createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719635677688
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd37475.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose16-07-2024 17:30:00
tenderQueryClose16-07-2024 16:00:00
technicalBidOpen18-07-2024 11:30:00
publishedDate29-06-2024 10:36:35
publishedByPostTP_CO_SRG
publishedByUserKPE12595 - MANJUNATHA S S
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonJUNIOR ENGINEER
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8217657598
tenderSupplierListNone
tenderSchedule
createdTs1719635677717
version5
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT19943
titleConstrction CC Drain from rama house to Kendagannaswamy land end at ward no 11 asphalt work from gurubhavana to Bidugalu road at ward no 1 construction CC Road from Bhairanayaka house to Jyothi house at ward No 09 from Bhaskar house to Hoovina bhairanayaka house at ward No 9 construction of CC Drain from Mangala house to Janardhana house to at ward No 12 asphalt work from Govinda hose to mangalamma house at ward No 7 Kullaiah house to Ambedkar Bhavana at ward No 4 asphalt work and Drain work fr
descriptionConstrction CC Drain from rama house to Kendagannaswamy land end at ward no 11 asphalt work from gurubhavana to Bidugalu road at ward no 1 construction CC Road from Bhairanayaka house to Jyothi house at ward No 09 from Bhaskar house to Hoovina bhairanayaka house at ward No 9 construction of CC Drain from Mangala house to Janardhana house to at ward No 12 asphalt work from Govinda hose to mangalamma house at ward No 7 Kullaiah house to Ambedkar Bhavana at ward No 4 asphalt work and Drain work from Venkatesh house to Printing press Gopalakrishna house at Ward No 10 construction of road from Purohitha Gopi house to Jain temple at Ward No 8 in Sargur TP Limit
categoryWORKS
categoryTextWorks
ecv1499000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2451
locationNameDMA Town Panchayat Saraguru
provisionalAmount1499000.0
groupOverheadTotal229999.63
fileNumber15FUBG/2024-25/SRG/95
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17196356780000NoneNoneOther WorksConstruction of CC Drain, CC Road and asphalt work in Sargur TP Limit1269000.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3406051120260Nonecode1Demolishing cement concrete manually/ by mechanical means including disposal of material to the appropriate disposal area as per direction of Engineer-in-charge. CSR-2023-24 .I.No.19.2.1, PN-187 of Volume1.Sqm1712.891712.8937.35FalseNoneNoneFalseNoneFalse63976.44150
3406052120260Nonecode2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (In all kinds of soils Depth upto 3 m) CSR 2023-24 PageNo. 8 Item No.1.14.1 Volume no ICum105.06105.0662.775FalseNoneNoneFalseNoneFalse6595.14150
3406053120260Nonecode3Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately), Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates. CSR 2023-24 Sl. No.2.1.2, Page No.15Volume1.Cum5833.925833.928.775FalseNoneNoneFalseNoneFalse51192.6480
3406054120260Nonecode4Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately). M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. CSR 2023-24 Sl. No.2.3.1, Page No.16 Volume1.Cum6512.696512.6921.195FalseNoneNoneFalseNoneFalse138036.464550
3406055120260Nonecode5Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications. CSR 2023-24 Sl. No.9.3, Page No.71Volume3.Tonne92140.7192140.710.771FalseNoneNoneFalseNoneFalse71040.487410
3406056120260Nonecode6Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. Addendum-1 Vol.1 Common SR -Page :115 - 116Cum2279.442279.4421.195FalseNoneNoneFalseNoneFalse48312.73080
3406057120260Nonecode7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications.CSR 2023-24 Sl. No.1.10, Page No.07Volume1.Cum164.8164.875.1499FalseNoneNoneFalseNoneFalse12384.703520
3406058120260Nonecode8Construction of granular sub-base by providing close graded material spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401(By mix in Place Method) For Grading II Material.PageNo. 19 Item No .4.2 B (ii) Volume IIICum2504.962504.9613.5FalseNoneNoneFalseNoneFalse33816.960
3406059120260Nonecode9Plain Cement Pavement Quality M30 grade Concrete (RMC) with OPC & GGBS laid without Paver Construction of un-reinforced plain cement concrete pavement using RMC M-30 grade with OPC @ 270 kg/m3 and GGBS@ 90 kg/m3 (75:25 proportion) as per approved mix design procedure and thickness as per design, over a prepared sub base. The superplastisiser confirming to IS 9103-1999 Reaffirmed-2008 Coarse aggregates and Fine aggregate confirming to IS:383-2016, transported to site, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work). Spreading the concrete with shovels, rackers and compacted using needle, suitable plate vibrator and finished in a continuous operation including provision of separation membrane and Hessian cloth finishing to lines and grades complete including cost of all materials, labour, all lead & lift, loading charges as per specification & direction of Engineer - incharge of the work. (Groove cutting shall be paid seperately) CSR 2023-24 I NO 6.6 V-3 P -51Cum6977.226977.2213.5FalseNoneNoneFalseNoneFalse94192.470
3406060120260Nonecode10Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. CSR 2023-24 I No.3.5, 305.4.3,PN -17 Volume -3Sqm6.186.18645.0FalseNoneNoneFalseNoneFalse3986.10
3406061120260Nonecode11Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per m3 for every 1.50 m height or part there off, Deduct 5% per m3 if rollers are not used and tamping is done manually, Add 8% per m3 for works under foul & sullage situation.CSR 2023-24 I No.1.8, PNO-7 V-1Cum488.22488.2289.625FalseNoneNoneFalseNoneFalse43756.71750
3406062120260Nonecode12Compacting Original Ground. Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. CSR 2023-24 I NO.3.7, 305.3.4 P-17 V-3Cum108.15108.1594.0FalseNoneNoneFalseNoneFalse10166.10
3406063120260Nonecode13Granular Sub-Base. Construction of Granular Sub-Base of required grading as per design mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 4.1, 401, A, (ii) For Grading -II Material.CSR 2023-24 INo.4.1, 401 PNO-23 V-3Cum2636.82636.813.125FalseNoneNoneFalseNoneFalse34608.00
3406064120260Nonecode14Wet Mix Macadam (Plant mix method). Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.CSR 2023-24 I 4.17,406 PNO-26 Volume-3Cum2635.772635.7789.625FalseNoneNoneFalseNoneFalse236230.886250
3406065120260Nonecode15Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90 kg per m2 using mechanical means. CSR 2023-24 I No.5.1, 502, A P NO-3 V -3 P-3Cum42.2342.23597.5FalseNoneNoneFalseNoneFalse25232.4250
3406066120260Nonecode16Bituminous Macadam Grading - I for traffic lessthan 20 MSA Providing and laying Bituminous Macadam with 120 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction. CSR 2023-24 I.No.5.6, 504, (i), A PNo-31 V-3 .Cum7762.087762.0829.875FalseNoneNoneFalseNoneFalse231892.140
3406067120260Nonecode17Tack coat on Bituminous surface Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom. CSR 2023-24 Si No.5.3, 503, (i), P-31 V-3Cum12.3612.36597.5FalseNoneNoneFalseNoneFalse7385.10
3406068120260Nonecode18Semi Dense Bituminous Concrete Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. CSR2023-24 I.No.1, 21-A, IRC-37: 2018, .V-3 P-43 5.31 IRC 37:2018Cum10456.5610456.5614.9375FalseNoneNoneFalseNoneFalse156194.8650
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17196356790000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17196356790000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17196356790000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17196356790000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17196356790000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17196356910000NoneNoneELIGIBILITYBIDDER SHOULD UPLOAD ALL RELEVANT TECHNICAL DOCUMENTS AS PER CONDITIONS MENTIONED IN THE TENDER DOCUMENT ATTACHEDNone
17196356980000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-1None
17196357360000NoneNoneELIGIBILITYThe authority reserves right to accept or reject of all tenders without giving any reasonsNone
17196357460000NoneNoneELIGIBILITYGST will be paid at the time of bill paymentNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNoneBIDDER SHOULD UPLOAD ALL RELEVANT TECHNICAL DOCUMENTS AS PER CONDITIONS MENTIONED IN THE TENDER DOCUMENT ATTACHEDCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- BIDDER SHOULD UPLOAD ALL RELEVANT TECHNICAL DOCUMENTS AS PER CONDITIONS MENTIONED IN THE TENDER DOCUMENT ATTACHED
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Class IV and above KPWD contractor registration certificateTrueTechnical Bid
Similar Work done certificateTrueTechnical Bid
Line of Credit CertificateTrueTechnical Bid
BIDDER SHOULD UPLOAD ALL RELEVANT TECHNICALDOCUMENTS AS PER CONDITIONS MENTIONED INTHE TENDER DOCUMENT ATTACHEDFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone