1710502436000 | 0 | None | None | Roads | Reconstruction of concrete 4 chamber doddanagudde hudco colony 1st cross road in Gundibail ward | 357815.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3094245 | 106363 | None | code01 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Pg 10, Item No. 1.17.1 Vol I PWDSR 2021-22) All kinds of soils. Depth upto 1.50 m | Cum | 217.28 | 217.28 | 57.7 | False | None | None | False | None | False | 12537.056 | 0 | 3094246 | 106363 | None | code02 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Pg 10, Item No. 1.17.3 Vol I PWDSR 2021-22) Depth exceeding 1.5 m, but not exceeding 3 m | Cum | 275.52 | 275.52 | 57.7 | False | None | None | False | None | False | 15897.504 | 0 | 3094247 | 106363 | None | code03 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(Pg 10, Item No. 1.17.2 Vol I PWDSR 2021-22) Depth exceeding 3 m, but not exceeding 4.50 m | Cum | 403.2 | 403.2 | 46.16 | False | None | None | False | None | False | 18611.712 | 0 | 3094248 | 106363 | None | code04 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates)(Pg 15, Item No. 2.1.3 Vol I PWDSR 2021-22) (Revised rate w.e.f from 04-01-2023) | Cum | 6220.48 | 6220.48 | 5.19 | False | None | None | False | None | False | 32284.2912 | 0 | 3094249 | 106363 | None | code05 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (Revised rate w.e.f from 04-01-2023) | Kg | 103.04 | 103.04 | 976.5 | False | None | None | False | None | False | 100618.56 | 0 | 3094250 | 106363 | None | code06 | Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)( Page no 16, item no2.3.1 , UNI SR 2021-22) (Revised rate w.e.f from 04-01-2023) | Cum | 9692.03 | 9692.03 | 15.96 | False | None | None | False | None | False | 154684.7988 | 0 | 3094251 | 106363 | None | code07 | Supplying and fixing SFRC frame and cover conforming to IS 12592 (partI)-1988 and IS 12592 (part-II)- 1991 with latest amendment, including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete (/CSR 2021-22 Item no. 22 of page no. 15) vol-v T380 , Heavy Duty | Cum | 2416.0 | 2416.0 | 4.0 | False | None | None | False | None | False | 9664.0 | 0 | 3094252 | 106363 | None | code08 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Sl. No.4.27, 406 P.No. 24/CSR 2021-22 VOL-3 | Cum | 2681.28 | 2681.28 | 3.78 | False | None | None | False | None | False | 10135.2384 | 0 | 3094253 | 106363 | None | code09 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications Sl. No.1.10 P.No. 7/CSR 2021-22 vol-1 | Cum | 134.2 | 134.2 | 25.2 | False | None | None | False | None | False | 3381.84 | 0 |
|