createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719664861023
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeONE_COVER
evaluationTypeTextOne Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd5675.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose09-07-2024 16:00:00
tenderQueryClose30-06-2024 16:13:58
technicalBidOpenNone
publishedDate29-06-2024 18:16:39
publishedByPostDMA_EE1_CC_HD
publishedByUserKPE11812 - VITTAL M TUBAKE
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonVittal M Tubake
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08362213834
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719664861053
version4
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT19225
titleConstruction of CD at EWS 3rd cross at Navnagar in Ward No-27
descriptionConstruction of CD at EWS 3rd cross at Navnagar in Ward No-27
categoryWORKS
categoryTextWorks
ecv227000.00
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2170
locationNameDMA City Corporation Hubballi-Dharawada
provisionalAmount227000.0
groupOverheadTotal35929.06
fileNumber226274
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17196648610000NoneNoneOther WorksConstruction of CD at EWS 3rd cross at Navnagar in Ward No-27191070.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3417973120969NonePg.No. 6 Item.No.1.5.2 Volume 1Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. Depth exceeding 1.5m, but not exceeding 3 mCum358.05358.0558.36FalseNoneNoneFalseNoneFalse20895.7980
3417974120969NonePg.No.15Item.No. 2.1.3 Volume 1(revised on 20-1Providing and laying in position plain cement concrete for levellingcourse for all works in foundation. The granite/trap/basalt crushedgraded coarse aggregates and fine aggregates as per relevant ISCodes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost ofall materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as pertechnical specifications. (The cost of steel reinforcement & formworkshall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregatesCum5720.45720.42.44FalseNoneNoneFalseNoneFalse13957.7760
3417975120969NonePg.No.15 Item.No.2.2.1.1 Volume 1( 20-10-23)Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)Cum6078.456078.4512.3FalseNoneNoneFalseNoneFalse74764.9350
3417976120969NonePg.No.71 Item.No.9.3 Volume 3(revised on 20-10-23Supplying, Fixing & Placing TMT Fe 550 Reinforcement in Foundation/ Substructure/ Superstructure complete as per Drawing and Technical SpecificationsTonne82052.2582052.250.807FalseNoneNoneFalseNoneFalse66216.165750
3417977120969NoneCorrigendum 3 Sl No. 1AAppendix I-Additionalities for Formwork, Centering & Scaffolding cement concrete drains .Finished rate of concrete per m3 35%Cum2127.462127.466.24FalseNoneNoneFalseNoneFalse13275.35040
3417978120969NonePg.No.15 Item.No.3.1 Volume 3Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of workCum33.633.658.36FalseNoneNoneFalseNoneFalse1960.8960
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17196648620000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17196648620000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17196648620001NoneNoneELIGIBILITYValid contractor Registration Certificate issued from competent authority in appropriate contractor classNone
17196648620000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17196648620000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17196648620001NoneNoneELIGIBILITYFinancial Turnover Certificate obtained and certified by the Registered Valid Chartered Accountant indicating the Registration no of Chartered Accountant with UDIN number details along with profit and loss statement tallying the annual Turnover statement tallying the annual TurnoverNone
17196648620000NoneNoneELIGIBILITYTotal value of civl engineering works executed and payments received in the last five years (year-wise)None
17196648620000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17196648620000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17196648620001NoneNoneELIGIBILITYWork done certificate for the work performed as prime contractor (in the same name) on works of Similar Nature over during the five years specified (Similar Nature of work done certificate i.e, 50% of amount put to tender)None
17196649230000NoneNoneELIGIBILITYUnconditional Line of credit i.e, 30% of amount put to tender obtained from Nationalised/Scheduled Banks in Given Pro-forma in the bid documentNone
17196649330000NoneNoneELIGIBILITYValid PAN Card and Valid GST Registration certificatesNone
17196649430000NoneNoneELIGIBILITYAll conditions As per kw1None
17196649550000NoneNoneELIGIBILITYContractor Contact phone number , address and e-mail id are mandatoryNone
preQualCriterionListNone
technicalCriterionListNone
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Line of CreditTrueTechnical Bid
Similar nature of work done certificateTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone