tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1718115581000 | 1 | None | None | Buildings | Construction and Supply of Furnitures to Government Girls High School at Mangalore Village in Kukanoor tq Koppal District (GROUND FLOOR) | 7389965.82 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3272589 | 113447 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- including cost of all materials, labour, HOM, I | Cum | 99.75 | 99.75 | 86.1 | False | None | None | False | None | False | 8588.475 | 0 | 3272590 | 113447 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3m ---- including cost of all materials, labour, HOM, I | Cum | 107.1 | 107.1 | 1100.55 | False | None | None | False | None | False | 117868.905 | 0 | 3272591 | 113447 | None | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20 percentage E.C. / Lindane 20 percentage E.C. at 3.19 l sqm including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 123.9 | 123.9 | 290.51 | False | None | None | False | None | False | 35994.189 | 0 | 3272592 | 113447 | None | 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead and lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6288.45 | 6288.45 | 57.16 | False | None | None | False | None | False | 359447.802 | 0 | 3272593 | 113447 | None | 2.2.3 | Providing and laying in position Cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6652.8 | 6652.8 | 92.12 | False | None | None | False | None | False | 612855.936 | 0 | 3272594 | 113447 | None | page No.-111 | Additional for formwork, Centering & Scaffolding for Sl No 1 a: Foundation upto plinth Isolated As per Appendix-I in Volume-1 of page No.-111at 8 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 532.22 | 532.22 | 92.12 | False | None | None | False | None | False | 49028.1064 | 0 | 3272595 | 113447 | None | 2.3.2 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6804.0 | 6804.0 | 6.42 | False | None | None | False | None | False | 43681.68 | 0 | 3272596 | 113447 | None | page No.111 | Additional for formwork, Centering & Scaffolding for Sl No 9: RCC Columns As per Appendix I in Volume-1 of page No 111at 70 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 4762.8 | 4762.8 | 6.42 | False | None | None | False | None | False | 30577.176 | 0 | 3272597 | 113447 | None | 2.3.2 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6804.0 | 6804.0 | 8.28 | False | None | None | False | None | False | 56337.12 | 0 | 3272598 | 113447 | None | page no 12 | Additional for formwork, Centering & Scaffolding for Sl No 11: Earth retaining structures As per Appendix I in Volume 1 of page No. 112 at 10 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 680.4 | 680.4 | 8.28 | False | None | None | False | None | False | 5633.712 | 0 | 3272599 | 113447 | None | 1.11 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- including cost of all materials, labour, HOM, I | Cum | 454.65 | 454.65 | 1173.46 | False | None | None | False | None | False | 533513.589 | 0 | 3272600 | 113447 | None | 2.5.2 | Providing and laying in position Cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, labour, HOM, I | Cum | 7185.15 | 7185.15 | 104.17 | False | None | None | False | None | False | 748477.0755 | 0 | 3272601 | 113447 | None | page no 111 | Additional for formwork, Centering & Scaffolding for Sl No 9 : RCC Columns As per Appendix-I in Volume-1 of page No.-111 (@70% of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 5029.6 | 5029.6 | 13.61 | False | None | None | False | None | False | 68452.856 | 0 | 3272602 | 113447 | None | page 111 | Additional for formwork, Centering & Scaffolding for Sl No 2 : Plinth beam As per Appendix-I in Volume-1 of page No.-111 (@50% of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 3592.57 | 3592.57 | 17.54 | False | None | None | False | None | False | 63013.6778 | 0 | 3272603 | 113447 | None | page no 112 | Additional for formwork, Centering & Scaffolding for Sl No 14 : RCC lintels & Beams As per Appendix I in Volume 1 of page No. 112 at 60 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 4311.09 | 4311.09 | 16.55 | False | None | None | False | None | False | 71348.5395 | 0 | 3272604 | 113447 | None | page no 112 | Additional for formwork, Centering & Scaffolding for Sl No 18 : Chejjas, Canopy & Other Architectural projections of minor sections As per Appendix I in Volume 1 of page No.112 at 45 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 3233.31 | 3233.31 | 1.27 | False | None | None | False | None | False | 4106.3037 | 0 | 3272605 | 113447 | None | page no 112 | Additional for formwork, Centering & Scaffolding for Sl No 15 : RCC Roof Slab & Staircase of buildings As per Appendix-I in Volume-1 of page No.-112 at 50% of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 3592.57 | 3592.57 | 55.21 | False | None | None | False | None | False | 198345.7897 | 0 | 3272606 | 113447 | None | 2.11 a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings Vol 1 (pg no 18, I No 2.11(a)) ---- including cost of all materials, labour, HOM, I | t | 93929.85 | 93929.85 | 21.47 | False | None | None | False | None | False | 2016673.8795 | 0 | 3272607 | 113447 | None | 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. Vol-2 (pg no 14, I No 6.8) ---- including cost of all materials, labour, HOM, I | Cum | 8367.45 | 8367.45 | 63.18 | False | None | None | False | None | False | 528655.491 | 0 | 3272608 | 113447 | None | 2.4.1 | Providing and laying in position Cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6724.2 | 6724.2 | 3.72 | False | None | None | False | None | False | 25014.024 | 0 | 3272609 | 113447 | None | 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 309.75 | 309.75 | 612.06 | False | None | None | False | None | False | 189585.585 | 0 | 3272610 | 113447 | None | 8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 389.55 | 389.55 | 402.09 | False | None | None | False | None | False | 156634.1595 | 0 | 3272611 | 113447 | None | 9.34 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, , including cost of materials, labour,curing, polishing complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1622.25 | 1622.25 | 320.26 | False | None | None | False | None | False | 519541.785 | 0 | 3272612 | 113447 | None | 9.40 | Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification ---- including cost of all materials, labour, HOM, I | Sqm | 978.6 | 978.6 | 55.1 | False | None | None | False | None | False | 53920.86 | 0 | 3272613 | 113447 | None | 11.34B | Providing and fixing M.S. grills of required pattern in frames of win- dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- including cost of all materials, labour, HOM, I | Kg | 192.15 | 192.15 | 768.0 | False | None | None | False | None | False | 147571.2 | 0 | 3272614 | 113447 | None | 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin- Charge. ---- including cost of all materials, labour, HOM, I | Kg | 144.9 | 144.9 | 499.5 | False | None | None | False | None | False | 72377.55 | 0 | 3272615 | 113447 | None | 11.14.3.1 | Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike-plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer- in-charge: Profile E Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I | m | 557.55 | 557.55 | 57.6 | False | None | None | False | None | False | 32114.88 | 0 | 3272616 | 113447 | None | 11.4 | Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T- iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I | Sqm | 5482.05 | 5482.05 | 23.04 | False | None | None | False | None | False | 126306.432 | 0 | 3272617 | 113447 | None | 11.11.1 | Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I | Kg | 155.4 | 155.4 | 1228.8 | False | None | None | False | None | False | 190955.52 | 0 | 3272618 | 113447 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 105.0 | 105.0 | 923.57 | False | None | None | False | None | False | 96974.85 | 0 | 3272619 | 113447 | None | 8.25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 143.85 | 143.85 | 923.57 | False | None | None | False | None | False | 132855.5445 | 0 | 3272620 | 113447 | None | 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 55.65 | 55.65 | 402.09 | False | None | None | False | None | False | 22376.3085 | 0 | 3272621 | 113447 | None | 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied at 4.84 kg/10 sqm) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 93.45 | 93.45 | 402.1 | False | None | None | False | None | False | 37576.245 | 0 | 3272622 | 113447 | None | 8.34.3 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 52.5 | 52.5 | 101.13 | False | None | None | False | None | False | 5309.325 | 0 | 3272623 | 113447 | None | 8.40. | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 120.75 | 120.75 | 101.13 | False | None | None | False | None | False | 12211.4475 | 0 | 3272624 | 113447 | None | 8.84 | Providing wall black boards in 12mm thick with CM 1:3 and applied with primer and two coats of acrylic emulsion black paint including finishing etc.,complete. ---- including cost of all materials, labour, HOM, I | Sqm | 498.75 | 498.75 | 14.4 | False | None | None | False | None | False | 7182.0 | 0 | 3272625 | 113447 | None | 8.16.2 | KSRB 15.8: Providing and fixing suitable plaster mesh manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120gms per sqm width, along route of walls chipped for services, JUnction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. (length of mesh only be measured for payment) plaster mesh 150mm wide ---- including cost of all materials, labour, HOM, I | m | 39.9 | 39.9 | 222.0 | False | None | None | False | None | False | 8857.8 | 0 |
| 1718115581000 | 1 | None | None | Buildings | Construction and Supply of Furnitures to Government Girls High School at Mangalore Village in Kukanoor tq Koppal District (FIRST FLOOR) | 2419381.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3272626 | 113448 | None | 2.5.2 | Providing and laying in position Cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead and lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. FIRST FLOOR ---- including cost of all materials, labour, HOM, I | Cum | 7257.0 | 7257.0 | 46.81 | False | None | None | False | None | False | 339700.17 | 0 | 3272627 | 113448 | None | page no 111 | Additional for formwork, Centering & Scaffolding for Sl No 9 : RCC Columns As per Appendix I in Volume 1 of page No.111 at 70 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 5079.9 | 5079.9 | 9.02 | False | None | None | False | None | False | 45820.698 | 0 | 3272628 | 113448 | None | page 112 | Additional for formwork, Centering & Scaffolding for Sl No 14 : RCC lintels & Beams As per Appendix I in Volume 1 of page No.112 at 60 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 4354.2 | 4354.2 | 8.65 | False | None | None | False | None | False | 37663.83 | 0 | 3272629 | 113448 | None | page 112 | Additional for formwork, Centering & Scaffolding for Sl No 18 : Chejjas, Canopy and Other Architectural projections of minor sections As per Appendix I in Volume1 of page No.112 at 45 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 3265.65 | 3265.65 | 0.8 | False | None | None | False | None | False | 2612.52 | 0 | 3272630 | 113448 | None | page 112 | Additional for formwork, Centering & Scaffolding for Sl No 15 : RCC Roof Slab and Staircase of buildings As per Appendix I in Volume 1 of page No.112 at 50 percentage of Finished Rate) ---- including cost of all materials, labour, HOM, I | Cum | 3628.5 | 3628.5 | 28.33 | False | None | None | False | None | False | 102795.405 | 0 | 3272631 | 113448 | None | 2.11 a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a. Buildings Vol 1 (pg no 18, I No 2.11(a)) ---- including cost of all materials, labour, HOM, I | t | 94869.14 | 94869.14 | 5.59 | False | None | None | False | None | False | 530318.4926 | 0 | 3272632 | 113448 | None | 6.8 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery and other incidental charges complete as per the direction of engineer incharge of work. Vol 2 (pg no 14, I No 6.8) ---- including cost of all materials, labour, HOM, I | Cum | 8451.12 | 8451.12 | 46.68 | False | None | None | False | None | False | 394498.2816 | 0 | 3272633 | 113448 | None | 2.4.1 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6791.44 | 6791.44 | 2.13 | False | None | None | False | None | False | 14465.7672 | 0 | 3272634 | 113448 | None | 8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 312.84 | 312.84 | 362.05 | False | None | None | False | None | False | 113263.722 | 0 | 3272635 | 113448 | None | 8.8 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 393.44 | 393.44 | 220.54 | False | None | None | False | None | False | 86769.2576 | 0 | 3272636 | 113448 | None | 9.34 | Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mixed with pigment to match the shade of the slab, including cost of materials, labour,curing, polishing complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1638.47 | 1638.47 | 155.05 | False | None | None | False | None | False | 254044.7735 | 0 | 3272637 | 113448 | None | 11.34B | Providing and fixing M.S. grills of required pattern in frames of win- dows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- including cost of all materials, labour, HOM, I | Kg | 194.07 | 194.07 | 444.0 | False | None | None | False | None | False | 86167.08 | 0 | 3272638 | 113448 | None | 11.26.1 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin Charge. ---- including cost of all materials, labour, HOM, I | Kg | 146.34 | 146.34 | 229.5 | False | None | None | False | None | False | 33585.03 | 0 | 3272639 | 113448 | None | 11.14.3.1 | Providing and fixing pressed steel door frames conforming to IS: 4351, manufactured from commercial mild steel sheet of 1.60 mm thickness, including hinges, jamb, lock jamb, bead and if required angle threshold of mild steel angle of section 50x25 mm, or base ties of 1.60 mm, pressed mild steel welded or rigidly fixed together by mechanical means, including M.S. pressed butt hinges 2.5 mm thick with mortar guards, lock strike plate and shock absorbers as specified and applying a coat of approved steel primer after pre-treatment of the surface as directed by Engineer in charge: Profile E Fixing with adjustable lugs with split end tail to each jamb including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in Charge. ---- including cost of all materials, labour, HOM, I | m | 563.12 | 563.12 | 20.4 | False | None | None | False | None | False | 11487.648 | 0 | 3272640 | 113448 | None | 11.4 | Providing and fixing 1 mm thick M.S. sheet sliding-shutters, with frame and diagonal braces of 40x40x6 mm angle iron, 3 mm M.S. gusset plates at the junctions and corners, 25 mm dia pulley, 40x40x6 mm angle and T iron guide at the top and bottom respectively, including applying a priming coat of approved steel primer including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in Charge. ---- including cost of all materials, labour, HOM, I | Sqm | 5536.87 | 5536.87 | 7.65 | False | None | None | False | None | False | 42357.0555 | 0 | 3272641 | 113448 | None | 11.11.1 | Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with 15x3 mm lugs 10 cm long embedded in cement concrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer in charge. ---- including cost of all materials, labour, HOM, I | Kg | 156.95 | 156.95 | 710.4 | False | None | None | False | None | False | 111497.28 | 0 | 3272642 | 113448 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 106.05 | 106.05 | 522.88 | False | None | None | False | None | False | 55451.424 | 0 | 3272643 | 113448 | None | 8.25 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 145.28 | 145.28 | 522.88 | False | None | None | False | None | False | 75964.0064 | 0 | 3272644 | 113448 | None | 8.27 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 56.2 | 56.2 | 220.54 | False | None | None | False | None | False | 12394.348 | 0 | 3272645 | 113448 | None | 8.28 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied at 4.84 kg/10 sqm) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 94.38 | 94.38 | 220.54 | False | None | None | False | None | False | 20814.5652 | 0 | 3272646 | 113448 | None | 8.34.3 | Applying priming coat: With ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron/ steel works including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 53.02 | 53.02 | 45.15 | False | None | None | False | None | False | 2393.853 | 0 | 3272647 | 113448 | None | 8.40 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 121.95 | 121.95 | 45.15 | False | None | None | False | None | False | 5506.0425 | 0 | 3272648 | 113448 | None | 8.16.2 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/sqm width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for payment plaster mesh 150mm wide ---- including cost of all materials, labour, HOM, I | m | 40.29 | 40.29 | 117.12 | False | None | None | False | None | False | 4718.7648 | 0 | 3272649 | 113448 | None | 13.48 | Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) single socketed pipes 100mm diameter. ---- including cost of all materials, labour, HOM, I | m | 308.6 | 308.6 | 36.45 | False | None | None | False | None | False | 11248.47 | 0 | 3272650 | 113448 | None | 11.16.1 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour,usage charges of machinery complete as per specifications and as per directions of the Engineer in charge Vol 2 (pg no 82, I No 11.16.1) ---- including cost of all materials, labour, HOM, I | Kg | 144.22 | 144.22 | 59.49 | False | None | None | False | None | False | 8579.6478 | 0 | 3272651 | 113448 | None | 7.38 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer in charge) 0.50 mm ( 0.05 percentage) total coated thickness with zinc coating 120 grams per m2 as per IS: 277 in 240 mpa steel grade, 5 to 7 microns epoxy primer on both side of the sheet and polyester top coat 15 to18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer in charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. Vol 2 (pg no 26, I No 7.38) ---- including cost of all materials, labour, HOM, I | Sqm | 602.36 | 602.36 | 25.34 | False | None | None | False | None | False | 15263.8024 | 0 |
| 1718115581000 | 0 | None | None | Buildings | Electrical works | 539497.45 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3272652 | 113449 | None | 1.2.1 | Concealed conduit system :supplying……mm dia 2mm 2.5mm thick heavy guage PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive pasteetc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused wires and unused junction boxes and pipe ends should be covered using PVC end enclosers. Run with 18 SWG GI fish wire wherever necessary a) 19/20mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 69.3 | 69.3 | 180.0 | False | None | None | False | None | False | 12474.0 | 0 | 3272653 | 113449 | None | 1.2.2 | Concealed conduit system :supplying……mm dia 2mm 2.5mm thick heavy guage PVC conduit pipe with suitable size bends, metal/PVC junction boxes adhesive pasteetc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused wires and unused junction boxes and pipe ends should be covered using PVC end enclosers. Run with 18 SWG GI fish wire wherever necessary b) 25mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 81.9 | 81.9 | 120.0 | False | None | None | False | None | False | 9828.0 | 0 | 3272654 | 113449 | None | 1.3.1 | Groove cutting : supplying…….dia 2mm/2.5mm thick heavy guage PVC conduit pipe with bends, metal junction boxes adhesive paste etc., and bracing U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. a) 19/20mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 71.4 | 71.4 | 80.0 | False | None | None | False | None | False | 5712.0 | 0 | 3272655 | 113449 | None | 1.3.2 | Groove cutting : supplying…….dia 2mm/2.5mm thick heavy guage PVC conduit pipe with bends, metal junction boxes adhesive paste etc., and bracing U or J hooks and cement plastering up to the surface of the brick level and run with 18 SWG GI fish wire run through out the conduit wherever necessary. b) 25mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 82.95 | 82.95 | 50.0 | False | None | None | False | None | False | 4147.5 | 0 | 3272656 | 113449 | None | 2.2.1 | Point wiring using copper wire without switch. Supplying and