createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1718435943339
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2730.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose29-06-2024 17:00:00
tenderQueryClose28-06-2024 17:00:00
technicalBidOpen01-07-2024 11:00:00
publishedDate19-06-2024 17:12:48
publishedByPostRDPR_EE_DIV_CNRPT
publishedByUserKPE12961 - G M BALAKRISHNA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate26-06-2024 11:30:59
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonSHIVAKUMARA
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08176252201
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1718435943381
version5
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/BD/WORK_INDENT5946
titleCONSTRUCTION OF ADDITIONAL CLASS ROOM FOR PU COLLEGE IN CHANNARAYAPATTANA TOWN (LL0045) IN IN CHANNARAYAPATTANA TALUK
descriptionCONSTRUCTION OF ADDITIONAL CLASS ROOM FOR PU COLLEGE IN CHANNARAYAPATTANA TOWN (LL0045) IN IN CHANNARAYAPATTANA TALUK
categoryWORKS
categoryTextWorks
ecv10907487.91
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location975
locationNameRDPR Division Office Channarayapattana
provisionalAmount12525000.0
groupOverheadTotal1663856.6
fileNumberRDPR/PRESD/CRP/VVKCLG/2023-24CRPTWN
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17184359430000NoneNoneBuildingsCONSTRUCTION OF ADDITIONAL CLASS ROOM FOR PU COLLEGE IN CHANNARAYAPATTANA TOWN (LL0045) IN IN CHANNARAYAPATTANA TALUK9243631.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3292962114532Nonecode01Demolishing R.C.C. work manually / mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workPer Cmtr2474.522474.520.83FalseNoneNoneFalseNoneFalse2053.85160
3292963114532Nonecode02Demolishing R.C.C. work manually by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum2498.752498.753.45FalseNoneNoneFalseNoneFalse8620.68750
3292964114532Nonecode03Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . Second Floor COLUMNS ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum11496.4211496.422.98FalseNoneNoneFalseNoneFalse34259.33160
3292965114532Nonecode04Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . Third Floor COLUMNS ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum11609.1311609.1317.27FalseNoneNoneFalseNoneFalse200489.67510
3292966114532Nonecode05Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates . Terrace Floor COLUMNS ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum11721.8411721.842.96FalseNoneNoneFalseNoneFalse34696.64640
3292967114532Nonecode06Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Second Floor Roof Beam ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum9958.469958.464.5FalseNoneNoneFalseNoneFalse44813.070
3292968114532Nonecode07Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Third Floor Roof Beam ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum10056.110056.123.04FalseNoneNoneFalseNoneFalse231692.5440
3292969114532Nonecode08Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Terrace Floor Roof Beam ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum10153.7310153.735.28FalseNoneNoneFalseNoneFalse53611.69440
3292970114532Nonecode09Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Second Floor Roof Slab ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum9336.069336.0611.16FalseNoneNoneFalseNoneFalse104190.42960
3292971114532Nonecode10Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Third Floor Roof Slab ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum9427.599427.5971.89FalseNoneNoneFalseNoneFalse677749.44510
3292972114532Nonecode11Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Terrace Floor Roof Slab ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum9519.129519.127.25FalseNoneNoneFalseNoneFalse69013.620
3292973114532Nonecode16Supplying,fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials,machinery,labour,cleaning,straightening, cutting, bending, hooking, laping welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Second floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workTonne91246.1491246.141.96FalseNoneNoneFalseNoneFalse178842.43440
3292974114532Nonecode17Supplying,fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials,machinery,labour,cleaning,straightening, cutting, bending, hooking, laping welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workTonne92140.7192140.7111.63FalseNoneNoneFalseNoneFalse1071596.45730
3292975114532Nonecode18Supplying,fitting and placing TMT FE 550 550D Steel Reinforcement including cost of all materials,machinery,labour,cleaning,straightening, cutting, bending, hooking, laping welding joints, tying with binding wire soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workTonne93035.2893035.281.96FalseNoneNoneFalseNoneFalse182349.14880
3292976114532Nonecode19Providing and laying autoclaved aerated cement blocks masonry with 150mm 230mm 300 mm thick AAC blocks as per IS 2185 Part III in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials,labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum8137.568137.5617.2FalseNoneNoneFalseNoneFalse139966.0320
3292977114532Nonecode20Providing and laying autoclaved aerated cement blocks masonry with 150mm 230mm 300 mm thick AAC blocks as per IS 2185 Part III in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials,labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum8217.348217.3499.19FalseNoneNoneFalseNoneFalse815077.95460
3292978114532Nonecode21Providing and laying autoclaved aerated cement blocks masonry with 150mm 230mm 300 mm thick AAC blocks as per IS 2185 Part III in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials,labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum8297.128297.1237.38FalseNoneNoneFalseNoneFalse310146.34560
3292979114532Nonecode22Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment Plaster mesh 150mm wide. Second floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm38.7638.76137.24FalseNoneNoneFalseNoneFalse5319.42240
3292980114532Nonecode23Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment Plaster mesh 150mm wide. Third floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm39.1439.14692.04FalseNoneNoneFalseNoneFalse27086.44560
3292981114532Nonecode24Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. length of mesh only be measured for payment Plaster mesh 150mm wide. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm39.5239.52100.0FalseNoneNoneFalseNoneFalse3952.00
3292982114532Nonecode25Providing 20 mm cement plaster of mix :1:6 1 cement: 6 fine sand to brick stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm339.66339.66415.8FalseNoneNoneFalseNoneFalse141230.6280
3292983114532Nonecode26Providing 20 mm cement plaster of mix 1 6 1 cement 6 fine sand to brick stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm342.99342.99384.28FalseNoneNoneFalseNoneFalse131804.19720
3292984114532Nonecode27Providing 20 mm cement plaster of mix 1 6 1 cement 6 fine sand to brick stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm346.32346.32271.53FalseNoneNoneFalseNoneFalse94036.26960
3292985114532Nonecode28Providing 6 mm cement plaster with cement mortar 13 1 cement 3 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm215.22215.2274.71FalseNoneNoneFalseNoneFalse16079.08620
3292986114532Nonecode29Providing 6 mm cement plaster with cement mortar 1 3 1 cement 3 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm217.33217.33478.48FalseNoneNoneFalseNoneFalse103988.05840
3292987114532Nonecode30Providing 6 mm cement plaster with cement mortar 1 3 1 cement 3 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm219.44219.4448.33FalseNoneNoneFalseNoneFalse10605.53520
3292988114532Nonecode31Providing 12 mm cement plaster with cement mortar 16 1 cement 6 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm245.82245.82115.42FalseNoneNoneFalseNoneFalse28372.54440
3292989114532Nonecode32Providing 12 mm cement plaster with cement mortar 1 6 1 cement 6 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm248.23248.23816.17FalseNoneNoneFalseNoneFalse202597.87910
3292990114532Nonecode33Providing 12 mm cement plaster with cement mortar 1 6 1 cement 6 fine sand including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm250.64250.6467.91FalseNoneNoneFalseNoneFalse17020.96240
3292991114532Nonecode34Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work two coats over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm139.74139.74189.83FalseNoneNoneFalseNoneFalse26526.84420
3292992114532Nonecode35Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work two coats over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm141.11141.111294.65FalseNoneNoneFalseNoneFalse182688.06150
3292993114532Nonecode36Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade New work two coats over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm142.48142.48116.24FalseNoneNoneFalseNoneFalse16561.87520
