createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1718547841064
version10
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee4430.00
emd266000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose05-07-2024 16:00:00
tenderQueryClose27-06-2024 16:00:00
technicalBidOpen06-07-2024 16:30:00
publishedDate20-06-2024 21:19:30
publishedByPostPWD_EE_DIV_KPL
publishedByUserKPE15981 - P HEMANTHARAJ
bidValidityPeriod90
noOfCalls1
preBidMeetingDate24-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonP Hemanthraj
splitEmdRequiredYnTrue
emdBankGuarantee166000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08539222318
mobileNumber9448021564
tenderSupplierListNone
tenderSchedule
createdTs1718547841101
version10
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT10775
titleConstruction of Cement Concrete Road & Drain in Ganadal Village limits of Yelburga Taluk, Yelburga Constituency in Koppal District.
descriptionConstruction of Cement Concrete Road & Drain in Ganadal Village limits of Yelburga Taluk, Yelburga Constituency in Koppal District.
categoryWORKS
categoryTextWorks
ecv17692458.56
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1696
locationNamePWD Division Office Koppala
provisionalAmount21330000.0
groupOverheadTotal0.0
fileNumberaeepwdyel2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17185478410001NoneNoneRoadsConstruction of Cement Concrete road & Drain in Ganadal Village limits of Yelburga Taluk, Yelburga Constituency Koppal District.10667402.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3298224114903NoneVol-3 Pg No. 9 It. No. 2.5.ii.a of 2023-24 DSRClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removalof stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means, In area of light jungle. ---- including cost of all materials, labour, HOM, I 100 Sqm412.65412.6520.3FalseNoneNoneFalseNoneFalse8376.7950
3298225114903NoneVol-1 Pg No. 8 It. No. 1.14.1 of 2023-24 DSREarth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including ressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- including cost of all materials, labour, HOM, I Cum107.1107.11188.0FalseNoneNoneFalseNoneFalse127234.80
3298226114903NoneVol-3 Pg No. 144 It. No. 16.8.b of 2023-24 DSRConstruction of unlined surface drains of average cross sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307. Mechanical Mean ---- including cost of all materials, labour, HOM, I m26.2526.25125.0FalseNoneNoneFalseNoneFalse3281.250
3298227114903NoneVol-3 Pg No. 17 It. No. 3.4 of 2023-24 DSRScarifying Existing Granular surface to a depth of 50mm by Mechanical Means. Scarifying the existing Granular surface to a depth of 50mm and disposal of scarified material and complete as per specifications. MORTH Specification No. 305.4.3 - Including cost and conveyance of all materials, labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc. complete as directed as per the specification and direction of Engineer-in-charge of the work ---- including cost of all materials, labour, HOM, I Sqm5.255.25753.75FalseNoneNoneFalseNoneFalse3957.18750
3298228114903NoneVol-3 Pg No. 17 It. No. 3.7 of 2023-24 DSRLoosening, levelling and compacting original ground supporting embankment to facilitate placement of first layer of embankment / subgrade, scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction ---- including cost of all materials, labour, HOM, I Cum110.25110.25532.12FalseNoneNoneFalseNoneFalse58666.230
3298229114903NoneVol-1 Pg No. 7 It. No. 1.7 of 2023-24 DSRConstruction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered ---- including cost of all materials, labour, HOM, I Cum124.95124.95594.0FalseNoneNoneFalseNoneFalse74220.30
3298230114903NoneVol-3 Pg No. 17 It. No. 3.6 of 2023-24 DSRConstruction of sub-grade and earthen shoulders with approved material Gravei/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 ---- including cost of all materials, labour, HOM, I Cum517.65517.6563.7FalseNoneNoneFalseNoneFalse32974.3050
3298231114903NoneVol-3 Pg No. 23 It. No. 4.2.v of 2023-24 DSRConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401(For Grading -V Material) ---- including cost of all materials, labour, HOM, I Cum2476.952476.95695.08FalseNoneNoneFalseNoneFalse1721678.4060
3298232114903NoneVol-3 Pg No. 26 It. No. 4.17 of 2023-24 DSRProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- including cost of all materials, labour, HOM, I Cum2686.952686.95751.28FalseNoneNoneFalseNoneFalse2018651.7960
3298233114903NoneVol-3 Pg No. 149 It. No. 16.28 of 2023-24 DSRProviding and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- including cost of all materials, labour, HOM, I Cum7091.77091.7629.99FalseNoneNoneFalseNoneFalse4467700.0830
