createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1710571222339
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd17125.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose04-07-2024 17:00:00
tenderQueryClose03-07-2024 17:00:00
technicalBidOpenNone
publishedDate24-06-2024 15:29:58
publishedByPostCMC_MCOM_UDP
publishedByUserKPE15327 - RAYAPPA
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonyashwantha prabhu
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9743412642
tenderSupplierListNone
tenderSchedule
createdTs1710571222367
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT17485
titleConstruction of Concrete chamber new colony 10 and 11 th cross in Kodankoor ward
descriptionConstruction of Concrete chamber new colony 10 and 11 th cross in Kodankoor ward
categoryWORKS
categoryTextWorks
ecv681435.12
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2411
locationNameDMA City Municipal Council Udupi
provisionalAmount685000.0
groupOverheadTotal103947.73
fileNumberUCMC/CR/B2/CR/309/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17105712220000NoneNoneOther WorksConstruction of Concrete chamber new colony 10 and 11 th cross in Kodankoor ward577487.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3117552107118Nonecode01Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Pg 10, Item No. 1.17.1 Vol I PWDSR 2023-24) All kinds of soils. Depth upto 1.50 mCum293.44293.44115.4FalseNoneNoneFalseNoneFalse33862.9760
3117553107118Nonecode02Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Pg 10, Item No. 1.17.3 Vol I PWDSR 2023-24) Depth exceeding 1.5 m, but not exceeding 3 mCum370.72370.7269.24FalseNoneNoneFalseNoneFalse25668.65280
3117554107118Nonecode03Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (Pg 15, Item No. 2.1.3 Vol I PWDSR 2023-24)Cum6707.686707.688.22FalseNoneNoneFalseNoneFalse55137.12960
3117555107118Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcementincluding cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Sl. No.3.7, 406 P.No. 16/CSR 2021-22 VOL-3Tonne96804.9696804.961.888FalseNoneNoneFalseNoneFalse182767.764480
3117556107118Nonecode05Providing and laying in Cement Concrete for all Basement & surface levelworks, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevantIS Codes machine mixed with super plasticisers, laid in layers, well compactedusing needle vibrators, providing weep holes wherever necessary, including alllead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ( Page no 16, item no2.3.1 , UNI SR 2023-24)Cum12038.9912038.9919.6FalseNoneNoneFalseNoneFalse235964.2040
3117557107118Nonecode06Supplying and fixing SFRC frame and cover conforming to IS 12592 (partI)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete (/CSR 2023-24 Item no. 16.23.2 of page no. 196) vol-v , Heavy DutyNo2871.682871.688.0FalseNoneNoneFalseNoneFalse22973.440
3117558107118Nonecode07Providing, laying, spreading and compacting graded stoneaggregate to wet mix macadam specification including premixingthe Material with water at OMC in mechanical mix plant carriageof mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density Sl. No.4.17, 406 P.No. 31/CSR 2023-24 VOL-3Cum2866.082866.085.4FalseNoneNoneFalseNoneFalse15476.8320
3117559107118Nonecode08Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Sl. No.1.10 P.No. 7/CSR 2021-22 vol-1Cum134.2134.242.0FalseNoneNoneFalseNoneFalse5636.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17105712230000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17105712230000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17105712230000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17105712230000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17105712230000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17105712230000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17105712230000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17105712230000NoneNoneELIGIBILITYBanker DetailsNone
17105712480000NoneNoneELIGIBILITYGST shall be paid SeparatelyNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Similar work done CertificateTrueTechnical Bid
ESI &EPF registration certificateTrueTechnical Bid
Unbalanced tender difference amount in the form of FDR-100 percentage -excluding 10 percentageTrueTechnical Bid
Payment more towards workers ESI &EPF challan up to till monthTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone