tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1719577441000 | 1 | None | None | Buildings | Construction of Tigala Samudayabhavana at Honnudike Village Honnudike GP Gulur Hobli, Tumkur Taluk FIRST FLOOR | 195167.94 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3403821 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 251.47 | 251.47 | 83.66 | False | None | None | False | None | False | 21037.9802 | 0 | 3403822 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions ofEngineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 287.22 | 287.22 | 201.72 | False | None | None | False | None | False | 57938.0184 | 0 | 3403823 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required s mooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 351.58 | 351.58 | 35.41 | False | None | None | False | None | False | 12449.4478 | 0 | 3403824 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.86 I No.11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Kg | 218.1 | 218.1 | 160.02 | False | None | None | False | None | False | 34900.362 | 0 | 3403825 | 120172 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 489.83 | 489.83 | 35.0 | False | None | None | False | None | False | 17144.05 | 0 | 3403826 | 120172 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.9 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 736.53 | 736.53 | 10.0 | False | None | None | False | None | False | 7365.3 | 0 | 3403827 | 120172 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 50mm dia., 6 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 120.37 | 120.37 | 10.0 | False | None | None | False | None | False | 1203.7 | 0 | 3403828 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.25 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 568.49 | 568.49 | 25.0 | False | None | None | False | None | False | 14212.25 | 0 | 3403829 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.32 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 663.83 | 663.83 | 15.0 | False | None | None | False | None | False | 9957.45 | 0 | 3403830 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.23 I No.7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 2403.86 | 2403.86 | 2.25 | False | None | None | False | None | False | 5408.685 | 0 | 3403831 | 120172 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.20 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 451.69 | 451.69 | 30.0 | False | None | None | False | None | False | 13550.7 | 0 |
| 1719577441000 | 1 | None | None | Buildings | SECOND FLOOR | 1148993.17 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3403832 | 120173 | None | PWD SR 2023-24 VOLUME-1, P.16 I No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. Thecost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 8236.23 | 8236.23 | 33.89 | False | None | None | False | None | False | 279125.8347 | 0 | 3403833 | 120173 | None | PWD SR 2023-24 Volume-1, P.No. 111, Sl.No. 9 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 5765.36 | 5765.36 | 3.67 | False | None | None | False | None | False | 21158.8712 | 0 | 3403834 | 120173 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 14 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4941.74 | 4941.74 | 10.72 | False | None | None | False | None | False | 52975.4528 | 0 | 3403835 | 120173 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 16 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4118.12 | 4118.12 | 16.43 | False | None | None | False | None | False | 67660.7116 | 0 | 3403836 | 120173 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 16 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4118.12 | 4118.12 | 3.06 | False | None | None | False | None | False | 12601.4472 | 0 | 3403837 | 120173 | None | PWD SR 2023-24 VOLUME-1, P. 18 I No. 2.11 A | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Tonne | 107670.45 | 107670.45 | 3.03 | False | None | None | False | None | False | 326241.4635 | 0 | 3403838 | 120173 | None | PWD SR 2023-24 VOLUME-2, P. 17 I No. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 1576.72 | 1576.72 | 69.99 | False | None | None | False | None | False | 110354.6328 | 0 | 3403839 | 120173 | None | PWD SR 2023-24 VOLUME-2, P. 149 I No. 15.1 | Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofingmembrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 983.34 | 983.34 | 70.8 | False | None | None | False | None | False | 69620.472 | 0 | 3403840 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 253.96 | 253.96 | 109.77 | False | None | None | False | None | False | 27877.1892 | 0 | 3403841 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions ofEngineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 290.07 | 290.07 | 183.42 | False | None | None | False | None | False | 53204.6394 | 0 | 3403842 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required s mooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 355.06 | 355.06 | 35.41 | False | None | None | False | None | False | 12572.6746 | 0 | 3403843 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.86 I No.11.34B220.26 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Kg | 220.26 | 220.26 | 160.02 | False | None | None | False | None | False | 35246.0052 | 0 | 3403844 | 120173 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 494.68 | 494.68 | 35.0 | False | None | None | False | None | False | 17313.8 | 0 | 3403845 | 120173 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.9 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 743.82 | 743.82 | 10.0 | False | None | None | False | None | False | 7438.2 | 0 | 3403846 | 120173 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 50mm dia., 6 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 121.56 | 121.56 | 10.0 | False | None | None | False | None | False | 1215.6 | 0 | 3403847 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.25 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 574.12 | 574.12 | 25.0 | False | None | None | False | None | False | 14353.0 | 0 | 3403848 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.32 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 670.41 | 670.41 | 15.0 | False | None | None | False | None | False | 10056.15 | 0 | 3403849 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.23 I No.7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 2427.66 | 2427.66 | 2.25 | False | None | None | False | None | False | 5462.235 | 0 | 3403850 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.20 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 456.16 | 456.16 | 30.0 | False | None | None | False | None | False | 13684.8 | 0 | 3403851 | 120173 | None | PWD SR 2023-24 VOLUME-II, P.123 I No.13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | l | 10.83 | 10.83 | 1000.0 | False | None | None | False | None | False | 10830.0 | 0 |
| 1719639763000 | 0 | None | None | Buildings | Construction of Tigala Samudayabhavana at Honnudike Village Honnudike GP Gulur Hobli, Tumkur Taluk | 1344161.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3406671 | 120299 | None | PWD SR 2023-24 VOLUME-1, P.16 I No. 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite /trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. Thecost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 8236.23 | 8236.23 | 33.89 | False | None | None | False | None | False | 279125.8347 | 0 | 3406660 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 251.47 | 251.47 | 83.66 | False | None | None | False | None | False | 21037.9802 | 0 | 3406672 | 120299 | None | PWD SR 2023-24 Volume-1, P.No. 111, Sl.No. 9 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 5765.36 | 5765.36 | 3.67 | False | None | None | False | None | False | 21158.8712 | 0 | 3406661 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions ofEngineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 287.22 | 287.22 | 201.72 | False | None | None | False | None | False | 57938.0184 | 0 | 3406662 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required s mooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 351.58 | 351.58 | 35.41 | False | None | None | False | None | False | 12449.4478 | 0 | 3406673 | 120299 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 14 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4941.74 | 4941.74 | 10.72 | False | None | None | False | None | False | 52975.4528 | 0 | 3406663 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.86 I No.11.34B | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Kg | 218.1 | 218.1 | 160.02 | False | None | None | False | None | False | 34900.362 | 0 | 3406674 | 120299 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 16 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4118.12 | 4118.12 | 16.43 | False | None | None | False | None | False | 67660.7116 | 0 | 3406675 | 120299 | None | PWD SR 2023-24 Volume-1, P.No. 112, Sl.No. 16 | Addendum I Percentage Additionalities for Formwork, Centering & Scaffolding ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 4118.12 | 4118.12 | 3.06 | False | None | None | False | None | False | 12601.4472 | 0 | 3406664 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 489.83 | 489.83 | 35.0 | False | None | None | False | None | False | 17144.05 | 0 | 3406665 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.9 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 736.53 | 736.53 | 10.0 | False | None | None | False | None | False | 7365.3 | 0 | 3406676 | 120299 | None | PWD SR 2023-24 VOLUME-1, P. 18 I No. 2.11 A | Steel Fabrication
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. a. Buildings. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Tonne | 107670.45 | 107670.45 | 3.03 | False | None | None | False | None | False | 326241.4635 | 0 | 3406677 | 120299 | None | PWD SR 2023-24 VOLUME-2, P. 17 I No. 6.32 | Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 1576.72 | 1576.72 | 69.99 | False | None | None | False | None | False | 110354.6328 | 0 | 3406666 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 50mm dia., 6 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 120.37 | 120.37 | 10.0 | False | None | None | False | None | False | 1203.7 | 0 | 3406678 | 120299 | None | PWD SR 2023-24 VOLUME-2, P. 149 I No. 15.1 | Polyurethane based Single Component for New Surface Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofingmembrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 983.34 | 983.34 | 70.8 | False | None | None | False | None | False | 69620.472 | 0 | 3406667 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.25 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 568.49 | 568.49 | 25.0 | False | None | None | False | None | False | 14212.25 | 0 | 3406668 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.32 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 663.83 | 663.83 | 15.0 | False | None | None | False | None | False | 9957.45 | 0 | 3406679 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.10 | Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 253.96 | 253.96 | 109.77 | False | None | None | False | None | False | 27877.1892 | 0 | 3406669 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.23 I No.7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 2403.86 | 2403.86 | 2.25 | False | None | None | False | None | False | 5408.685 | 0 | 3406680 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.41 I No.8.1.2 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions ofEngineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 290.07 | 290.07 | 183.42 | False | None | None | False | None | False | 53204.6394 | 0 | 3406681 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.43 I No.8.2.1 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required s mooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Sqm | 355.06 | 355.06 | 35.41 | False | None | None | False | None | False | 12572.6746 | 0 | 3406670 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.20 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 451.69 | 451.69 | 30.0 | False | None | None | False | None | False | 13550.7 | 0 | 3406682 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.86 I No.11.34B220.26 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Kg | 220.26 | 220.26 | 160.02 | False | None | None | False | None | False | 35246.0052 | 0 | 3406683 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.7 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 494.68 | 494.68 | 35.0 | False | None | None | False | None | False | 17313.8 | 0 | 3406684 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.9 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 160mm dia., 6 kg/sqcm & class 3 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 743.82 | 743.82 | 10.0 | False | None | None | False | None | False | 7438.2 | 0 | 3406685 | 120299 | None | PWD SR 2023-24 VOLUME-V, P.113 I No.10.1.3 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and onveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both estinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of pecials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For PVC pipes 50mm dia., 6 kg/sqcm & class 5 ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 121.56 | 121.56 | 10.0 | False | None | None | False | None | False | 1215.6 | 0 | 3406686 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.25 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 574.12 | 574.12 | 25.0 | False | None | None | False | None | False | 14353.0 | 0 | 3406687 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.32 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 670.41 | 670.41 | 15.0 | False | None | None | False | None | False | 10056.15 | 0 | 3406688 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.23 I No.7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | Cum | 2427.66 | 2427.66 | 2.25 | False | None | None | False | None | False | 5462.235 | 0 | 3406689 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.122 I No.13.32.2 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, i/c fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and the cost of cutting chases and making good the same including testing of joints complete as per direction of Engineer in Charge. Concealed work, including cutting chases and making good the walls etc.20 mm nominal dia pipes ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | m | 456.16 | 456.16 | 30.0 | False | None | None | False | None | False | 13684.8 | 0 | 3406690 | 120299 | None | PWD SR 2023-24 VOLUME-II, P.123 I No.13.34 | Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- Item including cost and conveyance of all materials, lead and lift charges loading and unloading charges labour charges all incidental charges hire charges of all machinery and equipment required for successful completion of work etc., complete. The work shall be executed as per standard technical specification and directions of Engineer in charge of the work. | l | 10.83 | 10.83 | 1000.0 | False | None | None | False | None | False | 10830.0 | 0 |
|
|
---|