| 2888182 | 94532 | None | code01 | Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete.Taro/ Texmo/Crompton Greeves/ or KUWS & DB Approved. (PRED SR 2023-24 Page no 151 Valume V Item No.13.11.1) 3.00 HP - 300 LPM @ 26 m = 5 STG Outlet Dia - 2.50" | Each | 24326.4 | 24326.4 | 4.0 | False | None | None | False | None | False | 97305.6 | 0 |
| 2888183 | 94532 | None | code02 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments.1x3x4 m2. (PRED SR 2023-24 Page no 154 Valume V Item No.13.22.3)Make Finolex/Ashirvad | Mtr | 141.75 | 141.75 | 648.0 | False | None | None | False | None | False | 91854.0 | 0 |
| 2888184 | 94532 | None | code03 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter (PRED SR 2023-24 Page no155 Valume V Item No.13.23.1) Upto 3 HP pumps | Each | 6825.0 | 6825.0 | 4.0 | False | None | None | False | None | False | 27300.0 | 0 |
| 2888185 | 94532 | None | code04 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments (PRED SR 2023-24 Page no154 Valume V Item No.13.25.1).a)50mm dia | Each | 1312.5 | 1312.5 | 4.0 | False | None | None | False | None | False | 5250.0 | 0 |
| 2888186 | 94532 | None | code05 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box..(PRED SR 2023-24 Page no 155 Valume V Item No.13.26). | No | 1207.5 | 1207.5 | 4.0 | False | None | None | False | None | False | 4830.0 | 0 |
| 2888187 | 94532 | None | code06 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 (PRED SR 2023-24 Page no 95 Valume V Item No.9.1.1).HDPE Grade PE80-PN6.0, 63mm dia | Mtr | 198.45 | 198.45 | 640.0 | False | None | None | False | None | False | 127008.0 | 0 |
| 2888188 | 94532 | None | code07 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.(PRED SR 2023-24 Page no 156 Valume V Item No.13.32) | Job | 6825.0 | 6825.0 | 4.0 | False | None | None | False | None | False | 27300.0 | 0 |
| 2888189 | 94532 | None | code08 | Labour charges for erection of indoor type panel board and meter board units with all necessary materials and labour tools and equipments including cement concrete for foundation/bed etc,complete as per specification, with testing of as per instructions of engineer incharge of work.(PRED SR 2023-24 Page no 156 Valume V Item No.13.33) | Job | 1417.5 | 1417.5 | 4.0 | False | None | None | False | None | False | 5670.0 | 0 |
| 2888190 | 94532 | None | code09 | Providing,Supplying and fixing suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps,bolts,nuts and washers etc. with necessary materials and labour tools and equipments as per instructions of engineer incharge of work.(PRED SR 2023-24 Page no 156 Valume V Item No.13.38.1)
i) 3.1/2 x 6 Sqm | Each | 393.75 | 393.75 | 1.0 | False | None | None | False | None | False | 393.75 | 0 |
| 2888191 | 94532 | None | code10 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia.(PRED SR 2023-24 Page no 157 Valume V Item No.13.39) | Job | 3937.5 | 3937.5 | 4.0 | False | None | None | False | None | False | 15750.0 | 0 |
| 2888192 | 94532 | None | code11 | Earth work in surface excavation by manual means for lowering & levelling the ground by chiselling and wedging in Hard rock for all works other than foundation & depth not exceeding 100 mm as per drawing and technical specifications, including setting out, barricading, caution lights, dressing of excavated surfaces, disposing off the excavated spalls/stuff & stacking the selected spall/ stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work.. PWD Common DSR 2023-24 Volume 1 (P No: 05 I.No:13)) | Cum | 185.85 | 185.85 | 163.14 | False | None | None | False | None | False | 30319.569 | 0 |
| 2888193 | 94532 | None | code12 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24Volume 1 (P No: 15 I.No:2.1.2) | Cum | 5947.2 | 5947.2 | 2.89 | False | None | None | False | None | False | 17187.408 | 0 |
