1718775885000 | 0 | None | None | Water supply/sewage lines | Construction of UGD Chamber and laying of UGD Line in R. C Colony near Talapathi Appartment to Subbrao house at ward no. 59 | 337610.15 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3307716 | 115395 | None | 001 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata All kinds of soils. Depth upto 1.50 m | Cum | 275.1 | 275.1 | 164.84 | False | None | None | False | None | False | 45347.484 | 0 | 3307717 | 115395 | None | 002 | Providing, lowering, laying, jointing, testing and commissioning of Glazed Stone Ware Pipes of following dia, conforming to IS 651:1992, IS 4127 with latest amendments, including conveying to work site, caulking with hemp dipped in tar and jointing with CM 1:1.5 using OPC, perfect linking and curing for 10 days and testing with water etc. with all lead, lifts and as per Technical Specifications. The cost to include the cost of all jointing materials, necessary survey works for laying of sewer lines etc. complete. The contractor will make own arrangements for procuring water for testing. 230 mm dia. pipes | Rmtr | 926.1 | 926.1 | 111.0 | False | None | None | False | None | False | 102797.1 | 0 | 3307718 | 115395 | None | 003 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications | Cum | 168.0 | 168.0 | 154.15 | False | None | None | False | None | False | 25897.2 | 0 | 3307719 | 115395 | None | 004 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including Providing and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, Providing and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Table Moulded Bricks & Medium Duty cover and frame.For 1.2m dia Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 1.50 M depth & Medium duty SFRC cover & frame | Each | 37172.1 | 37172.1 | 2.0 | False | None | None | False | None | False | 74344.2 | 0 | 3307720 | 115395 | None | 005 | Providing and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. With Table Moulded Bricks & Medium Duty SFRC Cover & Frame: For 1.2m dia Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. 1.80 m depth & Medium duty SFRC cover & frame | Each | 44135.49 | 44135.49 | 2.0 | False | None | None | False | None | False | 88270.98 | 0 | 3307721 | 115395 | None | 006 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work | Cum | 89.25 | 89.25 | 10.68 | False | None | None | False | None | False | 953.19 | 0 |
|