createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1719647579231
version8
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd19880000.00
bidValueTypeLUMPSUM
bidValueTypeTextLumpsum
tenderReceiptClose08-08-2024 16:00:00
tenderQueryClose22-07-2024 11:00:00
technicalBidOpen12-08-2024 11:00:00
publishedDate05-07-2024 18:49:38
publishedByPostKNNL_EE_DIV_MBC_GDNK
publishedByUserKPE10192 - MALLAPPA
bidValidityPeriod180
noOfCalls1
preBidMeetingDate22-07-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonM H Totager
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08354297046
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1719647579262
version8
createdDateNone
modifiedDateNone
tenderNumberKNNL/2024-25/LI/WORK_INDENT1124
titleKADARKOPPA LIFT IRRIGATION SCHEME Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, etc. coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) etc. O and M for a period of 5 years after successful commissioning of work for KADARKOPPA LIS on Turn-Key Basis.
descriptionKADARKOPPA LIFT IRRIGATION SCHEME Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation System (Head Works consisting of construction of Intake Canal, Jack well cum pump house, Vertical Turbine pumps coupled to HT Motors, Power supply including terminal bay, 110 KV Electrical Sub Station, Transmission line, Rising Main and Delivery Chamber) for providing irrigation facility to suffering command from Palkimani Direct Minor to Hanumaneri distributary of GRBC covering an ICA of 8750 Ha in Mudhol, Badami and Bagalkot taluk, Bagalkot District by lifting water from Ghataprabha River near Udagatti Village including Operation and Maintenance for a period of 5 years after successful commissioning of work for KADARKOPPA LIFT IRRIGATION SCHEME on Turn-Key Basis.
categoryWORKS
categoryTextWorks
ecv1987929522.68
deptNameKarnataka Neeravari Nigam Limited
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location3935
locationNameKNNL Division MBC Div Gaddanakeri
provisionalAmount2650000000.0
groupOverheadTotal0.0
fileNumber2024-25/AEE12/LOKAPUR/KADARKOPPALIS
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17196475790000NoneNoneLift Irrigation SchemeKadararakoppa LIS Annexure 7.1 Pumping Machinery & Annexure 7.2 Pump House Lighting376303353.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3408999120435Noneklisp1Design, manufacture, supply, erection, trail running, performance testing and commissioning of vertical turbine pump of approved make conforming to IS: 1710 having specified pump output under specified operating head coupled to HT motor of adequate HP rating operating at 6.6 KV with flexible coupling, self water lubricated thrust bearings,discharge Tee with flanged end for connecting delivery pipe with all other standard accessories and safety devices and all other ancillary operations complete as per specifications, terms and conditions of contract. V T pump coupled to more than 2500 hp upto 3000 hp motor (SR Item No 7.7.4 Page No 92 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)) Duty point head=126 Duty point discharge=5.0400 m3/sec Motor rating 2088.81 KW (2800 HP) x 5 ( 4 Working .1 Standby) 5 X 2800 = 14000 HPHP22611.7522611.7514000.0FalseNoneNoneFalseNoneFalse316564500.00
3409000120435Noneklisp2Providing and fixing of DI Double flanged wafer type (Concentric) / double eccentrically disc, Resilent seated Butterfly valves confoming to BS EN 593 / IS 13095 with shaft shall be of stainless steel AISI 410/431/420 and Renewable soft seal on the disc and body seat face of nickel weld overlay micro finished/Bolted External Seat of SS 304 / CF8 with Powder or liquid epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Fce to face dimensions as per EN 558-1 Basic series 14 (DIN 3203 F4) or AWWA C 504 : 80 or IS 13095. The valves shall be supplied along with the required number of standard make galvanized Bolts and nuits. The flange drilling standard is IS 1538. hence, drilling of hole in the valves shall match with the pipe flange drilling standard, the valves are to be suitabale for buried operaion with the gear box sealed and lubricated for life time opration. ( All the drilled holes in the body shall be of though holes, no tapped holes will be allowed) DI Double Flanged Eccentric Butterfly Valve For PN 16.0 800mm diameterEach740794.38740794.385.0FalseNoneNoneFalseNoneFalse3703971.90
3409001120435Noneklisp3Supply and fixing of Cast steel ASTM A 216 Gr.WCB double flanged Dual plate check valve Conforming to API 594 with latest amendments Shaft material shall be SS420/431 and spring shall be spring steel superior grade quality as detailed below of following diameters and types and conveying to work site, loading, unloading, stacking with appurtenances.complete with all lead and lift. The rates are inclusive of cost of Galvanised Bolts and Nuts: For Class 300 etc. complete 800mm diameterEach202227.1202227.15.0FalseNoneNoneFalseNoneFalse1011135.50
3409002120435Noneklisp4Supply, install, test & Commissioning Metallic dismantalling joint 830 mm Dia, PN 1.6 rating of approved make 800mm diameter Market RateSet216093.82216093.825.0FalseNoneNoneFalseNoneFalse1080469.10
3409003120435Noneklisp5Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) delivery pipes of specified diameter and plate thickness with flanged ends wherever required and provided with 1 coat 40 micron thick zinc rich epoxy primer paint and 3 coats 100 micron thick each coat coal tar epoxy paint for inner surface and 1 coat of 40 micron thick zinc rich epoxy primer paint and 2 coats of 100 micron thick each coat coal tar epoxy paint for outer surface including cost of all materials, machinery, labour, cutting, bending, welding, finishing, painting,conveying to spot, lowering, aligning, jointing,arranging water for testing, hydraulic testing at fabrication site and after laying and jointing at specified test pressure and all other ancillary operations complete as per specifications and approved drawings. Diameter of delivery pipe : ……..mm Thickness of plate : ……mm. Note: Rate per m of pipe = Rate per tonne x Weight of pipe per m Weight of pipe per m for specified diameter and plate thickness = 0.373 x Diameter of pipe in mm x Plate (SR Item No 7.4 Page No 91 of CSR 2023-24 Vol-4 (WRD-MI-KPCL))thickness in mm / 14400 800 mm dia, 6 mm thickRmtr22053.6522053.6550.0FalseNoneNoneFalseNoneFalse1102682.50
3409004120435Noneklisp6Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded /submerged arc welded mild steel (Fe-410 grade) manifold pipe system of specified diameter and plate thickness with flanged inlets / outlets at specified locations for connecting pump delivery pipes and rising mains and provided with 1 coat of 40 micron thick zinc rich epoxy primer paint and 3 coats of 100 micron thick each coat coal tar epoxy paint for inner surface and exposed outer surface including cost of all materials, machinery, labour, cutting, bending, welding, finishing, painting, conveying to spot, lowering, aligning,jointing, arranging water for testing,hydraulic testing at fabrication site and after laying and jointing at specified test pressure and all other ancillary operations complete as per specifications and approved drawings. (excluding cost of thrust block for anchoring / encasing manifold pipe ). Diameter of manifold pipe : …….mm Thickness of plate : ……mm. Note: Rate per m of pipe= Rate per tonne x Weight of pipe per Rm Weight of pipe per m for specified diameter and plate thickness = 0.976 x Diameter of pipe in mm x Plate thickness in mm / 30000 (SR Item No 7.5 Page No 91 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)) 2200 mm dia, 12 mm thickRmtr137875.83137875.8310.0FalseNoneNoneFalseNoneFalse1378758.30
3409005120435Noneklisp7Design, fabrication, supply, erection, testing and commissioning EOT crane consisting of double girder box type construction, rail mounted end carraiges with long and cross travel arrangement, main and auxiliary hoists of specified capacity, rails, pendant control, gear boxes,electric motors, brakes, rope drums, wire ropes, sheaves, end buffer stoppers, pendant operated DSL bus bars with all accessories for main and auxiliary hoists for handling pumps and accessories inpump house including cost of all materials,machinery,labour,cutting,aligning,welding, finishing, cleaning, greasing, applying two coats of zinc chromate red oxide primer and three coats of synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings Note: 1. EOT crane Main hoist capacity = 1.25 x Maximum lifting load in tonne 2. EOT crane auxiliary hoist capacity = 10 % of main hoist 3.. Rate for EOT crane shall be based on capacity of main hoist. (SR Item No.6.38 Page No 86 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Tonne Capacity262791.9262791.920.0FalseNoneNoneFalseNoneFalse5255838.00
3409006120435Noneklisp8Supplying, installing and commissioning electrode actuated water level transmitter of approved make with all accessoreis to protect against dry running of pump. Item No.7.13 Page No 93 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set240415.56240415.561.0FalseNoneNoneFalseNoneFalse240415.560
3409007120435Noneklisp9Design, fabrication, supply, assembling, testing and commissioning of HT pump panel board made of sheet metal duly painted with recess for cable entries at bottom suitable for 6.6 KV equipped with vaccum circuit breaker of suitable capacity for 3 number incoming 1600A and 8 numbers 630A outgoing of suitable capacity with aluminium bus bars of 1600 Amp metering panel, protection relays and all other accessories complete with wiring as per specifications and approved drawings. 3 numbers of complete set of HT pump panel board (6 numbers outgoing) and 2 number of complete set of Additonal VCB and fittings for bus and Auxilary supply Item No.(7.8) 7.8.1 and 7.8.2 Page No 93 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set8487050.888487050.881.0FalseNoneNoneFalseNoneFalse8487050.880
3409008120435Noneklisp10Supply, installation and commissioning of soft starter for specified kW load operating at 6.6 KV with load break switch, metering, protection by-pass vaccum contactor with all accessories complete housed in painted sheet metal enclosure. Note: Rate for Soft starter set per pump = Specified kW load x Rate per 500 kW / 500 Item No.7.17 Page No 94 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set4782666.874782666.875.0FalseNoneNoneFalseNoneFalse23913334.350
3409009120435Noneklisp11Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. 840 KVAr Item No.13.25 Page No 155 of CSR 2023-24 Vol-5 (BWSSB,KUWSDB&RWS)Set572418.0572418.05.0FalseNoneNoneFalseNoneFalse2862090.00
3409010120435Noneklisp12Supply and installation of floor mounting type LTAC panel of approved make fabricated from sheet metal and painted with provision for suitable incoming and specified number of outgoing feeder inlets with metering panel and all other accessories complete for auxiliary supply as per specifications. Item No.7.14 Page No 94 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Each580050.24580050.241.0FalseNoneNoneFalseNoneFalse580050.240
3409011120435Noneklisp13Battery Set and charger: Supply and Installing of 110 V,100AH of 2 No's Plant Battery Set and 2 No's Battery's Charger including control panels, change over arrangement etc., complete along with 1 No DC distribution panel (indoor) (Market Rate) 110V,100AHSet476047.87476047.872.0FalseNoneNoneFalseNoneFalse952095.740
3409012120435Noneklisp14Battery Set and charger: Supply and Installing of 110 V,100AH of 2 No's Plant Battery Set and 2 No's Battery's Charger including control panels, change over arrangement etc., complete along with 1 No DC distribution panel (indoor)B) BATTERY CHARGE (Market Rate) : 110 V, 100 AH (with float cum boost battery charger working on 230 V, 1 Ph AC supply as per specifications)Set173381.88173381.882.0FalseNoneNoneFalseNoneFalse346763.760
3409013120435Noneklisp15Battery Set and charger: Supply and Installing of 110 V,100AH of 2 No's Plant Battery Set and 2 No's Battery's Charger including control panels, change over arrangement etc., complete along with 1 No DC distribution panel (indoor) C) DC distribution panel (indoor) as per technical specification comprising of earth fault indicator, indication circuit for AC mains failure, 1 no.100A SFU for I/C . 12 nos. 32A SFU for O/G Item No.11.2.3 Page No.39 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele)No64465.1764465.171.0FalseNoneNoneFalseNoneFalse64465.170
3409014120435Noneklisp16Supplying of 1.1 KV Class Armoured Aluminium / copper conductor PVC insulated, extruded inner sheathed,galvanised,steel strip with glands/lugs/ferrules Item No 32.03 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele)1). 4 core 10 sqmmRmtr146.21146.21250.0FalseNoneNoneFalseNoneFalse36552.50
3409015120435Noneklisp17Supplying of 1.1 KV Class Armoured Aluminium / copper conductor PVC insulated, extruded inner sheathed,galvanised,steel strip with glands/lugs/ferrules Item No 32.03 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 2). 4 core 25 sqmmRmtr222.83222.83250.0FalseNoneNoneFalseNoneFalse55707.50
3409016120435Noneklisp18Supplying of 1.1 KV Class Armoured Aluminium / copper conductor PVC insulated, extruded inner sheathed,galvanised,steel strip with glands/lugs/ferrules Item No 32.03 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 3). 4 core 95 sqmmRmtr944.12944.12250.0FalseNoneNoneFalseNoneFalse236030.00
3409017120435Noneklisp19Supplying and drawing Copper control Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 (SR Item No 13.10 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 1). 4 Core 16.0 Sq.mm CablesRmtr693.84693.84350.0FalseNoneNoneFalseNoneFalse242844.00
3409018120435Noneklisp20Supplying and drawing Copper control Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 (SR Item No 13.10 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 2). 4 Core 6 Sq.mm CablesRmtr306.03306.03350.0FalseNoneNoneFalseNoneFalse107110.50
3409019120435Noneklisp21Supplying and drawing Copper control Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 (SR Item No 13.10 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 3). 2 Core 10.0 Sq.mm CablesRmtr250.28250.28350.0FalseNoneNoneFalseNoneFalse87598.00
3409020120435Noneklisp22Supplying and drawing Copper control Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 (SR Item No 13.10 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 4). 2 Core 2.5 Sq.mm CablesRmtr116.47116.47350.0FalseNoneNoneFalseNoneFalse40764.50
3409021120435Noneklisp23Supplying and drawing Copper control Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 (SR Item No 13.10 Page No 40 of CSR 2023-24 Vol-6 KPTCL (KPTCL, ESCOMs & PWD Ele) 5). 4 Core 4 Sq.mm CablesRmtr219.3219.3350.0FalseNoneNoneFalseNoneFalse76755.00
3409022120435Noneklisp24Supplying, laying and connecting xLPE 6.6 KV(E) 3 core cable suitable for 28 KA short circuit rating with end connecters from HT panel to motor, starters, capacitor panels etc., complete as per directions. Market Rate 16.a). From HT Panel to Soft stater & motors v3 core 240 sqmm cable with end connectorsRmtr1714.851714.85300.0FalseNoneNoneFalseNoneFalse514455.00
3409023120435Noneklisp25Supplying, laying and connecting xLPE 6.6 KV(E) 3 core cable suitable for 28 KA short circuit rating with end connecters from HT panel to motor, starters, capacitor panels etc., complete as per directions. Market Rate 16.b). From Transformer to panel 3 core 400 sqmm cable with end connectorsRmtr2451.572451.57400.0FalseNoneNoneFalseNoneFalse980628.00
3409024120435Noneklisp26Supplying of 1.1 KV Class Armoured Aluminium / copper conductor PVC insulated, extruded inner sheathed,galvanised,steel strip with glands/lugs/ferrules From Auxiliary transformer 6.6KV/ 433V, 160 KVA to LTAC panel 3.5 core 240 sqmm (SR Item No 32.18 Page No 13 of 81 CSR 2023-24 Vol-6 ESCOM (KPTCL, ESCOMs & PWD Ele)Rmtr1068.841068.84350.0FalseNoneNoneFalseNoneFalse374094.00
3409025120435Noneklisp27Concealed Conduit SystemSupplying heavy gauge PVC conduit pipe 25mm dia 2mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary (SR Item No.1.2.2, Page 2 of 105, Common SR2023-24 Volume-6 PWD Elem96.6496.64300.0FalseNoneNoneFalseNoneFalse28992.00
3409026120435Noneklisp28Supplying heavy gauge PVC Conduit Pipe 25mm Dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. (SR Item No.1.3.2, Page 2 of 105, Common SR2023-24 Volume-6 PWD Elem97.8897.88150.0FalseNoneNoneFalseNoneFalse14682.00
3409027120435Noneklisp29Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS:8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 2C X 1.5Sq.mm (SR Item No.2.5.1, Page 6 of 105, Common SR2023-24 Volume-6 PWD Elem65.6765.67200.0FalseNoneNoneFalseNoneFalse13134.00
3409028120435Noneklisp30Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS:8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 4C X 1.5Sq.mm (SR Item No.2.5.3, Page 6 of 105, Common SR2023-24 Volume-6 PWD Elem116.47116.47250.0FalseNoneNoneFalseNoneFalse29117.50
3409029120435Noneklisp31Point wiring using Copper wire with switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existingplastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Short point upto 3Mtr from tapping point to out let via switch (SR Item No.2.1.1, Page 5 of 105, Common SR2023-24 Volume-6 PWD EleEach Point353.11353.1124.0FalseNoneNoneFalseNoneFalse8474.640
3409030120435Noneklisp32Point wiring using Copper wire with switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existingplastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3Mtr upto 6Mtr from tapping point to out let via switch (SR Item No.2.1.2, Page 5 of 105, Common SR2023-24 Volume-6 PWD EleEach Point488.17488.1716.0FalseNoneNoneFalseNoneFalse7810.720
3409031120435Noneklisp33Point wiring using Copper wire with switch.Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5Sqmm (Phase & Neutral) & 1x1.0 sqmm (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6Amps flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Long point above 6Mtr upto 10Mtr from tapping point to out let via switch (SR Item No.2.1.3, Page 5 of 105, Common SR2023-24 Volume-6 PWD EleEach Point706.23706.2310.0FalseNoneNoneFalseNoneFalse7062.30
3409032120435Noneklisp34Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 6-32 Amps DP. (SR Item No.5.18.4, 17 of 105, Common SR2023-24 Volume-6 PWD EleEach915.62915.626.0FalseNoneNoneFalseNoneFalse5493.720
3409033120435Noneklisp35Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898. 50-63Amps TPN (SR Item No.5.18.9, 18 of 105, Common SR2023-24 Volume-6 PWD EleEach3826.033826.034.0FalseNoneNoneFalseNoneFalse15304.120
3409034120435Noneklisp36Supplying and fixing regular MCB distribution boards on wall / wood board / flush mounting using required clamps, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase / 3 phase / single door with powder coated painting. Made out of 14 SWG MS enclosure. III - Double Door 4Way TP &N (SR Item No.5.19.11, Page 18 of 105, Common SR2023-24 Volume-6 PWD EleEach5003.085003.082.0FalseNoneNoneFalseNoneFalse10006.160
3409035120435Noneklisp37Supplying of 1440rpm heavy duty exhaust fan with bracket blades suitable to operate on 230V 50Hz, AC Supply complete. 12" Sweep (300mm) (SR Item No.6.2.1, Page 30 of 105, Common SR2023-24 Volume-6 PWD EleEach3678.593678.596.0FalseNoneNoneFalseNoneFalse22071.540
3409036120435Noneklisp38Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire. (SR Item No.13.14, Page 57 of 105, Common SR2023-24 Volume-6 PWD EleEach609.59609.596.0FalseNoneNoneFalseNoneFalse3657.540
3409037120435Noneklisp39Supply of round/square recess/surface mounted rollingtype LED Down light with ........W GU 10 LED Lamp Rib Fabricated from Die cast aluminium with white powder coated prewired to mains connector & has swiveling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI should be greater than 80. Power Input: 220-240V @ 50/60Hz & Power factor should be greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition LED square or round down light 10-12W (SR Item No.11.5.2,Page 44 of 105,Common SR 2023-24 Volume-6 PWD EleEach1096.511096.5110.0FalseNoneNoneFalseNoneFalse10965.10
3409038120435Noneklisp40Supplying of .....feet -PVC Batten with integrated LED tube ....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI should be greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor should be greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 20/22 WEach814.2814.22.0FalseNoneNoneFalseNoneFalse1628.40
3409039120435Noneklisp41Supplying of .....feet -PVC Batten with integrated LED tube ....W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI should be greater than 80. Power Input: 220-240V@ 50/60Hz & Power factor should be greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fitting 1 x 4' - 36/40 W (SR Item No.11.3.2 and 11.3.3,Page 43 of 105,Common SR2023-24 Volume-6 PWD EleEach1497.421497.422.0FalseNoneNoneFalseNoneFalse2994.840
3409040120435Noneklisp42Supplying and fixing/replacing of 6/16/32Amps electrical accessories on existing switch board. Electronic stepped regulator. (SR Item No.3.14.16, Page 10 of 105,Common SR2023-24 Volume-6 PWD EleNo348.16348.1610.0FalseNoneNoneFalseNoneFalse3481.60
3409041120435Noneklisp43Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc., for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system. 56" Sweep (1400mm) Regular model (SR Item No.6.3.2, Page 30 of 105,Common SR2023-24 Volume-6 PWD EleEach3755.413755.414.0FalseNoneNoneFalseNoneFalse15021.640
3409042120435Noneklisp44Fixing a ceiling / wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23 / 0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired. (SR Item No.13.11, Page 57 of 105,Common SR2023-24 Volume-6 PWD EleEach390.28390.284.0FalseNoneNoneFalseNoneFalse1561.120
3409043120435Noneklisp45Supplying and Fixing 32mm dia clampsss A G I pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole ,using suitable clamps,bolts,nuts and wiring using suitable capacity wires. (SR Item No.13.2.2, Page 56 of 105, Common SR 2023-24 Volume-6 PWDEach1604.51604.58.0FalseNoneNoneFalseNoneFalse12836.00
3409044120435Noneklisp46Fabricating supplying and mounting MS box made out 18SWG suitable for floor / wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete. (SR Item No. 5.42.3, Page 20 of 105, Common SR 2023-24 Volume-6 PWD EleSq CM0.470.4722000.0FalseNoneNoneFalseNoneFalse10340.00
3409045120435Noneklisp47Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc., and fixing on existing wooden or metal box using N.F. screws. (SR Item No. 3.8, Page 9 of 105, Common SR 2023-24 Volume-6 PWD EleSq CM0.510.518000.0FalseNoneNoneFalseNoneFalse4080.00
3409046120435Noneklisp48Supplying 6A flush type socket and 6 amps flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654. 6Amps 3/5 Way (SR Item No.3.1.2, Page 8 of 105, Common SR 2023-24 Volume-6 PWD EleEach182.13182.1340.0FalseNoneNoneFalseNoneFalse7285.20
3409047120435Noneklisp49Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT should be greater than 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire should be greater than IK08. Power Factor should be greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. ED Light fixture with 40W System Power consumption. LED Efficiency should be greater than 130lm/w, nominal CRI should be greater than 75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source. LED Streetlight 40watts (SR Item No.11.8.2, Page 46 of 105, Common SR 2023-24 Volume-6 PWD EleEach4985.744985.748.0FalseNoneNoneFalseNoneFalse39885.920
3409048120435Noneklisp50Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part- 1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3975. 25 Sqmm, 3.5 Core, (12 GI Strips - 4 x 0.8 mm) (SR Item No.32.07, Page 13 of 81, Common SR 2023-24 Volume-6 PWD EleKm172901.21172901.210.025FalseNoneNoneFalseNoneFalse4322.530250
3409049120435Noneklisp51Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified (SR Item No.51.04 Page No 23 of 81 CSR 2023-24 Vol-6 ESCOM (KPTCL, ESCOMs & PWD Ele)Nos2691.112691.1120.0FalseNoneNoneFalseNoneFalse53822.20
3409050120435Noneklisp52Supply, installation and commissioning of Load Break Switch with HRO fuses, CBCT and ELR in painted sheet metal enclosure with operating console complete for use along with Power Factor capacitor bank as per specifications, terms and conditions of contract. Item No.7.10 Page No 93 CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set578142.18578142.185.0FalseNoneNoneFalseNoneFalse2890710.90
3409051120435Noneklisp53Supplying, installing, testing and commissioning of Dewatering Pump, including cost of all materials, machinery, labour, etc., complete with all leads and lifts.(20 HP) Market RateNos173342.0173342.02.0FalseNoneNoneFalseNoneFalse346684.00
3409052120435Noneklisp54Supplying and installing Temperature scanner suitable for operating at 110 V DC or 230 V AC mounted in a duly painted sheet metal enclosure provided with NO / NC relays for transmitting signal to VCBs for tripping with audiable alarm for both windings and bearings RTDs with all other accessories for satifactory functioning of the system etc., complete as per specifications, terms and conditions of contract.Item No.7.12 Page No 93 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set118299.72118299.725.0FalseNoneNoneFalseNoneFalse591498.60
3409053120435Noneklisp55Supply and installation of Auxiliary transformer 6.6 KV / 433 Volts 160 KVA copper wound, insulating oil filled with all accessories complete as per specifications..Item No.7.15 Page No 94 of CSR 2023-24 Vol-4 (WRD-MI-KPCL)Set496095.6496095.62.0FalseNoneNoneFalseNoneFalse992191.20
3409054120435Noneklisp56Supplying, fixing and commissioning C.I Tamper proof Air valve of approved make, body and seat ring of bronze, PN 1.6 class conforming to IS: 14845 of specified diameter with all fixtures including cost of all materials, machinery, labour etc., complete with all leads and lifts. 400 mm diameter Market RateSet106082.0106082.05.0FalseNoneNoneFalseNoneFalse530410.00
3409055120435Noneklisp57Supplying, fixing and commissioning of Pressure Relief Valve of pressure rating PN 1.6 as per IS 1538 (set pressure 4-5kg/cm2) including cost of all materials, labour, loading, unloading etc. and with all lead and lifts etc. complete and as directed by Engineer - In - Charge. 400 mm diameter Market RateSet321668.0321668.01.0FalseNoneNoneFalseNoneFalse321668.00
17196475790000NoneNoneLift Irrigation SchemeKadarakoppa LIS-Annexure 8.1 Electrical Sub Station59598097.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409056120436Noneklises1POWER TRANSFORMER : Power Transformer 2 X 11 MVA, 110/6.6 KV Delta / Star, Dynll, 3 Ph, 50Hz, Oil type OLTC Power Transformer with RTCC Panel & built in AVR, As per IS-2026 Stds with fittings & accessories and Supply of Nitrogen Injection Fire Protection System (NIFPS)(Market Rate : Universal Power) Market Rate for 11 MVANo16789518.0216789518.022.0FalseNoneNoneFalseNoneFalse33579036.040
3409057120436Noneklises2POWER TRANSFORMER : Power Transformer 2 X 11 MVA, 110/6.6 KV Delta / Star, Dynll, 3 Ph, 50Hz, Oil type OLTC Power Transformer with RTCC Panel & built in AVR, As per IS-2026 Stds with fittings & accessories and Supply of itrogen Injection Fire Protection System (NIFPS)(Market Rate : Universal Power Supply, Erection & ommissioning of Nitrogen Injection Fire Extinguishing System for Power Transformer below 100 MVANo1414485.771414485.772.0FalseNoneNoneFalseNoneFalse2828971.540
3409058120436Noneklises3110 KV SF-6 Circuit Breaker 110 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi pneumatic/pneumatic type operating echanism and mounting structure etc., as per technical specification Item No.3.3 Page No.27 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No941642.48941642.483.0FalseNoneNoneFalseNoneFalse2824927.440
3409059120436Noneklises4110 kV Isolator 110 kV, 1250 A, 40 kA double break electrically cum manually operated isolators with solid core insulator, terminal connector suitable for Al. tube/conductor, marshalling box etc., complete as per technical specification a) Upright with Earth Switch (Live Point Height Item No.9.9.1 Page No.36 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele) 4600 mm)Set499629.23499629.231.0FalseNoneNoneFalseNoneFalse499629.230
3409060120436Noneklises5110 kV Isolator 110 kV, 1250 A, 40 kA double break electrically cum manually operated isolators with solid core insulator, terminal connector suitable for Al. tube/conductor, marshalling box etc., complete as per technical specification b) Upright without Earth Switch (Live Point Height 4600 mm) Item No.9.9..2 Page No.36 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set426168.92426168.924.0FalseNoneNoneFalseNoneFalse1704675.680
3409061120436Noneklises6Metering Equipments (i) Current Transformer: Oil filled Current Transformer 0.2s class with terminal connector suitable for Al. tube/conductor with marshalling box etc., complete as per technical specification. 110 kV Class : 400-200/1-1-1 A Item No.5.2.6 Page No.31 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No195065.68195065.683.0FalseNoneNoneFalseNoneFalse585197.040
3409062120436Noneklises7Metering Equipment (ii) ETVM for metering (main and check meter) Item No.53.02 Page No.23 of 81 Common SR 2023-24 Volume-6 ESCOM ( KPTCL, ESCOMs & PWD Ele)No24736.6424736.642.0FalseNoneNoneFalseNoneFalse49473.280
3409063120436Noneklises8ETVM meter Box Suitable for 2 ETV meters Item No.55.04 Page No.25 of 81 of Common SR 2023-24 Volume-6 ESCOM ( KPTCL, ESCOMs & PWD Ele)No4514.924514.921.0FalseNoneNoneFalseNoneFalse4514.920
3409064120436Noneklises9Voltage Transformer Single phase,oil filled outdoor type VT with terminal connector suitable for AI tube/conductor with marshalling box etc complete as per technical specification.110 kV/sqrt3/110 V/sqrt3-110 V/sqrt3-110 V/sqrt3 Item No.7.2 Page No.33 Common SR 2023-24 Volume-6 KPTCL(KPTCL,ESCOMs & PWD Ele)No213055.96213055.963.0FalseNoneNoneFalseNoneFalse639167.880
3409065120436Noneklises10Protection CTs Oil filled Current Transformer 0.2s class with terminal connector suitable for Al. tube/conductor with marshalling box etc., complete as per technical specification.110 kV Class : 400-200/1-1-1 A Item No.5.2.6 Page No.31 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No195065.68195065.689.0FalseNoneNoneFalseNoneFalse1755591.120
3409066120436Noneklises11BUS PT Single phase, oil filled, outdoor type VT with terminal connector suitable for Al. tube/conductor with marshalling box etc complete as per technical specification. 110 kV/sqrt3 / 110 V/sqrt3 - 110 V/sqrt3 - 110 V/sqrt3 Item No.7.2 Page No.33 Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No213055.96213055.963.0FalseNoneNoneFalseNoneFalse639167.880
3409067120436Noneklises1296 kV Metal Oxide with surge counter Arrestor class : Discharge Class 2 (Station Low Duty (SL)) Item No.8.4 Page No.33 Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No52622.8152622.819.0FalseNoneNoneFalseNoneFalse473605.290
3409068120436Noneklises13Control & Relay Panel: a) 110 kV Panel for Overhead Line - Type 1L Item No.16.4.7 Page No.42 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No1719167.021719167.021.0FalseNoneNoneFalseNoneFalse1719167.020
3409069120436Noneklises14Control & Relay Panel: b) 110 kV Transformer Panel - Type 1T1 Item No.16.4.10 Page No.42of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No2527230.432527230.432.0FalseNoneNoneFalseNoneFalse5054460.860
3409070120436Noneklises15110 KV Station Structures: (i) Fabrication, galvanising and supply of High Tensile Steel tower materials 1T1 (0.986MT) = (6 x 0.986MT=5.92MT)MT191491.18191491.185.916FalseNoneNoneFalseNoneFalse1132861.820880
3409071120436Noneklises16110 KV Station Structures: (ii) Station Structure Beam suitable for 1B1, without under hung isolator (0.521MT) = (3x0.521MT=1.56MT) Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.171.56FalseNoneNoneFalseNoneFalse298726.22520
3409072120436Noneklises17110 KV Mounting Structures: (i) Isolators: 110 KV Isolators (0.726 * 5Nos) MTMT191491.17191491.173.63FalseNoneNoneFalseNoneFalse695112.94710
3409073120436Noneklises18110 KV Mounting Structures: (ii) Current Transformers: For 110 KV CTs (0.146 * 12Nos) MTMT191491.17191491.171.76FalseNoneNoneFalseNoneFalse337024.45920
3409074120436Noneklises19110 KV Mounting Structures: (iii) Voltage Transformers/ CVTs For 110 KV VT ( 0.137 * 6Nos) MTMT191491.17191491.170.82FalseNoneNoneFalseNoneFalse157022.75940
3409075120436Noneklises20110 KV Mounting Structures: (iv)Lightning Arrester For 30 KV LAs (0.105 * 9Nos) MTMT191491.17191491.170.945FalseNoneNoneFalseNoneFalse180959.155650
3409076120436Noneklises21110 KV Mounting Structures: (v) Pedestal Insulator For 110 kV PI (0.127 *6Nos) MT item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.762FalseNoneNoneFalseNoneFalse145916.271540
3409077120436Noneklises22Supply of galvanized Bolts & Nuts for above all (Station & Mounting structures) Sl No. 18.3 Page No.43 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele) Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT176904.42176904.421.02FalseNoneNoneFalseNoneFalse180442.50840
3409078120436Noneklises23i) Rigid bus: Aluminium Tube conforming to 6340 WP of IS- 5082/1969 (BS1600 - Sch. 40) of following sizes of 75 mm size Sl No. 36.1.2.4 Page No.56 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m1489.281489.28200.0FalseNoneNoneFalseNoneFalse297856.00
3409079120436Noneklises24ii) Taps: Straight taps made of 63 mm Aluminium Tube (BS-1600) of 1750 mm vertical height for vertical portion and cross bus on 110 kV side with rounded off end.Sl No. 36.2.3 Page No.56 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No4628.94628.912.0FalseNoneNoneFalseNoneFalse55546.80
3409080120436Noneklises25iii) 7/3.15 mm G.I. Wire for ground conductor Sl No. 20.8 Page No.44 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele) Main Bus/Cross Bus as above using Single Lynx Conductor Sl No. 25 Page No.122 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele) per bay 1m109.03109.03100.0FalseNoneNoneFalseNoneFalse10903.00
3409081120436Noneklises26Main bus/Cross Bus as above using single lynx conductor Sl No. 25 Page No.122 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Per Bay9123.999123.991.0FalseNoneNoneFalseNoneFalse9123.990
3409082120436Noneklises27Insulators i) Solid Core Bus Post Insulator 110 kV Sl No. 21.1.3 Page No.45 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No15486.2615486.266.0FalseNoneNoneFalseNoneFalse92917.560
3409083120436Noneklises28ii) Disc Insulator 90 kN Sl No.21.2.3 Page No.45 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No734.73734.736.0FalseNoneNoneFalseNoneFalse4408.380
3409084120436Noneklises29Wedge Connector Clamps for Lynx Conductor (Post Insulators-6, SF-6 Breaker-18 (3 x 6Nos), Transformer HT Terminals-6, Isolators-6 x 5 =30, CT-12, PT-6, LA-9 etc.,) Sl No.47.8.3 Page No.70 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No1056.871056.8787.0FalseNoneNoneFalseNoneFalse91947.690
3409085120436Noneklises30Control cable: i.19 Core 2.5 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m650.47650.47500.0FalseNoneNoneFalseNoneFalse325235.00
3409086120436Noneklises31Control cable: ii.2 Core 2.5 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m116.47116.47300.0FalseNoneNoneFalseNoneFalse34941.00
3409087120436Noneklises32Control cable: iii. 4 Core 2.5 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m175.94175.94600.0FalseNoneNoneFalseNoneFalse105564.00
3409088120436Noneklises33Control cable: iv.14 Core 2.5 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m516.66516.66600.0FalseNoneNoneFalseNoneFalse309996.00
3409089120436Noneklises34Control cable: v.4 Core 6 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m306.03306.031400.0FalseNoneNoneFalseNoneFalse428442.00
3409090120436Noneklises35Control cable: vi.4 Core 4 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m219.3219.3600.0FalseNoneNoneFalseNoneFalse131580.00
3409091120436Noneklises36Control cable: vii. 4 Core 10 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m464.63464.63200.0FalseNoneNoneFalseNoneFalse92926.00
3409092120436Noneklises37Control cable: viii. 10 Core 2.5 Sq mm Sl No. 13.16, 13.1, 13.6 13.15, 13.8, 13.7,13.9,13.14 Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m387.81387.81200.0FalseNoneNoneFalseNoneFalse77562.00
3409093120436Noneklises38Fire Fighting Equipments with necessary mounting Stands: A).Foam type extinguisher Fire Fighting Equipments with necessary mounting Stands: i.50 Litre capacity Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No12528.7712528.772.0FalseNoneNoneFalseNoneFalse25057.540
3409094120436Noneklises39Fire Fighting Equipments with necessary mounting Stands: ii.9 Litre capacity Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No5102.25102.22.0FalseNoneNoneFalseNoneFalse10204.40
3409095120436Noneklises40Fire Fighting Equipments with necessary mounting Stands: B).Water Type (Gas Pressure Type) 9.0 Liters Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No3101.223101.224.0FalseNoneNoneFalseNoneFalse12404.880
3409096120436Noneklises41Fire Fighting Equipments with necessary mounting Stands: C). Carbon Dioxide Type, 4.5 Liters capacity Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No10768.1510768.154.0FalseNoneNoneFalseNoneFalse43072.60
3409097120436Noneklises42Fire Fighting Equipments with necessary mounting Stands: D). Sand Type Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele) Fire Fighting Equipments with necessary mounting Stands: i.G.I.Bucket 9 Ltr.capacity Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No747.12747.1212.0FalseNoneNoneFalseNoneFalse8965.440
3409098120436Noneklises43Fire Fighting Equipments with necessary mounting Stands: ii.Steel Stands Sl No.51.1.1, 51.1.2 ,51.4, 51.5.2 , 51.7.1, 51.7.2 Page No.74 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No2926.522926.524.0FalseNoneNoneFalseNoneFalse11706.080
3409099120436Noneklises44RCC Pole - 9 Mtr Long, 145 Kg WL (Item No 1.01 Page No..3 of 81 of Common S R 2023-24 Volume-6 ESCOMs (KPTCL,ESCOMs&PWDEle)No10146.1710146.174.0FalseNoneNoneFalseNoneFalse40584.680
3409100120436Noneklises45POLES & HIGH MAST LIGHT Fabrication, Supplying, Erection, Testing and Commissioning of...... ms long Polygon high mast with Single/Multiple telescopic sections having, (minimum overlap distance of .5 times of top section) thickness as per BSEN 10025 grades 355 JO/ASTM A572-50 steel sheet plate for shaft suitable to withstand a wind velocity of 47 m/s as per IS 875 part (as per GA Drawing). Base plate as per IS 2062/ASTM A572-50. The mast shall be Galvanized in single Hot-dip as per BSEN ISO 1461/ASTM A123 with an average 70 microns as per S 2629, and welded as per BS 5135 Single L-Seam joint The mast shall have 2 Way head frame with die cast LM-6 pulleys, stainless steel axle, Phosphorus Bronze bearing bush ress-fitted with separate guides for 2 runs of 5 mm dia, stainless steel wire rope of AISI 304grade 7/19-core, (Factor of Safety as per TR no-7). 2.5 mm2 EPR insulated PCP heathed trailing power cable housed inside the bottom shaft of mast with door having locking arrangement The mast shall have manual/power tool (Suitable reversible geared motor operating on 230/415V, 50Hz, shall be provide above 15 Mtr mast) The mast shall have lantern of 2 segments, suitable dia with max load carrying capacity as per S 1239. The mast shall be erected on existing RCC footing. 12 m/12.5 m - Top 100 mm and Bottom 310 mm dia Sl No.4.5.1 Page No.13 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)Each162309.0162309.02.0FalseNoneNoneFalseNoneFalse324618.00
3409101120436Noneklises46a) Supply of LED Streetlight 70W luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT reater than 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor reater than0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools.Sl No.11.8.3 Page No.46 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)Each7424.087424.084.0FalseNoneNoneFalseNoneFalse29696.320
3409102120436Noneklises47b) Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS-694:2010 2Core 6 Sq mm Sl No.2.5.21 Page No.7 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)m242.84242.84250.0FalseNoneNoneFalseNoneFalse60710.00
3409103120436Noneklises48c) Supplying and fixing sheet metal box made out of 18 SWG sheet metal with necessary holes for cable/conduit entry as required with one coat of primer of approved make etc. 200 x 200 x 65 mm Sl No.1.4.7 Page No.2 of 105 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)Each431.17431.1712.0FalseNoneNoneFalseNoneFalse5174.040
3409104120436Noneklises49d) Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.63Amps Sl No.5.7.3 Page No.14 of 105 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)Each496.84496.8412.0FalseNoneNoneFalseNoneFalse5962.080
3409105120436Noneklises50e) Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.32Amps Sl No.5.7.2 Page No.14 of 105 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele)Each298.59298.598.0FalseNoneNoneFalseNoneFalse2388.720
3409106120436Noneklises51f) Supplying and fixing PVC conduit pipe and accessories of approved guage of open conduit system 25 mm dia 2 mm thick Sl No.1.1.2 Page No.2 of 105 Common SR 2023-24 Volume-6 PWD (KPTCL,ESCOMs & PWD Ele))m100.35100.35250.0FalseNoneNoneFalseNoneFalse25087.50
3409107120436Noneklises52Ground mat A).Supplying and laying of MS flats, of various sizes, welding and applying ACB paint to welded portion and covering with sodium bentonite clay, as per the drawing/standard specifications and consolidation. i) 50 mm X 6 mm MS flats Sl No.26 b Page No.123 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m500.56500.56600.0FalseNoneNoneFalseNoneFalse300336.00
3409108120436Noneklises53Ground mat B).Grounding of equipment with various sizes, G.I. Flat and connecting Equipment to the earthmat/ground pit. Each point of earthing with all formation works like bending, twisting, drilling of holes and connecting by welding (inclusive of all T&P and consumables) to the earthmat/ ground pit/ point of earth connection,all the materials supplied by the contractor. 50 mmX 6 mm Sl No.26 f Page No.123 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m415.06415.06800.0FalseNoneNoneFalseNoneFalse332048.00
3409109120436Noneklises54Ground mat C).Providing 25mm dia M.S.rod 1.05 Mtr. Long earthmat spikes including heating, bending top 50mm over lap flattening and making spike edge at one end driving into the earth below the ground level and welding the rod with ground mat flat.Sl No.26 g Page No.124 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)m561.27561.2732.0FalseNoneNoneFalseNoneFalse17960.640
3409110120436Noneklises55Ground mat D).Grounding of equipments by providing cast iron pipe of 100 mm ID 13 mm thickness, 2.75 metres long with 2 part clamp out of G.I. Flat 50 X 6 mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor) Sl No.6 c Page No.115 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Set20174.6420174.6432.0FalseNoneNoneFalseNoneFalse645588.480
3409111120436Noneklises56Ground mat E).Supplying & Providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc., Sl No.26 i Page No.124 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Each1857.261857.2630.0FalseNoneNoneFalseNoneFalse55717.80
3409112120436Noneklises57Maintenance Tools and Plant A).Ring spanner set Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Set1090.321090.321.0FalseNoneNoneFalseNoneFalse1090.320
3409113120436Noneklises58Maintenance Tools and Plant B).Pipe wrench 24 inches size Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No1548.751548.751.0FalseNoneNoneFalseNoneFalse1548.750
3409114120436Noneklises59Maintenance Tools and Plant C).Pipe wrench 18 inches size Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No857.39857.391.0FalseNoneNoneFalseNoneFalse857.390
3409115120436Noneklises60Maintenance Tools and Plant D).Double end spanner- 12 nos. per set Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Set1027.131027.131.0FalseNoneNoneFalseNoneFalse1027.130
3409116120436Noneklises61Maintenance Tools and Plant E).Hack saw frame B185 Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No449.76449.761.0FalseNoneNoneFalseNoneFalse449.760
3409117120436Noneklises62Maintenance Tools and Plant F).Hydraulic crimping tools upto 1000 sqmm Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No76834.1276834.121.0FalseNoneNoneFalseNoneFalse76834.120
3409118120436Noneklises63Maintenance Tools and Plant G).Rubber hand gloves 15 kV tested Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Pair363.03363.031.0FalseNoneNoneFalseNoneFalse363.030
3409119120436Noneklises64Maintenance Tools and Plant H).Rechargeable 5 W LED Hand Torch Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No1584.681584.681.0FalseNoneNoneFalseNoneFalse1584.680
3409120120436Noneklises65Maintenance Tools and Plant I).Insulated cutting plier 12 inch size Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No486.93486.931.0FalseNoneNoneFalseNoneFalse486.930
3409121120436Noneklises66Maintenance Tools and Plant J).Insulated cutting plier 8 inch size Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No292.4292.41.0FalseNoneNoneFalseNoneFalse292.40
3409122120436Noneklises67Maintenance Tools and Plant K).Line live tester AC/ DC 500 V Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No385.33385.331.0FalseNoneNoneFalseNoneFalse385.330
3409123120436Noneklises68Maintenance Tools and Plant L).screw driver 18 '' Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No276.29276.291.0FalseNoneNoneFalseNoneFalse276.290
3409124120436Noneklises69Maintenance Tools and Plant M).screw driver 12 '' Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No92.9392.931.0FalseNoneNoneFalseNoneFalse92.930
3409125120436Noneklises70Maintenance Tools and Plant N).Hammer 8 lbs Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No615.78615.781.0FalseNoneNoneFalseNoneFalse615.780
3409126120436Noneklises71Maintenance Tools and Plant O).Hammer 2 lbs Sl No.35 Page No.53 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No308.51308.511.0FalseNoneNoneFalseNoneFalse308.510
17196475790000NoneNoneLift Irrigation SchemeKadarakoppa LIS Annexure 8.1.1 Substation civil works5680589.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409127120437Nonekliselcivil1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. (SR Item No.1.12, Page 8 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum99.7599.751486.8FalseNoneNoneFalseNoneFalse148308.30
3409128120437Nonekliselcivil2SITE SURFACING & JELLY SPREADING a)Supplying and providing jelly in the station yard of uniform thickness of 100 mm including the cost of materials, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineerin-charge of works as per the standard procedure.(SR Item No.1,Page No 158, KPTCL,ESCOMS PWD Electrical Vol - 6 for 2023 -2024)Cum1861.651861.65472.0FalseNoneNoneFalseNoneFalse878698.80
3409129120437Nonekliselcivil3SITE SURFACING & JELLY SPREADING b) Supplying and providing stone dust in the station yard or wherever required including watering, ramming, consolidating and dressing. The rate includes the cost of material, labour charges, required tools and plants etc., complete. Work shall be carried out as per the instructions of Engineer-in-charge of works as per the standard procedure.(SR Item No.2,Page No 158, KPTCL,ESCOMS PWD Electrical Vol - 6 for 2023 -2024)Cum1756.651756.65413.0FalseNoneNoneFalseNoneFalse725496.450
3409130120437Nonekliselcivil4EQUIPMENT FOUNDATION 110 KV Station structure fabricated out of galvanised iron. Column type 1T1 with peak., 110 KV Isolators , 110 KV Current Transformer, NCT's, 110KV Lightning Arrestors, Pedestal insulators 110kv, For High pedestal insulators for 110 KV side , Power Transformer Foundation, 110KV Circuit Breaker Foundation, Cable Ducts,Inspection Chambers ,Oil sump pit & Storm Water Drains . Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (SR Item No.1.14.1, page 9 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum111.44111.44561.18FalseNoneNoneFalseNoneFalse62537.89920
3409131120437Nonekliselcivil5Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (SR Item No.1.15.1, page 9 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum396.57396.57336.71FalseNoneNoneFalseNoneFalse133529.08470
3409132120437Nonekliselcivil6Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work (SR Item No.1.16.1, page 9 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum586.49586.49224.48FalseNoneNoneFalseNoneFalse131655.27520
