noticeInvitingTenderDTO
createdTs1719490494947
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyRESERVED
invitingStrategyTextReserved
taxTypeINCLUSIVE_TAX
tenderFee1990.00
emd93810.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose05-07-2024 17:00:00
tenderQueryClose04-07-2024 17:00:00
technicalBidOpen06-07-2024 17:01:00
publishedDate28-06-2024 16:53:28
publishedByPostPWD_EE_DIV_CKM
publishedByUserKPE11164 - D N SRIDHAR
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonD N Sridhar
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08262234028
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719490494949
version17
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/BD/WORK_INDENT9621/CALL-2
titleConstruction of 4 class rooms to Government PU College in Belur road Chikmagalur
descriptionConstruction of 4 class rooms to Government PU College in Belur road Chikmagalur
categoryWORKS
categoryTextWorks
ecv7949637.01
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1699
locationNamePWD Division Office Chikkamagaluru
provisionalAmount9840000.0
groupOverheadTotal0.0
fileNumberKpwd/ckm/subdvsn/2023-24/Govtjunior/college
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17194904950001NoneNoneBuildingsGround Floor4157913.96
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3389243119341NoneVol 1 8 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils upto 300 mm depth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum97.8597.8572.43FalseNoneNoneFalseNoneFalse7087.27550
3389244119341NoneVol 1 8 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum105.06105.06172.75FalseNoneNoneFalseNoneFalse18149.1150
3389245119341NoneVol 1 9 1.15.2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum437.75437.7574.03FalseNoneNoneFalseNoneFalse32406.63250
3389246119341NoneVol 2 5 4.1Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 ltr/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm121.54121.54234.24FalseNoneNoneFalseNoneFalse28469.52960
3389247119341NoneVol 1 7 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum273.98273.98172.74FalseNoneNoneFalseNoneFalse47327.30520
3389248119341NoneVol 1 7 1.8Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum488.22488.22153.43FalseNoneNoneFalseNoneFalse74907.59460
3389249119341NoneVol 1 15 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6168.676168.6734.98FalseNoneNoneFalseNoneFalse215780.07660
3389250119341NoneVol 1 15 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Isolated Footing ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6526.086526.0840.06FalseNoneNoneFalseNoneFalse261434.76480
3389251119341NoneVol 1 111 1aFormwork, Centering & Scaffloding 8% For Isolated Footing ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum522.08522.0840.06FalseNoneNoneFalseNoneFalse20914.52480
3389252119341NoneVol 1 17 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns up to plinth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6526.086526.084.69FalseNoneNoneFalseNoneFalse30607.31520
3389253119341NoneVol 1 111 9Formwork, Centering & Scaffloding 70% For Columns up to plinth ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4568.254568.254.69FalseNoneNoneFalseNoneFalse21425.09250
3389254119341NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7048.297048.297.85FalseNoneNoneFalseNoneFalse55329.07650
3389255119341NoneVol 1 111 9Formwork, Centering & Scaffloding 70% For Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4933.84933.87.85FalseNoneNoneFalseNoneFalse38730.330
3389256119341NoneVol 1 17 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Plinth beams & Curtain wall ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6526.086526.0818.76FalseNoneNoneFalseNoneFalse122429.26080
3389257119341NoneVol 1 111 2Formwork, Centering & Scaffloding 50% For Plinth Beams & Curtain wall ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3263.043263.0418.76FalseNoneNoneFalseNoneFalse61214.63040
3389258119341NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7048.297048.2913.28FalseNoneNoneFalseNoneFalse93601.29120
3389259119341NoneVol 1 112 14Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4228.974228.9713.28FalseNoneNoneFalseNoneFalse56160.72160
3389260119341NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7048.297048.2932.65FalseNoneNoneFalseNoneFalse230126.66850
3389261119341NoneVol 1 112 15Formwork, Centering & Scaffloding 50% For Roof Slab ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3524.143524.1432.65FalseNoneNoneFalseNoneFalse115063.1710
3389262119341NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7048.297048.291.35FalseNoneNoneFalseNoneFalse9515.19150
3389263119341NoneVol 1 112 14Formwork, Centering & Scaffloding 3% For Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum211.44211.441.35FalseNoneNoneFalseNoneFalse285.4440
3389264119341NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7048.297048.290.43FalseNoneNoneFalseNoneFalse3030.76470
3389265119341NoneVol 1 112 119Formwork, Centering & Scaffloding 45% For Chejja ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3171.733171.730.43FalseNoneNoneFalseNoneFalse1363.84390
3389266119341NoneVol 1 18 2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.t92140.7192140.7111.65FalseNoneNoneFalseNoneFalse1073439.27150
3389267119341NoneVol 2 9 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum6580.676580.675.9FalseNoneNoneFalseNoneFalse38825.9530
3389268119341NoneVol 2 44 8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1275.141275.1416.33FalseNoneNoneFalseNoneFalse20823.03620
3389269119341NoneVol 2 17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1349.31349.3186.06FalseNoneNoneFalseNoneFalse251050.7580
3389270119341NoneVol 2 100 12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum101779.45101779.450.45FalseNoneNoneFalseNoneFalse45800.75250
3389271119341NoneVol 2 105 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos1046.481046.484.0FalseNoneNoneFalseNoneFalse4185.920
3389272119341NoneVol 2 69 10.6.3Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each61.861.824.0FalseNoneNoneFalseNoneFalse1483.20
3389273119341NoneVol 2 105 12.57.3Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm3095.153095.1510.08FalseNoneNoneFalseNoneFalse31199.1120
3389274119341NoneVol 2 110 12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets grey colour having isolated drainage and reinforced with Galvanized Iron profile through out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T P s shall not be made) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm6936.026936.0218.0FalseNoneNoneFalseNoneFalse124848.360
3389275119341NoneVol 2 86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg188.49188.49378.0FalseNoneNoneFalseNoneFalse71249.220
3389276119341NoneVol 2 41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm248.23248.23232.97FalseNoneNoneFalseNoneFalse57830.14310
3389277119341NoneVol 2 50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm103.0103.0524.72FalseNoneNoneFalseNoneFalse54046.160
3389278119341NoneVol 2 42 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm382.13382.13335.48FalseNoneNoneFalseNoneFalse128196.97240
3389279119341NoneVol 2 59 9.2Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 litre per 50 kg of cement or as per direction of Engineer incharge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm824.0824.041.04FalseNoneNoneFalseNoneFalse33816.960
3389280119341NoneVOL 2 61 9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1210.251210.25160.7FalseNoneNoneFalseNoneFalse194487.1750
3389281119341NoneVol 2 63 9.24Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with whitecement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cherry Red, Brown, Cat Eye, Lakared, River Pink, Orissa Blue or equivalent. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm2147.552147.55101.94FalseNoneNoneFalseNoneFalse218921.2470
3389282119341NoneVol 2 85 11.28Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessoris such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg581.95581.95196.29FalseNoneNoneFalseNoneFalse114230.96550
3389283119341NoneVol 2 46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm162.74162.74524.87FalseNoneNoneFalseNoneFalse85417.34380
3389284119341NoneVol 2 46 8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm179.22179.22335.48FalseNoneNoneFalseNoneFalse60124.72560
3389285119341NoneVol 2 47 8.33.2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm143.17143.1718.0FalseNoneNoneFalseNoneFalse2577.060
17194904950000NoneNoneBuildingsDismantling193316.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3389286119342NoneV-2 ITM. NO.19.7.2 P.NO.187Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge.In lime mortar (V-2 /ITM. NO.19.7.2/P.NO.187) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum600.49600.49164.16FalseNoneNoneFalseNoneFalse98576.43840
3389287119342NoneV-2 ITM. NO.19.9.1 P.NO.187Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer in-charg.In lime mortar (V-2 /ITM. NO.19.9.1/P.NO.187) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum815.76815.7615.73FalseNoneNoneFalseNoneFalse12831.90480
3389288119342NoneV-2 ITM. NO. 19.12.1 P.NO.188Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking to the appropriate disposal area as per direction of Engineer in-charg Of area 3 m² and below (V-2 /ITM. NO. 19.12.1/P.NO.188) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum247.2247.211.68FalseNoneNoneFalseNoneFalse2887.2960
3389289119342NoneV-2 ITM. NO 19.3 P.NO.187Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material to the appropriate disposal area as per direction of Engineer-in-charge (V-2 /ITM. NO 19.3 /P.NO.187) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum2498.782498.7823.86FalseNoneNoneFalseNoneFalse59620.89080
3389290119342NoneV-2 ITM. NO. 19.27.1 P.NO.165Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material to the appropriate disposal area as per direction of Engineer-in-charge G.S. Sheet. (V-2 /ITM. NO. 19.27.1 /P.NO.165) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm112.27112.27172.8FalseNoneNoneFalseNoneFalse19400.2560
17194904950001NoneNoneBuildingsFist Floor2689324.44
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3389291119343NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7118.777118.777.85FalseNoneNoneFalseNoneFalse55882.34450
3389292119343NoneVol 1 112 15Formwork, Centering & Scaffloding 70% For Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4983.144983.147.85FalseNoneNoneFalseNoneFalse39117.6490
3389293119343NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7118.777118.7713.3FalseNoneNoneFalseNoneFalse94679.6410
3389294119343NoneVol 1 112 14Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4271.264271.2613.3FalseNoneNoneFalseNoneFalse56807.7580
3389295119343NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab & Staircase ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7118.777118.7731.73FalseNoneNoneFalseNoneFalse225878.57210
3389296119343NoneVol 1 112 15Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3559.383559.3831.73FalseNoneNoneFalseNoneFalse112939.12740
3389297119343NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7118.777118.771.35FalseNoneNoneFalseNoneFalse9610.33950
3389298119343NoneVol 1 112 14Formwork, Centering & Scaffloding 3% For Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum213.56213.561.35FalseNoneNoneFalseNoneFalse288.3060
3389299119343NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Chejja ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7118.777118.770.43FalseNoneNoneFalseNoneFalse3061.07110
3389300119343NoneVol 1 112 119Formwork, Centering & Scaffloding 45% For Chejja ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3203.443203.440.43FalseNoneNoneFalseNoneFalse1377.47920
3389301119343NoneVol 1 18 2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.t93062.1193062.117.24FalseNoneNoneFalseNoneFalse673769.67640
3389302119343NoneVol 2 44 8.16aProviding lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1287.891287.8916.33FalseNoneNoneFalseNoneFalse21031.24370
3389303119343NoneVol 2 17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1362.791362.79214.3FalseNoneNoneFalseNoneFalse292045.8970
3389304119343NoneVol 2 100 12.13.1Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum102797.24102797.240.45FalseNoneNoneFalseNoneFalse46258.7580
3389305119343NoneVol 2 105 12.51Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Nos1056.941056.944.0FalseNoneNoneFalseNoneFalse4227.760
3389306119343NoneVol 2 69 10.6.3Providing and fixing expansion hold fasteners on C.C. /R.C.C./Brick masonry surface backing including drilling necessary holes and the cost of bolt etc complete.Fastener with threaded dia 12 mm ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each62.4162.4124.0FalseNoneNoneFalseNoneFalse1497.840
3389307119343NoneVol 2 105 12.57.2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets ( core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification.-do- 30 mm thick both side commercial ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm3126.13126.110.08FalseNoneNoneFalseNoneFalse31511.0880
3389308119343NoneVol 2 110 12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm7005.387005.3818.0FalseNoneNoneFalseNoneFalse126096.840
3389309119343NoneVol 2 86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg190.37190.37378.0FalseNoneNoneFalseNoneFalse71959.860
3389310119343NoneVol 2 41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm250.71250.71232.97FalseNoneNoneFalseNoneFalse58407.90870
3389311119343NoneVol 2 50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm104.03104.03518.93FalseNoneNoneFalseNoneFalse53984.28790
3389312119343NoneVol 2 42 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm385.95385.95353.78FalseNoneNoneFalseNoneFalse136541.3910
3389313119343NoneVOL 2 61 9.17.2Providing and laying Vitrified tiles in different sizes (thickness to be specified by manufacturer), with water absorption less than 0.08 % and conforming to I.S. 15622, of approved make, in all colours & shade, over 12 mm thick bed of cement mortar 1:3 (1 cement: 3 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joint with white cement & matching pigments etc. complete. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1222.351222.35160.7FalseNoneNoneFalseNoneFalse196431.6450
3389314119343NoneVol 2 64 9.31Providing and laying Polished Sadarahalli Grey Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 20 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm2169.022169.0272.04FalseNoneNoneFalseNoneFalse156256.20080
3389315119343NoneVol 2 85 11.28Providing and fixing stainless steel (Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessoris such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg587.76587.76115.29FalseNoneNoneFalseNoneFalse67762.85040
3389316119343NoneVol 2 46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm164.3164.3518.93FalseNoneNoneFalseNoneFalse85260.1990
3389317119343NoneVol 2 46 8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm181.01181.01353.77FalseNoneNoneFalseNoneFalse64035.90770
3389318119343NoneVol 2 47 8.33.2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm144.6144.618.0FalseNoneNoneFalseNoneFalse2602.80
17194904950000NoneNoneBuildingsTerrace Floor627018.66
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3389319119344NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7189.267189.262.64FalseNoneNoneFalseNoneFalse18979.64640
3389320119344NoneVol 1 112 15Formwork, Centering & Scaffloding 70% For Columns ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum5032.485032.482.647FalseNoneNoneFalseNoneFalse13320.974560
3389321119344NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7189.267189.261.52FalseNoneNoneFalseNoneFalse10927.67520
3389322119344NoneVol 1 112 14Formwork, Centering & Scaffloding 60% For Beams & Lintel ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum4313.554313.551.52FalseNoneNoneFalseNoneFalse6556.5960
3389323119344NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Roof Slab & Staircase ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7189.267189.261.69FalseNoneNoneFalseNoneFalse12149.84940
3389324119344NoneVol 1 112 15Formwork, Centering & Scaffloding 50% For Roof Slab & Staircase ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum3594.633594.631.69FalseNoneNoneFalseNoneFalse6074.92470
3389325119344NoneVol 1 17 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum7189.267189.260.26FalseNoneNoneFalseNoneFalse1869.20760
3389326119344NoneVol 1 112 14Formwork, Centering & Scaffloding 3% For Sill ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Cum215.68215.680.26FalseNoneNoneFalseNoneFalse56.07680
3389327119344NoneVol 1 18 2.11(a)Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.t93983.5293983.520.83FalseNoneNoneFalseNoneFalse78006.32160
3389328119344NoneVol 2 17 6.32Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm1376.291376.2978.91FalseNoneNoneFalseNoneFalse108603.04390
3389329119344NoneVol 7 75 11.5.2Providing and fixing 1mm thick M.S. sheet door with frame of 40x40x6 mm angle iron and 3 mm M.S. gusset plates at the junctions and corners, all necessary fittings complete, including applying a priming coat of approved steel primer. Using flats 30x6mm for diagonal braces and central cross piece including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm4456.654456.652.52FalseNoneNoneFalseNoneFalse11230.7580
3389330119344NoneVol 2 110 12.9Providing & fixing of 3-track x 2-panel sliding windows made out of multi chambered UPVC(Matching to RAL 9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GI reinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size20mm x 24 mm. Windows shall be provided with 6mm plain float glass, standard hardware& Multi point locking system with touch lock. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm7074.747074.742.25FalseNoneNoneFalseNoneFalse15918.1650
3389331119344NoneVol 2 86 11.34BProviding and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings / wooden frames with rawl plugs screws etc. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Kg192.26192.2647.25FalseNoneNoneFalseNoneFalse9084.2850
3389332119344NoneVol 2 41 8.1.2Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm253.19253.1951.99FalseNoneNoneFalseNoneFalse13163.34810
3389333119344NoneVol 2 50 8.51Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm105.06105.0672.78FalseNoneNoneFalseNoneFalse7646.26680
3389334119344NoneVol 2 42 8.8Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Out side) ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm389.77389.77161.83FalseNoneNoneFalseNoneFalse63076.47910
3389335119344NoneVol 2 149 15.10Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. Thewaterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm858.34858.34219.95FalseNoneNoneFalseNoneFalse188791.8830
3389336119344NoneVol 2 46 8.33.1Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm165.99165.9972.7804FalseNoneNoneFalseNoneFalse12080.8185960
3389337119344NoneVol 2 46 8.3Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paer smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm182.8182.8161.82FalseNoneNoneFalseNoneFalse29580.6960
3389338119344NoneVol 2 47 8.33.2Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Sqm146.03146.032.25FalseNoneNoneFalseNoneFalse328.56750
3389339119344NoneVol 2 125 13.48Providing and fixing on wall face unplasticised Rigid PVC rain water pipes of 150mm dia conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Rmtr596.74596.7432.8FalseNoneNoneFalseNoneFalse19573.0720
17194904950000NoneNoneBuildingsElectrical Work282063.16
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3389340119345None1.1.1Supplying heavy gauge PVC conduit pipe . dia mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc, and fixing using inverted wood plugs in case of RCC ceiling and RCC wall/ stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. 19/20 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr71.0771.07250.0FalseNoneNoneFalseNoneFalse17767.50
3389341119345None1.1.225 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr83.4383.43148.0FalseNoneNoneFalseNoneFalse12347.640
3389342119345None1.3.1Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fishwire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr70.0470.04100.0FalseNoneNoneFalseNoneFalse7004.00
3389343119345None1.3.225 mm dia 2 mm thick ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr81.3781.3750.0FalseNoneNoneFalseNoneFalse4068.50
3389344119345None1.5.1Supplying and fixing PVC/metal conduit Deep junction box 19/20 mm deep Junction box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each50.4750.4735.0FalseNoneNoneFalseNoneFalse1766.450
3389345119345None1.5.225 mm deep Junction box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each57.6857.6825.0FalseNoneNoneFalseNoneFalse1442.00
3389346119345None2.2.1Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box Short point upto 3m from tapping point to out let via switch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point277.07277.0715.0FalseNoneNoneFalseNoneFalse4156.050
3389347119345None2.2.2Medium point above 3m upto 6m from tapping point to out let via switch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point390.37390.3723.0FalseNoneNoneFalseNoneFalse8978.510
3389348119345None2.2.3Long point above 6m upto 10m from tapping point to out let viawitch box ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Point571.65571.6530.0FalseNoneNoneFalseNoneFalse17149.50
3389349119345None2.3.2Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr26.7826.78430.0FalseNoneNoneFalseNoneFalse11515.40
3389350119345None2.3.32.5 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr43.2643.26520.0FalseNoneNoneFalseNoneFalse22495.20
3389351119345None2.3.44 mm2 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr64.8964.89183.0FalseNoneNoneFalseNoneFalse11874.870
3389352119345None3.4.2Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each163.77163.778.0FalseNoneNoneFalseNoneFalse1310.160
3389353119345None3.4.48 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each226.2226.28.0FalseNoneNoneFalseNoneFalse1809.60
3389354119345None3.4.510-12 Way ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each268.83268.8310.0FalseNoneNoneFalseNoneFalse2688.30
3389355119345None3.5.2Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with requirednos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.1 to 4 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each165.83165.838.0FalseNoneNoneFalseNoneFalse1326.640
3389356119345None3.5.48 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each241.02241.028.0FalseNoneNoneFalseNoneFalse1928.160
3389357119345None3.5.510-12 Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each292.52292.5210.0FalseNoneNoneFalseNoneFalse2925.20
3389358119345None3.6.2Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch 6A Two Way Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each105.06105.0680.0FalseNoneNoneFalseNoneFalse8404.80
3389359119345None3.6.36A Three Way socket ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each176.13176.1318.0FalseNoneNoneFalseNoneFalse3170.340
3389360119345None3.6.4Stepped Fan Regulator Two Module ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each367.71367.7120.0FalseNoneNoneFalseNoneFalse7354.20
3389361119345None3.6.106/16A Universal Socket ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each243.08243.082.0FalseNoneNoneFalseNoneFalse486.160
3389362119345None3.6.86A Bell Push ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each182.31182.3110.0FalseNoneNoneFalseNoneFalse1823.10
3389363119345None3.6.932A DP Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each335.78335.784.0FalseNoneNoneFalseNoneFalse1343.120
3389364119345None3.6.1132A DP Switch ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No160.08160.082.0FalseNoneNoneFalseNoneFalse320.160
3389365119345None3.6.12RJ45/I.O Outlet Cat-6 ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No347.11347.112.0FalseNoneNoneFalseNoneFalse694.220
3389366119345None1.13Supplying And Fixing Metal Fan Box with Round Hook. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each120.51120.5120.0FalseNoneNoneFalseNoneFalse2410.20
3389367119345None6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each3073.523073.5220.0FalseNoneNoneFalseNoneFalse61470.40
3389368119345None11.3.2Supplying of .feet PVC Batten with integrated LED tube .W with high quality diffuser with Life of 25000 burning hours & 70 lumen maintenance with CRI 80. Power Input: 220-240V@ 50/60Hz & Power factor 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each710.7710.728.0FalseNoneNoneFalseNoneFalse19899.60
3389369119345None11.5. 2Supply of round/square recess/surface mounted rolling type LED Down light with . W GU 10 LED Lamp Rib Fabricated from diecast aluminium with white powder coated prewired to mains connector & has swivelling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI 80. Power Input: 220-240V @50/60Hz & Power factor 0.9 along with CE approved. 2years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each911.55911.5512.0FalseNoneNoneFalseNoneFalse10938.60
3389370119345None11.8.3Supply of LED Streetlight luminaire with pressure die castluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complet luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency 1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001 2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect LED Streetlight 70W ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No6171.766171.761.0FalseNoneNoneFalseNoneFalse6171.760
3389371119345None5.30Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1421.41421.41.0FalseNoneNoneFalseNoneFalse1421.40
3389372119345None13.1.1Supplying and Fixing of.mm dia class A GI pipe bracket upto 2 ms long bent at suitable angle and fixing to this bracket 1x40/2x40 W fluorescent tube street light fitting of all capacities to GI or GI or rail or RCC pole / wall using suitable clA, bolts, and nuts and wiring using suitable capacity wires. Using 25mm dia G.I.Pipe ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each1007.341007.341.0FalseNoneNoneFalseNoneFalse1007.340
3389373119345None51.04Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No2237.162237.162.0FalseNoneNoneFalseNoneFalse4474.320
3389374119345None51.01GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long,3.2 mm thick with bolt, nut, GI Strips and washercomplete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No765.29765.292.0FalseNoneNoneFalseNoneFalse1530.580
3389375119345None51.02Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.No696.28696.281.0FalseNoneNoneFalseNoneFalse696.280
3389376119345None51.03Good Quality Salt for grounding purposes packed in 50 Kg gunny bag ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Bag319.3319.31.0FalseNoneNoneFalseNoneFalse319.30
3389377119345None13.11Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clA and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr324.45324.4520.0FalseNoneNoneFalseNoneFalse6489.00
3389378119345None13.12Extra length of GI pipe of class B 19mm dia for down rod. ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Mtr202.91202.9120.0FalseNoneNoneFalseNoneFalse4058.20
3389379119345None13.7.1Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA.On wall/ ceiling / Rafter / Girders ---- Including cost and conveyance of all materials, Labor, Hire charges of Machineries and Equipments with all lead and lifts, loading and unloading charges etc. Complete as directed as per specification and direction of Engineer IN charge of the work.Each125.66125.6640.0FalseNoneNoneFalseNoneFalse5026.40
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17194904950000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17194904950000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17194904950000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17194904950000NoneNoneELIGIBILITYThe tenderer should be a PWD registered Contractor - also Contractors should have Registration of GST, Employers Provident Fund and tenderer should submit Registration Certificate along with technical bid.None
17194904950000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labor welfare fund and Contractors should follow strictly prevailing rules of labor act.None
17194904950000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17194904950000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Government orders. The item rates quoted shall include cost of royalty charges on construction materials & other taxes as per the rates provided in prevailing cost & conveyance of all materials, Curing, Watering, unloading with all leads & lifts labor, hire charges of machinery equipment etc., complete including all incidental charges. All the items shall be executed as directed by the Engineer in charge of the work.None
17194904950001NoneNoneELIGIBILITYThe bidder shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. The tender fee is non-refundable and The employer is not responsible for any delay in accessing KPP portal.None
17194904950000NoneNoneELIGIBILITYOnly Original documents to be scanned and uploaded, Executive Engineer reserves the right verify the Original Documents before approval, 0riginal documents / Certificates for qualification shall be produced when called for during evaluation of tender.None
17194904950000NoneNoneELIGIBILITYThe Tenderer should maintain the Work during defective liability period as indicated in The Contract DataNone
17194904950000NoneNoneELIGIBILITYThe materials like bitumen, Steel, Cement etc., required for the work shall be procured by the tenderer themselves and should be got tested by the Quality Control Authority before use on the work.None
17194904950000NoneNoneELIGIBILITYTenderer shall obtain the Work done Certificate in the prescribed format from the Competent Authority not below the rank of Executive Engineer (District Level Officer) and scan the Original Certificate and attach the scanned file to the tender. The Original Certificate shall be produced at the time of opening of Technical Bids for physical verification, if sought.None
17194904950000NoneNoneELIGIBILITYAs per Government order FD 447 EXP-12 2022 dated 30/07/2022, 18% GST will be added to the Contract amount separately. And Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17194904950000NoneNoneELIGIBILITYEstimate rates are excluding GST as per Common SR 2023-24 and prevailing GST (18% of Amount Put to tender) amount is kept in form of Lump sum in sanctioned estimate according to guidelines in Common SR (GO:PWD 51 RDF 2019 Bangaluru Dt:18.03.2022). Therefore, amount put to Tender and ECV amount are excluding GST. KPPP-PORTAL format has No Options to add GST Separately at stage of Draft Tender Schedule Process for Over All amount put to Tender, tender has been inviting through an Option with INCLUSIVE. But the item wise rates do not include GST. Hence, GST will be paid separately for the quoted amount as per prevailing Government order.Since the rates are exclusive of GST. The contractors has to quote the rates without GST. Declaration Certificate must be attached mandatorily.None
17194904950000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
17194904950000NoneNoneELIGIBILITYIn case if the death of a contractor, after executing the agreement / commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work.None
17194904950000NoneNoneELIGIBILITYSecurity deposit for an amount equivalent to 5% of the contract price shall be deducted in every running bill. However, in case of first and final bill the entire security deposit will be deducted from the final bill.None
17194904950000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17194904950000NoneNoneELIGIBILITYItem for which no rates or price has been entered in will not be paid for by the Employer when executed & shall be deemed covered by the other rates & prices in the bill of quantities.None
17194904950000NoneNoneELIGIBILITYThe tender validity period is 90Days from the date of opening of TenderNone