3292994114532Nonecode37Finishing walls with Acrylic Smooth exterior paint of required shade New work Two coat applied at 1.67 ltr 10 Sqm over and including priming coat of exterior primer applied at 2.20 kg 10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Ground Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm174.0174.0481.05FalseNoneNoneFalseNoneFalse83702.70
3292995114532Nonecode38Finishing walls with Acrylic Smooth exterior paint of required shade:New work Two coat applied at 1.67 ltr 10 m² over and including priming coat of exterior primer applied at 2.20 kg 10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. First Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm175.74175.74415.8FalseNoneNoneFalseNoneFalse73072.6920
3292996114532Nonecode39Finishing walls with Acrylic Smooth exterior paint of required shade:New work Two coat applied at 1.67 ltr 10 m² over and including priming coat of exterior primer applied at 2.20 kg 10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm177.48177.48415.8FalseNoneNoneFalseNoneFalse73796.1840
3292997114532Nonecode40Finishing walls with Acrylic Smooth exterior paint of required shade:New work Two coat applied at 1.67 ltr 10 m² over and including priming coat of exterior primer applied at 2.20 kg 10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm179.22179.22384.28FalseNoneNoneFalseNoneFalse68870.66160
3292998114532Nonecode41Finishing walls with Acrylic Smooth exterior paint of required shade:New work Two coat applied at 1.67 ltr 10 m² over and including priming coat of exterior primer applied at 2.20 kg 10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge.Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm180.96180.96271.53FalseNoneNoneFalseNoneFalse49136.06880
3292999114532Nonecode42Providing and laying Vitrified tiles in different sizes thickness to be specified by manufacturer , with water absorption less than 0.08 percent and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 1 cement: 3 coarse sand , jointing with grey cement slurry at 3.3 kg per sqm including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm. Second floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm1198.51198.580.33FalseNoneNoneFalseNoneFalse96275.5050
3293000114532Nonecode43Providing and laying Vitrified tiles in different sizes thickness to be specified by manufacturer , with water absorption less than 0.08 percent and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 1 cement: 3 coarse sand , jointing with grey cement slurry at 3.3 kg per sqm including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 600x600 mm. third floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm1210.251210.25358.41FalseNoneNoneFalseNoneFalse433765.70250
3293001114532Nonecode44Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints finished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm5487.845487.8444.3FalseNoneNoneFalseNoneFalse243111.3120
3293002114532Nonecode45Providing half nosing for 20mm thick granite slab using required machinery including cost and conveyance of all materials, labour for all items of work, HOM of equipment etc., complete as per specification. ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm185.4185.486.82FalseNoneNoneFalseNoneFalse16096.4280
3293003114532Nonecode46Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm average thick base of cement mortar 1:4 1 cement : 4 coarse sand laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer in Charge.Polished Granite stone slab Black,Cherry Red,Brown,Cat Eye, River Pink or equivalent. ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm2937.562937.56109.84FalseNoneNoneFalseNoneFalse322661.59040
3293004114532Nonecode47Providing Mathi Nandi wood frames of doors,windows,clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves excluding cost of cement concrete and side clamps , but including cost of materials, labour, usage charges complete as per specifications. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum126686.04126686.040.0788FalseNoneNoneFalseNoneFalse9982.8599520
3293005114532Nonecode48Providing Mathi Nandi wood frames of doors,windows,clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves excluding cost of cement concrete and side clamps , but including cost of materials, labour, usage charges complete as per specifications. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum127928.06127928.060.394FalseNoneNoneFalseNoneFalse50403.655640
3293006114532Nonecode49Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets core veneer hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 part I 1991. from manufacturer complete as per spcification.35 mm thick both side commercial. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm3388.443388.442.88FalseNoneNoneFalseNoneFalse9758.70720
3293007114532Nonecode50Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets core veneer hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 part I 1991. from manufacturer complete as per spcification.35 mm thick both side commercial. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm3421.663421.6614.4FalseNoneNoneFalseNoneFalse49271.9040
3293008114532Nonecode51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo.1036.321036.321.0FalseNoneNoneFalseNoneFalse1036.320
3293009114532Nonecode12Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Second Floor Lintel ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum10820.1610820.161.39FalseNoneNoneFalseNoneFalse15040.02240
3293010114532Nonecode13Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Third Floor Lintel ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum10926.2410926.249.31FalseNoneNoneFalseNoneFalse101723.29440
3293011114532Nonecode14Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite trap basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Terrace Floor Lintel ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum11032.3211032.321.45FalseNoneNoneFalseNoneFalse15996.8640
3293012114532Nonecode15Providing and laying in position Ready Mixed or Batch Mixed concrete as per IS 10262 mix design procedure for Cement Concrete works in all types of Structures other than Road works, using coarse aggregate and fine aggregate derived from natural sources, Ordinary Portland Cement OPC at 75percent & GGBS at 25percent proportion,admixtures to accelerate retard setting of concrete,to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the Engineer in charge. Third floor Staircase ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum9427.599427.597.55FalseNoneNoneFalseNoneFalse71178.30450
3293013114532Nonecode52Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo.1046.481046.485.0FalseNoneNoneFalseNoneFalse5232.40
3293014114532Nonecode53Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workKg186.66186.661408.05FalseNoneNoneFalseNoneFalse262826.6130
3293015114532Nonecode54Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings wooden frames with rawl plugs screws etc. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workKg188.49188.491408.05FalseNoneNoneFalseNoneFalse265403.34450
3293016114532Nonecode55Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Second floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm117.3117.367.05FalseNoneNoneFalseNoneFalse7864.9650
3293017114532Nonecode56Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Third floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm118.45118.4567.05FalseNoneNoneFalseNoneFalse7942.07250
3293018114532Nonecode57Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm119.6119.68.32FalseNoneNoneFalseNoneFalse995.0720
3293019114532Nonecode58Providing & fixing of 3 track x 2 panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free,gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame and sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor Tand P s shall not be made . Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm6868.686868.6867.05FalseNoneNoneFalseNoneFalse460544.9940
3293020114532Nonecode59Providing & fixing of 3 track x 2 panel sliding windows made out of multi chambered UPVC Matching to RAL 9016 sections and with minimum TiO2 Titanium Dioxide at 6PHR with TPE Thermo Plastic Elastomer and lead free,gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame and sash shall be of 2mm 2.5mm. Maximum possible size 2419mm x 2200mm. The cost is inclusive of all fixtures and separate charges for minor TandP s shall not be made . Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm6936.026936.0267.05FalseNoneNoneFalseNoneFalse465060.1410
3293021114532Nonecode60Applying priming coats with primer of approved brand and manufacture,having low VOC Volatile Organic Compound content. With ready mixed pink or grey primer on wood work hard and soft wood having VOC content less than 50 g L as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm57.1257.126.91FalseNoneNoneFalseNoneFalse394.69920
