1719837168000 | 0 | None | None | Buildings | CONSTRUCTION OF 100 BEDS MENS HOSTEL IN REGIONAL INSTITUTE OF ENGLISH , SOUTH INDIA CAMPUS AT BENGALURU. | 124575592.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3428434 | 121499 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth (P. No - 8, I. No - 1.12, Vol-1 - Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 123.31 | 123.31 | 919.2 | False | None | None | False | None | False | 113346.552 | 0 | 3428435 | 121499 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (P. No - 7, I. No - 1.8, Vol-1 - Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 615.25 | 615.25 | 554.72 | False | None | None | False | None | False | 341291.48 | 0 | 3428436 | 121499 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (P. No - 8, I. No - 1.14.1, Vol-1 - Common S R 2023-24,)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 132.4 | 132.4 | 2006.66 | False | None | None | False | None | False | 265681.784 | 0 | 3428437 | 121499 | None | 1.15.2 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. Depth exceeding 1.5 m, but not exceeding 3 m (P. No - 9, I. No - 1.15.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 551.65 | 551.65 | 1337.77 | False | None | None | False | None | False | 737980.8205 | 0 | 3428438 | 121499 | None | 1.6.1 | Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m (P. No - 6, I. No - 1.6.1, Vol-1 - Common S R2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 628.23 | 628.23 | 133.38 | False | None | None | False | None | False | 83793.3174 | 0 | 3428439 | 121499 | None | 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (P. No - 7, I. No - 1.9, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 345.27 | 345.27 | 2409.29 | False | None | None | False | None | False | 831855.5583 | 0 | 3428440 | 121499 | None | 1.1 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (P. No - 7, I. No - 1.10, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 207.68 | 207.68 | 96.12 | False | None | None | False | None | False | 19962.2016 | 0 | 3428441 | 121499 | None | 4.1 | Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. (P. No - 5, I. No - 4.1, Vol-2 Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 153.16 | 153.16 | 4175.0 | False | None | None | False | None | False | 639443.0 | 0 | 3428442 | 121499 | None | 2.1.2 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No - 2.1.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 7351.87 | 7351.87 | 362.35 | False | None | None | False | None | False | 2663950.0945 | 0 | 3428443 | 121499 | None | 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No - 2.1.4, Vol-1 - Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8069.67 | 8069.67 | 84.61 | False | None | None | False | None | False | 682774.7787 | 0 | 3428444 | 121499 | None | 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No - 2.1.4, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8150.36 | 8150.36 | 7.56 | False | None | None | False | None | False | 61616.7216 | 0 | 3428445 | 121499 | None | 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No - 2.1.4, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8231.06 | 8231.06 | 7.56 | False | None | None | False | None | False | 62226.8136 | 0 | 3428446 | 121499 | None | 2.1.4 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No - 2.1.4, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8311.76 | 8311.76 | 7.56 | False | None | None | False | None | False | 62836.9056 | 0 | 3428447 | 121499 | None | 5.4 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (P. No - 9, I. No - 5.4, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8292.92 | 8292.92 | 87.0 | False | None | None | False | None | False | 721484.04 | 0 | 3428448 | 121499 | None | 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P. No - 15, I. No -2.2.3, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8224.13 | 8224.13 | 572.79 | False | None | None | False | None | False | 4710699.4227 | 0 | 3428449 | 121499 | None | sl no 01 | Additionalities for formwork @ 8% of finished rate for RCC footing of item no 19, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 01, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 657.93 | 657.93 | 572.78 | False | None | None | False | None | False | 376849.1454 | 0 | 3428450 | 121499 | None | 2.3.2 | Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (P. No - 16, I. No - 2.3.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8411.04 | 8411.04 | 118.57 | False | None | None | False | None | False | 997297.0128 | 0 | 3428451 | 121499 | None | sl no 02 | Additionalities for formwork @ 50% of finished rate for RCC Plinth beam , including all lead and lift cost of material of quality, labor, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 02, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4205.52 | 4205.52 | 40.85 | False | None | None | False | None | False | 171795.492 | 0 | 3428452 | 121499 | None | sl no 11 | Additionalities for formwork @ 10% of finished rate for RCC Retaining wall of item no 21, including all lead and lift cost of material of quality, labor, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 11, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 841.1 | 841.1 | 77.7 | False | None | None | False | None | False | 65353.47 | 0 | 3428453 | 121499 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(P. No - 16, I. No - 2.5.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8882.21 | 8882.21 | 393.43 | False | None | None | False | None | False | 3494527.8803 | 0 | 3428454 | 121499 | None | sl no 09 | Additionalities for formwork @ 70% of finished rate for RCC column for basement and ground floor, including all lead and lift cost of material of quality, labor, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 09, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6217.55 | 6217.55 | 62.73 | False | None | None | False | None | False | 390026.9115 | 0 | 3428455 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC beam for basement and ground floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5329.33 | 5329.33 | 103.43 | False | None | None | False | None | False | 551212.6019 | 0 | 3428456 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC lintels for basement and ground floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5329.33 | 5329.33 | 20.65 | False | None | None | False | None | False | 110050.6645 | 0 | 3428457 | 121499 | None | sl no 19 | Additionalities for formwork @ 45% of finished rate for RCC chejja for basement and ground floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 19, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 3996.99 | 3996.99 | 12.06 | False | None | None | False | None | False | 48203.6994 | 0 | 3428458 | 121499 | None | sl no 15 | Additionalities for formwork @ 50% of finished rate for RCC roof slab for basement and ground floor, including all lead and lift cost of material of quality, labor, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 15, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4441.11 | 4441.11 | 194.56 | False | None | None | False | None | False | 864062.3616 | 0 | 3428459 | 121499 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(P. No - 16, I. No - 2.5.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8971.04 | 8971.04 | 245.22 | False | None | None | False | None | False | 2199878.4288 | 0 | 3428460 | 121499 | None | sl no 09 | Additionalities for formwork @ 70% of finished rate for RCC column First floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 09, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6279.73 | 6279.73 | 35.31 | False | None | None | False | None | False | 221737.2663 | 0 | 3428461 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC beam of first floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5382.62 | 5382.62 | 54.7 | False | None | None | False | None | False | 294429.314 | 0 | 3428462 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC lintels of first floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5382.62 | 5382.62 | 14.81 | False | None | None | False | None | False | 79716.6022 | 0 | 3428463 | 121499 | None | sl no 19 | Additionalities for formwork @ 45% of finished rate for RCC chejja of first floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 19, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4036.97 | 4036.97 | 8.83 | False | None | None | False | None | False | 35646.4451 | 0 | 3428464 | 121499 | None | sl no 15 | Additionalities for formwork @ 50% of finished rate for RCC roof slab of first floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 15, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4485.52 | 4485.52 | 131.54 | False | None | None | False | None | False | 590025.3008 | 0 | 3428465 | 121499 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(P. No - 16, I. No - 2.5.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 9059.86 | 9059.86 | 245.04 | False | None | None | False | None | False | 2220028.0944 | 0 | 3428466 | 121499 | None | sl no 09 | Additionalities for formwork @ 70% of finished rate for RCC column of second floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 09, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6341.9 | 6341.9 | 35.15 | False | None | None | False | None | False | 222917.785 | 0 | 3428467 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC beam of second floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5435.92 | 5435.92 | 54.7 | False | None | None | False | None | False | 297344.824 | 0 | 3428468 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC lintels of second floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5435.92 | 5435.92 | 14.81 | False | None | None | False | None | False | 80505.9752 | 0 | 3428469 | 121499 | None | sl no 19 | Additionalities for formwork @ 45% of finished rate for RCC chejja of second floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 19, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4076.94 | 4076.94 | 8.83 | False | None | None | False | None | False | 35999.3802 | 0 | 3428470 | 121499 | None | sl no 15 | Additionalities for formwork @ 50% of finished rate for RCC roof slab of second floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 15, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4529.93 | 4529.93 | 131.54 | False | None | None | False | None | False | 595866.9922 | 0 | 3428471 | 121499 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(P. No - 16, I. No - 2.5.2, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 9148.68 | 9148.68 | 245.07 | False | None | None | False | None | False | 2242067.0076 | 0 | 3428472 | 121499 | None | sl no 09 | Additionalities for formwork @ 70% of finished rate for RCC column of third floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 09, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6404.08 | 6404.08 | 35.15 | False | None | None | False | None | False | 225103.412 | 0 | 3428473 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC beam of third floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5489.21 | 5489.21 | 54.7 | False | None | None | False | None | False | 300259.787 | 0 | 3428474 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC lintels of third floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5489.21 | 5489.21 | 14.81 | False | None | None | False | None | False | 81295.2001 | 0 | 3428475 | 121499 | None | sl no 19 | Additionalities for formwork @ 45% of finished rate for RCC chejja of third floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 19, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4116.91 | 4116.91 | 8.83 | False | None | None | False | None | False | 36352.3153 | 0 | 3428476 | 121499 | None | sl no 15 | Additionalities for formwork @ 50% of finished rate for RCC roof slab of third floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 15, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4574.34 | 4574.34 | 131.54 | False | None | None | False | None | False | 601708.6836 | 0 | 3428477 | 121499 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(P. No - 16, I. No - 2.5.2, Vol-1 Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 9237.5 | 9237.5 | 25.35 | False | None | None | False | None | False | 234170.625 | 0 | 3428478 | 121499 | None | sl no 09 | Additionalities for formwork @ 70% of finished rate for RCC column of terrace floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 111, Sl no. 09, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 6466.25 | 6466.25 | 10.93 | False | None | None | False | None | False | 70676.1125 | 0 | 3428479 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC beam of terrace floor, , including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5542.5 | 5542.5 | 5.27 | False | None | None | False | None | False | 29208.975 | 0 | 3428480 | 121499 | None | sl no 14 | Additionalities for formwork @ 60% of finished rate for RCC lintels of terrace floor, including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 14, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 5542.5 | 5542.5 | 0.75 | False | None | None | False | None | False | 4156.875 | 0 | 3428481 | 121499 | None | sl no 15 | Additionalities for formwork @ 50% of finished rate for RCC roof slab of terrace floor, , including all lead and lift cost of material of quality, labour, usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specification. (P. No - 112, Sl no. 15, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 4618.75 | 4618.75 | 8.39 | False | None | None | False | None | False | 38751.3125 | 0 | 3428482 | 121499 | None | 8.16.1a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.(P. No - 44, I. No - 8.16.1a, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1606.92 | 1606.92 | 45.37 | False | None | None | False | None | False | 72905.9604 | 0 | 3428483 | 121499 | None | 8.16.1a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm diamild steel bars at 20 cms. c to c both horizontally and vertically fixed withchicken mesh for drop chajja,facia, backing to cup boards including costof all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.(P. No - 44, I. No - 8.16.1a, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1622.99 | 1622.99 | 45.37 | False | None | None | False | None | False | 73635.0563 | 0 | 3428484 | 121499 | None | 8.16.1a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm diamild steel bars at 20 cms. c to c both horizontally and vertically fixed withchicken mesh for drop chajja,facia, backing to cup boards including costof all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.(P. No - 44, I. No - 8.16.1a, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1639.06 | 1639.06 | 45.37 | False | None | None | False | None | False | 74364.1522 | 0 | 3428485 | 121499 | None | 8.16.1a | Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm diamild steel bars at 20 cms. c to c both horizontally and vertically fixed withchicken mesh for drop chajja,facia, backing to cup boards including costof all materials, labour, providing and removing form work usage charges,curing, complete as per specifications.(P. No - 44, I. No - 8.16.1a, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1655.13 | 1655.13 | 45.38 | False | None | None | False | None | False | 75109.7994 | 0 | 3428486 | 121499 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (The laps and wastages shall not be measured separately)Buildings (P. No - 18, I. No - 2.11a, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Tonne | 116115.19 | 116115.19 | 131.52 | False | None | None | False | None | False | 15271469.7888 | 0 | 3428487 | 121499 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (The laps and wastages shall not be measured separately) Buildings (P. No - 18, I. No - 2.11a, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Tonne | 117276.34 | 117276.34 | 31.71 | False | None | None | False | None | False | 3718832.7414 | 0 | 3428488 | 121499 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (The laps and wastages shall not be measured separately) Buildings (P. No - 18, I. No - 2.11a, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 118437.49 | 118437.49 | 31.68 | False | None | None | False | None | False | 3752099.6832 | 0 | 3428489 | 121499 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (The laps and wastages shall not be measured separately) Buildings (P. No - 18, I. No - 2.11a, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 119598.64 | 119598.64 | 31.68 | False | None | None | False | None | False | 3788884.9152 | 0 | 3428490 | 121499 | None | 2.11a | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings (The laps and wastages shall not be measured separately) Buildings (P. No - 18, I. No - 2.11a, Vol-1 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 120759.79 | 120759.79 | 3.99 | False | None | None | False | None | False | 481831.5621 | 0 | 3428491 | 121499 | None | 6.31 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(P. No - 17, I. No - 6.31, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 10355.44 | 10355.44 | 768.13 | False | None | None | False | None | False | 7954324.1272 | 0 | 3428492 | 121499 | None | 6.31 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(P. No - 17, I. No - 6.31, Vol-2 - Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 10459.0 | 10459.0 | 167.39 | False | None | None | False | None | False | 1750732.01 | 0 | 3428493 | 121499 | None | 6.31 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(P. No - 17, I. No - 6.31, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 10562.55 | 10562.55 | 165.1 | False | None | None | False | None | False | 1743877.005 | 0 | 3428494 | 121499 | None | 6.31 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(P. No - 17, I. No - 6.31, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 10666.11 | 10666.11 | 165.1 | False | None | None | False | None | False | 1760974.761 | 0 | 3428495 | 121499 | None | 6.31 | Providing and laying autoclaved aerated cement blocks masonry with 150mm/230mm/300 mm thick AAC blocks as per IS 2185 (Part III) in super structure above plinth level up to floor I level with RCC band at sill level and lintel level with approved block laying polymer modified adhesive mortar including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(P. No - 17, I. No - 6.31, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 10769.66 | 10769.66 | 56.83 | False | None | None | False | None | False | 612039.7778 | 0 | 3428496 | 121499 | None | 6.15 | Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) includingcost of all materials, labour, scaffolding and usage charges of machinery& other incidental charges complete as per the direction of engineerincharge of work. (P. No - 14, I. No - 6.15, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1340.83 | 1340.83 | 203.93 | False | None | None | False | None | False | 273435.4619 | 0 | 3428497 | 121499 | None | 6.15 | Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) includingcost of all materials, labour, scaffolding and usage charges of machinery& other incidental charges complete as per the direction of engineerincharge of work. (P. No - 14, I. No - 6.15, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1354.24 | 1354.24 | 173.16 | False | None | None | False | None | False | 234500.1984 | 0 | 3428498 | 121499 | None | 6.15 | Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) includingcost of all materials, labour, scaffolding and usage charges of machinery& other incidental charges complete as per the direction of engineerincharge of work. (P. No - 14, I. No - 6.15, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1367.65 | 1367.65 | 173.16 | False | None | None | False | None | False | 236822.274 | 0 | 3428499 | 121499 | None | 6.15 | Providing Half brick masonry with common burnt clay Non Modularbricks of class designation 3.5 in superstructure above plinth level upto floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) includingcost of all materials, labour, scaffolding and usage charges of machinery& other incidental charges complete as per the direction of engineerincharge of work. (P. No - 14, I. No - 6.15, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1381.06 | 1381.06 | 173.16 | False | None | None | False | None | False | 239144.3496 | 0 | 3428500 | 121499 | None | 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(P. No - 100, I. No - 12.13.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 128261.87 | 128261.87 | 1.38 | False | None | None | False | None | False | 177001.3806 | 0 | 3428501 | 121499 | None | 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(P. No - 100, I. No - 12.13.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 129544.49 | 129544.49 | 1.0 | False | None | None | False | None | False | 129544.49 | 0 | 3428502 | 121499 | None | 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(P. No - 100, I. No - 12.13.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 130827.11 | 130827.11 | 1.0 | False | None | None | False | None | False | 130827.11 | 0 | 3428503 | 121499 | None | 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(P. No - 100, I. No - 12.13.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 132109.73 | 132109.73 | 1.0 | False | None | None | False | None | False | 132109.73 | 0 | 3428504 | 121499 | None | 12.13.1 | Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.(P. No - 100, I. No - 12.13.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 133392.34 | 133392.34 | 0.06 | False | None | None | False | None | False | 8003.5404 | 0 | 3428505 | 121499 | None | 12.15 | Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) (P. No - 100, I. No - 12.15, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 9662.31 | 9662.31 | 3.78 | False | None | None | False | None | False | 36523.5318 | 0 | 3428506 | 121499 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (P. No - 105, I. No - 12.57.1, Vol-2 - Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5247.81 | 5247.81 | 50.19 | False | None | None | False | None | False | 263387.5839 | 0 | 3428507 | 121499 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (P. No - 105, I. No - 12.57.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5300.29 | 5300.29 | 35.49 | False | None | None | False | None | False | 188107.2921 | 0 | 3428508 | 121499 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (P. No - 105, I. No - 12.57.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5352.77 | 5352.77 | 35.49 | False | None | None | False | None | False | 189969.8073 | 0 | 3428509 | 121499 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (P. No - 105, I. No - 12.57.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5405.25 | 5405.25 | 35.49 | False | None | None | False | None | False | 191832.3225 | 0 | 3428510 | 121499 | None | 12.57.1 | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 30 mm thick Both side teak (P. No - 105, I. No - 12.57.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5457.73 | 5457.73 | 1.89 | False | None | None | False | None | False | 10315.1097 | 0 | 3428511 | 121499 | None | 12.93.2 | Providing and fixing factory made single extruded WPC (Wood PolymerComposite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (SuspensionGrade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for100 g) fabricated with miter joints after applying PVC solvent cement andscrewed with full body threaded star headed SS screws having minimumframe density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) &1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus ofelasticity 900 N/mm2 and resistance to spread of flame of Class A categorywith property of being termite/borer proof, water/moisture proof and fireretardant and fixed in position with M.S hold fast/lugs/SS dash fastenersof required dia and length complete as per direction of Engineer-InCharge.(Fixtures shall be paid for separately) Size 62 x 125mm (P. No - 111, I. No - 12.93.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 991.67 | 991.67 | 90.0 | False | None | None | False | None | False | 89250.3 | 0 | 3428512 | 121499 | None | 12.93.2 | Providing and fixing factory made single extruded WPC (Wood PolymerComposite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (SuspensionGrade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for100 g) fabricated with miter joints after applying PVC solvent cement andscrewed with full body threaded star headed SS screws having minimumframe density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) &1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus ofelasticity 900 N/mm2 and resistance to spread of flame of Class A categorywith property of being termite/borer proof, water/moisture proof and fireretardant and fixed in position with M.S hold fast/lugs/SS dash fastenersof required dia and length complete as per direction of Engineer-InCharge.(Fixtures shall be paid for separately) Size 62 x 125mm (P. No - 111, I. No - 12.93.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1001.59 | 1001.59 | 70.0 | False | None | None | False | None | False | 70111.3 | 0 | 3428513 | 121499 | None | 12.93.2 | Providing and fixing factory made single extruded WPC (Wood PolymerComposite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (SuspensionGrade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for100 g) fabricated with miter joints after applying PVC solvent cement andscrewed with full body threaded star headed SS screws having minimumframe density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) &1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus ofelasticity 900 N/mm2 and resistance to spread of flame of Class A categorywith property of being termite/borer proof, water/moisture proof and fireretardant and fixed in position with M.S hold fast/lugs/SS dash fastenersof required dia and length complete as per direction of Engineer-InCharge.(Fixtures shall be paid for separately) Size 62 x 125mm (P. No - 111, I. No - 12.93.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1011.51 | 1011.51 | 70.0 | False | None | None | False | None | False | 70805.7 | 0 | 3428514 | 121499 | None | 12.93.2 | Providing and fixing factory made single extruded WPC (Wood PolymerComposite) solid door/window/Clerestory windows & other Frames/Chowkhat comprising of virgin PVC polymer of K value 58-60 (SuspensionGrade), calcium carbonate and natural fibres (wood powder/rice husk/wheat husk) and non toxic additives (maximum toxicity index of 12 for100 g) fabricated with miter joints after applying PVC solvent cement andscrewed with full body threaded star headed SS screws having minimumframe density of 850 kg/m3, screw withdrawal strength of 2200 N (Face) &1100 N (Edge), minimum compressive strength of 58 N/mm2 , modulus ofelasticity 900 N/mm2 and resistance to spread of flame of Class A categorywith property of being termite/borer proof, water/moisture proof and fireretardant and fixed in position with M.S hold fast/lugs/SS dash fastenersof required dia and length complete as per direction of Engineer-InCharge.(Fixtures shall be paid for separately) Size 62 x 125mm (P. No - 111, I. No - 12.93.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1021.42 | 1021.42 | 70.0 | False | None | None | False | None | False | 71499.4 | 0 | 3428515 | 121499 | None | 12.94.1 | Providing and fixing factory made Green certified, Anti Termite, UV resistant,high water absorbant single extruded WPC (Wood PolymerComposite) solidplain flush door shutter of required size comprising of virgin polymer ofK value 58-60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/rice husk/wheat husk) and non toxic additives (maximumtoxicity index of 12 for 100 g) having minimum density of 650 kg/m3 andscrew withdrawal strength of 1800 N (Face) & 900 N (Edge), minimumcompressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 andresistance to spread of flame of Class A category with property of beingtermite/borer proof, water/moisture proof and fire retardant and fixingwith stainless steel butt hinges of required size with necessary full bodythreaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to bepaid separately) 30 mm thickness (P. No - 112, I. No - 12.94.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4523.53 | 4523.53 | 30.24 | False | None | None | False | None | False | 136791.5472 | 0 | 3428516 | 121499 | None | 12.94.1 | Providing and fixing factory made Green certified, Anti Termite, UV resistant,high water absorbant single extruded WPC (Wood PolymerComposite) solidplain flush door shutter of required size comprising of virgin polymer ofK value 58-60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/rice husk/wheat husk) and non toxic additives (maximumtoxicity index of 12 for 100 g) having minimum density of 650 kg/m3 andscrew withdrawal strength of 1800 N (Face) & 900 N (Edge), minimumcompressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 andresistance to spread of flame of Class A category with property of beingtermite/borer proof, water/moisture proof and fire retardant and fixingwith stainless steel butt hinges of required size with necessary full bodythreaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to bepaid separately) 30 mm thickness (P. No - 112, I. No - 12.94.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4568.77 | 4568.77 | 23.52 | False | None | None | False | None | False | 107457.4704 | 0 | 3428517 | 121499 | None | 12.94.1 | Providing and fixing factory made Green certified, Anti Termite, UV resistant,high water absorbant single extruded WPC (Wood PolymerComposite) solidplain flush door shutter of required size comprising of virgin polymer ofK value 58-60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/rice husk/wheat husk) and non toxic additives (maximumtoxicity index of 12 for 100 g) having minimum density of 650 kg/m3 andscrew withdrawal strength of 1800 N (Face) & 900 N (Edge), minimumcompressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 andresistance to spread of flame of Class A category with property of beingtermite/borer proof, water/moisture proof and fire retardant and fixingwith stainless steel butt hinges of required size with necessary full bodythreaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to bepaid separately) 30 mm thickness (P. No - 112, I. No - 12.94.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4614.0 | 4614.0 | 23.52 | False | None | None | False | None | False | 108521.28 | 0 | 3428518 | 121499 | None | 12.94.1 | Providing and fixing factory made Green certified, Anti Termite, UV resistant,high water absorbant single extruded WPC (Wood PolymerComposite) solidplain flush door shutter of required size comprising of virgin polymer ofK value 58-60 (Suspension Grade), calcium carbonate and natural fibers(wood powder/rice husk/wheat husk) and non toxic additives (maximumtoxicity index of 12 for 100 g) having minimum density of 650 kg/m3 andscrew withdrawal strength of 1800 N (Face) & 900 N (Edge), minimumcompressive strength of 50 N/mm2 , modulus of elasticity 850 N/mm2 andresistance to spread of flame of Class A category with property of beingtermite/borer proof, water/moisture proof and fire retardant and fixingwith stainless steel butt hinges of required size with necessary full bodythreaded star headed counter sunk S.S screws The cost includes cost of materials, transportation, labour and fixing charges.(Cost of Fixtures to bepaid separately) 30 mm thickness (P. No - 112, I. No - 12.94.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4659.24 | 4659.24 | 23.52 | False | None | None | False | None | False | 109585.3248 | 0 | 3428519 | 121499 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (P. No - 104, I. No - 12.51, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1318.77 | 1318.77 | 21.0 | False | None | None | False | None | False | 27694.17 | 0 | 3428520 | 121499 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (P. No - 104, I. No - 12.51, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1331.96 | 1331.96 | 16.0 | False | None | None | False | None | False | 21311.36 | 0 | 3428521 | 121499 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (P. No - 104, I. No - 12.51, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1345.14 | 1345.14 | 16.0 | False | None | None | False | None | False | 21522.24 | 0 | 3428522 | 121499 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (P. No - 104, I. No - 12.51, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1358.33 | 1358.33 | 16.0 | False | None | None | False | None | False | 21733.28 | 0 | 3428523 | 121499 | None | 12.51 | Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. (P. No - 104, I. No - 12.51, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1371.52 | 1371.52 | 1.0 | False | None | None | False | None | False | 1371.52 | 0 | 3428524 | 121499 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P. No - 86, I. No - 11.34A, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 218.06 | 218.06 | 3184.34 | False | None | None | False | None | False | 694377.1804 | 0 | 3428525 | 121499 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P. No - 86, I. No - 11.34A, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 220.24 | 220.24 | 2329.8 | False | None | None | False | None | False | 513115.152 | 0 | 3428526 | 121499 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P. No - 86, I. No - 11.34A, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 222.43 | 222.43 | 2329.8 | False | None | None | False | None | False | 518217.414 | 0 | 3428527 | 121499 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P. No - 86, I. No - 11.34A, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 224.61 | 224.61 | 2329.8 | False | None | None | False | None | False | 523296.378 | 0 | 3428528 | 121499 | None | 11.34A | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (P. No - 86, I. No - 11.34A, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 226.79 | 226.79 | 56.7 | False | None | None | False | None | False | 12858.993 | 0 | 3428529 | 121499 | None | 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GIreinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windowsshall be provided with 6mm plain float glass, standard hardware& Multipoint locking system with touch lock. Wall thickness of frame & sash shallbe of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (Thecost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 110, I. No - 12.90, Vol-2 -Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 8740.73 | 8740.73 | 99.98 | False | None | None | False | None | False | 873898.1854 | 0 | 3428530 | 121499 | None | 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GIreinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windowsshall be provided with 6mm plain float glass, standard hardware& Multipoint locking system with touch lock. Wall thickness of frame & sash shallbe of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (Thecost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 110, I. No - 12.90, Vol-2 -Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 8828.14 | 8828.14 | 66.6 | False | None | None | False | None | False | 587954.124 | 0 | 3428531 | 121499 | None | 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GIreinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windowsshall be provided with 6mm plain float glass, standard hardware& Multipoint locking system with touch lock. Wall thickness of frame & sash shallbe of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (Thecost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 110, I. No - 12.90, Vol-2 -Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 8915.55 | 8915.55 | 66.6 | False | None | None | False | None | False | 593775.63 | 0 | 3428532 | 121499 | None | 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GIreinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windowsshall be provided with 6mm plain float glass, standard hardware& Multipoint locking system with touch lock. Wall thickness of frame & sash shallbe of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (Thecost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 110, I. No - 12.90, Vol-2 -Common S R 2023-24) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 9002.95 | 9002.95 | 66.6 | False | None | None | False | None | False | 599596.47 | 0 | 3428533 | 121499 | None | 12.90 | Providing & fixing of 3-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2 (Titanium Dioxide) at 6PHR with TPE (Thermo Plastic Elastomer) andlead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer framehaving an overall size of 108mm width x 45mmheight with reinforcement of 1mm thickness and Sash with overall size of 39mm x 75mm with GIreinforcement of 2mm and mesh sash of size 37mm x 58mm. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 24 mm. Windowsshall be provided with 6mm plain float glass, standard hardware& Multipoint locking system with touch lock. Wall thickness of frame & sash shallbe of 2mm-2.5mm. Maximum possible size 2419mm x 2200mm. (Thecost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 110, I. No - 12.90, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 9090.36 | 9090.36 | 2.7 | False | None | None | False | None | False | 24543.972 | 0 | 3428534 | 121499 | None | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 109, I. No - 12.85, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 7423.26 | 7423.26 | 72.36 | False | None | None | False | None | False | 537147.0936 | 0 | 3428535 | 121499 | None | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 109, I. No - 12.85, Vol-2 -Common S R 2023-24 ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 7497.49 | 7497.49 | 44.16 | False | None | None | False | None | False | 331089.1584 | 0 | 3428536 | 121499 | None | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 109, I. No - 12.85, Vol-2 -Common S R 2023-24 ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 7571.73 | 7571.73 | 44.16 | False | None | None | False | None | False | 334367.5968 | 0 | 3428537 | 121499 | None | 12.85 | Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 109, I. No - 12.85, Vol-2 -Common S R 2023-24 ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 7645.96 | 7645.96 | 38.76 | False | None | None | False | None | False | 296357.4096 | 0 | 3428538 | 121499 | None | 12.92 | Providing& fixing of Openable door made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 102mm and GI reinforcement of 2mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 6mm plain float glass, Standard hardware with 2D/3D hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm. Maximum possible size 900mm x 2400mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) (P. No - 111, I. No - 12.92, S R 2023-24, Vol-2 - For Buildings) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 8106.01 | 8106.01 | 1.89 | False | None | None | False | None | False | 15320.3589 | 0 | 3428539 | 121499 | None | 18.2 | Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III(the system must passed the proof test at 1.5 times design wind pressurewithout any failure), including functional design of the aluminum sectionsfor fixing glazing panels of various thicknesses, aluminium cleats, sleevesand splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressureequalisation & drainage and protection against fire hazard luding:(b)Fabricating and supplying serrated M.S. hot dip galvanised / Aluminiumalloy of 6005 T5 brackets of required sizes, sections and profiles etc. toaccommodate 3 Dimentional movement for achieving perfect verticalityand fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steelanchor fasteners/ bolts, nylon seperator to prevent bimetallic contactswith nuts and washers etc. of stainless steel grade 316, of the requiredc apacity and in required numbers.(c)Providing and filling, two part pumpfilled, structural silicone sealant and one part weather silicone sealantcompatible with the structural silicone sealant of required bite size in aclean and controlled factory / work shop environment, including doublesided spacer tape, setting blocks and backer rod, all of approved grade,brand and manufacture, as per the approved sealant design, within and allaround the perimeter for holding glass.(d)Providing and fixing in positionflashings of solid aluminium sheet 1 mm thick and of sizes, shapes andprofiles, as required as per the site conditions, to seal the gap betweenthe building structure and all its interfaces with curtain glazing to makeit watertight.(e) Making provision for drainage of moisture/ water thatenters the curtain glazing system to make it watertight, by incorporatingprinciples of pressure equalization, providing suitable gutter profiles atbottom (if required), making necessary holes of required sizes and ofrequired numbers etc. complete.2This item includes cost of all inputs of designing, labour for fabricatingand installation of aluminium grid, installation of glazed units, T&P,scaffolding and other incidental charges including wastages etc., enablingtemporary structures and services, cranes or cradles etc. as describedabove and as specified. The item includes the cost of getting all thestructural and functional design including shop drawings checked bya structural designer, dully approved by Engineer-in-charge. The itemalso includes the cost of all mock ups at site, cost of all samples of theindividual components for testing in an approved laboratory, field testson the assembled working structural glazing as specified, cleaning andprotection till the handing over of the building for occupation. In the end,the Contractor shall provide a water tight structural glazing having allthe performance characteristics etc. all complete as required, as per theArchitectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer- in-Charge. (P. No - 182, I. No - 18.2, S R 2023-24, Vol-2 - For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3485.13 | 3485.13 | 9.0 | False | None | None | False | None | False | 31366.17 | 0 | 3428540 | 121499 | None | 18.2 | Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III(the system must passed the proof test at 1.5 times design wind pressurewithout any failure), including functional design of the aluminum sectionsfor fixing glazing panels of various thicknesses, aluminium cleats, sleevesand splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressureequalisation & drainage and protection against fire hazard luding:(b)Fabricating and supplying serrated M.S. hot dip galvanised / Aluminiumalloy of 6005 T5 brackets of required sizes, sections and profiles etc. toaccommodate 3 Dimentional movement for achieving perfect verticalityand fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steelanchor fasteners/ bolts, nylon seperator to prevent bimetallic contactswith nuts and washers etc. of stainless steel grade 316, of the requiredc apacity and in required numbers.(c)Providing and filling, two part pumpfilled, structural silicone sealant and one part weather silicone sealantcompatible with the structural silicone sealant of required bite size in aclean and controlled factory / work shop environment, including doublesided spacer tape, setting blocks and backer rod, all of approved grade,brand and manufacture, as per the approved sealant design, within and allaround the perimeter for holding glass.(d)Providing and fixing in positionflashings of solid aluminium sheet 1 mm thick and of sizes, shapes andprofiles, as required as per the site conditions, to seal the gap betweenthe building structure and all its interfaces with curtain glazing to makeit watertight.(e) Making provision for drainage of moisture/ water thatenters the curtain glazing system to make it watertight, by incorporatingprinciples of pressure equalization, providing suitable gutter profiles atbottom (if required), making necessary holes of required sizes and ofrequired numbers etc. complete.2This item includes cost of all inputs of designing, labour for fabricatingand installation of aluminium grid, installation of glazed units, T&P,scaffolding and other incidental charges including wastages etc., enablingtemporary structures and services, cranes or cradles etc. as describedabove and as specified. The item includes the cost of getting all thestructural and functional design including shop drawings checked bya structural designer, dully approved by Engineer-in-charge. The itemalso includes the cost of all mock ups at site, cost of all samples of theindividual components for testing in an approved laboratory, field testson the assembled working structural glazing as specified, cleaning andprotection till the handing over of the building for occupation. In the end,the Contractor shall provide a water tight structural glazing having allthe performance characteristics etc. all complete as required, as per theArchitectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer- in-Charge. (P. No - 182, I. No - 18.2, S R 2023-24, Vol-2 - For Buildings) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3519.98 | 3519.98 | 19.98 | False | None | None | False | None | False | 70329.2004 | 0 | 3428541 | 121499 | None | 18.2 | Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III(the system must passed the proof test at 1.5 times design wind pressurewithout any failure), including functional design of the aluminum sectionsfor fixing glazing panels of various thicknesses, aluminium cleats, sleevesand splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressureequalisation & drainage and protection against fire hazard luding:(b)Fabricating and supplying serrated M.S. hot dip galvanised / Aluminiumalloy of 6005 T5 brackets of required sizes, sections and profiles etc. toaccommodate 3 Dimentional movement for achieving perfect verticalityand fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steelanchor fasteners/ bolts, nylon seperator to prevent bimetallic contactswith nuts and washers etc. of stainless steel grade 316, of the requiredc apacity and in required numbers.(c)Providing and filling, two part pumpfilled, structural silicone sealant and one part weather silicone sealantcompatible with the structural silicone sealant of required bite size in aclean and controlled factory / work shop environment, including doublesided spacer tape, setting blocks and backer rod, all of approved grade,brand and manufacture, as per the approved sealant design, within and allaround the perimeter for holding glass.(d)Providing and fixing in positionflashings of solid aluminium sheet 1 mm thick and of sizes, shapes andprofiles, as required as per the site conditions, to seal the gap betweenthe building structure and all its interfaces with curtain glazing to makeit watertight.(e) Making provision for drainage of moisture/ water thatenters the curtain glazing system to make it watertight, by incorporatingprinciples of pressure equalization, providing suitable gutter profiles atbottom (if required), making necessary holes of required sizes and ofrequired numbers etc. complete.2This item includes cost of all inputs of designing, labour for fabricatingand installation of aluminium grid, installation of glazed units, T&P,scaffolding and other incidental charges including wastages etc., enablingtemporary structures and services, cranes or cradles etc. as describedabove and as specified. The item includes the cost of getting all thestructural and functional design including shop drawings checked bya structural designer, dully approved by Engineer-in-charge. The itemalso includes the cost of all mock ups at site, cost of all samples of theindividual components for testing in an approved laboratory, field testson the assembled working structural glazing as specified, cleaning andprotection till the handing over of the building for occupation. In the end,the Contractor shall provide a water tight structural glazing having allthe performance characteristics etc. all complete as required, as per theArchitectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer- in-Charge. (P. No - 182, I. No - 18.2, S R 2023-24, Vol-2 - For Buildings) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3554.83 | 3554.83 | 15.93 | False | None | None | False | None | False | 56628.4419 | 0 | 3428542 | 121499 | None | 18.2 | Designing, fabricating, testing, protection, installing and fixing in position semi (grid) unitized system of structural glazing (with open joints) for linear as well as curvilinear portions of the building for all heights and all levels, including:(a) Structural analysis & design and preparation of shop drawings for the specified design loads conforming to IS 875 part III(the system must passed the proof test at 1.5 times design wind pressurewithout any failure), including functional design of the aluminum sectionsfor fixing glazing panels of various thicknesses, aluminium cleats, sleevesand splice plates etc. gaskets, screws, toggles, nuts, bolts, clamps etc.,structural and weather silicone sealants, flashings, fire stop (barrier)-cumsmoke seals, microwave cured EPDM gaskets for water tightness, pressureequalisation & drainage and protection against fire hazard luding:(b)Fabricating and supplying serrated M.S. hot dip galvanised / Aluminiumalloy of 6005 T5 brackets of required sizes, sections and profiles etc. toaccommodate 3 Dimentional movement for achieving perfect verticalityand fixing structural glazing system rigidly to the RCC/ masonry/structural steel framework of building structure using stainless steelanchor fasteners/ bolts, nylon seperator to prevent bimetallic contactswith nuts and washers etc. of stainless steel grade 316, of the requiredc apacity and in required numbers.(c)Providing and filling, two part pumpfilled, structural silicone sealant and one part weather silicone sealantcompatible with the structural silicone sealant of required bite size in aclean and controlled factory / work shop environment, including doublesided spacer tape, setting blocks and backer rod, all of approved grade,brand and manufacture, as per the approved sealant design, within and allaround the perimeter for holding glass.(d)Providing and fixing in positionflashings of solid aluminium sheet 1 mm thick and of sizes, shapes andprofiles, as required as per the site conditions, to seal the gap betweenthe building structure and all its interfaces with curtain glazing to makeit watertight.(e) Making provision for drainage of moisture/ water thatenters the curtain glazing system to make it watertight, by incorporatingprinciples of pressure equalization, providing suitable gutter profiles atbottom (if required), making necessary holes of required sizes and ofrequired numbers etc. complete.2This item includes cost of all inputs of designing, labour for fabricatingand installation of aluminium grid, installation of glazed units, T&P,scaffolding and other incidental charges including wastages etc., enablingtemporary structures and services, cranes or cradles etc. as describedabove and as specified. The item includes the cost of getting all thestructural and functional design including shop drawings checked bya structural designer, dully approved by Engineer-in-charge. The itemalso includes the cost of all mock ups at site, cost of all samples of theindividual components for testing in an approved laboratory, field testson the assembled working structural glazing as specified, cleaning andprotection till the handing over of the building for occupation. In the end,the Contractor shall provide a water tight structural glazing having allthe performance characteristics etc. all complete as required, as per theArchitectural drawings, as per item description, as specified, as per theapproved shop drawings and as directed by the Engineer- in-Charge. (P. No - 182, I. No - 18.2, S R 2023-24, Vol-2 - For Buildings) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3589.68 | 3589.68 | 19.98 | False | None | None | False | None | False | 71721.8064 | 0 | 3428543 | 121499 | None | 18.3 | Providing, assembling and supplying vision glass panels (IGUs) comprisingof hermetically-sealed 6-12- 6 mm insulated glass (double glazed) visionpanel units of size and shape as required and specified, comprising of anouter heat strengthened float glass 6mm thick, of approved colour andshade with reflective soft coating on surface 2 of approved colour andshade, an inner Heat strengthned clear float glass 6mm thick, spacertube 12mm wide, dessicants, including primary seal and secondaryseal (structural silicone sealant) etc. all complete for the requiredperformances, as per the Architectural drawings, as per the approvedshop drawings, as specified and as directed by the Engineer-in-Charge. TheIGUs shall be assembled in the factory/ workshop of the glass processor.(Payment for fixing of IGU Panels in the curtain glazing is included in costof item No.18.2)For payment, only the actual area of glass on face 1 ofthe glass panels (excluding the areas of the grooves and weather siliconesealant) provided and fixed in position, shall be measured in m2.(i)Coloured tinted float glass 6mm thick substrate with reflective soft coatingon face 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass ofapproved make having properties as visible Light transmittance (VLT) of25 to 35 %, Light reflection internal 10 to 15%, light reflection external10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided bytechnical sanctioning authority as per the site requirement. (P. No - 183, I. No - 18.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3949.81 | 3949.81 | 9.0 | False | None | None | False | None | False | 35548.29 | 0 | 3428544 | 121499 | None | 18.3 | Providing, assembling and supplying vision glass panels (IGUs) comprisingof hermetically-sealed 6-12- 6 mm insulated glass (double glazed) visionpanel units of size and shape as required and specified, comprising of anouter heat strengthened float glass 6mm thick, of approved colour andshade with reflective soft coating on surface 2 of approved colour andshade, an inner Heat strengthned clear float glass 6mm thick, spacertube 12mm wide, dessicants, including primary seal and secondaryseal (structural silicone sealant) etc. all complete for the requiredperformances, as per the Architectural drawings, as per the approvedshop drawings, as specified and as directed by the Engineer-in-Charge. TheIGUs shall be assembled in the factory/ workshop of the glass processor.(Payment for fixing of IGU Panels in the curtain glazing is included in costof item No.18.2)For payment, only the actual area of glass on face 1 ofthe glass panels (excluding the areas of the grooves and weather siliconesealant) provided and fixed in position, shall be measured in m2.(i)Coloured tinted float glass 6mm thick substrate with reflective soft coatingon face 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass ofapproved make having properties as visible Light transmittance (VLT) of25 to 35 %, Light reflection internal 10 to 15%, light reflection external10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided bytechnical sanctioning authority as per the site requirement. (P. No - 183, I. No - 18.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3989.31 | 3989.31 | 19.98 | False | None | None | False | None | False | 79706.4138 | 0 | 3428545 | 121499 | None | 18.3 | Providing, assembling and supplying vision glass panels (IGUs) comprisingof hermetically-sealed 6-12- 6 mm insulated glass (double glazed) visionpanel units of size and shape as required and specified, comprising of anouter heat strengthened float glass 6mm thick, of approved colour andshade with reflective soft coating on surface 2 of approved colour andshade, an inner Heat strengthned clear float glass 6mm thick, spacertube 12mm wide, dessicants, including primary seal and secondaryseal (structural silicone sealant) etc. all complete for the requiredperformances, as per the Architectural drawings, as per the approvedshop drawings, as specified and as directed by the Engineer-in-Charge. TheIGUs shall be assembled in the factory/ workshop of the glass processor.(Payment for fixing of IGU Panels in the curtain glazing is included in costof item No.18.2)For payment, only the actual area of glass on face 1 ofthe glass panels (excluding the areas of the grooves and weather siliconesealant) provided and fixed in position, shall be measured in m2.(i)Coloured tinted float glass 6mm thick substrate with reflective soft coatingon face 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass ofapproved make having properties as visible Light transmittance (VLT) of25 to 35 %, Light reflection internal 10 to 15%, light reflection external10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided bytechnical sanctioning authority as per the site requirement. (P. No - 183, I. No - 18.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4028.81 | 4028.81 | 15.93 | False | None | None | False | None | False | 64178.9433 | 0 | 3428546 | 121499 | None | 18.3 | Providing, assembling and supplying vision glass panels (IGUs) comprisingof hermetically-sealed 6-12- 6 mm insulated glass (double glazed) visionpanel units of size and shape as required and specified, comprising of anouter heat strengthened float glass 6mm thick, of approved colour andshade with reflective soft coating on surface 2 of approved colour andshade, an inner Heat strengthned clear float glass 6mm thick, spacertube 12mm wide, dessicants, including primary seal and secondaryseal (structural silicone sealant) etc. all complete for the requiredperformances, as per the Architectural drawings, as per the approvedshop drawings, as specified and as directed by the Engineer-in-Charge. TheIGUs shall be assembled in the factory/ workshop of the glass processor.(Payment for fixing of IGU Panels in the curtain glazing is included in costof item No.18.2)For payment, only the actual area of glass on face 1 ofthe glass panels (excluding the areas of the grooves and weather siliconesealant) provided and fixed in position, shall be measured in m2.(i)Coloured tinted float glass 6mm thick substrate with reflective soft coatingon face 2, + 12mm Airgap + 6mm Heat Strengthened clear Glass ofapproved make having properties as visible Light transmittance (VLT) of25 to 35 %, Light reflection internal 10 to 15%, light reflection external10 to 20 %, shading coefficient (0.25-0.28) and U value of 3.0 to 3.3 W/m2 degree K etc. The properties of performance glass shall be decided bytechnical sanctioning authority as per the site requirement. (P. No - 183, I. No - 18.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4069.31 | 4069.31 | 19.98 | False | None | None | False | None | False | 81304.8138 | 0 | 3428547 | 121499 | None | 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.4.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 404.98 | 404.98 | 2201.54 | False | None | None | False | None | False | 891579.6692 | 0 | 3428548 | 121499 | None | 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.4.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 409.03 | 409.03 | 1684.54 | False | None | None | False | None | False | 689027.3962 | 0 | 3428549 | 121499 | None | 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.4.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 413.08 | 413.08 | 1684.54 | False | None | None | False | None | False | 695849.7832 | 0 | 3428550 | 121499 | None | 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.4.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 417.13 | 417.13 | 1684.54 | False | None | None | False | None | False | 702672.1702 | 0 | 3428551 | 121499 | None | 8.4.2 | Providing 12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.4.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 421.18 | 421.18 | 48.74 | False | None | None | False | None | False | 20528.3132 | 0 | 3428552 | 121499 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 42, I. No - 8.5.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 453.0 | 453.0 | 1458.69 | False | None | None | False | None | False | 660786.57 | 0 | 3428553 | 121499 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 42, I. No - 8.5.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 457.53 | 457.53 | 1000.15 | False | None | None | False | None | False | 457598.6295 | 0 | 3428554 | 121499 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 42, I. No - 8.5.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 462.06 | 462.06 | 989.67 | False | None | None | False | None | False | 457286.9202 | 0 | 3428555 | 121499 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 42, I. No - 8.5.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 466.59 | 466.59 | 989.67 | False | None | None | False | None | False | 461770.1253 | 0 | 3428556 | 121499 | None | 8.5.2 | Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 42, I. No - 8.5.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 471.12 | 471.12 | 652.27 | False | None | None | False | None | False | 307297.4424 | 0 | 3428557 | 121499 | None | 8.16.2 | Providing and fixing suitable plaster mesh 100mm wide manufacturedout of hot dipped galvanised iron of nominal thickness 0.35mm with azinc coating of 120g/m2width, along route of walls chipped for services,junction between RCC and brick walls including cost of materials, labourfor fixing complete as per specifications. ( length of mesh only be measuredfor payment.Plaster mesh 150mm wide (P. No -42 , I. No - 8.16.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Rmtr | 49.32 | 49.32 | 1200.0 | False | None | None | False | None | False | 59184.0 | 0 | 3428558 | 121499 | None | 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent (P. No - 63, I. No - 9.24, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3701.9 | 3701.9 | 693.15 | False | None | None | False | None | False | 2565971.985 | 0 | 3428559 | 121499 | None | 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent (P. No - 63, I. No - 9.24, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3738.91 | 3738.91 | 293.85 | False | None | None | False | None | False | 1098678.7035 | 0 | 3428560 | 121499 | None | 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent (P. No - 63, I. No - 9.24, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3775.93 | 3775.93 | 293.85 | False | None | None | False | None | False | 1109557.0305 | 0 | 3428561 | 121499 | None | 9.24 | Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing , curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. ** Polished Granite stone slab Black, Cat Eye, River Pink or equivalent (P. No - 63, I. No - 9.24, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 3812.95 | 3812.95 | 293.85 | False | None | None | False | None | False | 1120435.3575 | 0 | 3428562 | 121499 | None | 10.1.1 | Providing and fixing 18 mm thick gang saw cut granite of any color and shade, mirror polished, premoulded and prepolished, machine cut for kitchen platforms, vanity counters, window sills, facias and similar locations of required size, approved shade, colour and texture laid over 20 mm thick base cement mortar 1:4 (1 cement : 4 coarse sand), joints treated with white cement, mixed with matching pigment, epoxy touch up, including rubbing, curing, moulding and polishing to edges to give high gloss finish etc. complete at all levels. Area of the slab = 0.50 m2 (P. No - 69, I. No - 10.1.1, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 5199.79 | 5199.79 | 10.35 | False | None | None | False | None | False | 53817.8265 | 0 | 3428563 | 121499 | None | 10.19 | Providing and fixing 20mm thick gang saw water cut Lakared granite for cladding in CM 1:3 (1 cement : 3 coarse sand) proportion with a coat of rough plastering using CM 1:4 (1 cement : 4 fine sand), cut to required shape, pattern with paper joints, finished with cement mortar using white cement and colour pigments to match the colour of slab making through jointing with sealant, grooves in joints including cost of curing etc., complete including cost and conveyance of all materials, mortar, labour for all items of work, usage charges of machinery etc., complete as per specification. (P. No - 72, I. No - 10.19, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 4681.89 | 4681.89 | 127.45 | False | None | None | False | None | False | 596706.8805 | 0 | 3428564 | 121499 | None | 9.12.3 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 800x800 mm (P. No - 60, I. No - 9.12.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1631.59 | 1631.59 | 432.68 | False | None | None | False | None | False | 705956.3612 | 0 | 3428565 | 121499 | None | 9.12.3 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 800x800 mm Size of Tile 800x800 mm (P. No - 60, I. No - 9.12.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1647.9 | 1647.9 | 469.19 | False | None | None | False | None | False | 773178.201 | 0 | 3428566 | 121499 | None | 9.12.3 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 800x800 mm. Size of Tile 800x800 mm (P. No - 60, I. No - 9.12.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1664.22 | 1664.22 | 469.19 | False | None | None | False | None | False | 780835.3818 | 0 | 3428567 | 121499 | None | 9.12.3 | Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 800x800 mm. Size of Tile 800x800 mm (P. No - 60, I. No - 9.12.3, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1680.53 | 1680.53 | 469.19 | False | None | None | False | None | False | 788487.8707 | 0 | 3428568 | 121499 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(P. No - 60, I. No - 9.11, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 977.9 | 977.9 | 71.0 | False | None | None | False | None | False | 69430.9 | 0 | 3428569 | 121499 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(P. No - 60, I. No - 9.11, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1165.46 | 1165.46 | 53.2 | False | None | None | False | None | False | 62002.472 | 0 | 3428570 | 121499 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(P. No - 60, I. No - 9.11, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1177.0 | 1177.0 | 53.2 | False | None | None | False | None | False | 62616.4 | 0 | 3428571 | 121499 | None | 9.11 | Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer), of 1st quality conforming to IS : 15622, of approved make, in all colours, shades, except White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick bed of cement mortar 1:4 (1 Cement : 4 Coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including pointing the joints with white cement and matching pigments etc., complete.(P. No - 60, I. No - 9.11, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1188.54 | 1188.54 | 53.2 | False | None | None | False | None | False | 63230.328 | 0 | 3428572 | 121499 | None | 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.2.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 362.14 | 362.14 | 538.41 | False | None | None | False | None | False | 194979.7974 | 0 | 3428573 | 121499 | None | 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.2.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 365.76 | 365.76 | 213.78 | False | None | None | False | None | False | 78192.1728 | 0 | 3428574 | 121499 | None | 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.2.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 369.38 | 369.38 | 213.78 | False | None | None | False | None | False | 78966.0564 | 0 | 3428575 | 121499 | None | 8.2.2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (P. No - 41, I. No - 8.2.2, Vol-2 -Common S R 2023-24)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 373.01 | 373.01 | 213.78 | False | None | None | False | None | False | 79742.0778 | 0 | 3428576 | 121499 | None | 9.39 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (P. No - 65, I. No - 9.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1880.8 | 1880.8 | 437.36 | False | None | None | False | None | False | 822586.688 | 0 | 3428577 | 121499 | None | 9.39 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (P. No - 65, I. No - 9.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1899.61 | 1899.61 | 243.41 | False | None | None | False | None | False | 462384.0701 | 0 | 3428578 | 121499 | None | 9.39 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (P. No - 65, I. No - 9.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1918.42 | 1918.42 | 243.41 | False | None | None | False | None | False | 466962.6122 | 0 | 3428579 | 121499 | None | 9.39 | Providing skirting, dadooing, rises of steps with colour glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications. (P. No - 65, I. No - 9.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1937.23 | 1937.23 | 243.41 | False | None | None | False | None | False | 471541.1543 | 0 | 3428580 | 121499 | None | 9.40 | Providing, laying & fixing cement base, precast, pre polished cement concrete, designer tiles 25mm thick conforming to IS 1237 heavy duty tiles for flooring, treads of steps and landing, laid on a bed of 12mm thick cement mortar 1:3 mis finished with flush pointing using white cement, including cost of materials, mortar, including cutting, griding the edge to half/full round wherever required, labour, curing complete as per specification. (P. No - 65, I. No - 9.40, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1209.74 | 1209.74 | 285.33 | False | None | None | False | None | False | 345175.1142 | 0 | 3428581 | 121499 | None | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P. No - 85, I. No - 11.28, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 733.37 | 733.37 | 1696.17 | False | None | None | False | None | False | 1243920.1929 | 0 | 3428582 | 121499 | None | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P. No - 85, I. No - 11.28, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 740.7 | 740.7 | 1134.94 | False | None | None | False | None | False | 840650.058 | 0 | 3428583 | 121499 | None | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P. No - 85, I. No - 11.28, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 748.04 | 748.04 | 1134.94 | False | None | None | False | None | False | 848980.5176 | 0 | 3428584 | 121499 | None | 11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. (P. No - 85, I. No - 11.28, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Kgs | 755.37 | 755.37 | 1134.94 | False | None | None | False | None | False | 857299.6278 | 0 | 3428585 | 121499 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (P. No -149, I. No - 15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1060.47 | 1060.47 | 155.16 | False | None | None | False | None | False | 164542.5252 | 0 | 3428586 | 121499 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (P. No -149, I. No - 15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1071.07 | 1071.07 | 156.94 | False | None | None | False | None | False | 168093.7258 | 0 | 3428587 | 121499 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (P. No -149, I. No - 15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1081.68 | 1081.68 | 115.92 | False | None | None | False | None | False | 125388.3456 | 0 | 3428588 | 121499 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6kg per m2 to achieve final DFT (dry film thickness) of 1mm including prime coat of epoxy primer @150 g per m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In charge. (P. No -149, I. No - 15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1092.28 | 1092.28 | 115.92 | False | None | None | False | None | False | 126617.0976 | 0 | 3428589 | 121499 | None | 15.1 | Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU waterproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the waterproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. (P. No -149, I. No - 15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 1102.88 | 1102.88 | 1127.35 | False | None | None | False | None | False | 1243331.768 | 0 | 3428590 | 121499 | None | 2.1.6 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates.(P. No - 15, I. No - 2.1.6, S R 2023-24, Vol-.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8184.45 | 8184.45 | 3.03 | False | None | None | False | None | False | 24798.8835 | 0 | 3428591 | 121499 | None | 2.1.6 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 Using 20 mm nominal size graded crushed coarse aggregates.(P. No - 15, I. No - 2.1.6, S R 2023-24, Vol-.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 8427.55 | 8427.55 | 61.19 | False | None | None | False | None | False | 515681.7845 | 0 | 3428592 | 121499 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (P. No - 50, I. No - 8.51, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 129.8 | 129.8 | 3517.88 | False | None | None | False | None | False | 456620.824 | 0 | 3428593 | 121499 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (P. No - 50, I. No - 8.51, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 131.1 | 131.1 | 2710.71 | False | None | None | False | None | False | 355374.081 | 0 | 3428594 | 121499 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (P. No - 50, I. No - 8.51, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 132.4 | 132.4 | 2710.71 | False | None | None | False | None | False | 358898.004 | 0 | 3428595 | 121499 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (P. No - 50, I. No - 8.51, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 133.69 | 133.69 | 2710.71 | False | None | None | False | None | False | 362394.8199 | 0 | 3428596 | 121499 | None | 8.51 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (P. No - 50, I. No - 8.51, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 134.99 | 134.99 | 84.24 | False | None | None | False | None | False | 11371.5576 | 0 | 3428597 | 121499 | None | 8.55.2 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound) content.With water thinnable cement primer on wall surface having VOC contentless than 50 g/L as per specifications and as per directions of Engineer in charge.(P. No - 51, I. No - 8.55.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 68.79 | 68.79 | 3517.88 | False | None | None | False | None | False | 241994.9652 | 0 | 3428598 | 121499 | None | 8.55.2 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound) content.With water thinnable cement primer on wall surface having VOC contentless than 50 g/L as per specifications and as per directions of Engineer in charge.(P. No - 51, I. No - 8.55.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 69.48 | 69.48 | 2710.71 | False | None | None | False | None | False | 188340.1308 | 0 | 3428599 | 121499 | None | 8.55.2 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound) content.With water thinnable cement primer on wall surface having VOC contentless than 50 g/L as per specifications and as per directions of Engineer in charge.(P. No - 51, I. No - 8.55.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 70.17 | 70.17 | 2710.71 | False | None | None | False | None | False | 190210.5207 | 0 | 3428600 | 121499 | None | 8.55.2 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound) content.With water thinnable cement primer on wall surface having VOC contentless than 50 g/L as per specifications and as per directions of Engineer in charge.(P. No - 51, I. No - 8.55.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 70.86 | 70.86 | 2710.71 | False | None | None | False | None | False | 192080.9106 | 0 | 3428601 | 121499 | None | 8.55.2 | Applying priming coats with primer of approved brand andmanufacture, having low VOC (Volatile Organic Compound) content.With water thinnable cement primer on wall surface having VOC contentless than 50 g/L as per specifications and as per directions of Engineer in charge.(P. No - 51, I. No - 8.55.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 71.55 | 71.55 | 84.24 | False | None | None | False | None | False | 6027.372 | 0 | 3428602 | 121499 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P. No - 48, I. No - 8.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 164.85 | 164.85 | 3517.88 | False | None | None | False | None | False | 579922.518 | 0 | 3428603 | 121499 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P. No - 48, I. No - 8.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 166.49 | 166.49 | 2710.71 | False | None | None | False | None | False | 451306.1079 | 0 | 3428604 | 121499 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P. No - 48, I. No - 8.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 168.14 | 168.14 | 2710.71 | False | None | None | False | None | False | 455778.7794 | 0 | 3428605 | 121499 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P. No - 48, I. No - 8.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 169.79 | 169.79 | 2710.71 | False | None | None | False | None | False | 460251.4509 | 0 | 3428606 | 121499 | None | 8.39 | Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(P. No - 48, I. No - 8.39, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 171.44 | 171.44 | 84.24 | False | None | None | False | None | False | 14442.1056 | 0 | 3428607 | 121499 | None | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 231.04 | 231.04 | 1458.69 | False | None | None | False | None | False | 337015.7376 | 0 | 3428608 | 121499 | None | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 233.35 | 233.35 | 1000.15 | False | None | None | False | None | False | 233385.0025 | 0 | 3428609 | 121499 | None | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 235.66 | 235.66 | 989.67 | False | None | None | False | None | False | 233225.6322 | 0 | 3428610 | 121499 | None | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 237.98 | 237.98 | 989.67 | False | None | None | False | None | False | 235521.6666 | 0 | 3428611 | 121499 | None | 8.31 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives with pure Acrylic Resin, UV resistant, dirt & pick up resistant, Alkali & Water resistant of required shade: New work (Two coats applied @ 1.43 L/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 240.29 | 240.29 | 652.27 | False | None | None | False | None | False | 156733.9583 | 0 | 3428612 | 121499 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work(Two coats applied @ 3.28 L/10 m²) over and including priming coat ofexterior primer applied @ 2.20kg/10 m² to give an even shade afterthoroughly brooming the surface to remove all dirt, dust, mortar dropsand foreign matter including preparing the surface even and sand papersmooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 45, I. No - 8.29, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 367.33 | 367.33 | 71.1 | False | None | None | False | None | False | 26117.163 | 0 | 3428613 | 121499 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work(Two coats applied @ 3.28 L/10 m²) over and including priming coat ofexterior primer applied @ 2.20kg/10 m² to give an even shade afterthoroughly brooming the surface to remove all dirt, dust, mortar dropsand foreign matter including preparing the surface even and sand papersmooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 45, I. No - 8.29, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 371.01 | 371.01 | 47.4 | False | None | None | False | None | False | 17585.874 | 0 | 3428614 | 121499 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work(Two coats applied @ 3.28 L/10 m²) over and including priming coat ofexterior primer applied @ 2.20kg/10 m² to give an even shade afterthoroughly brooming the surface to remove all dirt, dust, mortar dropsand foreign matter including preparing the surface even and sand papersmooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 45, I. No - 8.29, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 374.68 | 374.68 | 47.4 | False | None | None | False | None | False | 17759.832 | 0 | 3428615 | 121499 | None | 8.29 | Finishing walls with textured exterior paint of required shade :New work(Two coats applied @ 3.28 L/10 m²) over and including priming coat ofexterior primer applied @ 2.20kg/10 m² to give an even shade afterthoroughly brooming the surface to remove all dirt, dust, mortar dropsand foreign matter including preparing the surface even and sand papersmooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 45, I. No - 8.29, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 378.35 | 378.35 | 28.2 | False | None | None | False | None | False | 10669.47 | 0 | 3428616 | 121499 | None | 8.34.1 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.34.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 68.79 | 68.79 | 125.04 | False | None | None | False | None | False | 8601.5016 | 0 | 3428617 | 121499 | None | 8.34.1 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.34.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 69.48 | 69.48 | 92.27 | False | None | None | False | None | False | 6410.9196 | 0 | 3428618 | 121499 | None | 8.34.1 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.34.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 70.17 | 70.17 | 92.27 | False | None | None | False | None | False | 6474.5859 | 0 | 3428619 | 121499 | None | 8.34.1 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.34.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 70.86 | 70.86 | 92.27 | False | None | None | False | None | False | 6538.2522 | 0 | 3428620 | 121499 | None | 8.34.1 | Applying priming coat: With ready mixed pink or Grey primer of approved brand and manufacture on wood work (hard and soft wood) including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.34.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 71.55 | 71.55 | 5.73 | False | None | None | False | None | False | 409.9815 | 0 | 3428621 | 121499 | None | 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.33.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 179.12 | 179.12 | 125.04 | False | None | None | False | None | False | 22397.1648 | 0 | 3428622 | 121499 | None | 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.33.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 180.92 | 180.92 | 92.27 | False | None | None | False | None | False | 16693.4884 | 0 | 3428623 | 121499 | None | 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.33.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 182.71 | 182.71 | 92.27 | False | None | None | False | None | False | 16858.6517 | 0 | 3428624 | 121499 | None | 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.33.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 184.5 | 184.5 | 92.27 | False | None | None | False | None | False | 17023.815 | 0 | 3428625 | 121499 | None | 8.33.2 | Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give an even shade including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, sand papering and knotting , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 46, I. No - 8.33.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 186.29 | 186.29 | 5.73 | False | None | None | False | None | False | 1067.4417 | 0 | 3428626 | 121499 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.33.3, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 180.42 | 180.42 | 175.4 | False | None | None | False | None | False | 31645.668 | 0 | 3428627 | 121499 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.33.3, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 182.23 | 182.23 | 122.82 | False | None | None | False | None | False | 22381.4886 | 0 | 3428628 | 121499 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.33.3, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 184.03 | 184.03 | 122.82 | False | None | None | False | None | False | 22602.5646 | 0 | 3428629 | 121499 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.33.3, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 185.83 | 185.83 | 122.82 | False | None | None | False | None | False | 22823.6406 | 0 | 3428630 | 121499 | None | 8.33.3 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (P. No - 47, I. No - 8.33.3, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 187.64 | 187.64 | 2.7 | False | None | None | False | None | False | 506.628 | 0 | 3428631 | 121499 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.5, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 285.56 | 285.56 | 224.4 | False | None | None | False | None | False | 64079.664 | 0 | 3428632 | 121499 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.5, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 288.42 | 288.42 | 42.0 | False | None | None | False | None | False | 12113.64 | 0 | 3428633 | 121499 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.5, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 291.27 | 291.27 | 42.0 | False | None | None | False | None | False | 12233.34 | 0 | 3428634 | 121499 | None | 10.1.5 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 75mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.5, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 294.13 | 294.13 | 42.0 | False | None | None | False | None | False | 12353.46 | 0 | 3428635 | 121499 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.7, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 533.48 | 533.48 | 160.0 | False | None | None | False | None | False | 85356.8 | 0 | 3428636 | 121499 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.7, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 538.81 | 538.81 | 42.0 | False | None | None | False | None | False | 22630.02 | 0 | 3428637 | 121499 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.7, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 544.15 | 544.15 | 42.0 | False | None | None | False | None | False | 22854.3 | 0 | 3428638 | 121499 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.7, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 549.48 | 549.48 | 42.0 | False | None | None | False | None | False | 23078.16 | 0 | 3428639 | 121499 | None | 10.1.7 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 110mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.7, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 554.82 | 554.82 | 400.4 | False | None | None | False | None | False | 222149.928 | 0 | 3428640 | 121499 | None | 10.1.10 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. PVC pipes 200mm dia., 6 kg/sqcm & class 3 (P. No - 113, I. No - 10.1.10, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1447.27 | 1447.27 | 180.0 | False | None | None | False | None | False | 260508.6 | 0 | 3428641 | 121499 | None | 10.8.6 | Supplying of special moulded variety PVC couplers as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark and with its latest amendments to walk site etc. complete. 75mm dia PVC couplers (P. No - 116 I. No - 10.8.6, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 86.97 | 86.97 | 30.0 | False | None | None | False | None | False | 2609.1 | 0 | 3428642 | 121499 | None | 10.8.8 | Supplying of special moulded variety PVC couplers as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark and with its latest amendments to walk site etc. complete. 110mm dia PVC couplers (P. No -116, I. No - 10.8.8, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 221.96 | 221.96 | 60.0 | False | None | None | False | None | False | 13317.6 | 0 | 3428643 | 121499 | None | 10.9.6 | Supply and delivery at site special moulded variety PVC elbows as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 75 mm dia PVC Elbows (P. No - 117, I. No - 10.9.6, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 249.22 | 249.22 | 30.0 | False | None | None | False | None | False | 7476.6 | 0 | 3428644 | 121499 | None | 10.9.8 | Supply and delivery at site special moulded variety PVC elbows as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 110 mm dia PVC Elbows (P. No -117, I. No - 10.9.8, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 392.0 | 392.0 | 60.0 | False | None | None | False | None | False | 23520.0 | 0 | 3428645 | 121499 | None | 10.10.6 | Supply and delivery at site special moulded variety PVC tee as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 75 mm dia PVC Tee (P. No - 117, I. No - 10.10.6, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 151.87 | 151.87 | 30.0 | False | None | None | False | None | False | 4556.1 | 0 | 3428646 | 121499 | None | 10.10.8 | Supply and delivery at site special moulded variety PVC tee as per IS 7834/ 1987 and fabricated as per IG124/ 1984 with ISI mark with its latest amendments 110 mm dia PVC Tee (P. No - 117, I. No - 10.10.8, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 325.8 | 325.8 | 60.0 | False | None | None | False | None | False | 19548.0 | 0 | 3428647 | 121499 | None | 13.32.2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work including cutting chases and making good walls etc. 20mm Nominal dia Pipes (P. No - 122, I. No - 13.32.2, S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 491.94 | 491.94 | 374.0 | False | None | None | False | None | False | 183985.56 | 0 | 3428648 | 121499 | None | 13.32.2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work including cutting chases and making good walls etc. 20mm Nominal dia Pipes (P. No - 122, I. No - 13.32.2, S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 496.86 | 496.86 | 168.0 | False | None | None | False | None | False | 83472.48 | 0 | 3428649 | 121499 | None | 13.32.2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work including cutting chases and making good walls etc. 20mm Nominal dia Pipes (P. No - 122, I. No - 13.32.2, S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 501.78 | 501.78 | 168.0 | False | None | None | False | None | False | 84299.04 | 0 | 3428650 | 121499 | None | 13.32.2 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement & the cost of cutting chases & making good the same including testing of joints complete as per direction of Engineer in charge. Concealed work including cutting chases and making good walls etc. 20mm Nominal dia Pipes (P. No - 122, I. No - 13.32.2, S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 506.7 | 506.7 | 168.0 | False | None | None | False | None | False | 85125.6 | 0 | 3428651 | 121499 | None | 13.31.4 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall. 32mm Nominal dia Pipes (P. No - 122, I. No - 13.31.4,S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 539.97 | 539.97 | 234.8 | False | None | None | False | None | False | 126784.956 | 0 | 3428652 | 121499 | None | 13.31.3 | Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. Internal work - Exposed on wall. 25mm Nominal dia Pipes (P. No - 122, I. No - 13.31.3, S R 2023-24,Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 429.27 | 429.27 | 646.8 | False | None | None | False | None | False | 277651.836 | 0 | 3428653 | 121499 | None | 13.33.6 | Providing and fixing Chorinated Poly Vinyl Chloride (CPVC) pipes conforming to IS 15778 having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings, this includes jointing of pipes and fittings with one step solvent cement, trenching, refilling & testing of joints complete. as per direction of Engineer in charge. external work 50mm Nominal dia Pipes (P. No -123, I. No - 13.33.6, S R 2023-24, Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 973.29 | 973.29 | 150.0 | False | None | None | False | None | False | 145993.5 | 0 | 3428654 | 121499 | None | 13.34 | Providing and placing on Terrace (at all floor levels) Polyethylene water storage tank IS: 12701 marked with cover and sutable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank (P. No - 123, I. No - 13.34, S R 2023-24, Vol-02)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | l | 12.15 | 12.15 | 12000.0 | False | None | None | False | None | False | 145800.0 | 0 | 3428655 | 121499 | None | 16.9 | Constructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. (P. No -191, I. No - 16.9, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7079.29 | 7079.29 | 18.0 | False | None | None | False | None | False | 127427.22 | 0 | 3428656 | 121499 | None | 16.10 | Constructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm(inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover. (P. No -191, I. No - 16.10, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5498.33 | 5498.33 | 12.0 | False | None | None | False | None | False | 65979.96 | 0 | 3428657 | 121499 | None | 16.15.1 | Providing and constructing WIRE CUT BRICK MACHINEHOLE CHAMBERS using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality,plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS:12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe 500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.H: Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.0 M depth & SFRC cover & frame(P. No - 192 I. No - 16.15.1, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 37703.01 | 37703.01 | 4.0 | False | None | None | False | None | False | 150812.04 | 0 | 3428658 | 121499 | None | 16.15.6 | Providing and constructing “WIRE CUT BRICK MACHINEHOLE CHAMBERS” using Portland/Pozzolana cement, conical in shape at top, with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15M alround the chamber. Construct Brick masonry in CM 1:4, 340 mm thick, with wirecut bricks of approved quality,plaster inside and out side with CM 1:3, 12mm thick, except for the conical surface outside where the plaster thickness shall be 20mm. Slope inside to be 1:6 in the concrete towards central drain and finished smooth. Fixing of pipes in CC 1:2:4 with graded metal of 20mm and down size. Supplying and fixing SFRC Machinehole frame and cover (Heavy Duty) conforming to IS12592 with latest amendment, in CC 1:2:4. Supplying and fixing footsteps made of 12mm dia. steel bars (Fe-500) with 3mm thick plastic encapsulation (IS-10910). The footsteps shall be fixed 30cms apart and on CC block embeded to masonry wall. The whole works include watering, curing, barricading, danger lighting, pouring tar over MH frame and cover, cost of tar, shoring, strutting, dewatering, engraving Machinehole number with flow direction on the inner conical surface etc. as per the drawing etc. as per technical specifications and for the following diameters and depth etc. for 1.2mm diaCirc. B M.H: Constructing Brick Masonry Circular Machinehole 1.2 m internal dia. , 1.5M depth & SFRC cover & frame(P. No - 192, I. No - 16.15.6, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 49818.54 | 49818.54 | 4.0 | False | None | None | False | None | False | 199274.16 | 0 | 3428659 | 121499 | None | 14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (P. No - 131, I. No - 14.3.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7758.15 | 7758.15 | 19.0 | False | None | None | False | None | False | 147404.85 | 0 | 3428660 | 121499 | None | 14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (P. No - 131, I. No - 14.3.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7835.73 | 7835.73 | 14.0 | False | None | None | False | None | False | 109700.22 | 0 | 3428661 | 121499 | None | 14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (P. No - 131, I. No - 14.3.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7913.31 | 7913.31 | 14.0 | False | None | None | False | None | False | 110786.34 | 0 | 3428662 | 121499 | None | 14.3.1 | Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous china flushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : W.C. pan with ISI marked white solid plastic seat and lid (P. No - 131, I. No - 14.3.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7990.89 | 7990.89 | 14.0 | False | None | None | False | None | False | 111872.46 | 0 | 3428663 | 121499 | None | 14.7A | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (P. No - 133, I. No - 14.7A, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5349.06 | 5349.06 | 25.0 | False | None | None | False | None | False | 133726.5 | 0 | 3428664 | 121499 | None | 14.7A | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (P. No - 133, I. No - 14.7A, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5402.55 | 5402.55 | 14.0 | False | None | None | False | None | False | 75635.7 | 0 | 3428665 | 121499 | None | 14.7A | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (P. No - 133, I. No - 14.7A, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5456.04 | 5456.04 | 14.0 | False | None | None | False | None | False | 76384.56 | 0 | 3428666 | 121499 | None | 14.7A | Providing and fixing wash basin with C.I. brackets, 15 mm dia CP Brass single hole basin mixer of approved quality and make, including painting of fittings and brackets, cutting and making good the walls wherever required: using White Vitreous China Wash basin size 550x400 mm with a 15 mm CP Brass single hole basin mixer (P. No - 133, I. No - 14.7A, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5509.53 | 5509.53 | 14.0 | False | None | None | False | None | False | 77133.42 | 0 | 3428667 | 121499 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. (P. No - 133, I. No - 14.8, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1847.05 | 1847.05 | 21.0 | False | None | None | False | None | False | 38788.05 | 0 | 3428668 | 121499 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. (P. No - 133, I. No - 14.8, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1865.52 | 1865.52 | 14.0 | False | None | None | False | None | False | 26117.28 | 0 | 3428669 | 121499 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. (P. No - 133, I. No - 14.8, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1884.0 | 1884.0 | 14.0 | False | None | None | False | None | False | 26376.0 | 0 | 3428670 | 121499 | None | 14.8 | Providing and fixing white vitreous china pedestal for wash basin completely recessed at the back for the reception of pipes and fittings. (P. No - 133, I. No - 14.8, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1902.47 | 1902.47 | 14.0 | False | None | None | False | None | False | 26634.58 | 0 | 3428671 | 121499 | None | 13.22.1.1 | Providing and fixing PTMT grating of approved quality and colour. Circular type.100 mm nominal dia (P. No - 120, I. No - 13.22.1.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 53.22 | 53.22 | 42.0 | False | None | None | False | None | False | 2235.24 | 0 | 3428672 | 121499 | None | 13.22.1.1 | Providing and fixing PTMT grating of approved quality and colour. Circular type.100 mm nominal dia (P. No - 120, I. No - 13.22.1.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 53.75 | 53.75 | 28.0 | False | None | None | False | None | False | 1505.0 | 0 | 3428673 | 121499 | None | 13.22.1.1 | Providing and fixing PTMT grating of approved quality and colour. Circular type.100 mm nominal dia (P. No - 120, I. No - 13.22.1.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 54.28 | 54.28 | 28.0 | False | None | None | False | None | False | 1519.84 | 0 | 3428674 | 121499 | None | 13.22.1.1 | Providing and fixing PTMT grating of approved quality and colour. Circular type.100 mm nominal dia (P. No - 120, I. No - 13.22.1.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 54.81 | 54.81 | 28.0 | False | None | None | False | None | False | 1534.68 | 0 | 3428675 | 121499 | None | 14.28.2.2 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. Flexible pipe 40 mm dia (P. No - 136, I. No - 14.28.2.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 119.42 | 119.42 | 25.0 | False | None | None | False | None | False | 2985.5 | 0 | 3428676 | 121499 | None | 14.28.2.2 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. Flexible pipe 40 mm dia (P. No - 136, I. No - 14.28.2.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 120.61 | 120.61 | 14.0 | False | None | None | False | None | False | 1688.54 | 0 | 3428677 | 121499 | None | 14.28.2.2 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. Flexible pipe 40 mm dia (P. No - 136, I. No - 14.28.2.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 121.8 | 121.8 | 14.0 | False | None | None | False | None | False | 1705.2 | 0 | 3428678 | 121499 | None | 14.28.2.2 | Providing and fixing P.V.C. waste pipe for sink or wash basin including P.V.C. waste fittings complete. Flexible pipe 40 mm dia (P. No - 136, I. No - 14.28.2.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 123.0 | 123.0 | 14.0 | False | None | None | False | None | False | 1722.0 | 0 | 3428679 | 121499 | None | 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. (P. No - 136, I. No - 14.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1583.56 | 1583.56 | 19.0 | False | None | None | False | None | False | 30087.64 | 0 | 3428680 | 121499 | None | 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. (P. No - 136, I. No - 14.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1599.4 | 1599.4 | 14.0 | False | None | None | False | None | False | 22391.6 | 0 | 3428681 | 121499 | None | 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. (P. No - 136, I. No - 14.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1615.23 | 1615.23 | 14.0 | False | None | None | False | None | False | 22613.22 | 0 | 3428682 | 121499 | None | 14.31 | Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. (P. No - 136, I. No - 14.31, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1631.07 | 1631.07 | 14.0 | False | None | None | False | None | False | 22834.98 | 0 | 3428683 | 121499 | None | 14.32.4 | Providing and fixing mirror of superior glass (of approved quality) andof required shape and size with plastic moulded frame of approved makeand shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm (P. No - 136, I. No - 14.32.4, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 2240.35 | 2240.35 | 2.0 | False | None | None | False | None | False | 4480.7 | 0 | 3428684 | 121499 | None | 14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.(P. No - 137, I. No - 14.40.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 643.81 | 643.81 | 22.0 | False | None | None | False | None | False | 14163.82 | 0 | 3428685 | 121499 | None | 14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.(P. No - 137, I. No - 14.40.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 650.25 | 650.25 | 14.0 | False | None | None | False | None | False | 9103.5 | 0 | 3428686 | 121499 | None | 14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.(P. No - 137, I. No - 14.40.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 656.68 | 656.68 | 14.0 | False | None | None | False | None | False | 9193.52 | 0 | 3428687 | 121499 | None | 14.40.2 | Providing and fixing PTMT towel rail complete with brackets fixed to wooden cleats with CP brass screws with concealed fittings arrangement of approved quality and colour. 600 mm long towel rail with total length of 645 mm, width 78 mm and effective height of 88 mm, weighing not less than 190 g.(P. No - 137, I. No - 14.40.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 663.12 | 663.12 | 14.0 | False | None | None | False | None | False | 9283.68 | 0 | 3428688 | 121499 | None | 13.63 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0cm X 4.0 cm with all fitting arrangements & all necessary accessories complete.(P. No - 128, I. No - 13.63, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | 1 * 2 | 316.71 | 316.71 | 45.0 | False | None | None | False | None | False | 14251.95 | 0 | 3428689 | 121499 | None | 13.63 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0cm X 4.0 cm with all fitting arrangements & all necessary accessories complete.(P. No - 128, I. No - 13.63, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | 1 * 2 | 319.88 | 319.88 | 28.0 | False | None | None | False | None | False | 8956.64 | 0 | 3428690 | 121499 | None | 13.63 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0cm X 4.0 cm with all fitting arrangements & all necessary accessories complete.(P. No - 128, I. No - 13.63, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | 1 * 2 | 323.05 | 323.05 | 28.0 | False | None | None | False | None | False | 9045.4 | 0 | 3428691 | 121499 | None | 13.63 | Providing and fixing PVC (S.W.R) Multi Floor Trap 10.0 cm X 7.5 cm X 5.0cm X 4.0 cm with all fitting arrangements & all necessary accessories complete.(P. No - 128, I. No - 13.63, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | 1 * 2 | 326.21 | 326.21 | 28.0 | False | None | None | False | None | False | 9133.88 | 0 | 3428692 | 121499 | None | 13.8.2.1 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 15 mm nominal bore (P. No - 118, I. No - 13.8.2.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 118.12 | 118.12 | 38.0 | False | None | None | False | None | False | 4488.56 | 0 | 3428693 | 121499 | None | 13.8.2.1 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 15 mm nominal bore (P. No - 118, I. No - 13.8.2.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 119.3 | 119.3 | 28.0 | False | None | None | False | None | False | 3340.4 | 0 | 3428694 | 121499 | None | 13.8.2.1 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 15 mm nominal bore (P. No - 118, I. No - 13.8.2.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 120.48 | 120.48 | 28.0 | False | None | None | False | None | False | 3373.44 | 0 | 3428695 | 121499 | None | 13.8.2.1 | Providing and fixing unplasticised PVC connection pipe with brass unions : 45 cm length 15 mm nominal bore (P. No - 118, I. No - 13.8.2.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 121.66 | 121.66 | 28.0 | False | None | None | False | None | False | 3406.48 | 0 | 3428696 | 121499 | None | 13.12 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.12, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 824.23 | 824.23 | 44.0 | False | None | None | False | None | False | 36266.12 | 0 | 3428697 | 121499 | None | 13.12 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.12, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 832.47 | 832.47 | 28.0 | False | None | None | False | None | False | 23309.16 | 0 | 3428698 | 121499 | None | 13.12 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.12, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 840.71 | 840.71 | 28.0 | False | None | None | False | None | False | 23539.88 | 0 | 3428699 | 121499 | None | 13.12 | Providing and fixing C.P. brass bib cock of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.12, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 848.96 | 848.96 | 28.0 | False | None | None | False | None | False | 23770.88 | 0 | 3428700 | 121499 | None | 13.16 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.16, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 804.76 | 804.76 | 88.0 | False | None | None | False | None | False | 70818.88 | 0 | 3428701 | 121499 | None | 13.16 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.16, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 812.81 | 812.81 | 66.0 | False | None | None | False | None | False | 53645.46 | 0 | 3428702 | 121499 | None | 13.16 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.16, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 820.86 | 820.86 | 66.0 | False | None | None | False | None | False | 54176.76 | 0 | 3428703 | 121499 | None | 13.16 | Providing and fixing C.P. brass angle valve for basin mixer and geyser points of approved quality conforming to IS:8931 (P. No - 119, I. No - 13.16, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 828.9 | 828.9 | 66.0 | False | None | None | False | None | False | 54707.4 | 0 | 3428704 | 121499 | None | 13.20.2 | Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms (P. No - 120, I. No - 13.20.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 407.57 | 407.57 | 25.0 | False | None | None | False | None | False | 10189.25 | 0 | 3428705 | 121499 | None | 13.20.2 | Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms (P. No - 120, I. No - 13.20.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 411.65 | 411.65 | 14.0 | False | None | None | False | None | False | 5763.1 | 0 | 3428706 | 121499 | None | 13.20.2 | Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms (P. No - 120, I. No - 13.20.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 415.72 | 415.72 | 14.0 | False | None | None | False | None | False | 5820.08 | 0 | 3428707 | 121499 | None | 13.20.2 | Providing and fixing PTMT pillar cock of approved quality and colour. 15 mm nominal bore, 125 mm long foam flow, weighing not less than 120 gms (P. No - 120, I. No - 13.20.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 419.8 | 419.8 | 14.0 | False | None | None | False | None | False | 5877.2 | 0 | 3428708 | 121499 | None | 14.22B | Providing and fixing CP Brass 15 mm nominal dia Single lever telephonic wall mixer of quality & make as approved by Engineer in charge. (P. No - 135, I. No - 14.22B, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 7219.48 | 7219.48 | 19.0 | False | None | None | False | None | False | 137170.12 | 0 | 3428709 | 121499 | None | 14.22B | Providing and fixing CP Brass 15 mm nominal dia Single lever telephonic wall mixer of quality & make as approved by Engineer in charge. (P. No - 135, I. No - 14.22B, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 7291.67 | 7291.67 | 14.0 | False | None | None | False | None | False | 102083.38 | 0 | 3428710 | 121499 | None | 14.22B | Providing and fixing CP Brass 15 mm nominal dia Single lever telephonic wall mixer of quality & make as approved by Engineer in charge. (P. No - 135, I. No - 14.22B, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 7363.87 | 7363.87 | 14.0 | False | None | None | False | None | False | 103094.18 | 0 | 3428711 | 121499 | None | 14.22B | Providing and fixing CP Brass 15 mm nominal dia Single lever telephonic wall mixer of quality & make as approved by Engineer in charge. (P. No - 135, I. No - 14.22B, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 7436.06 | 7436.06 | 14.0 | False | None | None | False | None | False | 104104.84 | 0 | 3428712 | 121499 | None | 13.26 | Providing and fixing PTMT soap Dish Holder having length of 138mm, breadth 102mm, height of 75mm with concealed fitting arrangements, weighing not less than 106 g. (P. No - 121, I. No - 13.26, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 129.8 | 129.8 | 25.0 | False | None | None | False | None | False | 3245.0 | 0 | 3428713 | 121499 | None | 13.26 | Providing and fixing PTMT soap Dish Holder having length of 138mm, breadth 102mm, height of 75mm with concealed fitting arrangements, weighing not less than 106 g. (P. No - 121, I. No - 13.26, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 131.1 | 131.1 | 14.0 | False | None | None | False | None | False | 1835.4 | 0 | 3428714 | 121499 | None | 13.26 | Providing and fixing PTMT soap Dish Holder having length of 138mm, breadth 102mm, height of 75mm with concealed fitting arrangements, weighing not less than 106 g. (P. No - 121, I. No - 13.26, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 132.4 | 132.4 | 14.0 | False | None | None | False | None | False | 1853.6 | 0 | 3428715 | 121499 | None | 13.26 | Providing and fixing PTMT soap Dish Holder having length of 138mm, breadth 102mm, height of 75mm with concealed fitting arrangements, weighing not less than 106 g. (P. No - 121, I. No - 13.26, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 133.69 | 133.69 | 14.0 | False | None | None | False | None | False | 1871.66 | 0 | 3428716 | 121499 | None | 9757 | Supplying and fixing Health Faucet ALD 573 "JAGUAR" Make etc.,The item is inclusive of all materials, lead and lift, loading and unloading, transportation charges, and all other incidental charges etc., and work should be carried out as per the directions of Engineer in charge of the work. ( SE/BLD/AE2/9757/2013-14 DATED: 13-02-2014 SL NO-09 )
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1815.0 | 1815.0 | 61.0 | False | None | None | False | None | False | 110715.0 | 0 | 3428717 | 121499 | None | 14.81.a | Providing and fixing Overhead rain showers of minimum dimension225x225mm & wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class economy (P. No - 143, I. No - 14.81.a, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1403.14 | 1403.14 | 19.0 | False | None | None | False | None | False | 26659.66 | 0 | 3428718 | 121499 | None | 14.81.a | Providing and fixing Overhead rain showers of minimum dimension225x225mm & wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class economy (P. No - 143, I. No - 14.81.a, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1417.17 | 1417.17 | 14.0 | False | None | None | False | None | False | 19840.38 | 0 | 3428719 | 121499 | None | 14.81.a | Providing and fixing Overhead rain showers of minimum dimension225x225mm & wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class economy (P. No - 143, I. No - 14.81.a, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1431.2 | 1431.2 | 14.0 | False | None | None | False | None | False | 20036.8 | 0 | 3428720 | 121499 | None | 14.81.a | Providing and fixing Overhead rain showers of minimum dimension225x225mm & wall flange made of Stainless steel with all concealed fitting arrangements & all necessary accesories complete - Class economy (P. No - 143, I. No - 14.81.a, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1445.23 | 1445.23 | 14.0 | False | None | None | False | None | False | 20233.22 | 0 | 3428721 | 121499 | None | 14.96.a | Providing and fixing Stainless Steel Grab Bar 600 mm Long with all concealed fitting arrangements & all necessary accesories complete - Class Economy(P. No - 145, I. No - 14.96.a, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 2533.7 | 2533.7 | 1.0 | False | None | None | False | None | False | 2533.7 | 0 | 3428722 | 121499 | None | 786 | Providing and fixing in position CPVC gate valve of approved quality ( screwed end ) 32mm nominal bore with all lead and lift loading & unloading, labour and all other incidental charges etc., complete as per the directions of the Engineer-in-charge of the work. ( SE/BLD/786/2013-14 DATED: 17-06-2023 SL NO-03 )
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 826.0 | 826.0 | 30.0 | False | None | None | False | None | False | 24780.0 | 0 | 3428723 | 121499 | None | 13.25.1 | Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments. Size 50 mm (P. No - 154, I. No - 13.25.1, S R 2023-24, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1622.5 | 1622.5 | 8.0 | False | None | None | False | None | False | 12980.0 | 0 | 3428724 | 121499 | None | 12.76.2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10mm (P. No - 107, I. No - 12.76.2, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 454.3 | 454.3 | 108.0 | False | None | None | False | None | False | 49064.4 | 0 | 3428725 | 121499 | None | 12.76.2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10mm (P. No - 107, I. No - 12.76.2, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 458.84 | 458.84 | 78.0 | False | None | None | False | None | False | 35789.52 | 0 | 3428726 | 121499 | None | 12.76.2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10mm (P. No - 107, I. No - 12.76.2, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 463.39 | 463.39 | 78.0 | False | None | None | False | None | False | 36144.42 | 0 | 3428727 | 121499 | None | 12.76.2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10mm (P. No - 107, I. No - 12.76.2, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 467.93 | 467.93 | 78.0 | False | None | None | False | None | False | 36498.54 | 0 | 3428728 | 121499 | None | 12.76.2 | Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete : 200x10mm (P. No - 107, I. No - 12.76.2, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 472.47 | 472.47 | 3.0 | False | None | None | False | None | False | 1417.41 | 0 | 3428729 | 121499 | None | 12.79.1 | Providing and fixing bright finished brass handles with screws etc. complete: Brass handles 125 mm with plate 175x32 mm (P. No - 108, I. No - 12.79.1, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 323.2 | 323.2 | 8.0 | False | None | None | False | None | False | 2585.6 | 0 | 3428730 | 121499 | None | 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90mm (P. No - 107, I. No - 12.74.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 132.4 | 132.4 | 172.0 | False | None | None | False | None | False | 22772.8 | 0 | 3428731 | 121499 | None | 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90mm (P. No - 107, I. No - 12.74.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 133.72 | 133.72 | 124.0 | False | None | None | False | None | False | 16581.28 | 0 | 3428732 | 121499 | None | 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90mm (P. No - 107, I. No - 12.74.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 135.04 | 135.04 | 124.0 | False | None | None | False | None | False | 16744.96 | 0 | 3428733 | 121499 | None | 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90mm (P. No - 107, I. No - 12.74.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 136.37 | 136.37 | 124.0 | False | None | None | False | None | False | 16909.88 | 0 | 3428734 | 121499 | None | 12.74.1 | Providing and fixing IS : 12817 marked stainless steel butt hinges with stainless steel screws etc. complete : 125x64x1.90mm (P. No - 107, I. No - 12.74.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 137.69 | 137.69 | 4.0 | False | None | None | False | None | False | 550.76 | 0 | 3428735 | 121499 | None | 12.58 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. (P. No - 105, I. No - 12.58, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 155.76 | 155.76 | 24.0 | False | None | None | False | None | False | 3738.24 | 0 | 3428736 | 121499 | None | 12.58 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. (P. No - 105, I. No - 12.58, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 157.32 | 157.32 | 16.0 | False | None | None | False | None | False | 2517.12 | 0 | 3428737 | 121499 | None | 12.58 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. (P. No - 105, I. No - 12.58, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 158.88 | 158.88 | 16.0 | False | None | None | False | None | False | 2542.08 | 0 | 3428738 | 121499 | None | 12.58 | Providing and fixing bright finished brass hanging type floor door stopper with necessary screws, etc. complete. (P. No - 105, I. No - 12.58, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 160.43 | 160.43 | 16.0 | False | None | None | False | None | False | 2566.88 | 0 | 3428739 | 121499 | None | 22.15.2 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 300mm (P. No - 218, I. No - 22.15.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 713.9 | 713.9 | 4.0 | False | None | None | False | None | False | 2855.6 | 0 | 3428740 | 121499 | None | 22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 200mm (P. No - 218, I. No - 22.15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 584.1 | 584.1 | 78.0 | False | None | None | False | None | False | 45559.8 | 0 | 3428741 | 121499 | None | 22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 200mm (P. No - 218, I. No - 22.15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 589.94 | 589.94 | 60.0 | False | None | None | False | None | False | 35396.4 | 0 | 3428742 | 121499 | None | 22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 200mm (P. No - 218, I. No - 22.15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 595.78 | 595.78 | 60.0 | False | None | None | False | None | False | 35746.8 | 0 | 3428743 | 121499 | None | 22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 200mm (P. No - 218, I. No - 22.15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 601.62 | 601.62 | 60.0 | False | None | None | False | None | False | 36097.2 | 0 | 3428744 | 121499 | None | 22.15.1 | Providing and fixing Stainless Steel Fixtures conforming to 304 graded steel as per direction of engineer in charge SS Handles 200mm (P. No - 218, I. No - 22.15.1, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 607.46 | 607.46 | 2.0 | False | None | None | False | None | False | 1214.92 | 0 | 3428745 | 121499 | None | 12.60 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. (P. No - 105, I. No - 12.60, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1365.5 | 1365.5 | 22.0 | False | None | None | False | None | False | 30041.0 | 0 | 3428746 | 121499 | None | 12.60 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. (P. No - 105, I. No - 12.60, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1379.15 | 1379.15 | 16.0 | False | None | None | False | None | False | 22066.4 | 0 | 3428747 | 121499 | None | 12.60 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. (P. No - 105, I. No - 12.60, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1392.81 | 1392.81 | 16.0 | False | None | None | False | None | False | 22284.96 | 0 | 3428748 | 121499 | None | 12.60 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. (P. No - 105, I. No - 12.60, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1406.46 | 1406.46 | 16.0 | False | None | None | False | None | False | 22503.36 | 0 | 3428749 | 121499 | None | 12.60 | Providing and fixing chromium plated brass 100 mm mortice latch and lock with 6 levers and a pair of lever handles of approved quality with necessary screws etc. complete. (P. No - 105, I. No - 12.60, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1420.12 | 1420.12 | 1.0 | False | None | None | False | None | False | 1420.12 | 0 | 3428750 | 121499 | None | 7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. (P. No - 23, I. No - 7.18, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 2618.07 | 2618.07 | 13.44 | False | None | None | False | None | False | 35186.8608 | 0 | 3428751 | 121499 | None | 7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. (P. No - 23, I. No - 7.18, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 2644.25 | 2644.25 | 10.08 | False | None | None | False | None | False | 26654.04 | 0 | 3428752 | 121499 | None | 7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. (P. No - 23, I. No - 7.18, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 2670.43 | 2670.43 | 10.08 | False | None | None | False | None | False | 26917.9344 | 0 | 3428753 | 121499 | None | 7.18 | Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. (P. No - 23, I. No - 7.18, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 2696.61 | 2696.61 | 10.08 | False | None | None | False | None | False | 27181.8288 | 0 | 3428754 | 121499 | None | 10.2 | Providing edge moulding to 18mm thick Granite stone counters, vanities etc including machine polishing to edge to give high gloss finish etc. complete as per design approved by Engineer-in-charge. (P. No - 69, I. No - 10.2, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 425.74 | 425.74 | 1755.18 | False | None | None | False | None | False | 747250.3332 | 0 | 3428755 | 121499 | None | 12.59 | Providing and fixing aluminium die cast body tubular type universal hy draulic door closer (having brand logo with ISI, IS : 3564, embossed on the
body, door weight upto 35 kg and door width upto 700 mm), with necessary
accessories and screws etc. complete. (P. No - 105, I. No - 12.59, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1445.97 | 1445.97 | 36.0 | False | None | None | False | None | False | 52054.92 | 0 | 3428756 | 121499 | None | 12.59 | Providing and fixing aluminium die cast body tubular type universal hy draulic door closer (having brand logo with ISI, IS : 3564, embossed on the
body, door weight upto 35 kg and door width upto 700 mm), with necessary
accessories and screws etc. complete. (P. No - 105, I. No - 12.59, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1460.43 | 1460.43 | 30.0 | False | None | None | False | None | False | 43812.9 | 0 | 3428757 | 121499 | None | 12.59 | Providing and fixing aluminium die cast body tubular type universal hy draulic door closer (having brand logo with ISI, IS : 3564, embossed on the
body, door weight upto 35 kg and door width upto 700 mm), with necessary
accessories and screws etc. complete. (P. No - 105, I. No - 12.59, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1474.89 | 1474.89 | 30.0 | False | None | None | False | None | False | 44246.7 | 0 | 3428758 | 121499 | None | 12.59 | Providing and fixing aluminium die cast body tubular type universal hy draulic door closer (having brand logo with ISI, IS : 3564, embossed on the
body, door weight upto 35 kg and door width upto 700 mm), with necessary
accessories and screws etc. complete. (P. No - 105, I. No - 12.59, S R 2023-24, Vol-2-For Buildings)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 1489.35 | 1489.35 | 30.0 | False | None | None | False | None | False | 44680.5 | 0 | 3428759 | 121499 | None | 12.4 | Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. (P. No - 140, I. No - 12.4, S R 2023-24, Vol-5-For BWSSB)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 6863.82 | 6863.82 | 2.0 | False | None | None | False | None | False | 13727.64 | 0 | 3428760 | 121499 | None | 12.1.1 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth Borewell depth of 0 to 50 Mtrs(I N 12.1.1 Page No.139, vol-5 )
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 480.26 | 480.26 | 50.0 | False | None | None | False | None | False | 24013.0 | 0 | 3428761 | 121499 | None | 12.1.2 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 50 to 100 Mtrs (I N 12.1.2 Page No.139, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 602.27 | 602.27 | 50.0 | False | None | None | False | None | False | 30113.5 | 0 | 3428762 | 121499 | None | 12.1.3 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 100 to 150 Mtrs (I N 12.1.3 Page No.139, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 639.91 | 639.91 | 50.0 | False | None | None | False | None | False | 31995.5 | 0 | 3428763 | 121499 | None | 12.1.4 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 150 to 200 Mtrs (I N 12.1.4 Page No.139, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 742.46 | 742.46 | 50.0 | False | None | None | False | None | False | 37123.0 | 0 | 3428764 | 121499 | None | 12.1.5 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 200 to 250 Mtrs (I N 12.1.5 Page No.139, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 870.96 | 870.96 | 50.0 | False | None | None | False | None | False | 43548.0 | 0 | 3428765 | 121499 | None | 12.1.6 | Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) Borewell depth of 250 to 300 Mtrs (I N 12.1.6 Page No.139, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 960.52 | 960.52 | 50.0 | False | None | None | False | None | False | 48026.0 | 0 | 3428766 | 121499 | None | 12.32 | Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty (I N 12.32, Page No.143, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 2509.03 | 2509.03 | 30.0 | False | None | None | False | None | False | 75270.9 | 0 | 3428767 | 121499 | None | 12.34 | Providing and laying at site of work MS casing caps as per IS 1239 (part II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge (I N 12.34 Page No.143, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 212.87 | 212.87 | 1.0 | False | None | None | False | None | False | 212.87 | 0 | 3428768 | 121499 | None | 13.40.9 | Supply and delivery of Centrifugal pumpset at site brand new best make and with discharge duty confirming to ISI standards and its latest amendments. 10 HP, size 80x65 Head 34.50M, Discharge 840 LPM (I no 13.40.9 Page No.157 Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 48834.65 | 48834.65 | 1.0 | False | None | None | False | None | False | 48834.65 | 0 | 3428769 | 121499 | None | 13.32 | Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. (I N 13.32, Page No.163, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Job | 8437.0 | 8437.0 | 1.0 | False | None | None | False | None | False | 8437.0 | 0 | 3428770 | 121499 | None | 13.22.4 | Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x6 m2 (I N 13.22.4 / Page No.154, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 240.13 | 240.13 | 300.0 | False | None | None | False | None | False | 72039.0 | 0 | 3428771 | 121499 | None | 13.23.3 | Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL Direct Online Starter 2) S-D- Star Delta Starter 6 to 15 HP pumps ( I No 13.23.3 Page No.155, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 20638.2 | 20638.2 | 1.0 | False | None | None | False | None | False | 20638.2 | 0 | 3428772 | 121499 | None | 13.25.1 | Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm (Page No 154, I.No. 13.25.1, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1622.5 | 1622.5 | 2.0 | False | None | None | False | None | False | 3245.0 | 0 | 3428773 | 121499 | None | 13.27.1 | Supply and delivery of galvanized mild steel tubes of 6mtr standard length heavy duty (C Class) as per IS 1239 (Part-I) 1990 with latest amendments with ISI Mark (one end fitted with Heavy Duty collar and other end fitted with protective cover. 50 mm (Page No.155, I.No.13.27.1, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 3958.9 | 3958.9 | 30.0 | False | None | None | False | None | False | 118767.0 | 0 | 3428774 | 121499 | None | 8.42.3 | Supplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3fixed and finsihed in line as per direction of Engineer in charge.(The cost of PCC shall be paid extra.600 x 300 x 150 mm size) (Page No.74, I.No.8.42.3, Vol-3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 600.97 | 600.97 | 300.0 | False | None | None | False | None | False | 180291.0 | 0 | 3428775 | 121499 | None | 8.10 | Painting Two Coats on New Concrete Surfaces. Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (P. No - 56, I. No - 8.10, S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 141.48 | 141.48 | 108.0 | False | None | None | False | None | False | 15279.84 | 0 | 3428776 | 121499 | None | 17.5 | Providing and fixing factory made precast RCC perforated drain covers, having concrete of strength not less than M-25, of size 1000 x 450x50 mm, reinforced with 8 mm dia four nos longitudinal & 9 nos cross sectional T.M.T. hoop bars, including providing 50 mm dia perforations @ 100 to 125 mm c/c, including providing edge binding with M.S. flats of size 50 mm x 1.6 mm complete, all as per direction of Engineer-in-charge. (P. No - 175, I. No - 17.5, S R 2023-24, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1457.65 | 1457.65 | 956.0 | False | None | None | False | None | False | 1393513.4 | 0 | 3428777 | 121499 | None | 4.2 B (ii) | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -II Material (P. No - 23, I. No - 4.2 B (ii) , Ref. to MoRT&H Spec.401 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 3061.98 | 3061.98 | 240.0 | False | None | None | False | None | False | 734875.2 | 0 | 3428778 | 121499 | None | 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (P. No - 26, I. No - 4.17, Ref. to MoRT&H:IRC Spec.406 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 3321.58 | 3321.58 | 232.5 | False | None | None | False | None | False | 772267.35 | 0 | 3428779 | 121499 | None | 5.2 B(i) | Providing and applying primer coat with SS1 grade Bituminous Emulsion on prepared surface of granular Base including cleaning with mechanical Broom of road surface and spraying primer at the rate of 0.90 kg/m2 using mechanical means. (P. No - 31, I. No -5.2 B(i) , Ref. to MoRT&H Spec.502 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 68.79 | 68.79 | 1550.0 | False | None | None | False | None | False | 106624.5 | 0 | 3428780 | 121499 | None | 5.4 (ii) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. (P. No - 31, I. No -5.4 (ii) , Ref. to MoRT&H Spec.503 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 18.17 | 18.17 | 1550.0 | False | None | None | False | None | False | 28163.5 | 0 | 3428781 | 121499 | None | 5.6 (i) C | Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction(P. No - 32, I. No -5.6 (i) C, Ref. to MoRT&H Spec.504 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 9685.68 | 9685.68 | 75.0 | False | None | None | False | None | False | 726426.0 | 0 | 3428782 | 121499 | None | 5.31 | Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision.(P. No -43, I. No 5.31, Ref. to MoRT&H SpecIRC-37: 2018 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 13177.3 | 13177.3 | 37.5 | False | None | None | False | None | False | 494148.75 | 0 | 3428783 | 121499 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(P. No - 67, I. No -8.15, Ref. to MoRT&H Spec.803 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 687.94 | 687.94 | 60.0 | False | None | None | False | None | False | 41276.4 | 0 | 3428784 | 121499 | None | 8.8 | Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area exceeding 0.9 m2 fixed over back support frame of min 40 x 40 x 5mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing(P. No -65, I. No -8.8, Ref. to MoRT&H Spec.801 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sqm | 12593.2 | 12593.2 | 3.2 | False | None | None | False | None | False | 40298.24 | 0 | 3428785 | 121499 | None | 8.6 (viii) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2012 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2012. 60 cm circular (P. No -65, I. No -8.6 ( viii) , Ref. to MoRT&H Spec.801 S R 2023-24, Vol-3-For Roads & Bridges)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5645.0 | 5645.0 | 2.0 | False | None | None | False | None | False | 11290.0 | 0 | 3428786 | 121499 | None | 17.1 | Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.(Page No.175, I.No.17.1, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1300.6 | 1300.6 | 25.12 | False | None | None | False | None | False | 32671.072 | 0 | 3428787 | 121499 | None | 17.2 | Supplying, filling, spreading &leveling gravels of size range 5 mm to 10 mm, in the recharge pit, over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer in-charge.(Page No.175, I.No.17.2, Vol-2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1539.43 | 1539.43 | 25.12 | False | None | None | False | None | False | 38670.4816 | 0 | 3428788 | 121499 | None | 17.3 | Supplying, filling, spreading &leveling coarse sand of size range 1.5 mm to
2 mm in recharge pit, in required thickness over gravel layer, for all leads
& lifts, all complete as per direction of Engineer -in-charge.(Page No.175, I.No.17.3, Vol-2)" ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 1547.22 | 1547.22 | 25.12 | False | None | None | False | None | False | 38866.1664 | 0 | 3428789 | 121499 | None | 22.2.1 | Waste water Treatment by Bio Sewage Treatment Plant (Bio STP) onsite construction [25 KLD and 50 KLD ]:Providing, installation and commissioning of anaerobic Bio Sewage Treatment Plant (Bio STP) for black water with all necessary accessories such as pre- filter, pipes for the onsite constructed ABD tank as per the prescribed specification, according to the capacity, with a baffle wall to control the flow of water and to increase the retention time in the RCC ABD Tank. It includes an internal matrix for enhanced growth of bacteria, rising and falling pipes. For grey water, pre - filter, oil skimmer is provided along with an aerator. Post filter such as sand and carbon filter are also included as per the enclosed detailed technical specification attached as Annexure-2, including cost of material, loading and unloading and as directed by the engineer in charge etc., complete, including annual maintenance of the system for 5 years. 25 KLD (P. No -251, I. No -22.2.1, S R 2023-24, Vol-5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1680910.0 | 1680910.0 | 1.0 | False | None | None | False | None | False | 1680910.0 | 0 |
| 1719837168000 | 0 | None | None | Buildings | CONSTRUCTION OF 100 BEDS MENS HOSTEL IN REGIONAL INSTITUTE OF ENGLISH , SOUTH INDIA CAMPUS AT BENGALURU. (Ele) | 10167684.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3428790 | 121500 | None | 1.2.1 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 19/20 mm dia 2 mm thick (1.2.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 85.67 | 85.67 | 1365.0 | False | None | None | False | None | False | 116939.55 | 0 | 3428791 | 121500 | None | 1.2.2 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 25 mm dia 2 mm thick (1.2.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 101.24 | 101.24 | 2630.0 | False | None | None | False | None | False | 266261.2 | 0 | 3428792 | 121500 | None | 1.2.3 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 32 mm dia 2.5 mm thick (1.2.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 133.69 | 133.69 | 510.0 | False | None | None | False | None | False | 68181.9 | 0 | 3428793 | 121500 | None | 1.2.4 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary 40 mm dia 2.5 mm thick (1.2.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 190.81 | 190.81 | 480.0 | False | None | None | False | None | False | 91588.8 | 0 | 3428794 | 121500 | None | 1.3.1 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. 19/20 mm dia 2 mm thick (1.3.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 88.26 | 88.26 | 580.0 | False | None | None | False | None | False | 51190.8 | 0 | 3428795 | 121500 | None | 1.3.2 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.25 mm dia 2 mm thick (1.3.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 102.54 | 102.54 | 920.0 | False | None | None | False | None | False | 94336.8 | 0 | 3428796 | 121500 | None | 1.3.3 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.32 mm dia 2.5 mm thick (1.3.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 128.5 | 128.5 | 245.0 | False | None | None | False | None | False | 31482.5 | 0 | 3428797 | 121500 | None | 1.3.4 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.40 mm dia 2.5 mm thick (1.3.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 180.42 | 180.42 | 210.0 | False | None | None | False | None | False | 37888.2 | 0 | 3428798 | 121500 | None | 1.9.1 | Supplying PVC/GI flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely 20 mm (1.9.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 24.66 | 24.66 | 380.0 | False | None | None | False | None | False | 9370.8 | 0 | 3428799 | 121500 | None | 1.9.2 | Supplying PVC/GI flexible conduit pipe . mm dia fixing on surface over inverted tapered wooden plugs or phill plugs or rawl plugs and clamped using heavy gauge saddles at an interval of 300 mm using NF screws and on either end of the pipe terminated completely25 mm (1.9.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 28.56 | 28.56 | 550.0 | False | None | None | False | None | False | 15708.0 | 0 | 3428800 | 121500 | None | 2.2.1 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3m from tapping point to out let via switch box (2.2.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Point | 349.16 | 349.16 | 310.0 | False | None | None | False | None | False | 108239.6 | 0 | 3428801 | 121500 | None | 2.2.2 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out let via switch box (2.2.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Point | 491.94 | 491.94 | 325.0 | False | None | None | False | None | False | 159880.5 | 0 | 3428802 | 121500 | None | 2.2.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6m upto 10m from tapping point to out let via switch box (2.2.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Point | 720.39 | 720.39 | 365.0 | False | None | None | False | None | False | 262942.35 | 0 | 3428803 | 121500 | None | 2.3.1 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1 mm2 (2.3.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 24.66 | 24.66 | 710.0 | False | None | None | False | None | False | 17508.6 | 0 | 3428804 | 121500 | None | 2.3.2 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1.5 mm2 (2.3.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 33.75 | 33.75 | 13800.0 | False | None | None | False | None | False | 465750.0 | 0 | 3428805 | 121500 | None | 2.3.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 2.5 mm2 (2.3.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 54.52 | 54.52 | 14250.0 | False | None | None | False | None | False | 776910.0 | 0 | 3428806 | 121500 | None | 2.3.4 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 4 mm2 (2.3.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 81.77 | 81.77 | 2200.0 | False | None | None | False | None | False | 179894.0 | 0 | 3428807 | 121500 | None | 2.3.5 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 6 mm2 (2.3.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 119.42 | 119.42 | 1800.0 | False | None | None | False | None | False | 214956.0 | 0 | 3428808 | 121500 | None | 2.3.6 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 10 mm2 (2.3.6)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 216.77 | 216.77 | 65.0 | False | None | None | False | None | False | 14090.05 | 0 | 3428809 | 121500 | None | 2.3.7 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 16 mm2 (2.3.7)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 412.76 | 412.76 | 210.0 | False | None | None | False | None | False | 86679.6 | 0 | 3428810 | 121500 | None | 3.4.1 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-2 Way (3.4.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 179.12 | 179.12 | 85.0 | False | None | None | False | None | False | 15225.2 | 0 | 3428811 | 121500 | None | 3.4.2 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 3 Way (3.4.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 206.38 | 206.38 | 110.0 | False | None | None | False | None | False | 22701.8 | 0 | 3428812 | 121500 | None | 3.4.3 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 4-5 Way (3.4.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 229.75 | 229.75 | 235.0 | False | None | None | False | None | False | 53991.25 | 0 | 3428813 | 121500 | None | 3.4.4 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 6 Way (3.4.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 285.56 | 285.56 | 65.0 | False | None | None | False | None | False | 18561.4 | 0 | 3428814 | 121500 | None | 3.4.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 8 Way (3.4.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 338.78 | 338.78 | 12.0 | False | None | None | False | None | False | 4065.36 | 0 | 3428815 | 121500 | None | 3.4.6 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 10-12 Way (3.4.6)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 414.06 | 414.06 | 64.0 | False | None | None | False | None | False | 26499.84 | 0 | 3428816 | 121500 | None | 3.4.7 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 16 Way (3.4.7)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 471.17 | 471.17 | 8.0 | False | None | None | False | None | False | 3769.36 | 0 | 3428817 | 121500 | None | 3.4.8 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 18 Way (3.4.8)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 525.69 | 525.69 | 10.0 | False | None | None | False | None | False | 5256.9 | 0 | 3428818 | 121500 | None | 3.5.1 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box. 1 to 2 Module (3.5.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 177.83 | 177.83 | 85.0 | False | None | None | False | None | False | 15115.55 | 0 | 3428819 | 121500 | None | 3.5.2 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.3 Module (3.5.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 208.98 | 208.98 | 110.0 | False | None | None | False | None | False | 22987.8 | 0 | 3428820 | 121500 | None | 3.5.3 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.4-5Module (3.5.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 227.15 | 227.15 | 235.0 | False | None | None | False | None | False | 53380.25 | 0 | 3428821 | 121500 | None | 3.5.4 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.6 Module (3.5.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 303.73 | 303.73 | 65.0 | False | None | None | False | None | False | 19742.45 | 0 | 3428822 | 121500 | None | 3.5.5 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.8 Module (3.5.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 368.63 | 368.63 | 12.0 | False | None | None | False | None | False | 4423.56 | 0 | 3428823 | 121500 | None | 3.5.6 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.10-12 Module (3.5.6)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 446.51 | 446.51 | 64.0 | False | None | None | False | None | False | 28576.64 | 0 | 3428824 | 121500 | None | 3.5.7 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.16 Module (3.5.7)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 515.31 | 515.31 | 8.0 | False | None | None | False | None | False | 4122.48 | 0 | 3428825 | 121500 | None | 3.5.8 | Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box.18 Module (3.5.8)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 593.19 | 593.19 | 10.0 | False | None | None | False | None | False | 5931.9 | 0 | 3428826 | 121500 | None | 3.6.1 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A One Way Switch (3.6.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 132.4 | 132.4 | 1085.0 | False | None | None | False | None | False | 143654.0 | 0 | 3428827 | 121500 | None | 3.6.2 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Two Way Switch (3.6.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 215.47 | 215.47 | 8.0 | False | None | None | False | None | False | 1723.76 | 0 | 3428828 | 121500 | None | 3.6.3 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Three Way socket (3.6.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 221.96 | 221.96 | 445.0 | False | None | None | False | None | False | 98772.2 | 0 | 3428829 | 121500 | None | 3.6.4 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. Stepped Fan Regulator Two Module (3.6.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 463.39 | 463.39 | 180.0 | False | None | None | False | None | False | 83410.2 | 0 | 3428830 | 121500 | None | 3.6.8 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6A Bell Push (3.6.8)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 229.75 | 229.75 | 2.0 | False | None | None | False | None | False | 459.5 | 0 | 3428831 | 121500 | None | 3.6.9 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 32A DP Switch (3.6.9)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 423.15 | 423.15 | 230.0 | False | None | None | False | None | False | 97324.5 | 0 | 3428832 | 121500 | None | 3.6.10 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. 6/16A Universal Socket (3.6.10)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 306.33 | 306.33 | 170.0 | False | None | None | False | None | False | 52076.1 | 0 | 3428833 | 121500 | None | 5.11.6 | Supplying of on load change over switches 4 poles, AC-23A Duty, 415V, 50Hz, AC Supply. (Open Execution) (25/5.11) 400Amps (25/5.11.6)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Nos | 37778.29 | 37778.29 | 1.0 | False | None | None | False | None | False | 37778.29 | 0 | 3428834 | 121500 | None | 5.14.5 | Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 65 A (5.14.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 13163.02 | 13163.02 | 1.0 | False | None | None | False | None | False | 13163.02 | 0 | 3428835 | 121500 | None | 5.14.11 | Supply and fixing of 4pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947265 A (5.14.11)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 64127.69 | 64127.69 | 3.0 | False | None | None | False | None | False | 192383.07 | 0 | 3428836 | 121500 | None | 5.15.1 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. THREE Pole 100 A 25 kA (5.15.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7899.63 | 7899.63 | 5.0 | False | None | None | False | None | False | 39498.15 | 0 | 3428837 | 121500 | None | 5.15.15 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. FOUR Pole 250 A 36 kA (5.15.15)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 30561.41 | 30561.41 | 2.0 | False | None | None | False | None | False | 61122.82 | 0 | 3428838 | 121500 | None | 5.15.17 | Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism. FOUR Pole320-400 A 50 kA (5.15.17)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 39084.08 | 39084.08 | 1.0 | False | None | None | False | None | False | 39084.08 | 0 | 3428839 | 121500 | None | 5.17.1 | Supplying and fixing regular MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2. 4 Way (5.17.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 13407.04 | 13407.04 | 5.0 | False | None | None | False | None | False | 67035.2 | 0 | 3428840 | 121500 | None | 5.17.2 | Supplying and fixing regular MCCB distribution Panel confirming to IS/IEC 61439 - 3 and IK09 tested as per IS/IEC 62262 with minimum IP43 protection provided with Polyurethane (PUR) gasket, with suitable earthing system, on wall/wood board/flush mounting using required cl A , bolts, nuts, etc., with provision for fixing of suitable type capacity MCCB's as an incomer for 3 phase Double door with necessary bus bar completely wired to use on 440V 3phase 4 wire powder coated painting etc., complete with a provision for fixing of single/three phase suitable capacity MCB's as outgoings confirming to IS/IEC 60898 - 2. 8 Way (5.17.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 16361.29 | 16361.29 | 2.0 | False | None | None | False | None | False | 32722.58 | 0 | 3428841 | 121500 | None | 5.18.1 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A SP (5.18.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 538.67 | 538.67 | 98.0 | False | None | None | False | None | False | 52789.66 | 0 | 3428842 | 121500 | None | 5.18.3 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 A SP (5.18.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1052.68 | 1052.68 | 1.0 | False | None | None | False | None | False | 1052.68 | 0 | 3428843 | 121500 | None | 5.18.4 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A DP (5.18.4)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 959.22 | 959.22 | 18.0 | False | None | None | False | None | False | 17265.96 | 0 | 3428844 | 121500 | None | 5.18.7 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 A TPN (5.18.7)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 2228.67 | 2228.67 | 10.0 | False | None | None | False | None | False | 22286.7 | 0 | 3428845 | 121500 | None | 5.18.9 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63 A TPN (5.18.9)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 4008.22 | 4008.22 | 45.0 | False | None | None | False | None | False | 180369.9 | 0 | 3428846 | 121500 | None | 5.19.12 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure. 6 Way TP & N (5.19.12)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 6412.12 | 6412.12 | 18.0 | False | None | None | False | None | False | 115418.16 | 0 | 3428847 | 121500 | None | 5.19.13 | Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure 8 Way TP & N (5.19.13)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 7906.12 | 7906.12 | 5.0 | False | None | None | False | None | False | 39530.6 | 0 | 3428848 | 121500 | None | 5.22 | Supplying, fixing and wiring 0 to 600V 96x96mm AC Voltmeter on existing panel/wood board. (5.22)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 586.7 | 586.7 | 1.0 | False | None | None | False | None | False | 586.7 | 0 | 3428849 | 121500 | None | 5.26 | Supplying, fixing and wiring 0 to 1500A CT operated AC analog type Ammeter without CT (5.26)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 623.04 | 623.04 | 1.0 | False | None | None | False | None | False | 623.04 | 0 | 3428850 | 121500 | None | 5.27 | Supplying, fixing and wiring rotary selector switch suitable for Ammeter (5.27)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 259.6 | 259.6 | 1.0 | False | None | None | False | None | False | 259.6 | 0 | 3428851 | 121500 | None | 5.28 | Supplying, fixing and wiring rotary selector switch suitable for Voltmeter (5.28)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 207.68 | 207.68 | 1.0 | False | None | None | False | None | False | 207.68 | 0 | 3428852 | 121500 | None | 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. (5.38)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 668.47 | 668.47 | 3.0 | False | None | None | False | None | False | 2005.41 | 0 | 3428853 | 121500 | None | 5.40.1 | Supplying . A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 100 A 4 x 30 x 6 mm Aluminium Strips (5.40.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 3199.57 | 3199.57 | 3.0 | False | None | None | False | None | False | 9598.71 | 0 | 3428854 | 121500 | None | 5.40.2 | Supplying . A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete 250 A 4 x 30 x 10 mm Aluminium Strips (5.40.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 4458.63 | 4458.63 | 24.0 | False | None | None | False | None | False | 107007.12 | 0 | 3428855 | 121500 | None | 5.41.5 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron. and M.S. Flat.with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 75 x 150 x 75 x 6 mm C channel (5.41.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 1201.95 | 1201.95 | 4.0 | False | None | None | False | None | False | 4807.8 | 0 | 3428856 | 121500 | None | 5.42.1 | Fabricating supplying and mounting MS box made out .SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clA with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. 14 SWG (5.42.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Sq CM | 0.65 | 0.65 | 500000.0 | False | None | None | False | None | False | 325000.0 | 0 | 3428857 | 121500 | None | 5.48 | Supplying and fixing Microprocessor Based Astronomical timer Switch with using necessary bolts, nuts and washers.
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 6286.21 | 6286.21 | 1.0 | False | None | None | False | None | False | 6286.21 | 0 | 3428858 | 121500 | None | 6.1 | Supplying exhaust fan of 1440 RPM of 300 mm (12") size with bracket blades complete for light duty suitable to operate on 230V 50Hz, AC Supply. (6.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1936.62 | 1936.62 | 54.0 | False | None | None | False | None | False | 104577.48 | 0 | 3428859 | 121500 | None | 6.2.2 | Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 15" Sweep (450 mm) (6.2.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 5770.91 | 5770.91 | 2.0 | False | None | None | False | None | False | 11541.82 | 0 | 3428860 | 121500 | None | 6.3.1 | Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 V, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 48" Sweep (1200 mm) Regular model (6.3.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 3873.23 | 3873.23 | 180.0 | False | None | None | False | None | False | 697181.4 | 0 | 3428861 | 121500 | None | 11.6.3 | Supplying of recess mounting non integral type . LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clA, Power LEDs with CCT 6500 degree K, CRI 70percent. efficacy 100 lumen per W, 120degree beam spread, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF 0.95, power loss should 5 of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. LED modular down light 2'x2' 36 W (11.6.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | No | 5909.79 | 5909.79 | 35.0 | False | None | None | False | None | False | 206842.65 | 0 | 3428862 | 121500 | None | 11.8.5 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with .W System Power consumption. LED Efficiency1301m/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. LED Streetlight 120 W (11.8.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 13057.88 | 13057.88 | 12.0 | False | None | None | False | None | False | 156694.56 | 0 | 3428863 | 121500 | None | 11.10.5 | Supplying & fixing of Surface mounting type retrofit type -LED tube . W comprising of LED linear source with CCT 6500 degree K, CRI 70%. efficacy 80 lumen per W, life 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF 0.95, power loss should 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition. Polycarbonate/OPAL Acrylic Casing 18W-20W (T8) (11.10.5)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 886.53 | 886.53 | 450.0 | False | None | None | False | None | False | 398938.5 | 0 | 3428864 | 121500 | None | 11.14.2 | Supplying and fixing of slim box fitting, made out of CRCA Sheet metal body with locking type holder completely wired. Excluding Ballast & Fluorescent Tube. 1 x 4' Tube light fitting. (11.14.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 468.58 | 468.58 | 415.0 | False | None | None | False | None | False | 194460.7 | 0 | 3428865 | 121500 | None | 11.14.3 | Supplying and fixing of slim box fitting, made out of CRCA Sheet metal body with locking type holder completely wired. Excluding Ballast & Fluorescent Tube.2 x 4' Tube light fitting. (11.14.3)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 546.46 | 546.46 | 15.0 | False | None | None | False | None | False | 8196.9 | 0 | 3428866 | 121500 | None | 13.2.2 | Supplying and Fixing.mm dia class A GI pipe bracket up to 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clamps, bolts, nuts and wiring using suitable capacity wires. - Using 32mm dia G.I.Pipe (13.2.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 1680.91 | 1680.91 | 24.0 | False | None | None | False | None | False | 40341.84 | 0 | 3428867 | 121500 | None | 13.6 | Fixing charges of post top/ Gate/ Garden fitting /LED on the existing CI/ GI or any other pipe using required size of reducer, wiring using suitable wires. (13.6)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 257.0 | 257.0 | 15.0 | False | None | None | False | None | False | 3855.0 | 0 | 3428868 | 121500 | None | 13.7.1 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps. On wall/ ceiling / Rafter / Girders (13.7.1)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 158.36 | 158.36 | 450.0 | False | None | None | False | None | False | 71262.0 | 0 | 3428869 | 121500 | None | 13.7.2 | Fixing all types and all capacities of fluorescent /false ceiling / spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clamps.Using necessary length of G.I. Chain (13.7.2)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 341.37 | 341.37 | 40.0 | False | None | None | False | None | False | 13654.8 | 0 | 3428870 | 121500 | None | 13.11 | Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 A. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (13.11)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 408.87 | 408.87 | 180.0 | False | None | None | False | None | False | 73596.6 | 0 | 3428871 | 121500 | None | 13.12 | Extra length of GI pipe of class B 19mm dia for down rod. (13.12)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | m | 255.71 | 255.71 | 20.0 | False | None | None | False | None | False | 5114.2 | 0 | 3428872 | 121500 | None | 13.14 | Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. (13.14)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Each | 638.62 | 638.62 | 56.0 | False | None | None | False | None | False | 35762.72 | 0 | 3428873 | 121500 | None | 13.09 | Distribution Transformer - 3 Phase, 11kV/433V - Amorphous Core with Oil as per IS-1180 (Part-1): 2014 Cable entry type, 250 kVA, Aluminium Wdg, Star 2 (5 Star) (13.09) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | No | 663685.57 | 663685.57 | 1.0 | False | None | None | False | None | False | 663685.57 | 0 | 3428874 | 121500 | None | 32.14 | 95 Sqmm, 3.5 Core, (21 GI Strips - 4 x 0.8 mm) (32.14)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Km | 484433.07 | 484433.07 | 0.1 | False | None | None | False | None | False | 48443.307 | 0 | 3428875 | 121500 | None | 32.18 | 240 Sqmm, 3.5 Core, (30 GI Strips - 4 x 0.8 mm) (32.18 )
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Km | 1119740.47 | 1119740.47 | 0.08 | False | None | None | False | None | False | 89579.2376 | 0 | 3428876 | 121500 | None | 1.4.1 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications,
including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (1.4.1) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Cum | 314.12 | 314.12 | 195.0 | False | None | None | False | None | False | 61253.4 | 0 | 3428877 | 121500 | None | bescom sr | For Laying of 1 KM Length of 11 kV, 3x95 Sqmm XLPE UG Cable Using Conventional Laying with Excavation of Soil (Material & Labour)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Km | 1732171.91 | 1732171.91 | 0.2 | False | None | None | False | None | False | 346434.382 | 0 | 3428878 | 121500 | None | 40.02 | DAS Specification Compact RMU (VCB/SF6 Type) as per IEC-62271 The DAS RMUs shall have the following in addition to the Standards: DC motors, Numerical Relays, Multi functional meters, fault passage indicator (FPI), Metering CTs, Protection CTs, Auxiliary transformers, Potential transformer, Batteries, Battery chargers (12 V 24 V), AC power socket and light for illumination of Control panel.Control cable from each panel shall be wired and terminated to suitable 24 pin connector in the control panel. Suitable space for fixing the Remote Terminal Unit (RTU) and Radio Modem in Control panel. Suitable Clamps for fixing Antenna Pipe 4 Way RMU, 2OD 2VL (One Incomer Two Breakers One Outgoing) 630 Amps with Copper Busbar(40.02) ---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Unit | 1400786.02 | 1400786.02 | 1.0 | False | None | None | False | None | False | 1400786.02 | 0 | 3428879 | 121500 | None | 58.01 | 11 kV HT Metering cubicle of different CT Ratio, Both side cable entry type with 3 CT & 3 PT, With Transparent Cover TTB, with 30x8 mm Copper Busbar, Modem & 2 No of Meters for 3 Phase 4 Wire Metering without Load Break Switch (HT Metering Box Fabricated out of 3 mm MS Sheet duly epoxy powder coated) as per revised Specification
(Dwg No. BESCOM/GM/QS&S/- Dtd 24.11.2018) (58.01)
---- Including all lead and lift, loading and unloading, hire charges of machinery and equipments, transportation charges labour charges and all other incidental charges etc., complete as per standard technical detailed specification and design and directions of the Engineer in charge of the work | Unit | 316026.66 | 316026.66 | 1.0 | False | None | None | False | None | False | 316026.66 | 0 |
|
|
---|