3.4.6 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 376.42 | 376.42 | 12.0 | False | None | None | False | None | False | 4517.04 | 0 | 3031835 | 102163 | None | 3.5.1 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 161.66 | 161.66 | 4.0 | False | None | None | False | None | False | 646.64 | 0 | 3031836 | 102163 | None | 3.5.4 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 276.12 | 276.12 | 2.0 | False | None | None | False | None | False | 552.24 | 0 | 3031837 | 102163 | None | 3.5.5 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 335.12 | 335.12 | 4.0 | False | None | None | False | None | False | 1340.48 | 0 | 3031838 | 102163 | None | 3.5.6 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 405.92 | 405.92 | 12.0 | False | None | None | False | None | False | 4871.04 | 0 | 3031839 | 102163 | None | 3.9 ELEC | Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.42 | 0.42 | 5000.0 | False | None | None | False | None | False | 2100.0 | 0 | 3031840 | 102163 | None | 2.2.1 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 317.42 | 317.42 | 50.0 | False | None | None | False | None | False | 15871.0 | 0 | 3031841 | 102163 | None | 2.2.2 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 447.22 | 447.22 | 26.0 | False | None | None | False | None | False | 11627.72 | 0 | 3031842 | 102163 | None | 2.2.3 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 654.9 | 654.9 | 20.0 | False | None | None | False | None | False | 13098.0 | 0 | 3031843 | 102163 | None | 2.3.1 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 22.42 | 22.42 | 725.0 | False | None | None | False | None | False | 16254.5 | 0 | 3031844 | 102163 | None | 2.3.2 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 30.68 | 30.68 | 1365.0 | False | None | None | False | None | False | 41878.2 | 0 | 3031845 | 102163 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 49.56 | 49.56 | 1100.0 | False | None | None | False | None | False | 54516.0 | 0 | 3031846 | 102163 | None | 2.3.4 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 74.34 | 74.34 | 720.0 | False | None | None | False | None | False | 53524.8 | 0 | 3031847 | 102163 | None | 2.3.5 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 108.56 | 108.56 | 910.0 | False | None | None | False | None | False | 98789.6 | 0 | 3031848 | 102163 | None | 2.5.14 | Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS-694:2010 (Make : VIP / Nandi / VI plast / Modi) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 145.14 | 145.14 | 80.0 | False | None | None | False | None | False | 11611.2 | 0 | 3031849 | 102163 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 120.36 | 120.36 | 132.0 | False | None | None | False | None | False | 15887.52 | 0 | 3031850 | 102163 | None | 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 195.88 | 195.88 | 2.0 | False | None | None | False | None | False | 391.76 | 0 | 3031851 | 102163 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 201.78 | 201.78 | 30.0 | False | None | None | False | None | False | 6053.4 | 0 | 3031852 | 102163 | None | 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 421.26 | 421.26 | 24.0 | False | None | None | False | None | False | 10110.24 | 0 | 3031853 | 102163 | None | 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 384.68 | 384.68 | 10.0 | False | None | None | False | None | False | 3846.8 | 0 | 3031854 | 102163 | None | 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 278.48 | 278.48 | 10.0 | False | None | None | False | None | False | 2784.8 | 0 | 3031855 | 102163 | None | 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 184.08 | 184.08 | 4.0 | False | None | None | False | None | False | 736.32 | 0 | 3031856 | 102163 | None | 5.19.9 ELEC | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/ single door with powder coated painting Made out of 14 SWG MS enclosure. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2748.22 | 2748.22 | 2.0 | False | None | None | False | None | False | 5496.44 | 0 | 3031857 | 102163 | None | 5.19.11 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/ single door with powder coated painting Made out of 14 SWG MS enclosure. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 4764.84 | 4764.84 | 2.0 | False | None | None | False | None | False | 9529.68 | 0 | 3031858 | 102163 | None | 15.20.4 ELEC | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5379.62 | 5379.62 | 4.0 | False | None | None | False | None | False | 21518.48 | 0 | 3031859 | 102163 | None | 5.18.1 ELEC | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 489.7 | 489.7 | 24.0 | False | None | None | False | None | False | 11752.8 | 0 | 3031860 | 102163 | None | 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 872.02 | 872.02 | 6.0 | False | None | None | False | None | False | 5232.12 | 0 | 3031861 | 102163 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. (Make : Usha / Almonard / Bajaj / Khaitan / crompton) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3521.12 | 3521.12 | 20.0 | False | None | None | False | None | False | 70422.4 | 0 | 3031862 | 102163 | None | 13.10 ELEC | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 201.78 | 201.78 | 20.0 | False | None | None | False | None | False | 4035.6 | 0 | 3031863 | 102163 | None | 13.12 ELEC | Extra length of GI pipe of class B 19mm dia for down rod. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 232.46 | 232.46 | 20.0 | False | None | None | False | None | False | 4649.2 | 0 | 3031864 | 102163 | None | 11.3.1 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make : Philip/Bajaj/Havells/Panasonic/Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 650.18 | 650.18 | 2.0 | False | None | None | False | None | False | 1300.36 | 0 | 3031865 | 102163 | None | 11.3.2 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make : Philip/Bajaj/Havells/Panasonic/Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 814.2 | 814.2 | 52.0 | False | None | None | False | None | False | 42338.4 | 0 | 3031866 | 102163 | None | 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 143.96 | 143.96 | 54.0 | False | None | None | False | None | False | 7773.84 | 0 | 3031867 | 102163 | None | 11.11.5 | Supplying & fixing of retrofit type - LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make Philips / Bajaj / Havells / Panasonic / Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 317.42 | 317.42 | 10.0 | False | None | None | False | None | False | 3174.2 | 0 | 3031868 | 102163 | None | 12.46 | Supplying & Fixing of 70-150 W lamp holder 2 Pin ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 74.34 | 74.34 | 10.0 | False | None | None | False | None | False | 743.4 | 0 | 3031869 | 102163 | None | 6.2.1 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. (Make : Usha / Almonard / Bajaj / Khaitan / crompton) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3503.42 | 3503.42 | 8.0 | False | None | None | False | None | False | 28027.36 | 0 | 3031870 | 102163 | None | 13.13 | Fixing one exhaust fan after making a suitable notch in the wall and finishing with cement mortar and colouring to match the existing wall or brackets, with bolts and nuts and a 5 A, ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire of approved make with wire mesh and wooden frame. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 834.26 | 834.26 | 8.0 | False | None | None | False | None | False | 6674.08 | 0 | 3031871 | 102163 | None | 11.8.3 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 7070.56 | 7070.56 | 4.0 | False | None | None | False | None | False | 28282.24 | 0 | 3031872 | 102163 | None | 13.1.2 | Supplying and Fixing of.mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole/wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1233.1 | 1233.1 | 4.0 | False | None | None | False | None | False | 4932.4 | 0 | 3031873 | 102163 | None | 13.5 | Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 191.16 | 191.16 | 4.0 | False | None | None | False | None | False | 764.64 | 0 | 3031874 | 102163 | None | 8.1 | Supplying and drawing UTP CAT 6E LAN cable. (Make D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 44.84 | 44.84 | 600.0 | False | None | None | False | None | False | 26904.0 | 0 | 3031875 | 102163 | None | 8.2.2 | Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable. (Make : D-Link / Polycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 24.78 | 24.78 | 140.0 | False | None | None | False | None | False | 3469.2 | 0 | 3031876 | 102163 | None | 8.4.3 | Supplying & Fixing of switch mounting rack with power manager & Cable manager. (Make : D-Link / TP - Link) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 10001.68 | 10001.68 | 1.0 | False | None | None | False | None | False | 10001.68 | 0 | 3031877 | 102163 | None | 8.9.1 | Supplying fixing of Network Switches (Make : Cisco / D-Link / TP - Link / Hewlett Packard) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 57690.2 | 57690.2 | 1.0 | False | None | None | False | None | False | 57690.2 | 0 | 3031878 | 102163 | None | 8.10.1 | Supplying & fixing of I/O socket with back box (Make : Cisco / D-Link / TP - Link / Hewlett Packard) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 578.2 | 578.2 | 30.0 | False | None | None | False | None | False | 17346.0 | 0 | 3031879 | 102163 | None | 8.11.1 | Supplying & Fixing of . ms Cat 6 Patch Cable (Make : D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 264.32 | 264.32 | 30.0 | False | None | None | False | None | False | 7929.6 | 0 | 3031880 | 102163 | None | 8.12.1E | Supplying & Fixing of Patch panel for LAN cabling (Make : D-Link / TP - Link) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 16661.6 | 16661.6 | 1.0 | False | None | None | False | None | False | 16661.6 | 0 | 3031881 | 102163 | None | 8.13.1 | Supplying and fixing of MDF krone junction box with KRONE Module / Telephone cable termination. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 407.1 | 407.1 | 30.0 | False | None | None | False | None | False | 12213.0 | 0 | 3031882 | 102163 | None | 6.22 | Extra for Fabrication supply and fixing of Stand fabricated using slotted angle /L angle of size 6mm x 50mm for mounting out door/indoor A.C. unit/ Batteries. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5672.26 | 5672.26 | 2.0 | False | None | None | False | None | False | 11344.52 | 0 | 3031883 | 102163 | None | 9.2.3 | Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete. (Make : Microtek / Luminous / V-GUARD / Exide) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 25125.74 | 25125.74 | 2.0 | False | None | None | False | None | False | 50251.48 | 0 | 3031884 | 102163 | None | 9.5.9 | Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries. (Make : Luminous / Exide / Amaron) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 18756.1 | 18756.1 | 6.0 | False | None | None | False | None | False | 112536.6 | 0 | 3031885 | 102163 | None | 5.7.4 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 815.38 | 815.38 | 2.0 | False | None | None | False | None | False | 1630.76 | 0 | 3031886 | 102163 | None | 5.43.1 | Supply and Installation / Fixing / Provision of Pole box with HRC Fuse / MCB provision and suitable connector / terminal for 3 Ph/ 1 Ph connections with Loop-In & Loop- Out terminals for 10 mm2 /25 mm2 3.5 C AI/Ar/Cu/Ar Cable and branch out 2.5 mm2 2 core AI/Cu PVC Insulated cable, enclosed in a Thermoplastic, Polystyrene enclosure, which should be shock proof, safe, IP65(Weather Proof), rust proof, dust proof, water proof having Internally Embedded Gasket with provision for cable entry through IP65 Thermo plastic, polyamide glands and/or grommets. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 2714.0 | 2714.0 | 1.0 | False | None | None | False | None | False | 2714.0 | 0 | 3031887 | 102163 | None | 5.46.3 | Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 443.68 | 443.68 | 2.0 | False | None | None | False | None | False | 887.36 | 0 | 3031888 | 102163 | None | 5.30 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1628.4 | 1628.4 | 1.0 | False | None | None | False | None | False | 1628.4 | 0 | 3031889 | 102163 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32) | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 146458.06 | 146458.06 | 0.06 | False | None | None | False | None | False | 8787.4836 | 0 | 3031890 | 102163 | None | VOL1 SR ITEM.1.17.1 | a) Cable trench excavation, 1000x0.6x 1=600, Ordinary soil ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 309.16 | 309.16 | 36.0 | False | None | None | False | None | False | 11129.76 | 0 | 3031891 | 102163 | None | Vol-1,PWD SR Sl No 1.10 | c) Refilling and consolidation
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 188.8 | 188.8 | 36.0 | False | None | None | False | None | False | 6796.8 | 0 | 3031892 | 102163 | None | ESCOM SR 2023-24 (CDS-19) | supplying and Laying of RCC Hume pipe (Material : 307(CDS-21) + Labour :69 (CDS-19) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 443.68 | 443.68 | 60.0 | False | None | None | False | None | False | 26620.8 | 0 | 3031893 | 102163 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.05) | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 24645.48 | 24645.48 | 0.06 | False | None | None | False | None | False | 1478.7288 | 0 | 3031894 | 102163 | None | 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 4141.8 | 4141.8 | 2.0 | False | None | None | False | None | False | 8283.6 | 0 | 3031895 | 102163 | None | BWSSB SR 2023-24 Page - 127 Sl.No.:11.1 | Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete. (Page : 178) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 486.16 | 486.16 | 4.0 | False | None | None | False | None | False | 1944.64 | 0 | 3031896 | 102163 | None | ESCOM SR 2023-24 (Sl.No.:60 Item No.:8.01) | Supplying of Guy Wire & GI Wire as per BESCOM Specification. (Page-435-436) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 88547.2 | 88547.2 | 0.02 | False | None | None | False | None | False | 1770.944 | 0 |
| 1710315393000 | 0 | None | None | Buildings | Proposed Construction of Laboratories and Classrooms in Govt. Boys Pre-University College building at Tiptur in Tumkur District | 15093305.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3032529 | 102185 | None | 1.2.1 ELEC SR | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 77.88 | 77.88 | 350.0 | False | None | None | False | None | False | 27258.0 | 0 | 3032412 | 102185 | None | Vol-I, Page No.5, Item No.1.1 | Earth work in surface excavation for stripping, seating of bund, Road way, by manual means for lowering & leveling the ground for all works other than foundation & depth in all kinds of soil not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 107.38 | 107.38 | 525.0 | False | None | None | False | None | False | 56374.5 | 0 | 3032530 | 102185 | None | 1.2.2 ELEC SR | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 92.04 | 92.04 | 150.0 | False | None | None | False | None | False | 13806.0 | 0 | 3032413 | 102185 | None | Vol-II, Page No.5, Item No.4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 139.24 | 139.24 | 525.0 | False | None | None | False | None | False | 73101.0 | 0 | 3032531 | 102185 | None | 1.3.2 ELEC | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 93.22 | 93.22 | 225.0 | False | None | None | False | None | False | 20974.5 | 0 | 3032414 | 102185 | None | Vol-I, Page No.8, Item No.1.14 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 120.36 | 120.36 | 375.14 | False | None | None | False | None | False | 45151.8504 | 0 | 3032532 | 102185 | None | 1.4 ELEC | Supplying and fixing sheet Metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 410.64 | 410.64 | 6.0 | False | None | None | False | None | False | 2463.84 | 0 | 3032415 | 102185 | None | Vol-I, Page No.5, Item No.1.4.2 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 305.62 | 305.62 | 125.05 | False | None | None | False | None | False | 38217.781 | 0 | 3032533 | 102185 | None | 1.5.1 ELEC | Supplying and fixing PVC/metal conduit Deep junction box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 57.82 | 57.82 | 50.0 | False | None | None | False | None | False | 2891.0 | 0 | 3032416 | 102185 | None | Vol-I, Page No.15, Item No.2.1.2 | Providing and laying in position Cement Concrete for levelling course for
all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6683.52 | 6683.52 | 74.44 | False | None | None | False | None | False | 497521.2288 | 0 | 3032534 | 102185 | None | 1.5.2 ELEC | Supplying and fixing PVC/metal conduit Deep junction box ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 66.08 | 66.08 | 52.0 | False | None | None | False | None | False | 3436.16 | 0 | 3032417 | 102185 | None | Vol-I, Page No.7, Item No.1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 313.88 | 313.88 | 500.2 | False | None | None | False | None | False | 157002.776 | 0 | 3032535 | 102185 | None | 1.13 | Supplying And Fixing Metal Fan Box with Round Hook. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 138.06 | 138.06 | 24.0 | False | None | None | False | None | False | 3313.44 | 0 | 3032418 | 102185 | None | Vol-II, Page No.9, Item No.5.1.1 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 6620.98 | 6620.98 | 54.52 | False | None | None | False | None | False | 360975.8296 | 0 | 3032536 | 102185 | None | 1.9.1 ELEC | Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 22.42 | 22.42 | 8.0 | False | None | None | False | None | False | 179.36 | 0 | 3032419 | 102185 | None | Vol-II, Page No.9, Item No.5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 7539.02 | 7539.02 | 34.65 | False | None | None | False | None | False | 261227.043 | 0 | 3032537 | 102185 | None | 1.9.2 ELEC | Supplying PVC flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely (Make : VIP / Nandi / VI plast) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 25.96 | 25.96 | 14.0 | False | None | None | False | None | False | 363.44 | 0 | 3032420 | 102185 | None | PWD SR 2021-22, VOLUME-1, Page No. 16, SI No.2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates( ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 7476.48 | 7476.48 | 70.89 | False | None | None | False | None | False | 530007.6672 | 0 | 3032538 | 102185 | None | 3.4.1 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 162.84 | 162.84 | 4.0 | False | None | None | False | None | False | 651.36 | 0 | 3032421 | 102185 | None | PWD SR 2021-22, VOLUME-1, Page No. 16, SI No.2.4.3 | ADD Centering upto Plinth level, Percentage on finished rate of concrete per m3 Charges at 8% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 598.12 | 598.12 | 70.88 | False | None | None | False | None | False | 42394.7456 | 0 | 3032539 | 102185 | None | 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 259.6 | 259.6 | 2.0 | False | None | None | False | None | False | 519.2 | 0 | 3032422 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 9.6 | False | None | None | False | None | False | 77517.504 | 0 | 3032540 | 102185 | None | 3.4.5 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 307.98 | 307.98 | 4.0 | False | None | None | False | None | False | 1231.92 | 0 | 3032423 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 25.66 | False | None | None | False | None | False | 207197.8284 | 0 | 3032541 | 102185 | None | 3.4.6 ELEC | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 376.42 | 376.42 | 12.0 | False | None | None | False | None | False | 4517.04 | 0 | 3032424 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Plinth Beams of Building Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4037.37 | 4037.37 | 25.67 | False | None | None | False | None | False | 103639.2879 | 0 | 3032542 | 102185 | None | 3.5.1 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 161.66 | 161.66 | 4.0 | False | None | None | False | None | False | 646.64 | 0 | 3032425 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 26.26 | False | None | None | False | None | False | 212042.6724 | 0 | 3032543 | 102185 | None | 3.5.4 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 276.12 | 276.12 | 2.0 | False | None | None | False | None | False | 552.24 | 0 | 3032426 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4844.84 | 4844.84 | 26.25 | False | None | None | False | None | False | 127177.05 | 0 | 3032544 | 102185 | None | 3.5.5 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 335.12 | 335.12 | 4.0 | False | None | None | False | None | False | 1340.48 | 0 | 3032427 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8074.74 | 8074.74 | 48.59 | False | None | None | False | None | False | 392351.6166 | 0 | 3032545 | 102185 | None | 3.5.6 ELEC | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. (Make : Anchor / Indo Asian / Lisha / Cona ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 405.92 | 405.92 | 12.0 | False | None | None | False | None | False | 4871.04 | 0 | 3032428 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4037.37 | 4037.37 | 48.59 | False | None | None | False | None | False | 196175.8083 | 0 | 3032546 | 102185 | None | 3.9 ELEC | Supplying and fixing hylum plastic sheet 3mm thick with necessary nitches for fixing switches, regulators etc., and fixing on existing wood or metal box using N. F. screws. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sq CM | 0.42 | 0.42 | 5000.0 | False | None | None | False | None | False | 2100.0 | 0 | 3032429 | 102185 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | t | 105559.26 | 105559.26 | 18.55 | False | None | None | False | None | False | 1958124.273 | 0 | 3032547 | 102185 | None | 2.2.1 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 317.42 | 317.42 | 50.0 | False | None | None | False | None | False | 15871.0 | 0 | 3032430 | 102185 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 1545.8 | 1545.8 | 450.81 | False | None | None | False | None | False | 696862.098 | 0 | 3032548 | 102185 | None | 2.2.2 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 447.22 | 447.22 | 26.0 | False | None | None | False | None | False | 11627.72 | 0 | 3032431 | 102185 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 300.9 | 300.9 | 596.88 | False | None | None | False | None | False | 179601.192 | 0 | 3032549 | 102185 | None | 2.2.3 ELEC | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amend ments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Point | 654.9 | 654.9 | 20.0 | False | None | None | False | None | False | 13098.0 | 0 | 3032432 | 102185 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 248.98 | 248.98 | 242.11 | False | None | None | False | None | False | 60280.5478 | 0 | 3032550 | 102185 | None | 2.3.1 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 22.42 | 22.42 | 725.0 | False | None | None | False | None | False | 16254.5 | 0 | 3032433 | 102185 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 437.78 | 437.78 | 326.97 | False | None | None | False | None | False | 143140.9266 | 0 | 3032551 | 102185 | None | 2.3.2 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 30.68 | 30.68 | 1365.0 | False | None | None | False | None | False | 41878.2 | 0 | 3032434 | 102185 | None | Vol-II, Page No.42, Item No.8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 411.82 | 411.82 | 41.75 | False | None | None | False | None | False | 17193.485 | 0 | 3032552 | 102185 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 49.56 | 49.56 | 1100.0 | False | None | None | False | None | False | 54516.0 | 0 | 3032435 | 102185 | None | Vol-II, Page No.50, Item No.8.51) | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 118.0 | 118.0 | 596.97 | False | None | None | False | None | False | 70442.46 | 0 | 3032553 | 102185 | None | 2.3.4 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 74.34 | 74.34 | 720.0 | False | None | None | False | None | False | 53524.8 | 0 | 3032436 | 102185 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 129.8 | 129.8 | 596.97 | False | None | None | False | None | False | 77486.706 | 0 | 3032554 | 102185 | None | 2.3.5 ELEC | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:2010 (Make : Havells/Finolex/Anchor/Polycab/ V-Gaurd) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 108.56 | 108.56 | 910.0 | False | None | None | False | None | False | 98789.6 | 0 | 3032437 | 102185 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 105.02 | 105.02 | 329.96 | False | None | None | False | None | False | 34652.3992 | 0 | 3032555 | 102185 | None | 2.5.14 | Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS-694:2010 (Make : VIP / Nandi / VI plast / Modi) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 145.14 | 145.14 | 80.0 | False | None | None | False | None | False | 11611.2 | 0 | 3032438 | 102185 | None | Vol-II, Page No.100, Item No.12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specification ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 116601.7 | 116601.7 | 0.36 | False | None | None | False | None | False | 41976.612 | 0 | 3032556 | 102185 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 120.36 | 120.36 | 132.0 | False | None | None | False | None | False | 15887.52 | 0 | 3032439 | 102185 | None | Vol-II, Page No.100, Item No.12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 8793.92 | 8793.92 | 11.85 | False | None | None | False | None | False | 104207.952 | 0 | 3032557 | 102185 | None | 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 195.88 | 195.88 | 2.0 | False | None | None | False | None | False | 391.76 | 0 | 3032440 | 102185 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1873.84 | 1873.84 | 8.61 | False | None | None | False | None | False | 16133.7624 | 0 | 3032558 | 102185 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 201.78 | 201.78 | 30.0 | False | None | None | False | None | False | 6053.4 | 0 | 3032441 | 102185 | None | Vol-II, Page No.104, Item No.12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 1198.88 | 1198.88 | 4.0 | False | None | None | False | None | False | 4795.52 | 0 | 3032559 | 102185 | None | 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 421.26 | 421.26 | 24.0 | False | None | None | False | None | False | 10110.24 | 0 | 3032442 | 102185 | None | Item 11.34 A Page No 86, vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 198.24 | 198.24 | 892.8 | False | None | None | False | None | False | 176988.672 | 0 | 3032560 | 102185 | None | 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 384.68 | 384.68 | 10.0 | False | None | None | False | None | False | 3846.8 | 0 | 3032443 | 102185 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mmX1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6360.2 | 6360.2 | 50.4 | False | None | None | False | None | False | 320554.08 | 0 | 3032561 | 102185 | None | 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 278.48 | 278.48 | 10.0 | False | None | None | False | None | False | 2784.8 | 0 | 3032444 | 102185 | None | Vol-II, Page No.49, Item No.8.47 | Polishing on wood work with ready mixed wax polish of approved brand and manufacture : New work to give an even surface including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 159.3 | 159.3 | 15.48 | False | None | None | False | None | False | 2465.964 | 0 | 3032562 | 102185 | None | 3.6.11 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. (Make : Anchor / Indo Asian / Lisha / Cona) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 184.08 | 184.08 | 4.0 | False | None | None | False | None | False | 736.32 | 0 | 3032445 | 102185 | None | Vol-II, Page No.84, Item No.11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 162.84 | 162.84 | 864.0 | False | None | None | False | None | False | 140693.76 | 0 | 3032563 | 102185 | None | 5.19.9 ELEC | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/ single door with powder coated painting Made out of 14 SWG MS enclosure. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 2748.22 | 2748.22 | 2.0 | False | None | None | False | None | False | 5496.44 | 0 | 3032446 | 102185 | None | Item 11.3 Page No 77, vol-2 | Providing and fixing in position collapsible steel shutters with vertical channels 20x10x2 mm and braced with flat iron diagonals 20x5 mm size, with top and bottom rail of T-iron 40x40x6 mm, with 40 mm dia steel pulleys, complete with bolts, nuts, locking arrangement, stoppers, handles, including applying a priming coat of approved steel primer including cost of materials ,labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 9765.68 | 9765.68 | 5.04 | False | None | None | False | None | False | 49219.0272 | 0 | 3032564 | 102185 | None | 5.19.11 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/ single door with powder coated painting Made out of 14 SWG MS enclosure. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 4764.84 | 4764.84 | 2.0 | False | None | None | False | None | False | 9529.68 | 0 | 3032447 | 102185 | None | Vol-II, Page No.60, Item No.9.12.2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1351.1 | 1351.1 | 224.91 | False | None | None | False | None | False | 303875.901 | 0 | 3032565 | 102185 | None | 15.20.4 ELEC | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V upto 300mA sensitivity on existing wood/ panel board. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5379.62 | 5379.62 | 4.0 | False | None | None | False | None | False | 21518.48 | 0 | 3032448 | 102185 | None | Vol-II, Page No.63, Item No.9.24 | Providing and laying flooring and steps machine cut granite slabs 40 mm
thick on cement mortar bed 1:6, 25 mm thick, and pointed with cement
mortar 1:3 over existing cement concrete bed , including cost of materials, mortar labour, curing complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 5049.22 | 5049.22 | 22.5 | False | None | None | False | None | False | 113607.45 | 0 | 3032566 | 102185 | None | 5.18.1 ELEC | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 489.7 | 489.7 | 24.0 | False | None | None | False | None | False | 11752.8 | 0 | 3032449 | 102185 | None | Vol-II, Page No.60, Item No.9.10 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1305.08 | 1305.08 | 20.67 | False | None | None | False | None | False | 26976.0036 | 0 | 3032567 | 102185 | None | 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. (Make : ABB / Indo Asian / Havells / Schinder) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 872.02 | 872.02 | 6.0 | False | None | None | False | None | False | 5232.12 | 0 | 3032450 | 102185 | None | Vol-II, Page No.65, Item No.9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1642.56 | 1642.56 | 85.46 | False | None | None | False | None | False | 140373.1776 | 0 | 3032568 | 102185 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. (Make : Usha / Almonard / Bajaj / Khaitan / crompton) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3521.12 | 3521.12 | 20.0 | False | None | None | False | None | False | 70422.4 | 0 | 3032451 | 102185 | None | Vol-II, Page No.131, Item No.14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and bracke ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 7052.86 | 7052.86 | 5.0 | False | None | None | False | None | False | 35264.3 | 0 | 3032569 | 102185 | None | 13.10 ELEC | Fixing a ceiling / Wall mounting fan of all capacities and all types to the existing 'S'' hook with fan regulator to the existing board together with supplying and fixing 5 A. ceiling rose, necessary length of 23 / 0.0076 inch PVC insulated twin twisted copper wire and wiring. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 201.78 | 201.78 | 20.0 | False | None | None | False | None | False | 4035.6 | 0 | 3032452 | 102185 | None | Vol-II, Page No.134, Item No.14.16A | Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1metre long with S.S. triangular plate to Eureopean type W.C. of quality'and make as approved by Engineer - in - charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 320.96 | 320.96 | 5.0 | False | None | None | False | None | False | 1604.8 | 0 | 3032570 | 102185 | None | 13.12 ELEC | Extra length of GI pipe of class B 19mm dia for down rod. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 232.46 | 232.46 | 20.0 | False | None | None | False | None | False | 4649.2 | 0 | 3032453 | 102185 | None | Vol-II, Page No.125, Item No.14.7B | Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2709.28 | 2709.28 | 4.0 | False | None | None | False | None | False | 10837.12 | 0 | 3032571 | 102185 | None | 11.3.1 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make : Philip/Bajaj/Havells/Panasonic/Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 650.18 | 650.18 | 2.0 | False | None | None | False | None | False | 1300.36 | 0 | 3032454 | 102185 | None | Vol-II, Page No.134, Item No.14.11.2 | Providing and fixing white vitreous china laboratory sink with C.I. brackets, C.P. brass chain with rubber plug, 40 mm C.P brass waste and 40mm C.P. brass trap with necessary C.P. brass unions complete, including painting of fittings and brackets, cutting and making good the wall wherever required :600x450x200 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5996.76 | 5996.76 | 10.0 | False | None | None | False | None | False | 59967.6 | 0 | 3032572 | 102185 | None | 11.3.2 | Supplying of .feet -PVC Batten with integrated LED tube . W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make : Philip/Bajaj/Havells/Panasonic/Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 814.2 | 814.2 | 52.0 | False | None | None | False | None | False | 42338.4 | 0 | 3032455 | 102185 | None | Vol-II, Page No.136, Item No.14.32.4 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2036.68 | 2036.68 | 3.0 | False | None | None | False | None | False | 6110.04 | 0 | 3032573 | 102185 | None | 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 143.96 | 143.96 | 54.0 | False | None | None | False | None | False | 7773.84 | 0 | 3032456 | 102185 | None | Vol-II, Page No.117, Item No.13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bor ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 647.82 | 647.82 | 5.0 | False | None | None | False | None | False | 3239.1 | 0 | 3032574 | 102185 | None | 11.11.5 | Supplying & fixing of retrofit type - LED bulb . W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. (Make Philips / Bajaj / Havells / Panasonic / Syska) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 317.42 | 317.42 | 10.0 | False | None | None | False | None | False | 3174.2 | 0 | 3032457 | 102185 | None | Vol-II, Page No.117, Item No.13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 359.9 | 359.9 | 5.0 | False | None | None | False | None | False | 1799.5 | 0 | 3032575 | 102185 | None | 12.46 | Supplying & Fixing of 70-150 W lamp holder 2 Pin ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 74.34 | 74.34 | 10.0 | False | None | None | False | None | False | 743.4 | 0 | 3032458 | 102185 | None | Vol-II, Page No.A-32, SL No.664 | PTMT Bottle Trap 31/32MM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 295.0 | 295.0 | 5.0 | False | None | None | False | None | False | 1475.0 | 0 | 3032576 | 102185 | None | 6.2.1 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. (Make : Usha / Almonard / Bajaj / Khaitan / crompton) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 3503.42 | 3503.42 | 8.0 | False | None | None | False | None | False | 28027.36 | 0 | 3032459 | 102185 | None | Vol-II, Page No.120, Item No.13.17.4 | Providing and fixing PTMT bib cock of approved quality and colour ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 285.56 | 285.56 | 5.0 | False | None | None | False | None | False | 1427.8 | 0 | 3032577 | 102185 | None | 13.13 | Fixing one exhaust fan after making a suitable notch in the wall and finishing with cement mortar and colouring to match the existing wall or brackets, with bolts and nuts and a 5 A, ceiling rose with sufficient length of 23 / 0.0076 inch PVC insulated twin core wire of approved make with wire mesh and wooden frame. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 834.26 | 834.26 | 8.0 | False | None | None | False | None | False | 6674.08 | 0 | 3032460 | 102185 | None | I.No.20.29.3, P.No. 200, vol-II | Providing and fixing bright finished brass hard drawn hooks and eyes : 200 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 84.96 | 84.96 | 20.0 | False | None | None | False | None | False | 1699.2 | 0 | 3032578 | 102185 | None | 11.8.3 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 7070.56 | 7070.56 | 4.0 | False | None | None | False | None | False | 28282.24 | 0 | 3032461 | 102185 | None | I.No. 13.3.2, P.No. 117,, vol-II | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing tee, including cutting and threading the pipe etc. complete : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 359.9 | 359.9 | 30.0 | False | None | None | False | None | False | 10797.0 | 0 | 3032579 | 102185 | None | 13.1.2 | Supplying and Fixing of.mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole/wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1233.1 | 1233.1 | 4.0 | False | None | None | False | None | False | 4932.4 | 0 | 3032462 | 102185 | None | SOR P090C Page No.149, I.No.13.6.2, vol-V | Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments 1.0HP/0.75KW 10 STG ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 16413.8 | 16413.8 | 1.0 | False | None | None | False | None | False | 16413.8 | 0 | 3032580 | 102185 | None | 13.5 | Fixing halogen/metal halide /SVL/IL/LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 191.16 | 191.16 | 4.0 | False | None | None | False | None | False | 764.64 | 0 | 3032463 | 102185 | None | Vol II, Sl No 13.33.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes, Having thermal stability for hot & cold water suply including all CPVC plain & brass threaded fittings This Includes Jointing of Pipes & fittings with one step CPVC solvent Cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge external work. Corregundum Issue - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 349.28 | 349.28 | 100.0 | False | None | None | False | None | False | 34928.0 | 0 | 3032581 | 102185 | None | 8.1 | Supplying and drawing UTP CAT 6E LAN cable. (Make D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 44.84 | 44.84 | 600.0 | False | None | None | False | None | False | 26904.0 | 0 | 3032464 | 102185 | None | Vol II, Sl No 13.33.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) Pipes, Having thermal stability for hot & cold water suply including all CPVC plain & brass threaded fittings This Includes Jointing of Pipes & fittings with one step CPVC solvent Cement, trenching, refilling & testing of joints complete as per direction of Engineer in charge external work. - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 438.96 | 438.96 | 100.0 | False | None | None | False | None | False | 43896.0 | 0 | 3032582 | 102185 | None | 8.2.2 | Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable. (Make : D-Link / Polycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 24.78 | 24.78 | 140.0 | False | None | None | False | None | False | 3469.2 | 0 | 3032465 | 102185 | None | Vol-V, Page No.134, SL No.10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 484.98 | 484.98 | 150.0 | False | None | None | False | None | False | 72747.0 | 0 | 3032583 | 102185 | None | 8.4.3 | Supplying & Fixing of switch mounting rack with power manager & Cable manager. (Make : D-Link / TP - Link) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 10001.68 | 10001.68 | 1.0 | False | None | None | False | None | False | 10001.68 | 0 | 3032466 | 102185 | None | Vol-V, Page No.134, SL No.10.1.3 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 50mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 119.18 | 119.18 | 50.0 | False | None | None | False | None | False | 5959.0 | 0 | 3032584 | 102185 | None | 8.9.1 | Supplying fixing of Network Switches (Make : Cisco / D-Link / TP - Link / Hewlett Packard) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 57690.2 | 57690.2 | 1.0 | False | None | None | False | None | False | 57690.2 | 0 | 3032467 | 102185 | None | Page 191, Sl no 16.9, Vol V | Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover - Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 6435.72 | 6435.72 | 5.0 | False | None | None | False | None | False | 32178.6 | 0 | 3032585 | 102185 | None | 8.10.1 | Supplying & fixing of I/O socket with back box (Make : Cisco / D-Link / TP - Link / Hewlett Packard) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 578.2 | 578.2 | 30.0 | False | None | None | False | None | False | 17346.0 | 0 | 3032468 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5652.32 | 5652.32 | 9.61 | False | None | None | False | None | False | 54318.7952 | 0 | 3032586 | 102185 | None | 8.11.1 | Supplying & Fixing of . ms Cat 6 Patch Cable (Make : D-Link / Poycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 264.32 | 264.32 | 30.0 | False | None | None | False | None | False | 7929.6 | 0 | 3032469 | 102185 | None | Vol-II, Page No.109, Item No.12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6748.42 | 6748.42 | 5.4 | False | None | None | False | None | False | 36441.468 | 0 | 3032587 | 102185 | None | 8.12.1E | Supplying & Fixing of Patch panel for LAN cabling (Make : D-Link / TP - Link) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 16661.6 | 16661.6 | 1.0 | False | None | None | False | None | False | 16661.6 | 0 | 3032470 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 9.6 | False | None | None | False | None | False | 78292.704 | 0 | 3032588 | 102185 | None | 8.13.1 | Supplying and fixing of MDF krone junction box with KRONE Module / Telephone cable termination. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 407.1 | 407.1 | 30.0 | False | None | None | False | None | False | 12213.0 | 0 | 3032471 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5708.84 | 5708.84 | 9.61 | False | None | None | False | None | False | 54861.9524 | 0 | 3032589 | 102185 | None | 6.22 | Extra for Fabrication supply and fixing of Stand fabricated using slotted angle /L angle of size 6mm x 50mm for mounting out door/indoor A.C. unit/ Batteries. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 5672.26 | 5672.26 | 2.0 | False | None | None | False | None | False | 11344.52 | 0 | 3032472 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 25.26 | False | None | None | False | None | False | 206007.6774 | 0 | 3032590 | 102185 | None | 9.2.3 | Supplying, erecting, testing & commissioning of OFF- LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with all accessories complete and Excluding batteries and wiring complete. (Make : Microtek / Luminous / V-GUARD / Exide) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 25125.74 | 25125.74 | 2.0 | False | None | None | False | None | False | 50251.48 | 0 | 3032473 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4893.29 | 4893.29 | 25.25 | False | None | None | False | None | False | 123555.5725 | 0 | 3032591 | 102185 | None | 9.5.9 | Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries. (Make : Luminous / Exide / Amaron) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 18756.1 | 18756.1 | 6.0 | False | None | None | False | None | False | 112536.6 | 0 | 3032474 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8155.49 | 8155.49 | 49.7 | False | None | None | False | None | False | 405327.853 | 0 | 3032592 | 102185 | None | 5.7.4 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 815.38 | 815.38 | 2.0 | False | None | None | False | None | False | 1630.76 | 0 | 3032475 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4077.74 | 4077.74 | 49.7 | False | None | None | False | None | False | 202663.678 | 0 | 3032593 | 102185 | None | 5.43.1 | Supply and Installation / Fixing / Provision of Pole box with HRC Fuse / MCB provision and suitable connector / terminal for 3 Ph/ 1 Ph connections with Loop-In & Loop- Out terminals for 10 mm2 /25 mm2 3.5 C AI/Ar/Cu/Ar Cable and branch out 2.5 mm2 2 core AI/Cu PVC Insulated cable, enclosed in a Thermoplastic, Polystyrene enclosure, which should be shock proof, safe, IP65(Weather Proof), rust proof, dust proof, water proof having Internally Embedded Gasket with provision for cable entry through IP65 Thermo plastic, polyamide glands and/or grommets. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 2714.0 | 2714.0 | 1.0 | False | None | None | False | None | False | 2714.0 | 0 | 3032476 | 102185 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 106614.85 | 106614.85 | 9.56 | False | None | None | False | None | False | 1019237.966 | 0 | 3032594 | 102185 | None | 5.46.3 | Supplying and fixing of Modular MCB Devices (Tripper) With Breaking capacity of 6kA. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 443.68 | 443.68 | 2.0 | False | None | None | False | None | False | 887.36 | 0 | 3032477 | 102185 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 1561.26 | 1561.26 | 345.19 | False | None | None | False | None | False | 538931.3394 | 0 | 3032595 | 102185 | None | 5.30 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Each | 1628.4 | 1628.4 | 1.0 | False | None | None | False | None | False | 1628.4 | 0 | 3032478 | 102185 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol-II, Page No.41, Item No.8.1.1) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 303.91 | 303.91 | 490.13 | False | None | None | False | None | False | 148955.4083 | 0 | 3032596 | 102185 | None | ESCOM SR 2023-24 (Sl.No.197 Item No : 32) | Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 as per BESCOM specification. (Page : 443) (Make :V-Gaurd / Universal / Polycab / Finolex) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 146458.06 | 146458.06 | 0.06 | False | None | None | False | None | False | 8787.4836 | 0 | 3032479 | 102185 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 251.47 | 251.47 | 242.11 | False | None | None | False | None | False | 60883.4017 | 0 | 3032480 | 102185 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 442.16 | 442.16 | 331.56 | False | None | None | False | None | False | 146602.5696 | 0 | 3032597 | 102185 | None | VOL1 SR ITEM.1.17.1 | a) Cable trench excavation, 1000x0.6x 1=600, Ordinary soil ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 309.16 | 309.16 | 36.0 | False | None | None | False | None | False | 11129.76 | 0 | 3032598 | 102185 | None | Vol-1,PWD SR Sl No 1.10 | c) Refilling and consolidation
---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 188.8 | 188.8 | 36.0 | False | None | None | False | None | False | 6796.8 | 0 | 3032481 | 102185 | None | Vol-II, Page No.42, Item No.8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 415.94 | 415.94 | 42.96 | False | None | None | False | None | False | 17868.7824 | 0 | 3032599 | 102185 | None | ESCOM SR 2023-24 (CDS-19) | supplying and Laying of RCC Hume pipe (Material : 307(CDS-21) + Labour :69 (CDS-19) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 443.68 | 443.68 | 60.0 | False | None | None | False | None | False | 26620.8 | 0 | 3032482 | 102185 | None | Vol-II, Page No.50, Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 119.18 | 119.18 | 490.29 | False | None | None | False | None | False | 58432.7622 | 0 | 3032600 | 102185 | None | ESCOM SR 2023-24 (Sl.No.:174 Item No.:21.05) | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden/Aluminum Rollers as directed by the departmental staff ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Km | 24645.48 | 24645.48 | 0.06 | False | None | None | False | None | False | 1478.7288 | 0 | 3032483 | 102185 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 131.1 | 131.1 | 490.29 | False | None | None | False | None | False | 64277.019 | 0 | 3032601 | 102185 | None | 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40 mm dia 2.90 mm thick GI pipe 2.5m long buried in a pit . The pit should be filled with equal proportion of salt and charcoal 150 mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per lSI specification 7.3.3. of IS 732 using 12 mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 4141.8 | 4141.8 | 2.0 | False | None | None | False | None | False | 8283.6 | 0 | 3032484 | 102185 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 106.07 | 106.07 | 331.55 | False | None | None | False | None | False | 35167.5085 | 0 | 3032602 | 102185 | None | BWSSB SR 2023-24 Page - 127 Sl.No.:11.1 | Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete. (Page : 178) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 486.16 | 486.16 | 4.0 | False | None | None | False | None | False | 1944.64 | 0 | 3032485 | 102185 | None | Vol-II, Page No.100, Item No.12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 117767.72 | 117767.72 | 0.25 | False | None | None | False | None | False | 29441.93 | 0 | 3032603 | 102185 | None | ESCOM SR 2023-24 (Sl.No.:60 Item No.:8.01) | Supplying of Guy Wire & GI Wire as per BESCOM Specification. (Page-435-436) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 88547.2 | 88547.2 | 0.02 | False | None | None | False | None | False | 1770.944 | 0 | 3032486 | 102185 | None | Vol-II, Page No.100, Item No.12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 8219.84 | 8219.84 | 7.35 | False | None | None | False | None | False | 60415.824 | 0 | 3032487 | 102185 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1892.58 | 1892.58 | 6.72 | False | None | None | False | None | False | 12718.1376 | 0 | 3032488 | 102185 | None | Vol-II, Page No.104, Item No.12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 1210.87 | 1210.87 | 3.0 | False | None | None | False | None | False | 3632.61 | 0 | 3032489 | 102185 | None | Item 11.34 A Page No 84, vol-2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 200.82 | 200.82 | 504.0 | False | None | None | False | None | False | 101213.28 | 0 | 3032490 | 102185 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2-2.5 mm. Maximum possible size 1819mm x 1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6423.8 | 6423.8 | 26.1 | False | None | None | False | None | False | 167661.18 | 0 | 3032491 | 102185 | None | Vol-II, Page No.109, Item No.12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6815.9 | 6815.9 | 5.4 | False | None | None | False | None | False | 36805.86 | 0 | 3032492 | 102185 | None | Vol-II, Page No.49, Item No.8.47 | Polishing on wood work with ready mixed wax polish of approved brand and manufacture : New work to give an even surface including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 160.89 | 160.89 | 9.9 | False | None | None | False | None | False | 1592.811 | 0 | 3032493 | 102185 | None | Vol-II, Page No.84, Item No.11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 164.47 | 164.47 | 1012.02 | False | None | None | False | None | False | 166446.9294 | 0 | 3032494 | 102185 | None | Vol-II, Page No.60, Item No.9.12.2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1364.61 | 1364.61 | 217.01 | False | None | None | False | None | False | 296134.0161 | 0 | 3032495 | 102185 | None | Vol-II, Page No.60, Item No.9.10 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2 including pointing in white cement mixed with pigment of matching shade complete. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1318.13 | 1318.13 | 19.02 | False | None | None | False | None | False | 25070.8326 | 0 | 3032496 | 102185 | None | Vol-II, Page No.65, Item No.9.38 | Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1658.99 | 1658.99 | 81.68 | False | None | None | False | None | False | 135506.3032 | 0 | 3032497 | 102185 | None | Vol-II, Page No.131, Item No.14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and bracket ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No. | 7123.39 | 7123.39 | 4.0 | False | None | None | False | None | False | 28493.56 | 0 | 3032498 | 102185 | None | Vol-II, Page No.127, Item No.14.16A | Providing and fixing 8 mm dia C.P. / S.S. Jet with flexible tube upto 1 metre long with S.S. triangular plate to Eureopean type W.C. of quality and make as approved by Engineer - in - charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 324.17 | 324.17 | 4.0 | False | None | None | False | None | False | 1296.68 | 0 | 3032499 | 102185 | None | Vol-II, Page No.131, Item No.14.4.1 | Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 5308.28 | 5308.28 | 4.0 | False | None | None | False | None | False | 21233.12 | 0 | 3032500 | 102185 | None | Vol-II, Page No.133, Item No.14.7B | Providing and fixing wash basin with C.I. brackets, 15 mm PTMT pillar cock, 32 mm PTMT waste coupling of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever required. White Vitreous China Flat back wash basin size 550x400 mm with single 15 mm PTMT pillar cock. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2736.37 | 2736.37 | 4.0 | False | None | None | False | None | False | 10945.48 | 0 | 3032501 | 102185 | None | Vol-II, Page No.136, Item No.14.32.4 | Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 2057.05 | 2057.05 | 4.0 | False | None | None | False | None | False | 8228.2 | 0 | 3032502 | 102185 | None | Vol-II, Page No.115, Item No.13.4.1 | Providing and fixing Brass full way valve gate with C.I. wheel of approved quality (screwed end) : 25 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 654.3 | 654.3 | 4.0 | False | None | None | False | None | False | 2617.2 | 0 | 3032503 | 102185 | None | Vol-II, Page No.115, Item No.13.3.2 | Providing and fixing brass stop cock of approved quality : 20 mm nominal bore ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Nos | 363.5 | 363.5 | 4.0 | False | None | None | False | None | False | 1454.0 | 0 | 3032504 | 102185 | None | Vol-II, Page No.A-32, SL No.664 | PTMT Bottle Trap 31/32MM ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 297.95 | 297.95 | 4.0 | False | None | None | False | None | False | 1191.8 | 0 | 3032505 | 102185 | None | Vol II, Sl No 13.31.3 Pg. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 378.99 | 378.99 | 60.0 | False | None | None | False | None | False | 22739.4 | 0 | 3032506 | 102185 | None | Vol-V, SL No.11.15.1 | Supply and delivery at site GM (copper alloy) gate valves confirming to Class-I as per IS 778 with latest amendments, 1 No. screwed in bonnet inside screw, rising spring spindle integral seat screwed females ends confirming to IS 554/ 1990 body hydraulically tested 1.5HP seat standard tested 1 HP with IS mark. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No. | 768.71 | 768.71 | 10.0 | False | None | None | False | None | False | 7687.1 | 0 | 3032507 | 102185 | None | Vol-2, page no 117, SL No.13.6.1.1 | Providing and fixing gun metal non- return valve of approved quality ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | No | 738.92 | 738.92 | 4.0 | False | None | None | False | None | False | 2955.68 | 0 | 3032508 | 102185 | None | Vol II, Sl No 13.32.4 Pg. 122 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,
having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 663.83 | 663.83 | 60.0 | False | None | None | False | None | False | 39829.8 | 0 | 3032509 | 102185 | None | Vol-V, Page No.113, SL No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest
amendments and conveying to worksite, rolling and lowering into
trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc.PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | m | 489.83 | 489.83 | 60.0 | False | None | None | False | None | False | 29389.8 | 0 | 3032510 | 102185 | None | Vol-II, Page No.149, Item No.15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation,
making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 973.7 | 973.7 | 302.78 | False | None | None | False | None | False | 294816.886 | 0 | 3032511 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.95 | False | None | None | False | None | False | 32533.1085 | 0 | 3032512 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Columns Percentage on finished rate of concrete per m3 Charges at 70% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 5765.36 | 5765.36 | 3.94 | False | None | None | False | None | False | 22715.5184 | 0 | 3032513 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.07 | False | None | None | False | None | False | 25285.2261 | 0 | 3032514 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Beams & Lintels Building Percentage on finished rate of concrete per m3 Charges at 60% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4941.74 | 4941.74 | 3.06 | False | None | None | False | None | False | 15121.7244 | 0 | 3032515 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 8236.23 | 8236.23 | 3.89 | False | None | None | False | None | False | 32038.9347 | 0 | 3032516 | 102185 | None | Vol-I, Page No.16, Item No.2.5.2 | ADD Centering Roof Slabs Percentage on finished rate of concrete per m3 Charges at 50% ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Cum | 4118.12 | 4118.12 | 3.89 | False | None | None | False | None | False | 16019.4868 | 0 | 3032517 | 102185 | None | Vol-I, Page No.18, Item no. 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,
cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Tonne | 107670.45 | 107670.45 | 1.23 | False | None | None | False | None | False | 132434.6535 | 0 | 3032518 | 102185 | None | Vol-II, Page No.17, Item no. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks
of size 400x200x200mm having block density more than 1800kg/m3
and minimum compressive strength of 4.00 N/mm2 conforming to IS
2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage
charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1576.72 | 1576.72 | 164.47 | False | None | None | False | None | False | 259323.1384 | 0 | 3032519 | 102185 | None | Vol-II, Page No.41, Item No.8.1.1 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 306.92 | 306.92 | 62.87 | False | None | None | False | None | False | 19296.0604 | 0 | 3032520 | 102185 | None | Vol-II, Page No.43, Item No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 253.96 | 253.96 | 25.92 | False | None | None | False | None | False | 6582.6432 | 0 | 3032521 | 102185 | None | Vol-II, Page No.42, Item No.8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 446.54 | 446.54 | 258.67 | False | None | None | False | None | False | 115506.5018 | 0 | 3032522 | 102185 | None | Vol-II, Page No.50, Item No.8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 120.36 | 120.36 | 62.87 | False | None | None | False | None | False | 7567.0332 | 0 | 3032523 | 102185 | None | Vol-II, Page No.50, Item No.8.54.2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Two coats as per specifications and as per directions of Engineer in charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 132.4 | 132.4 | 62.87 | False | None | None | False | None | False | 8323.988 | 0 | 3032524 | 102185 | None | Vol-II, Page No.45, Item No.8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 107.12 | 107.12 | 258.67 | False | None | None | False | None | False | 27708.7304 | 0 | 3032525 | 102185 | None | Vol-II, Page No.104, Item No.12.53 | Providing & fixing 30mm thick factory made rigid foam Panelled Door Shutters made from M.S. tube of 19 gauge thickness, size 19x19mm for stiles and 15x15mm for top & bottom rails, covered with heat moulded PVC C channel of 5mm thick sheet & 30 x 50mm wide to form stiles & 5mm thick & 75mm wide PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick 20mm wide PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet fitted in the M.S. Frame, Sealed to the stiles & rails with 5x30mm PVC sheet beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75 mm Aluminium hinges. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 1911.32 | 1911.32 | 2.2 | False | None | None | False | None | False | 4204.904 | 0 | 3032526 | 102185 | None | Vol-II, Page No.110, Item No.12.88 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having a overall size of 60mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm X 58mm with GI reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 2 2.5 mm. Maximum possible size 1819mm x 1819mm ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Sqm | 6487.4 | 6487.4 | 2.7 | False | None | None | False | None | False | 17515.98 | 0 | 3032527 | 102185 | None | Vol-II, Page No.77, SL No.11.2 | Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Kg | 136.01 | 136.01 | 480.0 | False | None | None | False | None | False | 65284.8 | 0 | 3032528 | 102185 | None | Vol-II, Page No.123, SL No.13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work | Ltr | 10.83 | 10.83 | 2000.0 | False | None | None | False | None | False | 21660.0 | 0 |
|
|
---|