createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1718793820299
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd384000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-07-2024 16:30:00
tenderQueryClose05-07-2024 16:30:00
technicalBidOpen08-07-2024 16:31:00
publishedDate27-06-2024 11:39:57
publishedByPostPWD_EE_DIV_VJP
publishedByUserKPE15035 - R K MUJUMADAR
bidValidityPeriod90
noOfCalls1
preBidMeetingDate26-06-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShri R K Mujumadar
splitEmdRequiredYnTrue
emdBankGuarantee284000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8880889091
tenderSupplierListNone
tenderSchedule
createdTs1718793820330
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT10948
titleCONSTRUCTION OF PWD I.B AT MULAWADA VILLAGE IN KOLHAR TALUK OF VIJAYAPURA DISTRICT under Appendex E-4059 22-23
descriptionCONSTRUCTION OF PWD I.B AT MULAWADA VILLAGE IN KOLHAR TALUK OF VIJAYAPURA DISTRICT under Appendex E-4059 22-23
categoryWORKS
categoryTextWorks
ecv25544932.14
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1687
locationNamePWD Division Office Vijayapura
provisionalAmount30000000.0
groupOverheadTotal0.0
fileNumberKPWD/SD/BGD/IB/BUILDING/MULWAD/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17187938200000NoneNoneBuildingsSUB ESTIMATE FOR GROUND FLOOR15037309.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3311157115624NoneVol-1page no 8 item no 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum117.71117.71280.8FalseNoneNoneFalseNoneFalse33052.9680
3311158115624Nonevol-1 page no 8 item no 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum126.38126.38388.85FalseNoneNoneFalseNoneFalse49142.8630
3311159115624Nonevol-1 page no 8 item no 1.15.11.14 Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.15.1 In ordinary/soft rock without blasting upto 1.5 m depth ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum449.76449.76267.87FalseNoneNoneFalseNoneFalse120477.21120
3311160115624NoneVol-2 page no 5 item no 4.14.0 ANTI-TERMITE TREATMENT 4.1 Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm146.2146.2462.0FalseNoneNoneFalseNoneFalse67544.40
3311161115624NoneVol-1 page no 15 item no 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) 2.1.3 Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7420.377420.37115.37FalseNoneNoneFalseNoneFalse856088.08690
3311162115624NoneVol-1 page no 15 item no 2.2.32.2 Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) 2.2.2.1 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7850.37850.3115.9FalseNoneNoneFalseNoneFalse909849.770
3311163115624NoneVol-1 page no 111 item no sl no 1aAddendum I-Additionalities for formwork, Centering & Scaffolding " For Foundation upto Plinth (a) Isolated " at 8% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum628.02628.02115.9FalseNoneNoneFalseNoneFalse72787.5180
3311164115624NoneVol-1 page no 16 item no 2.4.32.4 Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) 2.4.3 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7850.37850.340.72FalseNoneNoneFalseNoneFalse319664.2160
3311165115624NoneVol-1 page no 111 item no sl no 9Addendum II-Additionalities for formwork, Centering & Scaffolding " For Columns " at 70% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5495.215495.2110.75FalseNoneNoneFalseNoneFalse59073.50750
3311166115624NoneVol-1 page no 111 item no sl no 2Addendum I -Additionalities for formwork, Centering & Scaffolding " For Plinth Beams of Buildings " at 50% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum3925.153925.1527.22FalseNoneNoneFalseNoneFalse106842.5830
3311167115624NoneVol-1 page no 112 item no sl no 15Addendum I-Additionalities for formwork, Centering & Scaffolding " For Roof slab of Buildings " at 50% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum3925.153925.152.745FalseNoneNoneFalseNoneFalse10774.536750
3311168115624NoneVol-1 page no 16 item no 2.5.22.5 Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) 2.5.2 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum8478.488478.48155.94FalseNoneNoneFalseNoneFalse1322134.17120
3311169115624NoneVol-1 page no 111 item no sl no 9Addendum I-Additionalities for formwork, Centering & Scaffolding " For Columns " at 70% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5934.935934.9326.64FalseNoneNoneFalseNoneFalse158106.53520
3311170115624NoneVol-1 page no 112 item no sl no 14Addendum II-Additionalities for formwork, Centering & Scaffolding " For Beams & lintels of Buildings " at 60% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5087.095087.0948.29FalseNoneNoneFalseNoneFalse245655.57610
3311171115624NoneVol-1 page no 112 item no sl no 19Addendum I-Additionalities for formwork, Centering & Scaffolding " For Chejjas, Canopy & Other Architectural projections of minor sections " at 45% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum3815.313815.3112.67FalseNoneNoneFalseNoneFalse48339.97770
3311172115624NoneVol-1 page no 112 item no sl no 15Addendum I-Additionalities for formwork, Centering & Scaffolding " For Roof slab of Buildings " at 50% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum4239.244239.2468.34FalseNoneNoneFalseNoneFalse289709.66160
3311173115624NoneVol-2 page no 9 item no 5.1.15.1 Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) upto plinth level with: 5.1.1 Cement mortar 1:6 (1 cement: 6 coarse sand) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum6952.036952.0362.43FalseNoneNoneFalseNoneFalse434015.23290
3311174115624NoneVol-1 page no 7 item no 1.91.9 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum329.57329.57655.55FalseNoneNoneFalseNoneFalse216049.61350
3311175115624NoneVol-2 page no 17 item no 6.316.31 Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum9884.749884.74132.4FalseNoneNoneFalseNoneFalse1308739.5760
3311176115624NoneVol-2 page no 16 item no 6.266.26 Providing and laying Autoclaved Aerated Cement blocks masonry with 100 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level in cement mortar 1:4 (1 cement : 4 coarse sand ) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum10602.1210602.128.26FalseNoneNoneFalseNoneFalse87573.51120
3311177115624NoneVol-1 page no 18 item no 2.11.a2.11 a Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Tonne110837.22110837.2229.09FalseNoneNoneFalseNoneFalse3224254.72980
3311178115624NoneVol-2 page no 100 item no 12.13.112.13.1 Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum122431.79122431.790.87FalseNoneNoneFalseNoneFalse106515.65730
3311179115624NoneVol-2 page no 100 item no 12.15Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. (excluding cost of fixtures ) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm8545.388545.385.0FalseNoneNoneFalseNoneFalse42726.90
3311180115624NoneVol-2 page no 105 item no 12.57.6 12.57 Providing and fixing flush door shutter made out of solid core block board type, well seasoned ,chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 12.57.6 -do- 35 mm thick both side commercial ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm4115.964115.9640.75FalseNoneNoneFalseNoneFalse167725.370
3311181115624NoneVol-2 page no 104 item no 12.5112.51 Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No1258.821258.8217.0FalseNoneNoneFalseNoneFalse21399.940
3311182115624NoneVol-2 page no 108 item no 12.83.212.83 Providing and fixing factory made uPVC door frame made of uPVC extruded sections having an overall dimension as below (tolerance 1mm), with wall thickness 2.0 mm (0.2 mm), corners of the door frame to be Jointed with galvanized brackets and stainless steel screws, joints mitred and Plastic welded. The hinge side vertical of the frames reinforced by galvanized M.S. tube of size 19 X 19 mm and 1mm (0.1 mm) wall thickness and 3 nos. stainless steel hinges fixed to the frame complete as per manufacturer’s specification and direction of Engineer- in- charge 12.83.2 42x50 mm PVC Extruded section ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m296.12296.1235.7FalseNoneNoneFalseNoneFalse10571.4840
3311183115624NoneVol-2 page no 111 item no 12.9212.92 Providing& fixing of Openable door made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 102mm and GI reinforcement of 2mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 6mm plain float glass, Standard hardware with 2D/3D hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 900mm x 2400mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm7737.567737.5613.23FalseNoneNoneFalseNoneFalse102367.91880
3311184115624NoneVol-2 page no 110 item no 12.9012.90 Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm8343.438343.4374.2FalseNoneNoneFalseNoneFalse619082.5060
3311185115624NoneVol-2 page no 109 item no 12.8512.85 Providing & fixing of louvered ventilator made out of multi chamberedUPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm7085.847085.8416.8FalseNoneNoneFalseNoneFalse119042.1120
3311186115624NoneVol-2 page no 86 item no 11.34B11.34B Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Kg226.74226.741638.0FalseNoneNoneFalseNoneFalse371400.120
3311187115624NoneVol-2 page no 41 item no 8.1.18.1.1 Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm315.95315.95653.6FalseNoneNoneFalseNoneFalse206504.920
3311188115624NoneVol-2 page no 50 item no 8.518.51 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm123.9123.91632.76FalseNoneNoneFalseNoneFalse202298.9640
3311189115624NoneVol-2 page no 42 item no 8.88.8 Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm459.67459.67303.61FalseNoneNoneFalseNoneFalse139560.40870
3311190115624NoneVol-2 page no 60 item no 9.12.29.12 Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. 9.12.2 Size of Tile 600x600 mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm1418.661418.66302.75FalseNoneNoneFalseNoneFalse429499.3150
3311191115624NoneVol-2 page no 63 item no 9.239.23 Providing and laying flamed finish Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing, curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge : Flamed finish granite stone slab Black, Cherry Red, Brown, Cat Eye, River Pink or equivalent. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm3055.373055.37201.07FalseNoneNoneFalseNoneFalse614343.24590
3311192115624NoneVol-2 page no 60 item no 9.119.11 Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm1101.471101.4734.5FalseNoneNoneFalseNoneFalse38000.7150
3311193115624NoneVol-2 page no 65 item no 9.389.38 Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm1724.691724.69128.08FalseNoneNoneFalseNoneFalse220898.29520
3311194115624NoneVol-2 page no 46 item no 8.33.28.33.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm170.98170.985.0FalseNoneNoneFalseNoneFalse854.90
3311195115624NoneVol-2 page no 47 item no 8.33.38.33.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm172.22172.2291.0FalseNoneNoneFalseNoneFalse15672.020
3311196115624NoneVol-2 page no 47 item no 8.35.28.35.2 Painting with silicon & acrylic emulsion-based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces: Two coats with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm245.32245.321632.76FalseNoneNoneFalseNoneFalse400548.68320
3311197115624NoneVol-2 page no 46 item no 8.308.30 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm215.59215.59501.74FalseNoneNoneFalseNoneFalse108170.12660
3311198115624NoneVol-2 page no 85 item no 11.2811.28 Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless-steel nuts and bolts complete, i/c fixing the railing with necessary accessories &stainless-steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Kg700.04700.04640.98FalseNoneNoneFalseNoneFalse448711.63920
3311199115624NoneVol-2 page no 59 item no 9.6.1Providing and laying Chequerred precast cement concrete tiles 22 mm thick in footpath & courtyard, jointed with neat cement slurry mixed with pigment to match the shade of tiles, including rubbing and cleaning etc. complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm1572.291572.2934.34FalseNoneNoneFalseNoneFalse53992.43860
3311200115624NoneVol-2 page no 105 item no 12.5912.59 Providing and fixing aluminium die cast body tubular type universal hydraulic door closer (having brand logo with ISI, IS : 3564, embossed on the body, door weight upto 35 kg and door width upto 700 mm), with necessary accessories and screws etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No1353.961353.964.0FalseNoneNoneFalseNoneFalse5415.840
3311201115624NoneVol-2 page no 106 item no 12.69.212.69 Providing and fixing ISI marked oxidised M.S. single acting spring hinges with necessary screws etc. 12.69.2 125mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No295.34295.34100.0FalseNoneNoneFalseNoneFalse29534.00
3311202115624NoneVol-2 page no 105 item no 12.5812.58 Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No145.85145.8519.0FalseNoneNoneFalseNoneFalse2771.150
3311203115624NoneVol-2 page no 105 item no 12.6112.61 Providing and fixing chromium plated brass night latch of approved quality including necessary screws etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No1203.251203.2550.0FalseNoneNoneFalseNoneFalse60162.50
3311204115624NoneVol-2 page no 105 item no 12.6312.63 Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No158.0158.050.0FalseNoneNoneFalseNoneFalse7900.00
3311205115624NoneVol-2 page no 107 item no 12.73.112.73 Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete : 12.73.1 125mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Each53.4853.4850.0FalseNoneNoneFalseNoneFalse2674.00
3311206115624NoneVol-2 page no 121 item no 13.31.313.31 Providing and fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including fixing the pipe with clamp at 1 00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer -in-charge. Internal work -Exposed on wall 25mm nominal OD Pipe ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m394.0394.0600.0FalseNoneNoneFalseNoneFalse236400.00
3311207115624NoneVol-5 page no 113 item no 10.1.7Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3 m 394 ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m509.23509.23400.0FalseNoneNoneFalseNoneFalse203692.00
3311208115624NoneVol-2 page no 131 item no 14.2.114.2 Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : 14.2.1 W.C. pan with ISI marked white solid plastic seat and lid ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Each5994.25994.26.0FalseNoneNoneFalseNoneFalse35965.20
3311209115624NoneVol-2 page no 135 item no 14.25.1Providing and fixing white vitreous china wash basin including making all connections but including the cost of fittings :Flat back wash basin of size 630x450 mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Each1221.651221.659.0FalseNoneNoneFalseNoneFalse10994.850
3311210115624NoneVol-2 page no 120 item no 13.17.413.17 Providing and fixing PTMT bib cock of approved quality and colour 13.17.4 15 mm nominal bore, 90 mm long, ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No299.84299.8450.0FalseNoneNoneFalseNoneFalse14992.00
3311211115624NoneVol-2 page no 120 item no 13.18.113.18 Providing and fixing PTMT stop cock of approved quality and colour 13.18.1 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No162.31162.3150.0FalseNoneNoneFalseNoneFalse8115.50
3311212115624NoneVol-5 page no 221 item no 18.3Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coats with black Japan paint etc. complete as directed by the engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Each2430.922430.924.0FalseNoneNoneFalseNoneFalse9723.680
3311213115624NoneVol-2 page no 125 item no 13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter etc. complete as directed by the engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m360.55360.5581.0FalseNoneNoneFalseNoneFalse29204.550
17187938200000NoneNoneBuildingsSUB ESTIMATE FOR FIRST FLOOR / TERRACE FLOOR1969705.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3311214115625NoneVol-1 page no 16 item no 2.5.22.5 Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) 2.5.2 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum8563.268563.2610.3FalseNoneNoneFalseNoneFalse88201.5780
3311215115625NoneVol-1 page no 111 item no sl no 9Addendum I-Additionalities for formwork, Centering & Scaffolding " For Columns " at 70% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5994.285994.289.4FalseNoneNoneFalseNoneFalse56346.2320
3311216115625NoneVol-1 page no 112 item no sl no 14Addendum II-Additionalities for formwork, Centering & Scaffolding " For Beams & lintels of Buildings " at 60% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5137.965137.960.89FalseNoneNoneFalseNoneFalse4572.78440
3311217115625NoneVol-2 page no 17 item no 6.316.31 Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum9983.599983.5943.1FalseNoneNoneFalseNoneFalse430292.7290
3311218115625NoneVol-2 page no 86 item no 11.34B11.34B Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Kg229.0229.054.0FalseNoneNoneFalseNoneFalse12366.00
3311219115625NoneVol-1 page no 18 item no 2.11.A2.11 a Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Tonne111945.6111945.61.32FalseNoneNoneFalseNoneFalse147768.1920
3311220115625NoneVol-2 page no 100 item no 12.13.112.13.1 Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum123656.1123656.10.06FalseNoneNoneFalseNoneFalse7419.3660
3311221115625NoneVol-2 page no 105 item no 12.57.612.57 Providing and fixing flush door shutter made out of solid core block board type, well seasoned ,chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. 12.57.6 -do- 35 mm thick both side commercial ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm4157.124157.122.25FalseNoneNoneFalseNoneFalse9353.520
3311222115625NoneVol-2 page no 104 item no 12.5112.51 Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No1271.411271.411.0FalseNoneNoneFalseNoneFalse1271.410
3311223115625NoneVol-2 page no 110 item no 12.9012.90 Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm8426.868426.863.0FalseNoneNoneFalseNoneFalse25280.580
3311224115625NoneVol-2 page no 42 item no 8.88.8 Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm464.27464.27308.03FalseNoneNoneFalseNoneFalse143009.08810
3311225115625NoneVol-2 page no 41 item no 8.1.18.1.1 Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm319.1319.170.07FalseNoneNoneFalseNoneFalse22359.3370
3311226115625NoneVol-2 page no 50 item no 8.518.51 Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm125.14125.1474.8FalseNoneNoneFalseNoneFalse9360.4720
3311227115625NoneVol-2 page no 46 item no 8.33.28.33.2 Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm172.69172.692.25FalseNoneNoneFalseNoneFalse388.55250
3311228115625NoneVol-2 page no 47 item no 8.33.38.33.3 Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm173.94173.943.0FalseNoneNoneFalseNoneFalse521.820
3311229115625NoneVol-2 page no 47 item no 8.35.28.35.2 Painting with silicon & acrylic emulsion-based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces: Two coats with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm247.78247.7874.8FalseNoneNoneFalseNoneFalse18533.9440
3311230115625NoneVol-2 page no 46 item no 8.308.30 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm217.74217.74321.45FalseNoneNoneFalseNoneFalse69992.5230
3311231115625NoneVol-2 page no 149 item no 15.115.1Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm1022.391022.39518.08FalseNoneNoneFalseNoneFalse529679.81120
3311232115625NoneVol-2 page no 121 item no 13.31.313.31 Providing and fixing Chorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot and cold water supply, including all CPVC plain and brass threaded fittings, including fixing the pipe with clamp at 1 00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer -in-charge. Internal work -Exposed on wall 25mm nominal OD Pipe ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m397.94397.94200.0FalseNoneNoneFalseNoneFalse79588.00
3311233115625NoneVol-5 page no 113 item no 10.1.7Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3 m 394 ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m514.32514.32150.0FalseNoneNoneFalseNoneFalse77148.00
3311234115625NoneVol-2 page no 120 item no 13.17.413.17 Providing and fixing PTMT bib cock of approved quality and colour 13.17.4 15 mm nominal bore, 90 mm long, ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No302.84302.844.0FalseNoneNoneFalseNoneFalse1211.360
3311235115625NoneVol-2 page no 120 item no 13.18.113.18 Providing and fixing PTMT stop cock of approved quality and colour 13.18.1 15 mm nominal bore, 86 mm long, weighing not less than 88 g ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No163.93163.9316.0FalseNoneNoneFalseNoneFalse2622.880
3311236115625NoneVol-2 page no 125 item no 13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes 100 mm diameter etc. complete as directed by the engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.m364.15364.1580.0FalseNoneNoneFalseNoneFalse29132.00
3311237115625NoneVol-2 page no 123 item no 13.3413.34 Providing and placing on terrace(at all floor levels), polyethylene water storage tanks as per IS:12701 marked, withcover and suitable locking arrangements, making necessary holes of suitable diameter for inlet, outlet and overflow pipes, but without fittings and the base support for tank. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Ltr11.2611.264000.0FalseNoneNoneFalseNoneFalse45040.00
3311238115625NoneVol-2 page no 106 item no 12.69.212.69 Providing and fixing ISI marked oxidised M.S. single acting spring hinges with necessary screws etc. 12.69.2 125mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No298.35298.354.0FalseNoneNoneFalseNoneFalse1193.40
3311239115625NoneVol-2 page no 105 item no 12.5812.58 Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No147.33147.331.0FalseNoneNoneFalseNoneFalse147.330
3311240115625NoneVol-2 page no 105 item no 12.6512.65 Providing and fixing magnetic catcher of approved quality in cupboard / ward robe shutters, including fixing with necessary screws etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No72.4472.441.0FalseNoneNoneFalseNoneFalse72.440
3311241115625NoneVol-2 page no 105 item no 12.6112.61 Providing and fixing chromium plated brass night latch of approved quality including necessary screws etc. complete. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No1215.511215.512.0FalseNoneNoneFalseNoneFalse2431.020
3311242115625NoneVol-2 page no 105 item no 12.6312.63 Providing and fixing aluminium tower bolts, ISI marked, anodised (anodic coating not less than grade AC 10 as per IS : 1868 ) transparent or dyed to required colour or shade, with necessary screws etc. complete ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.No159.61159.612.0FalseNoneNoneFalseNoneFalse319.220
3311243115625NoneVol-2 page no 107 item no 12.73.112.73 Providing and fixing ISI marked oxidised M.S. handles conforming to IS:4992 with necessary screws etc. complete : 12.73.1 125mm ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Each54.0254.022.0FalseNoneNoneFalseNoneFalse108.040
3311244115625NoneVol-2 page no 82 item no 11.16.1Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Kg170.19170.19754.66FalseNoneNoneFalseNoneFalse128435.58540
3311245115625NoneVol-2 Page no 26 Item no 7.38Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.50 mm (+ 0.05 %) total coated thickness with zinc coating 120 grams per m2 as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 m or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x 55 mm) with EPDM seal,complete upto any pitch in horizontal/ vertical or curved surfaces,excluding the cost of purlins, rafters and trusses and including cuttingto size and shape wherever required ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm710.79710.7935.93FalseNoneNoneFalseNoneFalse25538.68470
17187938200000NoneNoneBuildingsSUB ESTIMATE FOR CC ROAD3685539.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3311246115626NoneSR 2023-24, Vo-1 ,Page No-7,Item No 1.8Construction of Embankment by excavating the available approved ravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water, all materials,usage& all other appurtenaces required to complete the work ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum587.29587.29275.0FalseNoneNoneFalseNoneFalse161504.750
3311247115626NoneVol-3, P.No. 25, I.No. 4.10(ii)Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (Vol-3, P.No. 25 I.No. 4.10(ii)) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum4137.024137.02137.5FalseNoneNoneFalseNoneFalse568840.250
3311248115626NoneVol-3, P.No. 26, I.No. 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Vol-3, P.No. 26 I.No. 4.17) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum3170.63170.6206.25FalseNoneNoneFalseNoneFalse653936.250
3311249115626NoneVol-3, P.No. 149, I.No. 16.28Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum8368.218368.21275.0FalseNoneNoneFalseNoneFalse2301257.750
17187938200000NoneNoneBuildingsSUB ESTIMATE FOR COMPOUND WALL4852378.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3311250115627NoneSR 2023-24, Vo-1 ,Page No-8,Item No 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 m ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum126.38126.38162.0FalseNoneNoneFalseNoneFalse20473.560
3311251115627NoneSR 2023-24, Vo-1 ,Page No-15,Item No 2.1.3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7420.377420.3742.11FalseNoneNoneFalseNoneFalse312471.78070
3311252115627NoneSR 2023-24, Vo-1 ,Page No-15,Item No 2.2.32.2 Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7850.37850.38.1FalseNoneNoneFalseNoneFalse63587.430
3311253115627NoneSR 2023-24,Page No-111,Item No Sl no 1aAddendum I-Additionalities for formwork, Centering & Scaffolding " For Foundation upto Plinth (a) Isolated " at 8% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum628.02628.028.1FalseNoneNoneFalseNoneFalse5086.9620
3311254115627NoneSR 2023-24, Vo-1 ,Page No-16,Item No 2.4.32.4 Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum7850.37850.35.99FalseNoneNoneFalseNoneFalse47023.2970
3311255115627NoneSR 2023-24,Page No-111,Item No Sl no 9Addendum II-Additionalities for formwork, Centering & Scaffolding " For Columns " at 70% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5495.215495.215.99FalseNoneNoneFalseNoneFalse32916.30790
3311256115627NoneSR 2023-24, Vo-1 ,Page No-16,Item No 2.5.22.5 Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum8478.488478.4834.5FalseNoneNoneFalseNoneFalse292507.560
3311257115627NoneSR 2023-24,Page No-111,Item No Sl no 9Addendum I-Additionalities for formwork, Centering & Scaffolding " For Columns " at 70% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum5934.935934.937.26FalseNoneNoneFalseNoneFalse43087.59180
3311258115627NoneSR 2023-24,Page No-111,Item No Sl no 2Addendum I -Additionalities for formwork, Centering & Scaffolding " For Plinth Beams of Buildings " at 50% ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum4239.244239.2428.72FalseNoneNoneFalseNoneFalse121750.97280
3311259115627NoneSR 2023-24, Vo-1 ,Page No-7,Item No 1.91.9 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum329.57329.57139.97FalseNoneNoneFalseNoneFalse46129.91290
3311260115627NoneSR 2023-24, Vo-2 ,Page No-14,Item No 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum9873.599873.59150.13FalseNoneNoneFalseNoneFalse1482322.06670
3311261115627NoneSR 2023-24, Vo-1 ,Page No-18,Item No 2.11.a2.11 a Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Tonne110837.22110837.225.64FalseNoneNoneFalseNoneFalse625121.92080
3311262115627NoneSR 2023-24, Vo-2 ,Page No-41,Item No 8.1.18.1.1 Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm315.95315.951338.53FalseNoneNoneFalseNoneFalse422908.55350
3311263115627NoneSR 2023-24, Vo-2 ,Page No-46,Item No 8.308.30 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm215.59215.591622.7FalseNoneNoneFalseNoneFalse349837.8930
3311264115627NoneSR 2023-24, Vo-2 ,Page No-47,Item No 8.35.28.35.2 Painting with silicon & acrylic emulsion-based water thinnable sealer of approved brand and manufacture on wet or patchy portion of plastered surfaces: Two coats with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Sqm245.32245.321622.7FalseNoneNoneFalseNoneFalse398080.7640
3311265115627NoneSR 2023-24, Vo-1 ,Page No-8,Item No 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- with all lead and lift including other incidental charges wherever necessary for successful completion of work and as directed by the Engineer in charge of work.Cum117.71117.715004.43FalseNoneNoneFalseNoneFalse589071.45530
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17187938210000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17187938210000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17187938210001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17187938210000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17187938210000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17187939060000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17187939140000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contract value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17187939260000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17187939330000NoneNoneELIGIBILITYAs per karnataka state government order LD/300/LET/2006 Bangalore dated 01-01-2007 and Govt letter No.PW/134/BMS /2007/dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17187939390000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17187939440000NoneNoneELIGIBILITYAll the documents to be uploaded shall be neatly scanned and the documents scanned shall be in original.None
17187939490000NoneNoneELIGIBILITYAny discrepancies observed in the documents uploaded by the tenderer the tender shall liable to rejected.None
17187939650000NoneNoneELIGIBILITYAll the Formats prescribed in the bid documents shall be filled in complete manner. ( section 3 & 4 of the bid document ) and shall be uploaded properly, signed by Tenderer . Necessary Certificates shall be uploaded along with the formats wherever required. General documents Section can be used for this purpose.None
17187939850000NoneNoneELIGIBILITYEarnest Money Deposit will have to be in any one of the forms as per the instructions in the financial bid document and shall have to be valid for 45 days beyond the validity of the tender.None
17187939930000NoneNoneELIGIBILITYTenderers are requested to read the Bid Documents before submission of their bid.None
17187940000000NoneNoneELIGIBILITYThe Tenderer should submit proposed methodology and program of construction, backed with equipment and materials duly supported with broad calculations and quality management, plan, proposed to be adopted, justifying of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17187940060000NoneNoneELIGIBILITYDepartment will not supply any materials.None
17187940110000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17187940170000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E-Procurement Portal.None
17187940220000NoneNoneELIGIBILITYThe Employer reserves the rights reject one or all tender without assigning any reasons.None
17187940270000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Dept Division Vijayapur during office hours on all working days. It may be noted that if any of the dates mentioned above happened next working day will holds good in lieu of the dates mentioned.None
17187940330000NoneNoneELIGIBILITYThe contractor should employ only registered labours as per Govt. Circular No. PWD/198/BMS/2009/ Dated: 24-06-2009. As per EPF & MP act 1952 inrespect of of the employees angaged by or through contractors, agencies and contractors shall have provident fund code no. & all the contract employees deployed by them are enrolled as members of provident fund.None
17187940390000NoneNoneELIGIBILITYDefect liability period-365 days (1 year).None
17187940460000NoneNoneELIGIBILITYContractors should be Registered in KPWD and copy should be uploaded in E-portal Attested by the Gazzeted officers not below the rank of Executive Engineer.None
17187940500000NoneNoneELIGIBILITYContractor should prepare Quality Assurance Plan and get approved from Quality Assurance Executive Engineer before starting the work.None
17187940560000NoneNoneELIGIBILITYContractor should establish Field Laboratory for testing of Materials.None
17187940640000NoneNoneELIGIBILITYThe Increase in G.S.T shall not be paid in the extended period of Contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17187940740000NoneNoneELIGIBILITYTender invited only for eligible contractors registered under Karnataka Public Works DeptNone
17187940790000NoneNoneELIGIBILITYWork Completion/Execution Period: 11 Months.None
17187940840000NoneNoneELIGIBILITYThe tenderer shall furnish ,as part of his tender,EMD in the amount as shown in column 4 of the table of IFT for this particular work.The E.M.D. Rs. 3,84,000.00 shall be paid in full through E-payment or in two parts part(1)Rs.1,00,000/- BY E-PAYMENT. Part (2) balance EMD of Rs. 2,84,000/- EMD shall be in favour of Executive Engineer, Public Works Department Vijayapur Division Vijayapur. And should be in the form of Bank Guarantee in thePrescribed format obtained from any Nationalized / Scheduled Bank. The Part(2) of the EMD shall be delivered to the Executive Engineer before the prescribed date and time of opening of the Technical Bids. Earnest Money Deposit/ Bid security.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneC)Executed in any one year the following minimum quantities of work(2019-20 to 2023-24) 1) Earth work Excavation 5739.57 cum 2) Providing and constructing Brick Masonry/Stone Masonry 317.05 Cum 3) Providing and laying Cement concrete (PCC/RCC) work 643.14 Cum 4) Providing and Fabricating Reinforcement Steel work 28.84 MT 5) Plastering 2139.07 Sqm 6) Flooring including Laying of Tiles Etc-458.12 SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate in format 3 in support of format 4 with indent numbers compulsory
NoneNoneNoneNoneTo qualify for the award of this contract each tenderer in his name should have in the last five years financial years. 2019-20 to 2023-24. (b) satisfactorily completed (at least 90% of the contract value), as prime contractor, at least one similar work such as Building works of value not less than Rs. 127.72 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate from Employer. Information in format 2 with work indent Numbers
NoneNoneNoneNone3) Each Tenderer should further demonstrate:a)Availability by owning, owning/Hire/Lease basis, Govt circular on GO-FD/AE 263/EXP12-2022, dated- 11-05-2022, this clause for owning key equipments for works costing upto Rs. 3.00 crores is exempted. However it is obligatory for the contractor to use the following machineries for various activities involved in constructions as per MORTH specification.(1) Self Loading Concrete Mixer.(2) Concrete Mixer with Hopper.(3) Construction elevator/Building Hoist/Tower Cranes.(4) Water Tanker.(5) Shuttering materials.(6) Tippers. (7) Pin Vibrators.(8) Plate vibrators.(9) 5 HP Generator.(10) 5 HP pumpset.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned copy of relevant documents to be furnished. Information in format 8
NoneNoneNoneNoneAssessed Tender capacity shall be more than the tendered amountCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Assessment on the letter head of the tenderer
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under: Assessed available tender capacity-(AXNX1.5-B) whereA -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. N-Number of years prescribed for completion of the works for which tenders are invited -0.91 Year(11 Month).B-Value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next 0.91 year(11 month) form the probable date of Award of this contract.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in format 10
NoneNoneNoneNoneValue at 2024-25 price level, of existing commitments and on-going works to be executed during the next 11months(Financial commitment of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25), (Monthwise commitment shall be furnished).Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Statement on the Letter head of the tenderer
NoneNoneNoneNoneLatest income tax certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned copy of ITC certificate
NoneNoneNoneNoneEach Tenderer should further demonstrate:(b) liquid assets /or availability of credit facilities of not less than Rs.69.66 Lakhs (Credit lines/ letter of credit/ certificates from banks for meeting the fund requirement etc.as per 1.10 Section 3 Qualification Information.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Letter of Credit/Bankers Certified from Scheduled Bank or Nationalized Bank
NoneNoneNoneNoneThe tenderer shall furnish ,as part of his tender,EMD in the amount as shown in column 4 of the table of IFT for this particular work.The E.M.D. Rs. 3,84,000.00 shall be paid in full through E-payment or in two parts part(1)Rs.1,00,000/- BY E-PAYMENT. Part (2) balance EMD of Rs. 2,84,000/- EMD shall be in favour of Executive Engineer, Public Works Department Vijayapur Division Vijayapur. And should be in the form of Bank Guarantee in thePrescribed format obtained from any Nationalized / Scheduled Bank. The Part(2) of the EMD shall be delivered to the Executive Engineer before the prescribed date and time of opening of the Technical Bids. Earnest Money Deposit/ Bid security.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Scanned copy of FDR /Pledged small saving instrument / BG
NoneNoneNoneNoneTo qualify for the award of this contract each tenderer in his name should have in the last five year financial years. 2019-20 to 2023-24 (a) achieved in atleast two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 510.89 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certificate from Chartered Accountant year wise from 2019-20 to 2023-24. Information in format 1
NoneNoneNoneNoneMaximum of Civil Engineering works executed in any one year during the last five years (updated to 2023-24 price level) taking into account the completed as well as works in progress. (Financial turnover of previous years shall be given a weight of 10% per year to bring them to the price level of the 2024-25)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the Letter Head of the tenderer
NoneNoneNoneNoneInformation on works are yet to be completed.OthersCommitted works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in format 5 certificates in format 3
NoneNoneNoneNoneInformation on works for which tender acceptance letters are received.OthersNew works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in format 6 letter of acceptance
NoneNoneNoneNoneName, Address, Telephone No, Fax No, E-mail ID of the tenderers bankers.OthersBankers Details
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information on the letter head of the tenderer.
NoneNoneNoneNoneThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.OthersCPM/PERT
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- CPM/PERT Chart
NoneNoneNoneNoneConstitutional or legal status of the tendererOthersLegal Status
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of registration document
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involved.OthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in format 10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate FROM 2019-20 to 2023-24TrueTechnical Bid
Contractor KPWD Civil Registration CertificateTrueTechnical Bid
Work done Certificate with indent NumbersTrueTechnical Bid
Quantitywise work done certificateTrueTechnical Bid
Machineries DocumentsTrueTechnical Bid
Line of Credit in prescribed formatTrueTechnical Bid
GST RegistrationTrueTechnical Bid
Ongoing Work DetailsTrueTechnical Bid
Any other related DocumentsTrueTechnical Bid
UDIN from practicing Chartered Account is preferredTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1719312652000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineers office PWD division Station road vijayapur
streetNone
cityBijapur
stateKarnataka
pin586101
tenderRecallDTONone