createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719643135292
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd424000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose10-07-2024 16:00:00
tenderQueryClose06-07-2024 12:00:00
technicalBidOpen11-07-2024 16:30:00
publishedDate03-07-2024 10:53:56
publishedByPostPWD_EE_DIV_BLR
publishedByUserKPE10627 - HEMARAJA
bidValidityPeriod90
noOfCalls2
preBidMeetingDate02-07-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonEXECUTIVE ENGINEER
splitEmdRequiredYnTrue
emdBankGuarantee324000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08392266123
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719643135295
version13
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/RD/WORK_INDENT10917/CALL-2
titleConstruction of Cement Concrete Road and Drain from SH-40 Taranagara Village Main Road to SH-131 Lingadahalli (DRDO) in Sandur Taluk, Ballari district under 2515 KKRDB (Micro projects) for the year 2023-24.
descriptionConstruction of Cement Concrete Road and Drain from SH-40 Taranagara Village Main Road to SH-131 Lingadahalli (DRDO) in Sandur Taluk, Ballari district under 2515 KKRDB (Micro projects) for the year 2023-24.
categoryWORKS
categoryTextWorks
ecv28213177.43
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1693
locationNamePWD Division Office Ballari
provisionalAmount33613000.0
groupOverheadTotal0.0
fileNumberKPWD/AEE/SANDUR/2515/KKRDB/MICRO/2024-25
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17196431350001NoneNoneRoadsCement Concrete Road26888869.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3407669120364NoneI.No. 2.5 ii AClearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material tobe used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. in light area jungle (PWD SR 2023-24/Vol-3/P No:9, I No: 2.5 ii A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm412.65412.6562.64FalseNoneNoneFalseNoneFalse25848.3960
3407670120364NoneI.No. 3.7Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( PWD SR 2023-24/Vol-3/P No:17, I No:3.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum110.25110.253093.76FalseNoneNoneFalseNoneFalse341087.040
3407671120364NoneI.No. 1.14.1Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing ofexcavated surfaces, disposing off or levelling the excavated earth or sorting& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenacesrequired to complete the work (PWD CSR 2023-24/Vol-1,P No. 08, I No.1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.11404.0FalseNoneNoneFalseNoneFalse150368.40
3407672120364NoneI.No. 1.7Construction of Embankment with approved materials deposited at site fromroadway cutting and excavation from drain and foundation of other structuresgraded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (PWD CSR 2023-24/Vol-1,P No. 07, I No.1.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum124.95124.95842.4FalseNoneNoneFalseNoneFalse105257.880
3407673120364NoneI.No. 3.6Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ( PWD SR 2023-24/Vol-3/P No:17, I No:3.6) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum517.65517.653295.6FalseNoneNoneFalseNoneFalse1705967.340
3407674120364NoneI.No. 4.2vConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material By Mix in Place Method (PWD SR 2023-24/Vol-3/Page-23, I.No. 4.2 V ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2476.952476.953105.76FalseNoneNoneFalseNoneFalse7692812.2320
3407675120364NoneI.No. 4.17Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam (Plant mix method) (PWD SR 2023-24/Vol-3/Page-26, I.No. 4.17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2686.952686.952557.77FalseNoneNoneFalseNoneFalse6872600.10150
3407676120364NoneI.No. 16.28Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (PWD CSR 2023-24/Vol-3,P No. 149, I No.16.28) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7091.77091.7310.0FalseNoneNoneFalseNoneFalse2198427.00
3407677120364NoneI.No. 14.5Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. (PWD SR 2023-24/Vol-3/ Page-129, I.No. 14.5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum3187.83187.88.4FalseNoneNoneFalseNoneFalse26777.520
3407678120364NoneI.No. 14.4Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Techical specifications. A. Stone/Boulder (PWD SR 2023-24/Vol-3/ Page-129, I.No. 14.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2007.62007.66.3FalseNoneNoneFalseNoneFalse12647.880
3407679120364NoneI.No. 8.18Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24/Vol-3/ Page-67, I.No. 8.18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each785.4785.410.0FalseNoneNoneFalseNoneFalse7854.00
3407680120364NoneI.No. 5.1Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (PWD SR 2023-24/Vol-3/ Page-31, I.No. 5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm43.0543.0510679.0FalseNoneNoneFalseNoneFalse459730.950
3407681120364NoneI.No. 5.3Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. (PWD SR 2023-24/Vol-3/ Page-31, I.No. 5.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm14.714.710679.0FalseNoneNoneFalseNoneFalse156981.30
3407682120364NoneI.No. 5.6.CBituminous Macadam Grading - I for traffic 20 MSA Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (PWD SR 2023-24/Vol-3/ Page-32, I.No. 5.6 C ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum7835.17835.1533.94FalseNoneNoneFalseNoneFalse4183473.2940
3407683120364NoneI.No. 5.31Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (PWD SR 2023-24/Vol-3/ Page-43, I.No. 5.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum10659.610659.6266.97FalseNoneNoneFalseNoneFalse2845793.4120
3407684120364NoneI.No. 8.54Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 (PWD SR 2023-24/Vol-3/ Page-78, I.No. 8..54) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each9450.09450.02.0FalseNoneNoneFalseNoneFalse18900.00
3407685120364NoneI.No. 8.6.viRetro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm circular (PWD SR 2023-24/Vol-3/ Page-64, I.No. 8.6 vi ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each6741.06741.06.0FalseNoneNoneFalseNoneFalse40446.00
3407686120364NoneI.No. 8.6.viProviding and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (PWD SR 2023-24/Vol-3/ Page-64, I.No. 8.6 vi ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sqm9460.59460.54.64FalseNoneNoneFalseNoneFalse43896.720
17196431350000NoneNoneRoadsCement Concrete Drain666118.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3407687120365NoneI.No. 1.14.1Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (PWD CSR 2023-24/ Vol-1, P No. 05, I No.1.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum107.1107.1163.2FalseNoneNoneFalseNoneFalse17478.720
3407688120365NoneI.No. 2.1.2Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 15, I No.2.1.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum5947.25947.212.2FalseNoneNoneFalseNoneFalse72555.840
3407689120365NoneI.No. 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 16, I No.2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6639.156639.1544.0FalseNoneNoneFalseNoneFalse292122.60
3407690120365NoneI.No. 2.4.2Formwork,centering and scaffolding for Cement concrete drains 35% PWD CSR 2023-24 Vol 1 P.No-111 Addendum I ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum2323.72323.744.0FalseNoneNoneFalseNoneFalse102242.80
3407691120365NoneI.No. 2.11.hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures (PWD CSR 2023-24/ Vol-1, P No. 18, I No.2.11 h) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne82961.5582961.552.15FalseNoneNoneFalseNoneFalse178367.33250
3407692120365NoneI.No. 1.9Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (PWD CSR 2023-24/Vol-1,P No. 07, I No.1.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum279.3279.312.0FalseNoneNoneFalseNoneFalse3351.60
17196431350000NoneNoneRoadsStreet Light Poles658189.07
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3407693120366NoneI.No. 4.4.7Fabricating, supplying and erection of …Mtrs long hot dip Galvanized Conical pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/sec for …….Mtrs pole in single section and single joint welded as per IS 9595/IS 10178AWS having dimensions bottom …..mm, top….mm with 3mm thick, suitable base plate and 4Nos of ..... long J bolts along with template and the pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended. 9Mtr -Top 75mm and bottom 165mm dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-4/It No.4.4.7/Page No.12 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each21525.021525.010.0FalseNoneNoneFalseNoneFalse215250.00
3407694120366NoneI.No. 4.6.3Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Single Arm Bracket with 2000mm Standard 40/50MM dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-4/It No.4.6.3/Page No.13 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2730.02730.010.0FalseNoneNoneFalseNoneFalse27300.00
3407695120366NoneI.No. 11.8.5Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency 130lm/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/Lumileds/Osram make LED Source LED Streetlight 120watts CSR 2023-24/PWD/Elec/Vol-6/Chapter-11/It No.11.8.5/Page No.46 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each10563.010563.010.0FalseNoneNoneFalseNoneFalse105630.00
3407696120366NoneI.No. 13.5Fixing halogen/metal halide / SVL / IL / LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. CSR 2023-24/PWD/Elec/Vol-6/Chapter-13/It No.13.5/Page No.56 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each170.1170.110.0FalseNoneNoneFalseNoneFalse1701.00
3407697120366NoneI.No. 2.5.2Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to table 3 class 5 of IS:8130-1984 and (Virgin) PVC insulation and sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 3C X 1.5Sq.mm CSR 2023-24/PWD/Elec/Vol-6/Chapter-2/It No.2.5.2/Page No. 6 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr75.675.6110.0FalseNoneNoneFalseNoneFalse8316.00
3407698120366NoneI.No. 1.1.4Open Conduit System Supplying heavy gauge PVC conduit pipe 40mm dia 2.5mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. CSR 2023-24/PWD/Elec/Vol-6/Chapter-1/It No.1.1.4/Page No. 2 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr156.45156.4511.0FalseNoneNoneFalseNoneFalse1720.950
3407699120366NoneI.No. 3.8Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc., and fixing on existing wooden or metal box using N.F. screws. CSR 2023-24/PWD/Elec/Vol-6/Chapter-3/It No.3.8/Page No. 9 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sq CM0.430.438000.0FalseNoneNoneFalseNoneFalse3440.00
3407700120366NoneI.No. 5.29Supplying, fixing and wiring 3 Phase Digital Ammeter /Voltmeter. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.29/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each1496.251496.251.0FalseNoneNoneFalseNoneFalse1496.250
3407701120366NoneI.No. 5.35Supplying, fixing and wiring electronic 10 to 40 Amps three phase 4 wire class-1 Accuracy Energy Meter.CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.35/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5990.255990.251.0FalseNoneNoneFalseNoneFalse5990.250
3407702120366NoneI.No. 5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 220v A.C. 50 Hz 12/24v D.C. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.38/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each540.75540.753.0FalseNoneNoneFalseNoneFalse1622.250
3407703120366NoneI.No. 5.41.1Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. flat … with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40x40x6mm CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.41.1/Page No.20 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each320.25320.258.0FalseNoneNoneFalseNoneFalse2562.00
3407704120366NoneI.No. 5.42.1Fabricating supplying and mounting MS box made out 14SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.42.1/Page No.20 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Sq CM0.530.5312000.0FalseNoneNoneFalseNoneFalse6360.00
3407705120366NoneI.No. 5.47Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc.,.) 3-120sec setting. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.47/Page No.21 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2430.752430.751.0FalseNoneNoneFalseNoneFalse2430.750
3407706120366NoneI.No. 5.13.2Supply and fixing of 3pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 40Amps CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.13.2/Page No.16 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2370.92370.91.0FalseNoneNoneFalseNoneFalse2370.90
3407707120366NoneI.No. 5.20.5Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V up to 300mA sensitivity on existing wood/ panel board. 32-40Amps 4 pole CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.20.5/Page No.18 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each5404.355404.351.0FalseNoneNoneFalseNoneFalse5404.350
3407708120366NoneI.No. 5.18.8Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40Amps TPN CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.18.8/Page No.17 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3196.23196.21.0FalseNoneNoneFalseNoneFalse3196.20
3407709120366NoneI.No. 5.18.1Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps SP CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.18.1/Page No.17 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each435.75435.7511.0FalseNoneNoneFalseNoneFalse4793.250
3407710120366NoneI.No. 12.56Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-12/It No.12.56/Page No.54 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each3685.53685.51.0FalseNoneNoneFalseNoneFalse3685.50
3407711120366NoneI.No. 12.58.2GI/Copper strips for grounding connections, using necessary fixing materials as required. 25X3mm GI Strip CSR 2023-24/PWD/Elec/Vol-6/Chapter-12/It No.12.58.2/Page No.54 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr86.186.14.0FalseNoneNoneFalseNoneFalse344.40
3407712120366NoneI.No. 7.20.2Supply and laying double walled corrugated (DWC) HDPE Pipe including all necessary connecting Sockets/Couplings/Tees/ Bends / End-caps of same materials in existing trench as per IS 14930 part -II suitable for drawing underground cables. 50mm OD / 38mm ID DSR 2014-15, Page No-63 , It No- 7.20.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Mtr158.55158.55270.0FalseNoneNoneFalseNoneFalse42808.50
3407713120366NoneI.No. 60.01Aluminium End Terminal (Lug) 10sqmm Escom's 2023-24/Part-III/Sl.No.470/It.No.60.01 /Code No.288630/Pg No.27/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each2.12.188.0FalseNoneNoneFalseNoneFalse184.80
3407714120366NoneI.No. 32.031.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 4 Core, (10 GI Strips - 4 x 0.8 mm) Escom's 2023-24/Part-III/Sl.No.199/It..No.32.03/Code No.287205/Pg No.13/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km123904.2123904.20.33FalseNoneNoneFalseNoneFalse40888.3860
3407715120366NoneI.No. 21.05Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm Escom's 2023-24/Part-III/Item.No.21.05/Pg No.52/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Km21930.321930.30.33FalseNoneNoneFalseNoneFalse7236.9990
3407716120366NoneI.No. 29.03Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. Hard Soil Bescom 2022-23/Part-IV/Sl.No.202/Item.No.29.03/Page No.08/14 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum408.45408.45155.0FalseNoneNoneFalseNoneFalse63309.750
3407717120366NoneI.No. 29.07Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 MtrBescom 2022-23/Part-IV/ Sl.No.206/ Item.No.29.07/Page No.08/14 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum60.960.9155.0FalseNoneNoneFalseNoneFalse9439.50
3407718120366NoneI.No. 1.13Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work PWD SR 2023-24/Vol-I/It.No.1.13/Pg.No.08/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum380.1380.123.0FalseNoneNoneFalseNoneFalse8742.30
3407719120366NoneI.No. 2.1.5Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates PWD SR 2023-24/Vol-I/It.No.2.1.5/Pg.No.15/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6463.86463.83.0FalseNoneNoneFalseNoneFalse19391.40
3407720120366NoneI.No. 2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm and down size graded crushed coarse aggregates PWD SR 2023-24/Vol-I/It.No.2.2.1/Pg.No.15/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Cum6601.356601.353.0FalseNoneNoneFalseNoneFalse19804.050
3407721120366NoneI.No. 2.11.bSupplying, fitting and placing TMT FE 550/550D Steel Reinforcement complete as per drawing and technical specification.For Foundations of Bridges PWD SR 2023-24/Vol-I/It.No.2.11.b/Pg.No.18/214 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Tonne90831.390831.30.45FalseNoneNoneFalseNoneFalse40874.0850
3407722120366NoneI.No. 5.6.5Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 15"x12"x2" CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.6.5/Page No.14 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each211.05211.051.0FalseNoneNoneFalseNoneFalse211.050
3407723120366NoneI.No. 5.7.3Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63Amps CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.7.3/Page No.14 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work.Each421.05421.054.0FalseNoneNoneFalseNoneFalse1684.20
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17196431350000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17196431350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17196431350000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17196431350000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17196431350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17196431350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17196431350000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP Procurement Portal on or before the last date and time of bid submission.None
17196431350000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17196431350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17196431350000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17196431350000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka.None
17196431350000NoneNoneELIGIBILITYAs per Karnataka State Government order No.LD/300/LET/2006 Bangalore Dated 01.01.2007 and Government Letter No.PW/134/BMS/2007 Dated 27-07-2007, a sum amounting to 1% of the bill amount will be deducted towards Construction Labour Welfare fund.None
17196431350000NoneNoneELIGIBILITYThe Item Rate quoted shall include the Royalty Charges on construction materials and other taxes as per prevailing Government Orders.None
17196431350000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17196431350000NoneNoneELIGIBILITYThe Tenderer shall obtain the required work done certificates from the Competent Authority not below the rank of Executive Engineer or equivalent.None
17196431350000NoneNoneELIGIBILITYFinancial Year will be reckoned as the period between first day of April and Thirty first day of March of succeeding year (both days inclusive).None
17196431350000NoneNoneELIGIBILITYThe Tenderer shall scan Original Ownership Documents/ Lease/ Hire commitment Agreement for the Machineries and attach the scanned file to the Bid. The Original Documents shall be produced at the time of opening of technical Bids for physical verification.None
17196431350000NoneNoneELIGIBILITYThe Employer reserves the right to reject any or all Tenders without assigning any reason or what so ever.None
17196431350000NoneNoneELIGIBILITYThe tenderer shall maintain the Road/Building/Bridge during the defect liability period.None
17196431350000NoneNoneELIGIBILITYThe Department is not responsible for any delay in accessing kp-procurement portal.None
17196431350000NoneNoneELIGIBILITYFinancial turnover of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25. And Value at 2024-25 price level, of existing commitments and on-going works to be executed during the next 12 months (Financial commitment of previous years shall be given a weightage of 10% per year to bring them to the price level of the 2024-25) in the Technical Qualification Criteria mentioned in the next section.None
17196431350000NoneNoneELIGIBILITYTenderer shall note that the Tenders of those found Eligible as mentioned in Clause 3 - Qualification of the Tenderer in Section 2: Instructions to Tenderers (ITT), will only be considered for evaluation.None
17196431350000NoneNoneELIGIBILITYThe star rates in respect of specified materials (Cement, Steel and Bitumen) shall be payable as per GO No: FD/3/PCL/2008 Bangalore Dated 21.11.2008.None
17196431350000NoneNoneELIGIBILITYThe tenderer shall furnish required information in all formats. Scan and upload all Formats/Original documents required for this bid to the kp-procurement portal. The Original Formats/Documents shall be produced at the time of opening of Technical Bid for physical verification.None
17196431350000NoneNoneELIGIBILITYThe proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.None
17196431350000NoneNoneELIGIBILITYThe time stipulated for completion of work is 9 (Nine) calendar months including rainy season.None
17196431350000NoneNoneELIGIBILITYThe Agency shall comply with ISO 14001 (Environmental Management System) requirement during execution of work.None
17196431350000NoneNoneELIGIBILITYThe tenderer shall submit an affidavit stating that he has not involved in litigation with Government, also he shall state that, amount of existing / on going works and amount of works awarded to him and yet to be commenced.None
17196431350000NoneNoneELIGIBILITYContractor should follow strictly the prevailing rules of labour act and applicable any other law as concerned to work.None
17196431350000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity till completion. Contractor should indemnify the client to that extent.None
17196431350000NoneNoneELIGIBILITYThe defect liability period for the work is 12 (Twelve) calendar months.None
17196431350000NoneNoneELIGIBILITYContractor should establish a fully functional laboratory at site at their own cost and risk in order to carry out all the required tests for the materials and work being used in the project for satisfactory completion.None
17196431350000NoneNoneELIGIBILITYThe Bidder shall ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of KP-Procurement portalon or before the last date of bid submission.None
17196431350000NoneNoneELIGIBILITYThe tenderer is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of KP-Procurement portal due to internet connectivity issues and technical glitches.None
17196431350000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejectionNone
17196431350000NoneNoneELIGIBILITYIt is mandatory to use Manufactured Sand as per Government Circular No.PWD/72/BMS/2013 dated 31-07-2013. Also it is mandatory that the bidders should upload the required documents which demonstrate that, the bidder owns sand manufacturing unit or an agreement with the manufactured sand suppliers. The manufactured sand that should be got tested to confirm IS 383-2007 before use. Further, the contractor shall have his own Artificial sand manufacturing plant Unit.None
17196431350000NoneNoneELIGIBILITYAs per Government Circular No.PWD/15/ITC/20082009 dated 2-12-2010, the tenderer can submit requisite EMD in two parts. i.e., for works costing from Rs.50.00 lakhs to 1.00 Crore, minimum of Rs.50,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. For works costing Rs.1.00 crore and above, minimum of Rs.1,00,000/- through e-payment and rest of the amount either in the form of Bank Guarantee or FDR drawn in favour of the Executive Engineer, Public Works Department Division, Ballari issued by any Nationalised or Scheduled Bank. If the tenderer intends to submit the requisite EMD in two parts, then the validity of EMD submitted in the form of Bank Guarantee or FDR shall remain valid for a period of 135 days from the last day of bid submission. If not such tenders will not be considered for evaluation. The tenderer shall submit the original instrument of EMD remitted in second part.None
17196431350000NoneNoneELIGIBILITYThe Successful Tenderer has to execute the work as per approved designs and drawings provided by the Department.None
17196431350000NoneNoneELIGIBILITYContractor should adhere to HSE policy applicable for similar projects. Contractor to that extent should submit HSE document defining all the procedure including the policies before execution of the project.None
17196431350000NoneNoneELIGIBILITYThe tenderer shall note that, the increase in GST shall not be paid in the extended period of contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17196431350000NoneNoneELIGIBILITYThe tenderer shall note that, the GST at 18% shall be paid to the tendered amount separately.None
17196431350000NoneNoneELIGIBILITYThe tenderers shall note that as per the Govrnment Order No.FD/850/EXP-12/15 dated 29-12-2015 and GO No.FD/130/EXP-12/15 dated 8-9-2015, the exemption from payment of EMD for Micro and small enterprises registered with NSIC under single point vendor registration scheme is applicable only for supply of goods but not for works.None
17196431350000NoneNoneELIGIBILITYAny dispute or difference or claim arising out of, or in connection with, or relating to the present contract or the breach, termination or invalidity thereof shall be referred and settled under the Arbitration Centre - Karnataka (Domestic & International) Rules 2012, by one or more arbitrators appointed in accordance with its ruleNone
17196431350000NoneNoneELIGIBILITYIf undue delay caused by the contractor, the progressive damages caused to road will be assessed and make good at the cost and risk of the contractor. In addition, suitable action will be initiated against the contractor for the damages occurred during the undue delay period in accordance with the Karnataka Highway Act, 1964.None
17196431350000NoneNoneELIGIBILITYThe tenderers shall note that, as per The Karnataka Minor Mineral Concession Rules-1964, it is mandatory to submit the Mineral dispatch Permits (MDPs) issued by a competent authority, along with the bills. If not, penalty will be levied as per the prevailing clauses.None
17196431350000NoneNoneELIGIBILITYIt is mandatory for the contractor to upload the work done certificate issued by an officer not below the rank of Executive Engineer duly indicating the work indent numbers for works costing more than Rs.5.00 lakhsNone
17196431350000NoneNoneELIGIBILITYThe tenderer shall upload Physical and financial schedule format before last date of tender receipt in the kpp portal.None
17196431350000NoneNoneELIGIBILITYThe Tenderer or his identified sub-contractor should possess required valid electrical license for executing electrification worksNone
17196431350000NoneNoneELIGIBILITYSuccessful tender should have to obtain all mandatory clearances from Fire Services, Electrical Inspectorate, GESCOM Power Supply, Water supply, UGD from local bodies etc., before commencement of the workNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneExecuted in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneLiquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - satisfactorily completed as prime contractor, at least one similar work such as - IMPROVEMENTS OF ASPHALT ROAD WORKS of value not less than Rs.141.50 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24 - achieved in at least two financial years an annual financial turnover (in all classes of civil engineering construction works only) of Rs.565.00 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-1 (Supported by the year wise Chartered Accountants Certificate along with UDIN)
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 2020-21, 2021-22, 2022-23 and 2023-24, (c)executed in any one year, the following minimum quantities of work: (a)Earthwork Excavation/ Embankment/Subgrade : 4707.00 Cum, (b) Granular Sub base : 2485.00 Cum,(c) WBM/WMM : 2047.00 Cum, (d) BM/SDBC : 641.00 Cum, (e) PCC/RCC : 301.00 Cum & (f) Steel : 2.10 tPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate of similar nature work from competent authority not below the rank of Executive Engineer
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Tipper-2 Nos. and by Own / Hire / Lease Tipper - 2 Nos. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own Hydraulic Excavator (CK-90)-1 No. (The Documents in proof of Ownership shall have to attested by Notary or Government Gazetted Officer) at the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted water tanker-1 No. and by Own / Hire / Lease - 1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate: Availability by Own Vibratory Road Roller-1 No. (The documents in proof of ownership shall have to be attested by Notary or Government Gazetted Officer). At the time of opening of the Technical Bid, the documents to be submitted in original for verification.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Purchase Invoice and Information in Format-8 and scanned copies of the ownership document
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own 40/60 TPH Capacity of HMP-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership documents.
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Paver Finisher-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verificationCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership documents.
NoneNoneNoneNoneTenderer shall further demonstrate : Availability by Own Vehicle mounted Mechanical Bitumen Sprayer-1 No. (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership documents.
NoneNoneNoneNoneTenderer should further demonstrate: Availability by Own 60/70 TPH Capacity of Pug Mill-1No (The original documents in proof of Ownership shall have to be scanned and up-loaded in the e-procurement portal). The tenderer shall submit the document in original at the time of opening of the Technical Bid for verification).Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-8 and Scanned copies of the ownership documents.
NoneNoneNoneNoneLiquid Assets and /or availability of credit facilities of not less than Rs.95.00 Lakhs (Credit Lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.,)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers Certificate - Information in Format-9
NoneNoneNoneNoneConstitutional or Legal Status of the Tenderer.OthersLegal Status of the Tenderer
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Copy of Registration for having registered in KPWD
NoneNoneNoneNonePrincipal Place of Business.OthersPlace of Business
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Declaration by the Bidder on the Letter Head
NoneNoneNoneNoneInformation of the works for which Tender acceptance letters are received.OthersNew Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-6 and Letter of Acceptance
NoneNoneNoneNoneInformation on Existing commitments and on going works which are yet to be completedOthersCommitted Works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-5
NoneNoneNoneNoneInformation of the works for which Tenderer has submitted TenderOthersTendered works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-7
NoneNoneNoneNoneInformation on litigation in which the Tenderer is involvedOthersLitigation
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Information in Format-10
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
KPWD Contractor Registration CertificateTrueTechnical Bid
Annual Turnover Certificate for the last five years duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Existing CommitmentsTrueTechnical Bid
Physical and financial Implementation calendar formatTrueTechnical Bid
Similar Nature i.e IMPROVEMENTS OF ASPHALT ROAD WORKS Done Certificate as Prime Certificate from competent authority not below the rank of Executive Engineer or equivalent duly attested by the Notary or Government Gazetted Officer Submit the Originals at the time of Opening of the Financial BidTrueTechnical Bid
Key qty statement i.e yearwise breakup detailsTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1719643347000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer PWD Division Ballari
streetNone
cityBallari
stateKarnataka
pin583102
tenderRecallDTONone