| 1719395158000 | 0 | None | None | Buildings | Construction of Compound Wall for Burrial Ground At W.No 02 Near hatti Halla AT Nalatwad Town | 494323.27 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3363899 | 118315 | None | code01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(PWD SR 2023-24 vol 3 P No. 9 It No 2.5b) | 100 Sqm | 588.25 | 588.25 | 8.0 | False | None | None | False | None | False | 4706.0 | 0 | | 3363900 | 118315 | None | code02 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in aradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In All Types of Soil Depth Upto 3Mtrs (PWD SR 2023-24 vol 1 P No. 8 It No 1.12 ) | Cum | 115.46 | 115.46 | 21.6 | False | None | None | False | None | False | 2493.936 | 0 | | 3363901 | 118315 | None | code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 vol-1 Page No-15 I.No- 2.1.3 | Cum | 7279.03 | 7279.03 | 5.471 | False | None | None | False | None | False | 39823.57313 | 0 | | 3363902 | 118315 | None | code04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand :12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) | Cum | 6819.61 | 6819.61 | 17.55 | False | None | None | False | None | False | 119684.1555 | 0 | | 3363903 | 118315 | None | code05 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.PWD SR 2023-24 vol-2 Page No-13 I.No-6.1 | Cum | 9990.59 | 9990.59 | 17.81 | False | None | None | False | None | False | 177932.4079 | 0 | | 3363904 | 118315 | None | code06 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge PWD SR 2023-24 vol-2 Page No-41 I.No- 8.2.1 | Sqm | 358.54 | 358.54 | 156.0 | False | None | None | False | None | False | 55932.24 | 0 | | 3363905 | 118315 | None | code07 | Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge PWD SR 2023-24 vol-2 Page No-45 I.No- 8.28 | Sqm | 108.17 | 108.17 | 156.0 | False | None | None | False | None | False | 16874.52 | 0 | | 3363906 | 118315 | None | code08 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost
of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. PWD SR 2023-24 vol-1 Page No-15 I.No-2.2.1 | Cum | 7641.22 | 7641.22 | 4.39 | False | None | None | False | None | False | 33544.9558 | 0 | | 3363907 | 118315 | None | code09 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9 Footings 8% | Cum | 611.3 | 611.3 | 0.729 | False | None | None | False | None | False | 445.6377 | 0 | | 3363908 | 118315 | None | code10 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9Columns 70% | Cum | 5348.85 | 5348.85 | 0.222 | False | None | None | False | None | False | 1187.4447 | 0 | | 3363909 | 118315 | None | code11 | As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate.PWD SR 2023-24 vol-1 Page No-111 Addendum I SI.No- 1, 2, 9 Beams 50% | Cum | 3820.61 | 3820.61 | 3.439 | False | None | None | False | None | False | 13139.07779 | 0 | | 3363910 | 118315 | None | code12 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. BuildingsPWD SR 2023-24 vol-1 Page No-18 I.No-2.11 a | Tonne | 96029.97 | 96029.97 | 0.2974 | False | None | None | False | None | False | 28559.313078 | 0 |
|