3298234114903NoneVol-3 Pg No. 67 It. No. 8.15 of 2023-24 DSRProviding and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. ---- including cost of all materials, labour, HOM, I Sqm556.5556.5155.3FalseNoneNoneFalseNoneFalse86424.450
3298235114903NoneVol-3 Pg No. 51 It. No. 6.8.2 of 2023-24 DSRPrecast Cement Concrete Interlocking Blocks Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Cycle Tracks & Pedestrian Footpaths of approved shape and colour, laid in required pattern and including over 30mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in charge. (WMM/WBM Base to be paid separately if necessary as per relevant technical specification) ---- including cost of all materials, labour, HOM, I Sqm1219.051219.051395.0FalseNoneNoneFalseNoneFalse1700574.750
3298236114903NoneVol-3 Pg No. 63 It. No. 8.1.a of 2023-24 DSRConstruction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 15 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 PCC M15 grade for kerb base ---- including cost of all materials, labour, HOM, I m250.95250.95860.0FalseNoneNoneFalseNoneFalse215817.00
3298237114903NoneVol-3 Pg No. 66 It. No. 8.10 of 2023-24 DSRPainting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- including cost of all materials, labour, HOM, I Sqm114.45114.45313.9FalseNoneNoneFalseNoneFalse35925.8550
3298238114903NoneVol-3 Pg No. 74 It. No. 8.43 of 2023-24 DSRSupplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. ---- including cost of all materials, labour, HOM, I No383.25383.25263.0FalseNoneNoneFalseNoneFalse100794.750
3298239114903NoneVol-3 Pg No. 67 It. No. 8.18 of 2023-24 DSRReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting Boundary pillar / Guard Stone ---- including cost of all materials, labour, HOM, I Each785.4785.48.0FalseNoneNoneFalseNoneFalse6283.20
3298240114903NoneVol-3 Pg No. 67 It. No. 8.16.ii of 2023-24 DSRReinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- For Ordinary kilometer stone (precast) ---- including cost of all materials, labour, HOM, I Each3073.353073.351.0FalseNoneNoneFalseNoneFalse3073.350
3298241114903NoneVol-3 Pg No. 67 It. No. 8.16.iii of 2023-24 DSRReinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- For 200 m stone (precast) ---- including cost of all materials, labour, HOM, I Each884.1884.12.0FalseNoneNoneFalseNoneFalse1768.20
17185478410001NoneNoneRoads1000 mm dia, 1 Row Hume Pipe Culvert 3 Nos1025549.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3298242114904NoneVol-1 Pg No. 8 It. No. 1.14.1 of 2023-24 DSREarth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including ressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Common SOR For Engineering Departments ---- including cost of all materials, labour, HOM, I Cum107.1107.1156.29FalseNoneNoneFalseNoneFalse16738.6590
3298243114904NoneVol-1 Pg No. 15 It. No. 2.1.3 of 2023-24 DSRProviding and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6288.456288.459.31FalseNoneNoneFalseNoneFalse58545.46950
3298244114904NoneVol-1 Pg No. 18 It. No. 2.11.h of 2023-24 DSRSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- including cost of all materials, labour, HOM, I Tonne82961.5582961.551.03FalseNoneNoneFalseNoneFalse85450.39650
3298245114904NoneVol-1 Pg No. 16 It. No. 2.4.2 of 2023-24 DSRProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate ---- including cost of all materials, labour, HOM, I Cum6639.156639.1577.2FalseNoneNoneFalseNoneFalse512542.380
3298246114904NoneVol-1 Formwork Pg No 111 SI No. 1 of 2023-24Additionalities for Formwork, Centering & Scaffolding- For Foundation, Culverts (Head walls) ---- including cost of all materials, labour, HOM, I Cum531.13531.1377.2FalseNoneNoneFalseNoneFalse41003.2360
3298247114904NoneVol-3 Pg No. 146 It. No. 16.15.ii of 2023-24 DSRProviding and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101 1000mm. dia ---- including cost of all materials, labour, HOM, I Rmtr8355.98355.936.0FalseNoneNoneFalseNoneFalse300812.40
3298248114904NoneVol-1 Pg No. 7 It. No. 1.9 of 2023-24 DSRFilling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m ---- including cost of all materials, labour, HOM, I Cum279.3279.337.44FalseNoneNoneFalseNoneFalse10456.9920
17185478410001NoneNoneRoadsConstruction C C Drain Work5788269.32
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3298249114905NoneVol-1 Pg No. 8 It. No. 1.14.1 of 2023-24 DSREarth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including ressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m Common SOR For Engineering Departments ---- including cost of all materials, labour, HOM, I Cum107.1107.11038.0FalseNoneNoneFalseNoneFalse111169.80
3298250114905NoneVol-1 Pg No. 15 It. No. 2.1.3 of 2023-24 DSRProviding and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I Cum6288.456288.4586.5FalseNoneNoneFalseNoneFalse543950.9250
3298251114905NoneVol-1 Pg No. 18 It. No. 2.11.h of 2023-24 DSRSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire /soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures ---- including cost of all materials, labour, HOM, I Tonne82961.5582961.5523.55FalseNoneNoneFalseNoneFalse1953744.50250
3298252114905NoneVol-1 Pg No. 16 It. No. 2.4.2 of 2023-24 DSRProviding and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (M 20) Using 20 mm nominal size graded crushed coarse aggregate (35% for Drain centring) ---- including cost of all materials, labour, HOM, I Cum6639.156639.15382.41FalseNoneNoneFalseNoneFalse2538877.35150
3298253114905NoneVol-1 Formwork Pg No 111 SI No. 4 of 2023-24Additionalities for Formwork, Centering & Scaffolding- For Drain walls ---- including cost of all materials, labour, HOM, I Cum2323.72323.7265.64FalseNoneNoneFalseNoneFalse617267.6680
3298254114905NoneVol-1 Formwork Pg No 111 SI No. 1b of 2023-24Additionalities for Formwork, Centering & Scaffolding- For Drain raft b. All other types ---- including cost of all materials, labour, HOM, I Cum199.17199.17116.78FalseNoneNoneFalseNoneFalse23259.07260
17185478410000NoneNoneRoadsEstimate for Electrical Pole Shifting of 11KV electrical line211237.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3298255114906NoneVol-6 P No-3, I no-1.02, Material code-200106RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I Nos8242.08242.01.0FalseNoneNoneFalseNoneFalse8242.00
3298256114906NoneVol-6 P No-3, I no-1.06, Material code-200006PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos5365.05365.01.0FalseNoneNoneFalseNoneFalse5365.00
3298257114906NoneVol-6 P No-3, I no-1.05, Material code-200004PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos4631.04631.01.0FalseNoneNoneFalseNoneFalse4631.00
3298258114906NoneVol-6 P No-3, I no-2.01, Material code-27902011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos478.0478.03.0FalseNoneNoneFalseNoneFalse1434.00
3298259114906NoneVol-6 P No-3, I no-2.11, Material code-279092HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos197.0197.03.0FalseNoneNoneFalseNoneFalse591.00
3298260114906NoneVol-6 P No-3, I no-2.07, Material code-279012LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos238.0238.03.0FalseNoneNoneFalseNoneFalse714.00
3298261114906NoneVol-6 P No-5, I no-6.10, Material code-28332011 kV, 45 kN Polymeric Insulator ---- including cost of all materials, labour, HOM, I Nos186.0186.03.0FalseNoneNoneFalseNoneFalse558.00
3298262114906NoneVol-6 P No-5, I no-6.06, Material code-28300811 kV, 5 kN Composite/Polymeric Pin Insulator ---- including cost of all materials, labour, HOM, I Nos205.0205.03.0FalseNoneNoneFalseNoneFalse615.00
3298263114906NoneGuy SetGuy Set ---- including cost of all materials, labour, HOM, I Set1220.01220.03.0FalseNoneNoneFalseNoneFalse3660.00
3298264114906NoneVol-6 P No-5, I no-7.02, Material code-284108Rabbit ACSR conductor ---- including cost of all materials, labour, HOM, I kl49103.049103.03.0FalseNoneNoneFalseNoneFalse147309.00
3298265114906NoneVol-6 P No-218, I no-26.02Loading & Unloading of 9mt pole ---- including cost of all materials, labour, HOM, I Nos92.092.03.0FalseNoneNoneFalseNoneFalse276.00
3298266114906NoneVol-6 P No-218, I no-26.01Loading & Unloading of 8mt pole ---- including cost of all materials, labour, HOM, I Nos69.069.03.0FalseNoneNoneFalseNoneFalse207.00
3298267114906NoneR&R of 9mt poleR&R of 9mt pole ---- including cost of all materials, labour, HOM, I Nos1166.01166.03.0FalseNoneNoneFalseNoneFalse3498.00
3298268114906NoneR&R of X-ArmR&R of X-Arm ---- including cost of all materials, labour, HOM, I Nos106.0106.03.0FalseNoneNoneFalseNoneFalse318.00
3298269114906NoneR&R of HTSTR&R of HTST ---- including cost of all materials, labour, HOM, I Nos106.0106.03.0FalseNoneNoneFalseNoneFalse318.00
3298270114906NoneR&R of RabbitR&R of Rabbit ---- including cost of all materials, labour, HOM, I Nos2869.02869.03.0FalseNoneNoneFalseNoneFalse8607.00
3298271114906NoneVol-6 P No-3, I no-1.02, Material code-200106RCC Pole - 9 Mtr Long, 150 Kg WL Sq Section (Dwg No. BESCOM/GM/QS&S/51 Dtd 24.11.2018) as per IS-785. ---- including cost of all materials, labour, HOM, I Nos1166.01166.02.0FalseNoneNoneFalseNoneFalse2332.00
3298272114906NoneVol-6 P No-3, I no-1.06, Material code-200006PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/50 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos1166.01166.01.0FalseNoneNoneFalseNoneFalse1166.00
3298273114906NoneVol-6 P No-3, I no-1.05, Material code-200004PSCC Pole - 8 Mtr Long, 200 Kg WL (Dwg No. BESCOM/GM/QS&S/49 Dtd 24.11.2018) as per REC Standards. ---- including cost of all materials, labour, HOM, I Nos932.0932.01.0FalseNoneNoneFalseNoneFalse932.00
3298274114906NoneVol-6 P No-3, I no-2.01, Material code-27902011 kV, Horizontal Cross Arm - Mild Steel (MS) (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos106.0106.04.0FalseNoneNoneFalseNoneFalse424.00
3298275114906NoneVol-6 P No-3, I no-2.11, Material code-279092HT ST Support 50x6 mm Flat - MS (Dwg No. BESCOM/GM/QS&S/04 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos106.0106.04.0FalseNoneNoneFalseNoneFalse424.00
3298276114906NoneVol-6 P No-3, I no-2.07, Material code-279012LT 2 Pin Cross Arm - MS (Dwg No. BESCOM/GM/QS&S/32 Dtd 24.11.2018) ---- including cost of all materials, labour, HOM, I Nos106.0106.04.0FalseNoneNoneFalseNoneFalse424.00
3298277114906NoneGuy SetGuy Set ---- including cost of all materials, labour, HOM, I Set390.0390.04.0FalseNoneNoneFalseNoneFalse1560.00
3298278114906NoneVol-6 P No-218, I no-26.02Loading & Unloading of 9mt pole ---- including cost of all materials, labour, HOM, I Nos92.092.04.0FalseNoneNoneFalseNoneFalse368.00
3298279114906NoneVol-6 P No-218, I no-26.01Loading & Unloading of 8mt pole ---- including cost of all materials, labour, HOM, I Nos69.069.04.0FalseNoneNoneFalseNoneFalse276.00
3298280114906NoneR&R of 9mt poleR&R of 9mt pole ---- including cost of all materials, labour, HOM, I Nos1166.01166.04.0FalseNoneNoneFalseNoneFalse4664.00
3298281114906NoneR&R of X-ArmR&R of X-Arm ---- including cost of all materials, labour, HOM, I Nos106.0106.04.0FalseNoneNoneFalseNoneFalse424.00
3298282114906NoneR&R of HTSTR&R of HTST ---- including cost of all materials, labour, HOM, I Nos106.0106.04.0FalseNoneNoneFalseNoneFalse424.00
3298283114906NoneR&R of RabbitR&R of Rabbit ---- including cost of all materials, labour, HOM, I Nos2869.02869.04.0FalseNoneNoneFalseNoneFalse11476.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17185478420000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17185478420000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17185478420001NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17185478420000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17185478420000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17185501240000NoneNoneELIGIBILITYThe agency shall furnish affidavit stating that existing commitments furnished by him are true. If found falls action shall be taken as per rules.None
17185501420000NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of each tender and the employer will in no case be responsible and liable for those costs. The department is not responsible for any delayin accessing KPPP portal.None
17185501540000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27.7.2007, a sum amounting to 1%of the bill amount will be deducted towards Construction Labour Welfare fund.None
17185501730000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason.None
17185501810000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17185501910000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year. (both days inclusive)None
17185502140000NoneNoneELIGIBILITYConstructive materials & other taxes as per the prevailing Government Orders at the time of execution and including cost and conveyance of all materials, curing, loading and unloading, with all leads & lifts, labour, hire charges of all machineries & equipments and all incidental charges etc., complete necessary for completion of work. All the Items shall be executed as directed by the Engineer-in-charge of the work.None
17185502560000NoneNoneELIGIBILITYThe tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent. And scan the original certificates and attach the scanned file to the bid. The Original Certificate/certificates shall be produced at the time of opening of technical bids for physical verification.None
17185503050000NoneNoneELIGIBILITYThe tenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 -Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17185503440000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17185503570000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all prescribed formats. Scan & upload all the original documents/Formats required for this bid to the KPPP portal. The Original documents/ Formats shall be produced at the time of opening of technical bid for physical verification.None
17185503920000NoneNoneELIGIBILITYThe tenderer shall note that the scanned Documents shall also be up loaded in the tasks created under Document/ Evidence required from the bidder.None
17185504040000NoneNoneELIGIBILITYAll materials required for this work shall be procured by the bidder himself and should got tested by the quality control authorities at his own cost before use on the work.None
17185504170000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the standard bid document KW4 KPWD and further orders theron.None
17185504350000NoneNoneELIGIBILITYThe KPWD Code, KTTP Act/ Rules, Delegation of powers and other Government orders issued by Government from time to time will apply.None
17185504450000NoneNoneELIGIBILITYIf the office happens to be closed on the dates notified, next working day will holds good.None
17185504580000NoneNoneELIGIBILITYThe field laboratory shall preferably locate, adjacent to the site with the required amenity as per the clause. Failing which 1% of the amount of work done will be penalizedNone
17185504790000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damage occurred during the undue delay period in accordance with the Karnataka Highway act 1964None
17185504930000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17185505010000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any law as concerned.None
17185505100000NoneNoneELIGIBILITY18%GST shall be paid to the tendered amount separately.None
17185505210000NoneNoneELIGIBILITYThe increase in GST shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17185505720000NoneNoneELIGIBILITYAny dispute difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its rulesNone
17185506250000NoneNoneELIGIBILITYThe tenderer shall note that as per the Government Order No.FD/850/ EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015 & GO no 850-12/15 Dated 15-12-2016 the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for purchases, but not for works.None
17185506510000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work. In case of any mishap, accidents are cause of death it is the duty of the contractor to settle the dispute at is own cost. In no way department is held responsibleNone
17185506990000NoneNoneELIGIBILITYThe construction materials (Minerals Metal, Sand and Murum, etc.,) shall be bought from the authorized quarries along with the mineral dispatch permit or else 5 times the royalty will be deducted as penalty as per thDirections on the Director, Mines and Geology Department Bangalore Proceedings Dated 25-03-2013.None
17185507120000NoneNoneELIGIBILITYThe defect liability period is one (1) year from the date of actual completion of work.None
17185507240000NoneNoneELIGIBILITYFinancial turn over and Financial commitments of previous years shall be given weight age of 10% per year to bring them to the price level of 2024-25 in the technical qualification criteria.None
17185507400000NoneNoneELIGIBILITYAs per Govt circular no GO-FD/AE 263/EXP12-2022 dt-11-05-2022, this clause for owning key equipments for works costing up to Rs.3.00 crores is exempted. However it is obligatory for the contractor to use the required machineries for various activities involved in construction as per MORTH specification.None
17185507510001NoneNoneELIGIBILITYThe tender period for completion of work is 9 (Nine) Calendar months. (Including monsoon period)None
17185507780001NoneNoneELIGIBILITYThe Earnest Money Deposit Rs. 2,66,000.00 through KPPP portal OR it shall be in two parts. Part (1) Rs. 1,00,000.00 through KPPP portal under any one of the option(CC/DD/NEFT/OTC) and Part (2) Balance EMD of Rs. 1,66,000.00 shall be in favour of the Executive Engineer, PWD Division Koppal, in the form of Bank Guarantee in the prescribed format obtained from any Nationalized/Scheduled Bank. The scanned copy of the original Part(2) EMD should be uploaded along with the Technical bid. The part (2) of the EMD shall be delivered to the Executive Engineer before the prescribed Date and time of opening of the Technical Bids.None
17185508010000NoneNoneELIGIBILITYThe tenderer has to quote the rates are exclusive of GST and As per Government CIRCULAR NO:FD/447/EXPENDITURENone
17185508800000NoneNoneELIGIBILITYEstimate rates are excluding GST and the prevailing GST 18 percent of APT is added in the form of Lumpsum in santioned estimate as per the guidelines in common SR 2021-22 GO PWD51 RDF 2019 Bengaluru Date:18-03-2022. Therefore, APT or ECV is excluding GST. In kppp portal there is no option to add GST separately over and above APT during DTS process. Hence even through the tender has been invited by opting for the INCLUSIVE option, the item wise rates do not include GST. Hence GST will be paid separately for the quoted amount as per the Govt. circular no FD/447/expenditure/12/2022/dt -30-07-2022. Therefore GST declaration certificate must be uploaded mandatory by the prospective bidders.None
17185509030000NoneNoneELIGIBILITYAll necessary arrangements shall be made and precaution taken to prevent completely or partially, damage to the structure or labours / employees during construction period. (As per recent Labour Act) Contractor shall be fully responsible for any damage to the structure during the construction and maintainance period.Any damage caused due to any reasons shall be rectified / replaced at his own cost as per the direction of Engineer in charge. Nothing shall be payable by the Department on account of inclusive of all such arrangements/ precautions work needed.None
17185509130000NoneNoneELIGIBILITYAbove Tender amount will not be given.None
17185509300001NoneNoneELIGIBILITYThe Tenderer or his identified sub contractor sholud possess required valid electrical license for executing building electrification works.None
17185510030000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17185510170000NoneNoneELIGIBILITYThe awarded Contractor has to submit his bills through e-MB for payment. (Billing is through e-Mb i.e., Contractor has to produce Soft copy and hard Copy of RA or Final bill for payments), as per the G.O. No. FD 56 Pro. Cell 2004, Bangalore Dated 18th January 2005.None
17185510320000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders endNone
17185510520000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD 72 BMS 2013 dated 31-07-2013. also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own artificial sand manufacturing plant unit.None
17185510710000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion should be furnished by the successful tenderer at the time of agreement.None
17185510840000NoneNoneELIGIBILITYThe Agency shall comply with ISO14001 (Environmental Management System) requirement during execution of work.None
17185511060000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneAs per Clause 3.2(b) : To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 &2023-24 (b) satisfactorily completed (at least 50% of the contract value) as prime contractor, at least one similar work such as CC Road & Drain Work of value not less than Rs. 88.47 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.2(c) To qualify for award of this contract, each Tenderer in its Name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 2022-23 and 2023-24 (c) executed in any one year, the following minimum quantities of work (a)Earthwork/ Emankment/subgrade/shoulders-2432.00 Cum (b)RCC/ PCC-949.00 Cum (c)WWM-602.00Cum(d)GSB-557.00 Cum(e)TMT Steel- 20.00TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneAs per Clause 3.2(a): To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 (a) achieved in at least two financial years a minimum financial turn over (in all classes ofcivil engineering construction works only) of Rs. 353.85 Lakhs. (usually not less than two times the estimated annual payments under this contract)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAs per Clause 3.3(c) : To qualify for award of this contract, Each Tenderer should further demonstrate: Liquid assets and /or availability of credit facilities of not less than Rs. 59.00 Lakhs.(Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc. (usually the equivalent of the estimated cash flow for three months in the peak construction period)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneCopy of RegistrationOthersCopy of Registration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneCost of work for which Tender acceptance letters received.OthersCost of work for which Tender acceptance letters received.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Cost of work for which Tender acceptance letters received.
NoneNoneNoneNonePrincipal Place of BusinessOthersPrincipal Place of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Principal Place of Business
NoneNoneNoneNoneLitigation in which the Tenderer is involved.OthersLitigation in which the Tenderer is involved.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Litigation in which the Tenderer is involved.
NoneNoneNoneNoneCost of work for which Tenders submitted.OthersCost of work for which Tenders submitted.
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Cost of work for which Tenders submitted.
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN issued by CATrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
Principal place of businessTrueTechnical Bid
Quantity wise work done certificate.TrueTechnical Bid
Information of litigation in which the Tenderer is involvedTrueTechnical Bid
Line Credit/Bankers CertificateTrueTechnical Bid
List of works for which tenders already submittedTrueTechnical Bid
List of works for which tenders acceptance letter receivedTrueTechnical Bid
List of Existing commitments & Ongoing worksTrueTechnical Bid
Work performed as a prime contractor in the same name on works of similar natureTrueTechnical Bid
Work Done Certificate Not Below the rank of Executive EngineerTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718786272000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of The Executive Engineer, PWD Division Koppal
streetNone
cityKoppal
stateKarnataka
pin583231
tenderRecallDTONone