wiring adopting loop system in existin PVC conduit /casing caping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete outlet. Short point upto 3Mtr from tapping point to outlet via switch box ---- including cost of all materials, labour, HOM, I | Point | 282.45 | 282.45 | 20.0 | False | None | None | False | None | False | 5649.0 | 0 | 3272657 | 113449 | None | 2.2.2 | Point wiring using copper wire without switch. Supplying and wiring adopting loop system in existin PVC conduit /casing caping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete outlet. medium point above 3Mtr upto 6Mtr from tapping point outlet via switch box ---- including cost of all materials, labour, HOM, I | Point | 397.95 | 397.95 | 30.0 | False | None | None | False | None | False | 11938.5 | 0 | 3272658 | 113449 | None | 2.2.3 | Point wiring using copper wire without switch. Supplying and wiring adopting loop system in existin PVC conduit /casing caping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete outlet. long point above 6Mtr upto 10Mtr tapping point to outlet via switch box ---- including cost of all materials, labour, HOM, I | Point | 582.75 | 582.75 | 40.0 | False | None | None | False | None | False | 23310.0 | 0 | 3272659 | 113449 | None | 2.2.4 | Point wiring using copper wire without switch. Supplying and wiring adopting loop system in existin PVC conduit /casing caping using copper PVC insulated multi strand 2x1.5Sqmm copper wire without switch, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block.complete outlet. long Two outlet in a row, above 3 Mtr upto 6Mtr from tapping point to outlet let via switches 2.3.4 ---- including cost of all materials, labour, HOM, I | Point | 710.85 | 710.85 | 2.0 | False | None | None | False | None | False | 1421.7 | 0 | 3272660 | 113449 | None | 3.4.2 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 3 way ---- including cost of all materials, labour, HOM, I | Each | 166.95 | 166.95 | 5.0 | False | None | None | False | None | False | 834.75 | 0 | 3272661 | 113449 | None | 3.4.3 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 4 to 5 way ---- including cost of all materials, labour, HOM, I | Each | 185.85 | 185.85 | 5.0 | False | None | None | False | None | False | 929.25 | 0 | 3272662 | 113449 | None | 3.4.4 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 6 way ---- including cost of all materials, labour, HOM, I | Each | 231.0 | 231.0 | 4.0 | False | None | None | False | None | False | 924.0 | 0 | 3272663 | 113449 | None | 3.4.5 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 8 way ---- including cost of all materials, labour, HOM, I | Each | 274.05 | 274.05 | 4.0 | False | None | None | False | None | False | 1096.2 | 0 | 3272664 | 113449 | None | 3.4.6 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 10 to12 way ---- including cost of all materials, labour, HOM, I | Each | 334.95 | 334.95 | 6.0 | False | None | None | False | None | False | 2009.7 | 0 | 3272665 | 113449 | None | 3.4.7 | Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone /c.c wall 16 way ---- including cost of all materials, labour, HOM, I | Each | 381.15 | 381.15 | 8.0 | False | None | None | False | None | False | 3049.2 | 0 | 3272666 | 113449 | None | 3.5.2 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 3 module ---- including cost of all materials, labour, HOM, I | Each | 169.05 | 169.05 | 5.0 | False | None | None | False | None | False | 845.25 | 0 | 3272667 | 113449 | None | 3.5.3 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 4 module ---- including cost of all materials, labour, HOM, I | Each | 183.75 | 183.75 | 5.0 | False | None | None | False | None | False | 918.75 | 0 | 3272668 | 113449 | None | 3.5.4 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 6 module ---- including cost of all materials, labour, HOM, I | Each | 245.7 | 245.7 | 4.0 | False | None | None | False | None | False | 982.8 | 0 | 3272669 | 113449 | None | 3.5.5 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 8 module ---- including cost of all materials, labour, HOM, I | Each | 298.2 | 298.2 | 4.0 | False | None | None | False | None | False | 1192.8 | 0 | 3272670 | 113449 | None | 3.5.6 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 10 to 12 module ---- including cost of all materials, labour, HOM, I | Each | 361.2 | 361.2 | 6.0 | False | None | None | False | None | False | 2167.2 | 0 | 3272671 | 113449 | None | 3.5.7 | Supplying and fixing superior quality modular switch mounting poly carbonate plate with necessary supporting back plate with required nos. of machine screws, bolts, nuts etc., complete on the existing metal/PVC box. 16 Module ---- including cost of all materials, labour, HOM, I | Each | 416.85 | 416.85 | 8.0 | False | None | None | False | None | False | 3334.8 | 0 | 3272672 | 113449 | None | 3.6.1 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 6Amps one way ---- including cost of all materials, labour, HOM, I | Each | 107.1 | 107.1 | 110.0 | False | None | None | False | None | False | 11781.0 | 0 | 3272673 | 113449 | None | 3.6.2 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 6Amps 2 way ---- including cost of all materials, labour, HOM, I | Each | 174.3 | 174.3 | 2.0 | False | None | None | False | None | False | 348.6 | 0 | 3272674 | 113449 | None | 3.6.3 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 6Amps 3 way socket ---- including cost of all materials, labour, HOM, I | Each | 179.55 | 179.55 | 20.0 | False | None | None | False | None | False | 3591.0 | 0 | 3272675 | 113449 | None | 3.6.4 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials Stepped fan regulator ---- including cost of all materials, labour, HOM, I | Each | 374.85 | 374.85 | 24.0 | False | None | None | False | None | False | 8996.4 | 0 | 3272676 | 113449 | None | 3.6.7 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 16Amps 1 way switch ---- including cost of all materials, labour, HOM, I | Each | 189.0 | 189.0 | 2.0 | False | None | None | False | None | False | 378.0 | 0 | 3272677 | 113449 | None | 3.6.10 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 32Amps DP switch ---- including cost of all materials, labour, HOM, I | Each | 342.3 | 342.3 | 2.0 | False | None | None | False | None | False | 684.6 | 0 | 3272678 | 113449 | None | 3.6.11 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials 6/16Amps universal socket ---- including cost of all materials, labour, HOM, I | Each | 247.8 | 247.8 | 2.0 | False | None | None | False | None | False | 495.6 | 0 | 3272679 | 113449 | None | 3.6.12 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials TV/Telephone socket ---- including cost of all materials, labour, HOM, I | Each | 163.8 | 163.8 | 2.0 | False | None | None | False | None | False | 327.6 | 0 | 3272680 | 113449 | None | 3.6.13 | Supplying and fixing of modular switch/socket /stepped electronic fan regulator/dimmer/telephone socket etc on excistin modular switch plate. Using group 'A' materials RJ45/I.O outlet ---- including cost of all materials, labour, HOM, I | Each | 353.85 | 353.85 | 2.0 | False | None | None | False | None | False | 707.7 | 0 | 3272681 | 113449 | None | 2.3.2 | Wiring for lighting or power circuit using one of FRLS PVC insulated 1100v grade,multis and copper with low conductor resistance single core wire in open or consealed system of wiring with specified IS 694:1990 & confirming to GTP Group 'A' material 1.5 Sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 27.3 | 27.3 | 400.0 | False | None | None | False | None | False | 10920.0 | 0 | 3272682 | 113449 | None | 2.3.3 | Wiring for lighting or power circuit using one of FRLS PVC insulated 1100v grade,multis and copper with low conductor resistance single core wire in open or consealed system of wiring with specified IS 694:1990 and confirming to GTP Group 'A' material 2.5 Sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 44.1 | 44.1 | 900.0 | False | None | None | False | None | False | 39690.0 | 0 | 3272683 | 113449 | None | 2.3.4 | Wiring for lighting or power circuit using one of FRLS PVC insulated 1100v grade,multis and copper with low conductor resistance single core wire in open or consealed system of wiring with specified IS 694:1990 & confirming to GTP Group 'A' material 4 Sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 66.15 | 66.15 | 100.0 | False | None | None | False | None | False | 6615.0 | 0 | 3272684 | 113449 | None | 2.3.5 | Wiring for lighting or power circuit using one of FRLS PVC insulated 1100v grade,multis and copper with low conductor resistance single core wire in open or consealed system of wiring with specified IS 694:1990 and confirming to GTP Group 'A' material 6 Sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 96.6 | 96.6 | 50.0 | False | None | None | False | None | False | 4830.0 | 0 | 3272685 | 113449 | None | 5.19.12 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.III - Double Door 6Way TP &N ---- including cost of all materials, labour, HOM, I | Each | 5187.0 | 5187.0 | 1.0 | False | None | None | False | None | False | 5187.0 | 0 | 3272686 | 113449 | None | 5.19.10 | Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure.II Double Door 16Way SP and N ---- including cost of all materials, labour, HOM, I | Each | 3053.4 | 3053.4 | 1.0 | False | None | None | False | None | False | 3053.4 | 0 | 3272687 | 113449 | None | 5.18.1 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 amps SP ---- including cost of all materials, labour, HOM, I | Each | 435.75 | 435.75 | 5.0 | False | None | None | False | None | False | 2178.75 | 0 | 3272688 | 113449 | None | 5.18.4 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6 32 amps DP No 6.16.3 ---- including cost of all materials, labour, HOM, I | Each | 775.95 | 775.95 | 4.0 | False | None | None | False | None | False | 3103.8 | 0 | 3272689 | 113449 | None | 5.20.10 | Supplying, fixing and wiring Residual currrent circuit breaker (RCCB) 240/450V up to 300mA sensitivity on existing wood/panel board. 63 Amps 4 pole ---- including cost of all materials, labour, HOM, I | Each | 5822.25 | 5822.25 | 2.0 | False | None | None | False | None | False | 11644.5 | 0 | 3272690 | 113449 | None | 12.56 | Supplying, fixing, wiring, earth electrode for grounding
conduits, I.C. cutouts and other equipment's on the meter
board using 40mm dia 2.90mm thick GI pipe 2.5 mtr
long buried in a pit … The pit should be filled with equal
proportion of salt and charcoal 150mm all-round the pipe to
complete depth. The connection from the pipe to the conduit
etc., is to be established through GI wire of size as per ISI
specification 7.3.3. of IS 732 using 12mm dia bolts, nuts,
washers and check nuts etc., the pipe shall have 16 through
holes of 12 mm dia ---- including cost of all materials, labour, HOM, I | Nos | 3685.5 | 3685.5 | 2.0 | False | None | None | False | None | False | 7371.0 | 0 | 3272691 | 113449 | None | 6.3.2 | Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. 25x6mm GI Strip ---- including cost of all materials, labour, HOM, I | Mtr | 120.75 | 120.75 | 20.0 | False | None | None | False | None | False | 2415.0 | 0 | 3272692 | 113449 | None | 6.3.6 | Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. 25x3mm Copper Strip ---- including cost of all materials, labour, HOM, I | Mtr | 530.25 | 530.25 | 20.0 | False | None | None | False | None | False | 10605.0 | 0 | 3272693 | 113449 | None | 6.18.6 | Supplying and running GI/Copper conductor for grounding
and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. 8 SWG copper wire ---- including cost of all materials, labour, HOM, I | Mtr | 110.25 | 110.25 | 20.0 | False | None | None | False | None | False | 2205.0 | 0 | 3272694 | 113449 | None | 11.3.3 | Supplying of PVC Batten with integrated LED tube LED light fighting 1 x4'- 36/40 w with high quality diffuser with Life of 25000 burning hours and 70 percentage lumen maintenance with CRI 80. Power Input: 220 240V at 50/60Hz and Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. ---- including cost of all materials, labour, HOM, I | Each | 1332.45 | 1332.45 | 66.0 | False | None | None | False | None | False | 87941.7 | 0 | 3272695 | 113449 | None | 3.10.3 | Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size 110mm conduite using necessary machine screws. ---- including cost of all materials, labour, HOM, I | No | 22.05 | 22.05 | 100.0 | False | None | None | False | None | False | 2205.0 | 0 | 3272696 | 113449 | None | 12.45 | Supplying and Fixing of 230 Volts 20/40 watts Fluorescent
Lamp holder ---- including cost of all materials, labour, HOM, I | No | 34.65 | 34.65 | 100.0 | False | None | None | False | None | False | 3465.0 | 0 | 3272697 | 113449 | None | 1.13 | Supplying and fixing Metal Fan Box with Round Hook ---- including cost of all materials, labour, HOM, I | No | 122.85 | 122.85 | 24.0 | False | None | None | False | None | False | 2948.4 | 0 | 3272698 | 113449 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts,50 cycles. Single phase AC supply conforming to ISS-374 1979 and with double ball bearing system. 48" Sweep (1200mm) Regular model (Khaitan,Crompton Greaves,Orient,Polar,Bajaj,Havells,Almonard) ---- including cost of all materials, labour, HOM, I | Each | 3133.2 | 3133.2 | 24.0 | False | None | None | False | None | False | 75196.8 | 0 | 3272699 | 113449 | None | 13.7.1 | Fixing all types and all capacities fluorecent/false ceiling/spot light/CFL fittings indoor on the wall / rafter / girders using 23/0.0076" twin twisted PVC insulated wires, required nos of round blocks and clamps (if required)a)On wall/ceiling/Rafters/Girders ---- including cost of all materials, labour, HOM, I | Each | 128.1 | 128.1 | 66.0 | False | None | None | False | None | False | 8454.6 | 0 | 3272700 | 113449 | None | 13.10 | Fixing a ceiling/wall mounting fan of all capacities and all types to the existing S hook together with supplying and fixing a 5 amperes ceiling rose,necessary lenth of 23/0.0076 inch PVC insluted twisted copper wire and wiring completely. ---- including cost of all materials, labour, HOM, I | Each | 179.55 | 179.55 | 24.0 | False | None | None | False | None | False | 4309.2 | 0 | 3272701 | 113449 | None | 6.4.8 | Supplying of 1.1 KV LT UG cable XLPE or Heat resistant
PVC insulated, PVC extruded Inner sheath armoured UG LT
cable as per IS-1554 (Part-1) or IS 7098 Part 1, Armouring
strip thickness in average 5percentage and resistivity 14 Ohms/Kms(Max) as per IS-3975 3.5 core 70 sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 367.5 | 367.5 | 30.0 | False | None | None | False | None | False | 11025.0 | 0 | 3272702 | 113449 | None | 6.6.1 | Digging of trench of 0.6m deep x 0.50 mtr wide refiling the trench to the required ground level and consolidating etc., complete. In soil (Ordinary) ---- including cost of all materials, labour, HOM, I | Mtr | 79.8 | 79.8 | 30.0 | False | None | None | False | None | False | 2394.0 | 0 | 3272703 | 113449 | None | 6.5.2 | Labour charges for laying of 1.1 KV class UG cable in
existing trench GI pipe / stoneware pipe / on wall / on pole
as required. 25sqmm to 75 sqmm ---- including cost of all materials, labour, HOM, I | Mtr | 16.28 | 16.28 | 30.0 | False | None | None | False | None | False | 488.4 | 0 | 3272704 | 113449 | None | 6.17.10 | Supplying tinnd copper lugs and crimping and wiring to terminal point for wire of the following sizes 70 sqmm Long Barrel ---- including cost of all materials, labour, HOM, I | Each | 99.75 | 99.75 | 2.0 | False | None | None | False | None | False | 199.5 | 0 | 3272705 | 113449 | None | 6.11.4 | Supplying and fixingof heavy duty cable glands suitable or UG cable o 1.1KV class (metal only) 45 mm dia ---- including cost of all materials, labour, HOM, I | Each | 203.7 | 203.7 | 1.0 | False | None | None | False | None | False | 203.7 | 0 | 3272706 | 113449 | None | 6.10.6 | Supplying and fixing L.T. cast Iron pot heads suitable for 1.1
KV class UG cable filled with necessary bitumen/insulating
compound complete with terminals, clamps, bolts, nuts and
washers etc. 70Sqmm ---- including cost of all materials, labour, HOM, I | Each | 653.1 | 653.1 | 1.0 | False | None | None | False | None | False | 653.1 | 0 | 3272707 | 113449 | None | 5.15.11 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts and wiring complete. Protection of Overload and Short circuit with thermal Magnetic/Microprocessed release and Earth Fault as per IS 13947. ( Icu = Ics)(34/9) FOUR POLE 160Amps 25kA ---- including cost of all materials, labour, HOM, I | Each | 14119.35 | 14119.35 | 1.0 | False | None | None | False | None | False | 14119.35 | 0 | 3272708 | 113449 | None | 5.33 | Supplying of multi function digital meter with three line back light LCD type display for voltage,Current,frequency,Power, Powerfactor,KVA,KWH,KVARsuitable for 3 Phase,4 wire LT network with IP 54 degree of protection and completely wired as required wuth communication Port and Class 0.5s accuracy. ---- including cost of all materials, labour, HOM, I | Each | 9780.75 | 9780.75 | 1.0 | False | None | None | False | None | False | 9780.75 | 0 | 3272709 | 113449 | None | 5.21 | Supplying,fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based,digital readout of percentage leakage current,programable delay/auto/manual reset facility suitable to mount on DIN rail/flush mounting on panel board. ---- including cost of all materials, labour, HOM, I | Each | 9717.75 | 9717.75 | 1.0 | False | None | None | False | None | False | 9717.75 | 0 | 3272710 | 113449 | None | 5.18.9 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and wiring complete as required.1 Group 'A'5.17.9)50-63Amps TPN ---- including cost of all materials, labour, HOM, I | Each | 3242.4 | 3242.4 | 1.0 | False | None | None | False | None | False | 3242.4 | 0 | 3272711 | 113449 | None | 5.18.6 | 5.17.6)50-63Amps DP
---- including cost of all materials, labour, HOM, I | Each | 1157.1 | 1157.1 | 2.0 | False | None | None | False | None | False | 2314.2 | 0 | 3272712 | 113449 | None | 5.18.4 | 5.17.4)6-32Amps DP
---- including cost of all materials, labour, HOM, I | Each | 775.95 | 775.95 | 2.0 | False | None | None | False | None | False | 1551.9 | 0 | 3272713 | 113449 | None | 5.16 | Supplying,fixing and Fixing of Shunt trip suitable for MCCB. CBCT
---- including cost of all materials, labour, HOM, I | Each | 1788.15 | 1788.15 | 1.0 | False | None | None | False | None | False | 1788.15 | 0 | 3272714 | 113449 | None | 5.40.1 | Supplying ….amps rated 3phase with netural bus bar using required capacity electrolytic alluminium strips covered with heat shrinkable coloured PVC sleeve,mounted on phenolic/ERP/DMC insulator which are mounted on powder coated 40x6 mm M.S.flat frame work in existing panel board.The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts,nuts and washers etc.,complete.5.40.1)100Amps 4x30x6mm Alluminium Strips
---- including cost of all materials, labour, HOM, I | Rmtr | 2588.25 | 2588.25 | 1.0 | False | None | None | False | None | False | 2588.25 | 0 | 3272715 | 113449 | None | 5.40.2 | 5.40.2)250Amps 4x30x10mm Alluminium Strips ---- including cost of all materials, labour, HOM, I | Rmtr | 3606.75 | 3606.75 | 1.0 | False | None | None | False | None | False | 3606.75 | 0 | 3272716 | 113449 | None | 5.42.1 | Fabricating supplying and mounting MS box made out 16 SWG suitable for floor/wall mounting,fully weather proof with provision for better heat dissipation, provided with hinged front cover,equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete.
---- including cost of all materials, labour, HOM, I | Sq CM | 0.53 | 0.53 | 100800.0 | False | None | None | False | None | False | 53424.0 | 0 | 3272717 | 113449 | None | 5.38 | Supplying and fixing of LED type pannel board indicating lamp with reqired colour suitable for 220v A.C.50 Hz 12/24v D.C.
---- including cost of all materials, labour, HOM, I | Each | 540.7 | 540.7 | 1.0 | False | None | None | False | None | False | 540.7 | 0 | 3272718 | 113449 | None | 5.11.2 | Supplying of an load change over switches 4 poles AC-23A Duty 415V, 50Hz, AC Supply (Open Execution) 100 Amps
---- including cost of all materials, labour, HOM, I | Each | 7444.5 | 7444.5 | 1.0 | False | None | None | False | None | False | 7444.5 | 0 |
|
|
---|