3293022114532Nonecode61Applying priming coats with primer of approved brand and manufacture,having low VOC Volatile Organic Compound content. With ready mixed pink or grey primer on wood work hard and soft wood having VOC content less than 50 g L as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm57.6857.6834.56FalseNoneNoneFalseNoneFalse1993.42080
3293023114532Nonecode62Painting with oil type wood preservative of approved brand and manu facture :New work two coats to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting,cost of materials,labour complete as per specifications and as per directions of Engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm40.840.86.91FalseNoneNoneFalseNoneFalse281.9280
3293024114532Nonecode63Painting with oil type wood preservative of approved brand and manu facture :New work two coats to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting,cost of materials,labour complete as per specifications and as per directions of Engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm41.241.234.56FalseNoneNoneFalseNoneFalse1423.8720
3293025114532Nonecode64Providing and laying cinder concrete in cement 1:15 1 cement : 15 cinder of 12.5mm nominal gauge on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum2057.342057.341.3FalseNoneNoneFalseNoneFalse2674.5420
3293026114532Nonecode65Providing and laying cinder concrete in cement 1:15 1 cement : 15 cinder of 12.5mm nominal gauge on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workCum2077.512077.515.18FalseNoneNoneFalseNoneFalse10761.50180
3293027114532Nonecode66Honne wood beading 20x20mm. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm56.156.16.0FalseNoneNoneFalseNoneFalse336.60
3293028114532Nonecode67Honne wood beading 20x20mm. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm56.6556.6530.0FalseNoneNoneFalseNoneFalse1699.50
3293029114532Nonecode68Providing and fixing expansion hold fasteners on C.C. R.C.C. Brick ma sonry surface backing including drilling necessary holes and the cost of bolt etc complete. Second floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workEach56.156.16.0FalseNoneNoneFalseNoneFalse336.60
3293030114532Nonecode69Providing and fixing expansion hold fasteners on C.C. R.C.C. Brick ma sonry surface backing including drilling necessary holes and the cost of bolt etc complete. Third floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workEach56.6556.6530.0FalseNoneNoneFalseNoneFalse1699.50
3293031114532Nonecode70Providing and fixing bright finished brass butt hinges with necessary screws etc. complete 125x85x5.5 mm heavy type . Second Floor" ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo280.5280.58.0FalseNoneNoneFalseNoneFalse2244.00
3293032114532Nonecode71Providing and fixing bright finished brass butt hinges with necessary screws etc. complete 125x85x5.5 mm heavy type . Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo283.25283.2540.0FalseNoneNoneFalseNoneFalse11330.00
3293033114532Nonecode72Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo306.0306.01.0FalseNoneNoneFalseNoneFalse306.00
3293034114532Nonecode73Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo309.0309.05.0FalseNoneNoneFalseNoneFalse1545.00
3293035114532Nonecode74Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge.SS Handles 200mm. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo459.0459.04.0FalseNoneNoneFalseNoneFalse1836.00
3293036114532Nonecode75Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge.SS Handles 200mm. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo463.5463.520.0FalseNoneNoneFalseNoneFalse9270.00
3293037114532Nonecode76Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 200x10mm. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo153.0153.03.0FalseNoneNoneFalseNoneFalse459.00
3293038114532Nonecode77Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge. SS Tower Bolts 200x10mm. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo154.5154.515.0FalseNoneNoneFalseNoneFalse2317.50
3293039114532Nonecode78Providing and fixing magnetic catcher of approved quality in cupboard ward robe shutters, including fixing with necessary screws etc. complete. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo60.1860.182.0FalseNoneNoneFalseNoneFalse120.360
