noticeInvitingTenderDTO
createdTs1719567410687
version14
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2421000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose08-07-2024 17:30:00
tenderQueryClose02-07-2024 10:30:00
technicalBidOpen11-07-2024 11:30:00
publishedDate29-06-2024 14:06:06
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls2
preBidMeetingDate02-07-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonCHIEF ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee2321000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719567410689
version26
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9759/CALL-2
titlePackage 752 Improvements to road connecting Tumkur (on NH 73) to Virupasamudra (AP Border) SH184 via Chelur- Bukkapatna- Tavarekere- Amarapura- Arsikere- Pavagada from Ch 101.06 KM to 108.56 KM & Ch 122.72 KM to 126.72 KM (in selected reaches) in Sira Taluk of Tumkur District.
descriptionPackage 752 Improvements to road connecting Tumkur (on NH 73) to Virupasamudra (AP Border) SH184 via Chelur- Bukkapatna- Tavarekere- Amarapura- Arsikere- Pavagada from Ch 101.06 KM to 108.56 KM & Ch 122.72 KM to 126.72 KM (in selected reaches) in Sira Taluk of Tumkur District.
categoryWORKS
categoryTextWorks
ecv242129451.17
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-752/SIRA/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17195674110001NoneNoneRoadsRoad Work (Reconstruction)184910935.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398811119884None16.29Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7 UNISR2023-24,V-3,PageNo.149Item No.16.29 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNos18115.3618115.362.0FalseNoneNoneFalseNoneFalse36230.720
3398812119884None2.5 (ii) aClearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm463.74463.74168.26FalseNoneNoneFalseNoneFalse78028.89240
3398813119884None3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm7.087.0872100.0FalseNoneNoneFalseNoneFalse510468.00
3398814119884None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum112.1112.118100.36FalseNoneNoneFalseNoneFalse2029050.3560
3398815119884None1.7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum140.42140.429816.02FalseNoneNoneFalseNoneFalse1378365.52840
3398816119884None4.4Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(UNI SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum581.74581.7413506.67FalseNoneNoneFalseNoneFalse7857370.20580
3398817119884None4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(UNI SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum2783.622783.6216041.47FalseNoneNoneFalseNoneFalse44653356.72140
3398818119884None4.17Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(UNI SR Rates 2023-2024, Volume-3, Page No. 26,Item. No. 4.17) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum3019.623019.6218391.5FalseNoneNoneFalseNoneFalse55535341.230
3398819119884None5.1 A (i)Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm48.3848.3872100.0FalseNoneNoneFalseNoneFalse3488198.00
3398820119884None5.4 (ii)Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm16.5216.5272100.0FalseNoneNoneFalseNoneFalse1191092.00
3398821119884None5.12 (c)Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum11149.8211149.823605.0FalseNoneNoneFalseNoneFalse40195101.10
3398822119884None5.16(c)Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum12925.7212925.722163.0FalseNoneNoneFalseNoneFalse27958332.360
17195674110000NoneNoneRoadsRoad Furnitures6340661.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398823119885None8.7Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm10631.810631.89.32FalseNoneNoneFalseNoneFalse99088.3760
3398824119885None8.6 iiRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 ii) 90 cm equilateral triangle (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNo5602.645602.6424.0FalseNoneNoneFalseNoneFalse134463.360
3398825119885None8.6 (viii)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 viii) 60 cm circular (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 viii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNo5131.825131.8215.0FalseNoneNoneFalseNoneFalse76977.30
3398826119885None8.6 (xv)Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 xv) 90 cm high octagon (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNo7817.57817.524.0FalseNoneNoneFalseNoneFalse187620.00
3398827119885None8.31Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm221.84221.8478.75FalseNoneNoneFalseNoneFalse17469.90
3398828119885None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm625.4625.42427.9FalseNoneNoneFalseNoneFalse1518408.660
3398829119885None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(UNI SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNos430.7430.71807.0FalseNoneNoneFalseNoneFalse778274.90
3398830119885None8.16 (iii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNos993.56993.5652.0FalseNoneNoneFalseNoneFalse51665.120
3398831119885None8.16 (ii)Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTNos3453.863453.8610.0FalseNoneNoneFalseNoneFalse34538.60
3398832119885None8.16 (i)Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (i)) Rates are Inclusive of 18% GST (5TH km Stone) ---- Item rates are inclusive of 18 percent GSTNos5995.585995.581.0FalseNoneNoneFalseNoneFalse5995.580
3398833119885None8.25( i)Metal Beam Crash Barrier (i)Type A, W Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS1367 and IS1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTRmtr4295.24295.2800.0FalseNoneNoneFalseNoneFalse3436160.00
17195674110001NoneNoneRoadsConstruction of Box Culvert (Vent Size 1.2 X 1.2M) CH 101.77, CH 103.14 and CH 103.323580916.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398834119886None2.11(II(A)Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical meansPWD SR 2023-24, Vol-3 Page No 11 Item No 2.11(II(A)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum212.4212.419.35FalseNoneNoneFalseNoneFalse4109.940
3398835119886None1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum120.36120.36190.06FalseNoneNoneFalseNoneFalse22875.62160
3398836119886None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum7067.027067.0229.04FalseNoneNoneFalseNoneFalse205226.26080
3398837119886None2.11(h)Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTTonne93232.9893232.9810.51FalseNoneNoneFalseNoneFalse979878.61980
3398838119886None2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8971.788971.7860.93FalseNoneNoneFalseNoneFalse546650.55540
3398839119886None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum9689.699689.6917.85FalseNoneNoneFalseNoneFalse172960.96650
3398840119886None12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum1378.241378.2449.45FalseNoneNoneFalseNoneFalse68153.9680
3398841119886None12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24, Vol-3 Page No 117 Item No 12.4 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum3158.863158.8616.2FalseNoneNoneFalseNoneFalse51173.5320
3398842119886None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum7461.147461.144.46FalseNoneNoneFalseNoneFalse33276.68440
3398843119886None14.4.AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum2256.162256.1611.16FalseNoneNoneFalseNoneFalse25178.74560
3398844119886None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8. Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8036.988036.9822.68FalseNoneNoneFalseNoneFalse182278.70640
3398845119886None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum13965.313965.336.0FalseNoneNoneFalseNoneFalse502750.80
3398846119886None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2. Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum16485.7816485.784.59FalseNoneNoneFalseNoneFalse75669.73020
3398847119886None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTm2118.12118.172.0FalseNoneNoneFalseNoneFalse152503.20
3398848119886None13.14Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR 2023-24, Vol-3 Page No66 Item No 8.10 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm128.62128.6220.1FalseNoneNoneFalseNoneFalse2585.2620
3398849119886None2.17 (ix) BDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leadii) By Mechanical Means B. Above 600 mm to 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) B) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTm1293.281293.2822.5FalseNoneNoneFalseNoneFalse29098.80
3398850119886None2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8074.68074.665.21FalseNoneNoneFalseNoneFalse526544.6660
17195674110001NoneNoneRoadsPKG 752 Construction of Box Culvert (Vent Size 2 X 2M) CH 105.492126466.11
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398851119887None2.11(II(A))Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SR Rates 2023-24 Item no 2.11 II (A) Page No 11 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum212.4212.432.4FalseNoneNoneFalseNoneFalse6881.760
3398852119887None2.17 (ix) C)Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means C. Above 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) C) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTMtr1621.321621.3215.0FalseNoneNoneFalseNoneFalse24319.80
3398853119887None1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum120.36120.36100.63FalseNoneNoneFalseNoneFalse12111.82680
3398854119887None2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum7067.027067.0217.19FalseNoneNoneFalseNoneFalse121482.07380
3398855119887None2.11 (h)Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTTonne93232.9893232.987.3FalseNoneNoneFalseNoneFalse680600.7540
3398856119887None2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8971.788971.7843.35FalseNoneNoneFalseNoneFalse388926.6630
3398857119887None2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum9689.699689.6916.62FalseNoneNoneFalseNoneFalse161042.64780
3398858119887None12.3Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum1378.241378.2426.61FalseNoneNoneFalseNoneFalse36674.96640
3398859119887None12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24 Item No 12.4 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum3158.863158.865.4FalseNoneNoneFalseNoneFalse17057.8440
3398860119887None2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum7461.147461.146.38FalseNoneNoneFalseNoneFalse47602.07320
3398861119887None14.4AProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum2256.162256.165.56FalseNoneNoneFalseNoneFalse12544.24960
3398862119887None13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24 Item No 13.8 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8036.988036.987.56FalseNoneNoneFalseNoneFalse60759.56880
3398863119887None13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24 Item No 13.9 Page No 122 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum13965.313965.312.0FalseNoneNoneFalseNoneFalse167583.60
3398864119887None13.2Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24 Item No 13.2 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum16485.7816485.784.28FalseNoneNoneFalseNoneFalse70559.13840
3398865119887None13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24 Item No 13.16 Page No 124 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTMtr2118.12118.124.0FalseNoneNoneFalseNoneFalse50834.40
3398866119887None13.14Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces. PWD SR 2023-24 Item No 8.10 Page No 66 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTSqm128.62128.6217.37FalseNoneNoneFalseNoneFalse2234.12940
3398867119887None2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.2.3 Page No 15 Vol-1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GSTCum8074.68074.632.85FalseNoneNoneFalseNoneFalse265250.610
17195674110000NoneNoneRoads1st Year Road Maintenance0.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398868119888None2.5 ii a)Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (ii) By Mechanical Means using Dozer a In area of light jungle (PWD SR Rates 2023-2024, Volume-3, Page No. 9,Item. No. 2.5 ii a) Rates are inclusive of 18% GST LBD qty=82.40 ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398869119888None16.19Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.19) Rates are inclusive of 18% GST LBD Qty=6180.00 ---- Item rates are inclusive of 18 percent GSTRmtr0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398870119888None10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) Rates are inclusive of 18% GST LBD QTY=927.00 ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398871119888None10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) Rates are inclusive of 18% GST LBD QTY=3090.00 ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398872119888None10.5Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) (have to Rectify irrespective of qty)Rates are inclusive of 18% GST LBD QTY=0.00 ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398873119888None1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.12) Rates are inclusive of 18% GST LBD QTY=86.40 ---- Item rates are inclusive of 18 percent GSTCum0.010.011.0FalseNoneNoneFalseNoneFalse0.010
17195674110000NoneNoneRoads2nd Year Maintenance0.06
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398874119889Noneitem code 2.5 II aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a LBD QTY 123.60 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398875119889Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 LBD QTY 8240.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTRmtr0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398876119889Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 LBD QTY 927.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398877119889Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 LBD QTY 3090.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398878119889Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 (have to Rectify irrespective of qty) LBD QTY 0.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm0.010.011.0FalseNoneNoneFalseNoneFalse0.010
3398879119889Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 LBD QTY 86.40 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum0.010.011.0FalseNoneNoneFalseNoneFalse0.010
17195674110001NoneNoneRoads3rd Year Road Maintenance813774.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398880119890Noneitem code 2.5 II aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm519.39519.39113.16FalseNoneNoneFalseNoneFalse58774.17240
3398881119890Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTRmtr7.937.934120.0FalseNoneNoneFalseNoneFalse32671.60
3398882119890Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm51.5451.54927.0FalseNoneNoneFalseNoneFalse47777.580
3398883119890Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm128.19128.193090.0FalseNoneNoneFalseNoneFalse396107.10
3398884119890Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm563.0563.0360.5FalseNoneNoneFalseNoneFalse202961.50
3398885119890Noneitem code 16.22Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.22 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm2622.052622.057.0FalseNoneNoneFalseNoneFalse18354.350
3398886119890Noneitem code 16.24 iMaintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SR Rates 2023 2024 Volume 3 Page No. 148 Item. No. 16.24i Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm272.25272.2552.0FalseNoneNoneFalseNoneFalse14157.00
3398887119890Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum125.55125.55216.0FalseNoneNoneFalseNoneFalse27118.80
3398888119890Noneitem code 8.10Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR Rates 2023-2024 Volume-3 Page No. 66 Item. No. 8.10 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm144.05144.0535.7FalseNoneNoneFalseNoneFalse5142.5850
3398889119890Noneitem code 8.4Printing New letter and Figures of any Shade 8.3 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman PWD SR Rates 2023.2024 Volume 3 Page No. 63 Item. No. 8.4 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTcm1.191.199000.0FalseNoneNoneFalseNoneFalse10710.00
17195674110000NoneNoneRoads4th Year Road Maintenance792740.85
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398890119891Noneitem code 2.5 ii aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm537.94537.94113.16FalseNoneNoneFalseNoneFalse60873.29040
3398891119891Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTRmtr8.218.214120.0FalseNoneNoneFalseNoneFalse33825.20
3398892119891Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm53.3853.38927.0FalseNoneNoneFalseNoneFalse49483.260
3398893119891Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm132.77132.773090.0FalseNoneNoneFalseNoneFalse410259.30
3398894119891Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm583.11583.11360.5FalseNoneNoneFalseNoneFalse210211.1550
3398895119891Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum130.04130.04216.0FalseNoneNoneFalseNoneFalse28088.640
17195674110000NoneNoneRoads5th Year Road Maintenance1037570.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398896119892Noneitem code 2.5 ii aClearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm556.49556.49113.16FalseNoneNoneFalseNoneFalse62972.40840
3398897119892Noneitem code 16.19Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTRmtr8.58.54120.0FalseNoneNoneFalseNoneFalse35020.00
3398898119892Noneitem code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm55.2255.22927.0FalseNoneNoneFalseNoneFalse51188.940
3398899119892Noneitem code 10.2Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm137.35137.353090.0FalseNoneNoneFalseNoneFalse424411.50
3398900119892Noneitem code 10.5Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm603.22603.22721.0FalseNoneNoneFalseNoneFalse434921.620
3398901119892Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum134.52134.52216.0FalseNoneNoneFalseNoneFalse29056.320
17195674110000NoneNoneRoads6th Year Road Maintenance38787486.28
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398902119893None16.22Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.22) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm2902.992902.9910.3FalseNoneNoneFalseNoneFalse29900.7970
3398903119893None16.24iMaintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (PWD SR Rates 2023-2024, Volume-3, Page No. 148,Item. No. 16.24i) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm301.42301.4210.3FalseNoneNoneFalseNoneFalse3104.6260
3398904119893None8.10Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm159.49159.4935.7FalseNoneNoneFalseNoneFalse5693.7930
3398905119893None8.4Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.321.329000.0FalseNoneNoneFalseNoneFalse11880.00
3398906119893None5.3iProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.3i) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm17.5617.5672100.0FalseNoneNoneFalseNoneFalse1266076.00
3398907119893None5.16 CProviding and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 37,Item. No. 5.16 C) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum16027.8916027.892163.0FalseNoneNoneFalseNoneFalse34668326.070
3398908119893None8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSqm775.5775.52427.9FalseNoneNoneFalseNoneFalse1882836.450
3398909119893None8.43Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos534.07534.071722.0FalseNoneNoneFalseNoneFalse919668.540
17195674110000NoneNoneRoadsWater Supply1201698.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398910119894None1.14.1Earth work excavation for Foundation depth upto 3 m as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.PWD SR Rates 2023-2024, Volume1 Page No. 8 Item. No. 1.14.1 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum120.36120.36469.8FalseNoneNoneFalseNoneFalse56545.1280
3398911119894None9.2.3Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTm450.76450.76870.0FalseNoneNoneFalseNoneFalse392161.20
3398912119894None1.10Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCum188.8188.8462.93FalseNoneNoneFalseNoneFalse87401.1840
3398913119894None8.29Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GSTm2610.162610.16255.0FalseNoneNoneFalseNoneFalse665590.80
17195674110001NoneNoneRoadsElectrical Pole Shifting2537201.05
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3398914119895Noneitem codeRCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo10405.2410405.241.0FalseNoneNoneFalseNoneFalse10405.240
3398915119895Noneitem codePSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7010.387010.384.0FalseNoneNoneFalseNoneFalse28041.520
3398916119895Noneitem codePSCC Pole 9 Mtr Long 200 Kg WL stud Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7010.387010.382.0FalseNoneNoneFalseNoneFalse14020.760
3398917119895Noneitem codePSCC Pole 9 Mtr Long 300 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398918119895Noneitem codeDP Structure with RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo31057.631057.61.0FalseNoneNoneFalseNoneFalse31057.60
3398919119895Noneitem codeLoading and unloading of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo167.56167.568.0FalseNoneNoneFalseNoneFalse1340.480
3398920119895Noneitem codeTransporation of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo336.3336.38.0FalseNoneNoneFalseNoneFalse2690.40
3398921119895Noneitem code11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet1083.241083.242.0FalseNoneNoneFalseNoneFalse2166.480
3398922119895Noneitem code11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398923119895Noneitem codeSpecial 3 pin Cross Arm for PSCC PSC pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet1546.981546.982.0FalseNoneNoneFalseNoneFalse3093.960
3398924119895Noneitem codeLT 4 Pin Cross Arm with clamps bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398925119895Noneitem codeLT 4 Pin Cross Arm with clamps bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398926119895Noneitem codeLT 2 Pin Cross Arm with clamps bolts nuts for RCC Pole 9 Mtr Long145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398927119895Noneitem codeLT 2 Pin Cross Arm with clamps bolts nuts for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo499.14499.144.0FalseNoneNoneFalseNoneFalse1996.560
3398928119895Noneitem codeRabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398929119895Noneitem code11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo241.9241.912.0FalseNoneNoneFalseNoneFalse2902.80
3398930119895Noneitem code11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo219.48219.486.0FalseNoneNoneFalseNoneFalse1316.880
3398931119895Noneitem code1.1kV pin Insulator with GI pins Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398932119895Noneitem codeNo.8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398933119895Noneitem codeGuy Set Complete with No. 8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398934119895Noneitem codeGuy Set Complete with No. 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2080.342080.342.0FalseNoneNoneFalseNoneFalse4160.680
3398935119895Noneitem codeGuy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo295.0295.02.0FalseNoneNoneFalseNoneFalse590.00
3398936119895Noneitem codeRabbit ACSR conductor with 1.5 Percent sag Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm74219.6474219.640.1FalseNoneNoneFalseNoneFalse7421.9640
3398937119895Noneitem codeTransporation of Conductor Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm156.94156.940.1FalseNoneNoneFalseNoneFalse15.6940
3398938119895Noneitem codeSpiral earth Electrode Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo391.76391.767.0FalseNoneNoneFalseNoneFalse2742.320
3398939119895Noneitem codeEG Stirrup With GI Lacing Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398940119895Noneitem codeSingle Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet12453.7212453.721.0FalseNoneNoneFalseNoneFalse12453.720
3398941119895Noneitem codeH Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7544.927544.921.0FalseNoneNoneFalseNoneFalse7544.920
3398942119895Noneitem code11 kV DOLO Cutout Conventional to Erstwhile KEB Specification Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398943119895Noneitem codeReleasing and Restringing of Conductor 4361x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm9777.369777.361.65FalseNoneNoneFalseNoneFalse16132.6440
3398944119895Noneitem codeReleasing and Reerrection of pole 1742x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos3905.573905.5711.0FalseNoneNoneFalseNoneFalse42961.270
3398945119895Noneitem codeReleasing and Refixing of H X arm 272x1.9 ---- Item rates are inclusive of 18 percent GSTNos609.82609.8212.0FalseNoneNoneFalseNoneFalse7317.840
3398946119895Noneitem codeReleasing and Refixing of 4 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398947119895Noneitem codeReleasing and Refixing of 2 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398948119895Noneitem codeReleasing and Refixing of over head Service mains Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398949119895Noneitem codeReleasing and Refixing of 11KV AB Cable 3x95plus70Sqmm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398950119895Noneitem codeReleasing and Refixing of Cable Straight Thru Jointing Kits Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398951119895Noneitem codeReleasing and Refixing of 11KV AB Cable Terminatin Kit Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398952119895Noneitem codeReleasing and Refixing of Suspension Clamp Assembly 16 to 70 mm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398953119895Noneitem codeReleasing and Refixing of Pole clamp for HT LT AB cable Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398954119895Noneitem codeReleasing and Refixing of Eye Hook Flat type for fixing Clamps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398955119895Noneitem codeReleasing and Refixing of Dead End Clamp Anchor Clamp Assembly 16 to 70 Sqmm excluding pole clamps and Eye hook Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398956119895Noneitem codeReleasing and Refixing of End Caps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398957119895Noneitem codeDecommissioning of Assets Releasing of Conductor 2 4 ACSR Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm3377.163377.160.001FalseNoneNoneFalseNoneFalse3.377160
3398958119895Noneitem codeReleasing of Conductor Rabbit ACSR Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm4742.424742.420.001FalseNoneNoneFalseNoneFalse4.742420
3398959119895Noneitem codeReleasing of Idle Poles Scrap 0.9x1742 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos1850.01850.05.0FalseNoneNoneFalseNoneFalse9250.00
3398960119895Noneitem codeReleasing of Transformer Structure 0.9x5725 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos6079.956079.951.0FalseNoneNoneFalseNoneFalse6079.950
3398961119895Noneitem codeReleasing of H Cross Arm 0.9x160 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos169.92169.926.0FalseNoneNoneFalseNoneFalse1019.520
3398962119895Noneitem codeReleasing of 4 pin Cross Arm 0.9x160 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos169.92169.920.001FalseNoneNoneFalseNoneFalse0.169920
3398963119895Noneitem codePART A i EXTENSION OF 11KV LINE UG CABLE 11kV Class 3x95 Sq. mm XLPE UG Cable Round Armoured Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm1049805.881049805.880.05FalseNoneNoneFalseNoneFalse52490.2940
3398964119895Noneitem codeStraight Through Jointing Kits HS Type suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo8626.988626.980.0001FalseNoneNoneFalseNoneFalse0.8626980
3398965119895Noneitem codeCable Termination Kit Outdoor HS Type Suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTPer Kit4810.864810.862.0FalseNoneNoneFalseNoneFalse9621.720
3398966119895Noneitem codeCable Termination Kit Indoor HS Type Suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTPer Kit4417.924417.922.0FalseNoneNoneFalseNoneFalse8835.840
3398967119895Noneitem codeArtificial Manufacture sand Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTcm2107.482107.4814.0FalseNoneNoneFalseNoneFalse29504.720
3398968119895Noneitem codeRCC Hume Pipe 2000mm Long 150mm Dia Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo362.26362.265.0FalseNoneNoneFalseNoneFalse1811.30
3398969119895Noneitem codeCollars for RCC Hume Pipe Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo96.7696.765.0FalseNoneNoneFalseNoneFalse483.80
3398970119895Noneitem codeGI Pipe 150 mm Dia for drain crossing cable raising etc. Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr1457.31457.34.0FalseNoneNoneFalseNoneFalse5829.20
3398971119895Noneitem codeRoute and Joint indicating stones Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo156.94156.942.0FalseNoneNoneFalseNoneFalse313.880
3398972119895Noneitem code 9 aLabour charges a Cable trench Excavation 1000x0.6x1 600 Ordinary Soil Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTcm309.16309.1630.0FalseNoneNoneFalseNoneFalse9274.80
3398973119895Noneitem code 9 bb Laying of cable in trench Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm72359.9672359.960.05FalseNoneNoneFalseNoneFalse3617.9980
3398974119895Noneitem code 9 cc Refiling and Consolidation Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTcm188.8188.827.5FalseNoneNoneFalseNoneFalse5192.00
3398975119895Noneitem code 9 dd Making of straight through joint Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo3360.643360.640.001FalseNoneNoneFalseNoneFalse3.360640
3398976119895Noneitem code 9 ee Making of cable termination Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo3136.443136.444.0FalseNoneNoneFalseNoneFalse12545.760
3398977119895Noneitem code 9 ff Covering the cable with tie Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm5153.065153.060.13FalseNoneNoneFalseNoneFalse669.89780
3398978119895Noneitem code9 gg Spreading Sand and forming with Sand round the cable Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm17475.817475.80.13FalseNoneNoneFalseNoneFalse2271.8540
3398979119895Noneitem code 9 hh Laying of RCC Hume pipe Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr81.4281.423.0FalseNoneNoneFalseNoneFalse244.260
3398980119895Noneitem code 9 ii Laying of GI Pipe Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr109.74109.740.001FalseNoneNoneFalseNoneFalse0.109740
3398981119895Noneitem code 9 jj Laying of Route and Joint indicating stone Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo136.88136.882.0FalseNoneNoneFalseNoneFalse273.760
3398982119895Noneitem codePART B Shifting or Re Erection of Pole or Lines using 11 Mtr Spun Spole Spun pole 11 Mtr Long Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo26138.1826138.184.0FalseNoneNoneFalseNoneFalse104552.720
3398983119895Noneitem codeSingle Pole Transformer Structure Kit with Three H Frames without Transformer Seating and Seating Angle support cross arm for 63 100 250 500 kva UG Cable MS Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet28243.328243.30.001FalseNoneNoneFalseNoneFalse28.24330
3398984119895Noneitem codeHT Single Top Support with bolts nuts and washers Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet297.36297.3636.0FalseNoneNoneFalseNoneFalse10704.960
3398985119895Noneitem code11. KV 5 KN Polymeric pin insulator 24mm dia frp rod Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo241.9241.936.0FalseNoneNoneFalseNoneFalse8708.40
3398986119895Noneitem codeAlkathene tube 19mm dia and in coils of 13 mtr Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCoil610.06610.068.0FalseNoneNoneFalseNoneFalse4880.480
3398987119895Noneitem codeConcreting Matierials for 11 Mtrs Spun poles Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3398988119895Noneitem codeBase Concreting 1 2 4 1000 x 1000 x 150mm Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTEach1104.481104.484.0FalseNoneNoneFalseNoneFalse4417.920
3398989119895Noneitem codePole Concreting 1 2 4 1000 x 1000 x 2500mm Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTEach18417.4418417.444.0FalseNoneNoneFalseNoneFalse73669.760
3398990119895Noneitem codeCoping 1 2 4 as per actuals Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTEach2798.962798.964.0FalseNoneNoneFalseNoneFalse11195.840
3398991119895Noneitem codeGI wire 10 SWG Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKg93.4493.4420.0FalseNoneNoneFalseNoneFalse1868.80
3398992119895Noneitem codeGuy wire 7 10 SWG Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKg91.1391.1340.0FalseNoneNoneFalseNoneFalse3645.20
3398993119895Noneitem codeGI Pipe 100 mm Dia for cable raising etc. Extracted from Volume 5 BWSSB SR Item no 177 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr1567.041567.0440.0FalseNoneNoneFalseNoneFalse62681.60
3398994119895Noneitem codePVC Pipe 160mm dia Extracted from Volume 5 BWSSB SR Item no 649 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr599.44599.4480.0FalseNoneNoneFalseNoneFalse47955.20
3398995119895Noneitem codePVC Pipe 25mm dia Extracted from Volume 6 PWD SR Item no 2 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr30.6830.68160.0FalseNoneNoneFalseNoneFalse4908.80
3398996119895Noneitem codePART C Shifting Re errection of poles Lines using RCC PSCC Poles RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo10405.2410405.2414.0FalseNoneNoneFalseNoneFalse145673.360
3398997119895Noneitem codePSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7010.387010.3857.0FalseNoneNoneFalseNoneFalse399591.660
3398998119895Noneitem codePSCC Pole 9 Mtr Long 200 Kg WL stud Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7010.387010.389.0FalseNoneNoneFalseNoneFalse63093.420
3398999119895Noneitem codePSCC Pole 9 Mtr Long 300 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo8016.928016.920.0001FalseNoneNoneFalseNoneFalse0.8016920
3399000119895Noneitem codeDP Structure with RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo31057.631057.62.0FalseNoneNoneFalseNoneFalse62115.20
3399001119895Noneitem codeLoading and unloading of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo167.56167.5682.0FalseNoneNoneFalseNoneFalse13739.920
3399002119895Noneitem codeTransporation of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo336.3336.382.0FalseNoneNoneFalseNoneFalse27576.60
3399003119895Noneitem code11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet1083.241083.2428.0FalseNoneNoneFalseNoneFalse30330.720
3399004119895Noneitem code11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet1079.71079.70.0001FalseNoneNoneFalseNoneFalse0.107970
3399005119895Noneitem codeSpecial 3 pin Cross Arm for PSCC PSC pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet1546.981546.9815.0FalseNoneNoneFalseNoneFalse23204.70
3399006119895Noneitem codeLT 4 Pin Cross Arm with clamps bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet687.94687.940.0001FalseNoneNoneFalseNoneFalse0.0687940
3399007119895Noneitem codeLT 4 Pin Cross Arm with clamps bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet684.4684.470.0FalseNoneNoneFalseNoneFalse47908.00
3399008119895Noneitem codeLT 2 Pin Cross Arm with clamps bolts nuts for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo502.68502.680.0001FalseNoneNoneFalseNoneFalse0.0502680
3399009119895Noneitem codeLT 2 Pin Cross Arm with clamps bolts nuts for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo499.14499.1418.0FalseNoneNoneFalseNoneFalse8984.520
3399010119895Noneitem codeRabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo120.36120.360.0001FalseNoneNoneFalseNoneFalse0.0120360
3399011119895Noneitem code11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo241.9241.9171.0FalseNoneNoneFalseNoneFalse41364.90
3399012119895Noneitem code11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo219.48219.4884.0FalseNoneNoneFalseNoneFalse18436.320
3399013119895Noneitem code1.1kV pin Insulator with GI pins Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo77.8877.88140.0FalseNoneNoneFalseNoneFalse10903.20
3399014119895Noneitem codeNo8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo59.059.060.0FalseNoneNoneFalseNoneFalse3540.00
3399015119895Noneitem codeGuy Set Complete with No 8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2042.582042.580.0001FalseNoneNoneFalseNoneFalse0.2042580
3399016119895Noneitem codeGuy Set Complete with No 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2080.342080.3442.0FalseNoneNoneFalseNoneFalse87374.280
3399017119895Noneitem codeGuy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo295.0295.042.0FalseNoneNoneFalseNoneFalse12390.00
3399018119895Noneitem codeRabbit ACSR conductor with 1.5Percent sag Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm74219.6474219.642.0FalseNoneNoneFalseNoneFalse148439.280
3399019119895Noneitem codeTransporation of Conductor Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm156.94156.942.0FalseNoneNoneFalseNoneFalse313.880
3399020119895Noneitem codeSpiral earth Electrode Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo391.76391.7680.0FalseNoneNoneFalseNoneFalse31340.80
3399021119895Noneitem codeEG Stirrup With GI Lacing Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet514.48514.480.0001FalseNoneNoneFalseNoneFalse0.0514480
3399022119895Noneitem codeSingle Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet12453.7212453.722.0FalseNoneNoneFalseNoneFalse24907.440
3399023119895Noneitem codeH Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7544.927544.922.0FalseNoneNoneFalseNoneFalse15089.840
3399024119895Noneitem code11 kV DOLO Cutout Conventional to Erstwhile KEB Specification Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo6932.56932.50.0001FalseNoneNoneFalseNoneFalse0.693250
3399025119895Noneitem codeReleasing and Restringing of Conductor 4361x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm9777.369777.3615.3FalseNoneNoneFalseNoneFalse149593.6080
3399026119895Noneitem codeReleasing and Reerrection of pole 1742x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos3905.573905.570.001FalseNoneNoneFalseNoneFalse3.905570
3399027119895Noneitem codeReleasing and Refixing of H X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos609.82609.820.001FalseNoneNoneFalseNoneFalse0.609820
3399028119895Noneitem codeReleasing and Refixing of 4 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos609.82609.820.001FalseNoneNoneFalseNoneFalse0.609820
3399029119895Noneitem codeReleasing and Refixing of 2 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos609.82609.820.0001FalseNoneNoneFalseNoneFalse0.0609820
3399030119895Noneitem codeReleasing and Refixing of over head Service mains Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos201.78201.78105.0FalseNoneNoneFalseNoneFalse21186.90
3399031119895Noneitem codeReleasing and Refixing of 11KV AB Cable 3x95+70Sqmm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm77943.1377943.130.6FalseNoneNoneFalseNoneFalse46765.8780
3399032119895Noneitem codeReleasing and Refixing of Cable Straight Thru Jointing Kits Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos3192.613192.618.0FalseNoneNoneFalseNoneFalse25540.880
3399033119895Noneitem codeReleasing and Refixing of 11KV AB Cable Terminatin Kit Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos2553.632553.638.0FalseNoneNoneFalseNoneFalse20429.040
3399034119895Noneitem codeReleasing and Refixing of Suspension Clamp Assembly 16 to 70 mm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos215.23215.230.0001FalseNoneNoneFalseNoneFalse0.0215230
3399035119895Noneitem codeReleasing and Refixing of Pole clamp for HT LT AB cable Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos358.72358.720.0001FalseNoneNoneFalseNoneFalse0.0358720
3399036119895Noneitem codeReleasing and Refixing of Eye Hook Flat type for fixing Clamps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos0.010.010.0001FalseNoneNoneFalseNoneFalse1e-060
3399037119895Noneitem codeReleasing and Refixing of Dead End Clamp Anchor Clamp Assembly 16 to 70 Sqmm excluding pole clamps and Eye hook Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos430.46430.460.0001FalseNoneNoneFalseNoneFalse0.0430460
3399038119895Noneitem codeReleasing and Refixing of End Caps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos22.4222.420.0001FalseNoneNoneFalseNoneFalse0.0022420
3399039119895Noneitem codePART D Shifting Re errection OF DTCs 25 63 100kVA DP Transformer Structure using RCC Pole 9 Mtr Long 145 Kg WL for 25KVA and 63KVA and 100KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet45473.6645473.662.0FalseNoneNoneFalseNoneFalse90947.320
3399040119895Noneitem codeDP Transformer Structure using RCC Pole 9 Mtr Long 145 Kg WL for 250KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet51426.7651426.760.0001FalseNoneNoneFalseNoneFalse5.1426760
3399041119895Noneitem code11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo108891.58108891.580.0001FalseNoneNoneFalseNoneFalse10.8891580
3399042119895Noneitem code11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo126480.66126480.660.0001FalseNoneNoneFalseNoneFalse12.6480660
3399043119895Noneitem code11kV 433V 63 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo196943.18196943.180.0001FalseNoneNoneFalseNoneFalse19.6943180
3399044119895Noneitem code11kV 433V 63 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo216810.84216810.840.0001FalseNoneNoneFalseNoneFalse21.6810840
3399045119895Noneitem code11kV 433V 100 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo251576.0251576.00.0001FalseNoneNoneFalseNoneFalse25.15760
3399046119895Noneitem code11kV 433V 100 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo263779.56263779.560.0001FalseNoneNoneFalseNoneFalse26.3779560
3399047119895Noneitem code11kV 433V 250 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo523914.1523914.10.0001FalseNoneNoneFalseNoneFalse52.391410
3399048119895Noneitem code11kV 433V 250 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo638791.82638791.820.0001FalseNoneNoneFalseNoneFalse63.8791820
3399049119895Noneitem code11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo241.9241.96.0FalseNoneNoneFalseNoneFalse1451.40
3399050119895Noneitem code11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo219.48219.486.0FalseNoneNoneFalseNoneFalse1316.880
3399051119895Noneitem codeRabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo120.36120.3612.0FalseNoneNoneFalseNoneFalse1444.320
3399052119895Noneitem codeGuy Set Complete with No. 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2080.342080.344.0FalseNoneNoneFalseNoneFalse8321.360
3399053119895Noneitem codeEarthing materials pipe type for grounding Single Electrode with accessories Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet3160.043160.046.0FalseNoneNoneFalseNoneFalse18960.240
3399054119895Noneitem codeCaution Dangour Board Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo271.4271.44.0FalseNoneNoneFalseNoneFalse1085.60
3399055119895Noneitem codeAnti Climbing Device GI Barbed wire 12 Mtr Kg Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTEach154.58154.580.0001FalseNoneNoneFalseNoneFalse0.0154580
3399056119895Noneitem codeGuy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo295.0295.08.0004FalseNoneNoneFalseNoneFalse2360.1180
3399057119895Noneitem codeGI Wire 8 SWG Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKg88.5588.5510.0005FalseNoneNoneFalseNoneFalse885.5442750
3399058119895Noneitem codeGuy Wire Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKg91.1391.1320.001FalseNoneNoneFalseNoneFalse1822.691130
3399059119895Noneitem code 2311 kV Lightning Arrester Metal Oxide 10 kV 5 kA Polymetic type with ground disconnector Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet5747.785747.782.0FalseNoneNoneFalseNoneFalse11495.560
3399060119895Noneitem code 24a LT Protection Kit for 25 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2807.222807.222.0FalseNoneNoneFalseNoneFalse5614.440
3399061119895Noneitem code 24b LT Distribution Box for 100 250 kVA DTC with MCCBs SMC Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2841.442841.442.0FalseNoneNoneFalseNoneFalse5682.880
3399062119895Noneitem code 24i Alluminium lead wire 120sq mm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTMtr168.96168.9650.0FalseNoneNoneFalseNoneFalse8448.00
3399063119895Noneitem code 24ii Copper lugs 120Sqmm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo165.2165.28.0FalseNoneNoneFalseNoneFalse1321.60
3399064119895Noneitem code 24iii PG Clamps Rabbit to 120 Sqmm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo322.14322.148.0FalseNoneNoneFalseNoneFalse2577.120
3399065119895Noneitem code 24iv Spacers for DTC wiring Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo49.5649.5616.0FalseNoneNoneFalseNoneFalse792.960
3399066119895Noneitem code 24v Fish plate with clamp bolt nut Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo311.52311.524.0FalseNoneNoneFalseNoneFalse1246.080
3399067119895Noneitem code 24item I to v Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo1119.821119.822.0FalseNoneNoneFalseNoneFalse2239.640
3399068119895Noneitem code 24c LT Metering Box for housing the ETV Meter Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo8492.468492.460.0001FalseNoneNoneFalseNoneFalse0.8492460
3399069119895Noneitem code 24d L.T Electronic Tri Vector Meter 5A Class 0.5 1. accurancy Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo4573.684573.680.0001FalseNoneNoneFalseNoneFalse0.4573680
3399070119895Noneitem code 25GSM Modem Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo17009.717009.70.0001FalseNoneNoneFalseNoneFalse1.700970
3399071119895Noneitem codeHG Fuse 11 kV Solid Core Type Set 3 Nos Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet2100.42100.412.0FalseNoneNoneFalseNoneFalse25204.80
3399072119895Noneitem codeSingle Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTSet12453.7212453.720.0001FalseNoneNoneFalseNoneFalse1.2453720
3399073119895Noneitem codeH Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo7544.927544.920.0001FalseNoneNoneFalseNoneFalse0.7544920
3399074119895Noneitem codeTransparent Alkathene tube 19 mm 2mm 30 mtr Coil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTCoil610.06610.066.0FalseNoneNoneFalseNoneFalse3660.360
3399075119895Noneitem codeLoading and Unloading of Transformer 250 300 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos816.56816.560.0001FalseNoneNoneFalseNoneFalse0.0816560
3399076119895Noneitem codeLoading and Unloading of Transformer 25 63 100 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos503.86503.860.0001FalseNoneNoneFalseNoneFalse0.0503860
3399077119895Noneitem codeReleasing and Reerrection of 11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNo2674.72674.71.0FalseNoneNoneFalseNoneFalse2674.70
3399078119895Noneitem codeDecommissioning of Assets Releasing of Conductor 2 4 ACSR Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm3377.163377.162.0FalseNoneNoneFalseNoneFalse6754.320
3399079119895Noneitem codeReleasing of Conductor Rabbit ACSR Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTKm4742.424742.420.0001FalseNoneNoneFalseNoneFalse0.4742420
3399080119895Noneitem codeReleasing of Idle Poles Scrap 0.9x1742 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos1850.01850.071.0FalseNoneNoneFalseNoneFalse131350.00
3399081119895Noneitem codeReleasing of Transformer Structure 0.9x5725 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos6079.956079.951.0FalseNoneNoneFalseNoneFalse6079.950
3399082119895Noneitem codeReleasing of H Cross Arm 0.9x160 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos169.92169.9285.0FalseNoneNoneFalseNoneFalse14443.20
3399083119895Noneitem codeReleasing of 4 pin Cross Arm 0.9x160 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GSTNos169.92169.920.0001FalseNoneNoneFalseNoneFalse0.0169920
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17195674110000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17195674110000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17195674110000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17195674110000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17195674110000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17195674110000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17195674110000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17195674110000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costs.None
17195674110000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17195674110000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17195674110000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17195674110000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17195674110000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17195674110000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc., required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17195674110000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17195674110000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17195674110000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17195674110000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17195674110000NoneNoneELIGIBILITYOriginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17195674110000NoneNoneELIGIBILITYAll Item rates are inclusive of 18% GST. Hence GST will not be paid separately.None
17195674110000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tenders without assigning any reason.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23& 2023-24 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1210.65 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 c) -To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22,2022-23 & 2023-24 Executed in any one financial year, the following minimum quantities of work: Earth Work for Embankment/ Subgrade/ Shoulders : 34178.02 Cum,Granular Sub-Base (GSB)/ Wet Mix Macadam (WMM) : 27546.38 Cum,Bituminous Base and Surface Course (DBM, BM, BC & SDBC): 6344.80 Cum,Reinforced Cement Concrete (RCC) M20 & higher grades: 243.62 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned: Hot Mix Plant with Electronic Controls 40-60 TPH and higher capacity: 1 No,Mechanical Paver Finisher : 1 No,Static Road Roller/Vibratory road roller/Soil compactor : 2 No,Tippers : 4 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own, Sale agreement with original purchase invoice for own
NoneNoneNoneNoneSection 2 ITT 3.3(b) Machineries could be on Lease/Hire: Wet Mix Plant / Pug mill : 1 No,Truck mounted Bitumen Sprayer : 1 No,Motor Grader : 1 No,Vibratory roller/Tandem roller:3 No,Excavator 0.90 Cum Bucket Capacity : 2 No,Tipper Trucks : 6 No, Self loading concrete Mixer :3 NoCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNoneSection 2 ITT 3.7 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified if their available tender capacity is more than the total tender value The available tender capacity will be calculated as under Assessed available tender capacity AxNx1.5-B Where A Maximum value of civil engineering works executed in any one year during the last five years updated to 2019-20 to 2023-24 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value at 2023-24 price level of existing commitments and on-going works to be completed during the next 11months period of completion of the works for which Tenders are invitedCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneSection 2 ITT 3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22,2022-23 & 2023-24. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4842.59 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNoneSetion 2 ITT 3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.726.39 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAffidavit as per KW4OthersAffidavit as per KW4
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit as per KW4
NoneNoneNoneNoneTAX/GST Registration certificateOthersTAX/GST Registration certificate
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- TAX/GST Registration certificate
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration certificateTrueTechnical Bid
Annual Turnover Certificate along with UDINTrueTechnical Bid
Work done Certificate Issued by not below Rank of Executive EngineerTrueTechnical Bid
Bid Capacity Calculation as per KW 4 DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalised Bank as per KW-4TrueTechnical Bid
Details of committed worksTrueTechnical Bid
Copies of GST/Tax Registration certificateTrueTechnical Bid
AFFIDAVIT AS PER KW4TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1719648812000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer Project Implementation Unit State Highway Development Project PWD Annex Building, K.R.Circle
streetNone
cityBengaluru
stateKarnataka
pin560001