tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1718710483000 | 1 | None | None | Buildings | CONSTRUCTION OF BUDDA BASAVA AMBEDKAR SAMSKRUTIKA BHAVANA AT CHIKKAVANKALAKUNTA IN HIREVANKALAKUNTA HOBLI, YELBURGA TALUK OF KOPPAL DISTRICT (Ground Floor) | 21517022.43 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303490 | 115204 | None | Vol-3 Pg.no 9 It No. 2.5.(ii)a of 2023-24 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer. A) In area of light jungle. ---- including cost of all materials, labour, HOM, I | 100 Sqm | 412.65 | 412.65 | 26.98 | False | None | None | False | None | False | 11133.297 | 0 | 3303491 | 115204 | None | Vol-1 Pg.no 8 It No. 1.12 of 2023-24 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage ofachinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth. ---- including cost of all materials, labour, HOM, I | Cum | 99.75 | 99.75 | 809.4 | False | None | None | False | None | False | 80737.65 | 0 | 3303492 | 115204 | None | Vol-1 Pg.no 8 It No. 1.14.1 of 2023-24 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. ---- including cost of all materials, labour, HOM, I | Cum | 107.1 | 107.1 | 398.64 | False | None | None | False | None | False | 42694.344 | 0 | 3303493 | 115204 | None | Vol-1 Pg.no 9 It No. 1.15.2 of 2023-24 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m. ---- including cost of all materials, labour, HOM, I | Cum | 446.25 | 446.25 | 265.76 | False | None | None | False | None | False | 118595.4 | 0 | 3303494 | 115204 | None | Vol-1 Pg.no 5 It No. 1.4.1 of 2023-24 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sidesneatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.In all kinds of soils Depth upto 1.5 m ---- including cost of all materials, labour, HOM, I | Cum | 254.1 | 254.1 | 132.88 | False | None | None | False | None | False | 33764.808 | 0 | 3303495 | 115204 | None | Vol-2 Pg.no 5 It No. 4.1 of 2023-24 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 123.9 | 123.9 | 1839.82 | False | None | None | False | None | False | 227953.698 | 0 | 3303496 | 115204 | None | Vol-1 Pg.no 15 It No. 2.1.4 of 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6527.85 | 6527.85 | 218.23 | False | None | None | False | None | False | 1424572.7055 | 0 | 3303497 | 115204 | None | Vol-1 Formwork Pg No 111 SI No. 1 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding FOUNDATION UP TO PLINTH ---- including cost of all materials, labour, HOM, I | Cum | 532.22 | 532.22 | 156.13 | False | None | None | False | None | False | 83095.5086 | 0 | 3303498 | 115204 | None | Vol-1 Formwork Pg No 111 SI No. 2 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.PLINTH BEAMS ---- including cost of all materials, labour, HOM, I | Cum | 3326.4 | 3326.4 | 55.39 | False | None | None | False | None | False | 184249.296 | 0 | 3303499 | 115204 | None | Vol-1 Formwork Pg No 111 SI No. 9 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding. COLUMNS ---- including cost of all materials, labour, HOM, I | Cum | 5029.61 | 5029.61 | 43.11 | False | None | None | False | None | False | 216826.4871 | 0 | 3303500 | 115204 | None | Vol-1 Formwork Pg No 112 SI No. 14 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding. BEAMS AND LINTEL ---- including cost of all materials, labour, HOM, I | Cum | 4311.09 | 4311.09 | 118.58 | False | None | None | False | None | False | 511209.0522 | 0 | 3303501 | 115204 | None | Vol-1 Formwork Pg No 112 SI No. 15 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding RCC Roof Slabs ---- including cost of all materials, labour, HOM, I | Cum | 3592.58 | 3592.58 | 105.71 | False | None | None | False | None | False | 379771.6318 | 0 | 3303502 | 115204 | None | Vol-1 Formwork Pg No 112 SI No. 16 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding. Staircase and other similar structures ---- including cost of all materials, labour, HOM, I | Cum | 3592.58 | 3592.58 | 29.64 | False | None | None | False | None | False | 106484.0712 | 0 | 3303503 | 115204 | None | Vol-1 Formwork Pg No 112 SI No. 19 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding Chejjas, Canopy & Other Architectural projections of minor sections ---- including cost of all materials, labour, HOM, I | Cum | 3132.68 | 3132.68 | 13.27 | False | None | None | False | None | False | 41570.6636 | 0 | 3303504 | 115204 | None | Vol-1 Pg.no 16 It No. 2.4.3 of 2023-24 | Providing and laying in position Cement Concrete for all Sub structures of
building, Irrigation works, Sub structure works of bridges, Drain works &
other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt
crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes wherever necessary, including
all lead & lifts, cost of all materials of quality, confirming to the requirements
of relevant IS codes, labour, Usage charges of machinery, curing and all other
appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6652.8 | 6652.8 | 211.53 | False | None | None | False | None | False | 1407266.784 | 0 | 3303505 | 115204 | None | Vol-1 Pg.no 16 It No. 2.5.2 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 7185.15 | 7185.15 | 297.07 | False | None | None | False | None | False | 2134492.5105 | 0 | 3303506 | 115204 | None | Vol-1 Pg.no 16 It No. 2.5.1 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 6961.5 | 6961.5 | 13.27 | False | None | None | False | None | False | 92379.105 | 0 | 3303507 | 115204 | None | Vol-1 Pg.no 18 It No. 2.11.a of 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings ---- including cost of all materials, labour, HOM, I | Tonne | 93929.85 | 93929.85 | 62.17 | False | None | None | False | None | False | 5839618.7745 | 0 | 3303508 | 115204 | None | Vol-2 Pg.no 9 It No. 5.4 of 2023-24 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including cost of all materials, labour, HOM, I | Cum | 6708.45 | 6708.45 | 22.37 | False | None | None | False | None | False | 150068.0265 | 0 | 3303509 | 115204 | None | Vol-1 Pg.no 7 It No. 1.11 of 2023-24 | Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- including cost of all materials, labour, HOM, I | Cum | 454.65 | 454.65 | 425.45 | False | None | None | False | None | False | 193430.8425 | 0 | 3303510 | 115204 | None | Vol-2 Pg.no 17 It No. 6.32 of 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1375.5 | 1375.5 | 961.35 | False | None | None | False | None | False | 1322336.925 | 0 | 3303511 | 115204 | None | Vol-2 Pg.no 17 It No. 6.34 of 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1159.2 | 1159.2 | 64.76 | False | None | None | False | None | False | 75069.792 | 0 | 3303512 | 115204 | None | Vol-2 Pg.no 43 It No. 8.16.3 of 2023-24 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for paymentPlaster mesh 100mm wide ---- including cost of all materials, labour, HOM, I | m | 46.2 | 46.2 | 2136.04 | False | None | None | False | None | False | 98685.048 | 0 | 3303513 | 115204 | None | Vol-2 Pg.no 41 It No. 8.1.2 of 2023-24 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 253.05 | 253.05 | 1099.05 | False | None | None | False | None | False | 278114.6025 | 0 | 3303514 | 115204 | None | Vol-2 Pg.no 42 It No. 8.9 of 2023-24 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 404.25 | 404.25 | 1245.04 | False | None | None | False | None | False | 503307.42 | 0 | 3303515 | 115204 | None | Vol-2 Pg.no 41 It No. 8.2.1 of 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 309.75 | 309.75 | 605.15 | False | None | None | False | None | False | 187445.2125 | 0 | 3303516 | 115204 | None | Vol-2 Pg.no 50 It No. 8.51 of 2023-24 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 105.0 | 105.0 | 1978.96 | False | None | None | False | None | False | 207790.8 | 0 | 3303517 | 115204 | None | Vol-2 Pg.no 46 It No. 8.30 of 2023-24 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 182.7 | 182.7 | 1245.04 | False | None | None | False | None | False | 227468.808 | 0 | 3303518 | 115204 | None | Vol-2 Pg.no 48 It No. 8.39 of 2023-24 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 133.35 | 133.35 | 1978.97 | False | None | None | False | None | False | 263895.6495 | 0 | 3303519 | 115204 | None | Vol-2 Pg.no 61 It No. 9.19 of 2023-24 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser, treads of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average6 mm thickness, including grouting of joints as per direction of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 1231.65 | 1231.65 | 166.91 | False | None | None | False | None | False | 205574.7015 | 0 | 3303520 | 115204 | None | Vol-2 Pg.no 61 It No. 9.17.3 of 2023-24 | Providing and laying Vitrified tiles in different sizes (thickness to bespecified by manufacturer), with water absorption less than 0.08 % andconforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 800x800 mm ---- including cost of all materials, labour, HOM, I | Sqm | 1351.35 | 1351.35 | 1085.07 | False | None | None | False | None | False | 1466309.3445 | 0 | 3303521 | 115204 | None | Vol-2 Pg.no 60 It No. 9.11 of 2023-24 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- including cost of all materials, labour, HOM, I | Sqm | 933.45 | 933.45 | 182.1 | False | None | None | False | None | False | 169981.245 | 0 | 3303522 | 115204 | None | Vol-2 Pg.no 69 It No. 10.1.1 of 2023-24 | Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of the slab upto 0.50 m2 ---- including cost of all materials, labour, HOM, I | Sqm | 4206.3 | 4206.3 | 12.03 | False | None | None | False | None | False | 50601.789 | 0 | 3303523 | 115204 | None | Vol-2 Pg.no 71 It No. 10.14 of 2023-24 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2, including pointing in white cement mixed with pigment of matching shade complete. ---- including cost of all materials, labour, HOM, I | Sqm | 1161.3 | 1161.3 | 164.31 | False | None | None | False | None | False | 190813.203 | 0 | 3303524 | 115204 | None | Vol-2 Pg.no 99 It No. 12.10 of 2021-22 | Providing Teak wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps ), but including cost of materials, labour, usage charges complete as per specifications ---- including cost of all materials, labour, HOM, I | Cum | 247431.45 | 247431.45 | 1.15 | False | None | None | False | None | False | 284546.1675 | 0 | 3303525 | 115204 | None | Vol-2 Pg.no 100 It No. 12.14 of 2021-22 | Providing and fixing in position fully panelled Teak wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures) ---- including cost of all materials, labour, HOM, I | Sqm | 9800.7 | 9800.7 | 43.2 | False | None | None | False | None | False | 423390.24 | 0 | 3303526 | 115204 | None | Vol-2 Pg.no 54 It No. 8.82 of 2023-24 | Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below: 1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 no. 2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs. 3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs. ---- including cost of all materials, labour, HOM, I | Sqm | 710.85 | 710.85 | 43.2 | False | None | None | False | None | False | 30708.72 | 0 | 3303527 | 115204 | None | Vol-2 Pg.no 99 It No. 12.11 of 2023-24 | Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 144977.7 | 144977.7 | 0.67 | False | None | None | False | None | False | 97135.059 | 0 | 3303528 | 115204 | None | Vol-2 Pg.no 105 It No. 12.57.7 of 2023-24 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 40 mm thick both side Teak ---- including cost of all materials, labour, HOM, I | Sqm | 5208.0 | 5208.0 | 24.48 | False | None | None | False | None | False | 127491.84 | 0 | 3303529 | 115204 | None | Vol-2 Pg.no 104 It No. 12.54 of 2023-24 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Rmtr | 333.9 | 333.9 | 36.75 | False | None | None | False | None | False | 12270.825 | 0 | 3303530 | 115204 | None | Vol-2 Pg.no 104 It No. 12.55.2 of 2023-24 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded PrelaminatedPVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. with one side prelam. ---- including cost of all materials, labour, HOM, I | Sqm | 2142.0 | 2142.0 | 13.23 | False | None | None | False | None | False | 28338.66 | 0 | 3303531 | 115204 | None | Vol-2 Pg.no 104 It No. 12.51 of 2023-24 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labour, HOM, I | Nos | 1066.8 | 1066.8 | 13.0 | False | None | None | False | None | False | 13868.4 | 0 | 3303532 | 115204 | None | Vol-2 Pg.no 110 It No. 12.90 of 2023-24 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size -2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I | Sqm | 7070.7 | 7070.7 | 58.32 | False | None | None | False | None | False | 412363.224 | 0 | 3303533 | 115204 | None | Vol-2 Pg.no 109 It No. 12.85 of 2023-24 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size- 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I | Sqm | 6004.95 | 6004.95 | 11.96 | False | None | None | False | None | False | 71819.202 | 0 | 3303534 | 115204 | None | Vol-2 Pg.no 86 It No. 11.34B of 2023-24 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- including cost of all materials, labour, HOM, I | Kgs | 192.15 | 192.15 | 1673.96 | False | None | None | False | None | False | 321651.414 | 0 | 3303535 | 115204 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 120.75 | 120.75 | 79.71 | False | None | None | False | None | False | 9624.9825 | 0 | 3303536 | 115204 | None | Vol-2 Pg.no 50 It No. 8.55.1 of 2023-24 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 58.8 | 58.8 | 58.75 | False | None | None | False | None | False | 3454.5 | 0 | 3303537 | 115204 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 120.75 | 120.75 | 58.75 | False | None | None | False | None | False | 7094.0625 | 0 | 3303538 | 115204 | None | Vol-2 Pg.no 63 It No. 9.25 of 2023-24 | Providing and laying 60mm thick factory made cement concrete paver block of approved shape and colour of M -30 grade made of C&D waste by block making machine with vibratory compaction laid in required pattern and including over 50mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 840.0 | 840.0 | 109.68 | False | None | None | False | None | False | 92131.2 | 0 | 3303539 | 115204 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | KSRB 4-2.12 : Extra for providing throating or drip moulding to R.C.C. chajja with plastering ( labour charges only ) as per specifications. ---- including cost of all materials, labour, HOM, I | m | 33.0 | 33.0 | 182.49 | False | None | None | False | None | False | 6022.17 | 0 | 3303540 | 115204 | None | Vol-2 Pg.no 23 It No. 7.18 of 2023-24 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 2117.85 | 2117.85 | 128.02 | False | None | None | False | None | False | 271127.157 | 0 | 3303541 | 115204 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | KSRB 2.5 : Earthwork excavation in all soil deposits and filling sides of foundation upto plinth in layers not exceeding 20cms. in depth, compacting each deposited layer by ramming after watering with all lead and lift including cost of all labour complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 403.0 | 403.0 | 1720.32 | False | None | None | False | None | False | 693288.96 | 0 | 3303542 | 115204 | None | Vol-2 Pg.no 105 It No. 12.60 of 2023-24 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1104.6 | 1104.6 | 8.0 | False | None | None | False | None | False | 8836.8 | 0 | 3303543 | 115204 | None | Vol-2 Pg.no 218 It No. 22.15.2 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 300mm ---- including cost of all materials, labour, HOM, I | Nos | 577.5 | 577.5 | 7.0 | False | None | None | False | None | False | 4042.5 | 0 | 3303544 | 115204 | None | Vol-2 Pg.no 219 It No. 22.15.7 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolts 250x10mm. ---- including cost of all materials, labour, HOM, I | Nos | 210.0 | 210.0 | 14.0 | False | None | None | False | None | False | 2940.0 | 0 | 3303545 | 115204 | None | Vol-2 Pg.no 219 It No. 22.15.8 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm ---- including cost of all materials, labour, HOM, I | Nos | 52.5 | 52.5 | 56.0 | False | None | None | False | None | False | 2940.0 | 0 | 3303546 | 115204 | None | Vol-2 Pg.no 219 Sl No. 444 of 2023-24 | Hold fasts ---- including cost of all materials, labour, HOM, I | Nos | 50.0 | 50.0 | 56.0 | False | None | None | False | None | False | 2800.0 | 0 | 3303547 | 115204 | None | Vol-2 Pg.no A27 Sl No. 500 of 2023-24 | Magnetic catcher triple type. ---- including cost of all materials, labour, HOM, I | Nos | 31.5 | 31.5 | 14.0 | False | None | None | False | None | False | 441.0 | 0 | 3303548 | 115204 | None | Vol-2 Pg.no 219 It No. 22.15.4 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 300mm. ---- including cost of all materials, labour, HOM, I | Nos | 393.75 | 393.75 | 7.0 | False | None | None | False | None | False | 2756.25 | 0 | 3303549 | 115204 | None | Vol-2 Pg.no 105 It No. 12.59 of 2023-24 | Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1169.7 | 1169.7 | 7.0 | False | None | None | False | None | False | 8187.9 | 0 | 3303550 | 115204 | None | Vol-2 Pg.no 219 It No. 22.15.10 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Door stopper 75mm. ---- including cost of all materials, labour, HOM, I | Nos | 105.0 | 105.0 | 7.0 | False | None | None | False | None | False | 735.0 | 0 | 3303551 | 115204 | None | Vol-2 Pg.no A14 Sl No. 84 of 2023-24 | Brass Screws of 50mm. ---- including cost of all materials, labour, HOM, I | 1 EACH | 5.25 | 5.25 | 504.0 | False | None | None | False | None | False | 2646.0 | 0 | 3303552 | 115204 | None | Vol-2 Pg.no A28 Sl No. 548 of 2023-24 | Nails of varying sizes. ---- including cost of all materials, labour, HOM, I | Kgs | 70.35 | 70.35 | 20.0 | False | None | None | False | None | False | 1407.0 | 0 | 3303553 | 115204 | None | Vol-2 Pg.no A25 Sl No. 448 of 2023-24 | Honne wood beading 20x20 mm ---- including cost of all materials, labour, HOM, I | m | 57.75 | 57.75 | 93.6 | False | None | None | False | None | False | 5405.4 | 0 | 3303554 | 115204 | None | Vol-5 Pg.no 188 It No. 16.3.5 of 2023-24 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. ---- including cost of all materials, labour, HOM, I | m | 2470.65 | 2470.65 | 10.0 | False | None | None | False | None | False | 24706.5 | 0 | 3303555 | 115204 | None | Vol-2 Pg.no 127 It No. 13.55 of 2023-24 | Constructing brick masonry chamber for underground C.I. inspection chamber and bends with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) C.I. cover with frame (light duty) 600X850 mm internal dimensions, total weight of cover with frame to be not less than 38 kg (weight of cover 23 kg and weight of frame 15 kg), R.C.C. top slab with 1:1.5:3 mix (1 cement : 1.5 fine sand : 3 graded stone aggregate 20 mm nominal size), foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size), inside plastering 12 mm thick with cement mortar 1:3 (1 cement : 3 coarse sand), finished smooth with a floating coat of neat cement on walls and bed concrete etc.complete as per standard design: Inside dimensions 600x 850 mm and 45 cm deep for pipe line with three or more inlets : With common burnt clay (non modular) bricks of class designation3.5. ---- including cost of all materials, labour, HOM, I | No | 7771.05 | 7771.05 | 2.0 | False | None | None | False | None | False | 15542.1 | 0 |
| 1718710483000 | 1 | None | None | Buildings | CONSTRUCTION OF BUDDA BASAVA AMBEDKAR SAMSKRUTIKA BHAVANA AT CHIKKAVANKALAKUNTA IN HIREVANKALAKUNTA HOBLI, YELBURGA TALUK OF KOPPAL DISTRICT (FIRST FLOOR) | 12161009.29 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303556 | 115205 | None | Vol-1 Formwork Pg No 111 SI No. 9 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.COLUMNS ---- including cost of all materials, labour, HOM, I | Cum | 5079.9 | 5079.9 | 41.43 | False | None | None | False | None | False | 210460.257 | 0 | 3303557 | 115205 | None | Vol-1 Formwork Pg No 112 SI No. 14 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.BEAMS AND LINTEL ---- including cost of all materials, labour, HOM, I | Cum | 4354.2 | 4354.2 | 104.4 | False | None | None | False | None | False | 454578.48 | 0 | 3303558 | 115205 | None | Vol-1 Formwork Pg No 112 SI No. 15 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.Roof ---- including cost of all materials, labour, HOM, I | Cum | 3628.5 | 3628.5 | 129.32 | False | None | None | False | None | False | 469237.62 | 0 | 3303559 | 115205 | None | Vol-1 Formwork Pg No 112 SI No. 16 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.staircase ---- including cost of all materials, labour, HOM, I | Cum | 3628.5 | 3628.5 | 5.21 | False | None | None | False | None | False | 18904.485 | 0 | 3303560 | 115205 | None | Vol-1 Formwork Pg No 112 SI No. 19 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.Chejjas, Canopy & Other Architectural projections of minor sections ---- including cost of all materials, labour, HOM, I | Cum | 3164.0 | 3164.0 | 0.61 | False | None | None | False | None | False | 1930.04 | 0 | 3303561 | 115205 | None | Vol-1 Pg.no 16 It No. 2.5.2 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 7257.0 | 7257.0 | 280.35 | False | None | None | False | None | False | 2034499.95 | 0 | 3303562 | 115205 | None | Vol-1 Pg.no 16 It No. 2.5.1 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including cost of all materials, labour, HOM, I | Cum | 7031.12 | 7031.12 | 0.62 | False | None | None | False | None | False | 4359.2944 | 0 | 3303563 | 115205 | None | Vol-2 Pg.no 17 It No. 6.32 of 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1389.26 | 