createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719591556345
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd12000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose16-07-2024 17:30:00
tenderQueryClose16-07-2024 16:00:00
technicalBidOpenNone
publishedDate28-06-2024 22:07:40
publishedByPostTMC_CO_HDK
publishedByUserKPE14295 - SURESHA P
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonJUNIOR ENGINEER
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber8217657598
tenderSupplierListNone
tenderSchedule
createdTs1719591556379
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT19922
titleConstruction of welcome board in HD Kote TMC Limit
descriptionConstruction of welcome board in HD Kote TMC Limit
categoryWORKS
categoryTextWorks
ecv480000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2447
locationNameDMA Town Municipal Council H D Kote
provisionalAmount480000.0
groupOverheadTotal74536.8
fileNumberSFCSCSP/2024-25/HDK/117
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195915560000NoneNoneOther WorksConstruction of welcome board in HD Kote TMC Limit405463.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3405248120228Nonecode1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. CSR-2023-24 I.NO.1.14.1, PN-8 Volume -1Cum105.06105.067.68FalseNoneNoneFalseNoneFalse806.86080
3405249120228Nonecode2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.1.2, PN-15 VOLUME-1 2023-24Cum5833.925833.921.176FalseNoneNoneFalseNoneFalse6860.689920
3405250120228Nonecode3Providing and laying in position Reinforced cement concrete for allSub structures of building, Irrigation works, Sub structure works ofbridges, Drain works & other parallel works from 0.50m to 3.50 mheight. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with superplasticisers, laid in layers, well compacted using needle vibrators,providing weep holes wherever necesary, including all lead & lifts, costof all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other. appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement & formwork to be paidseparately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Page No.17 Revised Rate W.E.F From 04-01- CSR-2023-24 I.NO.2.4.3, PN-16 VOLUME-1 2023-24Cum6526.086526.083.888FalseNoneNoneFalseNoneFalse25373.399040
3405251120228Nonecode4Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately). M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates.. Revised Rate W.E.F From 04-01-2023. CSR-2023-24 I.NO.2.5.2, PN-17 Volume -1 2023-24Cum7048.297048.2910.08FalseNoneNoneFalseNoneFalse71046.76320
3405252120228Nonecode5Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications.CSR 2023-24 I 6.32 P 17 V-2Sqm1768.51768.523.76FalseNoneNoneFalseNoneFalse42019.560
3405253120228Nonecode6Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. CSR-2023-24 I.NO.1.10, PN-7 volume-1 2023-24Cum164.8164.81.152FalseNoneNoneFalseNoneFalse189.84960
3405254120228Nonecode7Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. CSR-2023-24 Addendum -1 PN-111 volume-1 2023-24 -Percentage on finished rate of concrete per m3. For Footing. (8%)Cum522.08522.083.888FalseNoneNoneFalseNoneFalse2029.847040
3405255120228Nonecode8Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. CSR-2023-24 Addendum -1 PN-111 volume-1 2023-24 -Percentage on finished rate of concrete per m3. For Columns. (70%)Cum4933.84933.84.68FalseNoneNoneFalseNoneFalse23090.1840
3405256120228Nonecode9Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. CSR-2023-24 Addendum -1 PN-111 volume-1 2023-24 Percentage on finished rate of concrete per m3. For Plinth Beams. (50%)Cum3524.143524.143.24FalseNoneNoneFalseNoneFalse11418.21360
3405257120228Nonecode10Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. CSR-2023-24 Addendum -1 PN-111 volume-1 2023-24 Percentage on finished rate of concrete per m3. For Plinth Beams. (50%)Percentage on finished rate of concrete per m3. For Lintel Beams and roof beams (60%)Cum4228.974228.972.16FalseNoneNoneFalseNoneFalse9134.57520
3405258120228Nonecode11Appendix I Additionalities for Formwork, Centering & Scaffolding. Following additional percentage to be added to the finished rates of concrete of Buildings, Irrigation works, Water supply works, Roads & Bridges depending upon the type of structure. These percentages are worked out based on empirical mathematical approaches & exhaustive studies on the common standard sizes of the type of the structure of Buildings, Irrigation works, Bridges, Water works etc. The use rate of shuttering material is considered at 40 repetitions and type of material to be used is steel centering. CSR-2023-24 Addendum -1 PN-111 volume-1 2023-24 Percentage on finished rate of concrete per m3. For Plinth Beams. (50%)Percentage on finished rate of concrete per m3.Percentage on finished rate of concrete per m3. For Roof. (50%)Cum3524.143524.142.16FalseNoneNoneFalseNoneFalse7612.14240
3405259120228Nonecode12Supplying, Fitting and Placing TMT Fe 500 & above Reinforcement in Foundation / Substructure / Superstructure complete as per Drawing and Technical Specifications.CSR 2023-24 Sl. No.2.11, Page No18 Volume1.Cum92140.7192140.711.5674FalseNoneNoneFalseNoneFalse144421.3488540
3405260120228Nonecode13Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. CSR 2023-24 I.NO.8.9, PN-42 Volume2.Sqm519.75519.7575.3599FalseNoneNoneFalseNoneFalse39168.3080250
3405261120228Nonecode14Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. CSR 2023-24 I.NO.8.30,VOLUME-2 PN-46Sqm295.8295.875.3599FalseNoneNoneFalseNoneFalse22291.458420
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195915580000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195915580000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17195915580000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17195915580000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17195915580000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195915580000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17195915580000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17195915580000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17195915580000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17195915580000NoneNoneELIGIBILITYBanker DetailsNone
17195915640000NoneNoneELIGIBILITYBIDDER SHOULD UPLOAD ALL RELEVANT TECHNICAL DOCUMENTS AS PER CONDITIONS MENTIONED IN THE TENDER DOCUMENT ATTACHEDNone
17195915690000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-1None
17195915770000NoneNoneELIGIBILITYGST will be paid at the time of bill paymentNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual turnover certificate and balance sheetTrueTechnical Bid
Class IV and above KPWD contractor registration certificateTrueTechnical Bid
Similar Work done certificateTrueTechnical Bid
Line of Credit CertificateTrueTechnical Bid
BIDDER SHOULD UPLOAD ALL RELEVANT TECHNICAL DOCUMENTS AS PER CONDITIONS MENTIONED IN THE TENDER DOCUMENT ATTACHEDFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone