| 1720104392000 | 0 | None | None | Roads | Construction of Road in ward no 1 G P Mallappapuram Shantharaju teacher house to Mestri Siddanna house | 423190.32 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3453606 | 122886 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead (CSR OF 2023-24 Vol-3, Pg-17, I-3.5) ---- As per the directions of the Engineer-in-charge of the work | Sqm | 6.18 | 6.18 | 273.0 | False | None | None | False | None | False | 1687.14 | 0 | | 3453607 | 122886 | None | 3.7 | Loosening, levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. (CSR VOL-3 OF 2023-24 P.NO.17 I.No:3.7) ---- As per the directions of the Engineer-in-charge of the work | Cum | 108.15 | 108.15 | 31.5 | False | None | None | False | None | False | 3406.725 | 0 | | 3453608 | 122886 | None | 3.1 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work (PWD SR 2023-24 Vol:3 P.NO.17 I.No:3.1) ---- As per the directions of the Engineer-in-charge of the work | Cum | 87.55 | 87.55 | 304.5 | False | None | None | False | None | False | 26658.975 | 0 | | 3453609 | 122886 | None | 3.1 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(PWD SR 2023-24 Vol:1 P.NO.7 I.No:3.1) ---- As per the directions of the Engineer-in-charge of the work | Cum | 488.22 | 488.22 | 31.5 | False | None | None | False | None | False | 15378.93 | 0 | | 3453610 | 122886 | None | 6.1 | Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation
after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. (PWD SR 2023-24 Vol:3 P.NO.49 I.No:6.1) ---- As per the directions of the Engineer-in-charge of the work | Cum | 5067.6 | 5067.6 | 31.5 | False | None | None | False | None | False | 159629.4 | 0 | | 3453611 | 122886 | None | 16.27 | Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. (CSR VOL-3 OF 2023-24, Pg-148, I-16.27) ---- As per the directions of the Engineer-in-charge of the work | Cum | 6565.22 | 6565.22 | 31.5 | False | None | None | False | None | False | 206804.43 | 0 | | 3453612 | 122886 | None | 16.25 | Dismantling the damaged or collapsed Machinehole ,conical in shape, and reconstructing the same for the same dimensions, with machine made wire cut brick in CM 1:4 with ordinary portland cement etc. as per design and specifications. The existing ring, cover and CC beeding to be used. For 1.2M dia(CSR VOL-5 OF 2023-24, Pg-197 , I No: 16.25) ---- As per the directions of the Engineer-in-charge of the work | Each | 3208.24 | 3208.24 | 3.0 | False | None | None | False | None | False | 9624.72 | 0 |
|