tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1718244043000 | 0 | None | None | Roads | Construction of C C Road and Drain in Hirewaddarkal, Katagihalli Village limit in Yelburga Constituency, Yelburga Taluk.(C C Road) | 10905074.49 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3280933 | 113892 | None | 2.19 vol3 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in olume and stock piling at designated ocations and disposal of dismantled materials and tacking serviceable and unserviceable materials separately ---- including cost of all materials, labour, HOM, I | Cum | 591.15 | 591.15 | 694.65 | False | None | None | False | None | False | 410642.3475 | 0 | 3280934 | 113892 | None | 3.7 vol3 | Loosening, leveling and Compacting original round supporting embankment to facilitate lacement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve nimum dry density as given in Table 300-2 for mbankment construction ---- including cost of all materials, labour, HOM, I | Cum | 110.25 | 110.25 | 315.0 | False | None | None | False | None | False | 34728.75 | 0 | 3280935 | 113892 | None | 1.14.1 vol1 | Earth work excavation for Foundation mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- including cost of all materials, labour, HOM, I | Cum | 107.1 | 107.1 | 1082.4 | False | None | None | False | None | False | 115925.04 | 0 | 3280936 | 113892 | None | 3.6 vol3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, preading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- including cost of all materials, labour, HOM, I | Cum | 517.65 | 517.65 | 720.9 | False | None | None | False | None | False | 373173.885 | 0 | 3280937 | 113892 | None | 4.2(B)(V) | Construction of Granular Sub Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 ---- including cost of all materials, labour, HOM, I | Cum | 2476.95 | 2476.95 | 480.6 | False | None | None | False | None | False | 1190422.17 | 0 | 3280938 | 113892 | None | 4.17 | Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting raded stone aggregate to wet mix macadam specification including premixing the Material with water at MC in mechanical mix plant carriage of ixed Material by tipper to site, laying in uniform ayers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density ---- including cost of all materials, labour, HOM, I | Cum | 2686.95 | 2686.95 | 720.9 | False | None | None | False | None | False | 1937022.255 | 0 | 3280939 | 113892 | None | 16.28 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine ggregates conforming to IS:383:2016 maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, edges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, creed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14 days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading and unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer in charge of the work ---- including cost of all materials, labour, HOM, I | Cum | 7091.7 | 7091.7 | 954.72 | False | None | None | False | None | False | 6770587.824 | 0 | 3280940 | 113892 | None | 16.4.2 | Laying,Lowering and jointing of S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes P-3 Class ,rolling and lowering into trenches, laying true to line and level at both destinations and jointing of pipes and specials, perfect inking of joints with jack to correct position ncludingcost of jointing materials, i.e, rubber rings with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing) 300 mm dia ---- including cost of all materials, labour, HOM, I | m | 262.5 | 262.5 | 54.0 | False | None | None | False | None | False | 14175.0 | 0 | 3280941 | 113892 | None | 6.8.2 | Providing and laying 80mm thick factory made Precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for ommercial Traffic Axle load repetitions upto 0MSA & for Residential Streets of approved hape and colour, laid in required pattern and ncluding over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer in charge. (WMM/WBM Base to be paid separately as per relevant technical specification ---- including cost of all materials, labour, HOM, I | Sqm | 1219.05 | 1219.05 | 32.4 | False | None | None | False | None | False | 39497.22 | 0 | 3280942 | 113892 | None | 8.54 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of ize 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 ---- including cost of all materials, labour, HOM, I | No | 9450.0 | 9450.0 | 2.0 | False | None | None | False | None | False | 18900.0 | 0 |
| 1718244043000 | 0 | None | None | Roads | Construction of Drain | 7784322.33 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3280943 | 113893 | None | 1.14.1 | Earth work excavation for Foundation mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- including cost of all materials, labour, HOM, I | Cum | 107.1 | 107.1 | 644.13 | False | None | None | False | None | False | 68986.323 | 0 | 3280944 | 113893 | None | 2.1.2 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not xceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all aterials of quality, labour, Usage charges of machinery, curing, and all the other ppurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 5947.2 | 5947.2 | 143.14 | False | None | None | False | None | False | 851282.208 | 0 | 3280945 | 113893 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, ncluding all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. ---- including cost of all materials, labour, HOM, I | Cum | 6639.15 | 6639.15 | 479.94 | False | None | None | False | None | False | 3186393.651 | 0 | 3280946 | 113893 | None | 4 vol1 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding Cement Concrete Drain Wall (35percentage) ---- including cost of all materials, labour, HOM, I | Cum | 2323.7 | 2323.7 | 370.48 | False | None | None | False | None | False | 860884.376 | 0 | 3280947 | 113893 | None | 2.11(h) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all aterials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ncilary operations complete as per drawing and technical specification All other type of structures ---- including cost of all materials, labour, HOM, I | t | 82961.55 | 82961.55 | 33.69 | False | None | None | False | None | False | 2794974.6195 | 0 | 3280948 | 113893 | None | code111 4 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding Cement Concrete Drain raft (3percentage) ---- including cost of all materials, labour, HOM, I | Cum | 199.17 | 199.17 | 109.46 | False | None | None | False | None | False | 21801.1482 | 0 |
| 1718244043000 | 0 | None | None | Roads | Shifting of Water Supply Pipe Lines | 965005.02 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3280949 | 113894 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent equired , utilising the available excavated earth locally for the work etc., and all other ppurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- including cost of all materials, labour, HOM, I | Cum | 275.1 | 275.1 | 405.0 | False | None | None | False | None | False | 111415.5 | 0 | 3280950 | 113894 | None | 10.1.9 vol5 | Providing PVC ringtite pipes conforming to IS 985:2000 with latest amendments and nveying to worksite, rolling and lowering into trenches, aying true to line and level and perfect linking at joints, testing and mmissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour ith all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft ravel or selected earth available from the cavation etc. complete and giving necessary ydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- including cost of all materials, labour, HOM, I | m | 648.9 | 648.9 | 1100.0 | False | None | None | False | None | False | 713790.0 | 0 | 3280951 | 113894 | None | 10.1.1 vol5 | Providing PVC ringtite pipes conforming to IS 985:2000 with latest amendments and nveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and mmissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) PVC pipes 25mm dia, 10 kg/sqcm & class 5 ---- including cost of all materials, labour, HOM, I | m | 50.4 | 50.4 | 1500.0 | False | None | None | False | None | False | 75600.0 | 0 | 3280952 | 113894 | None | 1.1 vol1 | Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, mpacting each deposited layer by ramming fter watering with lead upto SOm. and lift upto 1.5 m. including cost of all labour complete as per specifications.PWD SOR for Roads & Bridges - 2023-24 ---- including cost of all materials, labour, HOM, I | Cum | 168.0 | 168.0 | 382.14 | False | None | None | False | None | False | 64199.52 | 0 |
|
|
---|
generalCriterionList | createdTs | version | createdDate | modifiedDate | criterionType | description | tenderEligibilityCriterionDocumentList |
---|
1718244043000 | 0 | None | None | ELIGIBILITY | Tenders from Joint ventures are not acceptable. | None | 1718244043000 | 0 | None | None | ELIGIBILITY | Bidders shall not be under a declaration of ineligibility for
corrupt and fraudulent practices issued by Government of Karnataka
| None | 1718244043000 | 1 | None | None | ELIGIBILITY | EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection. | None | 1718244043000 | 0 | None | None | ELIGIBILITY | It shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission. | None | 1718244043000 | 0 | None | None | ELIGIBILITY | EMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection. | None | 1718544335000 | 0 | None | None | ELIGIBILITY | Bidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder. | None | 1718544372000 | 0 | None | None | ELIGIBILITY | The agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules. | None | 1718544381000 | 0 | None | None | ELIGIBILITY | The bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The department is not responsible for any delayin accessing KPPP portal. | None | 1718544396000 | 0 | None | None | ELIGIBILITY | As per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund. | None | 1718544417000 | 0 | None | None | ELIGIBILITY | The Employer reserves the right to reject any or all Tenders without assigning any reason. | None | 1718544425000 | 0 | None | None | ELIGIBILITY | Conditional tenders will not be accepted. | None | 1718544439000 | 0 | None | None | ELIGIBILITY | Financial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year. (both days inclusive) | None | 1718544462000 | 0 | None | None | ELIGIBILITY | Constructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall be executed as directed by the Engineer-in-charge of the work. | None | 1718544533000 | 0 | None | None | ELIGIBILITY | The Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification. | None | 1718544679000 | 0 | None | None | ELIGIBILITY | The tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation. | None | 1718544724000 | 0 | None | None | ELIGIBILITY | The bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end. | None | 1718544739000 | 0 | None | None | ELIGIBILITY | The tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification. | None | 1718544766000 | 0 | None | None | ELIGIBILITY | The tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder. | None | 1718544778000 | 0 | None | None | ELIGIBILITY | All materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the work. | None | 1718544791000 | 0 | None | None | ELIGIBILITY | The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theron. | None | 1718544813000 | 0 | None | None | ELIGIBILITY | The KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply. | None | 1718544823000 | 0 | None | None | ELIGIBILITY | If the office happens to be closed on the dates notified, next working day will holds good. | None | 1718544836000 | 0 | None | None | ELIGIBILITY | The field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalized | None | 1718544852000 | 0 | None | None | ELIGIBILITY | If undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964 | None | 1718544865000 | 0 | None | None | ELIGIBILITY | All safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent. | None | 1718544877000 | 0 | None | None | ELIGIBILITY | Contractor should follow strictly the prevailing rules of labour act and applicable any law as concerned. | None | 1718544885000 | 0 | None | None | ELIGIBILITY | 18%GST shall be paid to the tendered amount separately. | None | 1718544899000 | 0 | None | None | ELIGIBILITY | The increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time. | None | 1718544993000 | 0 | None | None | ELIGIBILITY | Any dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rules | None | 1718545043000 | 1 | None | None | ELIGIBILITY | The tenderer shall note that as per the Government Order No.FD/850/ EXP-12/15 dated 29-12-2015 and GO No.FD/13 /EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSICunder single point vendor registration scheme is applicable only for purchases, but not for works. | None | 1718545080000 | 0 | None | None | ELIGIBILITY | Contractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsible | None | 1718545097000 | 0 | None | None | ELIGIBILITY | The construction materials (Minerals Metal, Sand and Murum, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per the Directions on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013. | None | 1718545117000 | 0 | None | None | ELIGIBILITY | The defect liability period is one (1) year from the date of actual completion of work. | None | 1718545135000 | 0 | None | None | ELIGIBILITY | Financial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2024-25 in the technical qualification criteria. | None | 1718545151000 | 0 | None | None | ELIGIBILITY | As per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the required machineries for various activities involved in construction as per MORTH specification. | None | 1718545161000 | 1 | None | None | ELIGIBILITY | The tender period for completion of work is 9 (Nine) Calendar months. (Including monsoon period) | None | 1718545243000 | 0 | None | None | ELIGIBILITY | The Earnest Money Deposit Rs. 2,95,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option(CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 1,95,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids. | None | 1718545268000 | 0 | None | None | ELIGIBILITY | The tenderer has to quote the rates are exclusive of GST and As per Government CIRCULAR NO:FD/447/EXPENDITURE | None | 1718545299000 | 0 | None | None | ELIGIBILITY | Estimate rates are excluding GST and the prevailing GST 18 percent of APT is added in the form of Lumpsum in santioned estimate as per the guidelines in common SR 2021-22 GO PWD51 RDF 2019 Bengaluru Date:18-03-2022. Therefore, APT or ECV is excluding GST. In kppp portal there is no option to add GST separately over and above APT during DTS process. Hence even through the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence GST will be paid separately for the quoted amount as per the Govt. circular no FD/447/expenditur /12/2022/dt -30-07-2022. Therefore GST declar | None | 1718545396000 | 0 | None | None | ELIGIBILITY | All necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed. | None | 1718545434000 | 0 | None | None | ELIGIBILITY | Above Tender amount will not be given. | None | 1718545457000 | 0 | None | None | ELIGIBILITY | All safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent. | None | 1718545497000 | 0 | None | None | ELIGIBILITY | The awarded Contractor has to submit his bills through e-MB for payment.(Billing is through e-Mb i.e., Contractor has to produce Soft copy and hard Copy of RA or Final bill for payments), as per the G.O. No. FD 56 Pro. Cell 2004, Bangalore Dated 18th January 2005. | None | 1718545515000 | 0 | None | None | ELIGIBILITY | The bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end. | None | 1718545544000 | 0 | None | None | ELIGIBILITY | It is mandatory to use Manufactured Sand as per Government Circular No.PWD 72 BMS 2013 dated 31-07-2013. also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own artificial sand manufacturing plant unit | None | 1718545560000 | 0 | None | None | ELIGIBILITY | The proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion should be furnished by the successful tenderer at the time of agreement. | None | 1718545570000 | 0 | None | None | ELIGIBILITY | The Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work. | None | 1718545592000 | 0 | None | None | ELIGIBILITY | The star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008. | None |
|
---|