createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719572081961
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee2500.00
emd200000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-07-2024 16:00:00
tenderQueryClose06-07-2024 17:00:00
technicalBidOpen11-07-2024 11:00:00
publishedDate29-06-2024 14:11:40
publishedByPostMI_EE_DIV_BID
publishedByUserKPE16323 - MD ISHAQ AHMED QURESHI
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonExecutive Engineer
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08482232080
mobileNumber9986243883
tenderSupplierListNone
tenderSchedule
createdTs1719572081995
version4
createdDateNone
modifiedDateNone
tenderNumberMI/2024-25/LI/WORK_INDENT2104
titleImprovements to Jampad LIS near Jampad village in taluka and District Bidar
descriptionImprovements to Jampad LIS near Jampad village in taluka and District Bidar
categoryWORKS
categoryTextWorks
ecv9998315.69
deptNameMinor Irrigation Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location128
locationNameMinor Irrigation Division Bidar
provisionalAmount10000000.0
groupOverheadTotal1525166.8
fileNumberJampad/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195720820000NoneNoneLift Irrigation SchemeImprovements to Jampad LIS near Jampad village in taluka and District Bidar(Repairs to Pump House and Rising Main)3033600.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3402164120082NoneVol 4B Item No.8.30 Page 101Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Sqm9.879.87480.0FalseNoneNoneFalseNoneFalse4737.60
3402165120082NoneVol 4 Item No.8.2.1 Page 101Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all other ancillary operations complete with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each26.7826.78250.0FalseNoneNoneFalseNoneFalse6695.00
3402166120082NoneVol 3 Item No.2.8 (ii)a Page 10Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement oncrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20 with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum754.95754.9536.0FalseNoneNoneFalseNoneFalse27178.20
3402167120082NoneVol 1 Item No.1.14.1 Page 8Earth work excavation for Foundation by mechanicalmeans for all works & depth upto 3 m, as per drawingand technical specifications, including settingout, shoring, strutting, barricading, caution lights,including dressing of excavated surfaces, disposing offor levelling the excavated earth or sorting & stackingthe selected earth for reuse in a radius of 50 m andlift upto 1.5 m including Cost of labour, tools, usage ofmachinery & other appurtenaces required to completethe work. In all kinds of soils Depth upto 3 m.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum107.1107.11084.875FalseNoneNoneFalseNoneFalse116190.11250
3402168120082NoneSR Vol 4 PART ii Item No.1.8 Page 130Providing rubble stone/boulder filling between or behind abutment below apron including cost of all materials, labour, hand packing,finishing top surface & all necessary works as directed and complete as per specification.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum1341.91341.9193.575FalseNoneNoneFalseNoneFalse259758.29250
3402169120082NoneSR Vol 1 Item No.2.2.1 Page 15Providing and laying in position Cement Concretefor all Foundation works. The granite/trap/basaltcrushed graded coarse aggregates and fine aggregatesas per relevant IS Codes machine mixed with superplasticizers laid in finished layers, well compactedusing needle vibrators, including all lead & lifts, cost ofall materials, quality confirming to the requirements ofrelevant IS codes, labour, Usage charges of machinery,curing and all the other appurtenances required tocomplete the work as per technical specifications M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum6601.356601.3573.8FalseNoneNoneFalseNoneFalse487179.630
3402170120082NoneVol 1 Item No.2.3.1 Page 16Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum6838.326838.3226.607FalseNoneNoneFalseNoneFalse181947.180240
3402171120082NoneVol 1 Item No.2.11a Page 18Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification a)Buildings.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Tonne93929.8593929.851.211FalseNoneNoneFalseNoneFalse113749.048350
3402172120082NoneVol 4 Item No.7.28 Page 98Design, manufacturing, supply, errection, trail running, performance test and commissioning of centrifugal pump of approved make conforming to IS:12699 (1989) (Reaffirmed 2009) having specified pump output under specified operating head coupled to HT/LT ,WITH motor of adeuate HP rating operating at suitable KV with flexible coupling, self water lubricated thrust bearings, discharge Tee with flanged end for connecting delivery pipe with all other standard accessories and saftey device& all necessary works complete as per specification. UPTO 3500HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.HP11025.011025.060.0FalseNoneNoneFalseNoneFalse661500.00
3402173120082NoneSR Vol 4 Item No.7.5 Page 91Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded /submerged arc welded mild steel (Fe-410 grade) manifold pipe system of specified diameter and plate thickness with flanged inlets / outlets at specified locations for connecting pump delivery pipes and rising mains and provided with 1 coat of 40 micron thick zinc rich epoxy primer paint and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and exposed outer surface including cost of all materials, machinery, labour, cutting, bending, welding, finishing, painting, conveying to spot, lowering, aligning,jointing, arranging water for testing,hydraulic testing at fabrication site and after laying and jointing at specified test pressure and all other ancillary operations complete as per specifications and approved drawings. (excluding cost of thrust block for anchoring / encasing manifold pipe ).Diameter of manifold pipe : …….mm Thickness of plate : ……mm.Note: Rate per m of pipe= Rate per tonne x Weight of pipe per Rm Weight of pipe per m for specified diameter and plate thickness= 0.976 x Diameter of pipe in mm x Plate thickness in mm / 30000.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Tonne136042.2136042.23.683FalseNoneNoneFalseNoneFalse501043.42260
3402174120082NoneSR Vol 4 Item No.6.6 Page No 74Design, fabrication, supply, erection, testing and commissioning of vertical lift sliding type all interchangeable (except bottom element) stoplog gate elements consisting of skin plate, horizontal and vertical girders, stiffeners, lifting pins, bronze padded slide blocks, guide shoes, rubber seals, clamps with all accessories for spillway including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Tonne147315.0147315.00.6FalseNoneNoneFalseNoneFalse88389.00
3402175120082NoneVol 3 Item No.8.58 c Page No 80 Providing and laying Reinforced Cement Concrete pipe light duty NP2 for culverts, roadway utilities& crossingsas per IS 458:2003 in Single row including pointing ends and fixing collars with cement mortar 1:2 including cost of all materials, labour, curing completeas per specifications.600 mm dia.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.m2001.32001.3187.5FalseNoneNoneFalseNoneFalse375243.750
3402176120082NoneVol 4 Item No.4.13.3 Page No 61Laying and jointing NP- 2 class hume pipes in CM 1 : 2 proportion by volume including cost of all materials (excluding pipes and collars), labour, aligning pipes, batching and mixing mortar, packing joints with hemp and mortar, finishing, curing and all other ancillary operations complete 600 dia.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Joint837.9837.975.0FalseNoneNoneFalseNoneFalse62842.50
3402177120082NoneSR Vol 4 Item No.3.41.2 Page 54Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete. 300mm thick.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Sqm477.75477.75308.0FalseNoneNoneFalseNoneFalse147147.00
17195720820000NoneNoneLift Irrigation SchemeImprovements to Jampad LIS near Jampad village in taluka and District Bidar(Repairs to Pumping Machinery)510183.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3402178120083NoneWS&UGD VOL.5 CSR (I.No 13.49.9,P.No-158)Rewinding of monoblock motor with copper insulaton wire suitable gauge as per ISI specification with all necessary materials and labour,tools and equipments with guarantee period of not less than 12 months, 60 HP monobloc motor rewinding with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Job36750.036750.01.0FalseNoneNoneFalseNoneFalse36750.00
3402179120083NoneWS&UGD VOL.5 CSR (I.No 13.50.9,P.No-159)Providing Ball bearing as per ISI specifiction with guarantee period of not less than 12 months, Bearing cost for 60 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each6825.06825.02.0FalseNoneNoneFalseNoneFalse13650.00
3402180120083NoneWS&UGD VOL.5 CSR (Sl.No 819,P.No-A-49Supplying and fixing LT cable of size 4 x 25 Sqm suitable for centrifugal pump sets with ISI mark and its latest amendments with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Mtr590.1590.130.0FalseNoneNoneFalseNoneFalse17703.00
3402181120083NoneWS&UGD VOL.5 CSR (I.No 13.48,P.No-158)Supply and delivery at site brand new best make Foot valve suitable for centrifugal pump above 12.50HP confirming with ISI mark and its latest amendments.60HP motor.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each2310.02310.02.0FalseNoneNoneFalseNoneFalse4620.00
3402182120083NoneWS&UGD VOL.5 CSR (I.No 13.39,P.No-157)Earthing: Supplying and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit.The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Job3937.53937.57.0FalseNoneNoneFalseNoneFalse27562.50
3402183120083NoneWS&UGD VOL.5 CSR (I.No 13.84.2, P.No-165)For Both coupling new set for 25 HP to 100 HP pumps.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each10710.010710.01.0FalseNoneNoneFalseNoneFalse10710.00
3402184120083NoneWS&UGD VOL.5 CSR (I.No 13.55.2 ,P.No-130)Repairs to Vertical turbine pumps as per ISI specifiction with guarantee period of not less than 12 months V-T PUMP IMPELLER AND NECK RING for 50 HP to 60 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each5460.05460.01.0FalseNoneNoneFalseNoneFalse5460.00
3402185120083NoneWS&UGD VOL.5 CSR (I.No 13.51.4,P.No-159)Providing thrust bearing as per ISI specifiction with guarantee period of not less than 12 months Bearing cost for 60 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each11550.011550.01.0FalseNoneNoneFalseNoneFalse11550.00
3402186120083NoneWS&UGD VOL.5 CSR (I.No 13.76,P.No-164)For Side gland bush 25 HP to 100 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each1890.01890.01.0FalseNoneNoneFalseNoneFalse1890.00
3402187120083NoneWS&UGD VOL.5 CSR (I.No 19.14,P.No-228)Work of supply and fixing of 40 amps star delta panel Boards upto 15Hp backwash pump motor as specified below: a. Supply and fixing of new upto 15 Hp star delta starter panel board for back wash motor with the following materials. b. Power connector upto 40 A. c. On delay, off delay automatic timer. d. Over current relay upto 20-60 amps e. Upto 10 amps MCB 3 Pole for control circuit. f. Contactor 2 No+ 2 Nc upto 25 amps g. Single phase preventer. h. On and off push button switch. i. LED indication lamps RYB motor on, off and trip. j. 0 to 600 volts meter upto 96/96 mm. k. Amps meter C.T Ratio upto 100/5A. l. Current Transformer for metering upto 100/5A. m. upto 30mmx10mm Electronic Grad Aluminum bus bar for RYB phases. n. Internal main wiring using upto 95 sq.mm Copper wire. o. Volts and ammeter selector switch.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Job35413.3535413.351.0FalseNoneNoneFalseNoneFalse35413.350
3402188120083NoneWS&UGD VOL.5 CSR (I.No 13.43.3,P.No-158)Supply and delivery at site brand new best make starter/ control panel suitable for following HP centrifugal pump confirming with ISI mark and its latest amendments.10 to 120 HP centrifugal pump.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each37432.537432.51.0FalseNoneNoneFalseNoneFalse37432.50
3402189120083NoneWS&UGD VOL.5 CSR (I.No 19.23,P.No-230)Supply and brazing of motor end lead cable by using H.T Copper lugs, brazing materials, gas, soldering past, etc as original for all the three phases for motor.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Job35413.3535413.351.0FalseNoneNoneFalseNoneFalse35413.350
3402190120083NoneWS&UGD VOL.5 CSR (I.No 13.58,P.No-161)Pump dismentaling and refitting after attending repairs.60 HP to 120 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each12600.012600.01.0FalseNoneNoneFalseNoneFalse12600.00
3402191120083NoneWS&UGD VOL.5 CSR (I.No 13.2.3,P.No-147)Replace the components of submersible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones,including all materials, labour, equipments and testing etc.(with gurantee of period not less than 1 year) for:The Oil Seal.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each367.5367.52.0FalseNoneNoneFalseNoneFalse735.00
3402192120083NoneWS&UGD VOL.5 CSR (I.No 13.3.11,P.No-148)Replace the components of motor parts of submersible pump sets,items requiring replacements decided by the departmental officials,with respective make of damaged ones, including all materials, labour,equipments and testing etc and wtih guarantee/ warranty for one year for: The Carbon Housing (Thrust bearing block assembly complete with segment bearing pad.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each2100.02100.01.0FalseNoneNoneFalseNoneFalse2100.00
3402193120083NoneWS&UGD VOL.5 CSR (I.No 13.72.2P.No-163)For Gear box ball bearing 60 HP to 120 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each1732.51732.51.0FalseNoneNoneFalseNoneFalse1732.50
3402194120083NoneWS&UGD VOL.5 CSR (I.No 13.66,PNo-162)For Connecting bush G.M new making each 60 HP to 120 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each2073.752073.751.0FalseNoneNoneFalseNoneFalse2073.750
3402195120083NoneWS&UGD VOL.5 CSR (I.No 13.67.2,PNo-163)For Line shaft seat welding making each 60 HP to 120 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each577.5577.52.0FalseNoneNoneFalseNoneFalse1155.00
3402196120083NoneWS&UGD VOL.5 CSR (I.No 13.68.2,PNo-163)For Oil inside new Fitting & threading each 60 HP to 120 HP.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each1680.01680.01.0FalseNoneNoneFalseNoneFalse1680.00
3402197120083NoneWRD MI VOL.4B DSR (sI.No 12,PNo-125)Supply of Transformer oil.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Ltr126.0126.0150.0FalseNoneNoneFalseNoneFalse18900.00
3402198120083NoneWRD VOL.4A DSR (sI.No 15,PNo-20)Supply of Lubricant .with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Ltr307.65307.65500.0FalseNoneNoneFalseNoneFalse153825.00
3402199120083NoneWRD VOL.4A DSR (sI.No 11,PNo-20)Supply of Gear oil HP-90.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Ltr292.95292.95150.0FalseNoneNoneFalseNoneFalse43942.50
3402200120083NoneWRD VOL.4A DSR (sI.No 12,PNo-20)Supply of Grease GEM-RR3.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Kg332.85332.85100.0FalseNoneNoneFalseNoneFalse33285.00
17195720820000NoneNoneLift Irrigation SchemeImprovements to Jampad LIS near Jampad village in taluka and District Bidar(Repairs to Canal)2242351.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3402201120084NoneItem No.8.2.1 Page No.101 of WRD Volume IV Cutting and removing jauliflora bushes upto 1.50 m girth excluding removal of stumps and including burning or disposing off the materials as directed with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Each26.7826.78450.0FalseNoneNoneFalseNoneFalse12051.00
3402202120084NoneItem No.1.14.1 Page No.8 of PWD Volume I Common SREarth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m. with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum107.1107.1782.6FalseNoneNoneFalseNoneFalse83816.460
3402203120084NoneItem No.3.20 Page No.50 of WRD Volume IV SRProviding cohesive non-swelling ( CNS ) soil lining to canals using soil from borrow area including cost of all materials, labour, machinery, spreading soil in layers of thickness not more than 150 mm, breaking clods, levelling, watering, compacting to density control of not less than 95 percent or as stipulated, dressing to required profile and all other ancillary operations complete. with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum761.25761.25503.1FalseNoneNoneFalseNoneFalse382984.8750
3402204120084NoneItem No.3.27 Page No.51 of WRD Volume IVCommon SR Providing and laying insitu vibrated M-15 grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all other ancillary operations complete.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum6369.36369.352.21FalseNoneNoneFalseNoneFalse332541.1530
3402205120084NoneItem No.3.26.1 Page No.51 of WRD Volume IV part i Providing and laying insitu vibrated M-15 grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, abour,cleaning, batching, mixing, formwork, supports, placing in position, levelling, vibrating, finishing junction of bed and sides to required curvature, finishing side slopes, curing with all other ancillary operations complete.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum8688.758688.7574.43FalseNoneNoneFalseNoneFalse646703.66250
3402206120084NoneItem No.2.11 (f) Page No.18 of PWD Volume I SRSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning,straightening,cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.t94510.594510.57.56FalseNoneNoneFalseNoneFalse714499.380
3402207120084NoneItem No.8.24.1 Page No.104 of MI Volume IV partii Excavation and removal of silt and silt mixed with sand from canal bed by manual means including disposing off the same in spoil bank or on the canal embankment in layers as directed with all other ancillary operations complete in dry condition.with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum299.25299.25233.1FalseNoneNoneFalseNoneFalse69755.1750
17195720820000NoneNoneLift Irrigation SchemeImprovements to Jampad LIS near Jampad village in taluka and District Bidar(Construction of Approach road)2687013.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3402208120085NoneItem No.1.14.1 Page No.8 of PWD Volume I SREarth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mwith all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum107.1107.1720.0FalseNoneNoneFalseNoneFalse77112.00
3402209120085NoneItem No.1.8 Page No.7 of CSR Volume I Common SR Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum497.7497.72010.0FalseNoneNoneFalseNoneFalse1000377.00
3402210120085NoneItem No.4.14 B (i) a CSR Volume III Common SRProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-I (63 mm to 45 mm) by mechanical means using screening crushable type such as murrum or gravel with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum2272.22272.2360.0FalseNoneNoneFalseNoneFalse817992.00
3402211120085NoneIItem No.4.14 B(ii)b CSR Volume III Common SRProviding, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading-I Grading-II (53 mm to 22.4 mm) by mechanical means using screening crushable type such as murrum or gravel with all lead and lifts including loading and unloading as per the direction of the Engineer in-charge of the work.Cum2198.72198.7360.0FalseNoneNoneFalseNoneFalse791532.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195720840000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195720840001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17195720840001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KPPP on or before the last date and time of bid submission.None
17195720840000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17195720840000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195806170000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17195806440000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195806510000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17195806570000NoneNoneELIGIBILITYThe transaction fee is non-refundable if you wish to participate.None
17195806640000NoneNoneELIGIBILITYThe tenders are invited as per Standard tender Bid Document KW-3None
17195806720000NoneNoneELIGIBILITYAll relevant documents as per KW-3 need to be uploaded while submitting bid in general documents provision in KPP Portal portal.None
17195806800000NoneNoneELIGIBILITYConditional tender will not be considered.None
17195806870000NoneNoneELIGIBILITYSub - leasing /G.P.A of work is prohibited.None
17195806930000NoneNoneELIGIBILITYThe employer reserves the right to accept or reject any or all tenders without assigning any reason.None
17195807000000NoneNoneELIGIBILITYThe increase if any in the GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the Authority.None
17195807090000NoneNoneELIGIBILITYThe contractor has to furnish additional security deposit for unbalanced tenders in accordance with clause 25.5 of ITT & Clause 44 of the conditions of contract for all works, in addition to 5% performance performance security while executing the Agreement.None
17195807330000NoneNoneELIGIBILITYAll materials like steel, cement etc., required for the above work should be procured by the contractor only at his own cost. And these materials will have to be got tested by the competent authority before put to use and certificate shall be submitted.None
17195807410000NoneNoneELIGIBILITYThe necessary certificates / documents in support of eligibility criteria fulfilled as stipulated shall be scanned and attached duly attested to e-tender document. The original certificates/document shall be produced on or before stipulated date and time for verification. Scanned signature of bidder/authorized representative of the bidder shall be attached while up loading bid document.None
17195807480000NoneNoneELIGIBILITYDuring the execution of works, if any minor mineral are required, contractors have to abide by the Karnataka Minor Mineral Concession Rules 1994(as amended upto date). As per the previlling rules, for any use of minor Minerals, the contractor has to submit the Mineral Despatch permit obtained from Mines and Geology Department. If Mineral Despatch Permit (MDP) is not submitted by the contractor along with the bill, the prevailing penalty and DMF contribution as per Karnataka Minor Mineral Concession Rules 1994 (as amended from time to time) will be deducted from the contractors bill at the time of payment.None
17195807550000NoneNoneELIGIBILITYThe Tenderer shall also disclose if there are any bankruptcy proceedings against him.None
17195807620000NoneNoneELIGIBILITYUploaded Drawings are tender purpose only.None
17195807700000NoneNoneELIGIBILITYName, address,telephone,email id and fax numbers of the contractor is to be provided.None
17195807770000NoneNoneELIGIBILITYEach item of BOQ to be read as with all lead and lifts and as per the directions of Engineer in charge.None
17195808010000NoneNoneELIGIBILITYA copy of GST registration certificate to be uploaded.None
17195808090000NoneNoneELIGIBILITYLatest copy of the Income Tax Clearance Certificate and Sale Tax Clearance PAN and TAN Nos to be uploaded.None
17195808170000NoneNoneELIGIBILITYThe defective liability period is one year.None
17195808230000NoneNoneELIGIBILITYIf any of the dates mentioned above happens to be a general holiday, the next working day holds good.None
17195808310000NoneNoneELIGIBILITYIncomplete tender documents will be rejected.None
17195808410000NoneNoneELIGIBILITYCorrigendum will be published in web site for all modifications/corrections if any.None
17195808500000NoneNoneELIGIBILITYThe intending bidder are advised to visit the site of work before submission of the tenders.None
17195808590000NoneNoneELIGIBILITYIf any of the Contractor who have been black listed as per Government order are not eligible to participate in this tender.None
17195808660000NoneNoneELIGIBILITYAs per the Karnataka building and other construction workers welfare cess act 1996 1 % of the bill amount will be deducted from the bill.None
17195808740000NoneNoneELIGIBILITYFurther information can be had from the office of the Executive Engineer, Minor Irrigation & Ground Water Development Division, Bidar during the office Hours.None
17195808830000NoneNoneELIGIBILITYThe contractor should establish quality control laboratory equiped with all the equipments and the materials should be periodically tested and properly documented as per the direction of the Engineer-in-charge of the work.None
17195808910000NoneNoneELIGIBILITYThe Contractor is fully responsible for the Equipment / Material until the same is handed over to the EXECUTIVE ENGINEER in an operating condition after commissioning. The Contractor is responsible for the proper maintenance of equipment / material as well as protection of the same against theft, elements of nature, damages etc., while in his custody as well as after erection until the same is taken over by the EXECUTIVE ENGINEER under due acknowledgment in writing.None
17195808980000NoneNoneELIGIBILITYThe contractors whose tenders are rescinded due to delay in executing work/ delayed the work beyond tender period are not eligible for tendering for this work. And will not be considered though they may be lowest.None
17195809060000NoneNoneELIGIBILITYThe Work Done Certificates shall be issued by the Executive Engineer (if work done in Karnataka State), otherwise it shall be issued/counter signed by Superintending Engineer (if the work is done in other states)None
17195809140000NoneNoneELIGIBILITYThe Contractor shall quote the rates with adding GST for either materials or works contract (Service).None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSatisfactorily completed at least 90% of contract value as prime contractor, at least one similar work such as Construction of LIS/Impts to LIS/Work consisting of canal lining value not less than Rs. 49.99 Lakhs. The weightage of 10% will be given per year to bring them to the price level of 2024-25.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate
NoneNoneNoneNoneExecuted in any one year, the following minimum quantities of work: 1)EWE (combined excavation and embankment): 4266.94 cum, 2) Cement concrete: 181.64 Cum, 4) Steel: 7.50 Tonne.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work Done Certificate showing quantity of the different item
NoneNoneNoneNoneLiquid assets and / or availability of credit facilities of not less than Rs. 34.62 Lakhs (Credit lines/letter of credit / certificates from banks for meeting the fund requirement. It should be in prescribed format appended in Bid document.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Line of credit as prescribed in section 3
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e. (2019-20, 2020-21, 2021-22, 2022-23 & 2023-24) achieved in at least two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs. 266.61 lakhs. The weightage of 10% will be given per year to bring them to the price level of 2024-25.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Certificate issued by Chartered Accountant
NoneNoneNoneNoneSection 3, Qualification Information.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Section -3 of Bid Document
NoneNoneNoneNoneThe Tenderer shall have valid class - I KPWD License upload registration certificate of original should be produced while opening the tender.OthersRegistration
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Registration Certificate
NoneNoneNoneNoneThe tenderer shall give details of works on hand (Present contract commitment)OthersDocuments
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneAll documents including details of EMD are to be mentioned in the technical bid only ( as per KPPP options)OthersDocuments
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
NoneNoneNoneNoneAll documents to be furnished are to be attested by the officer of not below the rank of Executive Engineer or by Notary.OthersDocuments
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Relevant Document
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractors Registration CertificateTrueTechnical Bid
Annual Turnover Certificate issued by the C.ATrueTechnical Bid
Work Done Certificate for executed quantityTrueTechnical Bid
Similar Nature Of work done Certificate issued not below the rank of E.ETrueTechnical Bid
Line Of CreditTrueTechnical Bid
Works on hand Present contract commitmentTrueTechnical Bid
Section 3, Qualification Information.TrueTechnical Bid
Assess available tender capacityTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Lift Irrigation SchemeBidarBidarBidarBIDARNear village Jampad175840773824
tenderAddressNone
tenderRecallDTONone