noticeInvitingTenderDTO
createdTs1719568600743
version15
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd1436000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose06-07-2024 16:30:00
tenderQueryClose02-07-2024 10:30:00
technicalBidOpen08-07-2024 11:30:00
publishedDate29-06-2024 11:57:48
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls2
preBidMeetingDate02-07-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee1336000.00
emdCash100000.00
bgValidityPeriod90
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719568600746
version35
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT10088/CALL-2
titlePKG-613 (A) Improvements to road from Sulepeth to Ranapur (Up graded SH) Ch 12.00 KM to 18.00 KM (in selected reaches) in Kalagi Taluk of Kalburgi District (B)Improvements to road from Wanamarpalli to Raichur SH-15 from Ch 114.00 KM to 118.00 KM (in selected reaches) in Chincholi Taluk of Kalburgi District
descriptionPKG-613 (A) Improvements to road from Sulepeth to Ranapur (Up graded SH) Ch 12.00 KM to 18.00 KM (in selected reaches) in Kalagi Taluk of Kalburgi District (B)Improvements to road from Wanamarpalli to Raichur SH-15 from Ch 114.00 KM to 118.00 KM (in selected reaches) in Chincholi Taluk of Kalburgi District
categoryWORKS
categoryTextWorks
ecv95681372.20
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount100000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/ST-1/KLB/PKG-613/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195686010001NoneNoneRoadsPKG-613 (A) Estimates of Pavement31203050.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400168119981None16.29Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3400169119981None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm486.93486.9347.76FalseNoneNoneFalseNoneFalse23255.77680
3400170119981None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.437462.5FalseNoneNoneFalseNoneFalse55446.3750
3400171119981None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.7117.72184.42FalseNoneNoneFalseNoneFalse257106.2340
3400172119981None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum147.44147.44817.78FalseNoneNoneFalseNoneFalse120573.48320
3400173119981None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.28587.284090.02FalseNoneNoneFalseNoneFalse2401986.94560
3400174119981None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.838943.06FalseNoneNoneFalseNoneFalse5462689.33980
3400175119981None16.35Stabilized Sub base / Base: With Nano Technology Stabilized Sub-base / Base: Providing, Laying, Spreading and Compacting in-situ/borrow area soil of CBR 5 percent mixed with 30percent 40mm downsize crushed Aggregate. Application: (1) Rip and loosen soil with excavator / tractor operated ripper and scarify with tractor operated rotavator to achieve desired thickness. Mix aggregates as per mix design with rotavator. (2) Spread OPC Cement 3percent by weight of soil aggregate mix and mix with tractor operated rotavator. (3) Prepare and apply Chemical (IRC Accreditation)to achieve strength of minimum 4.5mpa mixed in OMC water (1000 ppm TDS) on loose mix . Scarify the treated mix with rotavator.(4).Compact the stabilized soil-aggregate-cement base with 8 to 10 tonne vibratory roller to achieve the desired density and thickness.Rates include all material, labour, hire charges of machinery etc.as per MoRD specifications, Tri-party agreement,IRC SP:89 2018 & direction of Engineer-in-ChargeUNI SR 2023-24, V-3,Pg. No. 153 I. No.16.35 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3144.583144.582407.9FalseNoneNoneFalseNoneFalse7571834.1820
3400176119981None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.61154.2FalseNoneNoneFalseNoneFalse3659506.520
3400177119981None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.810945.0FalseNoneNoneFalseNoneFalse556006.00
3400178119981None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.3517.3510945.0FalseNoneNoneFalseNoneFalse189895.750
3400179119981None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. UNI SR 2023-24, V-3,Pg. No. 35 I. No.5.12 (c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11707.3111707.31547.25FalseNoneNoneFalseNoneFalse6406825.39750
3400180119981None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects UNI SR 2023-24, V-3,Pg. No. 38 I. No.5.16(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum13572.013572.0328.35FalseNoneNoneFalseNoneFalse4456366.20
3400181119981None2.1 (A) (ii)Cutting of Trees, excluding removal of stumps and roots of trees ii) Girth from 600 mm to 900mm UNI SR 2023-24, V-3,Pg. No. 9 I. No.2.1 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1172.091172.093.0FalseNoneNoneFalseNoneFalse3516.270
17195686010001NoneNoneRoadsPKG-613 (A) ESTIMATE OF TRAFFIC SAFETY679753.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400182119982None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.3911163.392.7FalseNoneNoneFalseNoneFalse30141.1530
3400183119982None8.6 (A) (ii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.774.0FalseNoneNoneFalseNoneFalse23531.080
3400184119982None8.6 (A) (viii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5388.415388.412.0FalseNoneNoneFalseNoneFalse10776.820
3400185119982None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67398.0FalseNoneNoneFalseNoneFalse261354.660
3400186119982None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos452.23452.23222.0FalseNoneNoneFalseNoneFalse100395.060
3400187119982None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.553.0FalseNoneNoneFalseNoneFalse10879.650
3400188119982None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1043.241043.248.0FalseNoneNoneFalseNoneFalse8345.920
3400189119982None8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.0210.16FalseNoneNoneFalseNoneFalse25440.84320
3400190119982None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3872.0FalseNoneNoneFalseNoneFalse9099.360
3400191119982None8.29(i)Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2740.672740.6750.0FalseNoneNoneFalseNoneFalse137033.50
3400192119982None8.6 (A) (xv)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach8208.378208.372.0FalseNoneNoneFalseNoneFalse16416.740
3400193119982None8.18Boundary Pillars Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7750.0FalseNoneNoneFalseNoneFalse46338.50
17195686010000NoneNoneRoadsPKG-613 (A) ESTIMATE OF WATER SUPPLY PIPE LINE76004.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400194119983None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum324.5324.554.0FalseNoneNoneFalseNoneFalse17523.00
3400195119983None9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm diaUNI SR 2023-24 , V - 5 Pg No. ,95 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm473.3473.3100.0FalseNoneNoneFalseNoneFalse47330.00
3400196119983None10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: UNI SR 2023-24 , V - 5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm111.51111.51100.0FalseNoneNoneFalseNoneFalse11151.00
17195686010001NoneNoneRoadsPKG-613 (A) Electrical Pole shifting235518.07
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400197119984None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit779.33779.336.0FalseNoneNoneFalseNoneFalse4675.980
3400198119984None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.241379.246.0FalseNoneNoneFalseNoneFalse8275.440
3400199119984None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos5202.565202.562.0FalseNoneNoneFalseNoneFalse10405.120
3400200119984None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.241379.242.0FalseNoneNoneFalseNoneFalse2758.480
3400201119984None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1089.081089.086.0FalseNoneNoneFalseNoneFalse6534.480
3400202119984None3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet890.84890.846.0FalseNoneNoneFalseNoneFalse5345.040
3400203119984None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos253.99253.9918.0FalseNoneNoneFalseNoneFalse4571.820
3400204119984None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos631.89631.892.0FalseNoneNoneFalseNoneFalse1263.780
3400205119984None1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit405.15405.154.0FalseNoneNoneFalseNoneFalse1620.60
3400206119984None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km4970.874970.870.81FalseNoneNoneFalseNoneFalse4026.40470
3400207119984None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKms57283.9357283.930.81FalseNoneNoneFalseNoneFalse46399.98330
3400208119984None6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km6483.696483.690.81FalseNoneNoneFalseNoneFalse5251.78890
3400209119984None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo126.38126.3818.0FalseNoneNoneFalseNoneFalse2274.840
3400210119984None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet391.52391.5218.0FalseNoneNoneFalseNoneFalse7047.360
3400211119984None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo358.07358.071.0FalseNoneNoneFalseNoneFalse358.070
3400212119984None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo163.55163.551.0FalseNoneNoneFalseNoneFalse163.550
3400213119984None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3400214119984None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3400215119984None6.031.1 kV Ceramic Pin Insulator (Shell only ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos38.4138.415.0FalseNoneNoneFalseNoneFalse192.050
3400216119984None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos33.4533.455.0FalseNoneNoneFalseNoneFalse167.250
3400217119984None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos296.12296.128.0FalseNoneNoneFalseNoneFalse2368.960
3400218119984None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr115.23115.238.4FalseNoneNoneFalseNoneFalse967.9320
3400219119984None24.0111 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3400220119984None13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
3400221119984None1.8.1 aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach338.25338.258.0FalseNoneNoneFalseNoneFalse2706.00
3400222119984None1.8.1 Bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach438.61438.618.0FalseNoneNoneFalseNoneFalse3508.880
3400223119984None1.8.2 aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3912.763912.768.0FalseNoneNoneFalseNoneFalse31302.080
3400224119984None1.8.2 gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
3400225119984None21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer 3 Poles353.11353.116.0FalseNoneNoneFalseNoneFalse2118.660
3400226119984None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km152.4152.40.81FalseNoneNoneFalseNoneFalse123.4440
3400227119984None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo175.94175.946.0FalseNoneNoneFalseNoneFalse1055.640
3400228119984None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach138.77138.776.0FalseNoneNoneFalseNoneFalse832.620
3400229119984None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo631.89631.892.0FalseNoneNoneFalseNoneFalse1263.780
3400230119984None24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3400231119984None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos8767.168767.166.0FalseNoneNoneFalseNoneFalse52602.960
17195686010000NoneNoneRoadsPKG-613 (A) Routine maintenance cost for 1st Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400232119985None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a (Quantity to be executed 79.60) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400233119985None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3980.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400234119985None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =6965.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400235119985None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =6965.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400236119985None10.5Filling Pot-holes and Patch Repairs with BituminousRemoval of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5.(Quantity to be executed =10945.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400237119985None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =72.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195686010000NoneNoneRoadsPKG-613 (A) Routine maintenance cost for 2nd Year0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400238119986None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a(Quantity to be executed =79.600) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400239119986None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =3980.000) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400240119986None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =6965.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400241119986None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =6965.000) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400242119986None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =10945.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400243119986None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =72.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195686010000NoneNoneRoadsPKG-613 (A) Routine maintenance cost for 3rd Year195906.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400244119987None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.35545.3523.88FalseNoneNoneFalseNoneFalse13022.9580
3400245119987None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.338.331592.0FalseNoneNoneFalseNoneFalse13261.360
3400246119987None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12208.95FalseNoneNoneFalseNoneFalse11308.3740
3400247119987None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.6134.6696.5FalseNoneNoneFalseNoneFalse93748.90
3400248119987None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm591.15591.1554.72FalseNoneNoneFalseNoneFalse32347.7280
3400249119987None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.8372.0FalseNoneNoneFalseNoneFalse9491.760
3400250119987None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.161.99FalseNoneNoneFalseNoneFalse5478.78840
3400251119987None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.861.99FalseNoneNoneFalseNoneFalse568.86140
3400252119987None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.26151.2689.6FalseNoneNoneFalseNoneFalse13552.8960
3400253119987None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.251.252500.0FalseNoneNoneFalseNoneFalse3125.00
17195686010000NoneNoneRoadsPKG-613 (A) Routine maintenance cost for 4th Year179355.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400254119988None2.5(ii)aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.83564.8323.88FalseNoneNoneFalseNoneFalse13488.14040
3400255119988None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.621592.0FalseNoneNoneFalseNoneFalse13723.040
3400256119988None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05208.95FalseNoneNoneFalseNoneFalse11711.64750
3400257119988None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.41696.5FalseNoneNoneFalseNoneFalse97099.0650
3400258119988None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.2654.72FalseNoneNoneFalseNoneFalse33502.86720
3400259119988None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.5472.0FalseNoneNoneFalseNoneFalse9830.880
17195686010000NoneNoneRoadsPKG-613 (A) Routine maintenance cost for 5th Year220213.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400260119989None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3123.88FalseNoneNoneFalseNoneFalse13953.32280
3400261119989None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.928.921592.0FalseNoneNoneFalseNoneFalse14200.640
3400262119989None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9957.99208.95FalseNoneNoneFalseNoneFalse12117.01050
3400263119989None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.22696.5FalseNoneNoneFalseNoneFalse100449.230
3400264119989None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm633.38633.38109.45FalseNoneNoneFalseNoneFalse69323.4410
3400265119989None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.2572.0FalseNoneNoneFalseNoneFalse10170.00
17195686010000NoneNoneRoadsPKG-613 (A) CONSTRUCTION OF FIELD APPROACH1359757.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400266119990None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3860.72FalseNoneNoneFalseNoneFalse7673.79360
3400267119990None9.1 (ii)Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets .ii. 1200mm dia ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm13340.3113340.3152.5FalseNoneNoneFalseNoneFalse700366.2750
3400268119990None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29151.14FalseNoneNoneFalseNoneFalse88763.01060
3400269119990None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.373.85FalseNoneNoneFalseNoneFalse28568.42450
3400270119990None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9348.87FalseNoneNoneFalseNoneFalse413485.64910
3400271119990None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.631.235FalseNoneNoneFalseNoneFalse120899.868050
17195686010001NoneNoneRoadsPKG-613 (A) Estimates for periodicity of routine Maintenance Activities for 6th Year (Renewal/Resurfaing)6201443.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400272119991None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3048.143048.141.99FalseNoneNoneFalseNoneFalse6065.79860
3400273119991None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm316.49316.491.99FalseNoneNoneFalseNoneFalse629.81510
3400274119991None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm167.46167.4689.6FalseNoneNoneFalseNoneFalse15004.4160
3400275119991None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.381.382500.0FalseNoneNoneFalseNoneFalse3450.00
3400276119991None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm18.4418.4410945.0FalseNoneNoneFalseNoneFalse201825.80
3400277119991None5.16 (C)Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum16829.2916829.29328.35FalseNoneNoneFalseNoneFalse5525897.37150
3400278119991None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm814.27814.27398.0FalseNoneNoneFalseNoneFalse324079.460
3400279119991None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm560.77560.77222.0FalseNoneNoneFalseNoneFalse124490.940
17195686010000NoneNoneRoadsPKG-613 (A) Construction of 3 ROWS NP4 1200mm dia pipe culvert CD at Ch 12.551534705.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400280119992None2.10 (b)Dismantling Stone Masonry. Rubble stone masonry in cement mortar.UNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7916.88FalseNoneNoneFalseNoneFalse12757.73520
3400281119992None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3869.04FalseNoneNoneFalseNoneFalse8725.27520
3400282119992None12.3 (a)Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification Granular material UNISR2023-24,V-3,PageNo117ItemNo12.3 (a) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.1548.61FalseNoneNoneFalseNoneFalse70345.96150
3400283119992None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. UNI SR 2023 - 24 ,V-1,Page No 7 Item No 1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29121.84FalseNoneNoneFalseNoneFalse71555.41360
3400284119992None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.374.45FalseNoneNoneFalseNoneFalse33020.64650
3400285119992None2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusing needle vibrators, providing weep holes UNISR2023-24,V-1,PageNo16ItemNo2.4.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9367.22FalseNoneNoneFalseNoneFalse568743.71460
3400286119992None9.1.(ii)ProvidingandlayingReinforcedCementConcrete Pipe NP4 as per design LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworks in head walls and parapets .ii. 1200mm dia UNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm13340.3113340.3137.5FalseNoneNoneFalseNoneFalse500261.6250
3400287119992None2.17(ix) (B)Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works.UNISR2023-24,V-3,PageNo11ItemNo2.17(ix) (B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1702.391702.3930.0FalseNoneNoneFalseNoneFalse51071.70
3400288119992None14.1(A)Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A)Boulder Laid Dry Without Wire Crates. UNISR2023-24,V-3,PageNo129ItemNo14.1(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.979.14FalseNoneNoneFalseNoneFalse21652.38580
3400289119992None14.4(A)ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnicalspecificationsA)Stone /Boulder UNISR2023-24,V-3,PageNo129ItemNo14.4(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3400290119992None2.11.hSteel FabricationSupplying,fittingandplacingTMTFE550/550DSteelReinforcementincludingcostofallmaterials,machinery,labour,cleaning,straightening,cutting,bending,hooking,laping/weldingjoints,tyingwithbindingwire/softannealedsteelwireandotherancilaryoperationscompleteasperdrawingandtechnical specification. h. All other type of structures UNISR2023-24,V-1,PageNo18ItemNo2.11.h ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.631.51FalseNoneNoneFalseNoneFalse147820.89130
3400291119992None8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingandlettering but excluding painting UNISR2023-24,V-3,PageNo67ItemNo8.18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3400292119992None8.10Painting Two Coats on New Concrete SurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplastered concrete surfaces UNISR2023-24,V-3,PageNo66ItemNo8.10. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.05135.0565.86FalseNoneNoneFalseNoneFalse8894.3930
17195686010000NoneNoneRoadsPKG-613 (A) Construction of box culvert 2 vent (3m x 3m) at Ch 13.3,05702257.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400293119993None2.10 (b)Dismantling Stone Masonry. Rubble stone masonry in cement mortar.UNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7938.44FalseNoneNoneFalseNoneFalse29052.56760
3400294119993None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38351.3FalseNoneNoneFalseNoneFalse44397.2940
3400295119993None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. UNI SR 2023 - 24 ,V-1,Page No 7 Item No 1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.29328.93FalseNoneNoneFalseNoneFalse193177.29970
3400296119993None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3732.82FalseNoneNoneFalseNoneFalse243536.54340
3400297119993None2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8331.288331.286.65FalseNoneNoneFalseNoneFalse55403.0120
3400298119993None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.369420.36100.1FalseNoneNoneFalseNoneFalse942978.0360
3400299119993None2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8478.338478.3359.64FalseNoneNoneFalseNoneFalse505647.60120
3400300119993None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.1740.95FalseNoneNoneFalseNoneFalse416632.26150
3400301119993None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.6314.55FalseNoneNoneFalseNoneFalse1424366.86650
3400302119993None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.633.69FalseNoneNoneFalseNoneFalse361231.18470
3400303119993None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8316.2FalseNoneNoneFalseNoneFalse136709.0460
3400304119993None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) UNI SR 2023 - 24 ,V-3,Page No 122 Item No 13.9. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum15396.7415396.7427.0FalseNoneNoneFalseNoneFalse415711.980
3400305119993None13.16Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications. UNI SR 2023 - 24 ,V-3,Page No 124 Item No 13.16 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0136.0FalseNoneNoneFalseNoneFalse80064.360
3400306119993None13.2 AM2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.2.A ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum18175.5718175.5714.63FalseNoneNoneFalseNoneFalse265908.58910
3400307119993None14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. UNI SR 2023 - 24 ,V-3,Page No 129 Item No 14.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.5125.39FalseNoneNoneFalseNoneFalse77198.54890
3400308119993None12.4Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.888.51FalseNoneNoneFalseNoneFalse293569.9680
3400309119993None12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.12296.1224.0FalseNoneNoneFalseNoneFalse7106.880
3400310119993None13.5 (A)Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications. UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.5.(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2805.12805.132.52FalseNoneNoneFalseNoneFalse91221.8520
3400311119993None8.18Boundary pillar / Guard stoneReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting UNI SR 2023 - 24 ,V-3,Page No 67 Item No 8.18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7716.0FalseNoneNoneFalseNoneFalse14828.320
3400312119993None13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST6 Mtrs4052.774052.774.0FalseNoneNoneFalseNoneFalse16211.080
3400313119993None13.14Painting on concrete surfaceProviding and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. UNI SR 2023 - 24 ,V-3,Page No 123 Item No 13.14 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm104.08104.08142.74FalseNoneNoneFalseNoneFalse14856.37920
3400314119993None16.15 CProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia UNI SR 2023 - 24 ,V-3,Page No 146 Item No 16.15.C. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4132.074132.0715.0FalseNoneNoneFalseNoneFalse61981.050
3400315119993None8.5 (A) (xi)Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.UNI SR 2023 - 24 Page No 64 Item No8.5 (A) (xii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5233.545233.542.0FalseNoneNoneFalseNoneFalse10467.080
17195686010000NoneNoneRoadsPKG-613 (A) construction of 1 row NP4 1200mm dia pipe culvert recons CD at ch 13.35694395.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400316119994None2.10 (b)Dismantling Stone Masonry. Rubble stone masonry in cement mortar.UNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.793.71FalseNoneNoneFalseNoneFalse2803.98090
3400317119994None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3832.06FalseNoneNoneFalseNoneFalse4051.74280
3400318119994None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. UNI SR 2023 - 24 ,V-1,Page No 7 Item No 1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.2987.07FalseNoneNoneFalseNoneFalse51135.34030
3400319119994None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.372.37FalseNoneNoneFalseNoneFalse17586.27690
3400320119994None2.4.2ProvidingandlayinginpositionCementConcreteforallSubstructuresofbuilding,Irrigationworks,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight.Thegranite/trap/basaltcrushedgradedcoarseaggregatesandfineaggregatesasperrelevantISCodesmachinemixedwithsuperplasticisers,laidinlayers,wellcompactedusing needle vibrators, providing weep holes UNISR2023-24,V-1,PageNo16ItemNo2.4.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9334.02FalseNoneNoneFalseNoneFalse287840.83860
3400321119994None9.1.(ii)ProvidingandlayingReinforcedCementConcrete Pipe NP4 as per design LayingReinforcedCementConcretePipeNP4/PrestressedConcretePipeonFirstClassBedding in Single Row LayingReinforcedcementconcretepipeNP4/prestressedconcretepipeforculvertsonfirstclassbeddingofgranularmaterialinsinglerowincludingfixingcollarwithcementmortar1:2butexcludingexcavation,protectionworks,backfilling,concreteandmasonryworks in head walls and parapets .ii. 1200mm dia UNI SR 2023 - 24 ,V-3,Page No 87 Item No9.1.(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm13340.3113340.3112.5FalseNoneNoneFalseNoneFalse166753.8750
3400322119994None14.1(AProvidingandlayingbouldersaprononriverbedforprotectionagainstscourwithstonebouldersweighingnotlessthan40kgeachcompleteasperdrawingandTechnicalspecification.A)Boulder Laid Dry Without Wire Crates UNISR2023-24,V-3,PageNo129ItemNo14.1(A ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.973.64FalseNoneNoneFalseNoneFalse8623.05080
3400323119994None14.4(A)ProvidingandlayingPitchingonslopeslaidoverpreparedfiltermediaincludingboulderapronlaiddryinfrontoftoeofembankmentcompleteasperdrawingandTechnicalspecificationsA)Stone /Boulder UNISR2023-24,V-3,PageNo129ItemNo14.4(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.979.0FalseNoneNoneFalseNoneFalse21320.730
3400324119994None2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.79FalseNoneNoneFalseNoneFalse77336.75770
3400325119994None8.18Boundary pillarReinforcedcementconcreteM15gradeboundarypillarsofstandarddesignasperIRC:25,fixedinpositionincludingfinishingandlettering but excluding painting UNISR2023-24,V-3,PageNo67ItemNo8.18 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach926.77926.7720.0FalseNoneNoneFalseNoneFalse18535.40
3400326119994None8.18Painting Two Coats on New Concrete SurfacesPaintingtwocoatsafterfillingthesurfacewithsyntheticenamelpaintinallshadesonnewplastered concrete surfaces UNISR2023-24,V-3,PageNo66ItemNo8.10. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach135.05135.0540.37FalseNoneNoneFalseNoneFalse5451.96850
3400327119994None2.17(ix) (C)RemovingalltypeofHumePipesandStackingincludingEarthworkandDismantlingof Masonry Works. (c) Above 900 mm dia Hume pipeUNISR2023-24,V-3,PageNo11ItemNo2.17(ix) (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1702.391702.397.5FalseNoneNoneFalseNoneFalse12767.9250
3400328119994None12.3 (a)Backfillingbehindabutment,wingwallandreturnwallcompleteincludingcompactionasper drawing and Technical SpecificationGranular material UNISR2023-24,V-3,PageNo117ItemNo12.3 (a) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.1513.95FalseNoneNoneFalseNoneFalse20187.74250
17195686010001NoneNoneRoadsPKG-613 (B) Estimate of Pavement38557605.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400329119995None16.29Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3400330119995None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm486.93486.9339.36FalseNoneNoneFalseNoneFalse19165.56480
3400331119995None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.438855.0FalseNoneNoneFalseNoneFalse65792.650
3400332119995None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.7117.77196.27FalseNoneNoneFalseNoneFalse847000.9790
3400333119995None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum147.44147.442810.17FalseNoneNoneFalseNoneFalse414331.46480
3400334119995None1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.28587.281003.01FalseNoneNoneFalseNoneFalse589047.71280
3400335119995None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.837569.08FalseNoneNoneFalseNoneFalse4623421.13640
3400336119995None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.82445.9FalseNoneNoneFalseNoneFalse7148876.520
3400337119995None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.62956.74FalseNoneNoneFalseNoneFalse9374639.8440
3400338119995None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.811344.0FalseNoneNoneFalseNoneFalse576275.20
3400339119995None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm17.3517.3511554.0FalseNoneNoneFalseNoneFalse200461.90
3400340119995None5.13 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.13(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12102.5512102.55808.78FalseNoneNoneFalseNoneFalse9788300.3890
3400341119995None5.17(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.17(c) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14056.4614056.46346.62FalseNoneNoneFalseNoneFalse4872250.16520
17195686010000NoneNoneRoadsPKG-613 (B) Traffic safety measures845362.54
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400342119996None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.3911163.393.6FalseNoneNoneFalseNoneFalse40188.2040
3400343119996None8.6 (A) (ii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.774.0FalseNoneNoneFalseNoneFalse23531.080
3400344119996None8.6 (A) (vi)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm circular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (vi) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach7954.387954.383.0FalseNoneNoneFalseNoneFalse23863.140
3400345119996None8.6 (A) (xii)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:202260 cm x 45 cm rectangular UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5294.255294.254.0FalseNoneNoneFalseNoneFalse21177.00
3400346119996None8.6 (A) (xv)Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach8208.388208.384.0FalseNoneNoneFalseNoneFalse32833.520
3400347119996None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67448.59FalseNoneNoneFalseNoneFalse294575.59530
3400348119996None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos452.24452.24328.0FalseNoneNoneFalseNoneFalse148334.720
3400349119996None8.16(i)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach6295.366295.361.0FalseNoneNoneFalseNoneFalse6295.360
3400350119996None8.16(ii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.552.0FalseNoneNoneFalseNoneFalse7253.10
3400351119996None8.16(iii)Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach1043.241043.246.0FalseNoneNoneFalseNoneFalse6259.440
3400352119996None8.17Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.0216.0FalseNoneNoneFalseNoneFalse40064.320
3400353119996None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3840.46FalseNoneNoneFalseNoneFalse5113.33480
3400354119996None8.29(i)Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2740.672740.6725.0FalseNoneNoneFalseNoneFalse68516.750
3400355119996None2.4.1Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8331.348331.344.46FalseNoneNoneFalseNoneFalse37157.77640
3400356119996None8.25 (i)Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4509.964509.9620.0FalseNoneNoneFalseNoneFalse90199.20
17195686010000NoneNoneRoadsPKG-613 (B) Estimate of junctions225594.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400357119997None2.5(ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle UNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm486.75486.750.24FalseNoneNoneFalseNoneFalse116.820
3400358119997None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.4337.5FalseNoneNoneFalseNoneFalse278.6250
3400359119997None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.7117.78.1FalseNoneNoneFalseNoneFalse953.370
3400360119997None3.6Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.8348.23FalseNoneNoneFalseNoneFalse29460.33090
3400361119997None4.2.(B) (5)By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V MaterialUNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.819.06FalseNoneNoneFalseNoneFalse55708.5680
3400362119997None4.17Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.618.88FalseNoneNoneFalseNoneFalse59860.9280
3400363119997None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm50.850.872.5FalseNoneNoneFalseNoneFalse3683.00
3400364119997None5.32Tack coat on Bituminous surface Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm14.8714.8772.5FalseNoneNoneFalseNoneFalse1078.0750
3400365119997None5.13 (C)Dense Graded Bituminous Macadam Grading - II for traffic greater than 20 MSA Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum12102.5512102.553.62FalseNoneNoneFalseNoneFalse43811.2310
3400366119997None5.17 (C)Bituminous Concrete Grading II for traffic greater than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14056.4614056.462.18FalseNoneNoneFalseNoneFalse30643.08280
17195686010000NoneNoneRoadsPKG-613 (B)Water supply estimate152008.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400367119998None1.17.1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum324.5324.5108.0FalseNoneNoneFalseNoneFalse35046.00
3400368119998None9.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,140mm diaUNI SR 2023-24 , V - 5 Pg No. ,95 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm473.3473.3200.0FalseNoneNoneFalseNoneFalse94660.00
3400369119998None10.15.6Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and specials with jointing of approved type, with all labour with encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS and commissioning(Contractor will make his own arrangements for procuring water for testing) etc. complete for: UNI SR 2023-24 , V - 5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm111.51111.51200.0FalseNoneNoneFalseNoneFalse22302.00
17195686010000NoneNoneRoadsPKG-613 (B) 3rd year maintenance234396.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400370119999None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm471.81471.8129.52FalseNoneNoneFalseNoneFalse13927.83120
3400371119999None16.19Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.338.331312.0FalseNoneNoneFalseNoneFalse10928.960
3400372119999None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12246.0FalseNoneNoneFalseNoneFalse13313.520
3400373119999None10.2Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.6134.6820.0FalseNoneNoneFalseNoneFalse110372.00
3400374119999None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory/ requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.1615.0FalseNoneNoneFalseNoneFalse41297.40
3400375119999None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.869.0FalseNoneNoneFalseNoneFalse2572.740
3400376119999None10.5Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause503, back filling the potholes with hot bituminous material as per clause504 using HMP40 /60TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm591.15591.1557.4FalseNoneNoneFalseNoneFalse33932.010
3400377119999None1.12Nala Training: Earthwork insurface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing of for levelling the excavated earth or sorting & stacking the selected earth for re use in aradius of 50 mand lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.8318.0FalseNoneNoneFalseNoneFalse2372.940
3400378119999None16.26Painting of Parapet walls of CD wwork. White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications. UNI SR 2023-24, V-3, Page No. 148, Item No. 16.26 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm37.4637.46120.0FalseNoneNoneFalseNoneFalse4495.20
3400379119999None8.1Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm285.86285.864.14FalseNoneNoneFalseNoneFalse1183.46040
17195686010001NoneNoneRoadsPKG-613 (B) 4th year maintenance107461.87
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400380120000None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm488.66488.6629.52FalseNoneNoneFalseNoneFalse14425.24320
3400381120000None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.628.621312.0FalseNoneNoneFalseNoneFalse11309.440
3400382120000None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.41246.0FalseNoneNoneFalseNoneFalse34294.860
3400383120000None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm612.26612.2657.4FalseNoneNoneFalseNoneFalse35143.7240
3400384120000None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.5490.0FalseNoneNoneFalseNoneFalse12288.60
17195686010001NoneNoneRoadsPKG-613 (B) 5th year maintenance147527.19
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400385120001None2.6Clearing & grubbing road land including vegetation, bushes, shrubs, saplings by using weed cutter / minor equipment. UNI SR 2023-24, V-3, Page No. 9, Item No. 2.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm505.51505.5129.52FalseNoneNoneFalseNoneFalse14922.65520
3400386120001None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr8.928.921312.0FalseNoneNoneFalseNoneFalse11703.040
3400387120001None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.22246.0FalseNoneNoneFalseNoneFalse35478.120
3400388120001None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm633.37633.37114.8FalseNoneNoneFalseNoneFalse72710.8760
3400389120001None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.2590.0FalseNoneNoneFalseNoneFalse12712.50
17195686010000NoneNoneRoadsPKG-613 (B) 6th year maintenance6731033.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400390120002None16.22Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm3048.143048.1415.0FalseNoneNoneFalseNoneFalse45722.10
3400391120002None16.24 (i)Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm316.49316.499.0FalseNoneNoneFalseNoneFalse2848.410
3400392120002None8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.381.38240.0FalseNoneNoneFalseNoneFalse331.20
3400393120002None1.12White washing of parapet walls of CD work and tree trunks White washing two coats on parapet walls and tree trunks including preparation of surface by cleaning scraping etc. as per technical specifications. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm33.4533.4535.0FalseNoneNoneFalseNoneFalse1170.750
3400394120002None5.3 (i)Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm18.4418.4411480.0FalseNoneNoneFalseNoneFalse211691.20
3400395120002None5.17 (C)Bituminous Concrete Grading II for traffic greater than 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. UNI SR 2023-24, V-3, Page No. 38, Item No. 5.17 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum17430.017430.0344.4FalseNoneNoneFalseNoneFalse6002892.00
3400396120002None8.15Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm814.27814.27382.68FalseNoneNoneFalseNoneFalse311604.84360
3400397120002None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm560.77560.77276.0FalseNoneNoneFalseNoneFalse154772.520
17195686010001NoneNoneRoadsPKG-613 (B) Electrical estimate398021.78
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400398120003None1.1.1Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit779.33779.336.0FalseNoneNoneFalseNoneFalse4675.980
3400399120003None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.241379.246.0FalseNoneNoneFalseNoneFalse8275.440
3400400120003None1.06PSCC Pole - 9 Mtr Long, 200 Kg WL (Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos5202.565202.562.0FalseNoneNoneFalseNoneFalse10405.120
3400401120003None2.02Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1379.01379.02.0FalseNoneNoneFalseNoneFalse2758.00
3400402120003None2.0311 kV, Special 3 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1089.081089.086.0FalseNoneNoneFalseNoneFalse6534.480
3400403120003None3.0111 kV, Cross Arm with HT Top Support(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet890.84890.846.0FalseNoneNoneFalseNoneFalse5345.040
3400404120003None6.0511 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos253.99253.9918.0FalseNoneNoneFalseNoneFalse4571.820
3400405120003None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos631.89631.892.0FalseNoneNoneFalseNoneFalse1263.780
3400406120003None1.7.1Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Pit405.15405.151.0FalseNoneNoneFalseNoneFalse405.150
3400407120003None6.05Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km4970.874970.870.81FalseNoneNoneFalseNoneFalse4026.40470
3400408120003None7.02ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKms57283.9357283.930.81FalseNoneNoneFalseNoneFalse46399.98330
3400409120003None6.02Stringing of Rabbit Conductor (including pin binding, providingjumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km6483.696483.690.81FalseNoneNoneFalseNoneFalse5251.78890
3400410120003None9.03PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo126.38126.3818.0FalseNoneNoneFalseNoneFalse2274.840
3400411120003None10.06T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet391.52391.5218.0FalseNoneNoneFalseNoneFalse7047.360
3400412120003None2.05LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo358.07358.071.0FalseNoneNoneFalseNoneFalse358.070
3400413120003None2.07LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo163.55163.551.0FalseNoneNoneFalseNoneFalse163.550
3400414120003None5.02Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3400415120003None5.01Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet151.16151.161.0FalseNoneNoneFalseNoneFalse151.160
3400416120003None6.031.1 kV Ceramic Pin Insulator (Shell only ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos38.4138.415.0FalseNoneNoneFalseNoneFalse192.050
3400417120003None6.06No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos33.4533.455.0FalseNoneNoneFalseNoneFalse167.250
3400418120003None2.16Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos296.12296.128.0FalseNoneNoneFalseNoneFalse2368.960
3400419120003None4.03Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr115.23115.238.4FalseNoneNoneFalseNoneFalse967.9320
3400420120003None24.0111 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3400421120003None13.02Labour for 11 kV, GOSa) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1367.861367.861.0FalseNoneNoneFalseNoneFalse1367.860
3400422120003None1.8.1 aA) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach338.25338.258.0FalseNoneNoneFalseNoneFalse2706.00
3400423120003None1.8.1 Bb Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach438.61438.618.0FalseNoneNoneFalseNoneFalse3508.880
3400424120003None1.8.2 aB) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3912.763912.768.0FalseNoneNoneFalseNoneFalse31302.080
3400425120003None1.8.2 gGuy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach247.8247.81.0FalseNoneNoneFalseNoneFalse247.80
3400426120003None21.02Transporation by Head Load where ever there is noaccessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer 3 Poles353.11353.116.0FalseNoneNoneFalseNoneFalse2118.660
3400427120003None22.02For ACSR Conductors 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer Km152.4152.40.81FalseNoneNoneFalseNoneFalse123.4440
3400428120003None26.02Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo175.94175.946.0FalseNoneNoneFalseNoneFalse1055.640
3400429120003None5.06Fixing of HT/LT Single Top Support ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach138.77138.776.0FalseNoneNoneFalseNoneFalse832.620
3400430120003None6.08DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo631.89631.892.0FalseNoneNoneFalseNoneFalse1263.780
3400431120003None24.01GOS as per IS-9921, IS-1977174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet11708.5511708.551.0FalseNoneNoneFalseNoneFalse11708.550
3400432120003None27.0227 Loading & Unloading of Transformer (when maintaincemen for loading and unloading are not available in store)Loading 63 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo353.12353.122.0FalseNoneNoneFalseNoneFalse706.240
3400433120003None27.07Un loading 63 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos353.11353.112.0FalseNoneNoneFalseNoneFalse706.220
3400434120003None27.08Un loading 100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo529.05529.051.0FalseNoneNoneFalseNoneFalse529.050
3400435120003None26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet7930.847930.843.0FalseNoneNoneFalseNoneFalse23792.520
3400436120003None54.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet920.58920.588.0FalseNoneNoneFalseNoneFalse7364.640
3400437120003None54.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet837.56837.568.0FalseNoneNoneFalseNoneFalse6700.480
3400438120003None54.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet384.09384.098.0FalseNoneNoneFalseNoneFalse3072.720
3400439120003None54.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet2691.112691.119.0FalseNoneNoneFalseNoneFalse24219.990
3400440120003None1.01RCC Pole - 9 Mtr Long, 145 Kg WL (Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos8767.168767.166.0FalseNoneNoneFalseNoneFalse52602.960
3400441120003None19.0210 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo.1962.581962.586.0FalseNoneNoneFalseNoneFalse11775.480
3400442120003None26.01DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo.7930.847930.842.0FalseNoneNoneFalseNoneFalse15861.680
3400443120003None67.2Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo.185.5185.52.0FalseNoneNoneFalseNoneFalse371.00
3400444120003None4.02Anti Climbing Device (12 Mtr GI Barbed wire) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST2 Cmtr110.27110.272.0FalseNoneNoneFalseNoneFalse220.540
3400445120003None6.18.38 SWG GI Wire (44/6.18.3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTMtr23.5423.54300.0FalseNoneNoneFalseNoneFalse7062.00
3400446120003None17.07LT Protection Kit (Dwg No. For KPTCL & ESCOMs/GM/QS&S/10 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo2506.52506.52.0FalseNoneNoneFalseNoneFalse5013.00
3400447120003None15.17.1LT Wiring Kit 63/100 KVA (87/15.17.1) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1324.291324.292.0FalseNoneNoneFalseNoneFalse2648.580
3400448120003None24.04H Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing New GOS for sectionalisation) - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/61 Dtd 24.11.2018 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet5367.555367.5510.0FalseNoneNoneFalseNoneFalse53675.50
17195686010000NoneNoneRoadsPKG-613 (B) 1st year maintenance estimate0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400449120004None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 3280) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400450120004None10.3Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3(Quantity to be executed =820) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400451120004None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =2710) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400452120004None1.12Nala Training: Earthwork in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking thes elected earth for re use inaradius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depthUNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =36) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400453120004None2.5 ii aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light jungle PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii)a pg 9(quantity to be executed=98.40) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17195686010000NoneNoneRoadsPKG-613 (B) 2nd year maintenance estimate0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3400454120005None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =1312 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400455120005None10.3Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 . Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-2, Page No. 91, Item No. 10.3.(Quantity to be executed =813) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400456120005None10.2Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge. UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =246) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400457120005None10.5Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2 UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =114) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400458120005None1.12Nala Training : Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12(Quantity to be executed =225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3400459120005None2.5(ii) aClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. ii)By Mechanical Means using Dozer, a)In area of light jungle PWD SoR for Roads & Bridges - 2023-24 ( Item No.VOL-III-2.5 ii)a pg no 9(qty to be executed=29.54) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195686010000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195686010000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17195686010000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders.The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders endNone
17195686010000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17195686010000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195686010000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17195686010000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17195686010000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17195686010000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundableNone
17195686010000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17195686010000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17195686010000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt ordersNone
17195686010000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tenderNone
17195686010000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the workNone
17195686010000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fundNone
17195686010000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17195686010000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approvalNone
17195686010000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejectedNone
17195686010000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid documentNone
17195686010000NoneNoneELIGIBILITYThe units of items 2.5(ii)a, item 13.7 and item 8.43 of uni SR V-3 2023-24 , shall be read as 100sqm,No. & No. respectivelyNone
17195686010000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence bidders must quote the rates including GSTNone
17195686010000NoneNoneELIGIBILITYGST will not be paid separatelyNone
17195686010000NoneNoneELIGIBILITYPotholes and other maintenance items shall be rectified irrespective of quantities during DLP & maintenance periodNone
17195703390000NoneNoneELIGIBILITYThe Tenderer shall upload an Affidavit duly Notarized in the format given. Failure to upload the Affidavit shall make the Bid Non ResponsiveNone
17195724000000NoneNoneELIGIBILITYThe item code 12.2,-(Providing weep holes -Volume 3,page No.117 of SR 2023-24 stands cancelledNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 ,2022-23 and 2023-24(b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.478.41Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneSection 2 ITT 3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 ,2022-23 and 2023-24 Executed in any one financial year, the following minimum quantities of work:1. Earth Work for Embankment/ Subgrade/ Shoulders : 25384.95 Cum2. GSB/WMM : 7202.15Cum3. BM/SDBC/DBM/BC :1904.96Cum4.Dry Lean Concrete (DLC)/ Plain Cement Concrete (PCC)/Reinforced Cement Concrete (RCC) M20 & higher grades :428.57cumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability(ii) Machineries could be on Lease/Hire:1.Wet Mix Plant / Pug mill : 1 No.2.Truck mounted Bitumen Sprayer: 1 No 3. Motor Grader: 1 No.4.Excavator 0.90 Cum Bucket Capacity:1 No5.Tipper Trucks:3 Nos6.Self Loading Concrete Mixer 2 M3 Capacity/concrete mixer :1 No7Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER KW4 DOCUMENT UPLOADED
NoneNoneNoneNoneSection 2 ITT 3.3(a) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned:1.Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No2.Mechanical Paver Finisher:1 No3. Static Road Roller / Vibratory Road Roller: 2No.5.Tippers :4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AS PER KW4 DOCUMENT
NoneNoneNoneNoneSection 2 ITT 3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity (AXNX1.5 - B) Where, A is Maximum value of civil engineering works executed in any one year during the last five years (updated to 2019-20 to 2023-24 price level) taking into account the completed as well as works in progress. N is Number of years prescribed for completion of the works for which tenders are invited.B is Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- as per KW4 Document
NoneNoneNoneNoneDetails of Committed WorksCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- details of committed works
NoneNoneNoneNoneKPWD Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 2022-23 & 2023-24 (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.1931.62Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSection 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.287.04Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneAnnual turn over certificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneSECTION 11: AFFIDAVIT On a Stamp Paper of Rs 100 duly NotarizedOthersAffidavit in given format as per uploaded KW4 Document
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- AFFIDAVIT
NoneNoneNoneNoneCopies of Tax RegistrationOthersCOPY OF GST REGISTRATION
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneGST Registration
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
GST RegistrationTrueTechnical Bid
Annual Turnover certificate for the past five years along with Balance sheets and UDIN mentioned duly attested by Charted accountantTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW4TrueTechnical Bid
KPWD Registration CertificateTrueTechnical Bid
Workdone certificate issued by an Officer not below the rank of EE or equivalentTrueTechnical Bid
Section 2 ITT 3.2a as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.2c as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.2b as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.3 as mentioned in bid documentTrueTechnical Bid
Section 2 ITT 3.7 as mentioned in bid documentTrueTechnical Bid
AFFIDAVIT AS PER KW4 DOCUMENT UPLOADEDTrueTechnical Bid
WORK DONE -SIMILAR WORKTrueTechnical Bid
WORK DONE-YEARWISE QUANTITIESTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1719573871000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Project Officer, Project Implementation Unit, State Highway Development Project, PWD Annex Building, K.R. Circle, Bangalore
streetNone
cityBANGALORE
stateKarnataka
pin560001
tenderRecallDTONone