noticeInvitingTenderDTO
createdTs1719813376402
version5
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1250.00
emd99931.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose08-07-2024 17:00:01
tenderQueryClose06-07-2024 17:00:00
technicalBidOpen09-07-2024 17:02:02
publishedDate01-07-2024 11:35:38
publishedByPostPWD_EE_DIV_MYS
publishedByUserKPE11845 - G RAJU
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonG RAJU
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08212402810
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719813376405
version13
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BR/WORK_INDENT10947/CALL-2
titleConstruction of Culvert at Ch.645.70Km (Near Debur Village) of SH-57 Bagalkote Beligeriranganabetta State highway in Nanjangud taluk
descriptionConstruction of Culvert at Ch.645.70Km (Near Debur Village) of SH-57 Bagalkote Beligeriranganabetta State highway in Nanjangud taluk
categoryWORKS
categoryTextWorks
ecv4996578.91
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1674
locationNamePWD Division Office Mysuru
provisionalAmount5000000.0
groupOverheadTotal0.0
fileNumberPWD/NANJANGUD/2023-24/Culvert/SH-57Bagalkote
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17198133770001NoneNoneBridges/CulvertsConstruction of Culvert at Ch.645.70Km (Near Debur Village) of SH-57 Bagalkote Beligeriranganabetta State highway in Nanjangud taluk4996578.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3422796121158NoneP.No.200, I.No.16.36, SR 2023-24.Vol-5Clearing and grubbing land including uprooting rank vegetable grass, bushes, shrubs, saplings and trees upto 300mm girth by manual means, in areas of light jungle, removal of stumps, disposal of unserviceable materials, stacking of serviceable materials from road boundary etc. including cost of labour charges, all lead and lifts, etc. complete as directed by the Engineer in charge.Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm21.2421.24250.0FalseNoneNoneFalseNoneFalse5310.00
3422797121158NoneP.No.8. I.No.1.14.1,V-1,PWD SR-2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m, as per direction of Engineer in Charge, Rate inclusiveGST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum120.36120.36584.43FalseNoneNoneFalseNoneFalse70341.99480
3422798121158NoneP.No.61 I.No.4.31, V-4, PWD SR-2023-24Providing rubble / boulder and sand filling behind abutment and return walls in layers including cost of all materials, labour, watering, ramming etc., complete with all lead and lifts.as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum2604.262604.2625.62FalseNoneNoneFalseNoneFalse66721.14120
3422799121158NoneP.No.15 I.No.2.1.3, V-1, PWD SR-2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7067.027067.0234.65FalseNoneNoneFalseNoneFalse244872.2430
3422800121158NoneP.No.16, I.No.2.5.2, SR 2023-24 Vol-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum8074.748074.7484.94FalseNoneNoneFalseNoneFalse685868.41560
3422801121158NoneP.No.16, I.No.2.5.2, SR 2023-24 Vol-1Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transport1ation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work 8%,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum645.98645.9884.94FalseNoneNoneFalseNoneFalse54869.54120
3422802121158NoneP.No.16, I.No.2.4.3, SR 2023-24 Vol-1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum7476.487476.48151.4FalseNoneNoneFalseNoneFalse1131939.0720
3422803121158NoneP.No.16, I.No.2.4.3, SR 2023-24 Vol-1Additionalities for Formwork, Centering & Scaffolding for Super structure including cost and conveyance of all materials, Labour, hire, charges of machineries and equipment, lead and lift, loading and unloading charges transportation and all other incidental charges etc. complete the work shall carried out as per technical detailed specfications and as per direction of engineer in charge Form work 8%,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum598.12598.12151.4FalseNoneNoneFalseNoneFalse90555.3680
3422804121158NoneP.No.18, I.No.2.11.c, SR 2023-24 Vol-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Sub structure of Bridges,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Tonne93232.9893232.9812.4FalseNoneNoneFalseNoneFalse1156088.9520
3422805121158NonePage No.47, Item No.3.3. Vol - 4,2023-24Providing casing embankment using semi-pervious / pervious approved soil 3.3. from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller etc., complete with all lead and all lifts.as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum742.22742.221365.02FalseNoneNoneFalseNoneFalse1013145.14440
3422806121158NoneP.No.55 I.No.3.45, V-4, PWD SR-2023-24Providing and constructing 300 mm thick size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm set in CM 1 : 5 proportion by volume with pointing joints in CM 1 : 3 proportion by volume including cost of all materials from approved source, labour, packing stone chips and mortar into joints,finishing,curing etc.,complete with all lead and lifts.as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm1003.01003.056.0FalseNoneNoneFalseNoneFalse56168.00
3422807121158NoneP.No.121, I.No.13.2, SR 2023-24 Vol-3Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant), as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum16485.7816485.7811.61FalseNoneNoneFalseNoneFalse191399.90580
3422808121158NoneP.No.121,Ref. to MoRT&H Spec 2705. I.No.13.7, SR 2Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.No3859.783859.788.0FalseNoneNoneFalseNoneFalse30878.240
3422809121158NoneI.No.18.17,P.No.67, SR 2023-24 Vol-3Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings.,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Each2384.782384.788.0FalseNoneNoneFalseNoneFalse19078.240
3422810121158NoneI.No.9.i,P.No.87, SR 2023-24 Vol-3Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Rmtr11185.2211185.227.5FalseNoneNoneFalseNoneFalse83889.150
3422811121158NoneP.No.56 I.No.8.10 V-3)(P-56, I-8.1-V-3Painting Two Coats on New Concrete Surfaces. Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces.as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Sqm128.62128.6243.2FalseNoneNoneFalseNoneFalse5556.3840
3422812121158Nonep.no.140.i no.3.13,SR 2023-2024 VOL-4De-silting of Feeder Channel/Canal in dry condition by excavating the deposited bed material and disposing off the same by stacking/ formation of Embankment or as directed including cost of all machinery, labour & all necessary works as directed and as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.Cum110.92110.9236.0FalseNoneNoneFalseNoneFalse3993.120
3422813121158NoneP.No.69, I.No.8.25, SR 2023-24 Vol-3Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 Type - A, "W" : Metal Beam Crash Barrier,as per direction of Engineer in Charge, Rate inclusive GST18% ---- Including cost of all materials, with all lead lift and labour charges, complete as directed by the Engineer-in-charge of the work.m4295.24295.220.0FalseNoneNoneFalseNoneFalse85904.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17198133760000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17198133760000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17198133760000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17198133760000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17198133760000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17198133760000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KPP portal due to internet connectivity issues and technical glitches at bidders end.None
17198133760000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidderNone
17198133760000NoneNoneELIGIBILITYConditional tenders will not be acceptedNone
17198133760000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17198133760000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17198133760000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17198133760000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17198133760000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17198133760000NoneNoneELIGIBILITYThe employer reserves the rights to Reject or accept any or all the tenders without assigning any reasons.None
17198133760000NoneNoneELIGIBILITYIn the case of the death of the contractor after executing the agreement / commencement of the work, his legal heir, if is an eligible registered contractor and is willing can execute and compete the work at the accepted tender rates irrespective of the cost of the work.None
17198133760000NoneNoneELIGIBILITYThe successful Tenderer shall deliver to the Employer a Security deposit in the form of NSC/DD/FDR in the name of the Executive Engineer, PWD Division, Mysore given below for an amount equivalent to 5% of the Contract price plus additional security for unbalanced tenders in accordance with the Conditions of Contract.None
17198133760000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extent.None
17198133760000NoneNoneELIGIBILITYFormation levels and other data furnished are bare minimum the contractor should make all efforts to validate and to get additional data if required at his own cost.None
17198133760000NoneNoneELIGIBILITYMaterials like steel, cement etc., required for the work shall be procured by the tenderer themselves and should got tested by the quality control authority before use on the work at their own cost.None
17198133760000NoneNoneELIGIBILITYAll the items in the tender include all lead, lifts, loading unloading, transportation, labour, hire charges of machinery curing for concrete works, cost and conveyance of all material and all other such incidental charges necessary for successful completion of works as per the detailed technical specification and direction of Engineer - in charge of this workNone
17198133760000NoneNoneELIGIBILITYAll precautions should be taken by the contractor so that there are no damages to such public/ private properties.None
17198133760000NoneNoneELIGIBILITYContractor should take all precautionary measures to avoid any damage to the utilities during excavation as well as utility shifting. To that extent the contractor should indemnify the client.None
17198133760000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act.None
17198133760000NoneNoneELIGIBILITYFurther particulars, if any, required by the Contractor can be had from the office of the Executive Engineer, Public Works Department, Mysore Division, Mysore during office hours on all working days.None
17198133760000NoneNoneELIGIBILITYContractor should adhere to HSE (Health Safety Environment) policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17198133760000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17198133760000NoneNoneELIGIBILITYThe contractor who participates in tenders for more than one work for which tenders are invited in this IFT, the tenderer must fulfill all the conditions and criteria cumulatively for the participated works.None
17198133760000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-2None
17198133760000NoneNoneELIGIBILITYContractor shall submit the Turnover certificates alongwith supporting documents of balance sheets, profit & loss statement & IT returns signed by Chartered Accountants.None
17198133760000NoneNoneELIGIBILITYEstimate Item rates are inclusive of GST. Hence GST will not be paid separately for the quoted amount accordingly.None
17198133760000NoneNoneELIGIBILITYContractors should be registered as KPWD Class III & above Civil Contractor.None
17198133760000NoneNoneELIGIBILITY3.2a Achieved in at least two financial years 2019-20 2020-21 2021-22 2022-23 and 2023-24 a average financial turnover in all classes of civil engineering construction works only of Rs.49.97 LakhsNone
17198133760000NoneNoneELIGIBILITY3.2b)Satisfactorily completed 2019-20,2020-21,2021-22, 2022-23 & 2023-24 as prime contractor, at least one similar nature work of value not less than Rs. 24.99 LAKHSNone
17198133760000NoneNoneELIGIBILITYThe contractors assessed available tender capacity will be calculated as Assessed available tender capacity AxNx2.5-B ) Where, A -Maximum value of civil engineering works executed in any one year during the last five years (updated to 2024-25 price level) taking into account the completed as well as works in progress taking into account the completed as well as ongoing works. N-Number of years prescribed for completion of the works for which tenders are invited.B-value, at 2024-25 price level, of existing commitments and on-going works to be completed during the next 3months.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNone3.2To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e, 2019-20, 2020-2021,2021-22, 2022-23 and 2023-24 b)Satisfactorily completed, as prime contractor, at least one similar nature of work of value not less than Rs. 24.99 LakhsPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e, 2019-20, 2020-2021,2021-22, 2022-23 and 2023-24 a)Achieved in at least two financial years a average financial turnover (in all classes of civil engineering construction works only) of Rs.49.97 LakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersExisting commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedOthersTenders already submitted
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tenders already submitted
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate with UDIN from CA and Profit & loss statementsTrueTechnical Bid
KPWD Registration Certificate-CLASS-III & ABOVETrueTechnical Bid
Work Done Certificate for Similar nature work, duly attested by the Officer Not below the rank of E.E.TrueTechnical Bid
Existing Commitments work details - B-Value - should be furnished duly attested by the concerned Executive Engineer as per Standard Tender DocumentsTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone