createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719567767866
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd300000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-07-2024 16:00:00
tenderQueryClose06-07-2024 17:00:00
technicalBidOpen11-07-2024 11:00:00
publishedDate29-06-2024 14:13:00
publishedByPostMI_EE_DIV_BID
publishedByUserKPE16323 - MD ISHAQ AHMED QURESHI
bidValidityPeriod90
noOfCalls1
preBidMeetingDate04-07-2024 16:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08482232080
mobileNumber9986243883
tenderSupplierListNone
tenderSchedule
createdTs1719567767893
version4
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/IW/WORK_INDENT2113
titleConstruction of Check Dams near Chimkod, Markhal site-1, Markhal Site-2, Nandgaon, Gadgi, Khajapur and Vilaspur villages taluk Bidar District Bidar.
descriptionConstruction of Check Dams near Chimkod, Markhal site-1, Markhal Site-2, Nandgaon, Gadgi, Khajapur and Vilaspur villages taluk Bidar District Bidar.
categoryWORKS
categoryTextWorks
ecv19972803.52
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location128
locationNameMinor Irrigation Division Bidar
provisionalAmount20000000.0
groupOverheadTotal3046698.84
fileNumberCheckdams/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Chimkod village Bidar taluka and Bidar District2460985.23
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400020119971NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Each26.7826.78185.0FalseNoneNoneFalseNoneFalse4954.30
3400021119971NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0353.03212.0FalseNoneNoneFalseNoneFalse11242.360
3400022119971NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.1956.25FalseNoneNoneFalseNoneFalse102414.3750
3400023119971Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15252.65FalseNoneNoneFalseNoneFalse96297.54750
3400024119971NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete with all lead and lift as per the direction of engineer in charge of the workEach1337.71337.735.0FalseNoneNoneFalseNoneFalse46819.50
3400025119971NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7673.25FalseNoneNoneFalseNoneFalse335076.5250
3400026119971NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12121.69FalseNoneNoneFalseNoneFalse852818.12280
3400027119971NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates with all lead and lift as per the direction of engineer in charge of the workCum8047.378047.3769.8FalseNoneNoneFalseNoneFalse561706.4260
3400028119971NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.14FalseNoneNoneFalseNoneFalse292912.0740
3400029119971NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400030119971NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75300.0FalseNoneNoneFalseNoneFalse143325.00
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Markhal village site-1 Bidar taluka and Bidar District2273115.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400031119972NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Each26.7826.78200.0FalseNoneNoneFalseNoneFalse5356.00
3400032119972NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Each53.0253.02150.0FalseNoneNoneFalseNoneFalse7953.00
3400033119972NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Cum107.1107.1700.0FalseNoneNoneFalseNoneFalse74970.00
3400034119972Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Cum381.15381.15252.65FalseNoneNoneFalseNoneFalse96297.54750
3400035119972NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete with all lead and lift as per the direction of engineer in charge of the workEach1337.71337.730.0FalseNoneNoneFalseNoneFalse40131.00
3400036119972NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7790.25FalseNoneNoneFalseNoneFalse393307.4250
3400037119972NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Cum7008.127008.12121.685FalseNoneNoneFalseNoneFalse852783.08220
3400038119972NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates) with all lead and lift as per the direction of engineer in charge of the workCum8047.378047.3751.035FalseNoneNoneFalseNoneFalse410697.527950
3400039119972NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.t93284.193284.13.03FalseNoneNoneFalseNoneFalse282650.8230
3400040119972NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400041119972NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75200.0FalseNoneNoneFalseNoneFalse95550.00
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Markhal village site-2 Bidar taluka and Bidar District2542721.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400042119973NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Each26.7726.77325.0FalseNoneNoneFalseNoneFalse8700.250
3400043119973NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0253.02265.0FalseNoneNoneFalseNoneFalse14050.30
3400044119973NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.1956.25FalseNoneNoneFalseNoneFalse102414.3750
3400045119973Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15252.65FalseNoneNoneFalseNoneFalse96297.54750
3400046119973NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations complete with all lead and lift as per the direction of engineer in charge of the workEach1337.71337.735.0FalseNoneNoneFalseNoneFalse46819.50
3400047119973NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7874.25FalseNoneNoneFalseNoneFalse435114.2250
3400048119973NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12121.685FalseNoneNoneFalseNoneFalse852783.08220
3400049119973NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates)basic rate as per current quarter with all lead and lift as per the direction of engineer in charge of the workCum8047.378047.3769.8FalseNoneNoneFalseNoneFalse561706.4260
3400050119973NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.13FalseNoneNoneFalseNoneFalse291979.2330
3400051119973NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400052119973NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75250.0FalseNoneNoneFalseNoneFalse119437.50
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Vilaspur village Bidar taluka and Bidar District2247507.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400053119974NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Each26.7726.77150.0FalseNoneNoneFalseNoneFalse4015.50
3400054119974NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0253.02160.0FalseNoneNoneFalseNoneFalse8483.20
3400055119974NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.1700.0FalseNoneNoneFalseNoneFalse74970.00
3400056119974Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15252.65FalseNoneNoneFalseNoneFalse96297.54750
3400057119974NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations completeEach1337.71337.732.0FalseNoneNoneFalseNoneFalse42806.40
3400058119974NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7754.25FalseNoneNoneFalseNoneFalse375390.2250
3400059119974NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12121.685FalseNoneNoneFalseNoneFalse852783.08220
3400060119974NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates)(Item No.2.5.2 Page No.16 of PWD Volume I Common SR for 2023-24).basic rate as per current quarter.Cum8047.368047.3651.035FalseNoneNoneFalseNoneFalse410697.01760
3400061119974NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.03FalseNoneNoneFalseNoneFalse282650.8230
3400062119974NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400063119974NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75180.0FalseNoneNoneFalseNoneFalse85995.00
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Gadgi village taluka and Bidar District2665571.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400064119975NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Each26.7726.77325.0FalseNoneNoneFalseNoneFalse8700.250
3400065119975NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0253.02265.0FalseNoneNoneFalseNoneFalse14050.30
3400066119975NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.11062.5FalseNoneNoneFalseNoneFalse113793.750
3400067119975Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15287.72FalseNoneNoneFalseNoneFalse109664.4780
3400068119975NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations completeEach1337.71337.740.0FalseNoneNoneFalseNoneFalse53508.00
3400069119975NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7595.5FalseNoneNoneFalseNoneFalse296380.350
3400070119975NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12143.11FalseNoneNoneFalseNoneFalse1002932.05320
3400071119975NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates)(Item No.2.5.2 Page No.16 of PWD Volume I Common SR for 2023-24).basic rate as per current quarter.Cum8047.378047.3777.075FalseNoneNoneFalseNoneFalse620251.042750
3400072119975NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.36FalseNoneNoneFalseNoneFalse313434.5760
3400073119975NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400074119975NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75250.0FalseNoneNoneFalseNoneFalse119437.50
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Nandgaon village Bidar taluka and Bidar District2361055.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400075119976NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Each26.7726.77100.0FalseNoneNoneFalseNoneFalse2677.00
3400076119976NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0253.0250.0FalseNoneNoneFalseNoneFalse2651.00
3400077119976NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.1956.25FalseNoneNoneFalseNoneFalse102414.3750
3400078119976Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15250.19FalseNoneNoneFalseNoneFalse95359.91850
3400079119976NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations completeEach1337.71337.735.0FalseNoneNoneFalseNoneFalse46819.50
3400080119976NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7592.25FalseNoneNoneFalseNoneFalse294762.8250
3400081119976NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12121.685FalseNoneNoneFalseNoneFalse852783.08220
3400082119976NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates)(Item No.2.5.2 Page No.16 of PWD Volume I Common SR for 2023-24).basic rate as per current quarter.Cum8047.378047.3769.8FalseNoneNoneFalseNoneFalse561706.4260
3400083119976NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.14FalseNoneNoneFalseNoneFalse292912.0740
3400084119976NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400085119976NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75200.0FalseNoneNoneFalseNoneFalse95550.00
17195677680000NoneNoneIrrigation and Other WorksConstruction of Arch Check Dam near Khajapur village Bidar taluka and Bidar District2375148.32
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400086119977NoneItem No.8.2.1 Page No.101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work .Each26.7726.77120.0FalseNoneNoneFalseNoneFalse3212.40
3400087119977NoneItem No.8.2.2 Page No.101Cutting and removing jauliflora bushes above 1.50 m upto 3.00 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations completewith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workEach53.0253.0245.0FalseNoneNoneFalseNoneFalse2385.90
3400088119977NoneItem No.1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum107.1107.1956.25FalseNoneNoneFalseNoneFalse102414.3750
3400089119977Nonetem No.1.15.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth .with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum381.15381.15255.12FalseNoneNoneFalseNoneFalse97238.9880
3400090119977NoneItem No.2.9 Page No.38Providing and fixing 25 mm dia 2.75 m long ribbed steel anchor rods with one end split and driven fimly using steel wedge into 1.25 m deep 38 mm dia. hole drilled in bed rock and other end provided with L-bend for embedding in concrete / masonry for spillway and appurtenant works including cost of all materials, machinery, labour, steel wedge, drilling and cleaning hole, filling hole with thick cement slurry, driving anchor rod and all other ancillary operations completeEach1337.71337.735.0FalseNoneNoneFalseNoneFalse46819.50
3400091119977NoneItem No.1.8 Page No.7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum497.7497.7592.25FalseNoneNoneFalseNoneFalse294762.8250
3400092119977NoneItem No.2.3.2 Page No.16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates basic rate as per current quarter.with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workCum7008.127008.12121.685FalseNoneNoneFalseNoneFalse852783.08220
3400093119977NoneItem No.2.5.2 Page No.17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curingwith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates)(Item No.2.5.2 Page No.16 of PWD Volume I Common SR for 2023-24).basic rate as per current quarter.Cum8047.378047.3769.8FalseNoneNoneFalseNoneFalse561706.4260
3400094119977NoneItem No.2.11 (e) Page No.18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Dam & Allied Works with all lead and lifts including loading and unloading as per the direction of engineer in charge of the workt93284.193284.13.14FalseNoneNoneFalseNoneFalse292912.0740
3400095119977NoneItem No.1.8 Page No.130providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing, finishing top surface & all necessary workswith all lead and lifts including loading and unloading as per the direction of engineer in charge of the work.Sqm1341.91341.910.0FalseNoneNoneFalseNoneFalse13419.00
3400096119977NoneItem No.3.41.2 Page No.54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of engineer in charge of the work 300 mm thickSqm477.75477.75225.0FalseNoneNoneFalseNoneFalse107493.750
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195677690000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195677690001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17195677690001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date and time of bid submission.None
17195677690000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17195677690000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195678710000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17195678850000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17195678940000NoneNoneELIGIBILITYThe employer reserves the right to accept or reject any or all tenders without assigning any reason.None
17195679000000NoneNoneELIGIBILITYThe intending Bidder/ firm/ company are advised to visit the work site before submission of the tenders.None
17195679080000NoneNoneELIGIBILITYThe necessary Certificates / documents in support of eligibility criteria fulflled as stipulated shall be scanned and attached to e- tender document. The original certificate / documents shall be produced prior to the opening of bid for verification. Scanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid document.None
17195679140000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds goodNone
17195679220000NoneNoneELIGIBILITYconditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever.None
17195679290000NoneNoneELIGIBILITYCorrigendum will be published in the website for all modifications or corrections if any.None
17195679360000NoneNoneELIGIBILITYThe contractor should mention their recent correct postal address & mail address in declaration forms.None
17195679440000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only. No departmental supply of any materials shall be made by Department.None
17195679510000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also Land acquisition problems if any.None
17195679580000NoneNoneELIGIBILITYTypographical errors, if any, will not be the ground for any claims by the ContractorNone
17195679670000NoneNoneELIGIBILITYThe necessary Certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached to e- tender document. The original certificate / documents shall be produced for verification when demanded, otherwise the tender will be treated as non responsive bid and rejected.None
17195679730000NoneNoneELIGIBILITYScanned signature of the Bidder/ firm/ company authorized representative of the Bidder/ firm/ company shall be attached while uploading bid document.None
17195679800000NoneNoneELIGIBILITYIncomplete tender documents will be rejected.None
17195679870000NoneNoneELIGIBILITYAs per the Karnataka Building and other Constructions Workers Welfare Cess Act 1996, 1% of the bill amount will be deducted from the bills.None
17195679940000NoneNoneELIGIBILITYThe contractor should adhere to the accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work.None
17195680010000NoneNoneELIGIBILITYThe contractor should furnish the name of the individual / firm / company with address & telephone No with place of registration, year of incorporation etc.None
17195680080000NoneNoneELIGIBILITYOriginal documents shall be produced for verification at the any stage of tender process, Failure to produce original documents will lead to disqualification. work done certificate should have all the details CR no, work order issuing date, work completion date and year as asked in bid document.None
17195680220000NoneNoneELIGIBILITYThe Applicant shall be registered in KPWD and shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by GOK/GOI.None
17195680320000NoneNoneELIGIBILITYRestrictions on Public Procurement from Bidders of certain countries as per Government order No. FD 455 Exp-12 2020 Bengaluru dated:25-08-2020None
17195680480000NoneNoneELIGIBILITYDuring the execution of works, if any minor minerals are required, contractors have to abide by the prevailing rules and Acts applicable to Minor Minerals. As per the prevailing rules, for any use of Minor Minerals, the contractor has to submit the mineral Dispatch Permit (MDP) obtained from Mines and Geology Department. If mineral Dispatch permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty DMF contribution as per Karnataka Minor Mineral Concession Rules 1994 (as amended from time to time) will be deducted from the contractors bill.None
17195680590000NoneNoneELIGIBILITYThe agencies participating in the tender shall be registered in the Construction Labor Board as per the G.O. No. LD 300 LET 2006 Dated:18-1-2007 and Addendum No. LD 95 LET 2013 Bengaluru Dt:1-4-2013. Also the contractors entrusted with the work shall employ the labors only who have registered in the Karnataka Building and Construction Workers Welfare Board failing which the contractor shall be liable for any further action as deem fit by the authority.None
17195680660000NoneNoneELIGIBILITYWithin 20 days of receipt of the Letter of Acceptance, the successful Tenderer shall deliver to the Employer a Security deposit in any of the forms as mentioned in bid document for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with Clause 25.5 of ITT and Clause 44 of the Conditions of Contract for all works.None
17195680760000NoneNoneELIGIBILITYThe Bidder shall quote Rates By adding GST for either materials or works Contract (Service).None
17195680830000NoneNoneELIGIBILITYThe contractor has to make his own arrangements for procurement of all the required materials and the materials so procured shall confirm to the relevant IS Specifications and obtain necessary quality certificate from authorized quality control.None
17195681530000NoneNoneELIGIBILITYThe tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17195681610000NoneNoneELIGIBILITYThe Work Done Certificates shall be issued by the Executive Engineer with indent number mentioned (if work done in Karnataka State), otherwise it shall be issued/counter signed by Superintending Engineer (if the work is done in other states).None
17195681680000NoneNoneELIGIBILITYSub-Leasing/G.P.A of Work is Prohibited.None
17195681760000NoneNoneELIGIBILITYEach Item Of BOQ To be read as with all lead and lifts and including loading and unloading charges and all other charges and as per the direction of Engineer in charge.None
17195681820000NoneNoneELIGIBILITYUploaded drawings are for TENDER PURPOSE ONLY.None
17195681900000NoneNoneELIGIBILITYThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the work listed should be countersigned by the Employer in charge, not below the rank of an Executive Engineer or equivalent.None
17195681970000NoneNoneELIGIBILITYIncome Tax : Latest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos. to be uploadedNone
17195682050000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee into the respective receiving bank accounts of KPPP Portal on or before the last date and time of bid submission.None
17195682130000NoneNoneELIGIBILITYThe tender processing charges paid by the bidder/ firm/ company are not refundable even if the tenders are cancelledNone
17195682270000NoneNoneELIGIBILITYThe tenderer should maintain the scheme during the defective liability period.None
17195682350000NoneNoneELIGIBILITYThe contractor should establish quality control laboratory equiped with all the equipments and the materials should be periodically tested and properly documented as per the direction of the Engineer-in-charge of the work.None
17195682420000NoneNoneELIGIBILITYAll other terms and conditions as per KW-4 tender documents.None
17195682500000NoneNoneELIGIBILITYAny increase in GST amount will not be paid under this contract beyond the tender period.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneITT 3.2b.Satisfactory completion (at least 90% of the contract value), as Prime contractor, at least one similar work such as Check Dam/BCB/Barrage/Anicut/Pickup/Bandhara from Single Contract of value not less than Rs. 99.87 Lakhs during the last five years (2019-20 to 2023-24). The work done certificate should be obtained duly signed from an Officer not below the rank of Executive Engineer of the concerned division. Cost of completed works of previous years will be given weightage of 10% per year to bring them to 2024-25 price levelPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate
NoneNoneNoneNoneITT 3.2c To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. (2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) Executed in any one year the minimum quantities of work: 1)EWE (combined excavation and embankment): 10370.50 cum, 2) Cement concrete: 1065.26 Cum, 3) Revetment: 1284.00 Sqm 4) Steel : 17.58 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate showing quantity of the different item
NoneNoneNoneNoneSection 3 Qualification Information.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section -3 of Bid Document
NoneNoneNoneNoneThe tenderer shall give details of works on hand (Present contract commitment)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certified Copy
NoneNoneNoneNoneITT3.2 a. To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. (2019-20, 2020-21, 2021-22, 2022-23 & 2023-24). Achieved in at least two financial years a minimum financial turnover of Rs. 532.61 Lakhs.Financial turn over of previous years will be given a weightage of 10% per year to bring them to the price level of FY 2024-25Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certificate issued by Chartered Accountant
NoneNoneNoneNoneITT3.3 b. Liquid assets and / or availability of credit facilities of not less than Rs. 87.98 Lakhs (Credit lines/letter of credit / certificates from banks for meeting the fund requirement. It should be in prescribed format appended in Bid document.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Line of credit as prescribed in section 3
NoneNoneNoneNoneThe Tenderer shall have valid class - I KPWD License (upload registration certificate of original should be produced while opening the tender)OthersRegistration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Registration Certificate
NoneNoneNoneNoneAll documents including details of EMD are to be mentioned in the technical bid only ( as per KPPP options)OthersDocuments
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneAll documents to be furnished are to be attested by the officer of not below the rank of Executive Engineer or by Notary.OthersDocuments
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors Registration CertificateTrueTechnical Bid
Annual Turnover Certificate issued by the C.ATrueTechnical Bid
Work Done Certificate for executed quantityTrueTechnical Bid
Similar Nature Of work done Certificate issued not below the rank of E.ETrueTechnical Bid
Line Of CreditTrueTechnical Bid
Works on hand Present contract commitmentTrueTechnical Bid
Section 3 Qualification Information.TrueTechnical Bid
Assess available tender capacityTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Irrigation and Other WorksBidarBidarBidarBIDARnear Chimkod Markhal site1 Markhal Site2 Nandgaon Gadgi Khajapur and Vilaspur villages taluk BidarNoneNoneNoneNoneNoneNone
tenderAddress
createdTs1719569020000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engieer MI and GWD Division Naubad
streetNone
cityBidar
stateKarnataka
pin585402
tenderRecallDTONone