3293040114532Nonecode79Providing and fixing magnetic catcher of approved quality in cupboard ward robe shutters, including fixing with necessary screws etc. complete. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo60.7760.7710.0FalseNoneNoneFalseNoneFalse607.70
3293041114532Nonecode80Providing and fixing aluminium die cast body tubular type universal hy draulic door closer having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm , with necessary accessories and screws etc. complete. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo1136.281136.282.0FalseNoneNoneFalseNoneFalse2272.560
3293042114532Nonecode81Providing and fixing aluminium die cast body tubular type universal hy draulic door closer having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm , with necessary accessories and screws etc. complete. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo1147.421147.4210.0FalseNoneNoneFalseNoneFalse11474.20
3293043114532Nonecode82Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo122.4122.42.0FalseNoneNoneFalseNoneFalse244.80
3293044114532Nonecode84Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. Second Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm484.5484.55.4FalseNoneNoneFalseNoneFalse2616.30
3293045114532Nonecode85Providing wall black boards in 12mm thick with CM 1:3 and applied with primer & two coats of acrylic emulsion black paint including finishing etc.,complete. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm489.25489.2521.6FalseNoneNoneFalseNoneFalse10567.80
3293046114532Nonecode86Providing and fixing stainless steel Grade 304 railing made of Hollow tubes,channels,plates etc.,including welding,grinding,buffing, polishing and making curvature wherever required and fitting the same with necessary stainless steel nuts and bolts complete, i c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer in charge,for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc. including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in Charge Third floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workKg581.95581.95228.96FalseNoneNoneFalseNoneFalse133243.2720
3293047114532Nonecode87Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace Chajjas Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400percent and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats at 1.6kg per m2 to achieve final DFT dry film thickness of 1mm including prime coat of epoxy primer at150 g per m2 and protection with 120gsm Geo textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm841.51841.5173.44FalseNoneNoneFalseNoneFalse61800.49440
3293048114532Nonecode88Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace Chajjas Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400percent and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats at 1.6kg per m2 to achieve final DFT dry film thickness of 1mm including prime coat of epoxy primer at150 g per m2 and protection with 120gsm Geo textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. Terrace Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm849.68849.68509.86FalseNoneNoneFalseNoneFalse433217.84480
3293049114532Nonecode89Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners,all necessary fittings complete,including applying a priming coat of approved steel primer. Using M.S. angels 40x40x6 mm for diagonal braces including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in Charge. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workSqm4612.344612.343.78FalseNoneNoneFalseNoneFalse17434.64520
3293050114532Nonecode90Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion,i Single socketed pipes. Third Floor ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workm585.04585.04154.0FalseNoneNoneFalseNoneFalse90096.160
3293051114532NoneCode90Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. Floorthird ---- The rates includes all leads, lifts, loading, unloading, cost and conveyance of all materials, labour, equipments etc complete as per the direction of the Engineer in charge of workNo123.6123.610.0FalseNoneNoneFalseNoneFalse1236.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17184359440000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17184359440001NoneNoneELIGIBILITYTHE BIDDER SHOULD READ ALL THE CONDITION IN THE INSTRUCTION BIDDER SHEET AND OBEY ALL THE CONDITIONNone
17184359440000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17184359440000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17184359440000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneTENDERER SHALL OBTAIN THE WORK DONE CERTIFICATE OF SIMILAR NATURE OF WORK 50 PERCENT OF THE AMOUNT PUT TO TENDER PRICE IN ONE FINANCIAL YEAR FOR IN THE PRESCRIBED FORMAT FROM THE COMPETENT AUTHORITY NOT BELOW THE RANK OF EXECUTIVE ENGINEER OR DISTRICT LEVEL OFFICER AND SCAN THE ORIGINAL CERTIFICATED AND ATTACH THE SCANNED FILE TO THE TENDER. THE ORIGINAL CERTIFICATE SHALL BE PRODUCED AT THE TIME OF OPENING OF TENDERS.FROM LAST FIVE YEARS (2019-20 to 2023-24) RS. 54.54 LAKHSPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTO QUALIFY FOR AWARD OF THIS CONTRACT, EACH TENDERER IN ITS NAME SHOULD HAVE IN THE LAST FIVE YEAR I.E, 2019-20 TO 2023-24) A) ACHIEVED IN AT LEAST TWO FINANCIAL TURN OVER (IN ALL CLASSES OF CIVIL ENGINEERING CONSTRUCTION WORKS ONLY) OF RS. 218.14 LAKHS.(USUALLY NOT LESS THAN TWO TIMES THE ESTIMATED ANNUAL PAYMENTS UNDER THIS CONTRACT)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneEXECUTED IN ANY ONE YEAR THE FOLLOWING MINIMUM QUANTITIES OF WORK (80% OF PEAK RATE OF CONSTRUCTION) 1) PCC/RCC-138.00 CUM (2) MASONRY WORK - 123.01 CUM CUM (3) TMT STEEL -12.44 TONNE (4)PLASTERING AND PAINTING-5139.42 SQM (5)FLOORING- 474.30 SQM (6)WATER PROOFING-466.64Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLIQUID ASSETS AND OR AVAILABILITY OF CREDIT FACILITIES OF NO LESS THAN RS. 36.35 LAKHS UNCONDITIONAL CREDIT LINES LETTER OF CREDIT OR CERTIFICATES FROM NATIONALIZED BANKS FOR MEETING THE FUND REQUIREMENT ETCFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (2019-20 TO 2023-24)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneREPORTS ON THE FINANCIAL STANDING OF THE TENDERER, SUCH AS PROFIT AND LOSS STATEMENTS AND AUDITORS REPORTS FOR THE LAST FIVE YEARS(2019-20 TO 2023-24)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneOthers -- BALANCE SHEET OF PROFIT AND LOSS STATEMENT AND IT FILES COPIES
NoneNoneNoneNoneLIST OF EXISTING COMMITMENTS AND ONGOING WORKSOthersLIST OF EXISTING COMMITMENTS AND ONGOING WORKS
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- LIST OF EXISTING COMMITMENTS AND ONGOING WORKS
NoneNoneNoneNoneCONSTITUTION OR LEGAL STATUS OF TENDERER, PLACE OF REGISTRATION & PRINCIPAL PLACE OF BUSINESS. (AS PER CLASS-3 OF THE I.T.T)OthersANY ADDRESS PROOF OF BIDDER
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- ANY ADDRESS PROOF OF BIDDER
NoneNoneNoneNoneTHE TENDERER SHOULD SUBMIT THE REGISTRATION CERTIFICATE ALONG WITH THE APPLICATION. (SHOULD BE ENROLLED AND RENEWED IN PWD) (CLASS III & ABOVE CONTRACTOR ONLY)OthersPWD Registration Certificate (Class I/II/III/IV)
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneLIST OF WORKS FOR WHICH TENDERS ALREADY SUBMITTEDOthersLIST OF WORKS FOR WHICH TENDERS ALREADY SUBMITTED
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- LIST OF WORKS FOR WHICH TENDERS ALREADY SUBMITTED
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
TENDERER SHALL OBTAIN THE WORK DONE CERTIFICATE OF SIMILAR NATURE OF WORK 50 PERCENT OF THE AMOUNT PUT TO TENDER PRICE IN ONE FINANCIAL YEAR FOR IN THE PRESCRIBED FORMAT FROM THE COMPETENT AUTHORITY NOT BELOW THE RANK OF EXECUTIVE ENGINEER OR DISTRICT LEVEL OFFICER AND SCAN THE ORIGINAL CERTIFICATED AND ATTACH THE SCANNED FILE TO THE TENDER. THE ORIGINAL CERTIFICATE SHALL BE PRODUCED AT THE TIME OF OPENING OF TENDERS.FROM LAST FIVE YEARS FROM 2019-20 TO 2023-24 RS. 54.54 LAKHSTrueTechnical Bid
UNCONDITIONAL LIQUID ASSETS AND OR AVAILABILITY OF CREDIT FACILITIES OF NO LESS THAN RS. 36.35 LAKHS CREDIT LINES LETTER OF CREDIT OR CERTIFICATES FROM NATIONALIZED BANKS FOR MEETING THE FUND REQUIREMENT ETCTrueTechnical Bid
REPORTS ON THE FINANCIAL STANDING OF THE TENDERER, SUCH AS PROFIT AND LOSS STATEMENTS AND AUDITORS REPORTS FOR THE LAST FIVE YEARS 2019-20 TO 2023-24 VALUE NOT LESS THAN RS 218.14 LAKHSTrueTechnical Bid
THE BIDDER SHOULD ENROLLED IN PWD AS PRIME CONTRACTOR AS CLASS 3 AND ABOVETrueTechnical Bid
LIST OF EXISTING COMMITMENTS AND ONGOING WORKSTrueTechnical Bid
LIST OF WORKS FOR WHICH TENDERS ALREADY SUBMITTEDTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
BuildingsHassanChannarayapattanaHassanSRAVANABELAGOLAGOVT PU COLLEGE IN CHANNARAYAPATTAN TOWNNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1718780683000
version0
createdDateNone
modifiedDateNone
blockNumberOFFICE OF EXECUTIVE ENGINEER, PANCHAYATH RAJ ENGINEERING DIVISION,CHANNARAYAPATTANA
streetNone
cityCHANNARAYAPATTANA
stateKarnataka
pin573116
tenderRecallDTONone