tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1719567411000 | 1 | None | None | Roads | Road Work (Reconstruction) | 184910935.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398811 | 119884 | None | 16.29 | Providing and fixing of typical SHDP type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangle shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangle shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangle shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be
painted with primer and two coats of Epoxy paint. The steel
tube below ground level will be painted with three coats of
Epoxy paint. The design, painting and lettering shall be done
as per approved drawing.
(iii) For warranty and durability the clause 1701.5 and for
maintenance the clause 1911 shall be applicable.
(iv) A reference number along with the month and year
of installation should be placed on the back of a sign in
a contrasting colour or by stamping in characters not
exceeding 50 mm in height.485777/2019/Dir(Tech) 7 UNISR2023-24,V-3,PageNo.149Item No.16.29 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Nos | 18115.36 | 18115.36 | 2.0 | False | None | None | False | None | False | 36230.72 | 0 | 3398812 | 119884 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 463.74 | 463.74 | 168.26 | False | None | None | False | None | False | 78028.8924 | 0 | 3398813 | 119884 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 7.08 | 7.08 | 72100.0 | False | None | None | False | None | False | 510468.0 | 0 | 3398814 | 119884 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 112.1 | 112.1 | 18100.36 | False | None | None | False | None | False | 2029050.356 | 0 | 3398815 | 119884 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 140.42 | 140.42 | 9816.02 | False | None | None | False | None | False | 1378365.5284 | 0 | 3398816 | 119884 | None | 4.4 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2.(UNI SR Rates 2023-2024, Volume-3, Page No. 24,Item. No. 4.4) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 581.74 | 581.74 | 13506.67 | False | None | None | False | None | False | 7857370.2058 | 0 | 3398817 | 119884 | None | 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material.(UNI SR Rates 2023-2024, Volume-3, Page No. 23,Item. No. 4.2 (v)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 2783.62 | 2783.62 | 16041.47 | False | None | None | False | None | False | 44653356.7214 | 0 | 3398818 | 119884 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(UNI SR Rates 2023-2024, Volume-3, Page No. 26,Item. No. 4.17) Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Cum | 3019.62 | 3019.62 | 18391.5 | False | None | None | False | None | False | 55535341.23 | 0 | 3398819 | 119884 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 48.38 | 48.38 | 72100.0 | False | None | None | False | None | False | 3488198.0 | 0 | 3398820 | 119884 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 16.52 | 16.52 | 72100.0 | False | None | None | False | None | False | 1191092.0 | 0 | 3398821 | 119884 | None | 5.12 (c) | Dense Graded Bituminous Macadam Grading - II for traffic 20 MSA. Providing and laying Dense Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.UNI SR 2023-24, V-3,Page No. 35 Item No.5.12 (c) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 11149.82 | 11149.82 | 3605.0 | False | None | None | False | None | False | 40195101.1 | 0 | 3398822 | 119884 | None | 5.16(c) | Bituminous Concrete Grading II for traffic 20 MSA Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respectsUNI SR 2023-24, V-3,Page No. 38 Item No.5.16(c) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 12925.72 | 12925.72 | 2163.0 | False | None | None | False | None | False | 27958332.36 | 0 |
| 1719567411000 | 0 | None | None | Roads | Road Furnitures | 6340661.8 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398823 | 119885 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing.(UNI SR Rates 2023-2024, Volume-3, Page No. 65,Item. No. 8.7) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 10631.8 | 10631.8 | 9.32 | False | None | None | False | None | False | 99088.376 | 0 | 3398824 | 119885 | None | 8.6 ii | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 ii) 90 cm equilateral triangle (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 ii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | No | 5602.64 | 5602.64 | 24.0 | False | None | None | False | None | False | 134463.36 | 0 | 3398825 | 119885 | None | 8.6 (viii) | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 viii) 60 cm circular (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 viii) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | No | 5131.82 | 5131.82 | 15.0 | False | None | None | False | None | False | 76977.3 | 0 | 3398826 | 119885 | None | 8.6 (xv) | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made
of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022 xv) 90 cm high octagon (UNI SR Rates 2023-2024, Volume-3, Page No. 64,Item. No. 8.6 xv) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | No | 7817.5 | 7817.5 | 24.0 | False | None | None | False | None | False | 187620.0 | 0 | 3398827 | 119885 | None | 8.31 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(UNI SR Rates 2023-2024, Volume-3, Page No. 71,Item. No. 8.31) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 221.84 | 221.84 | 78.75 | False | None | None | False | None | False | 17469.9 | 0 | 3398828 | 119885 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, PWDform and free from streaks and holes.(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 625.4 | 625.4 | 2427.9 | False | None | None | False | None | False | 1518408.66 | 0 | 3398829 | 119885 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(UNI SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Nos | 430.7 | 430.7 | 1807.0 | False | None | None | False | None | False | 778274.9 | 0 | 3398830 | 119885 | None | 8.16 (iii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast)(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (iii)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Nos | 993.56 | 993.56 | 52.0 | False | None | None | False | None | False | 51665.12 | 0 | 3398831 | 119885 | None | 8.16 (ii) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast).(PWD SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (ii)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Nos | 3453.86 | 3453.86 | 10.0 | False | None | None | False | None | False | 34538.6 | 0 | 3398832 | 119885 | None | 8.16 (i) | Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including painting and printing etc.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.16 (i)) Rates are Inclusive of 18% GST (5TH km Stone) ---- Item rates are inclusive of 18 percent GST | Nos | 5995.58 | 5995.58 | 1.0 | False | None | None | False | None | False | 5995.58 | 0 | 3398833 | 119885 | None | 8.25( i) | Metal Beam Crash Barrier (i)Type A, W Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS1367 and IS1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (PWD SR Rates 2023-2024, Volume-3, Page No. 69,Item. No. 8.25( i)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Rmtr | 4295.2 | 4295.2 | 800.0 | False | None | None | False | None | False | 3436160.0 | 0 |
| 1719567411000 | 1 | None | None | Roads | Construction of Box Culvert (Vent Size 1.2 X 1.2M) CH 101.77, CH 103.14 and CH 103.32 | 3580916.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398834 | 119886 | None | 2.11(II(A) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical meansPWD SR 2023-24, Vol-3 Page No 11 Item No 2.11(II(A)) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 19.35 | False | None | None | False | None | False | 4109.94 | 0 | 3398835 | 119886 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 190.06 | False | None | None | False | None | False | 22875.6216 | 0 | 3398836 | 119886 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3 Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 29.04 | False | None | None | False | None | False | 205226.2608 | 0 | 3398837 | 119886 | None | 2.11(h) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures
PWD SR 2023-24, Vol-1 Page No 18 Item No 2.11(h) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 10.51 | False | None | None | False | None | False | 979878.6198 | 0 | 3398838 | 119886 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS
Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 60.93 | False | None | None | False | None | False | 546650.5554 | 0 | 3398839 | 119886 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 17.85 | False | None | None | False | None | False | 172960.9665 | 0 | 3398840 | 119886 | None | 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24, Vol-3 Page No 117 Item No 12.3 Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 49.45 | False | None | None | False | None | False | 68153.968 | 0 | 3398841 | 119886 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24, Vol-3 Page No 117 Item No 12.4 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 16.2 | False | None | None | False | None | False | 51173.532 | 0 | 3398842 | 119886 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 16 Item No 2.4.2 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 4.46 | False | None | None | False | None | False | 33276.6844 | 0 | 3398843 | 119886 | None | 14.4.A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder.
PWD SR 2023-24, Vol-3 Page No 129 Item No 14.4.A Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 11.16 | False | None | None | False | None | False | 25178.7456 | 0 | 3398844 | 119886 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification.
PWD SR 2023-24, Vol-3 Page No 121 Item No 13.8. Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 22.68 | False | None | None | False | None | False | 182278.7064 | 0 | 3398845 | 119886 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
PWD SR 2023-24, Vol-3 Page No 122 Item No 13.9 Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 36.0 | False | None | None | False | None | False | 502750.8 | 0 | 3398846 | 119886 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
PWD SR 2023-24, Vol-3 Page No 121 Item No 13.2. Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 4.59 | False | None | None | False | None | False | 75669.7302 | 0 | 3398847 | 119886 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.
PWD SR 2023-24, Vol-3 Page No 124 Item No 13.16 Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | m | 2118.1 | 2118.1 | 72.0 | False | None | None | False | None | False | 152503.2 | 0 | 3398848 | 119886 | None | 13.14 | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces PWD SR 2023-24, Vol-3 Page No66 Item No 8.10 Rates are Inclusive of 18% GST
---- Item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 20.1 | False | None | None | False | None | False | 2585.262 | 0 | 3398849 | 119886 | None | 2.17 (ix) B | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and leadii) By Mechanical Means B. Above 600 mm to 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) B) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | m | 1293.28 | 1293.28 | 22.5 | False | None | None | False | None | False | 29098.8 | 0 | 3398850 | 119886 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, Vol-1 Page No 15 Item No 2.2.3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8074.6 | 8074.6 | 65.21 | False | None | None | False | None | False | 526544.666 | 0 |
| 1719567411000 | 1 | None | None | Roads | PKG 752 Construction of Box Culvert (Vent Size 2 X 2M) CH 105.49 | 2126466.11 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398851 | 119887 | None | 2.11(II(A)) | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Dismantling Brick / Tile work / rubble masonry / pitching / etc by mechanical means PWD SR Rates 2023-24 Item no 2.11 II (A) Page No 11 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 212.4 | 212.4 | 32.4 | False | None | None | False | None | False | 6881.76 | 0 | 3398852 | 119887 | None | 2.17 (ix) C) | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means C. Above 900 mm dia(PWD SR Rates 2023-2024, Volume-3, Page No. 11,Item. No. 2.17 (ix) C) Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Mtr | 1621.32 | 1621.32 | 15.0 | False | None | None | False | None | False | 24319.8 | 0 | 3398853 | 119887 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 100.63 | False | None | None | False | None | False | 12111.8268 | 0 | 3398854 | 119887 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 7067.02 | 7067.02 | 17.19 | False | None | None | False | None | False | 121482.0738 | 0 | 3398855 | 119887 | None | 2.11 (h) | Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Tonne | 93232.98 | 93232.98 | 7.3 | False | None | None | False | None | False | 680600.754 | 0 | 3398856 | 119887 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8971.78 | 8971.78 | 43.35 | False | None | None | False | None | False | 388926.663 | 0 | 3398857 | 119887 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 9689.69 | 9689.69 | 16.62 | False | None | None | False | None | False | 161042.6478 | 0 | 3398858 | 119887 | None | 12.3 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material PWD SR 2023-24 Item no 12.3 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 1378.24 | 1378.24 | 26.61 | False | None | None | False | None | False | 36674.9664 | 0 | 3398859 | 119887 | None | 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. PWD SR 2023-24 Item No 12.4 Page No 117 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 3158.86 | 3158.86 | 5.4 | False | None | None | False | None | False | 17057.844 | 0 | 3398860 | 119887 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Mix M20 Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.4.2 Page No 16 Vol-1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 7461.14 | 7461.14 | 6.38 | False | None | None | False | None | False | 47602.0732 | 0 | 3398861 | 119887 | None | 14.4A | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder. PWD SR 2023-24 Item No 14.4A Page No 129 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 2256.16 | 2256.16 | 5.56 | False | None | None | False | None | False | 12544.2496 | 0 | 3398862 | 119887 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification. PWD SR 2023-24 Item No 13.8 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8036.98 | 8036.98 | 7.56 | False | None | None | False | None | False | 60759.5688 | 0 | 3398863 | 119887 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) PWD SR 2023-24 Item No 13.9 Page No 122 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 13965.3 | 13965.3 | 12.0 | False | None | None | False | None | False | 167583.6 | 0 | 3398864 | 119887 | None | 13.2 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant) PWD SR 2023-24 Item No 13.2 Page No 121 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 16485.78 | 16485.78 | 4.28 | False | None | None | False | None | False | 70559.1384 | 0 | 3398865 | 119887 | None | 13.16 | Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. PWD SR 2023-24 Item No 13.16 Page No 124 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Mtr | 2118.1 | 2118.1 | 24.0 | False | None | None | False | None | False | 50834.4 | 0 | 3398866 | 119887 | None | 13.14 | Painting Two Coats on New Concrete Surfaces
Painting two coats after filling the surface with synthetic
enamel paint in all shades on new plastered concrete surfaces. PWD SR 2023-24 Item No 8.10 Page No 66 Vol-3 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Sqm | 128.62 | 128.62 | 17.37 | False | None | None | False | None | False | 2234.1294 | 0 | 3398867 | 119887 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24 Item No 2.2.3 Page No 15 Vol-1 Rates are Inclusive of 18% GST ---- Item rates are inclusive of 18 percent GST | Cum | 8074.6 | 8074.6 | 32.85 | False | None | None | False | None | False | 265250.61 | 0 |
| 1719567411000 | 0 | None | None | Roads | 1st Year Road Maintenance | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398868 | 119888 | None | 2.5 ii a) | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness (ii) By Mechanical Means using Dozer a In area of light jungle (PWD SR Rates 2023-2024, Volume-3, Page No. 9,Item. No. 2.5 ii a) Rates are inclusive of 18% GST LBD qty=82.40 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398869 | 119888 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.19) Rates are inclusive of 18% GST LBD Qty=6180.00 ---- Item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398870 | 119888 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.3) Rates are inclusive of 18% GST LBD QTY=927.00 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398871 | 119888 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.2) Rates are inclusive of 18% GST LBD QTY=3090.00 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398872 | 119888 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete, 40mm (using Vg-30 grade Bitumen) Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface, all as per clause 3004.2 (PWD SR Rates 2023-2024, Volume-3, Page No. 91,Item. No. 10.5) (have to Rectify irrespective of qty)Rates are inclusive of 18% GST LBD QTY=0.00 ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398873 | 119888 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (PWD SR Rates 2023-2024, Volume-1, Page No. 7,Item. No. 1.12) Rates are inclusive of 18% GST LBD QTY=86.40 ---- Item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 |
| 1719567411000 | 0 | None | None | Roads | 2nd Year Maintenance | 0.06 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398874 | 119889 | None | item code 2.5 II a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a LBD QTY 123.60 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398875 | 119889 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 LBD QTY 8240.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398876 | 119889 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 LBD QTY 927.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398877 | 119889 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 LBD QTY 3090.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398878 | 119889 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 (have to Rectify irrespective of qty) LBD QTY 0.00 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 | 3398879 | 119889 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 LBD QTY 86.40 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 1.0 | False | None | None | False | None | False | 0.01 | 0 |
| 1719567411000 | 1 | None | None | Roads | 3rd Year Road Maintenance | 813774.69 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398880 | 119890 | None | item code 2.5 II a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 519.39 | 519.39 | 113.16 | False | None | None | False | None | False | 58774.1724 | 0 | 3398881 | 119890 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Rmtr | 7.93 | 7.93 | 4120.0 | False | None | None | False | None | False | 32671.6 | 0 | 3398882 | 119890 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 51.54 | 51.54 | 927.0 | False | None | None | False | None | False | 47777.58 | 0 | 3398883 | 119890 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 128.19 | 128.19 | 3090.0 | False | None | None | False | None | False | 396107.1 | 0 | 3398884 | 119890 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 563.0 | 563.0 | 360.5 | False | None | None | False | None | False | 202961.5 | 0 | 3398885 | 119890 | None | item code 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.22 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 2622.05 | 2622.05 | 7.0 | False | None | None | False | None | False | 18354.35 | 0 | 3398886 | 119890 | None | item code 16.24 i | Maintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint PWD SR Rates 2023 2024 Volume 3 Page No. 148 Item. No. 16.24i Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 272.25 | 272.25 | 52.0 | False | None | None | False | None | False | 14157.0 | 0 | 3398887 | 119890 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 125.55 | 125.55 | 216.0 | False | None | None | False | None | False | 27118.8 | 0 | 3398888 | 119890 | None | item code 8.10 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces PWD SR Rates 2023-2024 Volume-3 Page No. 66 Item. No. 8.10 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 144.05 | 144.05 | 35.7 | False | None | None | False | None | False | 5142.585 | 0 | 3398889 | 119890 | None | item code 8.4 | Printing New letter and Figures of any Shade 8.3 Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman PWD SR Rates 2023.2024 Volume 3 Page No. 63 Item. No. 8.4 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | cm | 1.19 | 1.19 | 9000.0 | False | None | None | False | None | False | 10710.0 | 0 |
| 1719567411000 | 0 | None | None | Roads | 4th Year Road Maintenance | 792740.85 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398890 | 119891 | None | item code 2.5 ii a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 537.94 | 537.94 | 113.16 | False | None | None | False | None | False | 60873.2904 | 0 | 3398891 | 119891 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Rmtr | 8.21 | 8.21 | 4120.0 | False | None | None | False | None | False | 33825.2 | 0 | 3398892 | 119891 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 53.38 | 53.38 | 927.0 | False | None | None | False | None | False | 49483.26 | 0 | 3398893 | 119891 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 132.77 | 132.77 | 3090.0 | False | None | None | False | None | False | 410259.3 | 0 | 3398894 | 119891 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 583.11 | 583.11 | 360.5 | False | None | None | False | None | False | 210211.155 | 0 | 3398895 | 119891 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 130.04 | 130.04 | 216.0 | False | None | None | False | None | False | 28088.64 | 0 |
| 1719567411000 | 0 | None | None | Roads | 5th Year Road Maintenance | 1037570.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398896 | 119892 | None | item code 2.5 ii a | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness ii By Mechanical Means using Dozer a In area of light jungle PWD SR Rates 2023 2024 Volume 3 Page No. 9 Item. No. 2.5 ii a Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 556.49 | 556.49 | 113.16 | False | None | None | False | None | False | 62972.4084 | 0 | 3398897 | 119892 | None | item code 16.19 | Maintenance of Drains The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR Rates 2023 2024 Volume 3 Page No. 147 Item. No. 16.19 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Rmtr | 8.5 | 8.5 | 4120.0 | False | None | None | False | None | False | 35020.0 | 0 | 3398898 | 119892 | None | item code 10.3 | Maintenance of Earth Shoulder (stripping excess soil)
Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 55.22 | 55.22 | 927.0 | False | None | None | False | None | False | 51188.94 | 0 | 3398899 | 119892 | None | item code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)
Making up loss of material/ irregularities on shoulder to the
design level by adding fresh approved soil and compacting it with appropriate equipment. PWD SR Rates 2023 2024 Volume 3 Page No.91 Item. No. 10.2 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 137.35 | 137.35 | 3090.0 | False | None | None | False | None | False | 424411.5 | 0 | 3398900 | 119892 | None | item code 10.5 | Filling Pot holes and Patch Repairs with Bituminous concrete 40mm using Vg 30 grade Bitumen Removal of all failed material trimming of completed excavation to provide firm vertical faces cleaning of surface painting of tack coat on the sides and base of excavation as per clause 503 back filling the pot holes with hot bituminous material as per clause 504 using HMP 40 60 TPH Capacity compacting trimming and finishing the surface to form a smooth continuous surface all as per clause 3004.2 PWD SR Rates 2023 2024 Volume 3 Page No. 91 Item. No. 10.5 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 603.22 | 603.22 | 721.0 | False | None | None | False | None | False | 434921.62 | 0 | 3398901 | 119892 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD SR Rates 2023 2024 Volume 1 Page No. 7 Item. No. 1.12 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 134.52 | 134.52 | 216.0 | False | None | None | False | None | False | 29056.32 | 0 |
| 1719567411000 | 0 | None | None | Roads | 6th Year Road Maintenance | 38787486.28 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398902 | 119893 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (PWD SR Rates 2023-2024, Volume-3, Page No. 147,Item. No. 16.22) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 2902.99 | 2902.99 | 10.3 | False | None | None | False | None | False | 29900.797 | 0 | 3398903 | 119893 | None | 16.24i | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (PWD SR Rates 2023-2024, Volume-3, Page No. 148,Item. No. 16.24i) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 301.42 | 301.42 | 10.3 | False | None | None | False | None | False | 3104.626 | 0 | 3398904 | 119893 | None | 8.10 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 (PWD SR Rates 2023-2024, Volume-3, Page No. 66,Item. No. 8.10) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 159.49 | 159.49 | 35.7 | False | None | None | False | None | False | 5693.793 | 0 | 3398905 | 119893 | None | 8.4 | Printing New letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade 8.4 English and Roman (PWD SR Rates 2023-2024, Volume-3, Page No. 63,Item. No. 8.4) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.32 | 1.32 | 9000.0 | False | None | None | False | None | False | 11880.0 | 0 | 3398906 | 119893 | None | 5.3i | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20 kg/m2 on the prepared bituminous surface cleaned with mechanical broom(PWD SR Rates 2023-2024, Volume-3, Page No. 31,Item. No. 5.3i) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 17.56 | 17.56 | 72100.0 | False | None | None | False | None | False | 1266076.0 | 0 | 3398907 | 119893 | None | 5.16 C | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(PWD SR Rates 2023-2024, Volume-3, Page No. 37,Item. No. 5.16 C) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 16027.89 | 16027.89 | 2163.0 | False | None | None | False | None | False | 34668326.07 | 0 | 3398908 | 119893 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(UNI SR Rates 2023-2024, Volume-3, Page No. 67,Item. No. 8.15) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Sqm | 775.5 | 775.5 | 2427.9 | False | None | None | False | None | False | 1882836.45 | 0 | 3398909 | 119893 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(PWD SR Rates 2023-2024, Volume-3, Page No. 74,Item. No. 8.43) Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 534.07 | 534.07 | 1722.0 | False | None | None | False | None | False | 919668.54 | 0 |
| 1719567411000 | 0 | None | None | Roads | Water Supply | 1201698.31 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398910 | 119894 | None | 1.14.1 | Earth work excavation for Foundation depth upto 3 m as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m.PWD SR Rates 2023-2024, Volume1 Page No. 8 Item. No. 1.14.1 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 120.36 | 120.36 | 469.8 | False | None | None | False | None | False | 56545.128 | 0 | 3398911 | 119894 | None | 9.2.3 | Supplying, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveyingto work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing ofpipes and specials with electrofusion welding, giving hydraulic test as perrelevant ISS with all lead and lifts including encasing the pipe alround toa depth of not less than 15 cms. with soft gravel or selected earth availablefrom the excation, testing and commissioning. The rate is exclusive ofrequired specials and fittings wherever necessary like saddle Tee, stubends, flanged sets, bedns, reducers etc. complete (Contractor will makehis own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. (Revised Rate)-For Grade PE100 (PN 6.0 / 6 Kg/cm2)-HDPE Grade PE80-PN8.0,90mm dia PWD SR 2023-24, Vol-5 Page No 96 Item No 9.2.3 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | m | 450.76 | 450.76 | 870.0 | False | None | None | False | None | False | 392161.2 | 0 | 3398912 | 119894 | None | 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications PWD SR 2023-24, Vol-1 Page No 35 Item No 1.10 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Cum | 188.8 | 188.8 | 462.93 | False | None | None | False | None | False | 87401.184 | 0 | 3398913 | 119894 | None | 8.29 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. (i) Single row for one utility service PWD SR 2023-24, Vol-3 Page No 71 Item No 8.29 Rates are Inclusive of 18 Percent GST ---- Item rates are inclusive of 18 percent GST | m | 2610.16 | 2610.16 | 255.0 | False | None | None | False | None | False | 665590.8 | 0 |
| 1719567411000 | 1 | None | None | Roads | Electrical Pole Shifting | 2537201.05 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3398914 | 119895 | None | item code | RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 10405.24 | 10405.24 | 1.0 | False | None | None | False | None | False | 10405.24 | 0 | 3398915 | 119895 | None | item code | PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7010.38 | 7010.38 | 4.0 | False | None | None | False | None | False | 28041.52 | 0 | 3398916 | 119895 | None | item code | PSCC Pole 9 Mtr Long 200 Kg WL stud Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7010.38 | 7010.38 | 2.0 | False | None | None | False | None | False | 14020.76 | 0 | 3398917 | 119895 | None | item code | PSCC Pole 9 Mtr Long 300 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398918 | 119895 | None | item code | DP Structure with RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 31057.6 | 31057.6 | 1.0 | False | None | None | False | None | False | 31057.6 | 0 | 3398919 | 119895 | None | item code | Loading and unloading of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 167.56 | 167.56 | 8.0 | False | None | None | False | None | False | 1340.48 | 0 | 3398920 | 119895 | None | item code | Transporation of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 336.3 | 336.3 | 8.0 | False | None | None | False | None | False | 2690.4 | 0 | 3398921 | 119895 | None | item code | 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 1083.24 | 1083.24 | 2.0 | False | None | None | False | None | False | 2166.48 | 0 | 3398922 | 119895 | None | item code | 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398923 | 119895 | None | item code | Special 3 pin Cross Arm for PSCC PSC pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 1546.98 | 1546.98 | 2.0 | False | None | None | False | None | False | 3093.96 | 0 | 3398924 | 119895 | None | item code | LT 4 Pin Cross Arm with clamps bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398925 | 119895 | None | item code | LT 4 Pin Cross Arm with clamps bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398926 | 119895 | None | item code | LT 2 Pin Cross Arm with clamps bolts nuts for RCC Pole 9 Mtr Long145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398927 | 119895 | None | item code | LT 2 Pin Cross Arm with clamps bolts nuts for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 499.14 | 499.14 | 4.0 | False | None | None | False | None | False | 1996.56 | 0 | 3398928 | 119895 | None | item code | Rabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398929 | 119895 | None | item code | 11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 12.0 | False | None | None | False | None | False | 2902.8 | 0 | 3398930 | 119895 | None | item code | 11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 219.48 | 219.48 | 6.0 | False | None | None | False | None | False | 1316.88 | 0 | 3398931 | 119895 | None | item code | 1.1kV pin Insulator with GI pins Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398932 | 119895 | None | item code | No.8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398933 | 119895 | None | item code | Guy Set Complete with No. 8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398934 | 119895 | None | item code | Guy Set Complete with No. 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2080.34 | 2080.34 | 2.0 | False | None | None | False | None | False | 4160.68 | 0 | 3398935 | 119895 | None | item code | Guy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 295.0 | 295.0 | 2.0 | False | None | None | False | None | False | 590.0 | 0 | 3398936 | 119895 | None | item code | Rabbit ACSR conductor with 1.5 Percent sag Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 74219.64 | 74219.64 | 0.1 | False | None | None | False | None | False | 7421.964 | 0 | 3398937 | 119895 | None | item code | Transporation of Conductor Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 156.94 | 156.94 | 0.1 | False | None | None | False | None | False | 15.694 | 0 | 3398938 | 119895 | None | item code | Spiral earth Electrode Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 391.76 | 391.76 | 7.0 | False | None | None | False | None | False | 2742.32 | 0 | 3398939 | 119895 | None | item code | EG Stirrup With GI Lacing Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398940 | 119895 | None | item code | Single Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 12453.72 | 12453.72 | 1.0 | False | None | None | False | None | False | 12453.72 | 0 | 3398941 | 119895 | None | item code | H Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7544.92 | 7544.92 | 1.0 | False | None | None | False | None | False | 7544.92 | 0 | 3398942 | 119895 | None | item code | 11 kV DOLO Cutout Conventional to Erstwhile KEB Specification Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398943 | 119895 | None | item code | Releasing and Restringing of Conductor 4361x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 9777.36 | 9777.36 | 1.65 | False | None | None | False | None | False | 16132.644 | 0 | 3398944 | 119895 | None | item code | Releasing and Reerrection of pole 1742x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 3905.57 | 3905.57 | 11.0 | False | None | None | False | None | False | 42961.27 | 0 | 3398945 | 119895 | None | item code | Releasing and Refixing of H X arm 272x1.9 ---- Item rates are inclusive of 18 percent GST | Nos | 609.82 | 609.82 | 12.0 | False | None | None | False | None | False | 7317.84 | 0 | 3398946 | 119895 | None | item code | Releasing and Refixing of 4 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398947 | 119895 | None | item code | Releasing and Refixing of 2 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398948 | 119895 | None | item code | Releasing and Refixing of over head Service mains Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398949 | 119895 | None | item code | Releasing and Refixing of 11KV AB Cable 3x95plus70Sqmm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398950 | 119895 | None | item code | Releasing and Refixing of Cable Straight Thru Jointing Kits Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398951 | 119895 | None | item code | Releasing and Refixing of 11KV AB Cable Terminatin Kit Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398952 | 119895 | None | item code | Releasing and Refixing of Suspension Clamp Assembly 16 to 70 mm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398953 | 119895 | None | item code | Releasing and Refixing of Pole clamp for HT LT AB cable Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398954 | 119895 | None | item code | Releasing and Refixing of Eye Hook Flat type for fixing Clamps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398955 | 119895 | None | item code | Releasing and Refixing of Dead End Clamp Anchor Clamp Assembly 16 to 70 Sqmm excluding pole clamps and Eye hook Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398956 | 119895 | None | item code | Releasing and Refixing of End Caps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398957 | 119895 | None | item code | Decommissioning of Assets Releasing of Conductor 2 4 ACSR Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 3377.16 | 3377.16 | 0.001 | False | None | None | False | None | False | 3.37716 | 0 | 3398958 | 119895 | None | item code | Releasing of Conductor Rabbit ACSR Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 4742.42 | 4742.42 | 0.001 | False | None | None | False | None | False | 4.74242 | 0 | 3398959 | 119895 | None | item code | Releasing of Idle Poles Scrap 0.9x1742 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 1850.0 | 1850.0 | 5.0 | False | None | None | False | None | False | 9250.0 | 0 | 3398960 | 119895 | None | item code | Releasing of Transformer Structure 0.9x5725 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 6079.95 | 6079.95 | 1.0 | False | None | None | False | None | False | 6079.95 | 0 | 3398961 | 119895 | None | item code | Releasing of H Cross Arm 0.9x160 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 169.92 | 169.92 | 6.0 | False | None | None | False | None | False | 1019.52 | 0 | 3398962 | 119895 | None | item code | Releasing of 4 pin Cross Arm 0.9x160 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 169.92 | 169.92 | 0.001 | False | None | None | False | None | False | 0.16992 | 0 | 3398963 | 119895 | None | item code | PART A i EXTENSION OF 11KV LINE UG CABLE
11kV Class 3x95 Sq. mm XLPE UG Cable Round Armoured Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 1049805.88 | 1049805.88 | 0.05 | False | None | None | False | None | False | 52490.294 | 0 | 3398964 | 119895 | None | item code | Straight Through Jointing Kits HS Type suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 8626.98 | 8626.98 | 0.0001 | False | None | None | False | None | False | 0.862698 | 0 | 3398965 | 119895 | None | item code | Cable Termination Kit Outdoor HS Type Suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Per Kit | 4810.86 | 4810.86 | 2.0 | False | None | None | False | None | False | 9621.72 | 0 | 3398966 | 119895 | None | item code | Cable Termination Kit Indoor HS Type Suitable for 3x95 Sq. mm Cable Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Per Kit | 4417.92 | 4417.92 | 2.0 | False | None | None | False | None | False | 8835.84 | 0 | 3398967 | 119895 | None | item code | Artificial Manufacture sand Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | cm | 2107.48 | 2107.48 | 14.0 | False | None | None | False | None | False | 29504.72 | 0 | 3398968 | 119895 | None | item code | RCC Hume Pipe 2000mm Long 150mm Dia Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 362.26 | 362.26 | 5.0 | False | None | None | False | None | False | 1811.3 | 0 | 3398969 | 119895 | None | item code | Collars for RCC Hume Pipe Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 96.76 | 96.76 | 5.0 | False | None | None | False | None | False | 483.8 | 0 | 3398970 | 119895 | None | item code | GI Pipe 150 mm Dia for drain crossing cable raising etc. Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 1457.3 | 1457.3 | 4.0 | False | None | None | False | None | False | 5829.2 | 0 | 3398971 | 119895 | None | item code | Route and Joint indicating stones Rates are Inclusive of Material 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 156.94 | 156.94 | 2.0 | False | None | None | False | None | False | 313.88 | 0 | 3398972 | 119895 | None | item code 9 a | Labour charges
a Cable trench Excavation 1000x0.6x1 600 Ordinary Soil Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | cm | 309.16 | 309.16 | 30.0 | False | None | None | False | None | False | 9274.8 | 0 | 3398973 | 119895 | None | item code 9 b | b Laying of cable in trench Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 72359.96 | 72359.96 | 0.05 | False | None | None | False | None | False | 3617.998 | 0 | 3398974 | 119895 | None | item code 9 c | c Refiling and Consolidation Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | cm | 188.8 | 188.8 | 27.5 | False | None | None | False | None | False | 5192.0 | 0 | 3398975 | 119895 | None | item code 9 d | d Making of straight through joint Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 3360.64 | 3360.64 | 0.001 | False | None | None | False | None | False | 3.36064 | 0 | 3398976 | 119895 | None | item code 9 e | e Making of cable termination Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 3136.44 | 3136.44 | 4.0 | False | None | None | False | None | False | 12545.76 | 0 | 3398977 | 119895 | None | item code 9 f | f Covering the cable with tie Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 5153.06 | 5153.06 | 0.13 | False | None | None | False | None | False | 669.8978 | 0 | 3398978 | 119895 | None | item code9 g | g Spreading Sand and forming with Sand round the cable Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 17475.8 | 17475.8 | 0.13 | False | None | None | False | None | False | 2271.854 | 0 | 3398979 | 119895 | None | item code 9 h | h Laying of RCC Hume pipe Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 81.42 | 81.42 | 3.0 | False | None | None | False | None | False | 244.26 | 0 | 3398980 | 119895 | None | item code 9 i | i Laying of GI Pipe Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 109.74 | 109.74 | 0.001 | False | None | None | False | None | False | 0.10974 | 0 | 3398981 | 119895 | None | item code 9 j | j Laying of Route and Joint indicating stone Rates are Inclusive of Labour Cost 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 136.88 | 136.88 | 2.0 | False | None | None | False | None | False | 273.76 | 0 | 3398982 | 119895 | None | item code | PART B Shifting or Re Erection of Pole or Lines using 11 Mtr
Spun Spole Spun pole 11 Mtr Long Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 26138.18 | 26138.18 | 4.0 | False | None | None | False | None | False | 104552.72 | 0 | 3398983 | 119895 | None | item code | Single Pole Transformer Structure Kit with Three H Frames without Transformer Seating and Seating Angle support cross arm for 63 100 250 500 kva UG Cable MS Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 28243.3 | 28243.3 | 0.001 | False | None | None | False | None | False | 28.2433 | 0 | 3398984 | 119895 | None | item code | HT Single Top Support with bolts nuts and washers Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 297.36 | 297.36 | 36.0 | False | None | None | False | None | False | 10704.96 | 0 | 3398985 | 119895 | None | item code | 11. KV 5 KN Polymeric pin insulator 24mm dia frp rod Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 36.0 | False | None | None | False | None | False | 8708.4 | 0 | 3398986 | 119895 | None | item code | Alkathene tube 19mm dia and in coils of 13 mtr Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Coil | 610.06 | 610.06 | 8.0 | False | None | None | False | None | False | 4880.48 | 0 | 3398987 | 119895 | None | item code | Concreting Matierials for 11 Mtrs Spun poles Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 0.01 | 0.01 | 0.001 | False | None | None | False | None | False | 1e-05 | 0 | 3398988 | 119895 | None | item code | Base Concreting 1 2 4 1000 x 1000 x 150mm Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Each | 1104.48 | 1104.48 | 4.0 | False | None | None | False | None | False | 4417.92 | 0 | 3398989 | 119895 | None | item code | Pole Concreting 1 2 4 1000 x 1000 x 2500mm Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Each | 18417.44 | 18417.44 | 4.0 | False | None | None | False | None | False | 73669.76 | 0 | 3398990 | 119895 | None | item code | Coping 1 2 4 as per actuals Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Each | 2798.96 | 2798.96 | 4.0 | False | None | None | False | None | False | 11195.84 | 0 | 3398991 | 119895 | None | item code | GI wire 10 SWG Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Kg | 93.44 | 93.44 | 20.0 | False | None | None | False | None | False | 1868.8 | 0 | 3398992 | 119895 | None | item code | Guy wire 7 10 SWG Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Kg | 91.13 | 91.13 | 40.0 | False | None | None | False | None | False | 3645.2 | 0 | 3398993 | 119895 | None | item code | GI Pipe 100 mm Dia for cable raising etc. Extracted from Volume 5 BWSSB SR Item no 177 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 1567.04 | 1567.04 | 40.0 | False | None | None | False | None | False | 62681.6 | 0 | 3398994 | 119895 | None | item code | PVC Pipe 160mm dia Extracted from Volume 5 BWSSB SR Item no 649 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 599.44 | 599.44 | 80.0 | False | None | None | False | None | False | 47955.2 | 0 | 3398995 | 119895 | None | item code | PVC Pipe 25mm dia Extracted from Volume 6 PWD SR Item no 2 Rates are Inclusive of Materials Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 30.68 | 30.68 | 160.0 | False | None | None | False | None | False | 4908.8 | 0 | 3398996 | 119895 | None | item code | PART C Shifting Re errection of poles Lines using RCC PSCC Poles
RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 10405.24 | 10405.24 | 14.0 | False | None | None | False | None | False | 145673.36 | 0 | 3398997 | 119895 | None | item code | PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7010.38 | 7010.38 | 57.0 | False | None | None | False | None | False | 399591.66 | 0 | 3398998 | 119895 | None | item code | PSCC Pole 9 Mtr Long 200 Kg WL stud Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7010.38 | 7010.38 | 9.0 | False | None | None | False | None | False | 63093.42 | 0 | 3398999 | 119895 | None | item code | PSCC Pole 9 Mtr Long 300 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 8016.92 | 8016.92 | 0.0001 | False | None | None | False | None | False | 0.801692 | 0 | 3399000 | 119895 | None | item code | DP Structure with RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 31057.6 | 31057.6 | 2.0 | False | None | None | False | None | False | 62115.2 | 0 | 3399001 | 119895 | None | item code | Loading and unloading of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 167.56 | 167.56 | 82.0 | False | None | None | False | None | False | 13739.92 | 0 | 3399002 | 119895 | None | item code | Transporation of Pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 336.3 | 336.3 | 82.0 | False | None | None | False | None | False | 27576.6 | 0 | 3399003 | 119895 | None | item code | 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 1083.24 | 1083.24 | 28.0 | False | None | None | False | None | False | 30330.72 | 0 | 3399004 | 119895 | None | item code | 11 kV Horizontal Cross Arm with clamps HTST supports bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 1079.7 | 1079.7 | 0.0001 | False | None | None | False | None | False | 0.10797 | 0 | 3399005 | 119895 | None | item code | Special 3 pin Cross Arm for PSCC PSC pole Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 1546.98 | 1546.98 | 15.0 | False | None | None | False | None | False | 23204.7 | 0 | 3399006 | 119895 | None | item code | LT 4 Pin Cross Arm with clamps bolts nuts and washers for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 687.94 | 687.94 | 0.0001 | False | None | None | False | None | False | 0.068794 | 0 | 3399007 | 119895 | None | item code | LT 4 Pin Cross Arm with clamps bolts nuts and washers for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 684.4 | 684.4 | 70.0 | False | None | None | False | None | False | 47908.0 | 0 | 3399008 | 119895 | None | item code | LT 2 Pin Cross Arm with clamps bolts nuts for RCC Pole 9 Mtr Long 145 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 502.68 | 502.68 | 0.0001 | False | None | None | False | None | False | 0.050268 | 0 | 3399009 | 119895 | None | item code | LT 2 Pin Cross Arm with clamps bolts nuts for PSCC Pole 9 Mtr Long 200 Kg WL Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 499.14 | 499.14 | 18.0 | False | None | None | False | None | False | 8984.52 | 0 | 3399010 | 119895 | None | item code | Rabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 120.36 | 120.36 | 0.0001 | False | None | None | False | None | False | 0.012036 | 0 | 3399011 | 119895 | None | item code | 11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 171.0 | False | None | None | False | None | False | 41364.9 | 0 | 3399012 | 119895 | None | item code | 11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 219.48 | 219.48 | 84.0 | False | None | None | False | None | False | 18436.32 | 0 | 3399013 | 119895 | None | item code | 1.1kV pin Insulator with GI pins Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 77.88 | 77.88 | 140.0 | False | None | None | False | None | False | 10903.2 | 0 | 3399014 | 119895 | None | item code | No8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 59.0 | 59.0 | 60.0 | False | None | None | False | None | False | 3540.0 | 0 | 3399015 | 119895 | None | item code | Guy Set Complete with No 8 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2042.58 | 2042.58 | 0.0001 | False | None | None | False | None | False | 0.204258 | 0 | 3399016 | 119895 | None | item code | Guy Set Complete with No 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2080.34 | 2080.34 | 42.0 | False | None | None | False | None | False | 87374.28 | 0 | 3399017 | 119895 | None | item code | Guy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 295.0 | 295.0 | 42.0 | False | None | None | False | None | False | 12390.0 | 0 | 3399018 | 119895 | None | item code | Rabbit ACSR conductor with 1.5Percent sag Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 74219.64 | 74219.64 | 2.0 | False | None | None | False | None | False | 148439.28 | 0 | 3399019 | 119895 | None | item code | Transporation of Conductor Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 156.94 | 156.94 | 2.0 | False | None | None | False | None | False | 313.88 | 0 | 3399020 | 119895 | None | item code | Spiral earth Electrode Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 391.76 | 391.76 | 80.0 | False | None | None | False | None | False | 31340.8 | 0 | 3399021 | 119895 | None | item code | EG Stirrup With GI Lacing Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 514.48 | 514.48 | 0.0001 | False | None | None | False | None | False | 0.051448 | 0 | 3399022 | 119895 | None | item code | Single Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 12453.72 | 12453.72 | 2.0 | False | None | None | False | None | False | 24907.44 | 0 | 3399023 | 119895 | None | item code | H Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7544.92 | 7544.92 | 2.0 | False | None | None | False | None | False | 15089.84 | 0 | 3399024 | 119895 | None | item code | 11 kV DOLO Cutout Conventional to Erstwhile KEB Specification Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 6932.5 | 6932.5 | 0.0001 | False | None | None | False | None | False | 0.69325 | 0 | 3399025 | 119895 | None | item code | Releasing and Restringing of Conductor 4361x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 9777.36 | 9777.36 | 15.3 | False | None | None | False | None | False | 149593.608 | 0 | 3399026 | 119895 | None | item code | Releasing and Reerrection of pole 1742x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 3905.57 | 3905.57 | 0.001 | False | None | None | False | None | False | 3.90557 | 0 | 3399027 | 119895 | None | item code | Releasing and Refixing of H X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 609.82 | 609.82 | 0.001 | False | None | None | False | None | False | 0.60982 | 0 | 3399028 | 119895 | None | item code | Releasing and Refixing of 4 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 609.82 | 609.82 | 0.001 | False | None | None | False | None | False | 0.60982 | 0 | 3399029 | 119895 | None | item code | Releasing and Refixing of 2 Pin X arm 272x1.9 Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 609.82 | 609.82 | 0.0001 | False | None | None | False | None | False | 0.060982 | 0 | 3399030 | 119895 | None | item code | Releasing and Refixing of over head Service mains Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 201.78 | 201.78 | 105.0 | False | None | None | False | None | False | 21186.9 | 0 | 3399031 | 119895 | None | item code | Releasing and Refixing of 11KV AB Cable 3x95+70Sqmm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 77943.13 | 77943.13 | 0.6 | False | None | None | False | None | False | 46765.878 | 0 | 3399032 | 119895 | None | item code | Releasing and Refixing of Cable Straight Thru Jointing Kits Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 3192.61 | 3192.61 | 8.0 | False | None | None | False | None | False | 25540.88 | 0 | 3399033 | 119895 | None | item code | Releasing and Refixing of 11KV AB Cable Terminatin Kit Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 2553.63 | 2553.63 | 8.0 | False | None | None | False | None | False | 20429.04 | 0 | 3399034 | 119895 | None | item code | Releasing and Refixing of Suspension Clamp Assembly 16 to 70 mm Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 215.23 | 215.23 | 0.0001 | False | None | None | False | None | False | 0.021523 | 0 | 3399035 | 119895 | None | item code | Releasing and Refixing of Pole clamp for HT LT AB cable Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 358.72 | 358.72 | 0.0001 | False | None | None | False | None | False | 0.035872 | 0 | 3399036 | 119895 | None | item code | Releasing and Refixing of Eye Hook Flat type for fixing Clamps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 0.01 | 0.01 | 0.0001 | False | None | None | False | None | False | 1e-06 | 0 | 3399037 | 119895 | None | item code | Releasing and Refixing of Dead End Clamp Anchor Clamp Assembly 16 to 70 Sqmm excluding pole clamps and Eye hook Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 430.46 | 430.46 | 0.0001 | False | None | None | False | None | False | 0.043046 | 0 | 3399038 | 119895 | None | item code | Releasing and Refixing of End Caps Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 22.42 | 22.42 | 0.0001 | False | None | None | False | None | False | 0.002242 | 0 | 3399039 | 119895 | None | item code | PART D Shifting Re errection OF DTCs 25 63 100kVA
DP Transformer Structure using RCC Pole 9 Mtr Long 145 Kg WL for 25KVA and 63KVA and 100KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 45473.66 | 45473.66 | 2.0 | False | None | None | False | None | False | 90947.32 | 0 | 3399040 | 119895 | None | item code | DP Transformer Structure using RCC Pole 9 Mtr Long 145 Kg WL for 250KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 51426.76 | 51426.76 | 0.0001 | False | None | None | False | None | False | 5.142676 | 0 | 3399041 | 119895 | None | item code | 11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 108891.58 | 108891.58 | 0.0001 | False | None | None | False | None | False | 10.889158 | 0 | 3399042 | 119895 | None | item code | 11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 126480.66 | 126480.66 | 0.0001 | False | None | None | False | None | False | 12.648066 | 0 | 3399043 | 119895 | None | item code | 11kV 433V 63 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 196943.18 | 196943.18 | 0.0001 | False | None | None | False | None | False | 19.694318 | 0 | 3399044 | 119895 | None | item code | 11kV 433V 63 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 216810.84 | 216810.84 | 0.0001 | False | None | None | False | None | False | 21.681084 | 0 | 3399045 | 119895 | None | item code | 11kV 433V 100 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 251576.0 | 251576.0 | 0.0001 | False | None | None | False | None | False | 25.1576 | 0 | 3399046 | 119895 | None | item code | 11kV 433V 100 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 263779.56 | 263779.56 | 0.0001 | False | None | None | False | None | False | 26.377956 | 0 | 3399047 | 119895 | None | item code | 11kV 433V 250 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 523914.1 | 523914.1 | 0.0001 | False | None | None | False | None | False | 52.39141 | 0 | 3399048 | 119895 | None | item code | 11kV 433V 250 kVA 3 Phase 50 Cys Distribution Transformer BEE 5 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 638791.82 | 638791.82 | 0.0001 | False | None | None | False | None | False | 63.879182 | 0 | 3399049 | 119895 | None | item code | 11 KV 5KN Polymeric Pin Insulator 24mm Dia FRPRod Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 241.9 | 241.9 | 6.0 | False | None | None | False | None | False | 1451.4 | 0 | 3399050 | 119895 | None | item code | 11KV 45KN Polymeric Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 219.48 | 219.48 | 6.0 | False | None | None | False | None | False | 1316.88 | 0 | 3399051 | 119895 | None | item code | Rabbit to Rabbit PG Clamp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 120.36 | 120.36 | 12.0 | False | None | None | False | None | False | 1444.32 | 0 | 3399052 | 119895 | None | item code | Guy Set Complete with No. 15 Strain Insulator Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2080.34 | 2080.34 | 4.0 | False | None | None | False | None | False | 8321.36 | 0 | 3399053 | 119895 | None | item code | Earthing materials pipe type for grounding Single Electrode with accessories Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 3160.04 | 3160.04 | 6.0 | False | None | None | False | None | False | 18960.24 | 0 | 3399054 | 119895 | None | item code | Caution Dangour Board Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 271.4 | 271.4 | 4.0 | False | None | None | False | None | False | 1085.6 | 0 | 3399055 | 119895 | None | item code | Anti Climbing Device GI Barbed wire 12 Mtr Kg Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Each | 154.58 | 154.58 | 0.0001 | False | None | None | False | None | False | 0.015458 | 0 | 3399056 | 119895 | None | item code | Guy concreting with Boulders Mud and Sand Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 295.0 | 295.0 | 8.0004 | False | None | None | False | None | False | 2360.118 | 0 | 3399057 | 119895 | None | item code | GI Wire 8 SWG Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Kg | 88.55 | 88.55 | 10.0005 | False | None | None | False | None | False | 885.544275 | 0 | 3399058 | 119895 | None | item code | Guy Wire Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Kg | 91.13 | 91.13 | 20.001 | False | None | None | False | None | False | 1822.69113 | 0 | 3399059 | 119895 | None | item code 23 | 11 kV Lightning Arrester Metal Oxide 10 kV 5 kA Polymetic type with ground disconnector Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 5747.78 | 5747.78 | 2.0 | False | None | None | False | None | False | 11495.56 | 0 | 3399060 | 119895 | None | item code 24 | a LT Protection Kit for 25 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2807.22 | 2807.22 | 2.0 | False | None | None | False | None | False | 5614.44 | 0 | 3399061 | 119895 | None | item code 24 | b LT Distribution Box for 100 250 kVA DTC with MCCBs SMC Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2841.44 | 2841.44 | 2.0 | False | None | None | False | None | False | 5682.88 | 0 | 3399062 | 119895 | None | item code 24 | i Alluminium lead wire 120sq mm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Mtr | 168.96 | 168.96 | 50.0 | False | None | None | False | None | False | 8448.0 | 0 | 3399063 | 119895 | None | item code 24 | ii Copper lugs 120Sqmm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 165.2 | 165.2 | 8.0 | False | None | None | False | None | False | 1321.6 | 0 | 3399064 | 119895 | None | item code 24 | iii PG Clamps Rabbit to 120 Sqmm Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 322.14 | 322.14 | 8.0 | False | None | None | False | None | False | 2577.12 | 0 | 3399065 | 119895 | None | item code 24 | iv Spacers for DTC wiring Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 49.56 | 49.56 | 16.0 | False | None | None | False | None | False | 792.96 | 0 | 3399066 | 119895 | None | item code 24 | v Fish plate with clamp bolt nut Rates are Inclusive of Material and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 311.52 | 311.52 | 4.0 | False | None | None | False | None | False | 1246.08 | 0 | 3399067 | 119895 | None | item code 24 | item I to v Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 1119.82 | 1119.82 | 2.0 | False | None | None | False | None | False | 2239.64 | 0 | 3399068 | 119895 | None | item code 24 | c LT Metering Box for housing the ETV Meter Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 8492.46 | 8492.46 | 0.0001 | False | None | None | False | None | False | 0.849246 | 0 | 3399069 | 119895 | None | item code 24 | d L.T Electronic Tri Vector Meter 5A Class 0.5 1. accurancy Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 4573.68 | 4573.68 | 0.0001 | False | None | None | False | None | False | 0.457368 | 0 | 3399070 | 119895 | None | item code 25 | GSM Modem Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 17009.7 | 17009.7 | 0.0001 | False | None | None | False | None | False | 1.70097 | 0 | 3399071 | 119895 | None | item code | HG Fuse 11 kV Solid Core Type Set 3 Nos Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 2100.4 | 2100.4 | 12.0 | False | None | None | False | None | False | 25204.8 | 0 | 3399072 | 119895 | None | item code | Single Break GOS 11 KV 200 Amp Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Set | 12453.72 | 12453.72 | 0.0001 | False | None | None | False | None | False | 1.245372 | 0 | 3399073 | 119895 | None | item code | H Frame for mounting GOS Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 7544.92 | 7544.92 | 0.0001 | False | None | None | False | None | False | 0.754492 | 0 | 3399074 | 119895 | None | item code | Transparent Alkathene tube 19 mm 2mm 30 mtr Coil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Coil | 610.06 | 610.06 | 6.0 | False | None | None | False | None | False | 3660.36 | 0 | 3399075 | 119895 | None | item code | Loading and Unloading of Transformer 250 300 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 816.56 | 816.56 | 0.0001 | False | None | None | False | None | False | 0.081656 | 0 | 3399076 | 119895 | None | item code | Loading and Unloading of Transformer 25 63 100 KVA Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 503.86 | 503.86 | 0.0001 | False | None | None | False | None | False | 0.050386 | 0 | 3399077 | 119895 | None | item code | Releasing and Reerrection of 11kV 433V 25 kVA 3 Phase 50 Cys Distribution Transformer BEE 4 Star Rated with Oil Rates are Inclusive of Material and Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | No | 2674.7 | 2674.7 | 1.0 | False | None | None | False | None | False | 2674.7 | 0 | 3399078 | 119895 | None | item code | Decommissioning of Assets
Releasing of Conductor 2 4 ACSR Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 3377.16 | 3377.16 | 2.0 | False | None | None | False | None | False | 6754.32 | 0 | 3399079 | 119895 | None | item code | Releasing of Conductor Rabbit ACSR Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Km | 4742.42 | 4742.42 | 0.0001 | False | None | None | False | None | False | 0.474242 | 0 | 3399080 | 119895 | None | item code | Releasing of Idle Poles Scrap 0.9x1742 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 1850.0 | 1850.0 | 71.0 | False | None | None | False | None | False | 131350.0 | 0 | 3399081 | 119895 | None | item code | Releasing of Transformer Structure 0.9x5725 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 6079.95 | 6079.95 | 1.0 | False | None | None | False | None | False | 6079.95 | 0 | 3399082 | 119895 | None | item code | Releasing of H Cross Arm 0.9x160 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 169.92 | 169.92 | 85.0 | False | None | None | False | None | False | 14443.2 | 0 | 3399083 | 119895 | None | item code | Releasing of 4 pin Cross Arm 0.9x160 Rates are Inclusive of Labour Cost and 18 Percent GST ---- Item rates are inclusive of 18 percent GST | Nos | 169.92 | 169.92 | 0.0001 | False | None | None | False | None | False | 0.016992 | 0 |
|
|
---|