| 2888194 | 94532 | None | code13 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) (Comman SR-2023-24,Vol-2)I.NO-5.1.1 Page No-09 | Cum | 5891.55 | 5891.55 | 30.84 | False | None | None | False | None | False | 181695.402 | 0 |
| 2888195 | 94532 | None | code14 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates PWD Common DSR 2023-24 Volume 1 (P No: 15 I.No:2.1.4) | Cum | 6527.85 | 6527.85 | 3.7874 | False | None | None | False | None | False | 24723.57909 | 0 |
| 2888196 | 94532 | None | code15 | Ruled/ Flush pointing on White sand stone masonry surface with lime, surkhi and marble dust mortar in the ratio of 1:1.5:1/2 One lime : 1.5 surkhi (15% dark red and 85% light yellow surkhi) : 1/2 marble dust. (The rate is inclusive of all materials & labours involved except scaffolding).(PWD Common DSR 2023-24 Volume 2 (P No:214 I.No:21.6) | Sqm | 258.3 | 258.3 | 36.0 | False | None | None | False | None | False | 9298.8 | 0 |
| 2888197 | 94532 | None | code16 | RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm.(Toper) (PRED SR 2023-24 Page no 116 Valume V Item No 10.6). | Each | 17221.05 | 17221.05 | 10.0 | False | None | None | False | None | False | 172210.5 | 0 |
| 2888198 | 94532 | None | code17 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) Medium Duty GI pipe of 50mm dia (PRED SR 2023-24 Page no 127 Valume V Item No 11.1.6). | Mtr | 464.1 | 464.1 | 25.0 | False | None | None | False | None | False | 11602.5 | 0 |
| 2888199 | 94532 | None | code18 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) Medium Duty GI pipe of 20mm dia (PRED SR 2021-22 Page no 127 Valume V Item No11.1.2). | Mtr | 236.25 | 236.25 | 20.0 | False | None | None | False | None | False | 4725.0 | 0 |
| 2888200 | 94532 | None | code19 | Providing GM gland cocks tested against hydraulic pressure of 20 Kg/m² with ISI mark.(PRED SR 2023-24 Page no 134 Valume V Item No 11.19.1) For 15 mm dia GM gland cocks | Each | 308.7 | 308.7 | 10.0 | False | None | None | False | None | False | 3087.0 | 0 |
| 2888201 | 94532 | None | code20 | Providing and fixing GI union in existing GI pipe line, cutting and threading the pipe and making long screws including excavation, refilling the earth or cutting of wall and making good the same complete wherever required etc. for:(PRED SR 2023-24 Page no 128 Valume V Item No 11.4.5) 20.88.5: 40 mm nominal bore | Each | 513.45 | 513.45 | 10.0 | False | None | None | False | None | False | 5134.5 | 0 |
| 2888202 | 94532 | None | code21 | Providing and fixing GI union in existing GI pipe line, cutting and threading the pipe and making long screws including excavation, refilling the earth or cutting of wall and making good the same complete wherever required etc. for:(PRED SR 2023-24 Page no 128 Valume V Item No 11.4.8) 20.88.8: 80 mm nominal bore | Each | 1093.05 | 1093.05 | 10.0 | False | None | None | False | None | False | 10930.5 | 0 |
| 2888203 | 94532 | None | code22 | Liasioning Charges for Power Supply for Water Supply Installations From HESCOM Like Test Reports others, Etc Expenditure. The Power Supply Sanction & Allocation of RR No is Must be done by Work Alloted Contractor Only. | No | 1000.0 | 1000.0 | 10.0 | False | None | None | False | None | False | 10000.0 | 0 |
| 2888204 | 94532 | None | code23 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for:1)PVC pipes75mm dia., 6 kg/sqcm & class 3 Finolex/jain Company PWD Common DSR 2023-24 Volume 5 (P No:113 I.No:10.1.5) | Mtr | 231.0 | 231.0 | 540.0 | False | None | None | False | None | False | 124740.0 | 0 |
| 2888205 | 94532 | None | code24 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD Common DSR 2023-24 Volume 1 (P No: 7 I.No:1.10) | Cum | 168.0 | 168.0 | 48.5999 | False | None | None | False | None | False | 8164.7832 | 0 |