1389.26 | 667.57 | False | None | None | False | None | False | 927428.2982 | 0 | 3303564 | 115205 | None | Vol-2 Pg.no 17 It No. 6.34 of 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1170.79 | 1170.79 | 57.78 | False | None | None | False | None | False | 67648.2462 | 0 | 3303565 | 115205 | None | Vol-2 Pg.no 43 It No. 8.16.3 of 2023-24 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour for fixing complete as per specifications. ( length of mesh only be measured for paymentPlaster mesh 100mm wide ---- including cost of all materials, labour, HOM, I | m | 46.66 | 46.66 | 1956.84 | False | None | None | False | None | False | 91306.1544 | 0 | 3303566 | 115205 | None | Vol-2 Pg.no 41 It No. 8.1.2 of 2023-24 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 255.58 | 255.58 | 1217.76 | False | None | None | False | None | False | 311235.1008 | 0 | 3303567 | 115205 | None | Vol-2 Pg.no 42 It No. 8.9 of 2023-24 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 408.29 | 408.29 | 963.9 | False | None | None | False | None | False | 393550.731 | 0 | 3303568 | 115205 | None | Vol-2 Pg.no 41 It No. 8.2.1 of 2023-24 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 312.85 | 312.85 | 359.51 | False | None | None | False | None | False | 112472.7035 | 0 | 3303569 | 115205 | None | Vol-2 Pg.no 50 It No. 8.51 of 2023-24 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 106.05 | 106.05 | 2185.62 | False | None | None | False | None | False | 231785.001 | 0 | 3303570 | 115205 | None | Vol-2 Pg.no 46 It No. 8.30 of 2023-24 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 184.53 | 184.53 | 963.9 | False | None | None | False | None | False | 177868.467 | 0 | 3303571 | 115205 | None | Vol-2 Pg.no 48 It No. 8.39 of 2023-24 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 134.68 | 134.68 | 2185.62 | False | None | None | False | None | False | 294359.3016 | 0 | 3303572 | 115205 | None | Vol-2 Pg.no 61 It No. 9.19 of 2023-24 | Providing and laying Vitrified tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shade, in skirting, riser, treads of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average6 mm thickness, including grouting of joints as per direction of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 1243.97 | 1243.97 | 30.84 | False | None | None | False | None | False | 38364.0348 | 0 | 3303573 | 115205 | None | Vol-2 Pg.no 61 It No. 9.17.3 of 2023-24 | Providing and laying Vitrified tiles in different sizes (thickness to bespecified by manufacturer), with water absorption less than 0.08 % andconforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 800x800 mm ---- including cost of all materials, labour, HOM, I | Sqm | 1364.86 | 1364.86 | 532.08 | False | None | None | False | None | False | 726214.7088 | 0 | 3303574 | 115205 | None | Vol-2 Pg.no 60 It No. 9.11 of 2023-24 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White,
Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- including cost of all materials, labour, HOM, I | Sqm | 942.78 | 942.78 | 53.84 | False | None | None | False | None | False | 50759.2752 | 0 | 3303575 | 115205 | None | Vol-2 Pg.no 69 It No. 10.1.1 of 2023-24 | Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels.Area of the slab upto 0.50 M2 ---- including cost of all materials, labour, HOM, I | Sqm | 4248.36 | 4248.36 | 5.28 | False | None | None | False | None | False | 22431.3408 | 0 | 3303576 | 115205 | None | Vol-2 Pg.no 71 It No. 10.14 of 2023-24 | Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per m2, including pointing in white cement mixed with pigment of matching shade complete. ---- including cost of all materials, labour, HOM, I | Sqm | 1172.91 | 1172.91 | 179.33 | False | None | None | False | None | False | 210337.9503 | 0 | 3303577 | 115205 | None | Vol-2 Pg.no 99 It No. 12.11 of 2023-24 | Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 146427.48 | 146427.48 | 1.02 | False | None | None | False | None | False | 149356.0296 | 0 | 3303578 | 115205 | None | Vol-2 Pg.no 105 It No. 12.57.7 of 2023-24 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 40 mm thick both side Teak ---- including cost of all materials, labour, HOM, I | Sqm | 5260.08 | 5260.08 | 31.68 | False | None | None | False | None | False | 166639.3344 | 0 | 3303579 | 115205 | None | Vol-2 Pg.no 104 It No. 12.54 of 2023-24 | Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Rmtr | 337.24 | 337.24 | 42.0 | False | None | None | False | None | False | 14164.08 | 0 | 3303580 | 115205 | None | Vol-2 Pg.no 104 It No. 12.55.2 of 2023-24 | Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for stiles and 15x15mm for top & bottom rails, covered with heat moulded PrelaminatedPVC C Channel of 5mm thick sheet & 30x50mm wide to form stiles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the stiles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm Aluminium hinges. with one side prelam ---- including cost of all materials, labour, HOM, I | Sqm | 2163.42 | 2163.42 | 15.12 | False | None | None | False | None | False | 32710.9104 | 0 | 3303581 | 115205 | None | Vol-2 Pg.no 104 It No. 12.51 of 2023-24 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labour, HOM, I | Nos | 1077.47 | 1077.47 | 11.0 | False | None | None | False | None | False | 11852.17 | 0 | 3303582 | 115205 | None | Vol-2 Pg.no 110 It No. 12.90 of 2023-24 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size -2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I | Sqm | 7141.41 | 7141.41 | 63.0 | False | None | None | False | None | False | 449908.83 | 0 | 3303583 | 115205 | None | Vol-2 Pg.no 109 It No. 12.85 of 2023-24 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size-1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I | Sqm | 6065.0 | 6065.0 | 13.95 | False | None | None | False | None | False | 84606.75 | 0 | 3303584 | 115205 | None | Vol-2 Pg.no 86 It No. 11.34B of 2023-24 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- including cost of all materials, labour, HOM, I | Kg | 194.07 | 194.07 | 2203.87 | False | None | None | False | None | False | 427705.0509 | 0 | 3303585 | 115205 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 121.96 | 121.96 | 104.95 | False | None | None | False | None | False | 12799.702 | 0 | 3303586 | 115205 | None | Vol-2 Pg.no 50 It No. 8.55.1 of 2023-24 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 59.39 | 59.39 | 76.03 | False | None | None | False | None | False | 4515.4217 | 0 | 3303587 | 115205 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 121.96 | 121.96 | 76.03 | False | None | None | False | None | False | 9272.6188 | 0 | 3303588 | 115205 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | KSRB 4-2.12 : Extra for providing throating or drip moulding to R.C.C. chajja with plastering ( labour charges only ) as per specifications. ---- including cost of all materials, labour, HOM, I | m | 34.65 | 34.65 | 245.34 | False | None | None | False | None | False | 8501.031 | 0 | 3303589 | 115205 | None | Vol-2 Pg.no 149 It No. 15.1 of 2023-24 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace /Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification ---- including cost of all materials, labour, HOM, I | Sqm | 866.43 | 866.43 | 261.75 | False | None | None | False | None | False | 226788.0525 | 0 | 3303590 | 115205 | None | Vol-2 Pg.no 23 It No. 7.18 of 2023-24 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 2139.03 | 2139.03 | 16.15 | False | None | None | False | None | False | 34545.3345 | 0 | 3303591 | 115205 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | Bore Packing : Providing & applying high strength non shrink free flow grout (confirming to BS 1881-Part 116 : 1983)comprising of blend of portland cement, graded fillars and chemical additives which impart controlled expansion in the plastic state duly minimizing water demand. (Minimum 25mm thickness around the pipe) ---- including cost of all materials, labour, HOM, I | Nos | 295.0 | 295.0 | 29.0 | False | None | None | False | None | False | 8555.0 | 0 | 3303592 | 115205 | None | Vol-2 Pg.no 105 It No. 12.60 of 2023-24 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1104.6 | 1104.6 | 12.0 | False | None | None | False | None | False | 13255.2 | 0 | 3303593 | 115205 | None | Vol-2 Pg.no 218 It No. 22.15.2 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in chargeSS Handles 300mm ---- including cost of all materials, labour, HOM, I | Nos | 577.5 | 577.5 | 11.0 | False | None | None | False | None | False | 6352.5 | 0 | 3303594 | 115205 | None | Vol-2 Pg.no 219 It No. 22.15.7 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolts 250x10mm. ---- including cost of all materials, labour, HOM, I | Nos | 210.0 | 210.0 | 22.0 | False | None | None | False | None | False | 4620.0 | 0 | 3303595 | 115205 | None | Vol-2 Pg.no 219 It No. 22.15.8 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm. ---- including cost of all materials, labour, HOM, I | Nos | 52.5 | 52.5 | 88.0 | False | None | None | False | None | False | 4620.0 | 0 | 3303596 | 115205 | None | Vol-2 Pg.no 219 Sl No. 444 of 2023-24 | Hold fasts ---- including cost of all materials, labour, HOM, I | Nos | 50.0 | 50.0 | 88.0 | False | None | None | False | None | False | 4400.0 | 0 | 3303597 | 115205 | None | Vol-2 Pg.no A27 Sl No. 500 of 2023-24 | Magnetic catcher triple type. ---- including cost of all materials, labour, HOM, I | Nos | 31.5 | 31.5 | 22.0 | False | None | None | False | None | False | 693.0 | 0 | 3303598 | 115205 | None | Vol-2 Pg.no 219 It No. 22.15.4 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 300mm. ---- including cost of all materials, labour, HOM, I | Nos | 393.75 | 393.75 | 11.0 | False | None | None | False | None | False | 4331.25 | 0 | 3303599 | 115205 | None | Vol-2 Pg.no 105 It No. 12.59 of 2023-24 | Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1169.7 | 1169.7 | 11.0 | False | None | None | False | None | False | 12866.7 | 0 | 3303600 | 115205 | None | Vol-2 Pg.no 219 It No. 22.15.10 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Door stopper 75mm. ---- including cost of all materials, labour, HOM, I | Nos | 105.0 | 105.0 | 11.0 | False | None | None | False | None | False | 1155.0 | 0 | 3303601 | 115205 | None | Vol-2 Pg.no A14 Sl No. 84 of 2023-24 | Brass Screws of 50mm ---- including cost of all materials, labour, HOM, I | Nos | 5.25 | 5.25 | 792.0 | False | None | None | False | None | False | 4158.0 | 0 | 3303602 | 115205 | None | Vol-2 Pg.no A28 Sl No. 548 of 2023-24 | Nails of varying sizes. ---- including cost of all materials, labour, HOM, I | Kgs | 70.35 | 70.35 | 20.0 | False | None | None | False | None | False | 1407.0 | 0 | 3303603 | 115205 | None | Vol-2 Pg.no A25 Sl No. 448 of 2023-24 | Honne wood beading 20x20 mm. ---- including cost of all materials, labour, HOM, I | m | 57.75 | 57.75 | 79.2 | False | None | None | False | None | False | 4573.8 | 0 | 3303604 | 115205 | None | Vol-1 Pg.no 18 It No. 2.11.a of 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft
annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- including cost of all materials, labour, HOM, I | Tonne | 94869.15 | 94869.15 | 38.02 | False | None | None | False | None | False | 3606925.083 | 0 |
| 1718710483000 | 1 | None | None | Buildings | CONSTRUCTION OF BUDDA BASAVA AMBEDKAR SAMSKRUTIKA BHAVANA AT CHIKKAVANKALAKUNTA IN HIREVANKALAKUNTA HOBLI, YELBURGA TALUK OF KOPPAL DISTRICT (Terrace Floor) | 6586093.98 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303605 | 115206 | None | Vol-1 Formwork Pg No 111 SI No. 9 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding. COLUMNS ---- including cost of all materials, labour, HOM, I | Cum | 5130.2 | 5130.2 | 6.91 | False | None | None | False | None | False | 35449.682 | 0 | 3303606 | 115206 | None | Vol-1 Formwork Pg No 112 SI No. 14 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.BEAMS AND LINTEL ---- including cost of all materials, labour, HOM, I | Cum | 4397.31 | 4397.31 | 28.56 | False | None | None | False | None | False | 125587.1736 | 0 | 3303607 | 115206 | None | Vol-1 Formwork Pg No 112 SI No. 15 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding.Roof ---- including cost of all materials, labour, HOM, I | Cum | 3664.43 | 3664.43 | 6.98 | False | None | None | False | None | False | 25577.7214 | 0 | 3303608 | 115206 | None | Vol-1 Formwork Pg No 112 SI No. 19 of 2023-24 | Addendum I - Percentage Additionalities for Formwork, Centering & Scaffolding. Chejjas, Canopy & Other Architectural projections of minor sections ---- including cost of all materials, labour, HOM, I | Cum | 3195.33 | 3195.33 | 0.19 | False | None | None | False | None | False | 607.1127 | 0 | 3303609 | 115206 | None | Vol-1 Pg.no 16 It No. 2.5.2 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, labour, HOM, I | Cum | 7328.85 | 7328.85 | 36.6 | False | None | None | False | None | False | 268235.91 | 0 | 3303610 | 115206 | None | Vol-1 Pg.no 15 It No. 2.1.4 of 2023-24 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of
machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, labour, HOM, I | Cum | 6658.41 | 6658.41 | 11.68 | False | None | None | False | None | False | 77770.2288 | 0 | 3303611 | 115206 | None | Vol-1 Pg.no 16 It No. 2.5.1 of 2023-24 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- including cost of all materials, labour, HOM, I | Cum | 7100.73 | 7100.73 | 0.19 | False | None | None | False | None | False | 1349.1387 | 0 | 3303612 | 115206 | None | Vol-2 Pg.no 17 It No. 6.32 of 2023-24 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005
including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- including cost of all materials, labour, HOM, I | Sqm | 1403.01 | 1403.01 | 238.07 | False | None | None | False | None | False | 334014.5907 | 0 | 3303613 | 115206 | None | Vol-2 Pg.no 43 It No. 8.16.3 of 2023-24 | Providing and fixing suitable plaster mesh 100mm wide manufactured out of hot dipped galvanised iron of nominal thickness 0.35mm with a zinc coating of 120g/m2 width, along route of walls chipped for services, junction between RCC and brick walls including cost of materials, labour
for fixing complete as per specifications. ( length of mesh only be measured for paymentPlaster mesh 100mm wide ---- including cost of all materials, labour, HOM, I | m | 47.12 | 47.12 | 482.86 | False | None | None | False | None | False | 22752.3632 | 0 | 3303614 | 115206 | None | Vol-2 Pg.no 41 It No. 8.1.2 of 2023-24 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 258.11 | 258.11 | 51.19 | False | None | None | False | None | False | 13212.6509 | 0 | 3303615 | 115206 | None | Vol-2 Pg.no 42 It No. 8.9 of 2023-24 | Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 412.34 | 412.34 | 670.47 | False | None | None | False | None | False | 276461.5998 | 0 | 3303616 | 115206 | None | Vol-2 Pg.no 50 It No. 8.51 of 2023-24 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 107.1 | 107.1 | 97.75 | False | None | None | False | None | False | 10469.025 | 0 | 3303617 | 115206 | None | Vol-2 Pg.no 46 It No. 8.30 of 2023-24 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 186.35 | 186.35 | 670.47 | False | None | None | False | None | False | 124942.0845 | 0 | 3303618 | 115206 | None | Vol-2 Pg.no 48 It No. 8.39 of 2023-24 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 136.02 | 136.02 | 97.75 | False | None | None | False | None | False | 13295.955 | 0 | 3303619 | 115206 | None | Vol-2 Pg.no 61 It No. 9.17.3 of 2023-24 | Providing and laying Vitrified tiles in different sizes (thickness to bespecified by manufacturer), with water absorption less than 0.08 % andconforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. Size of Tile 800x800 mm ---- including cost of all materials, labour, HOM, I | Sqm | 1378.38 | 1378.38 | 27.83 | False | None | None | False | None | False | 38360.3154 | 0 | 3303620 | 115206 | None | Vol-2 Pg.no 99 It No. 12.11 of 2023-24 | Providing Honne wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including cost of all materials, labour, HOM, I | Cum | 147877.25 | 147877.25 | 0.08 | False | None | None | False | None | False | 11830.18 | 0 | 3303621 | 115206 | None | Vol-2 Pg.no 105 It No. 12.57.7 of 2023-24 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 40 mm thick both side Teak ---- including cost of all materials, labour, HOM, I | Sqm | 5312.16 | 5312.16 | 2.52 | False | None | None | False | None | False | 13386.6432 | 0 | 3303622 | 115206 | None | Vol-2 Pg.no 104 It No. 12.51 of 2023-24 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- including cost of all materials, labour, HOM, I | Nos | 1088.14 | 1088.14 | 1.0 | False | None | None | False | None | False | 1088.14 | 0 | 3303623 | 115206 | None | Vol-2 Pg.no 110 It No. 12.90 of 2023-24 | Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size - 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- including cost of all materials, labour, HOM, I | Sqm | 7212.11 | 7212.11 | 1.8 | False | None | None | False | None | False | 12981.798 | 0 | 3303624 | 115206 | None | Vol-2 Pg.no 86 It No. 11.34B of 2023-24 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- including cost of all materials, labour, HOM, I | Kg | 195.99 | 195.99 | 37.8 | False | None | None | False | None | False | 7408.422 | 0 | 3303625 | 115206 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 123.17 | 123.17 | 1.8 | False | None | None | False | None | False | 221.706 | 0 | 3303626 | 115206 | None | Vol-2 Pg.no 50 It No. 8.55.1 of 2023-24 | Applying priming coats with primer of approved brand and manufacture, having low VOC (Volatile Organic Compound) content. With ready mixed pink or grey primer on wood work (hard and soft wood) having VOC content less than 50 grams/ litre as per specifications and as per directions of Engineer in charge. ---- including cost of all materials, labour, HOM, I | Sqm | 59.98 | 59.98 | 6.05 | False | None | None | False | None | False | 362.879 | 0 | 3303627 | 115206 | None | Vol-2 Pg.no 48 It No. 8.40 of 2023-24 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including cost of all materials, labour, HOM, I | Sqm | 123.17 | 123.17 | 6.05 | False | None | None | False | None | False | 745.1785 | 0 | 3303628 | 115206 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | KSRB 4-2.12 : Extra for providing throating or drip moulding to R.C.C. chajja with plastering ( labour charges only ) as per specifications. ---- including cost of all materials, labour, HOM, I | m | 35.34 | 35.34 | 216.85 | False | None | None | False | None | False | 7663.479 | 0 | 3303629 | 115206 | None | Vol-2 Pg.no 105 It No. 12.60 of 2023-24 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1104.6 | 1104.6 | 1.0 | False | None | None | False | None | False | 1104.6 | 0 | 3303630 | 115206 | None | Vol-2 Pg.no 218 It No. 22.15.2 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in chargeSS Handles 300mm ---- including cost of all materials, labour, HOM, I | Nos | 577.5 | 577.5 | 1.0 | False | None | None | False | None | False | 577.5 | 0 | 3303631 | 115206 | None | Vol-2 Pg.no 219 It No. 22.15.7 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Tower Bolts 250x10mm. ---- including cost of all materials, labour, HOM, I | Nos | 210.0 | 210.0 | 2.0 | False | None | None | False | None | False | 420.0 | 0 | 3303632 | 115206 | None | Vol-2 Pg.no 219 It No. 22.15.8 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS hinges 125 mm. ---- including cost of all materials, labour, HOM, I | Nos | 52.5 | 52.5 | 8.0 | False | None | None | False | None | False | 420.0 | 0 | 3303633 | 115206 | None | Vol-2 Pg.no 219 Sl No. 444 of 2023-24 | Hold fasts ---- including cost of all materials, labour, HOM, I | Nos | 50.0 | 50.0 | 8.0 | False | None | None | False | None | False | 400.0 | 0 | 3303634 | 115206 | None | Vol-2 Pg.no A27 Sl No. 500 of 2023-24 | Magnetic catcher triple type. ---- including cost of all materials, labour, HOM, I | Nos | 31.5 | 31.5 | 2.0 | False | None | None | False | None | False | 63.0 | 0 | 3303635 | 115206 | None | Vol-2 Pg.no 219 It No. 22.15.4 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Aldrop 16mm dia, 300mm. ---- including cost of all materials, labour, HOM, I | Nos | 393.75 | 393.75 | 1.0 | False | None | None | False | None | False | 393.75 | 0 | 3303636 | 115206 | None | Vol-2 Pg.no 105 It No. 12.59 of 2023-24 | Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. ---- including cost of all materials, labour, HOM, I | Nos | 1169.7 | 1169.7 | 1.0 | False | None | None | False | None | False | 1169.7 | 0 | 3303637 | 115206 | None | Vol-2 Pg.no 219 It No. 22.15.10 of 2023-24 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Door stopper 75mm. ---- including cost of all materials, labour, HOM, I | Nos | 105.0 | 105.0 | 1.0 | False | None | None | False | None | False | 105.0 | 0 | 3303638 | 115206 | None | Vol-2 Pg.no A14 Sl No. 84 of 2023-24 | Brass Screws of 50mm ---- including cost of all materials, labour, HOM, I | Nos | 5.25 | 5.25 | 72.0 | False | None | None | False | None | False | 378.0 | 0 | 3303639 | 115206 | None | Vol-2 Pg.no A28 Sl No. 548 of 2023-24 | Nails of varying sizes ---- including cost of all materials, labour, HOM, I | Kgs | 70.35 | 70.35 | 10.0 | False | None | None | False | None | False | 703.5 | 0 | 3303640 | 115206 | None | Vol-2 Pg.no 82 It No. 11.16.2 of 2023-24 | Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished seamless type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- including cost of all materials, labour, HOM, I | Kg | 154.35 | 154.35 | 18748.01 | False | None | None | False | None | False | 2893755.3435 | 0 | 3303641 | 115206 | None | Vol-2 Pg.no 38 It No. 7.67.2 of 2023-24 | Providing,fabricating and fixing Profiled Poly Urethane insulated Roof(PUF Sheet) having modular density 40kg/m2 and size 1.06m width and 7.60m length sheets roof having external sheet of 0.5mm steel, bottom sheet of 0.40mm steel with powder coated finish. The precoated sheet shall be of minimum 240MPa steel conforming to IS 14246 : 1995 and shal have zinc coating with minimum 120gsm as per IS 277:1992,.The roofing system shall have suitable water proof over lapping arrangments and GRIHA ceritifed.The fasting shall be of self tapping screws of required length with PVC head along with washer pre-painted aluminium cap unit with build in seal arrangments.The entire roof shall be firmly fastened to the existng frame including all lead and lifts, loading & unloading ,usage charges of machinery and equipments, transportation charges,labour charges and all other incidental charges etc.,complete as per standard technical detailed specifications and as directed by the Engineer in charge of the work. 50mm thickness ---- including cost of all materials, labour, HOM, I | Sqm | 2724.75 | 2724.75 | 474.63 | False | None | None | False | None | False | 1293248.0925 | 0 | 3303642 | 115206 | None | Vol-1 Pg.no 18 It No. 2.11.a of 2023-24 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- including cost of all materials, labour, HOM, I | Tonne | 95808.45 | 95808.45 | 10.12 | False | None | None | False | None | False | 969581.514 | 0 |
| 1718710483000 | 0 | None | None | Buildings | Electrical Works for Ground Floor | 302470.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303643 | 115207 | None | Vol-6 Pg.no 4 It No. 1.13 of 2023-24 | Supply and fixing one metal Fan box with round hook ---- including cost of all materials, labour, HOM, I | Each | 117.0 | 117.0 | 50.0 | False | None | None | False | None | False | 5850.0 | 0 | 3303644 | 115207 | None | Vol-6 Pg.no 2 It No. 1.1.1 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 20 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 69.0 | 69.0 | 110.0 | False | None | None | False | None | False | 7590.0 | 0 | 3303645 | 115207 | None | Vol-6 Pg.no 2 It No. 1.1.2 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 25 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 81.0 | 81.0 | 60.0 | False | None | None | False | None | False | 4860.0 | 0 | 3303646 | 115207 | None | Vol-6 Pg.no 2 It No. 1.1.3 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 32 mm dia 2.5mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 106.0 | 106.0 | 75.0 | False | None | None | False | None | False | 7950.0 | 0 | 3303647 | 115207 | None | Vol-6 Pg.no 2 It No. 1.2.1 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 20 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 66.0 | 66.0 | 950.0 | False | None | None | False | None | False | 62700.0 | 0 | 3303648 | 115207 | None | Vol-6 Pg.no 2 It No. 1.2.2 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 25 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 78.0 | 78.0 | 1200.0 | False | None | None | False | None | False | 93600.0 | 0 | 3303649 | 115207 | None | Vol-6 Pg.no 2 It No. 1.2.3 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 32 mm dia 2.5mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 103.0 | 103.0 | 600.0 | False | None | None | False | None | False | 61800.0 | 0 | 3303650 | 115207 | None | Vol-6 Pg.no 2 It No. 1.3.1 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 20 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 68.0 | 68.0 | 250.0 | False | None | None | False | None | False | 17000.0 | 0 | 3303651 | 115207 | None | Vol-6 Pg.no 2 It No. 1.3.2 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 25 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 79.0 | 79.0 | 300.0 | False | None | None | False | None | False | 23700.0 | 0 | 3303652 | 115207 | None | Vol-6 Pg.no 2 It No. 1.3.3 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 32 mm dia 2.5mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 99.0 | 99.0 | 50.0 | False | None | None | False | None | False | 4950.0 | 0 | 3303653 | 115207 | None | Vol-6 Pg.no 3 It No. 1.5.1 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 19/20mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 49.0 | 49.0 | 80.0 | False | None | None | False | None | False | 3920.0 | 0 | 3303654 | 115207 | None | Vol-6 Pg.no 3 It No. 1.5.2 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 25mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 56.0 | 56.0 | 120.0 | False | None | None | False | None | False | 6720.0 | 0 | 3303655 | 115207 | None | Vol-6 Pg.no 3 It No. 1.5.3 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 32mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 61.0 | 61.0 | 30.0 | False | None | None | False | None | False | 1830.0 | 0 |
| 1718710483000 | 0 | None | None | Buildings | Electrical Works for First Floor | 199166.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303656 | 115208 | None | Vol-6 Pg.no 4 It No. 1.13 of 2023-24 | Supply and fixing one metal Fan box with round hook ---- including cost of all materials, labour, HOM, I | Each | 117.0 | 117.0 | 25.0 | False | None | None | False | None | False | 2925.0 | 0 | 3303657 | 115208 | None | Vol-6 Pg.no 2 It No. 1.2.1 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 20 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 66.0 | 66.0 | 800.0 | False | None | None | False | None | False | 52800.0 | 0 | 3303658 | 115208 | None | Vol-6 Pg.no 2 It No. 1.2.2 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 25 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 78.0 | 78.0 | 950.0 | False | None | None | False | None | False | 74100.0 | 0 | 3303659 | 115208 | None | Vol-6 Pg.no 2 It No. 1.2.3 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with suitable size bends / metal / PVC junction boxes adhesive paste etc..and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wires where ever necessary 32 mm dia 2.5mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 103.0 | 103.0 | 300.0 | False | None | None | False | None | False | 30900.0 | 0 | 3303660 | 115208 | None | Vol-6 Pg.no 2 It No. 1.3.1 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 20 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 68.0 | 68.0 | 150.0 | False | None | None | False | None | False | 10200.0 | 0 | 3303661 | 115208 | None | Vol-6 Pg.no 2 It No. 1.3.2 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 25 mm dia 2mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 79.0 | 79.0 | 200.0 | False | None | None | False | None | False | 15800.0 | 0 | 3303662 | 115208 | None | Vol-6 Pg.no 2 It No. 1.3.3 of 2023-24 | Supplying 2 mm thick heavy gauge PVC conduit pipe with bends metal junction boxes adhesives paste etc and bracing U or J hooks and cement plastering upto the surface of the trick level and run with 18 SWG Gi fish wire run through out the conduit wherever necessary 32 mm dia 2.5mm thick ---- including cost of all materials, labour, HOM, I | Mtr | 99.0 | 99.0 | 35.0 | False | None | None | False | None | False | 3465.0 | 0 | 3303663 | 115208 | None | Vol-6 Pg.no 3 It No. 1.5.1 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 19/20mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 49.0 | 49.0 | 60.0 | False | None | None | False | None | False | 2940.0 | 0 | 3303664 | 115208 | None | Vol-6 Pg.no 3 It No. 1.5.2 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 25mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 56.0 | 56.0 | 86.0 | False | None | None | False | None | False | 4816.0 | 0 | 3303665 | 115208 | None | Vol-6 Pg.no 3 It No. 1.5.3 of 2023-24 | Supplying and fixing PVC/metal conduit deep junction box 32mm deep junction box ---- including cost of all materials, labour, HOM, I | Each | 61.0 | 61.0 | 20.0 | False | None | None | False | None | False | 1220.0 | 0 |
| 1718710484000 | 0 | None | None | Buildings | Sinking bore well | 578214.1 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3303666 | 115209 | None | Vol-5 Pg.no 140 It No. 12.4 of 2023-24 | Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete ---- including cost of all materials, labour, HOM, I | Each | 5552.4 | 5552.4 | 2.0 | False | None | None | False | None | False | 11104.8 | 0 | 3303667 | 115209 | None | Vol-5 Pg.no 140 It No. 12.5 of 2023-24 | Cleaning of borewells including yield testing of borewell either using slow or fast rigs for not more than 2 hours at the final depth with a minimum working of 2 hours continuously with air compressor or suitable pump as per specification, including the cost of transportation charges, crew charges, cost of consumables etc. complete ---- including cost of all materials, labour, HOM, I | Each | 19910.1 | 19910.1 | 1.0 | False | None | None | False | None | False | 19910.1 | 0 | 3303668 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.1 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 0 to 50 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 388.5 | 388.5 | 50.0 | False | None | None | False | None | False | 19425.0 | 0 | 3303669 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.2 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 50 to 100 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 487.2 | 487.2 | 50.0 | False | None | None | False | None | False | 24360.0 | 0 | 3303670 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.3 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 100 to 150 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 517.65 | 517.65 | 50.0 | False | None | None | False | None | False | 25882.5 | 0 | 3303671 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.4 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 150 to 200 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 600.6 | 600.6 | 50.0 | False | None | None | False | None | False | 30030.0 | 0 | 3303672 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.5 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 200 to 250 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 704.55 | 704.55 | 50.0 | False | None | None | False | None | False | 35227.5 | 0 | 3303673 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.6 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 250 to 300 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 777.0 | 777.0 | 50.0 | False | None | None | False | None | False | 38850.0 | 0 | 3303674 | 115209 | None | Vol-5 Pg.no 139 It No. 12.1.7 of 2023-24 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 300 to 350 Mtrs ---- including cost of all materials, labour, HOM, I | Rmtr | 911.4 | 911.4 | 50.0 | False | None | None | False | None | False | 45570.0 | 0 | 3303675 | 115209 | None | Vol-5 Pg.no 152 It No. 13.16.7 of 2023-24 | Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. 10.00 HP - 90 LPM @ 220 m = 20 STG Outlet Dia - 2.00 ---- including cost of all materials, labour, HOM, I | Nos | 57342.6 | 57342.6 | 1.0 | False | None | None | False | None | False | 57342.6 | 0 | 3303676 | 115209 | None | Vol-5 Pg.no 143 It No. 12.33 of 2023-24 | Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments ---- including cost of all materials, labour, HOM, I | Nos | 157.5 | 157.5 | 5.0 | False | None | None | False | None | False | 787.5 | 0 | 3303677 | 115209 | None | Vol-5 Pg.no 143 It No. 12.34 of 2023-24 | Providing and laying at site of work MS casing caps as per IS 1239 (part- II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by
the Engineer in charge ---- including cost of all materials, labour, HOM, I | Nos | 172.2 | 172.2 | 1.0 | False | None | None | False | None | False | 172.2 | 0 | 3303678 | 115209 | None | Approved by SE Vide ltr No 1598 Dt.13.09.2023 | KSRB-13-9.2 : Providing and fixing to wall, ceiling and floor, high density polyethylene pipes 6.00 kgf/sq.cm working pressure 40mm outside diameter with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. 40mm dia ---- including cost of all materials, labour, HOM, I | Rmtr | 262.0 | 262.0 | 25.0 | False | None | None | False | None | False | 6550.0 | 0 | 3303679 | 115209 | None | Vol-5 Pg.no 113 It No. 10.1.9 of 2023-24 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 160mm dia, 6 kg/sqcm & class 3 ---- including cost of all materials, labour, HOM, I | Rmtr | 648.9 | 648.9 | 300.0 | False | None | None | False | None | False | 194670.0 | 0 | 3303680 | 115209 | None | Vol-5 Pg.no 133 It No. 11.15.6 of 2023-24 | Supply and delivery at site GM (copper alloy) gate valves confirming to Class-I as per IS 778 with latest amendments, 1 No. screwed in bonnet inside screw, rising spring spindle integral seat screwed females ends confirming to IS 554/ 1990 body hydraulically tested 1.5HP seat standard tested 1 HP with IS mark. For 50 mm dia GM (Copper alloy) Gate valves ---- including cost of all materials, labour, HOM, I | Each | 1772.4 | 1772.4 | 1.0 | False | None | None | False | None | False | 1772.4 | 0 | 3303681 | 115209 | None | Vol-5 Pg.no 154 It No. 13.25.1 of 2023-24 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- including cost of all materials, labour, HOM, I | Each | 1312.5 | 1312.5 | 1.0 | False | None | None | False | None | False | 1312.5 | 0 | 3303682 | 115209 | None | Vol-5 Pg.no 154 It No. 13.22.2 of 2023-24 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments.1x3x2.5 Sqm ---- including cost of all materials, labour, HOM, I | m | 89.25 | 89.25 | 400.0 | False | None | None | False | None | False | 35700.0 | 0 | 3303683 | 115209 | None | Vol-1 Pg.no 5 It No. 1.4.1 of 2023-24 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sidesneatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work.In all kinds of soils Depth upto 1.5 ---- including cost of all materials, labour, HOM, I | Cum | 254.1 | 254.1 | 70.0 | False | None | None | False | None | False | 17787.0 | 0 | 3303684 | 115209 | None | Vol-1 Pg.no 7 It No. 1.10 of 2023-24 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- including cost of all materials, labour, HOM, I | Cum | 168.0 | 168.0 | 70.0 | False | None | None | False | None | False | 11760.0 | 0 |
|
|
---|