createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719481959707
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd177000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose05-07-2024 17:00:00
tenderQueryClose30-06-2024 17:00:00
technicalBidOpenNone
publishedDate28-06-2024 13:28:10
publishedByPostRDPR_EE_DIV_CMJ
publishedByUserKPE11778 - MADHUSUDAN A N
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonEE OFFICE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08226223019
mobileNumber8226223019
tenderSupplierListNone
tenderSchedule
createdTs1719481959747
version4
createdDateNone
modifiedDateNone
tenderNumberRDPR/2024-25/DA/WORK_INDENT6441
titleConstruction of Check Dam-1 to Nijagundi halla near Kannegala PVTGs Haadi at Kannegala village in Gundlupete Taluk Chamarajanagara Dist
descriptionCheck Dam
categoryWORKS
categoryTextWorks
ecv704709.05
deptNameRural Development and Panchayat Raj Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location837
locationNameRDPR Division Office Chamarajanagara
provisionalAmount705000.0
groupOverheadTotal107497.99
fileNumber20240615
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17194819600000NoneNoneDam and Allied worksConstruction of Check Dam-1 to Nijagundi halla near Kannegala PVTGs Haadi at Kannegala village in Gundlupete Taluk Chamarajanagara Dist597211.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3382473119145NoneVol 3 P.No 9 SL.No 2.4 I AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.100 Sqm1122.01122.04.664FalseNoneNoneFalseNoneFalse5233.0080
3382474119145NoneVol 1 P.No 8 SL.No 1.14.1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including Cost of labour, tools, usage of machinery & other appurtenances required to complete the work.Cum102.0102.077.47FalseNoneNoneFalseNoneFalse7901.940
3382475119145NoneVol 1 P.No 15 SL.No 2.1.2Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5664.05664.012.66FalseNoneNoneFalseNoneFalse71706.240
3382476119145NoneVol 2 P.No 9 SL.No 5.3Providing Coursed rubble masonry (Second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6205.06205.037.39FalseNoneNoneFalseNoneFalse232004.950
3382477119145NoneVol 2 P.No 9 SL.No 5.2Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum6618.06618.019.19FalseNoneNoneFalseNoneFalse126999.420
3382478119145NoneVol 2 P.No 16 SL.No 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Cum10608.010608.05.29FalseNoneNoneFalseNoneFalse56116.320
3382479119145NoneVol 2 P.No 214 SL.No 21.10Providing ruled pointing to coursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost all materials, labour, usage charges of machinery, curing complete as per specification.Sqm299.0299.076.7FalseNoneNoneFalseNoneFalse22933.30
3382480119145NoneVol 1 P.No 7 SL.No 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum266.0266.054.23FalseNoneNoneFalseNoneFalse14425.180
3382481119145NoneVol 2 P.No 14 SL.No 6.33Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. Boulder Laid Dry Without Wire CratesCum1912.01912.027.14FalseNoneNoneFalseNoneFalse51891.680
3382482119145NoneVol 4 P.No 140 SL.No 3.12De-silting of Feeder Channel or Canal in dry condition by excavating the deposited bed material and loading the same to transport vehicle ( excluding cost of transportation ) including cost of all machinery, labour & all necessary works as directed and complete as per specification.Cum54.054.0148.13FalseNoneNoneFalseNoneFalse7999.020
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17194819600000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17194819600000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17194819600000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17194819600000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17194819600000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17194819600000NoneNoneELIGIBILITYDepartment Registration DetailsNone
17194819600000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17194819600000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17194819600000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17194819600000NoneNoneELIGIBILITYBanker DetailsNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
The tenderer in its name should have in the last 5 years 2018-19 to 2022-23, must have achieved in atlest two financeal year an Average annual fincial turnover not less than the Amount put to tender as per clause 3.2a KW1TrueTechnical Bid
Bid capacity as per clause 3.6 KW1TrueTechnical Bid
The work done certificate as per clause 3.2b KW1, the contractor should satisfcatorly completed in any one of the last 5 financel year as prime contractor at least one similar nature of work value not less than 50 of cost of the workTrueTechnical Bid
PWD Contractor Regstration CertificatesTrueTechnical Bid
PAN and GSTTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone