noticeInvitingTenderDTO
createdTs1718878393172
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2710.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose02-07-2024 16:30:13
tenderQueryClose29-06-2024 16:30:02
technicalBidOpen03-07-2024 16:30:48
publishedDate25-06-2024 11:32:16
publishedByPostRWSSD_EE_DIV_KWR
publishedByUserKPE10478 - RAJEEV P NAIK
bidValidityPeriod90
noOfCalls1
preBidMeetingDate23-06-2024 17:28:02
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9448181976
tenderSupplierListNone
tenderSchedule
createdTs1718878393215
version7
createdDateNone
modifiedDateNone
tenderNumberRWSSD/2023-24/WS/WORK_INDENT7309
titleProviding FHTCs to 678 Households in Madhewada, Chendiya, Ice Factory, Nirakarwada and Wailwada habitations of Chendiya Village, Chendiya G.P. Karwar Taluka Uttara Kannada District Through Karwar Ankola Enroute Villages water supply scheme in Karwar Taluka.
descriptionRising main, OHT, Providing distribution pipeline and FHTC
categoryWORKS
categoryTextWorks
ecv10804048.91
deptNameRural Drinking Water and Sanitation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1272
locationNameRWSSD Division Office Karwar
provisionalAmount12350000.0
groupOverheadTotal0.0
fileNumberRWSSD/KWR/CHENDIYA/MADHEWADA/2021-22
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17188783930000NoneNoneWater supply/sewage linesPumping Machinery at Existing GLSR-261825.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318210116071Nonecode01Pumping Machinery at Existing GLSR-2 : Supplying & delivery to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034 3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, with necessary testing, testing shall confirm to latest eidition of IS & its amendmnents as per instructions of engineer incharge of work. 3.00 HP - 300 LPM @ 26 m = 2 STG Outlet Dia - 2.50" Designed 2.00 HP Head 24 m Discharge 2.184 LPS Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo22895.022895.01.0FalseNoneNoneFalseNoneFalse22895.00
3318211116071Nonecode02Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x16 Sqm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr144.0144.015.0FalseNoneNoneFalseNoneFalse2160.00
3318212116071Nonecode03Supply and delivery at site of brand new best make pressure gauge bourdon type as per IS 778/1984 with ISI Mark and as per its latest amendments 80 mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos410.0410.01.0FalseNoneNoneFalseNoneFalse410.00
3318213116071Nonecode04Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos1190.01190.01.0FalseNoneNoneFalseNoneFalse1190.00
3318214116071Nonecode05Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments 50mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos1175.01175.01.0FalseNoneNoneFalseNoneFalse1175.00
3318215116071Nonecode06Supply installing testing and commissioning COMMON Control panel consisting of the following INCOMING:1 No Set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1 no with Phase selector switch, Isolating Switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection like single Phase preventor, Under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no outdoor type Upto 6HP Pumps Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSet9517.09517.01.0FalseNoneNoneFalseNoneFalse9517.00
3318216116071Nonecode07Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKvar450.0450.04.0FalseNoneNoneFalseNoneFalse1800.00
3318217116071Nonecode08Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work3 Poles1025.01025.01.0FalseNoneNoneFalseNoneFalse1025.00
3318218116071Nonecode09Supply and delivery at site 50mm(2”) dia heavy duty unplasticized PVC Column pipes with heavy duty collers,rubber profile ring,vibration control profile ring,freezing and turbulence free leak proof EPDM ring with ISI mark with its latest amendments Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr498.0498.010.0FalseNoneNoneFalseNoneFalse4980.00
3318219116071Nonecode10Labour charges for Erection, Electrification and commissioning works of Pump sets including aligning and balancing with all necessary erection of materials and labour including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges, tools and equipments etc., involved in the job. as per specifications, with testing of as per instructions of engineer in-charge of work Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workJob5650.05650.01.0FalseNoneNoneFalseNoneFalse5650.00
3318220116071Nonecode11Labour charges for Erection of outdoor type panel board and meter board units with all necessary materials and labour tools and equipments including providing cement concrete foundation bed etc., complete. as per specifications, with testing of as per instructions of engineer in-charge of work Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workJob1198.01198.01.0FalseNoneNoneFalseNoneFalse1198.00
3318221116071Nonecode12Labour charges for Providing main connection from pole - PVC insulated sheathed steel wire cable as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit, with all necessary materials and labour tools and equipments, as per specifications, with testing of as per instructions of engineer in-charge of work 3 1/2 x 16sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr140.0140.020.0FalseNoneNoneFalseNoneFalse2800.00
3318222116071Nonecode13Providing main connection from pole PVC insulated sheathed steel wire cable in new trench as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr123.0123.015.0FalseNoneNoneFalseNoneFalse1845.00
3318223116071Nonecode14Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe as per IS 1554/ 1988 with latest amendments with ISI mark from KPTCL pole to meter board unit. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr70.070.015.0FalseNoneNoneFalseNoneFalse1050.00
3318224116071Nonecode15Providing, Supplying and fixing LT cast iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. with all necessary materials and labour tools and equipments . as per specifications,with testing of as per instructions of engineer incharge of work 3 1/2 x 16sqmm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach497.0497.01.0FalseNoneNoneFalseNoneFalse497.00
3318225116071Nonecode16Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workJob3633.03633.01.0FalseNoneNoneFalseNoneFalse3633.00
17188783930000NoneNoneWater supply/sewage linesProposed Rising Main720686.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318226116072Nonecode01Proposed Rising Main: Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.3135.63FalseNoneNoneFalseNoneFalse40865.3190
3318227116072Nonecode02Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Hard soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.390.42FalseNoneNoneFalseNoneFalse27243.5460
3318228116072Nonecode03Earth work excavatoin for water Supply and Sanitary lines Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification including setting out construction of shoring strutting barricading danger lighting bracing using sight rails and boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter dressing of sides and levelling the bottom of trench including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work in the following strata classifications by Mechanical Means Ordinary Soil /Hard Soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum149.5149.579.79FalseNoneNoneFalseNoneFalse11928.6050
3318229116072Nonecode04Earth work excavatoin for water Supply and Sanitary lines Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification including setting out construction of shoring strutting barricading danger lighting bracing using sight rails and boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter dressing of sides and levelling the bottom of trench including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work in the following strata classifications by Mechanical Means Ordinary rock without blasting Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum200.1200.119.85FalseNoneNoneFalseNoneFalse3971.9850
3318230116072Nonecode05Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Cement concrete road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum1271.91271.95.54FalseNoneNoneFalseNoneFalse7046.3260
3318231116072Nonecode06Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Asphalt road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum623.3623.30.29FalseNoneNoneFalseNoneFalse180.7570
3318232116072Nonecode07Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Macadam road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum397.9397.90.59FalseNoneNoneFalseNoneFalse234.7610
3318233116072Nonecode08Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used PE80 (PN 6.0 /6 Kg/cm2) 75mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr221.95221.95270.0FalseNoneNoneFalseNoneFalse59926.50
3318234116072Nonecode09Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used PE80 (PN 6.0 /6 Kg/cm2) 90mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr288.65288.65180.0FalseNoneNoneFalseNoneFalse51957.00
3318235116072Nonecode10Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used PE80 (PN 6.0/6 Kg/cm2) 140 mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr632.5632.5370.0FalseNoneNoneFalseNoneFalse234025.00
3318236116072Nonecode11Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For Scour Sluice Valve 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo9834.89834.82.0FalseNoneNoneFalseNoneFalse19669.60
3318237116072Nonecode12Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For Scour Sluice Valve 150mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo21809.7521809.752.0FalseNoneNoneFalseNoneFalse43619.50
3318238116072Nonecode13Supply and Fixing of Cast Steel Double Flanged Dual plate check valve Class150 Conforming to API 594 with latest amendments as detailed below of following diameters and types and conveying to work site loading unloading stacking etc complete with all lead and lift The rates are inclusive of cost of Bolts and Nuts 80mm- Class 300 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo5225.65225.61.0FalseNoneNoneFalseNoneFalse5225.60
3318239116072Nonecode14Supply and Fixing of Cast Steel Double Flanged Dual plate check valve Class150 Conforming to API 594 with latest amendments as detailed below of following diameters and types and conveying to work site loading unloading stacking etc complete with all lead and lift The rates are inclusive of cost of Bolts and Nuts 150mm- Class 300 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo10363.810363.81.0FalseNoneNoneFalseNoneFalse10363.80
3318240116072Nonecode15Supply and fixing of single chamber triple function tamper proof (Both the orifces to be housed in the single chamber) Air valves with Body and cover in Ductile cast iron of grade GGG 50 All internal parts such as float shell etc all cover bolts of austenitic alloy SS 304 steel DN 50 float of HOSTAFLON SS 304 and gaskers and seals of EPDM Epoxy powder coating (EP P) inside and outside colour bule RAL5005 The valves should be designed for all the three functions i e 1 Large orifice for venting of large air volumes on start up 2 Large orifice for intake of large air volumes 3 Small orifice for discharge of pressurized air during operation 50mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo18818.618818.61.0FalseNoneNoneFalseNoneFalse18818.60
3318241116072Nonecode16Supplying and fixing of fixed height surface box H 4057 MD KU with PP 40% GF Lid Housing of PA+ Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2 70 for service connection valves design derived from DIN 4057 Should be suppied with support tile I (FSL FSS SI) Should be able to receive class AA traffic loads Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2735.02735.06.0FalseNoneNoneFalseNoneFalse16410.00
3318242116072Nonecode17Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) 150mm Class- B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr1045.351045.3530.0FalseNoneNoneFalseNoneFalse31360.50
3318243116072Nonecode18Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead and lifts (Compacting with vibro roller) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum118.45118.45226.05FalseNoneNoneFalseNoneFalse26775.62250
3318244116072Nonecode19Dismantling of existing structures like culverts bridges retaining walls and other structure comprising of masonry cement concrete wood work steel work including TandP and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications Rubble stone masonry in cement mortar MORTH Specification No 202 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum402.5402.51.35FalseNoneNoneFalseNoneFalse543.3750
3318245116072Nonecode20Dismantling of existing structures like culverts bridges retaining walls and other structure comprising of masonry cement concrete wood work steel work including TandP and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and complete as per specifications Lime Cement Concrete By Manual Means Cement Concrete Grade M 15 and M 20MORTH Specification No 202 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum639.4639.41.82FalseNoneNoneFalseNoneFalse1163.7080
3318246116072Nonecode21Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.81.35FalseNoneNoneFalseNoneFalse9178.380
3318247116072Nonecode22Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement 320kgs with 20mm and down size graded granite metal coarse aggregates 0 69cum and fine aggregtes 0 460 cum with super plasticisers 3 liters confirming to IS 9103 1999 reafirmed 2008 machine mixed concrete laid in layers not exceeding 15 cms thick vibrated for all works in foundation for footings pedastals retaining walls return walls walls (any thickness) including attached pilasters column spillars posts struts buttresses bed blocks anchor blocks and plinths etc including cost of all materials labour HOM of machinery curing complete but excluding cost of reinforcement as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.611.82FalseNoneNoneFalseNoneFalse13146.97020
3318248116072Nonecode23Restoration of Roads. Providing and laying in position plain cement concrete of mix M20 with OPC cement 300kgs with 20mm and down size graded granite metal coarse aggregates 0 69cum and fine aggregtes 0 43cum machine mixed concrete laid in layers not exceeding 15 cms thick well compacted in foundation plinth and cills including cost of all materials labour HOM of machinery curing complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.86.41FalseNoneNoneFalseNoneFalse43580.3080
3318249116072Nonecode24thrust block 600x600: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.852.31FalseNoneNoneFalseNoneFalse794.29350
3318250116072Nonecode25Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregtes @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6546.266546.260.18FalseNoneNoneFalseNoneFalse1178.32680
3318251116072Nonecode26Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.611.02FalseNoneNoneFalseNoneFalse7368.08220
3318252116072Nonecode27Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth and string courses cost of all materials, labour complete as per specificaitons) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm411.7411.75.82FalseNoneNoneFalseNoneFalse2396.0940
3318253116072Nonecode28Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKg91.791.736.0FalseNoneNoneFalseNoneFalse3301.20
3318254116072Nonecode29RCC VALVE CHAMBER 1.00x1.00: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. In ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.854.37FalseNoneNoneFalseNoneFalse1502.62450
3318255116072Nonecode30Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregtes @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6546.266546.260.32FalseNoneNoneFalseNoneFalse2094.80320
3318256116072Nonecode31Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.611.26FalseNoneNoneFalseNoneFalse9101.74860
3318257116072Nonecode32Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm296.7296.70.96FalseNoneNoneFalseNoneFalse284.8320
3318258116072Nonecode33Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth and string courses cost of all materials, labour complete as per specificaitons) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm411.7411.711.35FalseNoneNoneFalseNoneFalse4672.7950
3318259116072Nonecode34Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKg91.791.794.5FalseNoneNoneFalseNoneFalse8665.650
3318260116072Nonecode35Providing and fixing 60x60cms M.S. inspection door with necessary M.S. frame made out of M.S. angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2090.72090.71.0FalseNoneNoneFalseNoneFalse2090.70
17188783930000NoneNoneWater supply/sewage linesRCC Hume pipe room at Ex. GLSR-230940.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318261116073Nonecode01RCC hume pipe Room at Proposed Borewell: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. in ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.850.87FalseNoneNoneFalseNoneFalse299.14950
3318262116073Nonecode02Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 20mm and down size graded granite metal coarse aggregates @0.84cum and fine aggregtes @ 0.56cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick,well compacted, in foundation,plinth and cills, ncluding cost of all materials, labour, HOM of machinery, curing complete as per specifications. For foundation Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6810.766810.760.29FalseNoneNoneFalseNoneFalse1975.12040
3318263116073Nonecode03Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6, edges of stones chistle dressed in courses not less than 15 cms high, bond stones at 2 m. apart in each course including cost of materials, labour, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6419.766419.761.02FalseNoneNoneFalseNoneFalse6548.15520
3318264116073Nonecode04Providing and Filling in foundation with granite / trap broken metal 100mm. And down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum2464.452464.450.33FalseNoneNoneFalseNoneFalse813.26850
3318265116073Nonecode05Providing and laying in position plain cement concrete of grade M 15 with cement @ 240kgs, with 20mm and down size graded granite metal coarse aggregates @0.878cum and fine aggregtes @ 0.53cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, ncluding cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6975.676975.670.45FalseNoneNoneFalseNoneFalse3139.05150
3318266116073Nonecode06RCC hume pipe Circular pump house: Supplying precast RCC Circular Hume pipe pump house with M.S door and RCC conical roof as per specification and drawings - Internal dia Mtr. 1200 mm & height of 2.5 Mtr. With Wall thickness 65mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach16000.016000.01.0FalseNoneNoneFalseNoneFalse16000.00
3318267116073Nonecode07Erection and positioning of RCC Hume pipe pump house/Cistern on size stone masory platform including transportation charges and handling,finishing with all necessary tools ,plants and materials etc.,complete as directed by the Engineer in charge of the work.Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach2165.452165.451.0FalseNoneNoneFalseNoneFalse2165.450
17188783930000NoneNoneWater supply/sewage linesReparis to Existing stone masonry GLSR (Capacity 75,000 ltr)252718.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318268116074Nonecode01Repairs to Existing Stone Masonry GLSR (capacity 75,000 ltr) :Clearing thin jungle growth (more than 50% open space) including bushes upto 300 mm parthenium and other weeds including burning or disposing off the same as directed etc complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm1.91.9118.08FalseNoneNoneFalseNoneFalse224.3520
3318269116074Nonecode02Dubbing out on old irregular walls average 10mm thick and making good the surface with the cement mortar 1 6 including curing cost of materals labour complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm162.15162.1596.3FalseNoneNoneFalseNoneFalse15615.0450
3318270116074Nonecode03Extra for providing and mixing waterproofing compound in cement plaster for stone masonry work at one kg per bag or in the proportion recommended by the manufacturers, for cement mortar 1:4, 20mm thick cost of materials complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm9.899.8996.3FalseNoneNoneFalseNoneFalse952.4070
3318271116074Nonecode04Providing 20mm thick cement plaster in single coat with cement mortar 1 4 tostone masonry concrete surface including rounding off corners wherever required smooth rendering Providing and removing scaffolding including cost of materials labour curingcomplete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm321.72321.7296.3FalseNoneNoneFalseNoneFalse30981.6360
3318272116074Nonecode05Providing and fixing food grade epoxy painting to over head tank and sump tank aftercleaning and drying including pumping and bailing out of water, including cost of all materials labour lead and lifts etc., complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm115.0115.096.3FalseNoneNoneFalseNoneFalse11074.50
3318273116074Nonecode06Providing 2 coats of snowcem /Water-proof cement paint painting over one coat of primer including scrapping the exposed faces, removing loose plastering, removal of vegetations, fungus, cleaning the surface, replastering wherever required in CM 1:3 to the required shape with necessary scaffolding & curing etc., (Including cost of materials). Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm244.95244.95116.0FalseNoneNoneFalseNoneFalse28414.20
3318274116074Nonecode07Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and complete as per specifications, Lime /Cement Concrete, By Manual Means, Cement Concrete Grade M-15 & M-20MORTH Specification Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum639.4639.412.18FalseNoneNoneFalseNoneFalse7787.8920
3318275116074Nonecode08Supply and delivery of Resilient seated soft sealing Sluice Valves with body, bonnet of Ductile Iron of grade GGG50, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163-89/IS 14846-2000/ DIN 3202 F4/F5. The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings). All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage. The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS. 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo12463.712463.71.0FalseNoneNoneFalseNoneFalse12463.70
3318276116074Nonecode09Supply and delivery of Resilient seated soft sealing Sluice Valves with body, bonnet of Ductile Iron of grade GGG50, wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163-89/IS 14846-2000/ DIN 3202 F4/F5. The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings). All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage. The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS. 150mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo21809.7521809.752.0FalseNoneNoneFalseNoneFalse43619.50
3318277116074Nonecode10Ladder inside the container Providing anodized aluminium ladder using 65mm x 32mm x 3 0mm ‘C’ section for ladder side channel x 25mm dia flutal pipe for Rungs at 250mm c c ladder fixed at an angle of 70 degrees to horizontal including necessary 25mm dia G I shutters with necessary G I fasteners for bracing the ladders to the Tank walls to prevent buckling of the ladder with necessary (M 15) bed for embedding the ladder bottom complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr3563.853563.854.0FalseNoneNoneFalseNoneFalse14255.40
3318278116074Nonecode11Providing and fixing 60x60cms M S inspection door with necessary M S frame made out of M S angle 50x50x6mm and M S shutters of 31 5mm or B G 10 thick with hinges on top and locking arrangement painting etc complete (for RCC over head tank and G L S R ) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach2090.72090.71.0FalseNoneNoneFalseNoneFalse2090.70
3318279116074Nonecode12RCC VALVE CHAMBER 1.00x1.00: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. In ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.8513.11FalseNoneNoneFalseNoneFalse4507.87350
3318280116074Nonecode13Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregtes @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6546.266546.260.96FalseNoneNoneFalseNoneFalse6284.40960
3318281116074Nonecode14Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.613.78FalseNoneNoneFalseNoneFalse27305.24580
3318282116074Nonecode15Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm296.7296.72.88FalseNoneNoneFalseNoneFalse854.4960
3318283116074Nonecode16Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth and string courses cost of all materials, labour complete as per specificaitons) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm411.7411.734.05FalseNoneNoneFalseNoneFalse14018.3850
3318284116074Nonecode17Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKg91.791.7283.5FalseNoneNoneFalseNoneFalse25996.950
3318285116074Nonecode18Providing and fixing 60x60cms M.S. inspection door with necessary M.S. frame made out of M.S. angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2090.72090.73.0FalseNoneNoneFalseNoneFalse6272.10
17188783930000NoneNoneWater supply/sewage linesRepairs to RCC GLSR 50,000 Ltrs Capacity36108.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318286116075Nonecode01Repairs to RCC GLSR 50,000 LTRS CAPACITY Clearing thin jungle growth (more than 50% open space) including bushes upto 300 mm parthenium and other weeds including burning or disposing off the same as directed etc complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm1.91.9144.0FalseNoneNoneFalseNoneFalse273.60
3318287116075Nonecode02Extra for providing and mixing waterproofing compound in cement plaster for stone masonry work at one kg per bag or in the proportion recommended by the manufacturers, for cement mortar 1:4, 20mm thick cost of materials complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm9.899.8966.76FalseNoneNoneFalseNoneFalse660.25640
3318288116075Nonecode03Providing and fixing food grade epoxy painting to over head tank and sump tank aftercleaning and drying including pumping and bailing out of water, including cost of all materials labour lead and lifts etc., complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm115.0115.066.76FalseNoneNoneFalseNoneFalse7677.40
3318289116075Nonecode04Providing 2 coats of snowcem /Water-proof cement paint painting over one coat of primer including scrapping the exposed faces, removing loose plastering, removal of vegetations, fungus, cleaning the surface, replastering wherever required in CM 1:3 to the required shape with necessary scaffolding & curing etc., (Including cost of materials). Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm244.95244.9592.02FalseNoneNoneFalseNoneFalse22540.2990
3318290116075Nonecode05Providing and fixing 60x60cms M S inspection door with necessary M S frame made out of M S angle 50x50x6mm and M S shutters of 31 5mm or B G 10 thick with hinges on top and locking arrangement painting etc complete (for RCC over head tank and G L S R ) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach2090.72090.71.0FalseNoneNoneFalseNoneFalse2090.70
3318291116075Nonecode06Painting two coats on new concrete surface :Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, with materials, labour complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm94.394.36.0FalseNoneNoneFalseNoneFalse565.80
3318292116075Nonecode07Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications. (“i) Hindi (Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH Specification Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos1.151.152000.0FalseNoneNoneFalseNoneFalse2300.00
17188783930001NoneNoneWater supply/sewage linesConstruction of ELSR 30,000 ltr, 7.50 m stg.1062337.17
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318293116076Nonecode01Construction of ELSR 30,000 ltr, 7.50 m stg.: Earth work in excavation of foundation of structures upto 3 m depth as per drawing and technical specification, including setting out, providing shoring,strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent required and utilising / transporting the remaining earth upto 1.00km lead, including cost of labour, materials and HOM of machineries, etc., complete. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum59.859.850.79FalseNoneNoneFalseNoneFalse3037.2420
3318294116076Nonecode02Providing and laying in position plain cement concrete of grade M 15 with OPC cement @ 240kgs, with 40mm and down size graded granite metal coarse aggregates @0.878cum and fine aggregtes @ 0.459cum machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6678.976678.972.4FalseNoneNoneFalseNoneFalse16029.5280
3318295116076Nonecode03Providing and laying Reinforced cement concrete of mix design of M-25 Grade with cement @ 340 kg, 20mm and graded granite or trap or basalt jelly of approved quality @ 0.7 cum and fine aggregates @ 0.47 cum, super plasticiser @ 3lts confirming to IS-9103-1999 reaffirmed 2008 in layers of not more than 15 cms thick, well consolidated including centering, formwork, vibrating, curing, smooth finishing to the required plumb and face in C.M.1:3 proportion wherever necessary etc., complete for R. rafts, raft ring-beam, column footing, columns below ground level (exclusive cost of steel and fabrication charges) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum8980.588980.585.55FalseNoneNoneFalseNoneFalse49842.2190
3318296116076Nonecode04Providing and laying Reinforced cement concrete of mix design of M-30 Grade with cement @ 360 kg, 20mm and graded granite or trap or basalt jelly of approved quality @ 0.69 cum and fine aggregates @0.46 cum, super plasticiser @ 3lts confirming to IS-9103-1999 reaffirmed 2008 in layers of not more than 15 cms thick, well consolidated including centering, formwork, vibrating, curing, smooth finishing to the required plumb and face in C.M.1:3 proportion wherever necessary etc., complete as per design and specification for staging, columns and braces above ground level (exclusive of cost of steel and fabrication charges) Staging - 7.50 MtrIncluding loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum14996.2314996.234.02FalseNoneNoneFalseNoneFalse60284.84460
3318297116076Nonecode05Providing and laying Reinforced cement concrete of mix design of M-30 Grade with cement @ 360 kg, 20mm and graded granite or trap or basalt jelly of approved quality @ 0.69 cum and fine aggregates @0.46 cum, super plasticiser @ 3lts confirming to IS-9103-1999 reaffirmed 2008 in layers of not more than 15 cms thick, well consolidated including centering, formwork, vibrating, curing, smooth finishing to the required plumb and face in C.M.1:3 proportion wherever necessary etc., complete as per design and specification and giving satisfactory water proof test including construction joints wherever necessary as per the directions of the departmental Officers complete for ring beam, side walls, bottom dome or bottom slab, shell portion and bottom ribs (exclusive of cost of steel and fabrication charges and jointing materials) Staging - 7.50 Mtr Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum20929.0820929.089.01FalseNoneNoneFalseNoneFalse188571.01080
3318298116076Nonecode06Providing and laying Reinforced cement concrete of mix design of M-30 Grade with cement @ 360 kg, 20mm and graded granite or trap or basalt jelly of approved quality @ 0.69 cum and fine aggregates @0.46 cum, super plasticiser @ 3lts confirming to IS-9103-1999 reaffirmed 2008 in layers of not more than 15 cms thick, well consolidated including centering, formwork, vibrating, curing, smooth finishing to the required plumb and face in C.M.1:3 proportion wherever necessary etc., completeas per design and specifications etc., complete for top rib and top dome or top slab (exclusive cost of steel and fabrication charges) Staging - 7.50 Mtr Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum15513.7315513.734.16FalseNoneNoneFalseNoneFalse64537.11680
3318299116076Nonecode07Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workTonne91704.8591704.853.18FalseNoneNoneFalseNoneFalse291621.4230
3318300116076Nonecode08Providing and fixing M.S. ladder between landing 45 cms. wide using angle iron of following size and 20 mm M.S. bars at 25cms. centre to centre with necessary supports of same angle iron as directed including hand railing on both sides with 25mm dia G.I. pipes with angle iron props at 2 mtrs, interval and 0.5 mtr, height including fixing in ground with C.C. 1:2:4 and two coats of nonpoisonous anticorrosive bituminous paint with all lead and lift etc., complete. 65x65x8mm angle iron frame. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr2094.152094.1515.0FalseNoneNoneFalseNoneFalse31412.250
3318301116076Nonecode09Ladder inside the container: Providing anodized aluminium ladder using 65mm x 32mm x 3.0mm ‘C’ section for ladder side channel x 25mm dia., flutal pipe for Rungs at 250mm c/c ladder fixed at an angle of 70 degrees to horizontal including necessary 25mm dia., G.I. shutters with necessary G.I. fasteners for bracing the ladders to the Tank walls to prevent buckling of the ladder with necessary (M-15) bed for embedding the ladder bottom complete Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr3563.853563.853.0FalseNoneNoneFalseNoneFalse10691.550
3318302116076Nonecode10Providing and fixing 60x60cms M.S. inspection door with necessary M.S. frame made out of M.S. angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach2090.72090.71.0FalseNoneNoneFalseNoneFalse2090.70
3318303116076Nonecode11Supplying, and Fixing CI puddle flanges confirming to IS 7181-1986 with latest amendments in position for RCC walls including hoisting and conveying them to work spot with all lead and lifts etc complete 80 mm dia CI puddle flange Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos3044.053044.054.0FalseNoneNoneFalseNoneFalse12176.20
3318304116076Nonecode12Supplying,,laying of CI flanged pipe true to line/hoisting of CI flanged pipe confirming to IS 7181-1986 with latest amendments in position and aligning to correct plumb including cost of jointing material,conveying to work spot with all lead and lifts etc complete 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr2263.22263.242.0FalseNoneNoneFalseNoneFalse95054.40
3318305116076Nonecode13Supplying,,laying of CI flanged pipe true to line/hoisting of CI flanged pipe confirming to IS 7181-1986 with latest amendments in position and aligning to correct plumb including cost of jointing material,conveying to work spot with all lead and lifts etc complete 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr2758.852758.8512.0FalseNoneNoneFalseNoneFalse33106.20
3318306116076Nonecode14Providing CI bank flange confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc. complete. 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos200.0200.01.0FalseNoneNoneFalseNoneFalse200.00
3318307116076Nonecode15Providing Bell mouthed pipes (flanged) confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc. complete. 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos320.0320.01.0FalseNoneNoneFalseNoneFalse320.00
3318308116076Nonecode16Providing Duck foot bend confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc. complete. 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos350.0350.03.0FalseNoneNoneFalseNoneFalse1050.00
3318309116076Nonecode17Providing Duck foot bend confirming to IS 1538 (Part-I to XXII) 1978 with latest amendments if any cost of all materials, labour charges etc. complete. 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos420.0420.01.0FalseNoneNoneFalseNoneFalse420.00
3318310116076Nonecode18Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For 80mm dia inlet Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo9834.89834.81.0FalseNoneNoneFalseNoneFalse9834.80
3318311116076Nonecode19Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For 80mm dia outlet Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo9834.89834.81.0FalseNoneNoneFalseNoneFalse9834.80
3318312116076Nonecode20Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS. Scour Valve 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo12463.712463.72.0FalseNoneNoneFalseNoneFalse24927.40
3318313116076Nonecode21Providing and fixing enameled gauge plate 3 mm thick, 0.23 M wide with plastic float thick plastic indicator and flexible nylon wire etc., complete to 2.50 M height. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach4044.554044.551.0FalseNoneNoneFalseNoneFalse4044.550
3318314116076Nonecode22Providing 2 coats of Snowcem/Water-proof cement paint of approved colour and shade over one coat of primer including curing etc., complete for RCC over head tank. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm244.95244.95151.22FalseNoneNoneFalseNoneFalse37041.3390
3318315116076Nonecode23Painting two coats on new concrete surface :Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces, with materials, labour complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm94.394.36.0FalseNoneNoneFalseNoneFalse565.80
3318316116076Nonecode24Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications. (“i) Hindi (Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH Specification Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos1.151.151000.0FalseNoneNoneFalseNoneFalse1150.00
3318317116076Nonecode25Providing & fixing copper lightning arrester with five spikes and 20mm dia copper tube or suitable length of aluminium strip of spike 25mmx3mm including grounding as per specification. The aluminium strip is to be encased in G.I. conduct pipe or 40mm dia., 6.8 M long suitably joined by collar with all specials, fixed to one of the columns etc., complete up to 6 M staging. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach12295.812295.81.0FalseNoneNoneFalseNoneFalse12295.80
3318318116076Nonecode26Providing & fixing G.I. pipe railing of 32mm dia.,G.I. pipe B-class in two rows of roof dome flat slab of landing of elevated storage reservoir including cutting, welding, threading, painting, embedding in C.M. pillars with all lead and lifts etc., complete. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr780.85780.8515.4FalseNoneNoneFalseNoneFalse12025.090
3318319116076Nonecode27Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering, Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead & lifts. (Compacting with vibro roller) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum118.45118.4541.65FalseNoneNoneFalseNoneFalse4933.44250
3318320116076Nonecode28RCC VALVE CHAMBER 1.00x1.00: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. In ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.8513.11FalseNoneNoneFalseNoneFalse4507.87350
3318321116076Nonecode29Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregtes @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6546.266546.260.96FalseNoneNoneFalseNoneFalse6284.40960
3318322116076Nonecode30Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.613.78FalseNoneNoneFalseNoneFalse27305.24580
3318323116076Nonecode31Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm296.7296.72.88FalseNoneNoneFalseNoneFalse854.4960
3318324116076Nonecode32Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth and string courses cost of all materials, labour complete as per specificaitons) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm411.7411.734.05FalseNoneNoneFalseNoneFalse14018.3850
3318325116076Nonecode33Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKg91.791.7283.5FalseNoneNoneFalseNoneFalse25996.950
3318326116076Nonecode34Providing and fixing 60x60cms M.S. inspection door with necessary M.S. frame made out of M.S. angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2090.72090.73.0FalseNoneNoneFalseNoneFalse6272.10
17188783930001NoneNoneWater supply/sewage linesDistribution pipe network4309794.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318327116077Nonecode01Distribution Pipe Network Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.31680.95FalseNoneNoneFalseNoneFalse506470.2350
3318328116077Nonecode02Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Hard soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.31092.62FalseNoneNoneFalseNoneFalse329206.4060
3318329116077Nonecode03Earth work excavatoin for water Supply & Sanitary lines, Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification, including setting out, construction of shoring, strutting, barricading, danger lighting, bracing, using sight rails & boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench, including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work. in the following strata classifications by Mechanical Means Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum680.8680.828.02FalseNoneNoneFalseNoneFalse19076.0160
3318330116077Nonecode04Earth work excavatoin for water Supply and Sanitary lines Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification including setting out construction of shoring strutting barricading danger lighting bracing using sight rails and boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter dressing of sides and levelling the bottom of trench including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work in the following strata classifications by Mechanical Means In Ordinary Soil or Hard Soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum149.5149.51519.97FalseNoneNoneFalseNoneFalse227235.5150
3318331116077Nonecode05Earth work excavatoin for water Supply and Sanitary lines Electrical conduits either in pits or pipe line trenches (upto 600mm Trench width) as per drawing and technical specification including setting out construction of shoring strutting barricading danger lighting bracing using sight rails and boning rods at every 100 mm whevere necessary removal of stumps and other deleterious matter dressing of sides and levelling the bottom of trench including backfilling the excavated earth to the extent required and utilising the remaining available excavated earth locally for the work in the following strata classifications by Mechanical Means Ordinary rock (without blasting) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum200.1200.1379.89FalseNoneNoneFalseNoneFalse76015.9890
3318332116077Nonecode06Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Cement concrete road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum1271.91271.943.61FalseNoneNoneFalseNoneFalse55467.5590
3318333116077Nonecode07Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Asphalt road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum623.3623.31.6FalseNoneNoneFalseNoneFalse997.280
3318334116077Nonecode08Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Macadam road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum397.9397.93.2FalseNoneNoneFalseNoneFalse1273.280
3318335116077Nonecode09Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used HDPE PE100 PN-6 63mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr161.0161.011008.0FalseNoneNoneFalseNoneFalse1772288.00
3318336116077Nonecode10Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used HDPE PE100 PN-6 75mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr202.4202.4399.0FalseNoneNoneFalseNoneFalse80757.60
3318337116077Nonecode11Supplying HDPE pipes conforming to IS 4984 1995 with latest amendments and conveying to work site including loading and unloading at both destination and rolling lowering into trenches laying true to line and jointing of pipes and specials by electrofusion welding as per standerd procedure and guide lines including encasing the pipe around to a depth not less than 15cms with cleaned soft gravel or selected earth available from the excavation etc complete giving hydraulic test as per relevant IS Specification with all lead and lift including testing and commissioning The rate is exclusive of required specials and fittings etc complete (Contractor will make his own arrangement for procuring water for testing) Upto 110mm dia Coils shall be used HDPE PE100 PN-6 110mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr356.5356.5321.0FalseNoneNoneFalseNoneFalse114436.50
3318338116077Nonecode12Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For Scour/ Sluice Valve PN-10 50mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo6681.56681.515.0FalseNoneNoneFalseNoneFalse100222.50
3318339116077Nonecode13Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For Scour/Sluice Valve PN-10 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo9834.89834.81.0FalseNoneNoneFalseNoneFalse9834.80
3318340116077Nonecode14Supply and delivery of Resilient seated soft sealing Sluice Valves with body bonnet of Ductile Iron of grade GGG50 wedge fully rubber lined with EPDM and seals of NBR and the valves should be of vacuum tight and 100% leak proof with face dimensions as per BS 5163 89 IS 14846 2000 DIN 3202 F4 F5 The stem sealing should be with Toroidal sealing rings (minimum 2 'O' rings) All the valves should be with electrostatic powder coating both inside and outside with pocket less body passage The valves shall be supplied with suitable size galvanized bolts and nuts of required numbers as per relevant IS For Scour/ Sluice Valve PN-10 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo12463.712463.71.0FalseNoneNoneFalseNoneFalse12463.70
3318341116077Nonecode15Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates. Bulk Flow Meter 50mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo14252.014252.01.0FalseNoneNoneFalseNoneFalse14252.00
3318342116077Nonecode16Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates. Bulk Flow Meter 80mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo19451.019451.01.0FalseNoneNoneFalseNoneFalse19451.00
3318343116077Nonecode17Supply and delivery of Woltman model with removal mechanism water meters confirming to ISO 4064 part I,II,III class B or IS 779 and IS 2373 with life cycle test certificate from FCRI/ NABL accredited lab. The water meters shall have magnetic drivers or mechanical drivers and shall be versatile for installation in any position. The meters shall be hydrodynamically, hydrostatically balanced. The runner, runner chamber, pointer of the meter shall be as per ISO 4064 class B specification. Dry dial excavated counter housing fully protected against flooding ensuring easy reading in all climates. Bulk Flow Meter 100mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo25531.025531.01.0FalseNoneNoneFalseNoneFalse25531.00
3318344116077Nonecode18Supplying and fixing of fixed height surface box H 4057 MD KU with PP 40% GF Lid Housing of PA+ Locking clip of PP with Notched bolt M 12 x 130 hexagon head A2 70 for service connection valves design derived from DIN 4057 Should be suppied with support tile I (FSL FSS SI) Should be able to receive class AA traffic loads Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2735.02735.016.0FalseNoneNoneFalseNoneFalse43760.00
3318345116077Nonecode19Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) 80mm Class B (MEDIUM) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr846.4846.430.0FalseNoneNoneFalseNoneFalse25392.00
3318346116077Nonecode20Providing and laying reinforced cement concrete pipe NP3 for culverts including pointing ends and fixing collars with cement mortar 1 2 including cost of all materials labour curing complete as per specifications Specifications i 300 mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr1765.251765.2530.0FalseNoneNoneFalseNoneFalse52957.50
3318347116077Nonecode21Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead and lifts (Compacting with vibro roller) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum118.45118.452801.58FalseNoneNoneFalseNoneFalse331847.1510
3318348116077Nonecode22Dismantling of existing structures like culverts bridges retaining walls and other structure comprising of masonry cement concrete wood work steel work including TandP and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts complete as per specifications Rubble stone masonry in cement mortar MORTH Specification No 202 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum402.5402.52.7FalseNoneNoneFalseNoneFalse1086.750
3318349116077Nonecode23Dismantling of existing structures like culverts bridges retaining walls and other structure comprising of masonry cement concrete wood work steel work including TandP and scaffolding wherever necessary sorting the dismantled material disposal of unserviceable material and stacking the serviceable material with all lifts and complete as per specifications Lime Cement Concrete By Manual Means Cement Concrete Grade M 15 and M 20MORTH Specification No 202 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum639.4639.43.65FalseNoneNoneFalseNoneFalse2333.810
3318350116077Nonecode24Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.82.7FalseNoneNoneFalseNoneFalse18356.760
3318351116077Nonecode25Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.613.65FalseNoneNoneFalseNoneFalse26366.17650
3318352116077Nonecode26Restoration of Roads Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.848.4FalseNoneNoneFalseNoneFalse329061.920
3318353116077Nonecode27RCC VALVE CHAMBER 1.00x1.00: Earthwork excavation by manual means for foundation of buildings, culverts, water supply and sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per specifications. In ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum343.85343.8517.48FalseNoneNoneFalseNoneFalse6010.4980
3318354116077Nonecode28Providing and laying in position plain cement concrete of grade M 10 with OPC cement @ 220kgs, with 40mm and down size graded granite metal coarse aggregates @0.892cum and fine aggregtes @ 0.465cum machine mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6546.266546.261.28FalseNoneNoneFalseNoneFalse8379.21280
3318355116077Nonecode29Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement @ 320kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.69cum and fine aggregtes @ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed, concrete laid in layers not exceeding 15 cms thick,vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness ) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks,anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum7223.617223.615.04FalseNoneNoneFalseNoneFalse36406.99440
3318356116077Nonecode30Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specificaitons Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm296.7296.73.84FalseNoneNoneFalseNoneFalse1139.3280
3318357116077Nonecode31Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for vertical surface such as walls at any thickness, including attached pilasters, buttresses, plinth and string courses cost of all materials, labour complete as per specificaitons) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm411.7411.745.4FalseNoneNoneFalseNoneFalse18691.180
3318358116077Nonecode32Providing T.M.T steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid) including for OHT & reservoier, cost of materials, labour, HOM of machinery complete as per specifications. TMT bars Fe 500 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workKg91.791.7378.0FalseNoneNoneFalseNoneFalse34662.60
3318359116077Nonecode33Providing and fixing 60x60cms M.S. inspection door with necessary M.S. frame made out of M.S. angle 50x50x6mm and M.S. shutters of 31.5mm or B.G.10 thick with hinges on top and locking arrangement, painting etc., complete (for RCC over head tank and G.L.S.R.) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNo2090.72090.74.0FalseNoneNoneFalseNoneFalse8362.80
17188783930001NoneNoneWater supply/sewage linesFunctional Household Tap Connection (FHTC)3643607.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318360116078Nonecode01Functional Houehold Tap Connection [F.H.T.C.] Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Cement concrete road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum1271.91271.911.75FalseNoneNoneFalseNoneFalse14944.8250
3318361116078Nonecode02Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Ordinary Soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.3334.5FalseNoneNoneFalseNoneFalse100784.850
3318362116078Nonecode03Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Hard Soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.3223.0FalseNoneNoneFalseNoneFalse67189.90
3318363116078Nonecode04Approved make Electro fusion saddle comply with BS EN 12201-3:2011, PN 12.5 rating and food grade raw material as per BS 6920 for effect on water Quality intended for human consumption Material of construction PE 80 or PE 100 and colour of fitting Blue Black for water applications EF tapping saddle is V Regulated type Designed to fuse at a fusion voltage of 40 volt AC EF tapping saddle shall have moulded SS Brass metal female threaded outlet EF tapping Saddle is fused by using a top loading pillar type pressure exerting 1500N (150 kilograms approx ) top load on EF Saddle Fusion time is 170 secs and cooling time is 10mins Exerted pressure should be removed after completing the 10 mins cooling time 63x20mm 75x20mm 90x20mm 110x20mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach350.0350.0575.0FalseNoneNoneFalseNoneFalse201250.00
3318364116078Nonecode05Providing and fixing to wall ceiling and floor medium density polyethylene pipes 6 00 kgs sq cm working pressure of outside diameter with special flange compression type fittings wall clips making good the wall ceiling and floor including cost of all materials labour charges HOM and testing complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work MDPE pipe 20mm diaRmtr123.05123.053450.0FalseNoneNoneFalseNoneFalse424522.50
3318365116078Nonecode06PP Make Female Threaded Elbow with SS304 Brass Plastic inserts suitable for a Pressure Rating PN16 (FTE 90 deg ) 20x15mm ( half inch)(market rate) 20x 20 mm dia elbow Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach85.085.02300.0FalseNoneNoneFalseNoneFalse195500.00
3318366116078Nonecode07Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI union confirming to IS 1239 II 1991 with latest amendments if any 15 mm dia GI union Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach55.055.01150.0FalseNoneNoneFalseNoneFalse63250.00
3318367116078Nonecode08Providing and fixing in position brass bib cock of approved quality nominal bore including cost of all materials labour and HOM with all leads complete as per specifications 15mm Brass bib cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach218.5218.5575.0FalseNoneNoneFalseNoneFalse125637.50
3318368116078Nonecode09Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) For Crossing drain 32mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr355.35355.3586.25FalseNoneNoneFalseNoneFalse30648.93750
3318369116078Nonecode10Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) For Crossing drain 15mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr195.5195.51178.75FalseNoneNoneFalseNoneFalse230445.6250
3318370116078Nonecode11Flow control Valve 10 LPM Providing and fixing Flow control valve using food grade materials SS 316 ball 1/ 2 " [15mm] including cost of all materials labour charges HOM and testing complete as per of following specification The FCV nominal design is for 10 Ltr Min Discharges at 0 5 bar pressure loss and should not exceed the flow the range of 7 Lit Min at 1 bar or more pressure MOC of valve Food grade stainless steel SS 316 MOC of Ball stainless steel 316 Flow direction arrow embossed on its outside surface The Valve should act as flow control valve and non return valve Minimum operating pressure 0 1 kgf( 10 cm head) Designed pressure 1 meter to 50 meters Accuracy of valves + 20% of average flow rate Orifice size not be less than 12mm Ball size not less than 12 mm Weight of FCV not less than 125 gms Length not be less than 70 mm The FCV is with internal arrangements of very simple passage in line such that the valve will pass the small floating particles if any entered in the valve to avoid choking The FCV shall be got tested from FCRI by the manufacturer as per above standards The quantum of checking to be done from FCRI is attached herewith The FCV should be fitted on Saddle which is fixed on distribution pipeline Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos280.0280.0575.0FalseNoneNoneFalseNoneFalse161000.00
3318371116078Nonecode12Mechanical water meters of 15 mm sizes shall be magnetically coupled MultiJet Class B inferetial type dry dial IP 68 peotection totalizers enclosed in metallic housing suitable against antifraud atempts scrwwed ends Thw body of the meter shall be of either Brass or Brinze The lower case of hte meter shall be painted with thermal painting externally Water meter shall coform to ISO 4064 IS779 standard with MID approval and marking MID product certificate and FCRI Life cycle test certificate Wter meters shall be provided with strainers; The maximum permissible error in the metering accuracy when determining as per IS 6784 1984 foe multi jet meter shall be + 2%; the acceptable flow parameters required to measure low fows accurately as per ISO 4064 2005 and including conveying and fixing of necessary G I specials etc complete with all lead and lift Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach1646.01646.0575.0FalseNoneNoneFalseNoneFalse946450.00
3318372116078Nonecode13Supply and fixing of HDPE water meter box to protect the water meter of class 'B multijet type of size 15 to 32mm including HDPE box with base dia 300mmxlid dia 200mmxheight 250mm with openable lid and the cover is buried below GL with lid flush with GL including earthwork excavation for 600mmx600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC 1 2 4 using 12 to 20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height disposal of excess earth with all lead and lifts etc complete as per drawing enclosed Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work HDPE water meter boxRmtr500.0500.0575.0FalseNoneNoneFalseNoneFalse287500.00
3318373116078Nonecode14Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead and lifts (Compacting with vibro roller) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum118.45118.45557.5FalseNoneNoneFalseNoneFalse66035.8750
3318374116078Nonecode15Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.858.33FalseNoneNoneFalseNoneFalse396574.0040
3318375116078Nonecode16Supplying and fixing R C C demarcation stones of 30cms x 15 cms and 90 cms Deep using 1 2 4 C C and 6 mm dia rods for verticals and stirrups and rendered smooth including engraving letters "KWB and Arrow" 6mm deep on the top including fixing demarcation stones 45cms below ground level and in CC 1 3 6 15cms height with 8cms offset around the stone and curing for 10 days including earthwork excavation in all types of soils with all lead and lift Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach440.0440.0575.0FalseNoneNoneFalseNoneFalse253000.00
3318376116078Nonecode17Painting two coats on new concrete surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces with materials labour complete as per specifications MORTH Specification Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm94.394.3310.5FalseNoneNoneFalseNoneFalse29280.150
3318377116078Nonecode18Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications (“i) Hindi (Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH Specification No 803 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workcm1.151.1543125.0FalseNoneNoneFalseNoneFalse49593.750
17188783930000NoneNoneWater supply/sewage linesRetrofitting to existing tap connection HHC to FHTCs686030.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3318378116079Nonecode01Retrofitting to existing tap connection from HHC to FHTC's: Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading danger lighting etc in the following classification Cutting in Cement concrete road surface Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum1271.91271.90.81FalseNoneNoneFalseNoneFalse1030.2390
3318379116079Nonecode02Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Ordinary soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.364.85FalseNoneNoneFalseNoneFalse19539.3050
3318380116079Nonecode03Earthwork excavation for pipeline trenches including depositing on bank upto a lead of 50 mtrs and depth up to 2 00 mtrs Including shoring and strutting danger lighting and using sight rails and boning rods at every 100 mtrs Wherever necessary as directed in the following strata (Manual Means) In Hard soil Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum301.3301.343.24FalseNoneNoneFalseNoneFalse13028.2120
3318381116079Nonecode04Approved make Electro fusion saddle comply with BS EN 12201-3:2011 PN 12.5 rating and food grade raw material as per BS 6920 for effect on water Quality intended for human consumption Material of construction PE 80 or PE 100 and colour of fitting Blue Black for water applications EF tapping saddle is V Regulated type Designed to fuse at a fusion voltage of 40 volt AC EF tapping saddle shall have moulded SS Brass metal female threaded outlet EF tapping Saddle is fused by using a top loading pillar type pressure exerting 1500N (150 kilograms approx ) top load on EF Saddle Fusion time is 170 secs and cooling time is 10mins Exerted pressure should be removed after completing the 10 mins cooling time 63x20mm 75x20mm 90x20mm 110x20mm Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach350.0350.0110.0FalseNoneNoneFalseNoneFalse38500.00
3318382116079Nonecode05Providing and fixing to wall ceiling and floor medium density polyethylene pipes 6 00 kgs/sq cm working pressure of outside diameter with special flange compression type fittings wall clips making good the wall ceiling and floor including cost of all materials labour charges HOM and testing complete as per specifications Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work MDPE pipe 20mm diaRmtr123.05123.05660.0FalseNoneNoneFalseNoneFalse81213.00
3318383116079Nonecode06PP Make Female Threaded Elbow with SS304 Brass Plastic inserts suitable for a Pressure Rating PN16 (FTE 90 deg ) 20x15mm ( half inch)(market rate) 20x 20 mm dia elbow Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach85.085.0440.0FalseNoneNoneFalseNoneFalse37400.00
3318384116079Nonecode07Supply and delivery at site wrought middle steel (galvanized) 15 mm dia GI union confirming to IS 1239 II 1991 with latest amendments if any 15 mm dia GI union Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach55.055.0220.0FalseNoneNoneFalseNoneFalse12100.00
3318385116079Nonecode08Providing and fixing in position brass bib cock of approved quality nominal bore including cost of all materials labour and HOM with all leads complete as per specifications 15mm Brass bib cock Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach218.5218.5110.0FalseNoneNoneFalseNoneFalse24035.00
3318386116079Nonecode09Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) For Crossing drain 32mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr355.35355.3516.5FalseNoneNoneFalseNoneFalse5863.2750
3318387116079Nonecode10Supplying laying jointing testing and commissioning of G I Pipes conforming to IS 1239 1990 with latest amendments including fixing Collars Elbows Tees bends Glad Cocks and other Fittings (Excluding Cost of Specials) with Cuts and Threads wherever necessary including conveying the materials to workspot including testing for water tightness with all lead and lifts etc complete (Contractor shall make his own arrangements for procuring water for testing) For Crossing drain 15mm dia Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workRmtr195.5195.5225.5FalseNoneNoneFalseNoneFalse44085.250
3318388116079Nonecode11Flow control Valve 10 LPM Providing and fixing Flow control valve using food grade materials SS 316 ball 1/ 2 " [15mm] including cost of all materials labour charges HOM and testing complete as per of following specification The FCV nominal design is for 10 Ltr Min Discharges at 0 5 bar pressure loss and should not exceed the flow the range of 7 Lit Min at 1 bar or more pressure MOC of valve Food grade stainless steel SS 316 MOC of Ball stainless steel 316 Flow direction arrow embossed on its outside surface The Valve should act as flow control valve and non return valve Minimum operating pressure 0 1 kgf( 10 cm head) Designed pressure 1 meter to 50 meters Accuracy of valves + 20% of average flow rate Orifice size not be less than 12mm Ball size not less than 12 mm Weight of FCV not less than 125 gms Length not be less than 70 mm The FCV is with internal arrangements of very simple passage in line such that the valve will pass the small floating particles if any entered in the valve to avoid choking The FCV shall be got tested from FCRI by the manufacturer as per above standards The quantum of checking to be done from FCRI is attached herewith The FCV should be fitted on Saddle which is fixed on distribution pipeline Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workNos280.0280.0110.0FalseNoneNoneFalseNoneFalse30800.00
3318389116079Nonecode12Mechanical water meters of 15 mm sizes shall be magnetically coupled MultiJet Class B inferetial type dry dial IP 68 peotection totalizers enclosed in metallic housing suitable against antifraud atempts scrwwed ends Thw body of the meter shall be of either Brass or Brinze The lower case of hte meter shall be painted with thermal painting externally Water meter shall coform to ISO 4064 IS779 standard with MID approval and marking MID product certificate and FCRI Life cycle test certificate Wter meters shall be provided with strainers; The maximum permissible error in the metering accuracy when determining as per IS 6784 1984 foe multi jet meter shall be + 2%; the acceptable flow parameters required to measure low fows accurately as per ISO 4064 2005 and including conveying and fixing of necessary G I specials etc complete with all lead and lift Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach1646.01646.0110.0FalseNoneNoneFalseNoneFalse181060.00
3318390116079Nonecode13Supply and fixing of HDPE water meter box to protect the water meter of class 'B multijet type of size 15 to 32mm including HDPE box with base dia 300mmxlid dia 200mmxheight 250mm with openable lid and the cover is buried below GL with lid flush with GL including earthwork excavation for 600mmx600mm and base sand filling for 100mm thick over which the cover is placed and enclosed by PCC 1 2 4 using 12 to 20mm BG jelly for an height of 150mm and refilling with excavated earth for balance 100mm height disposal of excess earth with all lead and lifts etc complete as per drawing enclosed Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the work HDPE water meter boxRmtr500.0500.0110.0FalseNoneNoneFalseNoneFalse55000.00
3318391116079Nonecode14Refilling the basement and pipeline trenches with selected available earth from trench excavation including watering Consolidation in layers of 15 cm thick including disposing of the surplus earth with all lead and lifts (Compacting with vibro roller) Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum118.45118.45108.09FalseNoneNoneFalseNoneFalse12803.26050
3318392116079Nonecode15Providing and laying in position plain cement concrete of mix M20 with OPC cement @ 300kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes @ 0.43cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation,plinth and cills, including cost of all materials, labour, HOM of machinery, curing complete as per specifications. Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workCum6798.86798.89.72FalseNoneNoneFalseNoneFalse66084.3360
3318393116079Nonecode16Supplying and fixing R C C demarcation stones of 30cms x 15 cms and 90 cms Deep using 1 2 4 C C and 6 mm dia rods for verticals and stirrups and rendered smooth including engraving letters "KWB and Arrow" 6mm deep on the top including fixing demarcation stones 45cms below ground level and in CC 1 3 6 15cms height with 8cms offset around the stone and curing for 10 days including earthwork excavation in all types of soils with all lead and lift Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workEach440.0440.0110.0FalseNoneNoneFalseNoneFalse48400.00
3318394116079Nonecode17Painting two coats on new concrete surface Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces with materials labour complete as per specifications MORTH Specification Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workSqm94.394.359.4FalseNoneNoneFalseNoneFalse5601.420
3318395116079Nonecode18Painting New Letter and Figures of any Shade with synthetic enamel paint black or any other approved colour to give an even shade complete as per specifications (“i) Hindi (Matras commas and the like not to be measured and paid for half letter shall be counted as half) “ MORTH Specification No 803 Including loading and unloading cost of conveyance of all materials labour cost of equipments machineries transportation etc complete as per Specification and direction of Engineer incharge of the workcm1.151.158250.0FalseNoneNoneFalseNoneFalse9487.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17188783960001NoneNoneELIGIBILITYdeletedNone
17188783960001NoneNoneELIGIBILITYdeletedNone
17188783960001NoneNoneELIGIBILITYdeleledNone
17188783960000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17188783960000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17188823080000NoneNoneELIGIBILITYTENDERS FROM JOINT VENTURES ARE NOT ACCEPTABLENone
17188823480000NoneNoneELIGIBILITYBIDDERS SHALL NOT BE UNDER A DECLARATION OF INELIGIBILITY FOR CORRUPT AND FRAUDULENT PRACTICES ISSUED BY ANY STATE GOVERNMENT / GOVERNMENT OF INDIA /UNION TERRITORY.None
17188823770000NoneNoneELIGIBILITYIT SHALL BE THE RESPONSIBILITY OF THE BIDDER TO ENSURE CREDIT OF TENDER PROCESSING FEE AND EMD INTO THE RESPECTIVE RECEIVING BANK ACCOUNTS OF E-PROCUREMENT ON OR BEFORE THE LAST DATE AND TIME OF BID SUBMISSION.None
17188823970000NoneNoneELIGIBILITYTO ENSURE BROWSER COMPATIBILITY OF THE COMPUTER WELL IN ADVANCE TO THE LAST DATE AND TIME FOR RECEIPT OF TENDERS THE DEPARTMENTS SHALL NOT BE RESPONSIBLE FOR NON ACCESSIBILITY OF KPPP PORTAL DUE TO INTERNET CONNECTIVITY ISSUES AND TECHNICAL GLITCHES AT BIDDERS END.None
17188824250000NoneNoneELIGIBILITYEMD PAYMENTS THROUGH E-PAYMENT MODE SHALL BE MADE AS ONE SINGLE TRANSACTION AND PAYMENTS MADE IN PART ARE LIABLE FOR REJECTION.None
17188824420000NoneNoneELIGIBILITYBIDDER SHALL PAY CONTRACT MANAGEMENT MODULE PROCESSING FEES OF 0.025% OF THE CONTACT VALUE (MIN RS.500/- & MAX RS.7500/-) SOON AFTER CONTRACT HAS BEEN ISSUED TO BIDDER.None
17188824550000NoneNoneELIGIBILITYFOR DETAILS REFER TENDER NOTIFICATION AND CONDITIONS IN THE BID DOCUMENTS.None
17188824660000NoneNoneELIGIBILITYALL MATERIALS SHOULD BE IN GOOD QUALITY AS PER SPECIFICATION, QUALITY CERTIFICATE FOR THE SAME SHOULD BE OBTAINED FROM THE CONCERNED AUTHORITY AT THEIR OWN COSTNone
17188824850000NoneNoneELIGIBILITYACCEPTENCE / CANCELLATION OF THE WORKS ARE RESERVED BY UNDER SIGNED WITHOUT ANY REASONS FOR THE SAME.None
17188824970000NoneNoneELIGIBILITYCORRIGENDUMS / MODIFICATIONS / CORRECTION, IF ANY, WILL BE PUBLISHED IN THE WEBSITE ONLY.None
17188825160000NoneNoneELIGIBILITYALL THE SCANNED DOCUMENTS PERTAINING TO BIDDER TO BE UPLOADED SHALL BE IN ORIGINAL AND SAME ORIGINALS SHOULD BE PRODUCED TO THE EXECUTIVE ENGINEER (AT THE TIME OF TECHNICAL BID OPENING) WHO RESERVES RIGHT TO VERIFY THE ORGINAL DOCUMENTS BEFORE APPROVAL.None
17188825300000NoneNoneELIGIBILITYTO QUALIFY FOR AWARD OF THIS CONTRACT EACH TENDERER SHOULD GIVE ALL DETAILS AND DOCUMENTS AS PER TECHNICAL AND FINANCIAL BID ATTACHED TO THIS TENDERNone
17188825440000NoneNoneELIGIBILITYALL THE MATERIALS TO BE UTILISED FOR THE WORK MUST BE TESTED IN PRED LABS AND QUALITY CONTROL TEST REPORTS MUST BE ENCLOSED TO THE BILLS. ALL TYPE OF PIPES AND PUMPING MACHINARY WITH ACCESSORIES MUST BE TESTED IN M/S. SGS INDIA LTD, CIPET & AIPS INSTITUTES. COST OF ALL QC TEST MUST BE BORNE BY CONTRACTOR.None
17188825590000NoneNoneELIGIBILITYIF ANY DATE IN THE TENDER TIME TABLE IS GOVERNMENT HOLIDAY, NEXT WORKING DATE WILL BE CONSIDEREDNone
17188825920000NoneNoneELIGIBILITYINCOMPLETE / CONDITIONAL TENDERS WILL NOT BE ACCEPTED.None
17188826040000NoneNoneELIGIBILITYTENDERER MUST SUBMIT HIS PRESENT ACCURATE POSTAL ADDRESS AND PHONE / CELL PHONE NUMBERNone
17188826150000NoneNoneELIGIBILITYTHE TENDER MAY BE CANCELLED AT ANY STAGE WITHOUT ASSIGNING ANY REASONNone
17188826290000NoneNoneELIGIBILITYTENDERERS MUST HAVE VALID PWD REGISTRATION COPYNone
17188826400000NoneNoneELIGIBILITYTHE RATES OF ITEMS ARE INCLUSIVE OF COST OF MATERIALS, LABOUR CHARGES, HOM OF MACHINERY, ALL LEAD AND LIFTS AND ALL OTHER CHARGES TO COMPLETE THE WORK SUCCESSFULLY AS PER SPECIFICATIONS AND AS DIRECTED BY ENGINEER IN CHARGE OF WORKNone
17188826510000NoneNoneELIGIBILITYTHE TENDERERS MUST SUBMIT THE SCANNED DOCUMENTS IN PDF / JPEG FORM, NOT IN OTHER FORM.None
17188826600000NoneNoneELIGIBILITYANY OBJECTION REGARDING THE TENDER MUST BE SUBMITTED DIRECTLY TO EXECUTIVE ENGINEER , NOT IN INWARD.None
17188826770000NoneNoneELIGIBILITYTHE WORK IS SUBJECTED TO THIRD PARTY INSPECTION AND INSPECTION BY OTHER GOVT AGENCIES. THIRD PARTY INSPECTION COST IS BORNE BY THE CONTRACTORNone
17188826920000NoneNoneELIGIBILITYFOR INTERPRETATIONS OF CLAUSES, CONDITIONS, SPELLING MISTAKES, ETC., DECISION OF EXECUTIVE ENGINEER, RDW&S, KARWAR IS FINALNone
17188827100000NoneNoneELIGIBILITYTHE BIDDER MUST SUBMIT LAST 5 YEARS (2018-19 to 2022-23) PROFIT AND LOSS ACCOUNT OBTAINED FROM CHARTERED ACCOUNTANT (CA) ONLY. BIDDER MUST HAVE ANNUAL CONTRACT AVERAGE TURN OVER FOR 2 YEARS NOT LESS THAN TWO TIMES THE AMOUNT PUT TO TENDER IN EACH FINANCIAL YEARS. THE BIDDER MUST HAVE MINIMUM ASSESSED AVAILABLE TENDER CAPACITY AMOUNT PUT TO TENDER AS PER FORMULA IN KW DOCUMENT PROVIDED HERE WITH.None
17188827380000NoneNoneELIGIBILITYEACH TENDERER MUST SUBMIT LIQUID ASSETS/BANK LINE OF CREDIT FROM ANY NATIONALIZED/SCHEDULED BANK AS PER KW BID DOCUMENTNone
17188827520000NoneNoneELIGIBILITYGST SHALL PAID SEPERATELYNone
17188827650000NoneNoneELIGIBILITYALL OTHER CONDITIONS AS PER KW TENDER DOCUMENTNone
17188827810000NoneNoneELIGIBILITYTHE SUCCESSFUL TENDERER SHALL DELIVER TO THE EMPLOYER A SECURITY DEPOSIT FOR AN AMOUNT EQUIVALENT TO 5% OF THE CONTRACT PRICENone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTENDERER MUST HAVE COMPLETED PHYSICAL WORK DONE AS PRESCRIBED IN BID DOCUMENT FORMAT 3.2C IN LAST 5 YEARS (2019-20 to 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- WORK DONE CERTIFICATE ISSUED BY EXECUTIVE ENGINEER OR EQUIVALENT
NoneNoneNoneNoneMANDATING SATISFACTORY COMPLETION AS A PRIME CONTRACTOR FOR AT LEAST ONE SIMILAR NATURE WORK TO AN EXTENT OF 50% OF THE COST OF THE WORK, RS. 54.03 LAKHS IN LAST 5 YEARS (2019-20 to 2023-24)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- WORK DONE CERTIFICATE ISSUED BY EXECUTIVE ENGINEER OR EQUIVALENT
NoneNoneNoneNoneACCURATE POSTAL ADDRESS AND PHONE / MOBILE NUMBERCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- ACCURATE POSTAL ADDRESS AND PHONE NUMBER / MOBILE NUMBER
NoneNoneNoneNoneTHE TENDERER SHOULD POSSESS VALID GST REGISTRATIONCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- GST REGISTRATION COPY
NoneNoneNoneNonePAN CARD COPYCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- PAN CARD COPY
NoneNoneNoneNoneTENDERER MUST HAVE ASSESSED AVAILABLE TENDER CAPACITY AS PER FORMULA IN SECTION 3.6 IN LAST 5 YEARS (2019-20 to 2023-24)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- ASSESSED AVILABLE TENDER CAPACITY
NoneNoneNoneNoneTHE TENDERER SHOULD POSSESS VALID REGISTRATION OF APPROPRIATE CLASS WITH PWD DEPARTMENT AS PER TENDER CONDITIONCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- PWD REGISTRATION CLASS III AND ABOVE
NoneNoneNoneNonePROFIT & LOSS ACCOUNT FROM CHARTERED ACCOUNTANT FOR LAST FIVE YEARS (2019-20 to 2023-24) TENDERER MUST HAVE ACHIEVED IN AT LEAST TWO FINANCIAL YEARS A MINIMUM FINANCIAL TURN OVER(IN ALL CLASSES OF CIVIL ENGINEERING CONSTRUCTION WORKS ONLY) OF RS. 216.10 LAKHS PER FINANCIAL YEAR (USUALLY NOT LESS THAN TWO TIMES THE ESTIMATED COST UNDER THIS CONTRACT )Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- PROFIT AND LOSS ACCOUNT AND TURN OVER CERTIFICAT FOR LAST FIVE YEARS ISSUED BY CHARTERED ACCOUNTANT
NoneNoneNoneNoneTHE TENDERER MUST SUBMIT LIQUID ASSETS AND /OR AVAILABILITY OF CREDIT FACILITIES OF NO LESS THAN RS. 32.41 LAKHS (CREDIT LINES/ LETTER OF CREDIT/ CERTIFICATES FROM BANKS FOR MEETING THE FUND REQUIREMENT ETC. (USUALLY THE EQUIVALENT OF THE ESTIMATED CASH FLOW FOR THREE MONTHS IN THE PEAK CONSTRUCTION PERIOD)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- BANK LINE OF CREDIT / LIQUID ASSETS
NoneNoneNoneNoneEXECUTED IN ANY ONE YEAR IN LAST 5 YEARS (2019-20 to 2023-24), THE FOLLOWING MINIMUM QUANTITIES OF WORK: GI/CI/PVC/MS/DI/HDPE-PIPELINE 10038.4 mtr Concrete : 141.47 cum Earthwork: 1662.65 cumOthersYEAR WISE PROPER BREAK UP FOR THE QUANTITIES EXECUTED DURING THE COMPLETION OF WORK
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- WORK DONE CERTIFICATE ISSUED BY EXECUTIVE ENGINEER OR EQUIVALENT
NoneNoneNoneNoneTHE TENDERER MUST SUBMIT ONGOING WORK COMMITMENTS (CERTIFIED BY AN OFFICER NOT BELOW THE RANK OF EXECUTIVE ENGINEER) TO COMPUTE AVAILABLE TENDER CAPACITY IN LAST 5 YEARS (2019-20 to 2023-24)OthersONGOING WORKS COMMITMENTS
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- COMMITMENTS OF ONGOING WORKS ISSUED BY EXECUTIVE ENGINEER OR EQUIVALENT
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
NoneNoneNoneNoneNOT APPLICABLEOthersNOT APPLICABLE
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- NOT APPLICABLE
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
ACCURATE POTAL ADRESS AND PHONE NUMBER AND EMAIL ADRESSTrueTechnical Bid
PWD REGISTRATION CERTIFICATE .TrueTechnical Bid
GST REGISTRATION CERTIFICATETrueTechnical Bid
DRINKING WATER SUPPLY WORKDONE CERTIFICATE ISSUED FROM EXECUTIVE ENGINEER.TrueTechnical Bid
LIQUID ASSETS/BANK LINE OF CREDIT FROM ANY NATIONALIZED/SCHEDULED BANK AS PER KW BID DOCUMENTTrueTechnical Bid
ANNUAL TURN OVER CERTIFICATE OF LAST 5 YEARS ISSUED BY CATrueTechnical Bid
BID CAPACITY AS PER FORMULA MENTIONED IN BID DOCUMENTTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1718949600000
version0
createdDateNone
modifiedDateNone
blockNumberEXECUTIVE ENGINEER RURAL DRINKING WATER SUPPLY AND SANITATION DIVISION HABBUWADA KARWAR
streetNone
cityKARWAR
stateKarnataka
pin581301
tenderRecallDTONone