tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1719643135000 | 1 | None | None | Roads | Cement Concrete Road | 26888869.47 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3407669 | 120364 | None | I.No. 2.5 ii A | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material tobe used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. in light area jungle (PWD SR 2023-24/Vol-3/P No:9, I No: 2.5 ii A) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 412.65 | 412.65 | 62.64 | False | None | None | False | None | False | 25848.396 | 0 | 3407670 | 120364 | None | I.No. 3.7 | Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment,scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ( PWD SR 2023-24/Vol-3/P No:17, I No:3.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 110.25 | 110.25 | 3093.76 | False | None | None | False | None | False | 341087.04 | 0 | 3407671 | 120364 | None | I.No. 1.14.1 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing ofexcavated surfaces, disposing off or levelling the excavated earth or sorting& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenacesrequired to complete the work
(PWD CSR 2023-24/Vol-1,P No. 08, I No.1.14.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 1404.0 | False | None | None | False | None | False | 150368.4 | 0 | 3407672 | 120364 | None | I.No. 1.7 | Construction of Embankment with approved materials deposited at site fromroadway cutting and excavation from drain and foundation of other structuresgraded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) (PWD CSR 2023-24/Vol-1,P No. 07, I No.1.7) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 124.95 | 124.95 | 842.4 | False | None | None | False | None | False | 105257.88 | 0 | 3407673 | 120364 | None | I.No. 3.6 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads,transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ( PWD SR 2023-24/Vol-3/P No:17, I No:3.6) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 517.65 | 517.65 | 3295.6 | False | None | None | False | None | False | 1705967.34 | 0 | 3407674 | 120364 | None | I.No. 4.2v | Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material By Mix in Place Method (PWD SR 2023-24/Vol-3/Page-23, I.No. 4.2 V ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2476.95 | 2476.95 | 3105.76 | False | None | None | False | None | False | 7692812.232 | 0 | 3407675 | 120364 | None | I.No. 4.17 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. - Wet Mix Macadam (Plant mix method) (PWD SR 2023-24/Vol-3/Page-26, I.No. 4.17) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2686.95 | 2686.95 | 2557.77 | False | None | None | False | None | False | 6872600.1015 | 0 | 3407676 | 120364 | None | I.No. 16.28 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383:2016:, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer
of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant, curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (PWD CSR 2023-24/Vol-3,P No. 149, I No.16.28) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7091.7 | 7091.7 | 310.0 | False | None | None | False | None | False | 2198427.0 | 0 | 3407677 | 120364 | None | I.No. 14.5 | Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification. (PWD SR 2023-24/Vol-3/ Page-129, I.No. 14.5) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 3187.8 | 3187.8 | 8.4 | False | None | None | False | None | False | 26777.52 | 0 | 3407678 | 120364 | None | I.No. 14.4 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Techical
specifications. A. Stone/Boulder (PWD SR 2023-24/Vol-3/ Page-129, I.No. 14.4) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2007.6 | 2007.6 | 6.3 | False | None | None | False | None | False | 12647.88 | 0 | 3407679 | 120364 | None | I.No. 8.18 | Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting (PWD SR 2023-24/Vol-3/ Page-67, I.No. 8.18 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 785.4 | 785.4 | 10.0 | False | None | None | False | None | False | 7854.0 | 0 | 3407680 | 120364 | None | I.No. 5.1 | Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means. (PWD SR 2023-24/Vol-3/ Page-31, I.No. 5.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 43.05 | 43.05 | 10679.0 | False | None | None | False | None | False | 459730.95 | 0 | 3407681 | 120364 | None | I.No. 5.3 | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular Surface. (PWD SR 2023-24/Vol-3/ Page-31, I.No. 5.3) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 14.7 | 14.7 | 10679.0 | False | None | None | False | None | False | 156981.3 | 0 | 3407682 | 120364 | None | I.No. 5.6.C | Bituminous Macadam Grading - I for traffic 20 MSA Providing and laying Bituminous Macadam with 40/60 tph capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction (PWD SR 2023-24/Vol-3/ Page-32, I.No. 5.6 C ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 7835.1 | 7835.1 | 533.94 | False | None | None | False | None | False | 4183473.294 | 0 | 3407683 | 120364 | None | I.No. 5.31 | Semi Dense Bituminous Concrete - Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision. (PWD SR 2023-24/Vol-3/ Page-43, I.No. 5.31) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 10659.6 | 10659.6 | 266.97 | False | None | None | False | None | False | 2845793.412 | 0 | 3407684 | 120364 | None | I.No. 8.54 | Providing and fixing board displaying information, such as 'Name of work, Tender cost, Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling, transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge & MoRTH specification 804 (PWD SR 2023-24/Vol-3/ Page-78, I.No. 8..54) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 9450.0 | 9450.0 | 2.0 | False | None | None | False | None | False | 18900.0 | 0 | 3407685 | 120364 | None | I.No. 8.6.vi | Retro-Reflectorised Traffic Signs Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm circular (PWD SR 2023-24/Vol-3/ Page-64, I.No. 8.6 vi ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 6741.0 | 6741.0 | 6.0 | False | None | None | False | None | False | 40446.0 | 0 | 3407686 | 120364 | None | I.No. 8.6.vi | Providing and erecting direction and place identification retro reflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (PWD SR 2023-24/Vol-3/ Page-64, I.No. 8.6 vi ) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sqm | 9460.5 | 9460.5 | 4.64 | False | None | None | False | None | False | 43896.72 | 0 |
| 1719643135000 | 0 | None | None | Roads | Cement Concrete Drain | 666118.89 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3407687 | 120365 | None | I.No. 1.14.1 | Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m (PWD CSR 2023-24/ Vol-1, P No. 05, I No.1.4.1) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 107.1 | 107.1 | 163.2 | False | None | None | False | None | False | 17478.72 | 0 | 3407688 | 120365 | None | I.No. 2.1.2 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 15, I No.2.1.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 5947.2 | 5947.2 | 12.2 | False | None | None | False | None | False | 72555.84 | 0 | 3407689 | 120365 | None | I.No. 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (PWD CSR 2023-24/ Vol-1, P No. 16, I No.2.4.2) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6639.15 | 6639.15 | 44.0 | False | None | None | False | None | False | 292122.6 | 0 | 3407690 | 120365 | None | I.No. 2.4.2 | Formwork,centering and scaffolding for Cement concrete drains 35% PWD CSR 2023-24 Vol 1 P.No-111 Addendum I ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 2323.7 | 2323.7 | 44.0 | False | None | None | False | None | False | 102242.8 | 0 | 3407691 | 120365 | None | I.No. 2.11.h | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification All other type of structures (PWD CSR 2023-24/ Vol-1, P No. 18, I No.2.11 h) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 82961.55 | 82961.55 | 2.15 | False | None | None | False | None | False | 178367.3325 | 0 | 3407692 | 120365 | None | I.No. 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (PWD CSR 2023-24/Vol-1,P No. 07, I No.1.9) ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 279.3 | 279.3 | 12.0 | False | None | None | False | None | False | 3351.6 | 0 |
| 1719643135000 | 0 | None | None | Roads | Street Light Poles | 658189.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3407693 | 120366 | None | I.No. 4.4.7 | Fabricating, supplying and erection of …Mtrs long hot dip Galvanized Conical pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/sec for …….Mtrs pole in single section and single joint welded as per IS 9595/IS 10178AWS having dimensions bottom …..mm, top….mm with 3mm thick, suitable base plate and 4Nos of ..... long J bolts along with template and the pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended. 9Mtr -Top 75mm and bottom 165mm dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-4/It No.4.4.7/Page No.12 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 21525.0 | 21525.0 | 10.0 | False | None | None | False | None | False | 215250.0 | 0 | 3407694 | 120366 | None | I.No. 4.6.3 | Supplying, and fixing of Hot dip Galvanized M.S.Bracket suitable for out door luminaries and mounted on Octagonal pole using necessary bolts, nuts etc., complete. Single Arm Bracket with 2000mm Standard 40/50MM dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-4/It No.4.6.3/Page No.13 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2730.0 | 2730.0 | 10.0 | False | None | None | False | None | False | 27300.0 | 0 | 3407695 | 120366 | None | I.No. 11.8.5 | Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire IK08. Power Factor 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency 130lm/w, nominal CRI 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/Lumileds/Osram make LED Source LED Streetlight 120watts CSR 2023-24/PWD/Elec/Vol-6/Chapter-11/It No.11.8.5/Page No.46 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 10563.0 | 10563.0 | 10.0 | False | None | None | False | None | False | 105630.0 | 0 | 3407696 | 120366 | None | I.No. 13.5 | Fixing halogen/metal halide / SVL / IL / LED floodlight fitting over existing pole / wall ceiling including clamps, bolts, nuts and wiring using suitable capacity wires. CSR 2023-24/PWD/Elec/Vol-6/Chapter-13/It No.13.5/Page No.56 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 170.1 | 170.1 | 10.0 | False | None | None | False | None | False | 1701.0 | 0 | 3407697 | 120366 | None | I.No. 2.5.2 | Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to table 3 class 5 of IS:8130-1984 and (Virgin) PVC insulation and sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 3C X 1.5Sq.mm CSR 2023-24/PWD/Elec/Vol-6/Chapter-2/It No.2.5.2/Page No. 6 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 75.6 | 75.6 | 110.0 | False | None | None | False | None | False | 8316.0 | 0 | 3407698 | 120366 | None | I.No. 1.1.4 | Open Conduit System Supplying heavy gauge PVC conduit pipe 40mm dia 2.5mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall / stone structure or rawl plugs in case of brick walls and cement plastering the damaged portion using heavy gauge saddles at an interval of 700mm using NF screws. CSR 2023-24/PWD/Elec/Vol-6/Chapter-1/It No.1.1.4/Page No. 2 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 156.45 | 156.45 | 11.0 | False | None | None | False | None | False | 1720.95 | 0 | 3407699 | 120366 | None | I.No. 3.8 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc., and fixing on existing wooden or metal box using N.F. screws. CSR 2023-24/PWD/Elec/Vol-6/Chapter-3/It No.3.8/Page No. 9 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sq CM | 0.43 | 0.43 | 8000.0 | False | None | None | False | None | False | 3440.0 | 0 | 3407700 | 120366 | None | I.No. 5.29 | Supplying, fixing and wiring 3 Phase Digital Ammeter /Voltmeter. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.29/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 1496.25 | 1496.25 | 1.0 | False | None | None | False | None | False | 1496.25 | 0 | 3407701 | 120366 | None | I.No. 5.35 | Supplying, fixing and wiring electronic 10 to 40 Amps three phase 4 wire class-1 Accuracy Energy Meter.CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.35/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5990.25 | 5990.25 | 1.0 | False | None | None | False | None | False | 5990.25 | 0 | 3407702 | 120366 | None | I.No. 5.38 | Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 220v A.C. 50 Hz 12/24v D.C. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.38/Page No.19 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 540.75 | 540.75 | 3.0 | False | None | None | False | None | False | 1622.25 | 0 | 3407703 | 120366 | None | I.No. 5.41.1 | Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. flat … with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint. 40x40x6mm CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.41.1/Page No.20 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 320.25 | 320.25 | 8.0 | False | None | None | False | None | False | 2562.0 | 0 | 3407704 | 120366 | None | I.No. 5.42.1 | Fabricating supplying and mounting MS box made out 14SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 2 coats of red oxide primer paint and finally finished with approved colour enameled metal paint etc., complete. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.42.1/Page No.20 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Sq CM | 0.53 | 0.53 | 12000.0 | False | None | None | False | None | False | 6360.0 | 0 | 3407705 | 120366 | None | I.No. 5.47 | Supplying and fixing Microprocessor based Electronic timer (without contactor, Din Mounting using necessary bolts, nuts and washers etc.,.) 3-120sec setting. CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.47/Page No.21 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2430.75 | 2430.75 | 1.0 | False | None | None | False | None | False | 2430.75 | 0 | 3407706 | 120366 | None | I.No. 5.13.2 | Supply and fixing of 3pole power contactor with NO/NC contacts on existing wood/panel board using necessary bolts, nuts, washers and wiring etc., complete with AC-3 Rating and as per IS-13947. 40Amps CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.13.2/Page No.16 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2370.9 | 2370.9 | 1.0 | False | None | None | False | None | False | 2370.9 | 0 | 3407707 | 120366 | None | I.No. 5.20.5 | Supplying, fixing and wiring Residual current circuit breaker (RCCB) 240/450V up to 300mA sensitivity on existing wood/ panel board. 32-40Amps 4 pole CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.20.5/Page No.18 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 5404.35 | 5404.35 | 1.0 | False | None | None | False | None | False | 5404.35 | 0 | 3407708 | 120366 | None | I.No. 5.18.8 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 40Amps TPN CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.18.8/Page No.17 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3196.2 | 3196.2 | 1.0 | False | None | None | False | None | False | 3196.2 | 0 | 3407709 | 120366 | None | I.No. 5.18.1 | Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32Amps SP CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.18.1/Page No.17 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 435.75 | 435.75 | 11.0 | False | None | None | False | None | False | 4793.25 | 0 | 3407710 | 120366 | None | I.No. 12.56 | Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit … The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts, washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia CSR 2023-24/PWD/Elec/Vol-6/Chapter-12/It No.12.56/Page No.54 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 3685.5 | 3685.5 | 1.0 | False | None | None | False | None | False | 3685.5 | 0 | 3407711 | 120366 | None | I.No. 12.58.2 | GI/Copper strips for grounding connections, using necessary fixing materials as required. 25X3mm GI Strip CSR 2023-24/PWD/Elec/Vol-6/Chapter-12/It No.12.58.2/Page No.54 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 86.1 | 86.1 | 4.0 | False | None | None | False | None | False | 344.4 | 0 | 3407712 | 120366 | None | I.No. 7.20.2 | Supply and laying double walled corrugated (DWC) HDPE Pipe including all necessary connecting Sockets/Couplings/Tees/ Bends / End-caps of same materials in existing trench as per IS 14930 part -II suitable for drawing underground cables. 50mm OD / 38mm ID DSR 2014-15, Page No-63 , It No- 7.20.2 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Mtr | 158.55 | 158.55 | 270.0 | False | None | None | False | None | False | 42808.5 | 0 | 3407713 | 120366 | None | I.No. 60.01 | Aluminium End Terminal (Lug) 10sqmm Escom's 2023-24/Part-III/Sl.No.470/It.No.60.01 /Code No.288630/Pg No.27/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 2.1 | 2.1 | 88.0 | False | None | None | False | None | False | 184.8 | 0 | 3407714 | 120366 | None | I.No. 32.03 | 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975 10 Sqmm, 4 Core, (10 GI Strips - 4 x 0.8 mm) Escom's 2023-24/Part-III/Sl.No.199/It..No.32.03/Code No.287205/Pg No.13/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 123904.2 | 123904.2 | 0.33 | False | None | None | False | None | False | 40888.386 | 0 | 3407715 | 120366 | None | I.No. 21.05 | Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using wooden/Aluminum Rollers as directed by the departmental staff 2.5 to 25 Sqmm Escom's 2023-24/Part-III/Item.No.21.05/Pg No.52/81 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Km | 21930.3 | 21930.3 | 0.33 | False | None | None | False | None | False | 7236.999 | 0 | 3407716 | 120366 | None | I.No. 29.03 | Earth work excavation for cable trench of 0.5 to 0.75 Mtr. Width and Depth upto 1 Mtr including trial pits, depositing on bank upto a lead of 50 Mtr, Supplying and Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign Boards at every 100 Mtr wherever necessary as directed. Hard Soil Bescom 2022-23/Part-IV/Sl.No.202/Item.No.29.03/Page No.08/14 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 408.45 | 408.45 | 155.0 | False | None | None | False | None | False | 63309.75 | 0 | 3407717 | 120366 | None | I.No. 29.07 | Refilling the cable trenches with selected available earth from trench excavation including watering, consolidation in layers of 15 cm. Thickness including depositing of the surplus earth with a lead of 200 MtrBescom 2022-23/Part-IV/ Sl.No.206/ Item.No.29.07/Page No.08/14 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 60.9 | 60.9 | 155.0 | False | None | None | False | None | False | 9439.5 | 0 | 3407718 | 120366 | None | I.No. 1.13 | Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5
m including cost of labour, tools, usage of machinery & other appurtenances
required to complete the work PWD SR 2023-24/Vol-I/It.No.1.13/Pg.No.08/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 380.1 | 380.1 | 23.0 | False | None | None | False | None | False | 8742.3 | 0 | 3407719 | 120366 | None | I.No. 2.1.5 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm and down size graded crushed coarse aggregates PWD SR 2023-24/Vol-I/It.No.2.1.5/Pg.No.15/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6463.8 | 6463.8 | 3.0 | False | None | None | False | None | False | 19391.4 | 0 | 3407720 | 120366 | None | I.No. 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M20 Design Mix Using 20 mm and down size
graded crushed coarse aggregates PWD SR 2023-24/Vol-I/It.No.2.2.1/Pg.No.15/118 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Cum | 6601.35 | 6601.35 | 3.0 | False | None | None | False | None | False | 19804.05 | 0 | 3407721 | 120366 | None | I.No. 2.11.b | Supplying, fitting and placing TMT FE 550/550D Steel Reinforcement complete as per drawing and technical specification.For Foundations of Bridges PWD SR 2023-24/Vol-I/It.No.2.11.b/Pg.No.18/214 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Tonne | 90831.3 | 90831.3 | 0.45 | False | None | None | False | None | False | 40874.085 | 0 | 3407722 | 120366 | None | I.No. 5.6.5 | Supply and fixing polished wood board made of not less than 15mm thick plank on both sides of not more than 2 pieces and fixing the same to the wall using tapered inverted wooden plugs screws. 15"x12"x2" CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.6.5/Page No.14 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 211.05 | 211.05 | 1.0 | False | None | None | False | None | False | 211.05 | 0 | 3407723 | 120366 | None | I.No. 5.7.3 | Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers. 63Amps CSR 2023-24/PWD/Elec/Vol-6/Chapter-5/It No.5.7.3/Page No.14 of 105 ---- with all lead, lifts, loading, un-loading charges, including cost of all materials, cost of labour, HoM all Machineries, transportation of all materials and machineries to site of work, labour, incidental and equipment charges, etc., complete as per specification and as per the directions of Engineer-in-charge for finished item of work. | Each | 421.05 | 421.05 | 4.0 | False | None | None | False | None | False | 1684.2 | 0 |
|
|
---|