17194904950001NoneNoneELIGIBILITYContractors has to upload the EPF Registration with MAY 2024 Challan Copy. Contractors has to submit their labour EPF details with every Running BillNone
17194904950000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document.None
17194904950000NoneNoneELIGIBILITYTHE WORK COMPLETION PERIOD IS 9 MONTHS(including monsoon)None
17194904950000NoneNoneELIGIBILITYEMD FOR RS. 93,810/-SHALL BE PAID THROUGH KARNATAKA PUBLIC PROCUREMENT PORTAL (KPPP).None
17194904950000NoneNoneELIGIBILITYThe contractor belonging to Scheduled Tribe should upload Caste Certificate issued by Competent Authority.None
17194904950000NoneNoneELIGIBILITYThe contractor belonging to Scheduled Tribe shall be domicile of the State of Karnataka for more than 10 years (Should upload Certificate issued by Competent Authority).None
17195700150000NoneNoneELIGIBILITYShould be a KPWD Class III and above Registered contractorNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMandating satisfactorily completed as prime contractor, for at least ANY construction work for a value not less than Rs.23.45 Lakhs (2019-2020 to 2023-2024)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneexisting commitments and on-going works to be completed during the next NINE months in the prescribed format from the Competent Authority not below the rank of Executive Engineer/District Level OfficerPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneexecuted in any one financial year(FROM 2019-20 TO 2023-24) the following minimum quantities of work(1) Earthwork Excavation/ Embankment:378.00Cum(2) PCC/RCC: 172.00Cum (3)TMT Steel:15.77tonnes(4) Solid Concrete Blocks/BBM : 383.00 Sqm (5) Plastering: 1095.00Sqm (6)Flooring (Ceramic/Vitrified/Granite) : 396.00 SqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneKPWD Class III and above RegistrationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneThe contractor belonging to Scheduled Tribes should upload Caste Certificate issued by Competent Authority.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- caste certificate
NoneNoneNoneNoneThe contractor belonging to Scheduled Tribes shall be domicile of the State of Karnataka for more than 10 years. Should upload Certificate issued by Competent Authority.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- domicile certificate
NoneNoneNoneNoneTenderers , will only be qualified, if their available tender capacity is more than the total tender value of Rs.93.81Lakhs i.e. AXNX5 - B as per KW-3 Document. computing the value of A and B for the last five years i.e.,2019-2020 to 2023-2024Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneAchieved in at least ONE financial years (2019-2020 to 2023-2024) a minimum financial turnover (in all classes of civil engineering construction works only) of Rs 93.81 Lakhs, Balance sheets audited by competent authority.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs 28.14 Lakhs in the format to be as prescribed in bid docFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Achieved in at least ONE financial years 2019-2020 to 2023-2024, a minimum financial turnover,in all classes of civil engineering construction works only of Rs 93.81 Lakhs, Balance sheets Audited by competent authorityTrueTechnical Bid
KPWD Class III and above Registration copyTrueTechnical Bid
The contractor belonging to Scheduled Tribes should upload Caste Certificate issued by Competent Authority.TrueTechnical Bid
Mandating satisfactorily completed as prime contractor, for at least ANY construction work for a value not less than Rs.23.45 Lakhs ,2019-2020 to 2023-2024TrueTechnical Bid
The contractor belonging to Scheduled Tribes shall be domicile of the State of Karnataka for more than 10 years. Should upload Certificate issued by Competent Authority.TrueTechnical Bid
Liquid assets and /or availability of credit facilities of no less than Rs 28.14 Lakhs in the format to be as prescribed in bid docTrueTechnical Bid
existing commitments and on-going works to be completed during the next NINE months in the prescribed format from the Competent Authority not below the rank of Executive Engineer/District Level OfficerTrueTechnical Bid
Name, address, and telephone, telex, and fax numbers of the Tenderers may provide references if contacted by the EmployerTrueTechnical Bid
Contractors has to upload the EPF Registration with Challan MAY 2024.TrueTechnical Bid
Executed in any one Financial Year, the minimum quantities of work as prescribed in Bid document from 2019-2020 to 2023-2024TrueTechnical Bid
Contractor has to upload GST Declaration Certificate in the given prescribed format.TrueTechnical Bid