createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719643757226
version2
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee500.00
emd23987.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose14-07-2024 17:00:00
tenderQueryClose12-07-2024 17:30:00
technicalBidOpen15-07-2024 17:30:00
publishedDate29-06-2024 16:45:24
publishedByPostPWD_EE_DIV_TUM
publishedByUserKPE13534 - HEMALATHA R
bidValidityPeriod90
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonHemalatha R
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedNone
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08162272479
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719643757257
version5
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT11192
titleConstruction of Anganavadi at Mudigerepalya Village, Galigenahalli GP in Tumkur Taluk
descriptionConstruction of Anganavadi at Mudigerepalya Village, Galigenahalli GP in Tumkur Taluk
categoryWORKS
categoryTextWorks
ecv959481.86
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1670
locationNamePWD Division Office Tumkuru
provisionalAmount1000000.0
groupOverheadTotalNone
fileNumberAEE/PWD/TMK/SD/Building-3/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17196437570000NoneNoneBuildingsConstruction of Anganavadi at Mudigerepalya Village, Galigenahalli GP in Tumkur Taluk959481.86
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3407876120373NoneVol.1 Pg No. 8 Item No. 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum112.1112.169.68FalseNoneNoneFalseNoneFalse7811.1280
3407877120373NoneVol.1 Pg No. 8 Item No. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum120.36120.3639.15FalseNoneNoneFalseNoneFalse4712.0940
3407878120373NoneVol.1 Pg No. 15 Item No. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7067.027067.0210.54FalseNoneNoneFalseNoneFalse74486.39080
3407879120373NoneVol. 2 Pg No. 9 Item No. 5.4Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7539.027539.0241.74FalseNoneNoneFalseNoneFalse314678.69480
3407880120373NoneVol. 1 Pg No. 16 Item No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7461.147461.146.78FalseNoneNoneFalseNoneFalse50586.52920
3407881120373NoneVol. 1 Pg No. 111 Sl. No. 1, 2 & 9Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum596.89596.891.44FalseNoneNoneFalseNoneFalse859.52160
3407882120373NoneVol. 1 Pg No. 111 Sl. No. 1, 2 & 9Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum5222.85222.80.36FalseNoneNoneFalseNoneFalse1880.2080
3407883120373NoneVol. 1 Pg No. 111 Sl. No. 1, 2 & 9Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3730.573730.574.97FalseNoneNoneFalseNoneFalse18540.93290
3407884120373NoneVol. 1 Pg No. 16 Item No. 2.5.1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum7823.47823.47.27FalseNoneNoneFalseNoneFalse56876.1180
3407885120373NoneVol. 1 Pg No. 111 Sl. No. 9, 14 & 15Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum5476.385476.380.68FalseNoneNoneFalseNoneFalse3723.93840
3407886120373NoneVol. 1 Pg No. 111 Sl. No. 9, 14 & 15Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3520.533520.530.72FalseNoneNoneFalseNoneFalse2534.78160
3407887120373NoneVol. 1 Pg No. 111 Sl. No. 9, 14 & 15Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum4694.044694.043.37FalseNoneNoneFalseNoneFalse15818.91480
3407888120373NoneVol. 1 Pg No. 111 Sl. No. 9, 14 & 15Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding 2. Plinth Beams of Buildings, Percentage on finished rate of concrete per Cum ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum3911.73911.72.51FalseNoneNoneFalseNoneFalse9818.3670
3407889120373NoneVol. 1 Pg No. 18 Sl. No. 2.11aSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Buildings ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Tonne105559.26105559.261.45FalseNoneNoneFalseNoneFalse153060.9270
3407890120373NoneVol. 2 Pg No. 14 Item No. 6.8Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Cum9403.429403.4224.09FalseNoneNoneFalseNoneFalse226528.38780
3407891120373NoneVol. 2 Pg No. 14 Item No. 6.15Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work.Sqm1218.941218.9414.41FalseNoneNoneFalseNoneFalse17564.92540
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17196437660000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17196437660000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17196437660001NoneNoneELIGIBILITYTotal value of civil engineering works executed and payments received in the last five years (year-wise)None
17196437660000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17196437660000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17196438500000NoneNoneELIGIBILITYList of existing commitments and ongoing workNone
17196438630000NoneNoneELIGIBILITYList of works for which tenders already submittedNone
17196438800000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPPP portal due to internet connectivity issues and technical glitches at bidders end.None
17196438950000NoneNoneELIGIBILITYConditional tenders will not be accepted .None
17196439240000NoneNoneELIGIBILITY1.The tenderer should submit proposed methodology and programme of construction backed with equipment and material planning, & deployment duly supported with broad calculation and quality management , plan, proposed to be adopted justifying their capability of execution and completion of the work as per technical specifications and within the stipulated period of completion. 2. The tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs. 3. The cost of the Tender form shall not be refundable.4. 0riginal documents / Certificates for pre qualification shall be produced at the time of opening of bid. 5.Royalty on construction materials and other taxes will be deducted as per prevailing Govt orders. 6.As per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund. 7.Tenderer should follow strictly prevailing rules of labour act .8. If the successful tenderers quoted rates are below the CSR of the work for which tenders are invited, the tenderer should submit difference amount in the form of cash / Bankers cheque / D.D./ Pay order / B.G. / Small Savings instruments pledged to Executive Engineer, PWP&IWTD Division, Tumkur, at the time of agreement. If he / she failed to submit the difference amount (un balanced amount) at time of agreement, action will be taken as per the departmental procedure.None
17196439380000NoneNoneELIGIBILITY1.The employer reserves the rights to reject one or all Tenders without assigning any reasons.2. All the formats prescribes in the bid document shall be filled by the Tenderer in complete manner other wise it will be rejected. 3.The intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Bid document KW-1. 4. In case if the death of a contractor, after executing the agreement / commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work. 5.The contractors assessed tender capacity will be calculated asper the clauses of Standard document attached. 6. Further particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, PWP&IWTD, Division, Tumkur during office hours on all working days.7. Department will not supply any materials.None
17196439520000NoneNoneELIGIBILITY1.Increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time. 2. MSME and NSIC Certificates are not valid as EMD payment as per GO.295/2019/ Dt. 26-03-2019.None
17196439640000NoneNoneELIGIBILITY1.The contractor should maintain the work for the period of One year after the completion of the work at his own cost. 2.All the terms in the tender include all lead lift, loading, unloading, transportation, labour, hire chares of machinery , curing for concrete works.None
17196440020000NoneNoneELIGIBILITY1.Bidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document and Domicile Certificate. 2.Contractors PWD Registred Class IV and Above can participate in this Tender. 3. The Turnover certificate should be obtained from the Chartered Accountant having UDIN number, if failed to satisfy the condition the tender will be RejectedNone
17196440200000NoneNoneELIGIBILITYThe rates and amount put to tender are inclusive of GST, Hence GST will not be paid separately over the quoted amount.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneDepartment Registration DetailsNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing workNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker DetailsNoneNone
NoneNoneNoneNoneb)satisfactorily completed(at least 50% of the contract value), as prime contractor, at least one similar nature of work value not less than Rs. 4.795 Lakhs (usually not less than 0.50% estimated value of contract)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateFalseTechnical Bid
Company Registration CertificateFalseTechnical Bid
Reserved Category CertificateFalseTechnical Bid
Small Scale Industries CertificateFalseTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone