tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1719226821000 | 1 | None | None | Water supply/sewage lines | Openwell 3.00 mtr dia meter (4.5m depth) Masonry work at prop ELSR-1 | 288194.62 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337002 | 117128 | None | code01 | Openwell 3.00 mtr dia meter (4.5m depth) (well sinking) Masonry work at prop. ELSR-1 (ZONE-1) : Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 0.00 to 1.50 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 361.76 | 361.76 | 55.29 | False | None | None | False | None | False | 20001.7104 | 0 | 3337003 | 117128 | None | code02 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 1.50 to 3.00 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 425.6 | 425.6 | 38.62 | False | None | None | False | None | False | 16436.672 | 0 | 3337004 | 117128 | None | code03 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 665.28 | 665.28 | 29.16 | False | None | None | False | None | False | 19399.5648 | 0 | 3337005 | 117128 | None | code04 | Providing and constructing granite / trap / basalt size stone masonry in foundation cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5295.53 | 5295.53 | 24.14 | False | None | None | False | None | False | 127834.0942 | 0 | 3337006 | 117128 | None | code05 | Renewing wooden beams in roofs including making good the holes in
walls and painting with oil type wood preservative of approved brand
and manufacture complete, including removal of rubbish to the dumping
ground, all complete as per direction of Engineer-in-Charge.1st ring including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 61005.28 | 61005.28 | 0.49 | False | None | None | False | None | False | 29892.5872 | 0 | 3337007 | 117128 | None | code06 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6988.97 | 6988.97 | 1.22 | False | None | None | False | None | False | 8526.5434 | 0 | 3337008 | 117128 | None | code07 | Proving Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C work including straightening , cutiing , bending , placing, in position ,binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour , usage charges complete as per specifications ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103040.0 | 103040.0 | 0.12 | False | None | None | False | None | False | 12364.8 | 0 | 3337009 | 117128 | None | code08 | Providing plastering in cement mortar 1:3 proportion with minimum 2% of approved quality water proof compound, including scaffolding, racking out joints 25mm deep, smooth finishing, curing etc. with all lead and lifts for all materials etc. complete for. including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 377.44 | 377.44 | 24.36 | False | None | None | False | None | False | 9194.4384 | 0 | 3337010 | 117128 | None | code09 | Supplying, filling, spreading & leveling stone boulders of size range 5
cm to 20 cm, in recharge pit, in the required thickness, for all leads &
lifts, all complete as per direction of Engineer-in-charge including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1075.2 | 1075.2 | 6.867 | False | None | None | False | None | False | 7383.3984 | 0 | 3337011 | 117128 | None | code10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 228.48 | 228.48 | 74.133 | False | None | None | False | None | False | 16937.90784 | 0 | 3337012 | 117128 | None | code11 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 122.0 | 122.0 | 83.22 | False | None | None | False | None | False | 10152.84 | 0 | 3337013 | 117128 | None | code12 | Providing chain link fencing 50mm size of 8 guage properly stretched between existing rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 800.8 | 800.8 | 7.07 | False | None | None | False | None | False | 5661.656 | 0 | 3337014 | 117128 | None | code13 | Applying red lead ready mix priming coat over new steel or other metal surface including preparing the surface after throughly cleaning oil, grease, dirt and other foreign matter, and scoured with wire brushes, fine steel wool, sand papers including cost of materials, labour,complete as per specifications. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 45.92 | 45.92 | 3.62 | False | None | None | False | None | False | 166.2304 | 0 | 3337015 | 117128 | None | code14 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 118.72 | 118.72 | 3.61 | False | None | None | False | None | False | 428.5792 | 0 | 3337016 | 117128 | None | code15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 4.5 | False | None | None | False | None | False | 453.6 | 0 | 3337017 | 117128 | None | code16 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3.36 | 3.36 | 1000.0 | False | None | None | False | None | False | 3360.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Openwell 3.60 mtr diameter (6m depth) (well sinking) Masonry work at prop. ELSR-2 (ZONE-2) | 402627.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337018 | 117129 | None | code01 | Openwell 3.60 mtr diameter (6m depth) (well sinking) Masonry work at prop. ELSR-2 (ZONE-2) : Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 0.00 to 1.50 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 361.76 | 361.76 | 79.23 | False | None | None | False | None | False | 28662.2448 | 0 | 3337019 | 117129 | None | code02 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 1.50 to 3.00 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 425.6 | 425.6 | 58.98 | False | None | None | False | None | False | 25101.888 | 0 | 3337020 | 117129 | None | code03 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M 1) 3.00 to 4.50 mtr depth including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 665.28 | 665.28 | 47.14 | False | None | None | False | None | False | 31361.2992 | 0 | 3337021 | 117129 | None | code04 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M 2) 4.50 to 6.00 mtr depth including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 762.72 | 762.72 | 36.62 | False | None | None | False | None | False | 27930.8064 | 0 | 3337022 | 117129 | None | code05 | Providing and constructing granite / trap / basalt size stone masonry in foundation cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5295.53 | 5295.53 | 33.53 | False | None | None | False | None | False | 177559.1209 | 0 | 3337023 | 117129 | None | code06 | Renewing wooden beams in roofs including making good the holes in
walls and painting with oil type wood preservative of approved brand
and manufacture complete, including removal of rubbish to the dumping
ground, all complete as per direction of Engineer-in-Charge.1st ring including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 61005.28 | 61005.28 | 0.57 | False | None | None | False | None | False | 34773.0096 | 0 | 3337024 | 117129 | None | code07 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6988.97 | 6988.97 | 1.22 | False | None | None | False | None | False | 8526.5434 | 0 | 3337025 | 117129 | None | code08 | Proving Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C work including straightening , cutiing , bending , placing, in position ,binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour , usage charges complete as per specifications ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103040.0 | 103040.0 | 0.11 | False | None | None | False | None | False | 11334.4 | 0 | 3337026 | 117129 | None | code09 | Providing plastering in cement mortar 1:3 proportion with minimum 2% of approved quality water proof compound, including scaffolding, racking out joints 25mm deep, smooth finishing, curing etc. with all lead and lifts for all materials etc. complete for. including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 377.44 | 377.44 | 28.98 | False | None | None | False | None | False | 10938.2112 | 0 | 3337027 | 117129 | None | code10 | Supplying, filling, spreading & leveling stone boulders of size range 5
cm to 20 cm, in recharge pit, in the required thickness, for all leads &
lifts, all complete as per direction of Engineer-in-charge including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1075.2 | 1075.2 | 7.754 | False | None | None | False | None | False | 8337.1008 | 0 | 3337028 | 117129 | None | code11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 228.48 | 228.48 | 57.346 | False | None | None | False | None | False | 13102.41408 | 0 | 3337029 | 117129 | None | code12 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 122.0 | 122.0 | 99.86 | False | None | None | False | None | False | 12182.92 | 0 | 3337030 | 117129 | None | code13 | Providing chain link fencing 50mm size of 8 guage properly stretched between existing rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 800.8 | 800.8 | 10.18 | False | None | None | False | None | False | 8152.144 | 0 | 3337031 | 117129 | None | code14 | Applying red lead ready mix priming coat over new steel or other metal surface including preparing the surface after throughly cleaning oil, grease, dirt and other foreign matter, and scoured with wire brushes, fine steel wool, sand papers including cost of materials, labour,complete as per specifications. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 45.92 | 45.92 | 5.19 | False | None | None | False | None | False | 238.3248 | 0 | 3337032 | 117129 | None | code15 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 118.72 | 118.72 | 5.17 | False | None | None | False | None | False | 613.7824 | 0 | 3337033 | 117129 | None | code16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 4.5 | False | None | None | False | None | False | 453.6 | 0 | 3337034 | 117129 | None | code17 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3.36 | 3.36 | 1000.0 | False | None | None | False | None | False | 3360.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Pumping Machinary at Proposed openwell-1 | 68360.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337035 | 117130 | None | code01 | Pumping Machinery at proposed OPEN WELL-1 (ZONE-1) : Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2.0 HP size 50X40 Head 13M, Discharge 462 LPM Designed 1.00 HP Head 12m Discharge 0.389LPS Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 17276.0 | 17276.0 | 1.0 | False | None | None | False | None | False | 17276.0 | 0 | 3337036 | 117130 | None | code02 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments 1x3x6 Sqm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 324.8 | 324.8 | 10.0 | False | None | None | False | None | False | 3248.0 | 0 | 3337037 | 117130 | None | code03 | Supply and delivery at site brand new best make pressure guage bourdon type as per IS 778/1984 with ISI mark and as per its latest amendments 63mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 504.0 | 504.0 | 1.0 | False | None | None | False | None | False | 504.0 | 0 | 3337038 | 117130 | None | code04 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337039 | 117130 | None | code05 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter Upto 6HP pumps Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Set | 14000.0 | 14000.0 | 1.0 | False | None | None | False | None | False | 14000.0 | 0 | 3337040 | 117130 | None | code06 | Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 616.0 | 616.0 | 4.0 | False | None | None | False | None | False | 2464.0 | 0 | 3337041 | 117130 | None | code07 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | 3 Poles | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337042 | 117130 | None | code08 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 40mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 499.25 | 499.25 | 15.0 | False | None | None | False | None | False | 7488.75 | 0 | 3337043 | 117130 | None | code09 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 6888.0 | 6888.0 | 1.0 | False | None | None | False | None | False | 6888.0 | 0 | 3337044 | 117130 | None | code10 | Labour charges for erection of outdoor type panel board and meter board
units with all necessary materials and labour, tools and equipments
including providing cement concrete foundation bed etc., complete as
per specification, with testing of as per instructions of engineer incharge
of work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 1512.0 | 1512.0 | 1.0 | False | None | None | False | None | False | 1512.0 | 0 | 3337045 | 117130 | None | code11 | Labour charges for providing connection using insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materials ,tools and equipments,as per specificationswith testing of as per instructions of engineer incharge of work.3 1/2 x 6 sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 218.4 | 218.4 | 20.0 | False | None | None | False | None | False | 4368.0 | 0 | 3337046 | 117130 | None | code12 | Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 151.2 | 151.2 | 15.0 | False | None | None | False | None | False | 2268.0 | 0 | 3337047 | 117130 | None | code13 | Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 89.6 | 89.6 | 15.0 | False | None | None | False | None | False | 1344.0 | 0 | 3337048 | 117130 | None | code14 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 4200.0 | 4200.0 | 1.0 | False | None | None | False | None | False | 4200.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Pumping Machinery at proposed Open Well 2 | 68354.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337049 | 117131 | None | code01 | Pumping Machinery at proposed OPEN WELL-2 (ZONE-2) : Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2.0 HP size 50X40 Head 22M, Discharge 186LPM Designed 1.00 HP Head 16m Discharge 0.815LPS Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 17470.0 | 17470.0 | 1.0 | False | None | None | False | None | False | 17470.0 | 0 | 3337050 | 117131 | None | code02 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments 1x3x6 Sqm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 324.8 | 324.8 | 10.0 | False | None | None | False | None | False | 3248.0 | 0 | 3337051 | 117131 | None | code03 | Supply and delivery at site brand new best make pressure guage bourdon type as per IS 778/1984 with ISI mark and as per its latest amendments 63mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 504.0 | 504.0 | 1.0 | False | None | None | False | None | False | 504.0 | 0 | 3337052 | 117131 | None | code04 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337053 | 117131 | None | code05 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter Upto 6HP pumps Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Set | 14000.0 | 14000.0 | 1.0 | False | None | None | False | None | False | 14000.0 | 0 | 3337054 | 117131 | None | code06 | Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 616.0 | 616.0 | 4.0 | False | None | None | False | None | False | 2464.0 | 0 | 3337055 | 117131 | None | code07 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | 3 Poles | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337056 | 117131 | None | code08 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 40mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 499.25 | 499.25 | 10.0 | False | None | None | False | None | False | 4992.5 | 0 | 3337057 | 117131 | None | code09 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 6888.0 | 6888.0 | 1.0 | False | None | None | False | None | False | 6888.0 | 0 | 3337058 | 117131 | None | code10 | Labour charges for erection of outdoor type panel board and meter board
units with all necessary materials and labour, tools and equipments
including providing cement concrete foundation bed etc., complete as
per specification, with testing of as per instructions of engineer incharge
of work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 1512.0 | 1512.0 | 1.0 | False | None | None | False | None | False | 1512.0 | 0 | 3337059 | 117131 | None | code11 | Labour charges for providing connection using insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materials ,tools and equipments,as per specificationswith testing of as per instructions of engineer incharge of work.3 1/2 x 6 sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 218.4 | 218.4 | 25.0 | False | None | None | False | None | False | 5460.0 | 0 | 3337060 | 117131 | None | code12 | Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 151.2 | 151.2 | 20.0 | False | None | None | False | None | False | 3024.0 | 0 | 3337061 | 117131 | None | code13 | Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 89.6 | 89.6 | 20.0 | False | None | None | False | None | False | 1792.0 | 0 | 3337062 | 117131 | None | code14 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 4200.0 | 4200.0 | 1.0 | False | None | None | False | None | False | 4200.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Sintex 2000ltr capacity with platform for zone-1 | 41675.74 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337063 | 117132 | None | code01 | Sintex 2000ltr capacity with platform for zone-1 : Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 0.87 | False | None | None | False | None | False | 181.2384 | 0 | 3337064 | 117132 | None | code02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.29 | False | None | None | False | None | False | 1803.9392 | 0 | 3337065 | 117132 | None | code03 | Providing Size stone masnory with hard stone in foundation & plinth with cement mortar 1:6 (1 cement : 6 coarse sand Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5994.24 | 5994.24 | 2.03 | False | None | None | False | None | False | 12168.3072 | 0 | 3337066 | 117132 | None | code04 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately).Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6415.36 | 6415.36 | 0.23 | False | None | None | False | None | False | 1475.5328 | 0 | 3337067 | 117132 | None | code05 | Providing and placing on terrace (at floor levels) polythylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and base support for tank Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Ltr | 8.96 | 8.96 | 2000.0 | False | None | None | False | None | False | 17920.0 | 0 | 3337068 | 117132 | None | code06 | Supply and delivery at site brand new best make pressure guage suitable for centrifugal pump confirming to latest IS standards 80mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 644.0 | 644.0 | 10.0 | False | None | None | False | None | False | 6440.0 | 0 | 3337069 | 117132 | None | code07 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 80mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 1.0 | False | None | None | False | None | False | 1428.0 | 0 | 3337070 | 117132 | None | code08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 0.9 | False | None | None | False | None | False | 90.72 | 0 | 3337071 | 117132 | None | code09 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 3.36 | 3.36 | 50.0 | False | None | None | False | None | False | 168.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Construction of ELSR of 5,000 Ltr. 6.0m stg for zone-2 | 251606.15 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337072 | 117133 | None | code01 | Construction of ELSR of 5,000 Ltr. 6.0m stg for zone-2 : Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 22.82 | False | None | None | False | None | False | 4753.8624 | 0 | 3337073 | 117133 | None | code02 | Providing and laying in position plain cement concrete for levelling course
for all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed,
laid in layers not exceeding 150 mm thickness, well compacted using
plate vibrators, including all lead & lifts, plywood / steel formwork, cost
of all materials of quality, labour, Usage charges of machineries, curing
and all the other appurtenances required to complete the work as per
technical specifications. ( The cost of steel reinforcement shall be paid
separately). PCC 1:1:. 5:3 using 20mm aggregate Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 8039.52 | 8039.52 | 0.29 | False | None | None | False | None | False | 2331.4608 | 0 | 3337074 | 117133 | None | code03 | Providing and laying in position Reinforced cement concrete for all
Foundation works. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed
with super plasticizers laid in finished layers, well compacted using
needle vibrators, including all lead & lifts, cost of all materials of quality,
confirming to the requirements of relevant IS codes , labour, strutting,
plywood / steel form work , Usage charges of machinery, curing and all
the other appurtenances required to complete the work as per technical
specifications. (The cost of steel reinforcement to be paid separately)
(Minimum cement content: 340 kgs (6.80 bags)). RCC M25 Design Mix with 20mm aggregate for footings, rafts and combind footing etc.with smooth finishing the exposed faces in CM 1:4, 12mm thick etc. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 12210.61 | 12210.61 | 1.11 | False | None | None | False | None | False | 13553.7771 | 0 | 3337075 | 117133 | None | code04 | Providing and laying in position Reinforced cement concrete for columns,
braces and ring beam above ground level. The granite/trap/basalt crushed
graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed with super plasticisers laid in layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials
of quality, confirming to the requirements of relevant IS codes with
plastering and smooth finishing the exposed faces in cement mortar 1:3,
12 mm thick, labour,centering, scaffolding, staging, strutting, plywood/
steel form work , Usage charges of machinery, curing and all other
appurtenances required to complete the work as per design and technical
specifications. (The cost of steel reinforcement, dowel bars to be paid
separately). (Minimum cement content: 360 kgs (7.20 bags)) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 15707.0 | 15707.0 | 1.8 | False | None | None | False | None | False | 28272.6 | 0 | 3337076 | 117133 | None | code05 | Providing and laying in position Reinforced cement concrete for shell
portion, bottom dome / slab and ribs over the staging. The granite/trap/
basalt crushed graded coarse aggregates and fine aggregates as per
relevant IS Codes machine mixed with super plasticisers laid in layers,
well compacted using needle vibrators, including all lead & lifts, cost
of all materials of quality, confirming to the requirements of relevant IS
codes with plastering and smooth finishing the exposed faces in cement
mortar 1:3, 12 mm thick and CM plastering 1:3 proportion 20mm thick
for inside with an admixture of water proof compound of requisite
proportion of approved quality, labour,centering, scaffolding, staging,
strutting, plywood/ steel form work , Usage charges of machinery, curing
and all other appurtenances required to complete the work as per design
and technical specifications.(Contractor will make his own arrangements
for procuring water for testing). (The cost of steel reinforcement, dowel
bars to be paid separately). (Minimum cement content: 360 kgs (7.20
bags)). Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 24670.14 | 24670.14 | 1.01 | False | None | None | False | None | False | 24916.8414 | 0 | 3337077 | 117133 | None | code06 | Providing and laying in position plain cement concrete for levelling course
for all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed,
laid in layers not exceeding 150 mm thickness, well compacted using
plate vibrators, including all lead & lifts, plywood / steel formwork, cost
of all materials of quality, labour, Usage charges of machineries, curing
and all the other appurtenances required to complete the work as per
technical specifications. ( The cost of steel reinforcement shall be paid
separately). PCC 1:1:. 5:3 using 20mm aggregate Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 8039.52 | 8039.52 | 0.4 | False | None | None | False | None | False | 3215.808 | 0 | 3337078 | 117133 | None | code07 | Providing Thermo-Mechanically Treated bars of grade Fe-500D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Tonne | 103040.0 | 103040.0 | 0.43 | False | None | None | False | None | False | 44307.2 | 0 | 3337079 | 117133 | None | code08 | Providing and placing on terrace (at floor levels) polythylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and base support for tank Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Ltr | 8.96 | 8.96 | 5000.0 | False | None | None | False | None | False | 44800.0 | 0 | 3337080 | 117133 | None | code09 | Providing and fixing MS ladder between landings, 45 cms wide using
angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre,
with necessary supports of same angle iron etc. as directed, including
hand railing on both sides with 25mm dia. GI pipes with angle iron props
at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC
1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead
and lifts etc. complete with: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 4841.76 | 4841.76 | 8.0 | False | None | None | False | None | False | 38734.08 | 0 | 3337081 | 117133 | None | code10 | Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC
Column pipes with heavy duty collars,rubber profile ring,vibration control
profile ring,freezing and turbulence free leak proof EPDM ring with ISI
mark with its latest amendments Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 644.0 | 644.0 | 20.0 | False | None | None | False | None | False | 12880.0 | 0 | 3337082 | 117133 | None | code11 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337083 | 117133 | None | code12 | Providing two coats of water proof cement painting with approved colour and shade over one coat of primer including scrapping the surface with wire brushes etc. before removal of scaffolding for new RCC over head tanks and cleaning of paint stains wherever necessary with all lead and lifts etc. complete for: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 151.2 | 151.2 | 42.41 | False | None | None | False | None | False | 6412.392 | 0 | 3337084 | 117133 | None | code13 | RCC VALVE CHAMBER 1.00x1.00: Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 383.04 | 383.04 | 4.37 | False | None | None | False | None | False | 1673.8848 | 0 | 3337085 | 117133 | None | code14 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.32 | False | None | None | False | None | False | 1990.5536 | 0 | 3337086 | 117133 | None | code15 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Concreteing rate including Formwork, Centring & Scaffolding for foundation, sub structure of cross drainage @ 5% Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6988.97 | 6988.97 | 1.26 | False | None | None | False | None | False | 8806.1022 | 0 | 3337087 | 117133 | None | code16 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 2364.32 | 2364.32 | 1.0 | False | None | None | False | None | False | 2364.32 | 0 | 3337088 | 117133 | None | code17 | Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103.04 | 103.04 | 94.5 | False | None | None | False | None | False | 9737.28 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Proposed Rising Main | 69214.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337089 | 117134 | None | code01 | Proposed Riising Main earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 20.52 | False | None | None | False | None | False | 8526.4704 | 0 | 3337090 | 117134 | None | code02 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE PE 100 PN-6 63 mm dia including barricading, danger lighting etc. in the classifications for:Cutting Cement Concrete Road surface by Machine cutting to demarcate the trench width of the surface. | Mtr | 183.46 | 183.46 | 45.0 | False | None | None | False | None | False | 8255.7 | 0 | 3337091 | 117134 | None | code03 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments For Scour/Sluice Valve 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337092 | 117134 | None | code04 | Supply and fixing of Cast steel ASTM A 216 Gr.WCB double flanged Dual plate check valve Conforming to API 594 with latest amendments Shaft material shall be SS420/431 and spring shall be spring steel superior grade quality as detailed below of following diameters and types and conveying to work site, loading, unloading, stacking with appurtenances., complete with all lead and lift. The rates are inclusive of cost of Galvanised Bolts and Nuts: For Class 150 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 4528.16 | 4528.16 | 2.0 | False | None | None | False | None | False | 9056.32 | 0 | 3337093 | 117134 | None | code05 | Supplying and fixing surface box of required dia. and size with synthetic lid for valves or spindle rods. The surface box should be usable for 50 to 400mm dia. valves, PN 10 / 16 and will consist of lid, housing, locking clip, notched bolt, cross bar, washer and torque nut. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3739.68 | 3739.68 | 3.0 | False | None | None | False | None | False | 11219.04 | 0 | 3337094 | 117134 | None | code06 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 80mm - class-B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 945.82 | 945.82 | 5.0 | False | None | None | False | None | False | 4729.1 | 0 | 3337095 | 117134 | None | code07 | RCC VALVE CHAMBER 1.00x1.00: Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 383.04 | 383.04 | 4.37 | False | None | None | False | None | False | 1673.8848 | 0 | 3337096 | 117134 | None | code08 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.32 | False | None | None | False | None | False | 1990.5536 | 0 | 3337097 | 117134 | None | code09 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Concreteing rate including Formwork, Centring & Scaffolding for foundation, sub structure of cross drainage @ 5% Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6988.97 | 6988.97 | 1.26 | False | None | None | False | None | False | 8806.1022 | 0 | 3337098 | 117134 | None | code10 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 2364.32 | 2364.32 | 1.0 | False | None | None | False | None | False | 2364.32 | 0 | 3337099 | 117134 | None | code11 | Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103.04 | 103.04 | 94.5 | False | None | None | False | None | False | 9737.28 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Distribution pipe network | 348739.87 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337100 | 117135 | None | code01 | Distribution Pipe Network : Earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 215.64 | False | None | None | False | None | False | 89602.7328 | 0 | 3337101 | 117135 | None | code02 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE PE 100 PN-6 63 mm dia including barricading, danger lighting etc. in the classifications for:Cutting Cement Concrete Road surface by Machine cutting to demarcate the trench width of the surface. | Rmtr | 183.46 | 183.46 | 473.0 | False | None | None | False | None | False | 86776.58 | 0 | 3337102 | 117135 | None | code03 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates Electro fusion Elbow i) 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 211.0 | 211.0 | 11.0 | False | None | None | False | None | False | 2321.0 | 0 | 3337103 | 117135 | None | code04 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates Electro fusionTee ii) 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 210.0 | 210.0 | 8.0 | False | None | None | False | None | False | 1680.0 | 0 | 3337104 | 117135 | None | code05 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates HDPE End cap 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 81.0 | 81.0 | 10.0 | False | None | None | False | None | False | 810.0 | 0 | 3337105 | 117135 | None | code06 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments For Scour/Sluice Valve 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337106 | 117135 | None | code07 | Supply and fixing of Horizontal Mechanical Woltman type hemetically sealed water meters with copper Glass register with IP 68 protection. The meter shall be removable mechanism type manufactured as ISO 4064-1: 1993 with MID zertification. The meters shall be capable of transmitting consumption data on daily basis to central server through GSM/GPRS. The meter interface unit shall be fitted to the meter without wire. The consumption data shall be collected , stored and analysed by data logger. The data logger should provide data like flow rate, total flow, consumption analyses, reverse flow, meter tampering, daily flow distribution, leakage detection. The data logger shall also send alams on blocked meter, flow rate above limit, pressure below or above limits. Bulk flow meter 50mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 67016.32 | 67016.32 | 2.0 | False | None | None | False | None | False | 134032.64 | 0 | 3337107 | 117135 | None | code08 | Supplying and fixing surface box of required dia. and size with synthetic lid for valves or spindle rods. The surface box should be usable for 50 to 400mm dia. valves, PN 10 / 16 and will consist of lid, housing, locking clip, notched bolt, cross bar, washer and torque nut Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3739.68 | 3739.68 | 4.0 | False | None | None | False | None | False | 14958.72 | 0 | 3337108 | 117135 | None | code09 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 80mm - class-B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 945.82 | 945.82 | 10.0 | False | None | None | False | None | False | 9458.2 | 0 | 3337109 | 117135 | None | code10 | Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 300mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 1248.8 | 1248.8 | 5.0 | False | None | None | False | None | False | 6244.0 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Functional Household Tap Connection (FHTC) | 116289.69 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337110 | 117136 | None | code01 | Functional Household Tap Connection (FHTC)Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications.Cutting concrete Road surface by Machine cutting to demarcate the trench width of the surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1065.12 | 1065.12 | 0.41 | False | None | None | False | None | False | 436.6992 | 0 | 3337111 | 117136 | None | code02 | Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications.Cutting asphalt Road surface by Machine cutting to demarcate the trench width of the surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 997.92 | 997.92 | 0.07 | False | None | None | False | None | False | 69.8544 | 0 | 3337112 | 117136 | None | code03 | Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications cutting in Macadam road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 913.92 | 913.92 | 0.27 | False | None | None | False | None | False | 246.7584 | 0 | 3337113 | 117136 | None | code04 | Earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 22.3 | False | None | None | False | None | False | 9266.096 | 0 | 3337114 | 117136 | None | code05 | Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 0.69 | False | None | None | False | None | False | 143.7408 | 0 | 3337115 | 117136 | None | code06 | Providing & fixing electro fusion saddle comply with BsEN12201 -3:2011, PN-12.5 rating and food grade raw material as per BS 6920 with material of construction PE 80 or PE 100 and colour of fitting - Blue/Black for water applications, EF tappinB saddle is V-Regarding type. Designed to fuse at a fusion voltage of 40 volt Ac. EF tapping saddle shall have moulded SS/Brass metal female threaded outlet. EF tapping saddle is fused by using a top loading piller type pressure exertin8 150ON (150 kg appn.) top load on EF saddle. Fusion tlme is 170 secs and cooling time is 10mins, Exerted pressure shoud be removed after completing the 10 mins cooling time. 63x20,75x20,90x20,110x20,140x20 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 392.0 | 392.0 | 14.0 | False | None | None | False | None | False | 5488.0 | 0 | 3337116 | 117136 | None | code07 | Providing & fixing Flow control Using food grade materiaIs SS 316 ball 1/2" [15mm] including cost of all materials, labour charges, HOM and testing complete as per of following specification. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 285.6 | 285.6 | 14.0 | False | None | None | False | None | False | 3998.4 | 0 | 3337117 | 117136 | None | code08 | Supplying MDPE pipe grade PE80 6kg/cm2, 5.3mm thick complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 142.0 | 142.0 | 165.2 | False | None | None | False | None | False | 23458.4 | 0 | 3337118 | 117136 | None | code09 | Supply and delivery at site wrought middle steel (galvanized) GI elbow
confirming to IS 1239-II, 1991 with latest amendments if any for:For 20 mm dia GI elbow Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 85.0 | 85.0 | 28.0 | False | None | None | False | None | False | 2380.0 | 0 | 3337119 | 117136 | None | code10 | Supplying and fixing Multijet class B inferential type, AMR compatible water meters with IP 68 protection totalizer confoming to IS 779 with its latest amendments of following size to service connections including conveying and fixing of necessary G.I. specials with appurtenances. complete, with all lead and lift.15mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1846.88 | 1846.88 | 14.0 | False | None | None | False | None | False | 25856.32 | 0 | 3337120 | 117136 | None | code11 | Providing and fixing PTMT stop cock of approved quality and colour. 15 mm nominal bore, 86mm long, weighing not less than 88g. complete as per specifications. 15 mm PTMT stop cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 159.04 | 159.04 | 14.0 | False | None | None | False | None | False | 2226.56 | 0 | 3337121 | 117136 | None | code12 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)For Medium Duty GI pipe i) For Crossing drain 32 mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 392.63 | 392.63 | 3.0 | False | None | None | False | None | False | 1177.89 | 0 | 3337122 | 117136 | None | code13 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)For Medium Duty GI pipe ii) For Meter box to tap 15 mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 209.48 | 209.48 | 21.0 | False | None | None | False | None | False | 4399.08 | 0 | 3337123 | 117136 | None | code14 | Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI union confirming to IS 1239-II, 1991 with latest amendments if any. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 77.28 | 77.28 | 28.0 | False | None | None | False | None | False | 2163.84 | 0 | 3337124 | 117136 | None | code15 | Supply and delivery at site wrought middle steel (galvanized) 15mm GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 53.76 | 53.76 | 70.0 | False | None | None | False | None | False | 3763.2 | 0 | 3337125 | 117136 | None | code16 | Supply and fixing of HDPE water meter box with locking arrangementto protect the water meter of Class ‘B’ Multijet type of size 15 to 32 mm including HDPE box with base dia 300mm x lid dia 200mm x height 250mm with openable lid and the cover is buried below GL with lid flush with GL including earth work excavation for 600mm x 600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC =1:2:4 using 12-20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height, disposal ofexcess earth with all lead and lifts with appurtenances complete as perdrawing enclosed. HDPE water meter box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 570.08 | 570.08 | 14.0 | False | None | None | False | None | False | 7981.12 | 0 | 3337126 | 117136 | None | code17 | Providing and fixing brass bib cock of approved quality : 15mm PTMT bib cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work HDPE water meter box | Each | 365.12 | 365.12 | 14.0 | False | None | None | False | None | False | 5111.68 | 0 | 3337127 | 117136 | None | code18 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6890.24 | 6890.24 | 0.75 | False | None | None | False | None | False | 5167.68 | 0 | 3337128 | 117136 | None | code19 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately).Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6415.36 | 6415.36 | 0.76 | False | None | None | False | None | False | 4875.6736 | 0 | 3337129 | 117136 | None | code20 | Providing and fixing R.C.C stand post for household connection of 30cms x 15 cms, and 90 cms. Deep using RCC M20 and 6 mm dia rods for verticals and stirrups and rendered smooth, including fixing R.C.C stand post 45cms below ground level and in M-20, 15cms. height, with 8 cms offset around the stand post and curing for 10 days including earthwork excavation in all types of soils with all lead and lift including cost of all material, labour, finishing, paintitng and lettering JJM logo and FHTC number etc. complete (as per typical estimate enclosed) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 577.05 | 577.05 | 14.0 | False | None | None | False | None | False | 8078.7 | 0 |
| 1719226821000 | 1 | None | None | Water supply/sewage lines | Providing FHTCs to 22 Households in Machalli habitation of Amadalli village, Amadalli GP of Karwar | 1655063.92 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3337130 | 117137 | None | code01 | Pumping Machinery at proposed OPEN WELL-1 (ZONE-1) : Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2.0 HP size 50X40 Head 13M, Discharge 462 LPM Designed 1.00 HP Head 12m Discharge 0.389LPS Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 17276.0 | 17276.0 | 1.0 | False | None | None | False | None | False | 17276.0 | 0 | 3337131 | 117137 | None | code01 | Pumping Machinery at proposed OPEN WELL-2 (ZONE-2) : Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 2.0 HP size 50X40 Head 22M, Discharge 186LPM Designed 1.00 HP Head 16m Discharge 0.815LPS Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 17470.0 | 17470.0 | 1.0 | False | None | None | False | None | False | 17470.0 | 0 | 3337132 | 117137 | None | code01 | Sintex 2000ltr capacity with platform for zone-1 : Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 0.87 | False | None | None | False | None | False | 181.2384 | 0 | 3337133 | 117137 | None | code01 | Construction of ELSR of 5,000 Ltr. 6.0m stg for zone-2 : Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 22.82 | False | None | None | False | None | False | 4753.8624 | 0 | 3337134 | 117137 | None | code01 | Proposed Riising Main earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 20.52 | False | None | None | False | None | False | 8526.4704 | 0 | 3337135 | 117137 | None | code01 | Distribution Pipe Network : Earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 215.64 | False | None | None | False | None | False | 89602.7328 | 0 | 3337136 | 117137 | None | code01 | Functional Household Tap Connection (FHTC)Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications.Cutting concrete Road surface by Machine cutting to demarcate the trench width of the surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1065.12 | 1065.12 | 0.41 | False | None | None | False | None | False | 436.6992 | 0 | 3337137 | 117137 | None | code01 | Openwell 3.00 mtr dia meter (4.5m depth) (well sinking) Masonry work at prop. ELSR-1 (ZONE-1) : Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 0.00 to 1.50 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 361.76 | 361.76 | 55.29 | False | None | None | False | None | False | 20001.7104 | 0 | 3337138 | 117137 | None | code01 | Openwell 3.60 mtr diameter (6m depth) (well sinking) Masonry work at prop. ELSR-2 (ZONE-2) : Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 0.00 to 1.50 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 361.76 | 361.76 | 79.23 | False | None | None | False | None | False | 28662.2448 | 0 | 3337139 | 117137 | None | code02 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments 1x3x6 Sqm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 324.8 | 324.8 | 10.0 | False | None | None | False | None | False | 3248.0 | 0 | 3337140 | 117137 | None | code02 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments 1x3x6 Sqm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 324.8 | 324.8 | 10.0 | False | None | None | False | None | False | 3248.0 | 0 | 3337141 | 117137 | None | code02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.29 | False | None | None | False | None | False | 1803.9392 | 0 | 3337142 | 117137 | None | code02 | Providing and laying in position plain cement concrete for levelling course
for all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed,
laid in layers not exceeding 150 mm thickness, well compacted using
plate vibrators, including all lead & lifts, plywood / steel formwork, cost
of all materials of quality, labour, Usage charges of machineries, curing
and all the other appurtenances required to complete the work as per
technical specifications. ( The cost of steel reinforcement shall be paid
separately). PCC 1:1:. 5:3 using 20mm aggregate Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 8039.52 | 8039.52 | 0.29 | False | None | None | False | None | False | 2331.4608 | 0 | 3337143 | 117137 | None | code02 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE PE 100 PN-6 63 mm dia including barricading, danger lighting etc. in the classifications for:Cutting Cement Concrete Road surface by Machine cutting to demarcate the trench width of the surface. | Mtr | 183.46 | 183.46 | 45.0 | False | None | None | False | None | False | 8255.7 | 0 | 3337144 | 117137 | None | code02 | Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE PE 100 PN-6 63 mm dia including barricading, danger lighting etc. in the classifications for:Cutting Cement Concrete Road surface by Machine cutting to demarcate the trench width of the surface. | Rmtr | 183.46 | 183.46 | 473.0 | False | None | None | False | None | False | 86776.58 | 0 | 3337145 | 117137 | None | code02 | Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications.Cutting asphalt Road surface by Machine cutting to demarcate the trench width of the surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 997.92 | 997.92 | 0.07 | False | None | None | False | None | False | 69.8544 | 0 | 3337146 | 117137 | None | code02 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 1.50 to 3.00 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 425.6 | 425.6 | 38.62 | False | None | None | False | None | False | 16436.672 | 0 | 3337147 | 117137 | None | code02 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M or part thereof beyond 1.50 Mtr to 10.50 Mtr. 0.00 to 3.00 mtr depth 1) 1.50 to 3.00 including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 425.6 | 425.6 | 58.98 | False | None | None | False | None | False | 25101.888 | 0 | 3337148 | 117137 | None | code03 | Supply and delivery at site brand new best make pressure guage bourdon type as per IS 778/1984 with ISI mark and as per its latest amendments 63mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 504.0 | 504.0 | 1.0 | False | None | None | False | None | False | 504.0 | 0 | 3337149 | 117137 | None | code03 | Supply and delivery at site brand new best make pressure guage bourdon type as per IS 778/1984 with ISI mark and as per its latest amendments 63mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 504.0 | 504.0 | 1.0 | False | None | None | False | None | False | 504.0 | 0 | 3337150 | 117137 | None | code03 | Providing Size stone masnory with hard stone in foundation & plinth with cement mortar 1:6 (1 cement : 6 coarse sand Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5994.24 | 5994.24 | 2.03 | False | None | None | False | None | False | 12168.3072 | 0 | 3337151 | 117137 | None | code03 | Providing and laying in position Reinforced cement concrete for all
Foundation works. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed
with super plasticizers laid in finished layers, well compacted using
needle vibrators, including all lead & lifts, cost of all materials of quality,
confirming to the requirements of relevant IS codes , labour, strutting,
plywood / steel form work , Usage charges of machinery, curing and all
the other appurtenances required to complete the work as per technical
specifications. (The cost of steel reinforcement to be paid separately)
(Minimum cement content: 340 kgs (6.80 bags)). RCC M25 Design Mix with 20mm aggregate for footings, rafts and combind footing etc.with smooth finishing the exposed faces in CM 1:4, 12mm thick etc. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 12210.61 | 12210.61 | 1.11 | False | None | None | False | None | False | 13553.7771 | 0 | 3337152 | 117137 | None | code03 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments For Scour/Sluice Valve 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337153 | 117137 | None | code03 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates Electro fusion Elbow i) 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 211.0 | 211.0 | 11.0 | False | None | None | False | None | False | 2321.0 | 0 | 3337154 | 117137 | None | code03 | Cutting road surfaces for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the classifications cutting in Macadam road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 913.92 | 913.92 | 0.27 | False | None | None | False | None | False | 246.7584 | 0 | 3337155 | 117137 | None | code03 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 665.28 | 665.28 | 29.16 | False | None | None | False | None | False | 19399.5648 | 0 | 3337156 | 117137 | None | code03 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M 1) 3.00 to 4.50 mtr depth including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 665.28 | 665.28 | 47.14 | False | None | None | False | None | False | 31361.2992 | 0 | 3337157 | 117137 | None | code04 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337158 | 117137 | None | code04 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337159 | 117137 | None | code04 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately).Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6415.36 | 6415.36 | 0.23 | False | None | None | False | None | False | 1475.5328 | 0 | 3337160 | 117137 | None | code04 | Providing and laying in position Reinforced cement concrete for columns,
braces and ring beam above ground level. The granite/trap/basalt crushed
graded coarse aggregates and fine aggregates as per relevant IS Codes
machine mixed with super plasticisers laid in layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials
of quality, confirming to the requirements of relevant IS codes with
plastering and smooth finishing the exposed faces in cement mortar 1:3,
12 mm thick, labour,centering, scaffolding, staging, strutting, plywood/
steel form work , Usage charges of machinery, curing and all other
appurtenances required to complete the work as per design and technical
specifications. (The cost of steel reinforcement, dowel bars to be paid
separately). (Minimum cement content: 360 kgs (7.20 bags)) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 15707.0 | 15707.0 | 1.8 | False | None | None | False | None | False | 28272.6 | 0 | 3337170 | 117137 | None | code04 | Supply and fixing of Cast steel ASTM A 216 Gr.WCB double flanged Dual plate check valve Conforming to API 594 with latest amendments Shaft material shall be SS420/431 and spring shall be spring steel superior grade quality as detailed below of following diameters and types and conveying to work site, loading, unloading, stacking with appurtenances., complete with all lead and lift. The rates are inclusive of cost of Galvanised Bolts and Nuts: For Class 150 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 4528.16 | 4528.16 | 2.0 | False | None | None | False | None | False | 9056.32 | 0 | 3337174 | 117137 | None | code04 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates Electro fusionTee ii) 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 210.0 | 210.0 | 8.0 | False | None | None | False | None | False | 1680.0 | 0 | 3337175 | 117137 | None | code04 | Earth work excavation for pipelines/cables by Manual means upto 600mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 415.52 | 415.52 | 22.3 | False | None | None | False | None | False | 9266.096 | 0 | 3337176 | 117137 | None | code04 | Providing and constructing granite / trap / basalt size stone masonry in foundation cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5295.53 | 5295.53 | 24.14 | False | None | None | False | None | False | 127834.0942 | 0 | 3337177 | 117137 | None | code04 | Earthwork excavation in soil, clay, sand, shedu soil, soft murrum, including shoring, strutting, barricading, danger lighting, bailing out water wherever necessary with stacking the materials as directed upto a lead of 50 Mtr and lift of 1.5 Mtr etc., complete. Add for additional lift charges for every lift of 1.50 M 2) 4.50 to 6.00 mtr depth including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 762.72 | 762.72 | 36.62 | False | None | None | False | None | False | 27930.8064 | 0 | 3337178 | 117137 | None | code05 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter Upto 6HP pumps Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Set | 14000.0 | 14000.0 | 1.0 | False | None | None | False | None | False | 14000.0 | 0 | 3337179 | 117137 | None | code05 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter Upto 6HP pumps Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Set | 14000.0 | 14000.0 | 1.0 | False | None | None | False | None | False | 14000.0 | 0 | 3337180 | 117137 | None | code05 | Providing and placing on terrace (at floor levels) polythylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and base support for tank Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Ltr | 8.96 | 8.96 | 2000.0 | False | None | None | False | None | False | 17920.0 | 0 | 3337181 | 117137 | None | code05 | Providing and laying in position Reinforced cement concrete for shell
portion, bottom dome / slab and ribs over the staging. The granite/trap/
basalt crushed graded coarse aggregates and fine aggregates as per
relevant IS Codes machine mixed with super plasticisers laid in layers,
well compacted using needle vibrators, including all lead & lifts, cost
of all materials of quality, confirming to the requirements of relevant IS
codes with plastering and smooth finishing the exposed faces in cement
mortar 1:3, 12 mm thick and CM plastering 1:3 proportion 20mm thick
for inside with an admixture of water proof compound of requisite
proportion of approved quality, labour,centering, scaffolding, staging,
strutting, plywood/ steel form work , Usage charges of machinery, curing
and all other appurtenances required to complete the work as per design
and technical specifications.(Contractor will make his own arrangements
for procuring water for testing). (The cost of steel reinforcement, dowel
bars to be paid separately). (Minimum cement content: 360 kgs (7.20
bags)). Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 24670.14 | 24670.14 | 1.01 | False | None | None | False | None | False | 24916.8414 | 0 | 3337182 | 117137 | None | code05 | Supplying and fixing surface box of required dia. and size with synthetic lid for valves or spindle rods. The surface box should be usable for 50 to 400mm dia. valves, PN 10 / 16 and will consist of lid, housing, locking clip, notched bolt, cross bar, washer and torque nut. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3739.68 | 3739.68 | 3.0 | False | None | None | False | None | False | 11219.04 | 0 | 3337183 | 117137 | None | code05 | HDPE electro fusion specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bends, reducers. Material Rates HDPE End cap 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 81.0 | 81.0 | 10.0 | False | None | None | False | None | False | 810.0 | 0 | 3337184 | 117137 | None | code05 | Earthwork excavation by manual means for drains,canals, waste weir, draft, approach channels, key trenches, foundation of bridges and such simillar works in all kinds of soils , as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 208.32 | 208.32 | 0.69 | False | None | None | False | None | False | 143.7408 | 0 | 3337185 | 117137 | None | code05 | Renewing wooden beams in roofs including making good the holes in
walls and painting with oil type wood preservative of approved brand
and manufacture complete, including removal of rubbish to the dumping
ground, all complete as per direction of Engineer-in-Charge.1st ring including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 61005.28 | 61005.28 | 0.49 | False | None | None | False | None | False | 29892.5872 | 0 | 3337186 | 117137 | None | code05 | Providing and constructing granite / trap / basalt size stone masonry in foundation cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 5295.53 | 5295.53 | 33.53 | False | None | None | False | None | False | 177559.1209 | 0 | 3337187 | 117137 | None | code06 | Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 616.0 | 616.0 | 4.0 | False | None | None | False | None | False | 2464.0 | 0 | 3337188 | 117137 | None | code06 | Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 616.0 | 616.0 | 4.0 | False | None | None | False | None | False | 2464.0 | 0 | 3337189 | 117137 | None | code06 | Supply and delivery at site brand new best make pressure guage suitable for centrifugal pump confirming to latest IS standards 80mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 644.0 | 644.0 | 10.0 | False | None | None | False | None | False | 6440.0 | 0 | 3337190 | 117137 | None | code06 | Providing and laying in position plain cement concrete for levelling course
for all works in foundation. The granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per relevant IS Codes machine mixed,
laid in layers not exceeding 150 mm thickness, well compacted using
plate vibrators, including all lead & lifts, plywood / steel formwork, cost
of all materials of quality, labour, Usage charges of machineries, curing
and all the other appurtenances required to complete the work as per
technical specifications. ( The cost of steel reinforcement shall be paid
separately). PCC 1:1:. 5:3 using 20mm aggregate Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 8039.52 | 8039.52 | 0.4 | False | None | None | False | None | False | 3215.808 | 0 | 3337191 | 117137 | None | code06 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 80mm - class-B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 945.82 | 945.82 | 5.0 | False | None | None | False | None | False | 4729.1 | 0 | 3337192 | 117137 | None | code06 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments For Scour/Sluice Valve 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337193 | 117137 | None | code06 | Providing & fixing electro fusion saddle comply with BsEN12201 -3:2011, PN-12.5 rating and food grade raw material as per BS 6920 with material of construction PE 80 or PE 100 and colour of fitting - Blue/Black for water applications, EF tappinB saddle is V-Regarding type. Designed to fuse at a fusion voltage of 40 volt Ac. EF tapping saddle shall have moulded SS/Brass metal female threaded outlet. EF tapping saddle is fused by using a top loading piller type pressure exertin8 150ON (150 kg appn.) top load on EF saddle. Fusion tlme is 170 secs and cooling time is 10mins, Exerted pressure shoud be removed after completing the 10 mins cooling time. 63x20,75x20,90x20,110x20,140x20 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 392.0 | 392.0 | 14.0 | False | None | None | False | None | False | 5488.0 | 0 | 3337194 | 117137 | None | code06 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6988.97 | 6988.97 | 1.22 | False | None | None | False | None | False | 8526.5434 | 0 | 3337195 | 117137 | None | code06 | Renewing wooden beams in roofs including making good the holes in
walls and painting with oil type wood preservative of approved brand
and manufacture complete, including removal of rubbish to the dumping
ground, all complete as per direction of Engineer-in-Charge.1st ring including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 61005.28 | 61005.28 | 0.57 | False | None | None | False | None | False | 34773.0096 | 0 | 3337196 | 117137 | None | code07 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | 3 Poles | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337197 | 117137 | None | code07 | Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | 3 Poles | 1400.0 | 1400.0 | 1.0 | False | None | None | False | None | False | 1400.0 | 0 | 3337198 | 117137 | None | code07 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 80mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 1.0 | False | None | None | False | None | False | 1428.0 | 0 | 3337199 | 117137 | None | code07 | Providing Thermo-Mechanically Treated bars of grade Fe-500D Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Tonne | 103040.0 | 103040.0 | 0.43 | False | None | None | False | None | False | 44307.2 | 0 | 3337200 | 117137 | None | code07 | RCC VALVE CHAMBER 1.00x1.00: Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 383.04 | 383.04 | 4.37 | False | None | None | False | None | False | 1673.8848 | 0 | 3337201 | 117137 | None | code07 | Supply and fixing of Horizontal Mechanical Woltman type hemetically sealed water meters with copper Glass register with IP 68 protection. The meter shall be removable mechanism type manufactured as ISO 4064-1: 1993 with MID zertification. The meters shall be capable of transmitting consumption data on daily basis to central server through GSM/GPRS. The meter interface unit shall be fitted to the meter without wire. The consumption data shall be collected , stored and analysed by data logger. The data logger should provide data like flow rate, total flow, consumption analyses, reverse flow, meter tampering, daily flow distribution, leakage detection. The data logger shall also send alams on blocked meter, flow rate above limit, pressure below or above limits. Bulk flow meter 50mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 67016.32 | 67016.32 | 2.0 | False | None | None | False | None | False | 134032.64 | 0 | 3337202 | 117137 | None | code07 | Providing & fixing Flow control Using food grade materiaIs SS 316 ball 1/2" [15mm] including cost of all materials, labour charges, HOM and testing complete as per of following specification. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 285.6 | 285.6 | 14.0 | False | None | None | False | None | False | 3998.4 | 0 | 3337203 | 117137 | None | code07 | Proving Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C work including straightening , cutiing , bending , placing, in position ,binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour , usage charges complete as per specifications ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103040.0 | 103040.0 | 0.12 | False | None | None | False | None | False | 12364.8 | 0 | 3337204 | 117137 | None | code07 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates | Cum | 6988.97 | 6988.97 | 1.22 | False | None | None | False | None | False | 8526.5434 | 0 | 3337205 | 117137 | None | code08 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 40mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 499.25 | 499.25 | 15.0 | False | None | None | False | None | False | 7488.75 | 0 | 3337206 | 117137 | None | code08 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 40mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 499.25 | 499.25 | 10.0 | False | None | None | False | None | False | 4992.5 | 0 | 3337207 | 117137 | None | code08 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 0.9 | False | None | None | False | None | False | 90.72 | 0 | 3337208 | 117137 | None | code08 | Providing and placing on terrace (at floor levels) polythylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and base support for tank Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Ltr | 8.96 | 8.96 | 5000.0 | False | None | None | False | None | False | 44800.0 | 0 | 3337209 | 117137 | None | code08 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.32 | False | None | None | False | None | False | 1990.5536 | 0 | 3337210 | 117137 | None | code08 | Supplying and fixing surface box of required dia. and size with synthetic lid for valves or spindle rods. The surface box should be usable for 50 to 400mm dia. valves, PN 10 / 16 and will consist of lid, housing, locking clip, notched bolt, cross bar, washer and torque nut Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3739.68 | 3739.68 | 4.0 | False | None | None | False | None | False | 14958.72 | 0 | 3337211 | 117137 | None | code08 | Supplying MDPE pipe grade PE80 6kg/cm2, 5.3mm thick complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 142.0 | 142.0 | 165.2 | False | None | None | False | None | False | 23458.4 | 0 | 3337212 | 117137 | None | code08 | Providing plastering in cement mortar 1:3 proportion with minimum 2% of approved quality water proof compound, including scaffolding, racking out joints 25mm deep, smooth finishing, curing etc. with all lead and lifts for all materials etc. complete for. including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 377.44 | 377.44 | 24.36 | False | None | None | False | None | False | 9194.4384 | 0 | 3337213 | 117137 | None | code08 | Proving Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C work including straightening , cutiing , bending , placing, in position ,binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour , usage charges complete as per specifications ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103040.0 | 103040.0 | 0.11 | False | None | None | False | None | False | 11334.4 | 0 | 3337214 | 117137 | None | code09 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 6888.0 | 6888.0 | 1.0 | False | None | None | False | None | False | 6888.0 | 0 | 3337215 | 117137 | None | code09 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 6888.0 | 6888.0 | 1.0 | False | None | None | False | None | False | 6888.0 | 0 | 3337216 | 117137 | None | code09 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 3.36 | 3.36 | 50.0 | False | None | None | False | None | False | 168.0 | 0 | 3337217 | 117137 | None | code09 | Providing and fixing MS ladder between landings, 45 cms wide using
angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre,
with necessary supports of same angle iron etc. as directed, including
hand railing on both sides with 25mm dia. GI pipes with angle iron props
at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC
1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead
and lifts etc. complete with: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 4841.76 | 4841.76 | 8.0 | False | None | None | False | None | False | 38734.08 | 0 | 3337218 | 117137 | None | code09 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Concreteing rate including Formwork, Centring & Scaffolding for foundation, sub structure of cross drainage @ 5% Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6988.97 | 6988.97 | 1.26 | False | None | None | False | None | False | 8806.1022 | 0 | 3337219 | 117137 | None | code09 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe: 80mm - class-B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 945.82 | 945.82 | 10.0 | False | None | None | False | None | False | 9458.2 | 0 | 3337220 | 117137 | None | code09 | Supply and delivery at site wrought middle steel (galvanized) GI elbow
confirming to IS 1239-II, 1991 with latest amendments if any for:For 20 mm dia GI elbow Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 85.0 | 85.0 | 28.0 | False | None | None | False | None | False | 2380.0 | 0 | 3337221 | 117137 | None | code09 | Supplying, filling, spreading & leveling stone boulders of size range 5
cm to 20 cm, in recharge pit, in the required thickness, for all leads &
lifts, all complete as per direction of Engineer-in-charge including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1075.2 | 1075.2 | 6.867 | False | None | None | False | None | False | 7383.3984 | 0 | 3337222 | 117137 | None | code09 | Providing plastering in cement mortar 1:3 proportion with minimum 2% of approved quality water proof compound, including scaffolding, racking out joints 25mm deep, smooth finishing, curing etc. with all lead and lifts for all materials etc. complete for. including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 377.44 | 377.44 | 28.98 | False | None | None | False | None | False | 10938.2112 | 0 | 3337223 | 117137 | None | code10 | Labour charges for erection of outdoor type panel board and meter board
units with all necessary materials and labour, tools and equipments
including providing cement concrete foundation bed etc., complete as
per specification, with testing of as per instructions of engineer incharge
of work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 1512.0 | 1512.0 | 1.0 | False | None | None | False | None | False | 1512.0 | 0 | 3337224 | 117137 | None | code10 | Labour charges for erection of outdoor type panel board and meter board
units with all necessary materials and labour, tools and equipments
including providing cement concrete foundation bed etc., complete as
per specification, with testing of as per instructions of engineer incharge
of work. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 1512.0 | 1512.0 | 1.0 | False | None | None | False | None | False | 1512.0 | 0 | 3337225 | 117137 | None | code10 | Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC
Column pipes with heavy duty collars,rubber profile ring,vibration control
profile ring,freezing and turbulence free leak proof EPDM ring with ISI
mark with its latest amendments Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 644.0 | 644.0 | 20.0 | False | None | None | False | None | False | 12880.0 | 0 | 3337226 | 117137 | None | code10 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 2364.32 | 2364.32 | 1.0 | False | None | None | False | None | False | 2364.32 | 0 | 3337227 | 117137 | None | code10 | Supplying S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey. 300mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 1248.8 | 1248.8 | 5.0 | False | None | None | False | None | False | 6244.0 | 0 | 3337228 | 117137 | None | code10 | Supplying and fixing Multijet class B inferential type, AMR compatible water meters with IP 68 protection totalizer confoming to IS 779 with its latest amendments of following size to service connections including conveying and fixing of necessary G.I. specials with appurtenances. complete, with all lead and lift.15mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 1846.88 | 1846.88 | 14.0 | False | None | None | False | None | False | 25856.32 | 0 | 3337229 | 117137 | None | code10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 228.48 | 228.48 | 74.133 | False | None | None | False | None | False | 16937.90784 | 0 | 3337230 | 117137 | None | code10 | Supplying, filling, spreading & leveling stone boulders of size range 5
cm to 20 cm, in recharge pit, in the required thickness, for all leads &
lifts, all complete as per direction of Engineer-in-charge including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 1075.2 | 1075.2 | 7.754 | False | None | None | False | None | False | 8337.1008 | 0 | 3337231 | 117137 | None | code11 | Labour charges for providing connection using insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materials ,tools and equipments,as per specificationswith testing of as per instructions of engineer incharge of work.3 1/2 x 6 sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 218.4 | 218.4 | 20.0 | False | None | None | False | None | False | 4368.0 | 0 | 3337232 | 117137 | None | code11 | Labour charges for providing connection using insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments from KPTCL pole to meter board unit, with all necessary materials ,tools and equipments,as per specificationswith testing of as per instructions of engineer incharge of work.3 1/2 x 6 sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 218.4 | 218.4 | 25.0 | False | None | None | False | None | False | 5460.0 | 0 | 3337233 | 117137 | None | code11 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Nos | 1428.0 | 1428.0 | 2.0 | False | None | None | False | None | False | 2856.0 | 0 | 3337234 | 117137 | None | code11 | Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103.04 | 103.04 | 94.5 | False | None | None | False | None | False | 9737.28 | 0 | 3337235 | 117137 | None | code11 | Providing and fixing PTMT stop cock of approved quality and colour. 15 mm nominal bore, 86mm long, weighing not less than 88g. complete as per specifications. 15 mm PTMT stop cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 159.04 | 159.04 | 14.0 | False | None | None | False | None | False | 2226.56 | 0 | 3337236 | 117137 | None | code11 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 122.0 | 122.0 | 83.22 | False | None | None | False | None | False | 10152.84 | 0 | 3337237 | 117137 | None | code11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 228.48 | 228.48 | 57.346 | False | None | None | False | None | False | 13102.41408 | 0 | 3337238 | 117137 | None | code12 | Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 151.2 | 151.2 | 15.0 | False | None | None | False | None | False | 2268.0 | 0 | 3337239 | 117137 | None | code12 | Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 151.2 | 151.2 | 20.0 | False | None | None | False | None | False | 3024.0 | 0 | 3337240 | 117137 | None | code12 | Providing two coats of water proof cement painting with approved colour and shade over one coat of primer including scrapping the surface with wire brushes etc. before removal of scaffolding for new RCC over head tanks and cleaning of paint stains wherever necessary with all lead and lifts etc. complete for: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 151.2 | 151.2 | 42.41 | False | None | None | False | None | False | 6412.392 | 0 | 3337241 | 117137 | None | code12 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)For Medium Duty GI pipe i) For Crossing drain 32 mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 392.63 | 392.63 | 3.0 | False | None | None | False | None | False | 1177.89 | 0 | 3337242 | 117137 | None | code12 | Providing chain link fencing 50mm size of 8 guage properly stretched between existing rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 800.8 | 800.8 | 7.07 | False | None | None | False | None | False | 5661.656 | 0 | 3337243 | 117137 | None | code12 | Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 122.0 | 122.0 | 99.86 | False | None | None | False | None | False | 12182.92 | 0 | 3337244 | 117137 | None | code13 | Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 89.6 | 89.6 | 15.0 | False | None | None | False | None | False | 1344.0 | 0 | 3337245 | 117137 | None | code13 | Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Mtr | 89.6 | 89.6 | 20.0 | False | None | None | False | None | False | 1792.0 | 0 | 3337246 | 117137 | None | code13 | RCC VALVE CHAMBER 1.00x1.00: Earth work excavation for pipeline trenches in all kinds of by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Ordinary/soft rock (without requiring blasting) Depth upto 1.50 m Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 383.04 | 383.04 | 4.37 | False | None | None | False | None | False | 1673.8848 | 0 | 3337247 | 117137 | None | code13 | Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing)For Medium Duty GI pipe ii) For Meter box to tap 15 mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Rmtr | 209.48 | 209.48 | 21.0 | False | None | None | False | None | False | 4399.08 | 0 | 3337248 | 117137 | None | code13 | Applying red lead ready mix priming coat over new steel or other metal surface including preparing the surface after throughly cleaning oil, grease, dirt and other foreign matter, and scoured with wire brushes, fine steel wool, sand papers including cost of materials, labour,complete as per specifications. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 45.92 | 45.92 | 3.62 | False | None | None | False | None | False | 166.2304 | 0 | 3337249 | 117137 | None | code13 | Providing chain link fencing 50mm size of 8 guage properly stretched between existing rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 800.8 | 800.8 | 10.18 | False | None | None | False | None | False | 8152.144 | 0 | 3337250 | 117137 | None | code14 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 4200.0 | 4200.0 | 1.0 | False | None | None | False | None | False | 4200.0 | 0 | 3337251 | 117137 | None | code14 | Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Job | 4200.0 | 4200.0 | 1.0 | False | None | None | False | None | False | 4200.0 | 0 | 3337252 | 117137 | None | code14 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6220.48 | 6220.48 | 0.32 | False | None | None | False | None | False | 1990.5536 | 0 | 3337253 | 117137 | None | code14 | Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI union confirming to IS 1239-II, 1991 with latest amendments if any. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 77.28 | 77.28 | 28.0 | False | None | None | False | None | False | 2163.84 | 0 | 3337254 | 117137 | None | code14 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 118.72 | 118.72 | 3.61 | False | None | None | False | None | False | 428.5792 | 0 | 3337255 | 117137 | None | code14 | Applying red lead ready mix priming coat over new steel or other metal surface including preparing the surface after throughly cleaning oil, grease, dirt and other foreign matter, and scoured with wire brushes, fine steel wool, sand papers including cost of materials, labour,complete as per specifications. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 45.92 | 45.92 | 5.19 | False | None | None | False | None | False | 238.3248 | 0 | 3337256 | 117137 | None | code15 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Concreteing rate including Formwork, Centring & Scaffolding for foundation, sub structure of cross drainage @ 5% Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6988.97 | 6988.97 | 1.26 | False | None | None | False | None | False | 8806.1022 | 0 | 3337257 | 117137 | None | code15 | Supply and delivery at site wrought middle steel (galvanized) 15mm GI elbow confirming to IS 1239-II, 1991 with latest amendments if any for: Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 53.76 | 53.76 | 70.0 | False | None | None | False | None | False | 3763.2 | 0 | 3337258 | 117137 | None | code15 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 4.5 | False | None | None | False | None | False | 453.6 | 0 | 3337259 | 117137 | None | code15 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. | Sqm | 118.72 | 118.72 | 5.17 | False | None | None | False | None | False | 613.7824 | 0 | 3337260 | 117137 | None | code16 | Providing and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 2364.32 | 2364.32 | 1.0 | False | None | None | False | None | False | 2364.32 | 0 | 3337261 | 117137 | None | code16 | Supply and fixing of HDPE water meter box with locking arrangementto protect the water meter of Class ‘B’ Multijet type of size 15 to 32 mm including HDPE box with base dia 300mm x lid dia 200mm x height 250mm with openable lid and the cover is buried below GL with lid flush with GL including earth work excavation for 600mm x 600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC =1:2:4 using 12-20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height, disposal ofexcess earth with all lead and lifts with appurtenances complete as perdrawing enclosed. HDPE water meter box Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Each | 570.08 | 570.08 | 14.0 | False | None | None | False | None | False | 7981.12 | 0 | 3337262 | 117137 | None | code16 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3.36 | 3.36 | 1000.0 | False | None | None | False | None | False | 3360.0 | 0 | 3337263 | 117137 | None | code16 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargencluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Sqm | 100.8 | 100.8 | 4.5 | False | None | None | False | None | False | 453.6 | 0 | 3337264 | 117137 | None | code17 | Providing Thermo-Mechanically Treated bars of grade Fe-550 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Kg | 103.04 | 103.04 | 94.5 | False | None | None | False | None | False | 9737.28 | 0 | 3337265 | 117137 | None | code17 | Providing and fixing brass bib cock of approved quality : 15mm PTMT bib cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work HDPE water meter box | Each | 365.12 | 365.12 | 14.0 | False | None | None | False | None | False | 5111.68 | 0 | 3337266 | 117137 | None | code17 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 3.36 | 3.36 | 1000.0 | False | None | None | False | None | False | 3360.0 | 0 | 3337267 | 117137 | None | code18 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6890.24 | 6890.24 | 0.75 | False | None | None | False | None | False | 5167.68 | 0 | 3337268 | 117137 | None | code19 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately).Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | Cum | 6415.36 | 6415.36 | 0.76 | False | None | None | False | None | False | 4875.6736 | 0 | 3337269 | 117137 | None | code20 | Providing and fixing R.C.C stand post for household connection of 30cms x 15 cms, and 90 cms. Deep using RCC M20 and 6 mm dia rods for verticals and stirrups and rendered smooth, including fixing R.C.C stand post 45cms below ground level and in M-20, 15cms. height, with 8 cms offset around the stand post and curing for 10 days including earthwork excavation in all types of soils with all lead and lift including cost of all material, labour, finishing, paintitng and lettering JJM logo and FHTC number etc. complete (as per typical estimate enclosed) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work | No | 577.05 | 577.05 | 14.0 | False | None | None | False | None | False | 8078.7 | 0 |
|
|
---|