createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719467901072
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1400.00
emd139751.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose22-07-2024 17:00:00
tenderQueryClose22-07-2024 16:30:00
technicalBidOpen24-07-2024 11:00:00
publishedDate29-06-2024 16:55:13
publishedByPostTMC_CO_MGK
publishedByUserKPE14651 - UDAYAKUMAR S GHATAKAMBLE
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonS R Chougala
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08331252229
mobileNumber9449908775
tenderSupplierListNone
tenderSchedule
createdTs1719467901075
version12
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT14736/CALL-2
titleConstruction and Development Of Compound Wall Near RTC No 738 SWM Land fill Site Under TMC Limit
descriptionConstruction and Development Of Compound Wall Near RTC No 738 SWM Land fill Site Under TMC Limit
categoryWORKS
categoryTextWorks
ecv5590050.92
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2497
locationNameDMA Town Municipal Council Mugalkhod
provisionalAmount6600000.0
groupOverheadTotalNone
fileNumber2023-24/15th/finance/01
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17194679010001NoneNoneOther WorksConstruction and Development Of Compound Wall Near RTC No 738 SWM Land fill Site Under TMC Limit5590050.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3373953118786Nonecode01Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. PWD SR Vol 1, P No 6, I No 1.5.1Cum313.95313.95543.5774FalseNoneNoneFalseNoneFalse170656.124730
3373954118786Nonecode02Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. PWD SR Vol 1 P No 15 I No 2.1.3Cum6288.456288.4534.0415FalseNoneNoneFalseNoneFalse214068.2706750
3373955118786Nonecode03Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD SR, Vol.1, 2023-24, Item no. 2.4.3, Page No.16)Cum9820.89820.895.8386FalseNoneNoneFalseNoneFalse941211.722880
3373956118786Nonecode04Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (PWD Vol-1 SR 2023-24, Item No. 2.11a, Page No. 18)Kg93929.8593929.856.9003FalseNoneNoneFalseNoneFalse648144.1439550
3373957118786Nonecode05Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. (PWD Vol-02 SR 2023-24, Item no. 6.7, Page No.13)Cum8621.558621.55268.18FalseNoneNoneFalseNoneFalse2312127.2790
3373958118786Nonecode06Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates. PWD SR Vol 1 P No 15 I No 2.1.3Cum6288.456288.4513.409FalseNoneNoneFalseNoneFalse84321.826050
3373959118786Nonecode07Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:3 (1 cement: 3 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (PWD SR Vol-02, 2023-24, Item no. 8.4.1, Page No.41)Sqm339.15339.151440.6FalseNoneNoneFalseNoneFalse488579.490
3373960118786Nonecode08Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 L/10 m² over and including one coat of Special primer applied @ 0.75 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (The gloss should be 50% @ 60 degree angle with 10 years life) (PWD SR Vol-02, 2023-24, Item no. 8.33.1, Page No.46)Sqm165.9165.92448.6FalseNoneNoneFalseNoneFalse406222.740
3373961118786Nonecode09Fencing with G.I. barbed wire Angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used.(PWD SR Vol-02, 2023-24, Item no. 11.57, Page No.95)Sqm18.918.94664.0FalseNoneNoneFalseNoneFalse88149.60
3373962118786Nonecode10Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.(PWD SR Vol-02, 2023-24, Item no. 11.57.2, Page No.95)Sqm118.65118.651696.5FalseNoneNoneFalseNoneFalse201289.7250
3373963118786Nonecode11Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding(PWD SR Vol-02, 2023-24, Item no. 11.34 A, Page No.86)Kg176.4176.4200.0FalseNoneNoneFalseNoneFalse35280.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17194679010000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17194679010000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17194679010000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneadditionOthers80%Work Done
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Similar Work Done
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Contractor Registration CertificateTrueTechnical Bid
Line of Credit CertificateTrueTechnical Bid
GST CertificateTrueTechnical Bid
80Percentage similar work DoneTrueTechnical Bid
Adress and Contect NoTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone