noticeInvitingTenderDTO
createdTs1719553786111
version11
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2413000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-07-2024 16:30:00
tenderQueryClose02-07-2024 10:30:00
technicalBidOpen08-07-2024 11:30:00
publishedDate29-06-2024 11:58:51
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls2
preBidMeetingDate02-07-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee2313000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719553786115
version26
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9769/CALL-2
titlePKG-617 (A) Improvements to road from Bhalki Chincholi road SH-75 from Ch 3.50 KM to 7.50 KM (in selected reaches) in Bhalki Taluk of Bidar District (B)Improvements to Aurad - Sadashivaghad road SH-34 from Ch 30.20 KM to 31.60 KM (in selected reaches)in Bhalki Taluk of Bidar District (C) Improvements to road from Bawalgaon (MS Border)-Dharmapura (T.S. Border) Road from Ch 49.00 KM to 62.85 KM (in selected reaches) in Bhalki Taluk of Bidar District
descriptionPKG-617(A) Improvements to road from Bhalki Chincholi road SH-75 from Ch 3.50 KM to 7.50 KM (in selected reaches) in Bhalki Taluk of Bidar District (B)Improvements to Aurad - Sadashivaghad road SH-34 from Ch 30.20 KM to 31.60 KM (in selected reaches)in Bhalki Taluk of Bidar District (C) Improvements to road from Bawalgaon (MS Border)-Dharmapura (T.S. Border) Road from Ch 49.00 KM to 62.85 KM (in selected reaches) in Bhalki Taluk of Bidar District
categoryWORKS
categoryTextWorks
ecv241230065.32
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-617/BIDAR/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195537860000NoneNoneRoadsPKG-617 (A) Improvements to road from Bhalki Chincholi road SH-75 from Ch 3.50 KM to 7.50 KM (in selected reaches) in Bhalki Taluk of Bidar District Road estimate61881283.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392592119524NoneUNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in RECTANGLE shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The RECTANGLE shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the RECTANGLE shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3392593119524None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.93486.93108.0FalseNoneNoneFalseNoneFalse52588.440
3392594119524NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (ii)Cutting of Trees, excluding removal of stumps and roots of trees ii) Girth from 600 mm to 900mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1172.091172.092.0FalseNoneNoneFalseNoneFalse2344.180
3392595119524None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.4321000.0FalseNoneNoneFalseNoneFalse156030.00
3392596119524None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.72527.26FalseNoneNoneFalseNoneFalse297458.5020
3392597119524None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum147.44147.44404.7FalseNoneNoneFalseNoneFalse59668.9680
3392598119524None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.28587.286586.21FalseNoneNoneFalseNoneFalse3867949.40880
3392599119524None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.835379.32FalseNoneNoneFalseNoneFalse3285850.03560
3392600119524None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.83306.16FalseNoneNoneFalseNoneFalse9663244.4480
3392601119524NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.65460.4FalseNoneNoneFalseNoneFalse17312744.240
3392602119524NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.821000.0FalseNoneNoneFalseNoneFalse1066800.00
3392603119524None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.3521000.0FalseNoneNoneFalseNoneFalse364350.00
3392604119524None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.311466.08FalseNoneNoneFalseNoneFalse17163853.04480
3392605119524None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.0630.0FalseNoneNoneFalseNoneFalse8550360.00
17195537860000NoneNoneRoadsTRAFFIC SAFETY2149029.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392606119525None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm11163.3911163.395.4FalseNoneNoneFalseNoneFalse60282.3060
3392607119525None8.6 (A) (ii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5882.775882.7718.0FalseNoneNoneFalseNoneFalse105889.860
3392608119525None8.6 (A) (viii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm circular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (viii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5388.415388.4114.0FalseNoneNoneFalseNoneFalse75437.740
3392609119525None8.6 (A) (xv)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90cm high octogon UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach8208.388208.386.0FalseNoneNoneFalseNoneFalse49250.280
3392610119525None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm656.67656.67807.82FalseNoneNoneFalseNoneFalse530471.15940
3392611119525None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos452.23452.23647.0FalseNoneNoneFalseNoneFalse292592.810
3392612119525None8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
3392613119525None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3626.553626.553.0FalseNoneNoneFalseNoneFalse10879.650
3392614119525None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1043.241043.2412.0FalseNoneNoneFalseNoneFalse12518.880
3392615119525None8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach2504.022504.026.0FalseNoneNoneFalseNoneFalse15024.120
3392616119525None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.38108.0FalseNoneNoneFalseNoneFalse13649.040
3392617119525None8.29(i)Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm2740.672740.6775.0FalseNoneNoneFalseNoneFalse205550.250
3392618119525NoneUNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iiiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound withreflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo64265.6964265.6912.0FalseNoneNoneFalseNoneFalse771188.280
17195537860001NoneNoneRoadsJUNCTIONS1780111.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392619119526None2.5(ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle UNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.75486.751.44FalseNoneNoneFalseNoneFalse700.920
3392620119526None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.43750.0FalseNoneNoneFalseNoneFalse5572.50
3392621119526None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.764.8FalseNoneNoneFalseNoneFalse7626.960
3392622119526None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.8381.92FalseNoneNoneFalseNoneFalse50039.19360
3392623119526None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V MaterialUNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.8105.08FalseNoneNoneFalseNoneFalse307127.8240
3392624119526None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.6193.52FalseNoneNoneFalseNoneFalse613574.5120
3392625119526None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.8750.0FalseNoneNoneFalseNoneFalse38100.00
3392626119526None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.35750.0FalseNoneNoneFalseNoneFalse13012.50
3392627119526None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.3137.52FalseNoneNoneFalseNoneFalse439258.27120
3392628119526None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.022.48FalseNoneNoneFalseNoneFalse305098.560
17195537860000NoneNoneRoadsESTIMATE FOR WIDENING OF HUME PIPE CULVERT OF 3 ROWS OF 1200mm1608595.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392629119527NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (iiDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and leadBy Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum890.84890.8421.65FalseNoneNoneFalseNoneFalse19286.6860
3392630119527NoneUNI SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ixRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1357.941357.9422.5FalseNoneNoneFalseNoneFalse30553.650
3392631119527NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3863.85FalseNoneNoneFalseNoneFalse8069.3630
3392632119527NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.29121.83FalseNoneNoneFalseNoneFalse71549.54070
3392633119527NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum1447.151447.1548.61FalseNoneNoneFalseNoneFalse70345.96150
3392634119527NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.374.45FalseNoneNoneFalseNoneFalse33020.64650
3392635119527NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9375.32FalseNoneNoneFalseNoneFalse637277.24760
3392636119527NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iiProviding and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3137.5FalseNoneNoneFalseNoneFalse500261.6250
3392637119527NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.1(AProviding and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.979.14FalseNoneNoneFalseNoneFalse21652.38580
3392638119527NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3392639119527NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.631.7FalseNoneNoneFalseNoneFalse166420.8710
3392640119527NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3392641119527NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.0576.28FalseNoneNoneFalseNoneFalse10301.6140
17195537860000NoneNoneRoadsCDs Repairs1118136.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392642119528NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depthnot exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.71117.71130.8FalseNoneNoneFalseNoneFalse15396.4680
3392643119528NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7934.567934.560.41FalseNoneNoneFalseNoneFalse3253.16960
3392644119528NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9756.5FalseNoneNoneFalseNoneFalse133846.8050
3392645119528NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTon-Km97894.6397894.630.94FalseNoneNoneFalseNoneFalse92020.95220
3392646119528NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7754.0FalseNoneNoneFalseNoneFalse50045.580
3392647119528NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.05224.19FalseNoneNoneFalseNoneFalse30276.85950
3392648119528NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9393.76FalseNoneNoneFalseNoneFalse793296.79680
17195537860000NoneNoneRoadsField Approach1072553.93
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392649119529None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3870.32FalseNoneNoneFalseNoneFalse8887.04160
3392650119529None9.1 (ii)Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm4132.074132.0775.0FalseNoneNoneFalseNoneFalse309905.250
3392651119529None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.2928.36FalseNoneNoneFalseNoneFalse16655.54440
3392652119529None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.375.5FalseNoneNoneFalseNoneFalse40812.0350
3392653119529None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9365.53FalseNoneNoneFalseNoneFalse554444.74290
3392654119529None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.631.449FalseNoneNoneFalseNoneFalse141849.318870
17195537860000NoneNoneRoadsWATER SUPPLY PIPE LINE190026.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392655119530None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum324.62324.62135.0FalseNoneNoneFalseNoneFalse43823.70
3392656119530None9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm diaUNI SR 2023-24 , V - 5 Pg No. ,95 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm473.3473.3250.0FalseNoneNoneFalseNoneFalse118325.00
3392657119530None10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: UNI SR 2023-24 , V - 5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm111.51111.51250.0FalseNoneNoneFalseNoneFalse27877.50
17195537860000NoneNoneRoadsMaintenance of First Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392658119531None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392659119531None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392660119531None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392661119531None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392662119531None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392663119531None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537860000NoneNoneRoadsMaintenance of Second Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392664119532None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392665119532None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392666119532None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392667119532None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392668119532None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392669119532None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537860000NoneNoneRoadsMaintenance of Third Year396938.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392670119533None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm545.35545.3536.0FalseNoneNoneFalseNoneFalse19632.60
3392671119533None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.338.332400.0FalseNoneNoneFalseNoneFalse19992.00
3392672119533None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm54.1254.12450.0FalseNoneNoneFalseNoneFalse24354.00
3392673119533None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm134.6134.61500.0FalseNoneNoneFalseNoneFalse201900.00
3392674119533None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm591.15591.15105.0FalseNoneNoneFalseNoneFalse62070.750
3392675119533None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum131.83131.83135.0FalseNoneNoneFalseNoneFalse17797.050
3392676119533None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2753.162753.163.0FalseNoneNoneFalseNoneFalse8259.480
3392677119533None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm285.86285.863.0FalseNoneNoneFalseNoneFalse857.580
3392678119533None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm151.26151.26238.5FalseNoneNoneFalseNoneFalse36075.510
3392679119533None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.251.254800.0FalseNoneNoneFalseNoneFalse6000.00
17195537860000NoneNoneRoadsMaintenance of Fourth Year358079.58
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392680119534None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm564.83564.8336.0FalseNoneNoneFalseNoneFalse20333.880
3392681119534None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.628.622400.0FalseNoneNoneFalseNoneFalse20688.00
3392682119534None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm56.0556.05450.0FalseNoneNoneFalseNoneFalse25222.50
3392683119534None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm139.41139.411500.0FalseNoneNoneFalseNoneFalse209115.00
3392684119534None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm612.26612.26105.0FalseNoneNoneFalseNoneFalse64287.30
3392685119534None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum136.54136.54135.0FalseNoneNoneFalseNoneFalse18432.90
17195537860000NoneNoneRoadsMaintenance of Fifth Year436945.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392686119535None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm584.31584.3136.0FalseNoneNoneFalseNoneFalse21035.160
3392687119535None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.928.922400.0FalseNoneNoneFalseNoneFalse21408.00
3392688119535None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm57.9957.99450.0FalseNoneNoneFalseNoneFalse26095.50
3392689119535None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.22144.221500.0FalseNoneNoneFalseNoneFalse216330.00
3392690119535None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm633.38633.38210.0FalseNoneNoneFalseNoneFalse133009.80
3392691119535None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum141.24141.24135.0FalseNoneNoneFalseNoneFalse19067.40
17195537860000NoneNoneRoadsMaintenance of Sixth Year11897300.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392692119536None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm3048.143048.143.0FalseNoneNoneFalseNoneFalse9144.420
3392693119536None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm316.49316.493.0FalseNoneNoneFalseNoneFalse949.470
3392694119536None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm167.46167.46238.5FalseNoneNoneFalseNoneFalse39939.210
3392695119536None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.381.384800.0FalseNoneNoneFalseNoneFalse6624.00
3392696119536None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm18.4418.4421000.0FalseNoneNoneFalseNoneFalse387240.00
3392697119536None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16829.2916829.29630.0FalseNoneNoneFalseNoneFalse10602452.70
3392698119536None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm814.27814.27700.02FalseNoneNoneFalseNoneFalse570005.28540
3392699119536None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm560.77560.77501.0FalseNoneNoneFalseNoneFalse280945.770
17195537860000NoneNoneRoadsEletrical Pole Shifting958783.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392700119537None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit779.33779.3325.0FalseNoneNoneFalseNoneFalse19483.250
3392701119537None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.011379.0125.0FalseNoneNoneFalseNoneFalse34475.250
3392702119537None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos5202.565202.566.0FalseNoneNoneFalseNoneFalse31215.360
3392703119537None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.01379.06.0FalseNoneNoneFalseNoneFalse8274.00
3392704119537None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo1089.081089.0825.0FalseNoneNoneFalseNoneFalse27227.00
3392705119537None3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet890.84890.8425.0FalseNoneNoneFalseNoneFalse22271.00
3392706119537None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos253.99253.9975.0FalseNoneNoneFalseNoneFalse19049.250
3392707119537None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos631.89631.899.0FalseNoneNoneFalseNoneFalse5687.010
3392708119537None1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3392709119537None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km4970.874970.873.375FalseNoneNoneFalseNoneFalse16776.686250
3392710119537None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKms57283.9357283.933.375FalseNoneNoneFalseNoneFalse193333.263750
3392711119537None6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km6483.696483.693.375FalseNoneNoneFalseNoneFalse21882.453750
3392712119537None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo126.38126.3875.0FalseNoneNoneFalseNoneFalse9478.50
3392713119537None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet391.52391.5275.0FalseNoneNoneFalseNoneFalse29364.00
3392714119537None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo358.07358.072.0FalseNoneNoneFalseNoneFalse716.140
3392715119537None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo163.55163.552.0FalseNoneNoneFalseNoneFalse327.10
3392716119537None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.162.0FalseNoneNoneFalseNoneFalse302.320
3392717119537None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.162.0FalseNoneNoneFalseNoneFalse302.320
3392718119537None6.031.1 kV Ceramic Pin Insulator (Shell only ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos38.4138.4110.0FalseNoneNoneFalseNoneFalse384.10
3392719119537None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos33.4533.4510.0FalseNoneNoneFalseNoneFalse334.50
3392720119537None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos296.12296.1231.0FalseNoneNoneFalseNoneFalse9179.720
3392721119537None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr115.23115.2335.0FalseNoneNoneFalseNoneFalse4033.050
3392722119537None24.0111 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3392723119537None13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
3392724119537None1.8.1 aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach338.25338.2531.0FalseNoneNoneFalseNoneFalse10485.750
3392725119537None1.8.1 Bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach438.61438.6131.0FalseNoneNoneFalseNoneFalse13596.910
3392726119537None1.8.2 aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3912.763912.7631.0FalseNoneNoneFalseNoneFalse121295.560
3392727119537None1.8.2 gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
3392728119537None21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer 3 Poles353.11353.1125.0FalseNoneNoneFalseNoneFalse8827.750
3392729119537None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km152.4152.43.375FalseNoneNoneFalseNoneFalse514.350
3392730119537None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo175.94175.9425.0FalseNoneNoneFalseNoneFalse4398.50
3392731119537None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach138.77138.7725.0FalseNoneNoneFalseNoneFalse3469.250
3392732119537None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo631.89631.899.0FalseNoneNoneFalseNoneFalse5687.010
3392733119537None24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3392734119537None27.0327 Loading & Unloading of Transformer (when maintaincemen for loading and unloading are not available in store)Loading 100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo529.05529.051.0FalseNoneNoneFalseNoneFalse529.050
3392735119537None27.08Un loading 100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo529.05529.051.0FalseNoneNoneFalseNoneFalse529.050
3392736119537None54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet920.58920.584.0FalseNoneNoneFalseNoneFalse3682.320
3392737119537None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet837.56837.564.0FalseNoneNoneFalseNoneFalse3350.240
3392738119537None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet384.09384.094.0FalseNoneNoneFalseNoneFalse1536.360
3392739119537None54.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet2691.112691.114.0FalseNoneNoneFalseNoneFalse10764.440
3392740119537None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos8767.168767.1625.0FalseNoneNoneFalseNoneFalse219179.00
3392741119537None3.01Erection of Double Pole Transformer Structure using 9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole including fixing of Structure Materials, Erection of Poles etc., complete for mounting of Transformer as per approved drawing For 25/63/100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach7093.277093.271.0FalseNoneNoneFalseNoneFalse7093.270
3392742119537None21.04Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977 For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet29815.329815.31.0FalseNoneNoneFalseNoneFalse29815.30
3392743119537None19.0210 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo1962.581962.583.0FalseNoneNoneFalseNoneFalse5887.740
3392744119537None26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet7930.847930.841.0FalseNoneNoneFalseNoneFalse7930.840
3392745119537None67.2Supplying & Fixing Chemical earthling for grounding. Conduits, IC cut-outs & other equipments backfill compound which is non-corrosive, thermally conductive, potential to permissible limits, superior Fault conduction capacity, non toxic, weather resistance & capable of achieving ohmic value less than one ohm (44/6.19)Using 6ft. Copper bonded rod with backfill compound (44/6.19.2) Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo185.85185.851.0FalseNoneNoneFalseNoneFalse185.850
3392746119537None4.02Anti Climbing Device (12 Mtr GI Barbed wire) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo110.27110.271.0FalseNoneNoneFalseNoneFalse110.270
3392747119537None6.18.3Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. (43/6.18) 8 SWG GI Wire (44/6.18.3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr23.5423.54150.0FalseNoneNoneFalseNoneFalse3531.00
3392748119537None17.01LT Protection Kit (Dwg No. For KPTCL & ESCOMs/GM/QS&S/10 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo2506.52506.51.0FalseNoneNoneFalseNoneFalse2506.50
3392749119537None15.17.1LT Wiring Kit 63/100 KVA (87/15.17.1) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet5263.525263.521.0FalseNoneNoneFalseNoneFalse5263.520
3392750119537None20.0111 kV, HG Fuse Unit with Solid Core Insulator 302122 852 (Dwg No. For KPTCL & ESCOMs/GM/QS&S/21 Dtd 24.11.2018) (3 Nos) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1324.491324.491.0FalseNoneNoneFalseNoneFalse1324.490
3392751119537None24.04H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/61 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet5367.355367.351.0FalseNoneNoneFalseNoneFalse5367.350
3392752119537None24.02Transporation by Head Load where ever there is no accessability for transporation by vechicle Distribution Transformer 63 kVA & 100 kVA 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1172.091172.091.0FalseNoneNoneFalseNoneFalse1172.090
17195537860000NoneNoneRoadsPKG-617 (B)Improvements to Aurad - Sadashivaghad road SH-34 from Ch 30.20 KM to 31.60 KM (in selected reaches)in Bhalki Taluk of Bidar District. Road estimate35277519.99
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392753119538NoneUNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in RECTANGLE shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The RECTANGLE shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the RECTANGLE shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3392754119538None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.93486.9350.4FalseNoneNoneFalseNoneFalse24541.2720
3392755119538None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.437700.0FalseNoneNoneFalseNoneFalse57211.00
3392756119538None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.75961.05FalseNoneNoneFalseNoneFalse701615.5850
3392757119538None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum147.44147.441048.02FalseNoneNoneFalseNoneFalse154520.06880
3392758119538None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.28587.2810271.84FalseNoneNoneFalseNoneFalse6032446.19520
3392759119538None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.835060.58FalseNoneNoneFalseNoneFalse3091154.08140
3392760119538None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.82185.12FalseNoneNoneFalseNoneFalse6386668.7360
3392761119538NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.62594.9FalseNoneNoneFalseNoneFalse8227389.940
3392762119538NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.89959.6FalseNoneNoneFalseNoneFalse505947.680
3392763119538None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.359959.6FalseNoneNoneFalseNoneFalse172799.060
3392764119538None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.31497.98FalseNoneNoneFalseNoneFalse5830006.23380
3392765119538None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.0298.79FalseNoneNoneFalseNoneFalse4055177.880
17195537860001NoneNoneRoadsTRAFFIC SAFETY692505.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392766119539None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm11163.3911163.391.8FalseNoneNoneFalseNoneFalse20094.1020
3392767119539None8.6 (A) (ii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5882.775882.778.0FalseNoneNoneFalseNoneFalse47062.160
3392768119539None8.6 (A) (viii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm circular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (viii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5388.415388.412.0FalseNoneNoneFalseNoneFalse10776.820
3392769119539None8.6 (A) (xv)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.80 mm x 60 mm rectangular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (x) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach8208.388208.383.0FalseNoneNoneFalseNoneFalse24625.140
3392770119539None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm656.67656.67405.08FalseNoneNoneFalseNoneFalse266003.88360
3392771119539None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos452.23452.23324.0FalseNoneNoneFalseNoneFalse146522.520
3392772119539None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3626.553626.551.0FalseNoneNoneFalseNoneFalse3626.550
3392773119539None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1043.241043.247.0FalseNoneNoneFalseNoneFalse7302.680
3392774119539None8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach2504.022504.026.0FalseNoneNoneFalseNoneFalse15024.120
3392775119539None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3854.0FalseNoneNoneFalseNoneFalse6824.520
3392776119539None8.29(i)Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm2740.672740.6737.5FalseNoneNoneFalseNoneFalse102775.1250
3392777119539None8.6 (A) (xii)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 60 cm x 45 cm rectangular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5233.545233.548.0FalseNoneNoneFalseNoneFalse41868.320
17195537860000NoneNoneRoadsRECONSTRUCTION OF HUME PIPE CULVERT OF 2 ROWS OF 1200mm1358331.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392778119540NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.Dismantling Stone Masonry. Rubble stone masonry in cement mortar. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum755.79755.796.75FalseNoneNoneFalseNoneFalse5101.58250
3392779119540NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3854.86FalseNoneNoneFalseNoneFalse6933.20680
3392780119540NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.29102.43FalseNoneNoneFalseNoneFalse60156.11470
3392781119540NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum1447.151447.1530.4FalseNoneNoneFalseNoneFalse43993.360
3392782119540NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7934.567934.564.01FalseNoneNoneFalseNoneFalse31817.58560
3392783119540NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9377.24FalseNoneNoneFalseNoneFalse653522.23320
3392784119540NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iiLaying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3125.0FalseNoneNoneFalseNoneFalse333507.750
3392785119540NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.1(AProviding and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.976.38FalseNoneNoneFalseNoneFalse15114.02860
3392786119540NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3392787119540NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.631.61FalseNoneNoneFalseNoneFalse157610.35430
3392788119540NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3392789119540NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.0579.37FalseNoneNoneFalseNoneFalse10718.91850
17195537870000NoneNoneRoadsWIDENING OF HUME PIPE CULVERT OF 3 ROWS OF 1200mm4318133.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392790119541NoneUNI SR 2023 - 24 ,V-3,Page No 10 Item No2.8 (iiDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and leadBy Mechanical Means Cement Concrete Grade M-15 & M-20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum890.84890.8443.3FalseNoneNoneFalseNoneFalse38573.3720
3392791119541NoneUNI SR 2023 - 24 ,V-3,Page No 11 Item No2.17(ixRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm1357.941357.9445.0FalseNoneNoneFalseNoneFalse61107.30
3392792119541NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.38152.02FalseNoneNoneFalseNoneFalse19212.28760
3392793119541NoneUNI SR 2023 - 24 ,V-1,Page No 7 Item No1.8.Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.29231.81FalseNoneNoneFalseNoneFalse136139.69490
3392794119541NoneUNI SR 2023 - 24 ,V-3,Page No 117 Item No12.3 (Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical SpecificationGranular material ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum1447.151447.1589.92FalseNoneNoneFalseNoneFalse130127.7280
3392795119541NoneUNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.3713.08FalseNoneNoneFalseNoneFalse97058.43960
3392796119541NoneUNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.93264.04FalseNoneNoneFalseNoneFalse2234023.95720
3392797119541NoneUNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(iiProviding and laying Reinforced Cement Concrete Pipe NP4 as per design Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm13340.3113340.3175.0FalseNoneNoneFalseNoneFalse1000523.250
3392798119541NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.1(AProviding and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.A)Boulder Laid Dry Without Wire Crates. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9718.28FalseNoneNoneFalseNoneFalse43304.77160
3392799119541NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9718.0FalseNoneNoneFalseNoneFalse42641.460
3392800119541NoneUNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.634.58FalseNoneNoneFalseNoneFalse448357.40540
3392801119541NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7740.0FalseNoneNoneFalseNoneFalse37070.80
3392802119541NoneUNI SR 2023 - 24 ,V-3,Page No 66 Item No8.10.Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm135.05135.05222.09FalseNoneNoneFalseNoneFalse29993.25450
17195537870001NoneNoneRoadsField Approach557067.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392803119542None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3835.16FalseNoneNoneFalseNoneFalse4443.52080
3392804119542NoneUNI SR 2023 - 24 ,V-3,Page No 146 Item No16.15.cProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row. Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 750 mm dia UNI SR 2023 - 24 ,V-3,Page No 146 Item No16.15.c ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm4132.064132.0637.5FalseNoneNoneFalseNoneFalse154952.250
3392805119542None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.2950.26FalseNoneNoneFalseNoneFalse29517.19540
3392806119542None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.372.75FalseNoneNoneFalseNoneFalse20406.01750
3392807119542None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9332.77FalseNoneNoneFalseNoneFalse277264.67610
3392808119542None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.630.72FalseNoneNoneFalseNoneFalse70484.13360
17195537870000NoneNoneRoadsWATER SUPPLY PIPE LINE228031.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392809119543None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum324.62324.62162.0FalseNoneNoneFalseNoneFalse52588.440
3392810119543None9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm diaUNI SR 2023-24 , V - 5 Pg No. ,95 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm473.3473.3300.0FalseNoneNoneFalseNoneFalse141990.00
3392811119543None10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: UNI SR 2023-24 , V - 5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm111.51111.51300.0FalseNoneNoneFalseNoneFalse33453.00
17195537870000NoneNoneRoadsMaintenance of First Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392812119544None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392813119544None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392814119544None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392815119544None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392816119544None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392817119544None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537870000NoneNoneRoadsMaintenance of Second Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392818119545None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392819119545None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392820119545None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392821119545None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392822119545None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392823119545None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537870001NoneNoneRoadsMaintenance of Third Year179325.83
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392824119546None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm545.35545.3516.8FalseNoneNoneFalseNoneFalse9161.880
3392825119546None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.338.331120.0FalseNoneNoneFalseNoneFalse9329.60
3392826119546None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm54.1254.12126.0FalseNoneNoneFalseNoneFalse6819.120
3392827119546None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm134.6134.6420.0FalseNoneNoneFalseNoneFalse56532.00
3392828119546None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm591.15591.1549.0FalseNoneNoneFalseNoneFalse28966.350
3392829119546None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum131.83131.83135.0FalseNoneNoneFalseNoneFalse17797.050
3392830119546None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2753.162753.161.4FalseNoneNoneFalseNoneFalse3854.4240
3392831119546None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm285.86285.861.4FalseNoneNoneFalseNoneFalse400.2040
3392832119546None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm151.26151.26270.0FalseNoneNoneFalseNoneFalse40840.20
3392833119546None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.251.254500.0FalseNoneNoneFalseNoneFalse5625.00
17195537870000NoneNoneRoadsMaintenance of Fourth Year133191.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392834119547None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm564.83564.8316.8FalseNoneNoneFalseNoneFalse9489.1440
3392835119547None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.628.621120.0FalseNoneNoneFalseNoneFalse9654.40
3392836119547None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm56.0556.05126.0FalseNoneNoneFalseNoneFalse7062.30
3392837119547None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm139.41139.41420.0FalseNoneNoneFalseNoneFalse58552.20
3392838119547None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm612.26612.2649.0FalseNoneNoneFalseNoneFalse30000.740
3392839119547None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum136.54136.54135.0FalseNoneNoneFalseNoneFalse18432.90
17195537870000NoneNoneRoadsMaintenance of Fifth Year168824.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392840119548None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm584.31584.3116.8FalseNoneNoneFalseNoneFalse9816.4080
3392841119548None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.928.921120.0FalseNoneNoneFalseNoneFalse9990.40
3392842119548None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm57.9957.99126.0FalseNoneNoneFalseNoneFalse7306.740
3392843119548None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.22144.22420.0FalseNoneNoneFalseNoneFalse60572.40
3392844119548None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm633.38633.3898.0FalseNoneNoneFalseNoneFalse62071.240
3392845119548None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum141.24141.24135.0FalseNoneNoneFalseNoneFalse19067.40
17195537870000NoneNoneRoadsMaintenance of Sixth Year5805290.57
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392846119549None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm3048.143048.141.4FalseNoneNoneFalseNoneFalse4267.3960
3392847119549None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm316.49316.491.4FalseNoneNoneFalseNoneFalse443.0860
3392848119549None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm167.46167.46270.0FalseNoneNoneFalseNoneFalse45214.20
3392849119549None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.381.384500.0FalseNoneNoneFalseNoneFalse6210.00
3392850119549None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm18.4418.449959.6FalseNoneNoneFalseNoneFalse183655.0240
3392851119549None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16829.2916829.29307.1FalseNoneNoneFalseNoneFalse5168274.9590
3392852119549None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm814.27814.27326.68FalseNoneNoneFalseNoneFalse266005.72360
3392853119549None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm560.77560.77234.0FalseNoneNoneFalseNoneFalse131220.180
17195537870000NoneNoneRoadsEletrical Pole Shifting370958.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392854119550None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit779.33779.3310.0FalseNoneNoneFalseNoneFalse7793.30
3392855119550None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.241379.2410.0FalseNoneNoneFalseNoneFalse13792.40
3392856119550None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos5202.565202.563.0FalseNoneNoneFalseNoneFalse15607.680
3392857119550None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.01379.03.0FalseNoneNoneFalseNoneFalse4137.00
3392858119550None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo1089.081089.0810.0FalseNoneNoneFalseNoneFalse10890.80
3392859119550None3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet890.84890.8410.0FalseNoneNoneFalseNoneFalse8908.40
3392860119550None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos253.99253.9930.0FalseNoneNoneFalseNoneFalse7619.70
3392861119550None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos631.89631.894.0FalseNoneNoneFalseNoneFalse2527.560
3392862119550None1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3392863119550None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km4970.874970.871.35FalseNoneNoneFalseNoneFalse6710.67450
3392864119550None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKms57283.9357283.931.35FalseNoneNoneFalseNoneFalse77333.30550
3392865119550None6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km6483.696483.691.35FalseNoneNoneFalseNoneFalse8752.98150
3392866119550None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo126.38126.3830.0FalseNoneNoneFalseNoneFalse3791.40
3392867119550None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet391.52391.5230.0FalseNoneNoneFalseNoneFalse11745.60
3392868119550None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo358.07358.071.0FalseNoneNoneFalseNoneFalse358.070
3392869119550None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo163.55163.551.0FalseNoneNoneFalseNoneFalse163.550
3392870119550None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3392871119550None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3392872119550None6.031.1 kV Ceramic Pin Insulator (Shell only ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos38.4138.415.0FalseNoneNoneFalseNoneFalse192.050
3392873119550None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos33.4533.455.0FalseNoneNoneFalseNoneFalse167.250
3392874119550None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos296.12296.1213.0FalseNoneNoneFalseNoneFalse3849.560
3392875119550None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr115.23115.2314.0FalseNoneNoneFalseNoneFalse1613.220
3392876119550None24.0111 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3392877119550None13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
3392878119550None1.8.1 aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach338.25338.2513.0FalseNoneNoneFalseNoneFalse4397.250
3392879119550None1.8.1 Bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach438.61438.6113.0FalseNoneNoneFalseNoneFalse5701.930
3392880119550None1.8.2 aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3912.763912.7613.0FalseNoneNoneFalseNoneFalse50865.880
3392881119550None1.8.2 gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
3392882119550None21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer 3 Poles353.11353.1110.0FalseNoneNoneFalseNoneFalse3531.10
3392883119550None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km152.4152.41.35FalseNoneNoneFalseNoneFalse205.740
3392884119550None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo175.94175.9410.0FalseNoneNoneFalseNoneFalse1759.40
3392885119550None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach138.77138.7710.0FalseNoneNoneFalseNoneFalse1387.70
3392886119550None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo631.89631.894.0FalseNoneNoneFalseNoneFalse2527.560
3392887119550None24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3392888119550None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos8767.168767.1610.0FalseNoneNoneFalseNoneFalse87671.60
17195537870000NoneNoneRoadsPKG-617 (C) Improvements to road from Bawalgaon (MS Border)-Dharmapura (T.S. Border) Road from Ch 49.00 KM to 62.85 KM (in selected reaches) in Bhalki Taluk of Bidar District. Road Estimate86295350.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392889119551NoneUNI SR 2023-24, V-3,Pg. No. 149 I. No.16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in RECTANGLE shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The RECTANGLE shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the RECTANGLE shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3392890119551None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.93486.93111.84FalseNoneNoneFalseNoneFalse54458.25120
3392891119551None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.4317475.0FalseNoneNoneFalseNoneFalse129839.250
3392892119551None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.76883.2FalseNoneNoneFalseNoneFalse810152.640
3392893119551None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum147.44147.442885.31FalseNoneNoneFalseNoneFalse425410.10640
3392894119551None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.28587.287606.22FalseNoneNoneFalseNoneFalse4466980.88160
3392895119551None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.8316346.72FalseNoneNoneFalseNoneFalse9985066.97760
3392896119551None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.87403.66FalseNoneNoneFalseNoneFalse21639417.4480
3392897119551NoneUNI SR 2023-24, V-3,Pg. No. 26 I. No.4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.66684.5FalseNoneNoneFalseNoneFalse21193875.70
3392898119551NoneUNI SR 2023-24, V-3,Pg. No. 31 I. No.5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.825630.0FalseNoneNoneFalseNoneFalse1302004.00
3392899119551None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.3525630.0FalseNoneNoneFalseNoneFalse444680.50
3392900119551None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.311267.75FalseNoneNoneFalseNoneFalse14841942.25250
3392901119551None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.0760.65FalseNoneNoneFalseNoneFalse10323541.80
3392902119551NoneUNI SR 2023-24, V-3,Pg. No. 49 I. No.6.2.1Pavement Quality Concrete using paver - M40 Grade Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11226.5811226.5855.0FalseNoneNoneFalseNoneFalse617461.90
3392903119551NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (i)Cutting of Trees, excluding removal of stumps and roots of trees i) Girth from 300 mm to 600mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach737.21737.2113.0FalseNoneNoneFalseNoneFalse9583.730
3392904119551NoneUNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (ii)Cutting of Trees, excluding removal of stumps and roots of trees i) Girth from 300 mm to 600mm UNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (i) ii) Girth from 600 mm to 900mm ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1172.091172.0911.0FalseNoneNoneFalseNoneFalse12892.990
17195537870001NoneNoneRoadsTRAFFIC SAFETY2160874.24
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392905119552None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm11163.3911163.395.4FalseNoneNoneFalseNoneFalse60282.3060
3392906119552None8.6 (A) (ii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5882.775882.7712.0FalseNoneNoneFalseNoneFalse70593.240
3392907119552None8.6 (A) (viii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.60 cm circular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (viii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5388.415388.4111.0FalseNoneNoneFalseNoneFalse59272.510
3392908119552None8.6 (A) (xv)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.80 mm x 60 mm rectangular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (x) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach8208.388208.3811.0FalseNoneNoneFalseNoneFalse90292.180
3392909119552None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm656.67656.671006.95FalseNoneNoneFalseNoneFalse661233.85650
3392910119552None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos452.23452.23538.0FalseNoneNoneFalseNoneFalse243299.740
3392911119552None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3626.553626.555.0FalseNoneNoneFalseNoneFalse18132.750
3392912119552None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach1043.241043.2418.0FalseNoneNoneFalseNoneFalse18778.320
3392913119552NoneUNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 iiiProviding Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound withreflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach64265.6964265.696.0FalseNoneNoneFalseNoneFalse385594.140
3392914119552None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.38270.49FalseNoneNoneFalseNoneFalse34184.52620
3392915119552NoneUNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach5335.055335.051.0FalseNoneNoneFalseNoneFalse5335.050
3392916119552NoneUNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i)Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm2740.672740.67187.5FalseNoneNoneFalseNoneFalse513875.6250
17195537870001NoneNoneRoadsJUNCTIONS1578653.07
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392917119553None2.5(ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle UNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm486.75486.751.44FalseNoneNoneFalseNoneFalse700.920
3392918119553None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm7.437.43532.5FalseNoneNoneFalseNoneFalse3956.4750
3392919119553None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.7117.748.6FalseNoneNoneFalseNoneFalse5720.220
3392920119553None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum610.83610.83266.37FalseNoneNoneFalseNoneFalse162706.78710
3392921119553None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V MaterialUNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2922.82922.8138.36FalseNoneNoneFalseNoneFalse404398.6080
3392922119553None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum3170.63170.6137.63FalseNoneNoneFalseNoneFalse436369.6780
3392923119553None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm50.850.8532.5FalseNoneNoneFalseNoneFalse27051.00
3392924119553None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm17.3517.35532.5FalseNoneNoneFalseNoneFalse9238.8750
3392925119553None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum11707.3111707.3126.63FalseNoneNoneFalseNoneFalse311765.66530
3392926119553None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum13572.013572.015.97FalseNoneNoneFalseNoneFalse216744.840
17195537870000NoneNoneRoadsCDs Repairs104356.53
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392927119554NoneUNI SR 2023 - 24 ,V-1,Page No 8 Item No1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depthnot exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum117.71117.71114.0FalseNoneNoneFalseNoneFalse13418.940
3392928119554NoneUNI SR 2023 - 24 ,V-3,Page No 129 Item No14.4(AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsA)Stone /Boulder ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum2368.972368.9720.0FalseNoneNoneFalseNoneFalse47379.40
3392929119554NoneUNI SR 2023 - 24 ,V-3,Page No 67 Item No8.18Boundary pillarReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach926.77926.7747.0FalseNoneNoneFalseNoneFalse43558.190
17195537870000NoneNoneRoadsField Approach1526154.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392930119555None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum126.38126.3898.46FalseNoneNoneFalseNoneFalse12443.37480
3392931119555NoneUNI SR 2023 - 24 ,V-3,Page No 146 Item No16.15.cProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row. Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101.6 750 mm dia UNI SR 2023 - 24 ,V-3,Page No 146 Item No16.15.c ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm4132.064132.06105.0FalseNoneNoneFalseNoneFalse433866.30
3392932119555None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum587.29587.2981.35FalseNoneNoneFalseNoneFalse47776.04150
3392933119555None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum7420.377420.377.7FalseNoneNoneFalseNoneFalse57136.8490
3392934119555None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum8460.938460.9391.74FalseNoneNoneFalseNoneFalse776205.71820
3392935119555None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesTonne97894.6397894.632.03FalseNoneNoneFalseNoneFalse198726.09890
17195537870000NoneNoneRoadsWATER SUPPLY PIPE LINE266014.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392936119556None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum324.5324.5189.0FalseNoneNoneFalseNoneFalse61330.50
3392937119556None9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm diaUNI SR 2023-24 , V - 5 Pg No. ,95 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm473.3473.3350.0FalseNoneNoneFalseNoneFalse165655.00
3392938119556None10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: UNI SR 2023-24 , V - 5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm111.51111.51350.0FalseNoneNoneFalseNoneFalse39028.50
17195537870000NoneNoneRoadsMaintenance of First Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392939119557None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392940119557None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392941119557None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392942119557None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392943119557None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392944119557None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537870000NoneNoneRoadsMaintenance of Second Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392945119558None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392946119558None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392947119558None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392948119558None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392949119558None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3392950119558None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195537870001NoneNoneRoadsMaintenance of Third Year424188.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392951119559None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm545.35545.3555.92FalseNoneNoneFalseNoneFalse30495.9720
3392952119559None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.338.333728.0FalseNoneNoneFalseNoneFalse31054.240
3392953119559None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm54.1254.12489.3FalseNoneNoneFalseNoneFalse26480.9160
3392954119559None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm134.6134.61631.0FalseNoneNoneFalseNoneFalse219532.60
3392955119559None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm591.15591.15128.15FalseNoneNoneFalseNoneFalse75755.87250
3392956119559None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum131.83131.8345.0FalseNoneNoneFalseNoneFalse5932.350
3392957119559None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm2753.162753.164.66FalseNoneNoneFalseNoneFalse12829.72560
3392958119559None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm285.86285.864.66FalseNoneNoneFalseNoneFalse1332.10760
3392959119559None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm151.26151.2679.5FalseNoneNoneFalseNoneFalse12025.170
3392960119559None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.251.257000.0FalseNoneNoneFalseNoneFalse8750.00
17195537870001NoneNoneRoadsMaintenance of Fourth Year403129.05
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392961119560None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm564.83564.8355.92FalseNoneNoneFalseNoneFalse31585.29360
3392962119560None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.628.623728.0FalseNoneNoneFalseNoneFalse32135.360
3392963119560None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm56.0556.05489.3FalseNoneNoneFalseNoneFalse27425.2650
3392964119560None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm139.41139.411631.0FalseNoneNoneFalseNoneFalse227377.710
3392965119560None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm612.26612.26128.15FalseNoneNoneFalseNoneFalse78461.1190
3392966119560None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum136.54136.5445.0FalseNoneNoneFalseNoneFalse6144.30
17195537870000NoneNoneRoadsMaintenance of Fifth Year498216.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392967119561None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantities100 Sqm584.31584.3155.92FalseNoneNoneFalseNoneFalse32674.61520
3392968119561None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesRmtr8.928.923728.0FalseNoneNoneFalseNoneFalse33253.760
3392969119561None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm57.9957.99489.3FalseNoneNoneFalseNoneFalse28374.5070
3392970119561None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm144.22144.221631.0FalseNoneNoneFalseNoneFalse235222.820
3392971119561None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm633.38633.38256.3FalseNoneNoneFalseNoneFalse162335.2940
3392972119561NoneUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum141.24141.2445.0FalseNoneNoneFalseNoneFalse6355.80
17195537870001NoneNoneRoadsMaintenance of Sixth Year14500689.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392973119562None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm3048.143048.144.66FalseNoneNoneFalseNoneFalse14204.33240
3392974119562None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKm316.49316.494.66FalseNoneNoneFalseNoneFalse1474.84340
3392975119562None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm167.46167.4679.5FalseNoneNoneFalseNoneFalse13313.070
3392976119562None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiescm1.381.387000.0FalseNoneNoneFalseNoneFalse9660.00
3392977119562None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm18.4418.4425630.0FalseNoneNoneFalseNoneFalse472617.20
3392978119562None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesCum16829.2916829.29768.9FalseNoneNoneFalseNoneFalse12940041.0810
3392979119562None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSqm814.27814.27932.0FalseNoneNoneFalseNoneFalse758899.640
3392980119562None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesm560.77560.77518.0FalseNoneNoneFalseNoneFalse290478.860
17195537870000NoneNoneRoadsEletrical Pole Shifting535471.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3392981119563None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit779.33779.3315.0FalseNoneNoneFalseNoneFalse11689.950
3392982119563None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.241379.2415.0FalseNoneNoneFalseNoneFalse20688.60
3392983119563None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos5202.565202.564.0FalseNoneNoneFalseNoneFalse20810.240
3392984119563None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos1379.01379.04.0FalseNoneNoneFalseNoneFalse5516.00
3392985119563None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo1089.081089.0815.0FalseNoneNoneFalseNoneFalse16336.20
3392986119563None3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet890.84890.8415.0FalseNoneNoneFalseNoneFalse13362.60
3392987119563None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos253.99253.9945.0FalseNoneNoneFalseNoneFalse11429.550
3392988119563None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos631.89631.895.0FalseNoneNoneFalseNoneFalse3159.450
3392989119563None1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3392990119563None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km4970.874970.872.025FalseNoneNoneFalseNoneFalse10066.011750
3392991119563None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesKms57283.9357283.932.025FalseNoneNoneFalseNoneFalse115999.958250
3392992119563None6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km6483.696483.692.025FalseNoneNoneFalseNoneFalse13129.472250
3392993119563None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo126.38126.3845.0FalseNoneNoneFalseNoneFalse5687.10
3392994119563None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet391.52391.5245.0FalseNoneNoneFalseNoneFalse17618.40
3392995119563None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo358.07358.071.0FalseNoneNoneFalseNoneFalse358.070
3392996119563None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo163.55163.551.0FalseNoneNoneFalseNoneFalse163.550
3392997119563None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3392998119563None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3392999119563None6.031.1 kV Ceramic Pin Insulator (Shell only ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos38.4138.415.0FalseNoneNoneFalseNoneFalse192.050
3393000119563None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos33.4533.455.0FalseNoneNoneFalseNoneFalse167.250
3393001119563None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos296.12296.1219.0FalseNoneNoneFalseNoneFalse5626.280
3393002119563None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesMtr115.23115.2321.0FalseNoneNoneFalseNoneFalse2419.830
3393003119563None24.0111 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3393004119563None13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
3393005119563None1.8.1 aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach338.25338.2519.0FalseNoneNoneFalseNoneFalse6426.750
3393006119563None1.8.1 Bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach438.61438.6119.0FalseNoneNoneFalseNoneFalse8333.590
3393007119563None1.8.2 aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach3912.763912.7619.0FalseNoneNoneFalseNoneFalse74342.440
3393008119563None1.8.2 gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
3393009119563None21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer 3 Poles353.11353.1115.0FalseNoneNoneFalseNoneFalse5296.650
3393010119563None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesPer Km152.4152.42.025FalseNoneNoneFalseNoneFalse308.610
3393011119563None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo175.94175.9415.0FalseNoneNoneFalseNoneFalse2639.10
3393012119563None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesEach138.77138.7715.0FalseNoneNoneFalseNoneFalse2081.550
3393013119563None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNo631.89631.895.0FalseNoneNoneFalseNoneFalse3159.450
3393014119563None24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3393015119563None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and including 18percent GST and in first and second year, have to rectify the potholes irrespective of quantitiesNos8767.168767.1615.0FalseNoneNoneFalseNoneFalse131507.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195537860000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195537860000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17195537860000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17195537860000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.None
17195537860000NoneNoneELIGIBILITYThe departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17195537860000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195537860000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17195537860000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17195537860000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17195537860000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17195537860000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17195537860000NoneNoneELIGIBILITYContractors should be registered with KPWD Class I Registration.None
17195537860000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17195537860000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17195537860000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17195537860000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17195537860000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17195537860000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17195537860000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17195537860000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17195537860000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17195537860000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including 18 percent GST.None
17195537860000NoneNoneELIGIBILITYGST shall not be paid separately.None
17195537860000NoneNoneELIGIBILITYAll maintenance items shall be rectified irrespective of quantities during DLP and maintenance periodNone
17195601980000NoneNoneELIGIBILITYThe Tenderer shall upload an Affidavit duly Notarized in the format given.Failure to upload the Affidavit shall make the Bid Non- Responsive.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e.,2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1206.15Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneDetails of Committed WorksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Details of Committed Works
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(b) Machineries to be owned and on lease as per KW4 1Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity 1- no. 2 Mechanical Paver Finisher 1- no . 3 Static Road Roller/ Vibratory Road Roller- 2 No. 4 Tippers-4noCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Availability by owning(b) Machineries to be owned and on lease as per KW4
NoneNoneNoneNoneBid capacity as per KW4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulders : 41732.00 Cum 2. GSB/WMM : 22567.45Cum 3. BM/SDBC/DBM/BC :5383.88Cum 4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC) : and . Reinforced Cement Concrete (RCC) M20 & higher grades :515.65 cumCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonecopies of Tax RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
NoneNoneNoneNoneAvailability by lease or hire basis as per KW4 1.Wet Mix Plant or Pug mill -1No.2.Truck mounted Bitumen Sprayer-1no. 3.Motor Grader-1no.4. Static Road Roller or Vibratory Road Roller-2no.5. Excavator 0.90 Cum Bucket Capacity Tipper Trucks -6no. 7.Concrete Mixer or self loading concrete mixer Concrete-1no.8. Road Paving Machine-1No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Availability by lease or hire basis as per KW4
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4824.60 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.723.70 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of works for which tenders already submittedOthersList of works for which tenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneBanker Details for referenceOthersBanker Details for reference
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Banker Details for reference
NoneNoneNoneNoneAffidavit as per KW4OthersAffidavit as per KW4
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit as per KW4
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
UDIN CERTIFICATETrueTechnical Bid
PWD Registration CertificateTrueTechnical Bid
DrawingsTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of Tax RegistrationTrueTechnical Bid
OTHER DOCUMENTS AS PER SBDTrueTechnical Bid
Affidavit as per uploaded KW4 document.TrueTechnical Bid
bankers certificateTrueTechnical Bid
workdone certificate issued for quantitiesTrueTechnical Bid
work done certificate for Smiliar nature of workTrueTechnical Bid
EPF registrationFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1719573450000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Engineer, State Highway Developement Project, 5th floor, KR circle, Bangalore.
streetNone
cityBangalore
stateKarnataka
pin560001
tenderRecallDTONone