3409133120437Nonekliselcivil7Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (SR Item No.2.1.6, page 15 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum6555.156555.1578.77FalseNoneNoneFalseNoneFalse516349.16550
3409134120437Nonekliselcivil8Providing and laying in position Reinforced cement concrete for al Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (SR Item No.2.4.3, Page 16 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum6652.86652.898.61FalseNoneNoneFalseNoneFalse656032.6080
3409135120437Nonekliselcivil9Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (SR Item No.2.11, Page 18 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)t82961.5582961.5510.85FalseNoneNoneFalseNoneFalse900132.81750
3409136120437Nonekliselcivil10Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (SR Item No.1.9, Page 7 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum279.3279.32782.15FalseNoneNoneFalseNoneFalse777054.4950
3409137120437Nonekliselcivil11Construction of platform with size stone, cement concert for erection of AuxilaryTransformer/Metering cubicle/Heavy Structure Equipment.Construction of platform (1.5x1.5x1.2) Mtr in size stone, for erection of transformers/Heavy equipment including all materials, labour.Excavation of (1.5x1.5x1) Mtr pit for foundation providing and laying cement concrete 1:4:8 for foundation laid in 10 cm thick layers, well compacted curing etc., complete providing and construction of stone masonary 0.9 Mtr below ground level and 1.2 Mtr above ground level neatly hammer dressed in cement morter 1:6. Providing and Laying cement concrete slab 1.5x1.5x0.10 Mtr with cement concrete of 1:2:4 mix forming & cutting complete, providing pointing to stone masonary in cement morter 1:3 after racking joint & nisely lining curing etc., plastering the concrete surfaces in cement morter 1:4 including smooth randering curing etc.,curing at every stages completely.(SL No.61, Item No.4.06.,Page No 2 of 14, KPTCL,ESCOMS PWD Electrical Vol - 6 for 2021 -202)No31879.0531879.052.36FalseNoneNoneFalseNoneFalse75234.5580
3409138120437Nonekliselcivil12SWITCH YARD FENCING a)Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm) (SR Item No.11.8, Page 95 of Common SR Vol-2 for 2023-24-Common SOR)Sqm843.15843.15651.36FalseNoneNoneFalseNoneFalse549194.1840
3409139120437Nonekliselcivil13SWITCH YARD FENCING b) Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete.(SR Item No.11.62, Page 96 of Common SR f Works Vol-2 for 2023-24-Common SOR)Each1139.251139.25110.92FalseNoneNoneFalseNoneFalse126365.610
17196475790000NoneNoneLift Irrigation SchemeKadarakoppa LIS Annexure 8.1.2 Fire wall230928.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409140120438Noneklisbaffle1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.Depth upto 3 m (SR Item No.1.14.1, Page 8 of Common SR Vol-1, 2023-24)Cum131.51131.516.0FalseNoneNoneFalseNoneFalse789.060
3409141120438Noneklisbaffle2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.(SR Item No.1.15.1, Page 8 of Common SR Vol-1, 2023-24)Cum620.17620.175.0FalseNoneNoneFalseNoneFalse3100.850
3409142120438Noneklisbaffle3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work (SR Item No.1.16, Page 9 of Common SR Vol-1, 2023-24)Cum692.07692.073.0FalseNoneNoneFalseNoneFalse2076.210
3409143120438Noneklisbaffle4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (SR Item No.2.1, Page 15 of Common SR Vol-1, 2023-24)Cum7735.087735.080.17FalseNoneNoneFalseNoneFalse1314.96360
3409144120438Noneklisbaffle5Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (SR Item No.5.4, Page 9 of Vol-2, 2023-224Cum7915.987915.9813.31FalseNoneNoneFalseNoneFalse105361.69380
3409145120438Noneklisbaffle6Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(SR Item No.6.8, Page 14 of Vol-2, 2023-24)Cum9873.69873.611.98FalseNoneNoneFalseNoneFalse118285.7280
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 8.2 Terminal bay7349420.04
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409146120439Noneklistb1110 KV SF-6 Circuit Breaker 110 kV, 40 kA class, SF-6 Circuit Breaker with terminal connector suitable for Al. tube/conductor with spring/semi-pneumatic/pneumatic type operating mechanism and mounting structure etc., as per technical specification Item No.3.3 Page No.27 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set941642.48941642.481.0FalseNoneNoneFalseNoneFalse941642.480
3409147120439Noneklistb2Lightning Arrester 96 kV Metal Oxide with surge counter Arrestor class : Discharge Class 2 (Station Low Duty (SL)) Item No.8.4 Page No.33 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No52622.852622.83.0FalseNoneNoneFalseNoneFalse157868.40
3409148120439Noneklistb3110 kV Isolator:110 kV, 1250 A, 40 kA double break electrically cum manually operated isolators with solid core insulator, terminal connector suitable for Al. tube/conductor, marshalling box etc., complete as per technical specification a) Upright with Earth Switch (Live Point Height4600 mm) Item No.9.9.1 Page No.36 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set499629.23499629.231.0FalseNoneNoneFalseNoneFalse499629.230
3409149120439Noneklistb4110 kV Isolator:110 kV, 1250 A, 40 kA double break electrically cum manually operated isolators with solid core insulator, terminal connector suitable for Al. tube/conductor, marshalling box etc., complete as per technical specification b) Upright without Earth Switch (Live Point Height4600 mm) Item No.9.9..2 Page No.36 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set426168.92426168.921.0FalseNoneNoneFalseNoneFalse426168.920
3409150120439Noneklistb5Terminal Clamps for Single Lynx Conductor to (Post Insulators-6, SF-6 Breaker-6, Isolators-6 x 2 =12, CT-3, LA-3 etc.,) Item No.47.7.8 Page No.69 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No664.1664.130.0FalseNoneNoneFalseNoneFalse19923.00
3409151120439Noneklistb6Current Transformer: Oil filled Current Transformer 0.2s class with terminal connector suitable for Al. tube/conductor with marshalling box etc., complete as per technical specification.110 kV Class : 400-200/1-1-1 A Item No.5.2.6 Page No.31 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No195065.68195065.683.0FalseNoneNoneFalseNoneFalse585197.040
3409152120439Noneklistb7Relay & Protection Panels 110 kV Panel for Overhead Line - Type 1L Item No.16.4.7 Page No.42 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set1719167.021719167.021.0FalseNoneNoneFalseNoneFalse1719167.020
3409153120439Noneklistb8110 KV Station Structures (i) Fabrication, galvanising and supply of High Tensile Steel tower materials 1T1 (0.986MT) = (6 x 0.986MT=5.92MT) Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)MT191491.17191491.171.392FalseNoneNoneFalseNoneFalse266555.708640
3409154120439Noneklistb9110 KV Station Structures (ii) Station Structure Beam suitable for 1B1, without under hung isolator (0.521MT) = (3x0.521MT=1.56MT) Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.368FalseNoneNoneFalseNoneFalse70468.750560
3409155120439Noneklistb10110 KV Mounting Structures: (i) Isolators:110 KV Isolators (0.726 * 5Nos) MT Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.5FalseNoneNoneFalseNoneFalse95745.5850
3409156120439Noneklistb11110 KV Mounting Structures:(ii) Current Transformers:For 110 KV CTs (0.146 * 3Nos) MT Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.27FalseNoneNoneFalseNoneFalse51702.61590
3409157120439Noneklistb12110 KV Mounting Structures: (iii)Lightning Arrester :For 30 KV LAs (0.105 * 3Nos) MT Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.246FalseNoneNoneFalseNoneFalse47106.827820
3409158120439Noneklistb13110 KV Mounting Structures:(iv) Pedestal Insulator For 110 kV PI (0.127 *3Nos) MT Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT191491.17191491.170.246FalseNoneNoneFalseNoneFalse47106.827820
3409159120439Noneklistb14Supply of galvanized Bolts & Nuts for above all (Station & Mounting structures) Sl No. 18.3 Page No.43 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele) Sl No.ii.A Page No.246 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)( For MT )MT176904.42176904.420.224FalseNoneNoneFalseNoneFalse39626.590080
3409160120439Noneklistb15i) Rigid bus: Aluminium Tube conforming to 6340 WP of IS- 5082/1969 (BS1600 - Sch. 40) of following sizes of 75 mm size Sl No. 36.1.2.4 Page No.56 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Rmtr1489.281489.28100.0FalseNoneNoneFalseNoneFalse148928.00
3409161120439Noneklistb16ii) Taps: Straight taps made of 63 mm Aluminium Tube (BS-1600) of 1750 mm vertical height for vertical portion and cross bus on 110 kV side with rounded off end.Sl No. 36.2.3 Page No.56 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No4628.94628.96.0FalseNoneNoneFalseNoneFalse27773.40
3409162120439Noneklistb17iii) 7/3.15 mm G.I. Wire for ground conductor Sl No. 20.8 Page No.44 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Rmtr109.03109.03100.0FalseNoneNoneFalseNoneFalse10903.00
3409163120439Noneklistb18Main Bus/Cross Bus as above using Single Lynx Conductor Sl No. 25 Page No.122 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Per Bay9123.999123.991.0FalseNoneNoneFalseNoneFalse9123.990
3409164120439Noneklistb19Insulators i) Solid Core Bus Post Insulator 110 kV Sl No. 21.1.3 Page No.45 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No734.73734.733.0FalseNoneNoneFalseNoneFalse2204.190
3409165120439Noneklistb20Insulators ii.) Disc Insulator 90 kN Sl No.21.2.3 Page No.45 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No734.73734.7312.0FalseNoneNoneFalseNoneFalse8816.760
3409166120439Noneklistb21C - Type Wedge Connectors Lynx to Lynx ACSR Conductor.Sl No.47.10.7 Page No.70 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No1698.671698.6720.0FalseNoneNoneFalseNoneFalse33973.40
3409167120439Noneklistb22Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 A).2C X 1.5 Sqmm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr65.6765.67300.0FalseNoneNoneFalseNoneFalse19701.00
3409168120439Noneklistb23Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 B).2C X 2.5 Sq. mm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr116.45116.45350.0FalseNoneNoneFalseNoneFalse40757.50
3409169120439Noneklistb24Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 C).10C x 2.5 Sq.mm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr387.81387.81500.0FalseNoneNoneFalseNoneFalse193905.00
3409170120439Noneklistb25Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 D).4C x 6 Sq.mm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr306.03306.03500.0FalseNoneNoneFalseNoneFalse153015.00
3409171120439Noneklistb26Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 E).19C x 2.5 Sq.mm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr650.47650.47200.0FalseNoneNoneFalseNoneFalse130094.00
3409172120439Noneklistb27Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS 8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100V as per IS- 694:2010 F).4C x 2.5 Sq.mm Sl No.2.5.1,2.5.9 Page No.6 of 105 Common SR 2023-24 Volume-6 PWD Ele (KPTCL,ESCOMs & PWD Ele) Sl No. 13.1, 13.14, 13.8, 13.16, 13.6, Page No.40 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD EleRmtr183.37183.37200.0FalseNoneNoneFalseNoneFalse36674.00
3409173120439Noneklistb28A).Grounding of equipment with various sizes, G.I. Flat and connecting Equipment to the earthmat/ground pit. Each point of earthing with all formation works like bending, twisting, drilling of holes and connecting by welding (inclusive of all T&P and consumables) to the earthmat/ ground pit/ point of earth connection,all the materials supplied by the contractor.50 mmX 6 mm Sl No.26 f Page No.123 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Rmtr415.06415.06150.0FalseNoneNoneFalseNoneFalse62259.00
3409174120439Noneklistb29B).Grounding of equipments by providing cast iron pipe of 100 mm ID 13 mm thickness, 2.75 metres long with 2 part clamp out of G.I. Flat 50 X 6 mm continuously welded alround the pipe using cast iron welding electrodes as per drawing including the cost of excavation (All materials to be supplied by the contractor) Sl No.6 c Page No.115 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)Set20174.6420174.6412.0FalseNoneNoneFalseNoneFalse242095.680
3409175120439Noneklistb30C) Supplying & Providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non pressure type) for earth pits including all lead and lifts etc.Sl No.26 i Page No.124 Common SR 2023-24 Volume-6 KPTCL (KPTCL,ESCOMs & PWD Ele)No1857.261857.2612.0FalseNoneNoneFalseNoneFalse22287.120
3409176120439Noneklistb31Rearrangement of exisiting equipments in existing substation like 110 KV existing tower, 110 KV PT , 11 KV no.of lines, fencing, extension of bus to be shifted for extension of 110 KV Terminal bayJob1239000.01239000.01.0FalseNoneNoneFalseNoneFalse1239000.00
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 8.2.1 Terminal Bay Civil works1444532.71
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409177120440Noneklistc1Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.(SR Item No.1.12, Page 8 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SORCum117.71117.71410.0FalseNoneNoneFalseNoneFalse48261.10
3409178120440Noneklistc2Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(SR Item No.1.17.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum324.62324.6230.55FalseNoneNoneFalseNoneFalse9917.1410
3409179120440Noneklistc3Earth work excavation for pipeline trenches in Soft rock (without requiring blasting) by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata..(SR Item No.1.19.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum562.51562.5118.7476FalseNoneNoneFalseNoneFalse10545.7124760
3409180120440Noneklistc4Earth work excavation for pipeline trenches in Hard rock (requiring blasting) by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. (SR Item No.1.21.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum828.89828.8912.4984FalseNoneNoneFalseNoneFalse10359.7987760
3409181120440Noneklistc5Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (SR Item No.2.1.5, page 15 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum7735.087735.08142.284FalseNoneNoneFalseNoneFalse1100578.122720
3409182120440Noneklistc6Providing and laying in position Reinforced cement concrete for al Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) (SR Item No.2.4.3, page 16 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum7850.37850.314.98FalseNoneNoneFalseNoneFalse117597.4940
3409183120440Noneklistc7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (SR Item No.2.11, page 18 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)t97894.6397894.631.34FalseNoneNoneFalseNoneFalse131178.80420
3409184120440Noneklistc8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(SR Item No.1.9, Page 7 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum329.57329.5748.835FalseNoneNoneFalseNoneFalse16094.550950
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 8.3 Transmission Line34932901.21
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409185120441Noneklistl1i) Supply and Erection of Towers 110 kV DC 'A' Type : A Normal (942.96 Kgs high tensile steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DA (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT192027.65192027.6510.37FalseNoneNoneFalseNoneFalse1991326.73050
3409186120441Noneklistl2ii) Supply and Erection of Towers 110 kV DC 'A' Type : A - Normal (1911 Kgs mild steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DA (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT175536.56175536.5621.02FalseNoneNoneFalseNoneFalse3689778.49120
3409187120441Noneklistl311 No's for 6.5 Kmi) Supply and Erection of Towers 110 kV DC 'A' Type A .3 Mtr Extension (1259.4 Kgs high tensile steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DA (3 BE) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT192027.65192027.652.22FalseNoneNoneFalseNoneFalse426301.3830
3409188120441Noneklistl4A Type Normal Towers ii) Supply and Erection of Towers 110 kV DC 'A' Type A .3 Mtr Extension (2243.88 Kgs mild steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DA (3 BE) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT175536.56175536.564.49FalseNoneNoneFalseNoneFalse788159.15440
3409189120441Noneklistl5A.3 Type Towers 2 No's for 6.5 Kmi) Supply and Erection of Towers 110 kV DC 'B' Type : B Normal (1587.90 Kgs high tensile steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Item No.DB (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT192027.65192027.653.18FalseNoneNoneFalseNoneFalse610647.9270
3409190120441Noneklistl6A.3 Type Towers ii) Supply and Erection of Towers 110 kV DC 'B' Type : B Normal (2058.68 Kgs mild steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge. Item No.18.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Item No.DB (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT175536.56175536.564.12FalseNoneNoneFalseNoneFalse723210.62720
3409191120441Noneklistl7B Type Normal Towers 2 No's for 6.5 Kmi) Supply and Erection of Towers 110 kV 'DC 'C' Type: C Mtr Extension (2044.90 Kgs high tensile steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Item No.DC (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT192027.65192027.654.09FalseNoneNoneFalseNoneFalse785393.08850
3409192120441Noneklistl8B Type Normal Towers ii) Supply and Erection of Towers 110 kV 'DC 'C' Type: C Mtr Extension (1862.02 Kgs mild steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DC (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT175536.56175536.563.72FalseNoneNoneFalseNoneFalse652996.00320
3409193120441Noneklistl9C Type Normal Towers 2 No's for 6.5 Kmi)Supply and Erection of Towers 110 kV DC 'D' Type: D (2969.89 Kgs high tensile steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material) Item No.DD (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT192027.65192027.655.94FalseNoneNoneFalseNoneFalse1140644.2410
3409194120441Noneklistl10C Type Normal Towers ii)Supply and Erection of Towers 110 kV DC 'D' Type: D (1649.00 Kgs mild steel per tower) including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)(for material)Item No.DD (NT) Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT175536.56175536.563.3FalseNoneNoneFalseNoneFalse579270.6480
3409195120441Noneklistl11D Type Normal Towers = 2 No's for 6.5 KmSupply and fixing of stub templates and aligning dismantling and transportaion of templates from one location to another location for 110 kV including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.(SR Item No 11.4 Page No.4 Vol 6 Distribution BESCOM - Part-VI - 33 kV Material)No114920.97114920.9710.0FalseNoneNoneFalseNoneFalse1149209.70
3409196120441Noneklistl12Supply and fixing of Galvanised Bolts & Nuts including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.Item No.18.3 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele) sheet :110 kV DC Tower (Design Code: KPTCL-1D-AQUS),Page No.184 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)MT176904.42176904.422.98FalseNoneNoneFalseNoneFalse527175.17160
3409197120441Noneklistl13Supplying and fixing G.I. Angle iron 45 x 45 x 5 mm (1 m length) with cleats, bolt & nuts as per specification and fixing above 0.5 m length each at inner and outer surface of the tower to facilitate running of barbed wire Item No.2.a Page No.113 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set5105.925105.9219.0FalseNoneNoneFalseNoneFalse97012.480
3409198120441Noneklistl14Supplying and fixing barbed wire as per specification Item No.2.b Page No.113 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Rmtr94.1694.16950.0FalseNoneNoneFalseNoneFalse89452.00
3409199120441Noneklistl15Tower accessories a) Number Plates/Circuit Plates Item No.19.2 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Nos493.12493.1219.0FalseNoneNoneFalseNoneFalse9369.280
3409200120441Noneklistl16Tower accessories b) Danger Plates/Caution Plates (1 no. per tower) Item No.19.3 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Nos493.12493.1219.0FalseNoneNoneFalseNoneFalse9369.280
3409201120441Noneklistl17Tower accessories c) Phase Plates (set of 6 per tower) Item No.19.1 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Set621.98621.9819.0FalseNoneNoneFalseNoneFalse11817.620
3409202120441Noneklistl18Tower accessories d) Earth Bond 300 mm Long (all A type tower) Item No.19.5 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Nos581.09581.0913.0FalseNoneNoneFalseNoneFalse7554.170
3409203120441Noneklistl19Tower accessories e) Earth Bond 450 mm Long (all B.C.D type tower) Item No.19.4 Page No.43 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)Nos666.58666.586.0FalseNoneNoneFalseNoneFalse3999.480
3409204120441Noneklistl20Tower accessories: Supply and fixing of Grounding of tower with GI Pipe including the cost of GI pipe including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc., complete and as directed by Engineer-In-Charge.(SR Item No.11.A,Page No 12 of 27 of Vol 6 Transmission KPTCL - Part-II - Labour ChargesSet6220.46220.438.0FalseNoneNoneFalseNoneFalse236375.20
3409205120441Noneklistl21Conductor: LYNX ACSR (6.5 Km*3 ) = 19.5 Km = 19500 Meter Item No.20.5 Page No.44 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele) (SR Item No.8.A.ii,Page No 9 of 27, KPTCL,ESCOMS PWD Electrical Vol - 6 for 2021 -2022)m245.23245.2319500.0FalseNoneNoneFalseNoneFalse4781985.00
3409206120441Noneklistl22Conductor & Earth Wire: 7/3.15 mm G.I. Wire for ground conductor (6.5 Km*1.05 ) = 6.82 Km = 6825 Meter Item No.20.8 Page No.44 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)m109.03109.036825.0FalseNoneNoneFalseNoneFalse744129.750
3409207120441Noneklistl23Hardware for Transmission Line Work: a) Double Tension Clamps with arcing horns for LYNX ACSR Item No.46.2 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No5787.375787.3715.0FalseNoneNoneFalseNoneFalse86810.550
3409208120441Noneklistl24Hardware for Transmission Line Work: b) Single Tension Clamps with arcing horns for LYNX ACSR Item No.46.1 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No2033.22033.228.0FalseNoneNoneFalseNoneFalse56929.60
3409209120441Noneklistl25Hardware for Transmission Line Work: c) Double Suspension Clamps with arcing horns for LYNX ACSR Item No.46.4 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No4710.684710.6816.0FalseNoneNoneFalseNoneFalse75370.880
3409210120441Noneklistl26Hardware for Transmission Line Work: d) Single Suspension Clamps with arcing horns for LYNX ACSR Item No.46.3 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No2469.332469.3324.0FalseNoneNoneFalseNoneFalse59263.920
3409211120441Noneklistl27Hardware for Transmission Line Work: e) M.S.C. Joints for LYNX ACSR Item No 46.6 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No827.65827.6576.0FalseNoneNoneFalseNoneFalse62901.40
3409212120441Noneklistl28Hardware for Transmission Line Work: f) Pre-formed Armour Rods for LYNX ACSR Item No 46.7 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No1564.861564.8639.0FalseNoneNoneFalseNoneFalse61029.540
3409213120441Noneklistl29Hardware for Transmission Line Work: g) Repair Sleeves for LYNX ACSR Item No 46.8 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No733.49733.4919500.0FalseNoneNoneFalseNoneFalse14303055.00
3409214120441Noneklistl30Hardware for Transmission Line Work: h) Vibration Damper for LYNX ACSR Item No 46.9 Page No.67 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No1256.351256.35114.0FalseNoneNoneFalseNoneFalse143223.90
3409215120441Noneklistl31Conductor & Earth Wire: Supply and fixing of 120KN insulators along with hardware for LYNX ACSR including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc Item No.21.2.2 Page No.45 Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No993.68993.68522.0FalseNoneNoneFalseNoneFalse518700.960
3409216120441Noneklistl32Conductor & Earth Wire: Supply and fixing of 90 KN insulators along with hardware for LYNX ACSR including cost of all material, machinery, labour, transportation, taxes with all leads and lifts etc Item No21.2.3 Page No.45 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No734.73734.73448.0FalseNoneNoneFalseNoneFalse329159.040
3409217120441Noneklistl33Hardware for Earthwire: Welding of bolts and nuts Item No 1.1 e Page No.113 of Common SR 2023-24 Volume-6 KPTCL ( KPTCL, ESCOMs & PWD Ele)No27.2627.266650.0FalseNoneNoneFalseNoneFalse181279.00
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 8.3.1 110Kv Transmission Line Civil Works12494834.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409218120442Noneklistlcivil1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.(SR Item No.1.17.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum324.62324.62540.1FalseNoneNoneFalseNoneFalse175327.2620
3409219120442Noneklistlcivil2Earth work excavation for pipeline trenches in Soft rock (without requiring blasting) by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.(SR Item No.1.19.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum562.51562.51324.06FalseNoneNoneFalseNoneFalse182286.99060
3409220120442Noneklistlcivil3Earth work excavation for pipeline trenches in Hard rock (requiring blasting) by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm whevere necessary as directed, removal of slumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.(SR Item No.1.21.1, page 10 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum828.89828.89216.04FalseNoneNoneFalseNoneFalse179073.39560
3409221120442Noneklistlcivil4Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:64(M15) Using 20 mm nominal size graded crushed coarse aggregates (SR Item No.2.1.6, page 15 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum7735.087735.08121.96FalseNoneNoneFalseNoneFalse943370.35680
3409222120442Noneklistlcivil5Providing and laying in position Reinforced cement concrete for al Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)(SR Item No.2.4.3, Page 16 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum7850.37850.3696.92FalseNoneNoneFalseNoneFalse5471031.0760
3409223120442Noneklistlcivil6Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (SR Item No.2.11, Page 18 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)t97894.6397894.6355.75FalseNoneNoneFalseNoneFalse5457625.62250
3409224120442Noneklistlcivil7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(SR Item No.1.9, Page 7 of Common SR for Earthwork & Concrete Works Vol-1 for 2023-24-Common SOR)Cum329.57329.57261.31FalseNoneNoneFalseNoneFalse86119.93670
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 5 Construction of intake channel15485909.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409225120443Noneklisint1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.2 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.510113.75FalseNoneNoneFalseNoneFalse1329958.1250
3409226120443Noneklisint2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth 3 m to 6 m (Common SR item No 1.14.3 in Vol-1,Pg.no.8 for 2023-24)Cum153.75153.757392.0FalseNoneNoneFalseNoneFalse1136520.00
3409227120443Noneklisint3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth above 6 m (Common SR item No 1.14.3 in Vol-1,Pg.no.8 for 2023-24)Cum192.92192.922788.5FalseNoneNoneFalseNoneFalse537957.420
3409228120443Noneklisint4Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth exceeding 6 m, but not exceeding 7.5 m (Common SR item No 1.15.3 in Vol-1,Pg.no.8 for 2023-24)Cum683.73683.732788.5FalseNoneNoneFalseNoneFalse1906581.1050
3409229120443Noneklisint5Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth exceeding 7.5 m, but not exceeding 9 m(Common SR item No 1.15.3 in Vol-1,Pg.no.8 for 2023-24)Cum717.92717.921122.0FalseNoneNoneFalseNoneFalse805506.240
3409230120443Noneklisint6Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth exceeding 9 m, but not exceeding 10.5 m(Common SR item No 1.15.3 in Vol-1,Pg.no.8 for 2023-24)Cum753.81753.811122.0FalseNoneNoneFalseNoneFalse845774.820
3409231120443Noneklisint7Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth exceeding 10.5 m, but not exceeding 12 m(Common SR item No 1.15.3 in Vol-1,Pg.no.8 for 2023-24)Cum791.51791.51748.0FalseNoneNoneFalseNoneFalse592049.480
3409232120443Noneklisint8Providing and laying in position Cement Concrete for levelling course for all works in foundation.The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 (M15) Using 20 mm nominal size graded crushed coarse aggregates(Common SR item No 2.1.6 in Vol-1,Pg.no.15 for 2023-24)Cum7735.087735.08151.83FalseNoneNoneFalseNoneFalse1174417.19640
3409233120443Noneklisint9Form work for staging (Foundation works) (Common SR item No 2.6.1 in Vol-1,Pg.no.16 for 2023-24)Cum231.1231.1151.83FalseNoneNoneFalseNoneFalse35087.9130
3409234120443Noneklisint10Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Template wall @ every 15 m interval (Common SR item No 2.4.2 in Vol-1,Pg.no.16 for 2023-24)Cum7850.317850.313.31FalseNoneNoneFalseNoneFalse25984.52610
3409235120443Noneklisint11Formwork For Staging (For Sub structure) (Common SR item No 2.6.1 in Vol-1,Pg.no.16 for 2023-24)Cum785.04785.043.31FalseNoneNoneFalseNoneFalse2598.48240
3409236120443Noneklisint12Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification f. Steel for Canal & Allied Works (Common SR item No 2.11 in Vol-1,Pg.no.18 for 2023-24)t111522.39111522.399.31FalseNoneNoneFalseNoneFalse1038273.45090
3409237120443Noneklisint13Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts.(Common SR item No 3.37 in Vol-4,Pg.no.53 for 2023-24)m106.56106.56110.42FalseNoneNoneFalseNoneFalse11766.35520
3409238120443Noneklisint14Providing and constructing size stone pitching using 200 to 250 mm size stones with pin headers at 2 per sqm set in CM 1 : 5 proportion by volume with pointing joints in CM 1 : 3 proportion by volume including cost of all materials from approved source, labour, packing stone chips and mortar into joints,finishing,curing and all other ancillary operations complete.(Common SR item No 3.45 in Vol-4,Pg.no.55 for 2023-24)Sqm1053.151053.153637.14FalseNoneNoneFalseNoneFalse3830453.9910
3409239120443Noneklisint15Kilometre Stone Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (iii) 200 m stone (precast) (Common SR item No 8.16 Vol-3 in Page 67 for 2023-24)Each1043.241043.242.0FalseNoneNoneFalseNoneFalse2086.480
3409240120443Noneklisint16Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage / arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.(Common SR item No 8.7 in Vol-4,Pg.no.120 for 2023-24)Each334.53334.5312.0FalseNoneNoneFalseNoneFalse4014.360
3409241120443Noneklisint17Kilometre Stone Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii)Ordinary kilometer stone (precast) (Common SR item No 8.16 Vol-3 in Page 67 for 2023-24)Each3626.563626.561.0FalseNoneNoneFalseNoneFalse3626.560
3409242120443Noneklisint18Providing and fixing GI pressure relief pipe with one end closed by perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes and all other ancillary operations complete.(Common SR item No 3.29.2 Vol-4 (Part-I) in Page 52 for 2023-24) 50 mm diameter and 225 mm longEach313.47313.47115.0FalseNoneNoneFalseNoneFalse36049.050
3409243120443Noneklisint19Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(Common SR item No 710.1.4 of IRC:78 & 2200 Vol-3 in Page 117 for 2023-24)Cum3316.813316.81653.4FalseNoneNoneFalseNoneFalse2167203.6540
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure 6 Construction of Jackwell cum Pump House140316790.97
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409244120444Noneklisjp1Clearing and Grubbing Road Land:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(Common SR 2023-24 - Item no 2.5, Pg 9 of Vol-3)Sqm4.874.873500.0FalseNoneNoneFalseNoneFalse17045.00
3409245120444Noneklisjp2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR 2023-24 - Item no 1.14.1, Pg 8 of Vol-1)Cum131.51131.515576.28FalseNoneNoneFalseNoneFalse733336.58280
3409246120444Noneklisjp3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth 3 m to 6 m (Common SR 2023-24 - Item no 1.14.1, Pg 8 of Vol-1)Cum153.75153.754220.19FalseNoneNoneFalseNoneFalse648854.21250
3409247120444Noneklisjp4Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR 2023-24 - Item no 1.15.3, Pg 9 of Vol-1) In Soft Rock Depth 4.5 m to 6 mCum651.18651.18867.73FalseNoneNoneFalseNoneFalse565048.42140
3409248120444Noneklisjp5Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR 2023-24 - Item no 1.15.3, Pg 9 of Vol-1) In Soft Rock Depth 6 m to 7.5 mCum683.74683.741835.99FalseNoneNoneFalseNoneFalse1255339.80260
3409249120444Noneklisjp6Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR 2023-24 - Item no 1.15.3, Pg 9 of Vol-1) In Soft Rock Depth 7.5 m to 9 mCum717.92717.921766.64FalseNoneNoneFalseNoneFalse1268306.18880
3409250120444Noneklisjp7Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR 2023-24 - Item no 1.15.3, Pg 9 of Vol-1) In Soft Rock Depth 9 m to 10.5 mCum753.82753.82711.5FalseNoneNoneFalseNoneFalse536342.930
3409251120444Noneklisjp8Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to (Common SR 2023-24 - Item no 1.21.5, Pg 11 of Vol-1)complete the work In Hard Rock (blasting prohibited) Depth 7.5 m to 9 mCum1715.431715.4354.45FalseNoneNoneFalseNoneFalse93405.16350
3409252120444Noneklisjp9Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to (Common SR 2023-24 - Item no 1.21.5, Pg 11 of Vol-1)complete the work In Hard Rock (blasting prohibited) Depth 9 m to 10.5 mCum1801.191801.19688.74FalseNoneNoneFalseNoneFalse1240551.60060
3409253120444Noneklisjp10Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to (Common SR 2023-24 - Item no 1.21.5, Pg 11 of Vol-1)complete the work In Hard Rock (blasting prohibited) Depth 10.5 m to 12 mCum1891.261891.26341.4FalseNoneNoneFalseNoneFalse645676.1640
3409254120444Noneklisjp11Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR 2023-24 - Item no 2.1.5, Pg 15 of Vol-1)Cum7735.087735.08100.5FalseNoneNoneFalseNoneFalse777375.540
3409255120444Noneklisjp12Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR 2023-24 - Item no 2.2.5, Pg 15 of Vol-1)Cum8052.268052.26588.31FalseNoneNoneFalseNoneFalse4737225.08060
3409256120444Noneklisjp13Form work for Staging (For Foundations) Concrete Quantity for Isolated Footings (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum644.18644.18122.77FalseNoneNoneFalseNoneFalse79085.97860
3409257120444Noneklisjp14Form work for Staging (For Foundations) Concrete Quantity for All other types (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum241.57241.57465.54FalseNoneNoneFalseNoneFalse112460.49780
3409258120444Noneklisjp15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR 2023-24 - Item no 2.4.4, Pg 16 of Vol-1) for Total Substructure Concrete QuantityCum8353.348353.342161.3FalseNoneNoneFalseNoneFalse18054073.7420
3409259120444Noneklisjp16Form work for Staging (For Sub Structure) 0-5m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Earth retaining StructuresCum835.33835.33582.22FalseNoneNoneFalseNoneFalse486345.83260
3409260120444Noneklisjp17Form work for Staging (For Sub Structure) 0-5m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Piers & AbutmentsCum835.33835.33118.8FalseNoneNoneFalseNoneFalse99237.2040
3409261120444Noneklisjp18Form work for Staging (For Sub Structure) 0-5m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC ColumnsCum5847.345847.3430.0FalseNoneNoneFalseNoneFalse175420.20
3409262120444Noneklisjp19Form work for Staging (For Sub Structure) 0-5m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC Beams, LintelsCum5012.05012.037.34FalseNoneNoneFalseNoneFalse187148.080
3409263120444Noneklisjp20Form work for Staging (For Sub Structure) 5-10m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Earth retaining StructuresCum935.57935.57436.66FalseNoneNoneFalseNoneFalse408525.99620
3409264120444Noneklisjp21Form work for Staging (For Sub Structure) 5-10m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Piers & AbutmentsCum935.57935.57162.0FalseNoneNoneFalseNoneFalse151562.340
3409265120444Noneklisjp22Form work for Staging (For Sub Structure) 5-10m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC ColumnsCum6549.026549.0230.0FalseNoneNoneFalseNoneFalse196470.60
3409266120444Noneklisjp23Form work for Staging (For Sub Structure) 5-10m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC Beams, LintelsCum5613.455613.4574.68FalseNoneNoneFalseNoneFalse419212.4460
3409267120444Noneklisjp24Form work for Staging (For Sub Structure) 10-15m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Earth retaining StructuresCum952.28952.28229.52FalseNoneNoneFalseNoneFalse218567.30560
3409268120444Noneklisjp25Form work for Staging (For Sub Structure) 10-15m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Piers & AbutmentsCum952.28952.28162.0FalseNoneNoneFalseNoneFalse154269.360
3409269120444Noneklisjp26Form work for Staging (For Sub Structure) 10-15m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC ColumnsCum6665.976665.9730.0FalseNoneNoneFalseNoneFalse199979.10
3409270120444Noneklisjp27Form work for Staging (For Sub Structure) 15-20m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Earth retaining StructuresCum968.99968.9970.6FalseNoneNoneFalseNoneFalse68410.6940
3409271120444Noneklisjp28Form work for Staging (For Sub Structure) 15-20m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for Piers & AbutmentsCum968.99968.9950.22FalseNoneNoneFalseNoneFalse48662.67780
3409272120444Noneklisjp29Form work for Staging (For Sub Structure) 15-20m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC Beams, LintelsCum5813.935813.9363.87FalseNoneNoneFalseNoneFalse371335.70910
3409273120444Noneklisjp30Form work for Staging (For Sub Structure) 15-20m height (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) Concrete Quantity for RCC SlabsCum4844.944844.9483.39FalseNoneNoneFalseNoneFalse404019.54660
3409274120444Noneklisjp31Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1) 0.0m to 3.6 lift Columns in Control Room and Pump houseCum8681.678681.6747.52FalseNoneNoneFalseNoneFalse412552.95840
3409275120444Noneklisjp32Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1) 0.0m to 3.6 lift Slabs in Control Room and Pump houseCum8681.678681.6792.88FalseNoneNoneFalseNoneFalse806353.50960
3409276120444Noneklisjp33Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1) 0.0m to 3.6 lift Beams in Control Room and Pump houseCum8681.678681.6748.9FalseNoneNoneFalseNoneFalse424533.6630
3409277120444Noneklisjp34Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)3.6 to 7.2 m Lift Columns in Control Room and Pump houseCum8768.498768.4947.52FalseNoneNoneFalseNoneFalse416678.64480
3409278120444Noneklisjp35Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)3.6 to 7.2 m Lift Beams in Control Room and Pump houseCum8768.498768.491.09FalseNoneNoneFalseNoneFalse9557.65410
3409279120444Noneklisjp36Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)7.2m to 10.8 m Lift Columns in Control Room and Pump houseCum8856.188856.1839.24FalseNoneNoneFalseNoneFalse347516.50320
3409280120444Noneklisjp37Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)7.2m to 10.8 m Lift Slabs in Control Room and Pump houseCum8856.188856.1826.99FalseNoneNoneFalseNoneFalse239028.29820
3409281120444Noneklisjp38Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)7.2m to 10.8 m Lift Beams in Control Room and Pump houseCum8856.188856.1851.86FalseNoneNoneFalseNoneFalse459281.49480
3409282120444Noneklisjp39Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)10.8m to 14.4m LiftColumns in Control Room and Pump houseCum8944.748944.7414.28FalseNoneNoneFalseNoneFalse127730.88720
3409283120444Noneklisjp40Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR 2023-24 - Item no 2.5.3, Pg 16 of Vol-1)10.8m to 14.4m LiftBeams @ El. 538.50 to El. 542.00Cum8944.748944.7451.93FalseNoneNoneFalseNoneFalse464500.34820
3409284120444Noneklisjp41Form work for 0-5m height Staging (For SuperStructure)Concrete Quantity for RCC Columns (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum6077.176077.1766.0FalseNoneNoneFalseNoneFalse401093.220
3409285120444Noneklisjp42Form work for 0-5m height Staging (For SuperStructure) Concrete Quantity for RCC Slabs (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum4340.844340.8492.88FalseNoneNoneFalseNoneFalse403177.21920
3409286120444Noneklisjp43Form work for 0-5m height Staging (For SuperStructure)Concrete Quantity for RCC Beams, Lintels (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum5209.05209.048.9FalseNoneNoneFalseNoneFalse254720.10
3409287120444Noneklisjp44Form work for 5-10m height Staging (For SuperStructure) Concrete Quantity for RCC Columns (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum6806.446806.4460.6FalseNoneNoneFalseNoneFalse412470.2640
3409288120444Noneklisjp45Form work for 5-10m height Staging (For SuperStructure Concrete Quantity for RCC Slabs (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum4861.744861.7426.99FalseNoneNoneFalseNoneFalse131218.36260
3409289120444Noneklisjp46Form work for 5-10m height Staging (For SuperStructureConcrete Quantity for RCC Beams, Lintels (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum5834.085834.0852.95FalseNoneNoneFalseNoneFalse308914.5360
3409290120444Noneklisjp47Form work for 10-15m height Staging (For SuperStructureConcrete Quantity for RCC Columns (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum6927.986927.9821.96FalseNoneNoneFalseNoneFalse152138.44080
3409291120444Noneklisjp48Form work for 10-15m height Staging (For SuperStructureConcrete Quantity for RCC Beams, Lintels (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1)Cum5938.275938.2751.93FalseNoneNoneFalseNoneFalse308374.36110
3409292120444Noneklisjp49Providing and laying 52 mm thick cement concrete flooring with concrete hardener topping, under layer 40 mm thick cement concrete 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12 mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix : 2 graded stone aggregate 6 mm nominal size) by volume, hardening compound mixed @ 2 L per 50 kg of cement or as per direction of Engineer incharge.For all slabs in Delivery/Motor Floor Level (Common SR 2023-24 - Item no 9.2, Pg 59 of Vol-2)Sqm991.19991.19881.67FalseNoneNoneFalseNoneFalse873902.48730
3409293120444Noneklisjp50Providing and laying Polished Glazed Vitrified tiles with thickness 10mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).Size of Tile 600x600 mm (Common SR 2023-24 - Item no 9.22.2, Pg 62 of Vol-2)Sqm1642.911642.91160.0FalseNoneNoneFalseNoneFalse262865.60
3409294120444Noneklisjp51Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR 2023-24 - Item no 2.11, Pg 18 of Vol-1) For All RCC Workst110837.22110837.22667.69FalseNoneNoneFalseNoneFalse74004903.42180
3409295120444Noneklisjp52Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(Common SR 2023-24 - Item no 1.9, Pg 7 of Vol-1)Filling Behind JWPH and ForebayCum329.57329.5712436.51FalseNoneNoneFalseNoneFalse4098700.60070
3409296120444Noneklisjp53Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.(Common SR 2023-24 - Item no 13.34, Pg 123 of Vol-2)l11.1511.152000.0FalseNoneNoneFalseNoneFalse22300.00
3409297120444Noneklisjp54Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Common SR 2023-24 - Item no 6.8, Pg 14 of Vol-2)Total BrickworkSqm9873.599873.59402.77FalseNoneNoneFalseNoneFalse3976785.84430
3409298120444Noneklisjp55Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters. 80x1.20 mm M.S. laths with 1.20 mm thick top cover including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Common SR 2023-24 - Item no 11.6.2, Pg 78 of Vol-2)Sqm3101.223101.2236.0FalseNoneNoneFalseNoneFalse111643.920
3409299120444Noneklisjp56Providing and fixing galvalume/ cladding sheets for roof with necessary fixtures etc., including cost of all materials, machinery, labour, scaffolding etc., complete with lead upto 50m and all lifts.(Market rate) Market RateSqm5060.255060.25236.3FalseNoneNoneFalseNoneFalse1195737.0750
3409300120444Noneklisjp57Providing and fixing Structural Steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Common SR 2023-24 - Item no 11.2, Pg 77 of Vol-2)Kg140.0140.04918.12FalseNoneNoneFalseNoneFalse688536.80
3409301120444Noneklisjp58Providing and fixing glazing in aluminium door, window, ventilator shutters and partitions etc. with EPDM rubber / neoprene gasketetc. complete as per the architectural drawings and the directions of engineer-in-charge . (Cost of aluminium snap beading shall be paid in basic item):With float glass panes of 4.0 mm thickness (weight not less than 10kg/ m²) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Common SR 2023-24 - Item no 11.37.1, Pg 89 of Vol-2)Sqm1224.131224.1351.12FalseNoneNoneFalseNoneFalse62577.52560
3409302120444Noneklisjp59Providing and fixing aluminium work for doors, windows, ventilators and partitions with extruded built up standard tubular sections/appropriate sections and other sections of approved make conforming to IS: 733 and IS:1285, fixing with dash fasteners of required dia and size, including necessary filling up the gaps at junctions, i.e. at top, bottom and sides with required EPDM rubber/ neoprene gasket etc. Aluminium sections shall be smooth, rust free, straight, mitred and jointed mechanically wherever required including cleat angle, Aluminium snap beading for glazing / paneling, C.P. brass / stainless steel screws, all complete as per architectural drawings and the directions of Engineer-incharge. (Glazing, paneling and dash fasteners to be paid for separately) :For Fixed Portion : Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15) including cost of materials, labour, usage charges of machinery complete as per specifications.(Common SR 2023-24 - Item no 11.35.1.1, Pg 87 of Vol-2)Sqm560.03560.03562.0FalseNoneNoneFalseNoneFalse314736.860
3409303120444Noneklisjp60Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour,curing complete as per specifications and as per directions of Engineerin-charge.(Common SR 2023-24 - Item no 8.6.1, Pg 42 of Vol-2)Sqm400.19400.194237.11FalseNoneNoneFalseNoneFalse1695649.05090
3409304120444Noneklisjp61Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.(Common SR 2023-24 - Item no 8.28, Pg 45 of Vol-2)Sqm110.27110.272665.0FalseNoneNoneFalseNoneFalse293869.550
3409305120444Noneklisjp62Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.(Common SR 2023-24 - Item no 8.63, Pg 51 of Vol-2)Sqm101.59101.594235.91FalseNoneNoneFalseNoneFalse430326.09690
3409306120444Noneklisjp63Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment,including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete.(Common SR 2023-24 - Item no 16.23, Pg 196 of Vol-5)Set3176.793176.7910.0FalseNoneNoneFalseNoneFalse31767.90
3409307120444Noneklisjp64Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm)(Common SR 2023-24 - Item no 11.58, Pg 95 of Vol-2)m994.92994.92100.0FalseNoneNoneFalseNoneFalse99492.00
3409308120444Noneklisjp65Design, fabrication, supply, erection and commissioning of embedded parts consisting of liners for trash rack grooves ( for coarse and fine screens ) with all accessories for pump house intake structure including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint and all other ancillary operations complete as per specifications and approved drawings. Note: 1. Wt of 1 set of embedded parts in tonnes = 100 to 125 kg / m height 2. Quantity of structural steel = 100.0 % of computed weight for 1 set. (Common SR 2023-24 - Item no 6.32, Pg 84 of Vol-4: Part I)t214223.09214223.0920.8FalseNoneNoneFalseNoneFalse4455840.2720
3409309120444Noneklisjp66Design, fabrication, supply, erection and commissioning of trash racks consisting of a number of panels of suitable height with vertical trash bars welded to structural steel frame at wider interval and provided with weld mesh frame for pump house intake structure including cost of all materials,machinery, labour, cutting, aligning, welding, finishing,cleaning, applying one coat of zinc rich epoxy primer and four coats cold applied coal tar epoxy paint etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials. Note: 1. Wt of trash rack panels for 1 vent in t = 0.0375 x ( L2 x H x h )0.716 Where ( L ) is length = Clear distance between piers in m . 0.20m. ( H ) is total height of trash rack panels in m ( h ) is head of water above sill of trash rack in m = FSL - Sill level 2. Quantity of structural steel = 100.0 % of computed weight.(Common SR 2023-24 - Item no 6.33, Pg 84 of Vol-4: Part I)t163300.19163300.193.53FalseNoneNoneFalseNoneFalse576449.67070
3409310120444Noneklisjp67Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, wheel tracks, seal seats, guide rails, gate groove liners etc., with all accessories for pump house intake stoplog gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing,cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials.Note: 1.Wt of 1 set of embedded parts in tonnes = 0.0665 x ( L2 x H x h )0.716. Where ( L ) is length = Clear distance between piers in m . 0.50 m. ( H ) is total height of stoplog gate in m = FSL - Sill level . 0.30 m ( h ) is head of water above sill of gate in m = FSL - Sill level 2. Quantity of structural steel = 95.9 % of computed weight for 1 set.(Common SR 2023-24 - Item no 6.34, Pg 85 of Vol-4: Part I)t226984.8226984.812.33FalseNoneNoneFalseNoneFalse2798722.5840
3409311120444Noneklisjp68Design, fabrication, supply, erection, testing and commissioning of sliding type stoplog gate consisting of skin plate, horizontal and vertical girders, lifting hooks, bronze padded slide blocks, stiffeners, guide shoes, rubber seals with all accessories for pump house intake vent including cost of all materials, machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coats of zinc rich epoxy primer and three coats of cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. Note:1. Wt of 1 stoplog gate in tonnes = 0.0995 ( L2 x H x h )0.716 Where ( L ) is length = Clear distance between piers in m . 0.50 m. ( H ) is total height of stoplog gate in m = FSL - Sill level . 0.30 m ( h ) is head of water above sill of gate in m = FSL - Sill level 2. Quantity of structural steel = 98.5 % of computed weight for 1 gate.(Common SR 2023-24 - Item no 6.35, Pg 85 of Vol-4: Part I)t199479.0199479.01.84FalseNoneNoneFalseNoneFalse367041.360
3409312120444Noneklisjp69Design, fabrication, supply, erection and commissioning of electrically operated mono-rail hoist assembly consisting of electric motor, rope drum, gear system, wire rope with lifting attachment, festoon cabling etc., with all accessories for operating pump house stop-log gate including cost of all materials ( excluding providing mono-rail hoist supporting structure and mono-rail with fixtures ), machinery, labour, cleaning, greasing etc., complete as per specifications and approved drawings Note: 1. Hoist capacity = 1.50 x weight of stop-gate (Common SR 2023-24 - Item no 6.36, Pg 85 of Vol-4: Part I)t79791.5979791.592.77FalseNoneNoneFalseNoneFalse221022.70430
3409313120444Noneklisjp70Design, fabrication, supply, erection and commissioning of structural steel hoist supporting structure consisting of columns, cross beams, bracings, stiffeners, mono-rail with fixtures etc., with all accessories for electrically operated monorail rope drum hoist for operating pump house intake vertical lift gates including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of synthetic enamel paint etc., complete as per specifications and approved drawings with all lead and all lifts including packing / forwarding charges for other materials. Note: 1. Columns with bracings / anchors / stiffeners: 150 kg per metre height. Weight proposed above is for each intake vent 2. Mono rail beam with cross beams : 100 kg per metre length 3. Quantity of structural steel = 97.8 % of computed weight for 1 span.(Common SR 2023-24 - Item no 6.37, Pg 86 of Vol-4: Part I)t168751.8168751.819.56FalseNoneNoneFalseNoneFalse3300785.2080
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure A Drilling of Borewells to Provide Water291872.77
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409314120445Noneklisb1Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty.(Common SR Item No.12.32 in Vol-5 (CHAP-12), Pg-143 , for 2023-24) Casing Pipe ISI Mark 175 mmMtr2394.982394.98100.0FalseNoneNoneFalseNoneFalse239498.00
3409315120445Noneklisb2Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II)1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge (Common SR Item No.12.34 in Vol-5 (CHAP-12), Pg-143 for 2023-24) MS casing capsNo203.19203.196.0FalseNoneNoneFalseNoneFalse1219.140
3409316120445Noneklisb3Providing and fixing MS casing collars as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments (Common SR Item No.12.33 in Vol-5 (CHAP-12), Pg-143 for 2023-24) MS collar 175 mmNo185.85185.858.0FalseNoneNoneFalseNoneFalse1486.80
3409317120445Noneklisb4Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete.(Common SR Item No.12.4 in Vol-5 (CHAP-12), Pg-140 for 2023-24)No6551.836551.831.0FalseNoneNoneFalseNoneFalse6551.830
3409318120445Noneklisb5Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) (Common SR Item No.12.2 page 139 of Vol-5, for 2023-24) i)Borewell depth of 0 to 50 MtrsRmtr382.85382.8550.0FalseNoneNoneFalseNoneFalse19142.50
3409319120445Noneklisb6Sinking borewell of 150mm dia. clear, using super fast hydraulic rig of capacity 250 PSIG & above 900 CMF and above, in all strata of earth, including over burden upto 20M, fixing of casing pipes, collars and cap with ncessary cutting, threading and welding including transportation of rig and supporting vehicles, crew charges, cost of consumables, cost of yield test at the final depth with a minimum working of compressor for one hour etc. complete. The cost excludes the cost of casing pipes, collars and caps etc.) for: (Above 300m of drilling add 10% for every 50m depth) (Common SR Item No.12.2 page 139 of Vol-5, for 2023-24)ii)Borewell depth of 50 to 100 MtrsRmtr479.49479.4950.0FalseNoneNoneFalseNoneFalse23974.50
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-B Construction of Toilet in JWPH66651.56
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409320120446Noneklistoilet1Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For:(Common SR item No.10.1 in Vol-5 (CHAP-12), Pg-113 for 2023-24) PVC pipes 25mm dia, 10 kg/sqcm & class 5m59.4759.4715.0FalseNoneNoneFalseNoneFalse892.050
3409321120446Noneklistoilet2Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For:(Common SR item No.10.1 in Vol-5 (CHAP-12), Pg-113 for 2023-24) pipes 90mm dia., 6 kg/sqcm & class 3m364.26364.2615.0FalseNoneNoneFalseNoneFalse5463.90
3409322120446Noneklistoilet3Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.(Common SR item No. 9.7 in Vol-2, Pg.no.59 for 2023-24)Sqm1543.791543.7921.0FalseNoneNoneFalseNoneFalse32419.590
3409323120446Noneklistoilet4Providing and fixing white vitreous china pedestal type water closet (European type) with seat and lid, 10 litre low level white vitreous chinaflushing cistern & C.P. flush bend with fittings & C.I. brackets, 40 mm flush bend, overflow arrangement with specials of standard make and mosquito proof coupling of approved municipal design complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required (Common SR item No. 14.3 in Vol-2, Pg.no.131 for 2023-24Each7405.57405.51.0FalseNoneNoneFalseNoneFalse7405.50
3409324120446Noneklistoilet5Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm or 340x410x265 mm sizes respectively.(Common SR item No. 14.23, in Vol-2, Pg.no.135 for 2023-24)Each1429.811429.812.0FalseNoneNoneFalseNoneFalse2859.620
3409325120446Noneklistoilet6White Vitreous China Flat back wash basin size 550x 400 mm with single 15 mm C.P. brass pillar tap (Common SR item No. 14.7.4, in Vol-2, Pg.no.132 for 2023-24)Cum2905.452905.452.0FalseNoneNoneFalseNoneFalse5810.90
3409326120446Noneklistoilet7Septic tank construction for 3000 lts Lump sum amountEach11800.011800.01.0FalseNoneNoneFalseNoneFalse11800.00
17196475790000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-C Construction of Watchman Quarters1330407.34
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409327120447Nonekliswq1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.518.99FalseNoneNoneFalseNoneFalse2497.1850
3409328120447Nonekliswq2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth (Common SR item No 1.15.1 in Vol-1,Pg.no.8 for 2023-24)Cum467.09467.092.11FalseNoneNoneFalseNoneFalse985.55990
3409329120447Nonekliswq3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth upto 1.50m (Common SR item No. 1.16.1 in Vol-1, Pg.no.9 for 2023-24)Cum692.06692.067.59FalseNoneNoneFalseNoneFalse5252.73540
3409330120447Nonekliswq4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates (Common SR item No. 2.1.2 in Vol-1, Pg.no.15 for 2023-24)Cum7017.77017.74.46FalseNoneNoneFalseNoneFalse31298.9420
3409331120447Nonekliswq5Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) (Common SR item No. 5.4 in Vol-2, Pg.no.9 for 2023-24)Cum7915.987915.9839.39FalseNoneNoneFalseNoneFalse311810.45220
3409332120447Nonekliswq6Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item No. 2.2.1 in Vol-1, Pg.no.15 for 2023-24)Cum7850.317850.312.77FalseNoneNoneFalseNoneFalse21745.35870
3409333120447Nonekliswq7Formwork For Staging (Foundation works) Plinth beamCum628.02628.022.77FalseNoneNoneFalseNoneFalse1739.61540
3409334120447Nonekliswq8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(Common SR Item No.1.9 in Vol-1, Pg.no.7 for 2023-24)Cum329.58329.588.69FalseNoneNoneFalseNoneFalse2864.05020
3409335120447Nonekliswq9Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Common SR item No. 6.8 in Vol-2, Pg.no.14 for 2023-24)Cum9873.69873.619.05FalseNoneNoneFalseNoneFalse188092.080
3409336120447Nonekliswq10Providing Half brick masonry with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level up to floor 1 level cement mortar 1:4 (1 cement :4 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.(Common SR item No. 6.15 in Vol-2, Pg.no.14 for 2023-24)Sqm1279.891279.892.16FalseNoneNoneFalseNoneFalse2764.56240
3409337120447Nonekliswq11Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item No.2.5.2 in Vol-1, Pg.no.16 for 2023-24) RCC Beams, LintelsCum8478.488478.482.12FalseNoneNoneFalseNoneFalse17974.37760
3409338120447Nonekliswq12Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item No.2.5.2 in Vol-1, Pg.no.16 for 2023-24)RCC Roof SlabsCum8478.488478.485.96FalseNoneNoneFalseNoneFalse50531.74080
3409339120447Nonekliswq13Formwork For Staging (For Super Structure) 0-5m Height RCC Beams, LintelsCum5087.095087.092.12FalseNoneNoneFalseNoneFalse10784.63080
3409340120447Nonekliswq14Formwork For Staging (For Super Structure) 0-5m Height RCC Roof SlabsCum4239.244239.245.96FalseNoneNoneFalseNoneFalse25265.87040
3409341120447Nonekliswq15Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item No. 2.11 in Vol-1, Pg.no.18 for 2023-24)t110837.23110837.230.58FalseNoneNoneFalseNoneFalse64285.59340
3409342120447Nonekliswq16Providing and fixing factory made ISI marked steel glazed doors, windows and ventilators, side /top /centre hung, with beading and all members such as F7D,F4B, K11 B and K12 B etc. complete of standard rolled steel sections, joints mitred and flash butt welded and sash bars tenoned and riveted, including providing and fixing of hinges, pivots, including priming coat of approved steel primer, but excluding the cost of other fittings, complete all as per approved design, (sectional weight of only steel members shall be measured for payment). Fixing with carbon steel galvanised dash fastener of required dia and size (to be paid for separately) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Common SR item No. 11.11.2 in Vol-2, Pg.no.80 for 2023-24)Sqm132.58132.5818.45FalseNoneNoneFalseNoneFalse2446.1010
3409343120447Nonekliswq17Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (Common SR item No. 11.34A in Vol-2, Pg.no.86 for 2023-24)Kg208.16208.16176.4FalseNoneNoneFalseNoneFalse36719.4240
3409344120447Nonekliswq18Providing & fixing factory made PVC Door frame of size 50x47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet metered cut at corners & jointed 2 No.s of 150mm long brackets of 15x15mm M.S Square tube, the entire door frame to be reinforced with 19x19mm M.S Square tube of 19 gauge. The door frame to be fixed to the wall using M.S. Screws of 65/80mm size complete as per manufacturers specification & direction of Engineer-in-charge.(Common SR item No. 12.54 in Vol-2, Pg.no.104 for 2023-24)Sqm394.01394.011.89FalseNoneNoneFalseNoneFalse744.67890
3409345120447Nonekliswq19Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with : 4.0 mm thick glass panes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.(Common SR item No. 11.30.1 in Vol-2, Pg.no.84 for 2021-22)Sqm1129.971129.978.37FalseNoneNoneFalseNoneFalse9457.84890
3409346120447Nonekliswq20Providing and laying Polished Glazed Vitrified tiles with thickness 10mm in floor with different sizes with water absorption less than 0.08% and conforming to IS:15622, of approved brand & manufacturer, in all colours and shade, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS : 15477, in average 6 mm thickness, including grouting of joints (Payment for grouting of joints to be made separately).(Common SR item No. 9.22.2 in Vol-2, Pg.no.62 for 2023-24)Sqm1642.921642.9236.68FalseNoneNoneFalseNoneFalse60262.30560
3409347120447Nonekliswq21Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.(Common SR item No. 9.38 in Vol-2, Pg.no.65 for 2023-24)Sqm1724.691724.692.83FalseNoneNoneFalseNoneFalse4880.87270
3409348120447Nonekliswq22Providing and fixing 10 mm thick acid and/or alkali resistant tiles of approved make and colour using acid and/or alkali resisting mortar bedding for Bathrooms: Toilet: Chemically exposed areas and joints filled with acid and/or alkali resisting cement as per IS : 4457, complete as per the direction of Engineer-in- Charge.(Common SR item No. 9.7 in Vol-2, Pg.no.59 for 2023-24)Sqm1543.81543.86.51FalseNoneNoneFalseNoneFalse10050.1380
3409349120447Nonekliswq23Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) finished with a top layer 6 mm thick cement plaster with cement mortar 1:6 (1 cement : 6 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Common SR item No. 8.8 in Vol-2, Pg.no.42 for 2023-24)Sqm459.67459.67278.46FalseNoneNoneFalseNoneFalse127999.70820
3409350120447Nonekliswq24Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour,curing complete as per specifications and as per directions of Engineerin-charge. (Common SR Item No.8.6.1 in Vol-2, Pg.no.42 for 2023-24)Sqm400.2400.229.79FalseNoneNoneFalseNoneFalse11921.9580
3409351120447Nonekliswq25Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Common SR item No. 8.39 in Vol-2, Pg.no.48 for 2023-24)Sqm157.36157.36308.26FalseNoneNoneFalseNoneFalse48507.79360
3409352120447Nonekliswq26Finishing walls with water proofing cement paint of required shade : Old work (one coats @ 2.20 kg/10 m²) complete. including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter , cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Common SR item No. 8.72.2 in Vol-2, Pg.no.52 for 2023-24)Sqm69.3969.39154.38FalseNoneNoneFalseNoneFalse10712.42820
3409353120447Nonekliswq27Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. (Common SR item No. 8.51 in Vol-2, Pg.no.50 for 2023-24)Sqm123.9123.9115.71FalseNoneNoneFalseNoneFalse14336.4690
3409354120447Nonekliswq28Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. (Common SR item No. 13.34 in Vol-2, Pg.No.124 for 2023-24)Sqm11.1611.16500.0FalseNoneNoneFalseNoneFalse5580.00
3409355120447Nonekliswq29Water supply and sanitary works 8% of Estimated amountLS86571.8886571.881.0FalseNoneNoneFalseNoneFalse86571.880
3409356120447Nonekliswq30Electricity 10% of Estimated amountLS108215.44108215.441.0FalseNoneNoneFalseNoneFalse108215.440
3409357120447Nonekliswq31Miscellaneous 5% of Estimated amountLS54107.5454107.541.0FalseNoneNoneFalseNoneFalse54107.540
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Jackwell Approach Road31350498.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409358120448Noneklisjar1Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(Common SR Item No 2.4, page 9 Vol-3 for 2023-24) (iiiA) By Mechanical means using Motor Grader In area of light jungleSqm4.884.887750.0FalseNoneNoneFalseNoneFalse37820.00
3409359120448Noneklisjar2Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.In all kinds of soils Depth upto 3 m (Common SR Item No.1.14.1, Page 8 Vol-1 for 2023-24)Cum131.52131.521586.25FalseNoneNoneFalseNoneFalse208623.60
3409360120448Noneklisjar3Cement stabilisation in Embankment Providing, laying and spreading available soil in the embankment on a prepared surface, pulverising, mixing the spreaded soil in place with Soil Stabilisor with 2% of cement using Binder spreader machine grading with the motor grader and compacting with the road roller at OMC to the desired density to form a layer of improved embankment.(Common SR Item No.4.5 in Vol-3, Pg-24 for 2023-24)Cum1339.361339.3615679.5FalseNoneNoneFalseNoneFalse21000495.120
3409361120448Noneklisjar4Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Common SR Item No.3.6, Vol-3, Pg.No.17 for 2023-24)Cum610.83610.83790.86FalseNoneNoneFalseNoneFalse483081.01380
3409362120448Noneklisjar5Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.(Common SR Item No.3.7 ,Vol-3,Pg.No.17 for 2023-24)Cum130.1130.18146.8FalseNoneNoneFalseNoneFalse1059898.680
3409363120448Noneklisjar6Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (v)For Grading -V Material (Common SR Item No.4.2 Vol-3, Pg.No.23 for 2023-24)Cum2922.812922.81409.68FalseNoneNoneFalseNoneFalse1197416.80080
3409364120448Noneklisjar7Wet Mix Macadam (Plant mix method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.(Common SR Item No.4.17, Vol-3 ,Pg.No.26 for 2023-24)Cum3170.613170.61375.0FalseNoneNoneFalseNoneFalse1188978.750
3409365120448Noneklisjar8Prime Coat over WMM/WBM Prime Coat over WMM/WBM: Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg per m2 using mechanical means.(Common SR Item No.5.1 Vol-3 ,Pg.No.29 for 2023-24)Sqm50.850.82250.0FalseNoneNoneFalseNoneFalse114300.00
3409366120448Noneklisjar9Tack coat on Granular surface treated with primer Providing and applying tack coat with VG-10 Bitumen using pressure distributor at the rate of 0.25 kg/m2 on Granular Surface.(Common SR Item No.5.33 of Vol-3, Pg-43 for 2023-24)Sqm18.5918.592250.0FalseNoneNoneFalseNoneFalse41827.50
3409367120448Noneklisjar10Rumble Strips Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint.(Common SR Item No.8.31 Page 71 Vol-3 for 2023-24)Sqm232.94232.942250.0FalseNoneNoneFalseNoneFalse524115.00
3409368120448Noneklisjar11Seal Coat Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats with bituminous binder VG-30 (ii) Case - II : Type B Premix Sand Seal coat (Common SR Item No.5.21, Vol-3 ,Pg.No.39 for 2023-24)Sqm64.4364.432250.0FalseNoneNoneFalseNoneFalse144967.50
3409369120448Noneklisjar12Providing and Fixing 'Logo Board ' of PMGSY at Starting Point Providing and fixing of typical Logo board as per specifications and drawing. Two ACP Sheet of 3mm thick, top and Bottom plate duly welded/bolted with MS Square angle 25mm x25mmx 5mm size on back and on the edges. The Top and Bottom plate will be welded/ bolted to 1 nos75x75x6 mm square Hallow section duly embedded in cement concrete M15 Grade of 600*600*600 mm, 450 mm below ground level.Retro-Reflecting Sheet as per IRC:67 Clause 1701.3.8.1 fixed over aluminium sheeting.All sections of steel tube will be painted with primer and two coats of epoxy paint as per drawing. A) Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type-1 (Common SR Item No.16.30,Vol-3 ,Pg.No.150 for 2023-24)Each12725.7712725.7720.0FalseNoneNoneFalseNoneFalse254515.40
3409370120448Noneklisjar13Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface: Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/ m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(Common SR Item No.8.15, Page 67 ,Vol-3 for 2023-24)Sqm656.67656.67100.0FalseNoneNoneFalseNoneFalse65667.00
3409371120448Noneklisjar14Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(Common SR Item No.8.43 , Page 74 Vol-3 for 2023-24)Each452.24452.24150.0FalseNoneNoneFalseNoneFalse67836.00
3409372120448Noneklisjar15Providing and erecting a "W" metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 811 (Common SR Item No.8.25 , Page 69 Vol-3 for 2023-24)m4509.964509.961100.0FalseNoneNoneFalseNoneFalse4960956.00
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME APPENDIX12.3-CONSTRUCTIONOFBOXCULVERT4692329.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409373120449Noneklisbox1Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing ofexcavated surfaces, disposing off or levelling the excavated earth or sorting& stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR Item No 1.14 in Vol-1,Pg-8 for 2023-24) In all kinds of soils Depth upto 3 mCum126.38126.38323.25FalseNoneNoneFalseNoneFalse40852.3350
3409374120449Noneklisbox2Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.(Common SR Item No 2.1 & 2.1.6 in Vol-1,Part Pg-15 for 2023-24) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregatesCum7735.087735.0843.47FalseNoneNoneFalseNoneFalse336243.92760
3409375120449Noneklisbox3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.(Common SR Item No 2.2 2.2.5 in Vol-1, Pg-15 for 2023-24) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8052.278052.2744.24FalseNoneNoneFalseNoneFalse356232.42480
3409376120449Noneklisbox4Form work for Staging (For Foundations) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for All other TypesCum241.57241.5744.24FalseNoneNoneFalseNoneFalse10687.05680
3409377120449Noneklisbox5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR Item No 2.4, 2.4.4 in Vol-1, Pg-16 for 2023-24) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8353.348353.34180.87FalseNoneNoneFalseNoneFalse1510868.60580
3409378120449Noneklisbox6Form work for Staging (Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Box CulvertCum1670.671670.67180.87FalseNoneNoneFalseNoneFalse302174.08290
3409379120449Noneklisbox7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening,cutting, bending, haooking, laping/welding joints, tying with binding wire / softannealed steel wire and other ancilary operations complete as per drawing and technical specification.(Common SR Item No 2.11 in Vol-1, Pg-18 for 2023-24)t110075.24110075.2414.64FalseNoneNoneFalseNoneFalse1611501.51360
3409380120449Noneklisbox8Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification (Common SR Item No 12.3 in Vol-3, Pg-117 for 2023-24)Cum1447.161447.16261.02FalseNoneNoneFalseNoneFalse377737.70320
3409381120449Noneklisbox9Providing and constructing contraction joints by fixing 310 mm wide central bulb type approved quality PVC water stop in two lines with 8 mm dia. steel dowel rods on either side at 1 m interval, foming 125 x 125 mm size groove in between two water stops for fillinf asphalt, fixing 15 mm dia two legged G.I pipe with U-bend at bottom for circulating steam at interval and foming 150 mm dia fomed drain behind water seals including cost of all materials, machinery, labour, filling asphalt in groove, circulation of steam through pipes, vulcanizing water seal joints and all other ancillary operations complete. (Common SR Vol - 4 (Part I), Item No. 2.24, Page 41 of CSoR 2023-24)m3042.333042.3348.0FalseNoneNoneFalseNoneFalse146031.840
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-E Construction of Embakment20232046.84
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409382120450Noneklisembak1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.(Common SR Item No.1.9 in Vol-1, Pg.no.7 for 2023-24)Cum329.58329.5821207.0FalseNoneNoneFalseNoneFalse6989403.060
3409383120450Noneklisembak2Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (SR Item No.1.8, page 7,Vol-1 for 2023-24) 0 to 1.50m LiftCum587.29587.296339.0FalseNoneNoneFalseNoneFalse3722831.310
3409384120450Noneklisembak3Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (SR Item No.1.8, page 7,Vol-1 for 2023-24) 1.50 to 3.0m LiftCum616.66616.666517.0FalseNoneNoneFalseNoneFalse4018773.220
3409385120450Noneklisembak4Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (SR Item No.1.8, page 7,Vol-1 for 2023-24) 3.0 to 4.50m LiftCum647.49647.491529.0FalseNoneNoneFalseNoneFalse990012.210
3409386120450Noneklisembak5Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. (SR Item No.1.8, page 7,Vol-1 for 2023-24) 4.50 to 6.00m LiftCum679.86679.861402.0FalseNoneNoneFalseNoneFalse953163.720
3409387120450Noneklisembak6Providing and constructing dry rubble stone pitching with pin headers at 2 per m2 using stones and stone chips from approved source including cost of all materials, labour, hand packing / wedging stone chips, finishing and all other ancillary operations complete.(SR Item No 3.41, page 54, Vol-4 for 2023-24)Sqm563.75563.756016.34FalseNoneNoneFalseNoneFalse3391711.6750
3409388120450Noneklisembak7Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineerin- charge. (Made of G.I. wire of dia 4 mm) (Common SR 11.58, Vol-2 in Pg.No-95 for 2023-24)m994.92994.92167.0FalseNoneNoneFalseNoneFalse166151.640
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-9 Rising Main1112282321.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409389120451Noneklisrising1Cutting and burning or disposing off Apu / Jondu from marshy areas as directed with all other ancillary operations complete.(Common SR Item No.8.3 in Vol-4, Pg.no.101 for 2023-24)Sqm11.6511.6532989.0FalseNoneNoneFalseNoneFalse384321.850
3409390120451Noneklisrising2Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m (Common SR Item No.1.17.1 in Vol-1, Pg.no.10 for 2023-24)Cum324.62324.6250586.66FalseNoneNoneFalseNoneFalse16421441.56920
3409391120451Noneklisrising3Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.Ordinary/soft rock (without requiring blasting) Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Item No.1.19.2 in Vol-1, Pg.no.10 for 2023-24)Cum690.13690.1340469.33FalseNoneNoneFalseNoneFalse27929098.71290
3409392120451Noneklisrising4Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specification, including setting out, construction of shoring, strutting, cost of blasting materials, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata. Hard rock (requiring blasting) Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Item No.1.21.2 in Vol-1, Pg.no.10 for 2023-24)Cum931.73931.7310117.33FalseNoneNoneFalseNoneFalse9426619.88090
3409393120451Noneklisrising5Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Refer Annexure-10A for Data Rate of E-300/Fe 440 Grade) E-300 / Fe 440 For 1610 Inner Dia, 10mm thick Pipe from Chainage 0+000 to 9+460mRmtr66210.9966210.999650.0FalseNoneNoneFalseNoneFalse638936053.50
3409394120451Noneklisrising6Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Refer Annexure-13B for Data Rate of E-300/Fe 440 Grade) E-250 / Fe 410 For 1300 Inner Dia, 8mm thick Pipe from Chainage 9+460 to 17+110 mRmtr41487.7141487.717803.0FalseNoneNoneFalseNoneFalse323728601.130
3409395120451Noneklisrising7Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 E-250 / Fe 410 For 1000 Inner Dia, 6mm thick Pipe from Chainage 9+460 to 0+020mRmtr23935.2223935.2221.0FalseNoneNoneFalseNoneFalse502639.620
3409396120451Noneklisrising8Providing and applying pipe coating of fibres, coal tar and solvent based rubber modified bituminous primer of density 0.92 gms/cu cm and viscosity of 1000-2000 cps @ 150 gms/sqm followed by seven layers(4mm thick) of polythene polymerised bitumen and polyester of local 7 layers) pipe coat 4 mm should conform to requirement of IS-10221 and AWWA C-203 for prefabricated tapes including covering cost on pipe coating. Rates shall include cost of material coating and wrapping over the pipes,handling charges, preparation of pipe surface, all labour, material,etc.complete.(SR Item No.19 of page No.189 of Maharastra SR SECTION-I(XVI) for 2023-24)Sqm936.92936.9274725.43FalseNoneNoneFalseNoneFalse70011749.87560
3409397120451Noneklisrising9Providing and filling murrum / gravely soil ( CNS soil ) for foundation or around pipes including cost of all materials, labour, spreading soil in layers of 100 to 150 mm, breaking clods, watering, compaction by earth masters to achieve density control of not less than 90 percent etc., complete with all lead and lifts.(Common SR Item No.4.15 in Vol-4 , Pg.no.61 for 2023-24)Cum1015.981015.983588.73FalseNoneNoneFalseNoneFalse3646077.90540
3409398120451Noneklisrising10Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Item No.1.10 in Vol-1, Pg.no.7 for 2023-24)Cum198.24198.2470689.93FalseNoneNoneFalseNoneFalse14013571.72320
3409399120451Noneklisrising11Providing and fixing 200 x 200 x 750 mm roughly dressed boundary / demarcation / chainage / arrow stones including cost of all materials, labour, engraving marks, excavating pit, fixing in position, murum filling with all other ancillary operations complete.(Common SR Item No.8.7 in Vol-4 , Pg-120 for 2023-24)Each334.53334.531717.0FalseNoneNoneFalseNoneFalse574388.010
3409400120451Noneklisrising12Kilometre Stone: Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (Common SR Item No.8.16 in Vol-3, Pg-67 for 2023-24)Each3626.563626.5618.0FalseNoneNoneFalseNoneFalse65278.080
3409401120451Noneklisrising13Supplying, fixing and commissioning C.I Tamper proof Air valve of approved make bodyand seat ring of bronze PN 1.6 conforming to IS:14845 of specified diameter with all fixturesincluding cost of all materials, machinery, labour and all other anicillary operations complete .(Common SR Item No.8.36 in Vol-4, Pg.no.107 for 2023-24) PN 1.6 - 150mm diaNo74302.8374302.834.0FalseNoneNoneFalseNoneFalse297211.320
3409402120451Noneklisrising14Supplying, fixing and commissioning C.I Tamper proof Air valve of approved make bodyand seat ring of bronze PN 1.0 conforming to IS:14845 of specified diameter with all fixturesincluding cost of all materials, machinery, labour and all other anicillary operations complete .(Common SR Item No.8.37 in Vol-4, Pg.no.108 for 2023-24) PN 1.0 - 150mm diaNo73237.2973237.2966.0FalseNoneNoneFalseNoneFalse4833661.140
3409403120451Noneklisrising15Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete (Common SR Item No.2.24 in Vol-5 (CHAP-2), Pg.no.22 for 2023-24) PN 16- 200mm diaNo40931.6140931.612.0FalseNoneNoneFalseNoneFalse81863.220
3409404120451Noneklisrising16Supplying, fixing and commissioning C.I Scour valve (sluice valve) of approved make bodyand seat ring of bronze PN 1.0 conforming to IS:14846 of specified diameter and to withstand specified pressure with all accessoreis true to line and perfect linkingwith pipes on either side including loading, unloading, lifting and placing in position, cleaning ends, inserting gaskets into correct position, jointing pipes and valve to form water tight joint, cost of all jointing materials, machinery,labour and all other ancillary operations complete.(Common SR Item No.2.23 in Vol-4 Part-I, Pg.no107 for 2023-24) PN 10 - 200mm diaNo40849.8340849.8335.0FalseNoneNoneFalseNoneFalse1429744.050
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-A Air Valve Chamber7090854.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409405120452Noneklisairvalve1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m (Common SR Vol-1, Item No.1.14, 1.14.1,Page 8 of CSoR 2023-2024)Cum131.51131.51537.6FalseNoneNoneFalseNoneFalse70699.7760
3409406120452Noneklisairvalve2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth (Common SR Vol-1, Item No.1.15, 1.15.1,Page 8 of CSoR 2023-2024)Cum467.96467.96268.8FalseNoneNoneFalseNoneFalse125787.6480
3409407120452Noneklisairvalve3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Vol-1, Item No.1.15, 1.15.2,Page 8 of CSoR 2023-2024)Cum558.58558.58161.35FalseNoneNoneFalseNoneFalse90126.8830
3409408120452Noneklisairvalve4Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.16, 1.16.3,Page 9 of CSoR 2023-2024)Cum894.06894.06107.45FalseNoneNoneFalseNoneFalse96066.7470
3409409120452Noneklisairvalve5Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.1, 2.1.6,Page 15 of CSoR 2023-2024)Cum7735.087735.0840.25FalseNoneNoneFalseNoneFalse311336.970
3409410120452Noneklisairvalve6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.4, 2.4.3 ,Page 16 of CSoR 2023-2024)Cum7850.317850.31378.0FalseNoneNoneFalseNoneFalse2967417.180
3409411120452Noneklisairvalve7Formwork for Staging (Sub structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m HeightCum785.04785.04378.0FalseNoneNoneFalseNoneFalse296745.120
3409412120452Noneklisairvalve8Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No.2.11,Page 18 of CSoR 2023-2024)t97894.6397894.6330.09FalseNoneNoneFalseNoneFalse2945649.41670
3409413120452Noneklisairvalve9Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment,including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete.(Common SR Vol-5 (CHAP- 16), Item No.16.23,Page 196 of CSoR 2023-2024)Set3176.83176.835.0FalseNoneNoneFalseNoneFalse111188.00
3409414120452Noneklisairvalve10Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.24382.55FalseNoneNoneFalseNoneFalse75836.7120
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-B Scour Valve Chamber3410241.38
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409415120453Noneklissvc1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m (Common SR Vol-1, Item No.1.14, 1.14.1,Page 8 of CSoR 2023-2024)Cum131.51131.51235.08FalseNoneNoneFalseNoneFalse30915.37080
3409416120453Noneklissvc2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Vol-1, Item No.1.15, 1.15.2,Page 8 of CSoR 2023-2024)Cum558.58558.58179.64FalseNoneNoneFalseNoneFalse100343.31120
3409417120453Noneklissvc3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 3 m but not exceeding 4.5 m (Common SR Vol-1, Item No.1.15, 1.15.3,Page 8 of CSoR 2023-2024)Cum620.17620.178.28FalseNoneNoneFalseNoneFalse5135.00760
3409418120453Noneklissvc4Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.16, 1.16.3,Page 9 of CSoR 2023-2024)Cum894.06894.0646.98FalseNoneNoneFalseNoneFalse42002.93880
3409419120453Noneklissvc5Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.1, 2.1.6,Page 15 of CSoR 2023-2024)Cum7735.087735.0813.86FalseNoneNoneFalseNoneFalse107208.20880
3409420120453Noneklissvc6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.4, 2.4.3, Page 16 of CSoR 2023-2024)Cum7850.317850.31183.96FalseNoneNoneFalseNoneFalse1444143.02760
3409421120453Noneklissvc7Formwork for Staging (for Sub structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m HeightCum785.04785.04183.96FalseNoneNoneFalseNoneFalse144415.95840
3409422120453Noneklissvc8Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No.2.11,Page 18 of CSoR 2023-2024)t97894.6397894.6314.76FalseNoneNoneFalseNoneFalse1444924.73880
3409423120453Noneklissvc9Providing and fixing SFRC frame and cover conforming to IS 12592 (part-I)-1988 and IS 12592 (part-II)- 1991 with latest amendment,including cutting slabs to the required size for the opening and fixing the cover in C.C. 1:2:4 and C.M. 1:3 plastering 20 mm thick to all exposed faces, curing for 10 days with all lead and lift with appurtenances. complete.(Common SR Vol-5 (CHAP- 16), Item No.16.23,Page 196 of CSoR 2023-2024)Set3176.83176.818.0FalseNoneNoneFalseNoneFalse57182.40
3409424120453Noneklissvc10Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.24171.36FalseNoneNoneFalseNoneFalse33970.40640
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-C Thrust Block 0 to 15 degree Bends1757350.99
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409425120454Noneklistb1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.581.0FalseNoneNoneFalseNoneFalse10651.50
3409426120454Noneklistb2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5864.8FalseNoneNoneFalseNoneFalse36195.9840
3409427120454Noneklistb3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.0216.2FalseNoneNoneFalseNoneFalse12652.5240
3409428120454Noneklistb4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.089.72FalseNoneNoneFalseNoneFalse75184.97760
3409429120454Noneklistb5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.3111.24FalseNoneNoneFalseNoneFalse873267.3720
3409430120454Noneklistb6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Earth retaining StructuresCum785.03785.03111.24FalseNoneNoneFalseNoneFalse87326.73720
3409431120454Noneklistb7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.636.68FalseNoneNoneFalseNoneFalse653936.12840
3409432120454Noneklistb8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2441.04FalseNoneNoneFalseNoneFalse8135.76960
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-C Thrust Block 15 to 30 degree Bends1556642.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409433120455Noneklistb1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.584.0FalseNoneNoneFalseNoneFalse11046.00
3409434120455Noneklistb2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5849.56FalseNoneNoneFalseNoneFalse27683.22480
3409435120455Noneklistb3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.026.09FalseNoneNoneFalseNoneFalse4756.41180
3409436120455Noneklistb4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.086.0FalseNoneNoneFalseNoneFalse46410.480
3409437120455Noneklistb5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.3100.74FalseNoneNoneFalseNoneFalse790839.2220
3409438120455Noneklistb6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Earth retaining StructuresCum785.03785.03100.74FalseNoneNoneFalseNoneFalse79083.92220
3409439120455Noneklistb7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.636.03FalseNoneNoneFalseNoneFalse590304.61890
3409440120455Noneklistb8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2432.88FalseNoneNoneFalseNoneFalse6518.13120
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-C Thrust Block 30 to 45 Degree Bends1749388.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409441120456Noneklistb1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.585.68FalseNoneNoneFalseNoneFalse11266.920
3409442120456Noneklistb2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5853.14FalseNoneNoneFalseNoneFalse29682.94120
3409443120456Noneklistb3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.024.06FalseNoneNoneFalseNoneFalse3170.94120
3409444120456Noneklistb4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.085.86FalseNoneNoneFalseNoneFalse45327.56880
3409445120456Noneklistb5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.3114.16FalseNoneNoneFalseNoneFalse896190.2480
3409446120456Noneklistb6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Earth retaining StructuresCum785.03785.03114.16FalseNoneNoneFalseNoneFalse89619.02480
3409447120456Noneklistb7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.636.84FalseNoneNoneFalseNoneFalse669599.26920
3409448120456Noneklistb8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2422.86FalseNoneNoneFalseNoneFalse4531.76640
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-C Thrust Block 45 to 60 Degree Bends1292636.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409449120457Noneklistb1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.571.01FalseNoneNoneFalseNoneFalse9337.8150
3409450120457Noneklistb2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5838.2FalseNoneNoneFalseNoneFalse21337.7560
3409451120457Noneklistb3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.022.03FalseNoneNoneFalseNoneFalse1585.47060
3409452120457Noneklistb4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.084.21FalseNoneNoneFalseNoneFalse32564.68680
3409453120457Noneklistb5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.384.3FalseNoneNoneFalseNoneFalse661780.290
3409454120457Noneklistb6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Earth retaining StructuresCum785.03785.0384.3FalseNoneNoneFalseNoneFalse66178.0290
3409455120457Noneklistb7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.635.06FalseNoneNoneFalseNoneFalse495346.82780
3409456120457Noneklistb8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2422.73FalseNoneNoneFalseNoneFalse4505.99520
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-E Highway Road Crossing1077033.55
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409457120458Noneklishrc1Dismantling of Flexible Pavements Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately As per MoRT&H Specification 202.(Common SR Vol-3, Item No.2.18,Page 11 of CSoR 2023-2024) II By Mechanical MeansCum398.96398.9646.62FalseNoneNoneFalseNoneFalse18599.51520
3409458120458Noneklishrc2Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (Common SR Vol-1, Item No.1.17, 1.17.1, Page 10 of CSoR 2023-2024)Cum324.62324.6286.625FalseNoneNoneFalseNoneFalse28120.20750
3409459120458Noneklishrc3Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soil Depth exceeding 1.5 m, but not exceeding 3 m(Common SR Vol-1, Item No.1.17, 1.17.1, Page 10 of CSoR 2023-2024)Cum410.11410.1117.33FalseNoneNoneFalseNoneFalse7107.20630
3409460120458Noneklishrc4Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Vol-1, Item No.1.19, 1.19.2,Page 10 of CSoR 2023-2024)Cum690.12690.1283.16FalseNoneNoneFalseNoneFalse57390.37920
3409461120458Noneklishrc5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.21, 1.21.3, Page 10 of CSoR 2023-2024)Cum1028.371028.3720.79FalseNoneNoneFalseNoneFalse21379.81230
3409462120458Noneklishrc6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.1, 2.1.6, Page 15 of CSoR 2023-2024)Cum7735.087735.0813.43FalseNoneNoneFalseNoneFalse103882.12440
3409463120458Noneklishrc7Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.4, 2.4.3, Page 16 of CSoR 2023-2024)Cum7850.37850.346.81FalseNoneNoneFalseNoneFalse367472.5430
3409464120458Noneklishrc8Formwork for Staging (for sub structure) 0.0 m to 5.0 m Height (Common SR Vol-1, Item No. 2.6.1, Page 16 of CSoR 2023-2024)Cum785.03785.0346.81FalseNoneNoneFalseNoneFalse36747.25430
3409465120458Noneklishrc9Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No. 2.11, Page 18 of CSoR 2023-2024) Encasement 50 kg/cumKg97894.6397894.632.34FalseNoneNoneFalseNoneFalse229073.43420
3409466120458Noneklishrc10Providing casing embankment using semi-pervious / pervious approved soil from borrow areas in layers of 250 to 300 mm ( before compaction ) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, levelling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller and all other ancillary operations complete. (Common SR Vol-4 (Part-I), Item No. 3.3, Page 47 of CSoR 2023-2024)Cum779.33779.3369.3FalseNoneNoneFalseNoneFalse54007.5690
3409467120458Noneklishrc11Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Common SR Vol-3, Item No. 4.17, Page 26 of CSoR 2023-2024)Cum3170.63170.614.4375FalseNoneNoneFalseNoneFalse45775.53750
3409468120458Noneklishrc12Providing and laying Dense Graded Bituminous Macadam with 100 TPH capacity HMP batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site,laying with mechanical paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.(Common SR Vol-3, Item No. 5.13 B, Page 35 of CSoR 2023-2024)Cum11993.5211993.521.73FalseNoneNoneFalseNoneFalse20748.78960
3409469120458Noneklishrc13Providing and laying Bituminous Concrete with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects(Common SR Vol-3, Item No. 5.16 B, Page 37 of CSoR 2023-2024)Cum13461.7313461.730.99FalseNoneNoneFalseNoneFalse13327.11270
3409470120458Noneklishrc14Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (v)For Grading -V Material(Common SR Vol-3, Item No. 4.2 Page 23 of CSoR 2023-2024)Cum2922.82922.811.55FalseNoneNoneFalseNoneFalse33758.340
3409471120458Noneklishrc15Construction of Subgrade and Earthen Shoulders: Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (Common SR Vol-3, Item No. 3.6 Page 17 of CSoR 2023-2024) As Per MoRT&H Specification 305.Cum610.83610.8311.55FalseNoneNoneFalseNoneFalse7055.08650
3409472120458Noneklishrc16Clearing and Grubbing Road Land:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical Means using Dozer A. In area of light jungle (Common SR Vol-3, Item No. 2.5 Page 9 of CSoR 2023-2024) As Per MoRT&H Specification 201.Sqm486.93486.931.3125FalseNoneNoneFalseNoneFalse639.0956250
3409473120458Noneklishrc17Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.( x ) 80 mm x 60 mm rectangular (Common SR Vol-3, Item No. 8.6 Page 65 of CSoR 2023-2024) As Per MoRT&H Specification 801.No6820.696820.692.0FalseNoneNoneFalseNoneFalse13641.380
3409474120458Noneklishrc18Kilometre Stone:Reinforced cement concrete M15 grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc (ii) Ordinary kilometer stone (precast) (Common SR Vol-3, Item No. 8.16 Page 67 of CSoR 2023-2024) As Per MoRT&H Specification 805.No3626.553626.555.0FalseNoneNoneFalseNoneFalse18132.750
3409475120458Noneklishrc19Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control (i)Over 10 cm in width (Common SR Vol-3, Item No. 8.14 Page 66 of CSoR 2023-2024) As Per MoRT&H Specification 803.Sqm177.18177.180.99FalseNoneNoneFalseNoneFalse175.40820
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-F Asphalt Road Crossing2466269.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409476120459Noneklisarc1Dismantling of Flexible pavements and disposal of dismantled materials and stacking serviceable and unserviceable materials separately(Common SR Vol-3, Item No.2.18,Page 11 of CSoR 2023-2024)Cum398.96398.9638.34FalseNoneNoneFalseNoneFalse15296.12640
3409477120459Noneklisarc2Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (Common SR Item No.1.14.1 in Vol-1, Pg.no.8 for 2023-24)Cum324.62324.62276.02FalseNoneNoneFalseNoneFalse89601.61240
3409478120459Noneklisarc3Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In ordinary/soft rock without blasting Depth exceeding 1.5 m but not exceeding 3 m(Common SR Vol-1, Item No.1.19, 1.19.2,Page 10 of CSoR 2023-2024)Cum690.12690.12184.01FalseNoneNoneFalseNoneFalse126988.98120
3409479120459Noneklisarc4Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata In ordinary/soft rock without blasting Depth exceeding 3 m but not exceeding 4.5 m (Common SR Vol-1, Item No.1.19, 1.19.3,Page 10 of CSoR 2023-2024)Cum784.29784.2936.8FalseNoneNoneFalseNoneFalse28861.8720
3409480120459Noneklisarc5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m In Hard Rock ( requiring blasting) (Common SR Vol-1, Item No.1.21, 1.21.3, Page 10 of CSoR 2023-2024)Cum1028.371028.37153.34FalseNoneNoneFalseNoneFalse157690.25580
3409481120459Noneklisarc6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.1, 2.1.6, Page 15 of CSoR 2023-2024) PCC for pipe EncasementCum7735.087735.0819.59FalseNoneNoneFalseNoneFalse151530.21720
3409482120459Noneklisarc7Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.4, 2.4.3, Page 16 of CSoR 2023-2024)Cum7850.37850.3128.53FalseNoneNoneFalseNoneFalse1008999.0590
3409483120459Noneklisarc8Formwork for Staging (For sub structure) 0.0 m to 5.0 m Height (Common SR Vol-1, Item No. 2.6.1, Page 16 of CSoR 2023-2024)Cum785.03785.03128.53FalseNoneNoneFalseNoneFalse100899.90590
3409484120459Noneklisarc9Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No. 2.11, Page 18 of CSoR 2023-2024)t97894.6397894.635.14FalseNoneNoneFalseNoneFalse503178.39820
3409485120459Noneklisarc10Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications(Common SR Vol-1, Item No. 1.10, Page 7 of CSoR 2023-2024)Cum198.24198.24291.39FalseNoneNoneFalseNoneFalse57765.15360
3409486120459Noneklisarc11Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. (Common SR Vol-3, Item No. 4.14, Page 26 of CSoR 2023-2024)Cum2594.472594.478.21FalseNoneNoneFalseNoneFalse21300.59870
3409487120459Noneklisarc12Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (Common SR Item No. 4.2 in Vol-3, Pg.no.23 for 2023-24)Cum2922.82922.816.43FalseNoneNoneFalseNoneFalse48021.6040
3409488120459Noneklisarc13Providing and laying Bituminous Concrete with 100 TPH capacity hot mix plant batch type using crushed aggregates of specified grading, premixed with bituminous binder VG-30, @5.4 per cent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required grade,level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Common SR Vol-3, Item No. 5.16 B, Page 37 of CSoR 2023-2024)Cum13461.7313461.735.48FalseNoneNoneFalseNoneFalse73770.28040
3409489120459Noneklisarc14Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (Common SR Vol-3, Item No. 8.6 Page 65 of CSoR 2023-2024)Each6820.696820.6912.0FalseNoneNoneFalseNoneFalse81848.280
3409490120459Noneklisarc15Painting lines, dashes, arrows etc on roads in two coats on old work with ready mixed road marking paint conforming to IS: 164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control (Common SR Vol-3, Item No. 8.14 Page 66 of CSoR 2023-2024)Sqm177.18177.182.92FalseNoneNoneFalseNoneFalse517.36560
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-G Cart Track Crossing3047293.47
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409491120460Noneklisctc1Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata.All kinds of soils. Depth upto 1.50 m (Common SR Vol-1, Item No.1.17, 1.17.1, Page 10 of CSoR 2023-2024)Cum324.62324.62545.3FalseNoneNoneFalseNoneFalse177015.2860
3409492120460Noneklisctc2Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds Depth exceeding 1.5 m, but not exceeding 3 m(Common SR Vol-1, Item No.1.17, 1.17.2, Page 10 of CSoR 2023-2024)Cum410.1410.123.98FalseNoneNoneFalseNoneFalse9834.1980
3409493120460Noneklisctc3Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Vol-1, Item No.1.19, 1.19.2,Page 10 of CSoR 2023-2024)Cum690.12690.12436.24FalseNoneNoneFalseNoneFalse301057.94880
3409494120460Noneklisctc4Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata.In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.21, 1.21.2, Page 10 of CSoR 2023-2024)Cum931.73931.7359.0835FalseNoneNoneFalseNoneFalse55049.8694550
3409495120460Noneklisctc5Earth work excavation for pipeline trenches by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work and all other appurtenances to complete in the following strata In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.21, 1.21.3, Page 10 of CSoR 2023-2024)Cum1028.371028.3749.98FalseNoneNoneFalseNoneFalse51397.93260
3409496120460Noneklisctc6Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.1, 2.1.6, Page 15 of CSoR 2023-2024) PCC for pipe EncasementCum7735.087735.0818.99FalseNoneNoneFalseNoneFalse146889.16920
3409497120460Noneklisctc7Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR Vol-1, Item No. 2.4, 2.4.3, Page 16 of CSoR 2023-2024) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7850.37850.3173.96FalseNoneNoneFalseNoneFalse1365638.1880
3409498120460Noneklisctc8Formwork for Staging (For Sub structure) 0.0 m to 5.0 m Height (Common SR Vol-1, Item No. 2.6.1, Page 16 of CSoR 2023-2024)Cum785.03785.03173.96FalseNoneNoneFalseNoneFalse136563.81880
3409499120460Noneklisctc9Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No. 2.11, Page 18 of CSoR 2023-2024)t97894.6397894.636.96FalseNoneNoneFalseNoneFalse681346.62480
3409500120460Noneklisctc10Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.24617.94FalseNoneNoneFalseNoneFalse122500.42560
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-H Canal Crossing791916.49
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409501120461Nonekliscc1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m (Common SR Item No.1.14.1 in Vol-1, Pg-8 for 2023-24)Cum131.5131.5187.13FalseNoneNoneFalseNoneFalse24607.5950
3409502120461Nonekliscc2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting upto 1.5 m depth(Common SR Item No.1.15.1 in Vol-1, Pg-8 for 2023-24)Cum467.96467.9680.19FalseNoneNoneFalseNoneFalse37525.71240
3409503120461Nonekliscc3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Item No.2.1.4 in Vol-1, Pg-15 for 2023-24) PCC for pipe EncasementCum7702.867702.865.6FalseNoneNoneFalseNoneFalse43136.0160
3409504120461Nonekliscc4Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.(Common SR Item No.2.4.3 in Vol-1, Pg-16 for 2023-24) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7850.37850.352.19FalseNoneNoneFalseNoneFalse409707.1570
3409505120461Nonekliscc5Form work for staging (Sub structure) 0-5m heightCum785.03785.0352.19FalseNoneNoneFalseNoneFalse40970.71570
3409506120461Nonekliscc6Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Item No.2.11 in Vol-1, Pg-18 for 2023-24)t97894.6397894.632.09FalseNoneNoneFalseNoneFalse204599.77670
3409507120461Nonekliscc7Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Item No.1.10 in Vol-1, Pg-7 for 2023-24)Cum198.24198.24158.24FalseNoneNoneFalseNoneFalse31369.49760
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-I Railway Track Crossing5634799.75
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409508120462Noneklisrtc1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. (Common SR Item No.1.14.1 in Vol-1, Pg-8 for 2023-24)Cum131.5131.5105.84FalseNoneNoneFalseNoneFalse13917.960
3409509120462Noneklisrtc2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR Item No.1.15.1 in Vol-1, Pg-8 for 2023-24)Cum467.09467.0930.24FalseNoneNoneFalseNoneFalse14124.80160
3409510120462Noneklisrtc3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work (Common SR Item No1.16.1 in Vol-1, Pg.no. 9 for 2023-2024)Cum562.51562.5115.12FalseNoneNoneFalseNoneFalse8505.15120
3409511120462Noneklisrtc4Installation of product pipe by manual jacking method - Manufacturing, providing, transporting, rolling, lowering, laying & jointing, testing, commissioning of ERW (Electric Resistance Welded), SAW (Submerged Arc Welded) MS pipe (Fe-410 grade) conforming to IS 3589-2001 with latest ammendments including perfect linking welding of joints to correct position including cost and conveyance of pipes and materials with all lead ,lift, cost of labour, loading and unloading of pipes for the following diameters with specified thickness of plate as noted below including bailing out of water wherever necessary for laying of carrier pipe of suitable dia including inside and outside of casing pipe painted with two coats of Anti corrossive tankmastic paint. Installation of steel pipe by Ramming / Jacking method to cross Railway track / NH /BDA /BBMP/Other roads/Existing utilities / NALA crossings, filling the gap between casing pipe and carrier pipe with quarry grit using compressor with all necessary equipments, plants etc, complete. Suitable spacers of HDP/MS or other similar material should be provided in between carrier & casing pipe to prevent carrier pipe forming metallic contact with casing pipe. Note : a. The cost of jacking is inclusive of cost M.S. casing pipe of specified thickness b. The cost of carrying pipe is separate and provision shall be made as per site requirement c. The cost of Jacking includes all leads lifts, cost of consumables, fuel charges, labour. d. The cost of jacking and receving pits shall be proposed seperatelly as per site requirement. (Common SR Item no.17.3.2 in Vol-5 (CHAP-19), Pg-216 for 2023-24)m139332.98139332.9840.0FalseNoneNoneFalseNoneFalse5573319.20
3409512120462Noneklisrtc5Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Item No.1.10 in Vol-1, Pg.no.7 for 2023-24)Cum198.24198.24125.77FalseNoneNoneFalseNoneFalse24932.64480
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-J one way surge tank68137952.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409513120463NoneKlisowst1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.(Common SR Vol-1, Item No.1.14, 1.14.1,Page 8 of CSoR 2023-2024) In all kinds of soils Depth upto 3 mCum131.5131.51294.74FalseNoneNoneFalseNoneFalse170258.310
3409514120463NoneKlisowst2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5 m, but not exceeding 3 m (Common SR Vol-1, Item No.1.15, 1.15.2,Page 8 of CSoR 2023-2024)Cum558.57558.57924.81FalseNoneNoneFalseNoneFalse516571.12170
3409515120463NoneKlisowst3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth excceding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.15, 1.15.3,Page 8 of CSoR 2023-2024)Cum620.16620.16110.98FalseNoneNoneFalseNoneFalse68825.35680
3409516120463NoneKlisowst4Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.16, 1.16.3,Page 9 of CSoR 2023-2024) In Hard Rock (requiring blasting) Depth exceeding 1.50m, but not exceeding 3 m (SR Item No. 1.16.1, Page 9 of Common SR for Earthwork & Concrete Works Vol-1 for 2021- 22 (Common SOR )Cum894.05894.05258.95FalseNoneNoneFalseNoneFalse231514.24750
3409517120463NoneKlisowst5Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No. 2.1, 2.1.6,Page 15 of CSoR 2023-2024)Cum7735.087735.0863.51FalseNoneNoneFalseNoneFalse491254.93080
3409518120463NoneKlisowst6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.4, 2.4.4 ,Page 16 of CSoR 2023-2024)Cum8353.348353.34785.99FalseNoneNoneFalseNoneFalse6565641.70660
3409519120463NoneKlisowst7Form work for Staging (For Sub Structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Height Concrete Quantity for RCC ColumnsCum5847.345847.3438.88FalseNoneNoneFalseNoneFalse227344.57920
3409520120463NoneKlisowst8Form work for Staging (For Sub Structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Height Concrete Quantity for All other TypesCum235.5235.5705.78FalseNoneNoneFalseNoneFalse166211.190
3409521120463NoneKlisowst9Form work for Staging (For Sub Structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Height Concrete Quantity for RCC BeamsCum5012.05012.040.01FalseNoneNoneFalseNoneFalse200530.120
3409522120463NoneKlisowst10Form work for Staging (For Sub Structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Height Concrete Quantity for RCC SlabCum4176.674176.671.36FalseNoneNoneFalseNoneFalse5680.27120
3409523120463NoneKlisowst11Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 0.00m to 3.60m LiftCum8681.678681.6757.61FalseNoneNoneFalseNoneFalse500151.00870
3409524120463NoneKlisowst12Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 3.6m to 6.6m LiftCum8768.498768.4985.35FalseNoneNoneFalseNoneFalse748390.62150
3409525120463NoneKlisowst13Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 6.6m to 9.6m LiftCum8856.178856.1785.36FalseNoneNoneFalseNoneFalse755962.67120
3409526120463NoneKlisowst14Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 9.6m to 12.6m LiftCum8944.748944.7485.35FalseNoneNoneFalseNoneFalse763433.5590
3409527120463NoneKlisowst15Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 12.6m to 15.6m LiftCum9034.189034.1848.01FalseNoneNoneFalseNoneFalse433730.98180
3409528120463NoneKlisowst16Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 15.6m to18.6m LiftCum9124.539124.5385.35FalseNoneNoneFalseNoneFalse778778.63550
3409529120463NoneKlisowst17Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 18.6m to 21.6m LiftCum9215.779215.77302.32FalseNoneNoneFalseNoneFalse2786111.58640
3409530120463NoneKlisowst18Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR Vol-1, Item No.2.5.3,Page 16 of CSoR 2023-2024) For 21.6m to 24.6m LiftCum9307.939307.93229.28FalseNoneNoneFalseNoneFalse2134122.19040
3409531120463NoneKlisowst19Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Height Concrete Quantity for RCC ColumnsCum6077.186077.1880.0FalseNoneNoneFalseNoneFalse486174.40
3409532120463NoneKlisowst20Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Heigh Concrete Quantity for RCC BeamsCum5209.05209.040.01FalseNoneNoneFalseNoneFalse208412.090
3409533120463NoneKlisowst21Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 0.0 m to 5.0 m Heigh Concrete Quantity for RCC SlabCum4341.084341.081.35FalseNoneNoneFalseNoneFalse5860.4580
3409534120463NoneKlisowst22Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 5.0 m to 10.0 m Heigh Concrete Quantity for RCC ColumnsCum6806.436806.4380.0FalseNoneNoneFalseNoneFalse544514.40
3409535120463NoneKlisowst23Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 5.0 m to 10.0 m Heigh Concrete Quantity for RCC BeamsCum5834.085834.0836.01FalseNoneNoneFalseNoneFalse210085.22080
3409536120463NoneKlisowst24Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 5.0 m to 10.0 m Heigh Concrete Quantity for RCC SlabCum4861.744861.741.36FalseNoneNoneFalseNoneFalse6611.96640
3409537120463NoneKlisowst25Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 10.0 m to 15.0 m Height Concrete Quantity for RCC ColumnsCum6927.986927.9880.01FalseNoneNoneFalseNoneFalse554307.67980
3409538120463NoneKlisowst26Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 10.0 m to 15.0 m Height Concrete Quantity for RCC BeamsCum5938.275938.2736.0FalseNoneNoneFalseNoneFalse213777.720
3409539120463NoneKlisowst27Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 10.0 m to 15.0 m Height Concrete Quantity for RCC SlabCum4948.554948.551.36FalseNoneNoneFalseNoneFalse6730.0280
3409540120463NoneKlisowst28Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 15.0 m to 20.0 m Height Concrete Quantity for RCC ColumnsCum7049.527049.5280.01FalseNoneNoneFalseNoneFalse564032.09520
3409541120463NoneKlisowst29Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 15.0 m to 20.0 m Height Concrete Quantity for RCC BeamsCum6042.456042.4584.0FalseNoneNoneFalseNoneFalse507565.80
3409542120463NoneKlisowst30Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 15.0 m to 20.0 m Height Concrete Quantity for RCC SlabCum5035.375035.37156.46FalseNoneNoneFalseNoneFalse787833.99020
3409543120463NoneKlisowst31Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 20.0 m to 25.0 m Height Concrete Quantity for RCC ColumnsCum7171.067171.0664.01FalseNoneNoneFalseNoneFalse459019.55060
3409544120463NoneKlisowst32Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 20.0 m to 25.0 m Height Concrete Quantity for RCC BeamsCum6146.626146.6260.0FalseNoneNoneFalseNoneFalse368797.20
3409545120463NoneKlisowst33Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 20.0 m to 25.0 m Height Concrete Quantity for Earth Retainig StructuresCum1024.441024.44128.01FalseNoneNoneFalseNoneFalse131138.56440
3409546120463NoneKlisowst34Form work for Staging (For Super structure) (Common SR Vol-1, Item No.2.6.1,Page 16 of CSoR 2023-2024) 20.0 m to 25.0 m Height Concrete Quantity for RCC SlabCum5122.195122.1954.09FalseNoneNoneFalseNoneFalse277059.25710
3409547120463NoneKlisowst35Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (Common SR Vol-2, Item No.8.28,Page 45 of CSoR 2023-2024)Sqm110.27110.271529.46FalseNoneNoneFalseNoneFalse168653.55420
3409548120463NoneKlisowst36Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 litre/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 litre/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. (SR Item No.8.32,page 46 of PWD (C&B)- Buildings Vol-2 for 2021-22-Common SOR)Sqm193.28193.281438.59FalseNoneNoneFalseNoneFalse278050.67520
3409549120463NoneKlisowst37Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR Vol-1, Item No.2.11,Page 18 of CSoR 2023-2024)t97894.6397894.63317.63FalseNoneNoneFalseNoneFalse31094271.32690
3409550120463NoneKlisowst38Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (Common SR Vol-1, Item No.1.9,Page 7 of CSoR 2023-2024)Cum329.57329.572263.39FalseNoneNoneFalseNoneFalse745945.44230
3409551120463NoneKlisowst39Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Common SR Item No.8.6.2 in Vol-2, Pg.no.42 for 2023-24)Sqm531.53531.531529.61FalseNoneNoneFalseNoneFalse813033.60330
3409552120463NoneKlisowst40Providing 12 mm cement plaster with Cement mortar 1:3 (1 cement: 3coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour,curing complete as per specifications and as per directions of Engineerin-charge. (Common SR Vol-1, Item No.8.6.1,Page 42 of CSoR 2023-2024)Sqm400.19400.191438.83FalseNoneNoneFalseNoneFalse575805.37770
3409553120463NoneKlisowst41Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying priming coat of approved steel primer. M.S. tube including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineerin-Charge. (SR Item No.11.26.1, Page 82 of PWD (C&B) - Buildings Vol-2 for 2022-24-Common SOR)Kg170.98170.98768.01FalseNoneNoneFalseNoneFalse131314.34980
3409554120463NoneKlisowst42Providing and fixing MS ladder between landings, 45 cms wide using angle iron of specified sizes, 20mm MS bars at 25 cms. centre to centre,with necessary supports of same angle iron etc. as directed, including hand railing on both sides with 25mm dia. GI pipes with angle iron props at 2 mtrs. intervals and 0.5M heigh, including fixing in ground with CC 1:2:4 and two coats of anticorrosive bituminous paint etc. with all lead and lifts etc. complete with: (Common SR Item No.7.1 in Vol-5 (Chapter-7), Pg-85 for 2023-24)m5423.15423.1100.01FalseNoneNoneFalseNoneFalse542364.2310
3409555120463NoneKlisowst43Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Common SR Vol-4, Item No.7.24,Page 96 of CSoR 2023-2024) 600 mm dia 5 mm Thick MS Connecting pipem11967.6111967.61104.0FalseNoneNoneFalseNoneFalse1244631.440
3409556120463NoneKlisowst44Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Common SR Vol-4, Item No.7.24,Page 96 of CSoR 2023-2024) 600 mm dia 5 mm Thick MS Inlet Pipem11967.6111967.61100.0FalseNoneNoneFalseNoneFalse1196761.00
3409557120463NoneKlisowst45Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Common SR Vol-4, Item No.7.24,Page 96 of CSoR 2023-2024) 300 mm dia 5 mm Thick MS overflow pipem5983.85983.8100.01FalseNoneNoneFalseNoneFalse598439.8380
3409558120463NoneKlisowst46Manufacturing, supplying, laying in position, aligning, jointing, testing and commissioning of electric resistance welded / submerged arc welded mild steel ( Fe-410 grade ) raising main pipe of specified diameter and plate thickness provided with flanges / outlets wherever required for connecting to manifold system /for fixing valves and provided with 2 coat of 60 micron thick Zinc epoxy primer paint and 3 coats of 100 micron thick each coal tar epoxy for inner surface and 25mm thick outer lining of CM 1:3 propotion by volume ( aggregate for outer lining shall be mixture of 80 percent natural sand and 20 percent 6 mm down crushed stone chips ) over 13 gauge 50 x 50 mm opening size weld mesh including cost of all materials, machinery, labour, cutting, bending, welding, cement mortar lining, finishing, curing, conveying to spot, lowering, aligning, jointing, arranging water for testing, hydraulic testing at manufacturing site and after laying and jointing at specified test pressure & all necessary works complete as per specifications and approved drawings. Basic Cost of MS Plate is considered as Rs.71,700.00 per MT. Diameter of raising main pipe : ……….mm Thickness of plate :………..mm. Note: Rate per m of pipe = Rate per tonne x weight of pipe per m weight of pipe per m for specified diameter in mm and thickness of plate in mm = 0.597x diameter of pipe in mm x plate thickness in mm / 24000 (Common SR Vol-4, Item No.7.24,Page 96 of CSoR 2023-2024) 300 mm dia 5 mm Thick MS scour pipem5983.85983.8116.01FalseNoneNoneFalseNoneFalse694180.6380
3409559120463NoneKlisowst47Providing and fixing DI Resilient seated soft sealing SLUICE VALVE of variouis dia. with body bonnet of Ductile Iron (DI) conforming ti IS-1865 with the latest amendments and of grade GGG 40/50, shaft of stainless steel, wedge fully rubber lined with EDPM seals of NBR and the valves should be vacum tight and 100% leak proof with face to face dimensions as per IS 14846-2000 with the latest amendments only. The stem sealing should be with toroidal sealing rings (minimum 2 " O " rings). Body and bonnet should be coated with Electrostatically applied Epoxy Powder Coating with minimum coating thickness of 250 micron both inside and outside. The rate is inclusive of cost of valves, T.P set, galvanized bolts & nuts and rubber insertions etc. but excluding earth work. For PN-10: (Note: TP set should be considered only for DI pipes estimate. For MS pipes estimates, TP sets cost of corresponding dia shall be deducted from the SR rates of valves and provision for corresponding dia MS flanges should be made in the estimate.) etc. complete (Common SR Vol-5, Item No.2.24.7,Page 23 of CSoR 2023-2024)Each87280.1287280.128.0FalseNoneNoneFalseNoneFalse698240.960
3409560120463NoneKlisowst48Providing and fixing of DI Double flanged wafer type (Concentric) / double eccentrically disc, Resilent seated Butterfly valves confoming to BS EN 593 / IS 13095 with shaft shall be of stainless steel AISI 410/431/420 and of nickel weld overlay micro finished/Bolted External Seat of SS 304 Renewable soft seal on the disc and body seat face of nickel weld overlay micro finished/Bolted External Seat of SS 304 / CF8 with Powder or liquid epoxy coating with minimum thickness of 250 microns applied on both body and disc inside and outside. Face to face dimensions as per EN 558-1 Basic series 14 (DIN 3203 F4) or AWWA C 504 : 80 or IS 13095. The valves shall be supplied along with the required number of standard make galvanized Bolts and nuits. The flange drilling standard is IS 1538. hence, drilling of hole in the valves shall match with the pipe flange drilling standard, the valves are to be suitabale for buried operaion with the gear box sealed and lubricated for life time opration. ( All the drilled holes in the body shall be of though holes, no tapped holes will be allowed) PN 16.0 600mm Dia (Common SR Vol-5, Item No.2.40,Page 31 of CSoR 2023-2024)Each291276.51291276.514.0FalseNoneNoneFalseNoneFalse1165106.040
3409561120463NoneKlisowst49DIDF DPCV API 594 DRILLED TO IS 1538, BODY AND DOORS IN DI IS 1865 GR 500/7 , SPRING STEEL SPRINGS , SS 410 STOP PIN [Non Return Valve] Market Rate 600 mm dia-Non Return ValveEach754610.0754610.04.0FalseNoneNoneFalseNoneFalse3018440.00
3409562120463NoneKlisowst50Float Valve Market Rate 300 mm dia -Float ValveEach574070.0574070.04.0FalseNoneNoneFalseNoneFalse2296280.00
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-10 Delivery Chamber1912849.93
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409563120464NoneKlisdc1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.Common SR Item No.1.14.1, Page No. 8, Vol 1 for 2023-24 In all kinds of soils Depth upto 3 mCum131.5131.5117.41FalseNoneNoneFalseNoneFalse15439.4150
3409564120464NoneKlisdc2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.Common SR Item No.1.15.1, Page No. 8, Vol 1 for 2023-24 In ordinary/soft rock without blasting upto 1.5 m depth For Delivery chamberCum467.09467.0941.13FalseNoneNoneFalseNoneFalse19211.41170
3409565120464NoneKlisdc3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Common SR Item No.2.1.5, Page No.15, Vol 1 for 2023-24 Mix 1:2:4 (M15) Using 40 mm nominal size graded crushed coarse aggregatesCum7627.287627.2815.08FalseNoneNoneFalseNoneFalse115019.38240
3409566120464NoneKlisdc4Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (Common SR Item No.2.2.3.1,Vol-1,, Page No.15 for 2023-24) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8052.268052.2614.6FalseNoneNoneFalseNoneFalse117562.9960
3409567120464NoneKlisdc5Form work for staging (for foundation works) (Common SR Item No.2.6.1,Vol-1,, Page No.16 for 2023-24)Cum241.57241.5714.6FalseNoneNoneFalseNoneFalse3526.9220
3409568120464NoneKlisdc6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Common SR Item No. 2.4.4in Vol-1, Page No.16 for 2023-24 M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For wallsCum8353.348353.3414.64FalseNoneNoneFalseNoneFalse122292.89760
3409569120464NoneKlisdc7Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Common SOR Item No.2.4.3 in Vol-1, Page No.16 for 2023-24 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For pipe encasementCum7850.37850.352.13FalseNoneNoneFalseNoneFalse409236.1390
3409570120464NoneKlisdc8Formwork For Staging (For Sub structure) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum835.33835.3314.64FalseNoneNoneFalseNoneFalse12229.23120
3409571120464NoneKlisdc9Formwork For Staging (For Sub structure) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum785.03785.0352.13FalseNoneNoneFalseNoneFalse40923.61390
3409572120464NoneKlisdc10Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.Common SR Item No. 2.5.3 in Vol-1, Page No.17 for 2023-24 M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Earth retaining structures For wallsCum8681.678681.672.38FalseNoneNoneFalseNoneFalse20662.37460
3409573120464NoneKlisdc11Formwork For Staging (For Super structure) Common SR Item No. 2.6.1 in Vol-1, Page No.17 for 2023-24Cum868.17868.172.38FalseNoneNoneFalseNoneFalse2066.24460
3409574120464NoneKlisdc12Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification Common SR Item No.2.11 in Vol-1, Page No.18 for 2023-24t97894.6397894.636.91FalseNoneNoneFalseNoneFalse676451.89330
3409575120464NoneKlisdc13Providing and constructing contraction joints by fixing 230 mm wide central bulb type PVC water stop in single line supported by 10 mm dia. steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, vulcanizing water seal joints and all other ancillary operations complete. Common SR Item No.2.26, Page No. 41, Vol- 4 for 2023-24Cum712.43712.438.0FalseNoneNoneFalseNoneFalse5699.440
3409576120464NoneKlisdc14Providing rubble and sand filling in layers of 250 to 300 mm including cost of all materials,machinery, labour, watering, ramming and all other ancillary operations complete. Common SR Item No. 3.10, Page No. 48, Vol- 4 for 2023-24Cum2601.892601.89119.95FalseNoneNoneFalseNoneFalse312096.70550
3409577120464NoneKlisdc15Providing and constructing protective railing consisting of cast in-situ railing posts of size 150 x 150 mm at bottom, 100 x 100 mm at top and 750 mm height, placed approximately at 2 m centre to centre in M-20 (28 days cube compressive strength not less than 20 N / sq mm) grade cement concrete using 20 mm down approved clean, hard, graded aggregates with each post reinforced by 4 numbers 8 mm dia.main bars embedded in kerb concrete for 400 mm depth and 5 numbers 6 mm dia. stirrups and fixing 3 rows of 40 mm dia. GI pipes with two coats of synthetic enamel painting over a coat of red oxide primer paint including cost of all materials, machinery, labour, formwork, supports, fabricating and placing reinforcement bars, batching, mixing, placing in position, compacting, finishing, curing etc., complete with all lead and lifts.Commom SR Item No. 4.12 in Vol- 4, Page no.61 for 2023-24Cum2098.872098.8712.0FalseNoneNoneFalseNoneFalse25186.440
3409578120464NoneKlisdc16Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Commom SOR Item No. 8.28 in Vol-2 page no.45 for 2023-24Sqm110.27110.27138.25FalseNoneNoneFalseNoneFalse15244.82750
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-12 Canal Cross Regulator14254745.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409579120465Nonekliscr1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24) In all kinds of soils Depth upto 3 mCum131.5131.5495.97FalseNoneNoneFalseNoneFalse65220.0550
3409580120465Nonekliscr2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work (Common SR item No 1.15.1 in Vol-1,Pg.no.8 for 2023-24) In ordinary/soft rock without blasting upto 1.5 m depthCum467.09467.0998.88FalseNoneNoneFalseNoneFalse46185.85920
3409581120465Nonekliscr3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (Common SR item No 2.1.4 in Vol-1,Pg.no.15 for 2023-24) Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregatesCum7735.087735.0888.14FalseNoneNoneFalseNoneFalse681769.95120
3409582120465Nonekliscr4Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (Common SR item No 2.2 in Vol-1,Pg.no.15 for 2023-24) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8052.268052.26417.3FalseNoneNoneFalseNoneFalse3360208.0980
3409583120465Nonekliscr5Formwork For Staging (Foundation works) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum241.57241.57417.3FalseNoneNoneFalseNoneFalse100807.1610
3409584120465Nonekliscr6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (Common SR item No 2.4.2 in Vol-1,Pg.no.16 for 2023-24) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7850.37850.3593.3578FalseNoneNoneFalseNoneFalse4658036.737340
3409585120465Nonekliscr7Formwork For Staging Sub structure M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum785.03785.03593.3578FalseNoneNoneFalseNoneFalse465803.6737340
3409586120465Nonekliscr8Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (Common SR item No 2.5 in Vol-1,Pg.no.16 for 2023-24)Cum8478.488478.4839.672FalseNoneNoneFalseNoneFalse336358.258560
3409587120465Nonekliscr9Formwork For Staging Super structure M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum847.85847.8539.672FalseNoneNoneFalseNoneFalse33635.90520
3409588120465Nonekliscr10Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item No 2.11 in Vol-1,Pg.no.18 for 2023-24) Steel for All other type of structurest97894.6397894.6331.65FalseNoneNoneFalseNoneFalse3098365.03950
3409589120465Nonekliscr11Providing and fixing 20 mm thick 100 mm depth tarfelt expansion joint filler board for cement concrete lining of canal including cost of all materials, labour etc., complete with all leads and lifts. (Common SR item No 3.37 in Vol-4,Pg.no.53 for 2023-24)m106.55106.5515.0FalseNoneNoneFalseNoneFalse1598.250
3409590120465Nonekliscr12Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals with all accessories for river sluice /canal sluice vent including cost of all materials,machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. Note: 1. Wt of 1 gate in tonnes ( including ballast) = 0.0888 ( L2 x H x h )0.659 Where ( L ) is length = Clear vent opening in m + 0.70 m. ( H ) is height of gate in m = Clear vent height in m + 0.30 m ( h ) is head of water above sill of gate in m = FRL - Sill level 2. Quantity of structural steel = 47.5 % of computed weight of 1 gate.(Common SR item No 6.6 Vol-4 in Page 74 for 2023-24)Regulatort173831.69173831.691.52FalseNoneNoneFalseNoneFalse264224.16880
3409591120465Nonekliscr13Design, fabrication, supply, erection, testing and commissioning of fixed wheel type vertical lift service gate consisting of skin plate, vertical and horizontal girders, wheels, stiffeners, lifting brackets, guide rollers, ballast blocks, teflon claded rubber seals with all accessories for river sluice /canal sluice vent including cost of all materials,machinery, labour, cutting, aligning, welding, finishing, cleaning, applying one coat of zinc rich epoxy primer and three coats cold applied coal tar epoxy paint, seal fixing and all other ancillary operations complete as per specifications and approved drawings. Note: 1. Wt of 1 gate in tonnes ( including ballast) = 0.0888 ( L2 x H x h )0.659 Where ( L ) is length = Clear vent opening in m + 0.70 m. ( H ) is height of gate in m = Clear vent height in m + 0.30 m ( h ) is head of water above sill of gate in m = FRL - Sill level 2. Quantity of structural steel = 47.5 % of computed weight of 1 gate.(Common SR item No 6.6 Vol-4 in Page 74 for 2023-24) Escape channelt173831.69173831.690.7FalseNoneNoneFalseNoneFalse121682.1830
3409592120465Nonekliscr14Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner ( upto one vent height plus 1 m above the roof of vent) with all accessories for river / canal sluice service gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint and all other ancillary operations complete as per specifications and approved drawings.with groove liner upto breast wall level Note: 1. Wt of 1 set embedded parts in tonnes = 0.0444 x ( L2 x H x h ) 0.659 Weight of breast wall lining : 250 kg / m2 of breast wall Weight of groove liner : 200 kg / m2 of groove lining Where ( L ) is length = Clear vent opening in m + 0.70 m. ( H ) is height of gate in m = Clear vent height in m + 0.30 m ( h ) is head of water above sill of gate in m = FRL - Sill level 2. Quantity of structural steel = 90.5 % of computed weight 1 set.(Common SR item No 6.10 Vol-4 in Page 76 for 2023-24) Regulatort215338.19215338.190.76FalseNoneNoneFalseNoneFalse163657.02440
3409593120465Nonekliscr15Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, wheel tracks, seal seats, guide rails, breast wall liner ( upto one vent height plus 1 m above the roof of vent) with all accessories for river / canal sluice service gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint and all other ancillary operations complete as per specifications and approved drawings.with groove liner upto breast wall level Note: 1. Wt of 1 set embedded parts in tonnes = 0.0444 x ( L2 x H x h ) 0.659 Weight of breast wall lining : 250 kg / m2 of breast wall Weight of groove liner : 200 kg / m2 of groove lining Where ( L ) is length = Clear vent opening in m + 0.70 m. ( H ) is height of gate in m = Clear vent height in m + 0.30 m ( h ) is head of water above sill of gate in m = FRL - Sill level 2. Quantity of structural steel = 90.5 % of computed weight 1 set.(Common SR item No 6.10 Vol-4 in Page 76 for 2023-24) Esacpe channelt215338.19215338.190.35FalseNoneNoneFalseNoneFalse75368.36650
3409594120465Nonekliscr16Design, fabrication, supply, erection, testing and commissioning of adequate capacity screw type hoist consisting of supporting structure, platfom, railing, ladder with all accessories for operating canal escape/ regulator gate including cost of all materials, machinery, labour,cutting, aligning, anchoring, welding, finishing, cleaning, greasing,applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint and all other ancillary operations complete as per specifications and approved drawings. Note: 1. Capacity of hoist in t with 25 % reserve capacity =2.50 x Wt of gate. ( Hoist capacity shall be rounded off to next 1 tonne ) Weight of hoist with all accessories: 300 kg per tonne capacity of hoist 2. Quantity of structural steel = 61.2 % of computed weight for 1 hoist. (Common SR item No 6.29 in Vol-4,Pg.no.83 for 2023-24)t59100.2959100.2912.76FalseNoneNoneFalseNoneFalse754119.70040
3409595120465Nonekliscr17Providing and constructing protective railing consisting of cast in-situ railing posts of size 150 x 150 mm at bottom, 100 x 100 mm at top and 750 mm height, placed approximately at 2 m centre to centre in M-20 grade cement concrete using 20 mm down approved clean, hard, graded aggregates with each post reinforced by 4 numbers 8 mm dia.main bars embedded in kerb concrete for 400 mm depth and 5 numbers 6 mm dia. stirrups and fixing 3 rows of 40 mm dia. GI pipes with two coats of synthetic enamel painting over a coat of red oxide primer paint including cost of all materials, machinery, labour, formwork, supports,fabricating and placing reinforcement bars, batching, mixing, placingin position, compacting, finishing, curing and all other ancillary operations complete. (Common SR item No 4.12 in Vol-4,Pg.no.61 for 2023-24)m2098.872098.8713.2FalseNoneNoneFalseNoneFalse27705.0840
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-11 Energy Dissipation Chamber1484846.45
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409596120466Noneklisedc1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. Common SR Item No.1.14.1, Page No. 8, Vol 1 for 2023-24 In all kinds of soils Depth upto 3 mCum131.5131.598.55FalseNoneNoneFalseNoneFalse12959.3250
3409597120466Noneklisedc2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. Common SR Item No.1.15.1, Page No. 8, Vol 1 for 2023-24 In ordinary/soft rock without blasting upto 1.5 m depth For Receiving chamberCum467.09467.0928.55FalseNoneNoneFalseNoneFalse13335.41950
3409598120466Noneklisedc3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Common SR Item No.2.1.5, Page No.15, Vol 1 for 2023-24 Mix 1:2:4 (M15) Using 40 mm nominal size graded crushed coarse aggregatesCum7627.287627.2813.27FalseNoneNoneFalseNoneFalse101214.00560
3409599120466Noneklisedc4Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (Common SR Item No.2.2.3.1,Vol-1,, Page No.15 for 2023-24) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum8052.268052.269.68FalseNoneNoneFalseNoneFalse77945.87680
3409600120466Noneklisedc5Form work for staging (for foundation works) (Common SR Item No.2.6.1,Vol-1,, Page No.16 for 2023-24)Cum241.57241.579.68FalseNoneNoneFalseNoneFalse2338.39760
3409601120466Noneklisedc6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Common SR Item No. 2.4.4in Vol-1, Page No.16 for 2023-24 M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For wallsCum8353.348353.3411.19FalseNoneNoneFalseNoneFalse93473.87460
3409602120466Noneklisedc7Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Common SOR Item No.2.4.3 in Vol-1, Page No.16 for 2023-24 M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For pipe encasementCum7850.37850.341.03FalseNoneNoneFalseNoneFalse322097.8090
3409603120466Noneklisedc8Formwork For Staging (For Sub structure) M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum835.33835.3311.19FalseNoneNoneFalseNoneFalse9347.34270
3409604120466Noneklisedc9Formwork For Staging (For Sub structure) M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum785.03785.0341.03FalseNoneNoneFalseNoneFalse32209.78090
3409605120466Noneklisedc10Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing andtechnical specification Common SR Item No.2.11 in Vol-1, Page No.18 for 2023-24t97894.6397894.635.22FalseNoneNoneFalseNoneFalse511009.96860
3409606120466Noneklisedc11Providing and constructing contraction joints by fixing 230 mm wide central bulb type PVC water stop in single line supported by 10 mm dia. steel dowel rods on either side at 1 metre interval including cost of all materials, machinery, labour, vulcanizing water seal joints and all other ancillary operations complete.Common SR Item No.2.26, Page No. 41, Vol- 4 for 2023-24Cum712.43712.436.0FalseNoneNoneFalseNoneFalse4274.580
3409607120466Noneklisedc12Providing rubble and sand filling in layers of 250 to 300 mm including cost of all materials,machinery, labour, watering, ramming and all other ancillary operations complete.Cum2601.92601.9105.4FalseNoneNoneFalseNoneFalse274240.260
3409608120466Noneklisedc13Providing and constructing protective railing consisting of cast in-situ railing posts of size 150 x 150 mm at bottom, 100 x 100 mm at top and 750 mm height, placed approximately at 2 m centre to centre in M-20 (28 days cube compressive strength not less than 20 N / sq mm) grade cement concrete using 20 mm down approved clean, hard, graded aggregates with each post reinforced by 4 numbers 8 mm dia.main bars embedded in kerb concrete for 400 mm depth and 5 numbers 6 mm dia. stirrups and fixing 3 rows of 40 mm dia. GI pipes with two coats of synthetic enamel painting over a coat of red oxide primer paint including cost of all materials, machinery, labour, formwork, supports, fabricating and placing reinforcement bars, batching, mixing, placing in position, compacting, finishing, curing etc., complete with all lead and lifts. Common SR Item No. 4.12 in Vol- 4, Page no.61 for 2023-24Cum2098.872098.879.0FalseNoneNoneFalseNoneFalse18889.830
3409609120466Noneklisedc14Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. Common SOR Item No. 8.28 in Vol-2 page no.45 for 2023-24Sqm110.27110.27104.38FalseNoneNoneFalseNoneFalse11509.98260
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-D Anchor block 0 to 5 Degree Bends919753.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409610120467Noneklisab1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.546.66FalseNoneNoneFalseNoneFalse6135.790
3409611120467Noneklisab2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5837.32FalseNoneNoneFalseNoneFalse20846.20560
3409612120467Noneklisab3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.029.33FalseNoneNoneFalseNoneFalse7286.91660
3409613120467Noneklisab4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.085.59FalseNoneNoneFalseNoneFalse43239.09720
3409614120467Noneklisab5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.356.81FalseNoneNoneFalseNoneFalse445975.5430
3409615120467Noneklisab6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m heightCum785.03785.0356.81FalseNoneNoneFalseNoneFalse44597.55430
3409616120467Noneklisab7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.633.41FalseNoneNoneFalseNoneFalse333820.68830
3409617120467Noneklisab8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2490.05FalseNoneNoneFalseNoneFalse17851.5120
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-D Anchor block 5 to 10 Degree Bends834446.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409618120468Noneklisab1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.536.03FalseNoneNoneFalseNoneFalse4737.9450
3409619120468Noneklisab2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5828.83FalseNoneNoneFalseNoneFalse16103.86140
3409620120468Noneklisab3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.0228.83FalseNoneNoneFalseNoneFalse22516.80660
3409621120468Noneklisab4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.082.88FalseNoneNoneFalseNoneFalse22277.03040
3409622120468Noneklisab5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.352.44FalseNoneNoneFalseNoneFalse411669.7320
3409623120468Noneklisab6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m heightCum785.03785.0352.44FalseNoneNoneFalseNoneFalse41166.97320
3409624120468Noneklisab7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.633.15FalseNoneNoneFalseNoneFalse308368.08450
3409625120468Noneklisab8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2438.37FalseNoneNoneFalseNoneFalse7606.46880
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-D Anchor block 10 to 15 Degree Bends730264.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409626120469Noneklisab1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.542.02FalseNoneNoneFalseNoneFalse5525.630
3409627120469Noneklisab2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting depth 1.5 m but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.58558.5824.5FalseNoneNoneFalseNoneFalse13685.210
3409628120469Noneklisab3Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 1.5 m but not excceding 3 m (Common SR Vol-1, Item No.1.16, 1.16.2,Page 9 of CSoR 2023-2024)Cum781.02781.026.12FalseNoneNoneFalseNoneFalse4779.84240
3409629120469Noneklisab4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.087735.083.68FalseNoneNoneFalseNoneFalse28465.09440
3409630120469Noneklisab5Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.346.46FalseNoneNoneFalseNoneFalse364724.9380
3409631120469Noneklisab6Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m heightCum785.03785.0346.46FalseNoneNoneFalseNoneFalse36472.49380
3409632120469Noneklisab7Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)t97894.6397894.632.78FalseNoneNoneFalseNoneFalse272147.07140
3409633120469Noneklisab8Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.2422.52FalseNoneNoneFalseNoneFalse4464.36480
17196475800000NoneNoneLift Irrigation SchemeSection 2- Part A- Detailed Engineering19497337.01
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409634120470None1..Add 1% for Survey, Investigation and Detailed Engineering of Lift Scheme consisting Electro-mechanical, Electrical works, Intake channel, Jack well cum Pump House, Rising Main including structures, Delivery chambers and other miscellaneous worksJob19497337.0119497337.011.0FalseNoneNoneFalseNoneFalse19497337.010
17196475800000NoneNoneLift Irrigation SchemeSection 3- Part B- Operation and Maintenance18698484.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409635120471NoneOM1Operation and maintenance of Lift SchemeJob3739696.863739696.865.0FalseNoneNoneFalseNoneFalse18698484.30
17196475800000NoneNoneLift Irrigation SchemeKADARKOPPA LIFT IRRIGATION SCHEME Annexure-K Anti buoyancy Block7500929.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3409636120472NoneKlisab1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (Common SR item No 1.14.1 in Vol-1,Pg.no.8 for 2023-24)Cum131.5131.5586.53FalseNoneNoneFalseNoneFalse77128.6950
3409637120472NoneKlisab2Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 1.5m, but not exceeding 3m (Common SR item No 1.15.2 in Vol-1,Pg.no.8 for 2023-24)Cum558.57558.57418.95FalseNoneNoneFalseNoneFalse234012.90150
3409638120472NoneKlisab3Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out,shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In ordinary/soft rock without blasting Depth exceeding 3m, but not exceeding 4.5m (Common SR item No 1.15.3 in Vol-1,Pg.no.8 for 2023-24)Cum620.16620.1650.35FalseNoneNoneFalseNoneFalse31225.0560
3409639120472NoneKlisab4Earth work excavation for Foundation by Mechanical means depth upto 1.50m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including cost of explosives, dressing of excavated surfaces, disposing off or levelling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, blasting materials, tools, usage of Machinery & all other appurtenaces required to complete the work In Hard Rock ( requiring blasting) Depth exceeding 3 m but not excceding 4.5 m (Common SR Vol-1, Item No.1.16, 1.16.3,Page 9 of CSoR 2023-2024)Cum894.05894.05117.23FalseNoneNoneFalseNoneFalse104809.48150
3409640120472NoneKlisab5Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.1.6 of Vol-1, Pg.no.15 for 2023-24)Cum7735.077735.0735.72FalseNoneNoneFalseNoneFalse276296.70040
3409641120472NoneKlisab6Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirement of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (Common SR item no. 2.4.3 of Common SR Vol-1, Pg.no.16 for 2023-24)Cum7850.37850.3458.09FalseNoneNoneFalseNoneFalse3596143.9270
3409642120472NoneKlisab7Form work for Staging (For Sub Structure) (Common SR 2023-24 - Item no 2.6.1, Pg 16 of Vol-1) 0-5m height Concrete Quantity for Earth retaining StructuresCum785.03785.03458.09FalseNoneNoneFalseNoneFalse359614.39270
3409643120472NoneKlisab8Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing andtechnical specification (Common SR item no. 2.11 of Vol-1, Pg.no.18 for 2023-24)Kg97894.397894.327.55FalseNoneNoneFalseNoneFalse2696987.9650
3409644120472NoneKlisab9Refilling available earth around trenches/pipelines,cables in layers not exceeding 20 cm in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5m. Including cost of all labour complete as per specifications (Common SR Vol-1, Item No.1.10,Page 7 of CSoR 2023-2024)Cum198.24198.24629.09FalseNoneNoneFalseNoneFalse124710.80160
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17196494180001NoneNoneELIGIBILITYTenders from Joint ventures are acceptable.None
17196494180000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17196494180001NoneNoneELIGIBILITYAny other condition as per tender notification or tender notification.None
17196494180000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17196494180000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17200883790000NoneNoneELIGIBILITYTenders must be accompanied by earnest money deposit which will be paid online through e-Procurement portal Tenderers must submit Electronic Tender Documents One and Two electronically on-line through internet within the date and time published in KPPP portal.None
17200884260000NoneNoneELIGIBILITYThe Executive Engineer, KNNL, MBC Division No-1 Gaddankeri Camp, Bagalkote invites Turnkey tenders on behalf of Managing Director, KNNL, Bengaluru, from eligible tenderers, for the construction of works detailed in the Table below. The tenderers may submit tenders for any or all of the works given in the Table. Two Electronic Tender procedure as per Rule 28 of the KTPP Act shall be followed. The Tenderers are required to submit two separate sealed covers, one containing the Earnest money deposit and the details of their capability to undertake the tender as detailed in ITT Clause 3 and 6, which will be opened first and the second cover containing the price tender which will be opened only if the Tenderer is found to be qualified to execute the tendered works. The Tenderers are advised to note the minimum qualification criteria specified in Clause 3 of the Instructions to Tenderers to qualify for award of the contract.None
17200885210000NoneNoneELIGIBILITYTh eamount put to tender consist of the following. a. Total Amount Put to Tender including GST of 18 percentage - Rs. 198.80 Crores. The bidder should quote for this amount -Rs. 198.80 Crores. No separate GST shall be paid to the ContractorNone
17200885710000NoneNoneELIGIBILITYQuoted amount is exclusive of all deposits and Land Acquisition cost. The amount will be paid by the Nigam.None
17200886480000NoneNoneELIGIBILITYThe bid should be submitted in two covers A. FIRST ELECTRONIC DOCUMENT (TECHNICAL BID) SHALL CONTAIN THE QUALIFYING DOCUMENTS MENTIONED IN TENDER NOTIFICATION AND BID DOCUMENT B. Second Electronic Document shall contain financial Bid.None
17200886940000NoneNoneELIGIBILITYThe First Electronic Document (Technical bid) will be opened first and thereafter Second Electronic Document (financial bid) will be opened only of those bidders who qualify in the technical bid. In case the lowest bidder fails to produce the original documents for entering into an agreement or the original documents submitted does not match with the uploaded documents or found false, then his bid is treated as non-responsive bid as per clause -26(4) of the KTPP rules & his name would be recommended for cancellation of registration in Karnataka PWD and barred from participation in any of the tenders invited by the KNNL apart from forfeiting the EMD paid through E-cash.None
17200887590000NoneNoneELIGIBILITYThe Prebid meeting will be held as mentioned in portal in the office of the Chief Engineer, KNNL, Irrigation (N) Zone, Club Road, Belagavi.The queries if any are to be sent not later than on by the intending bidders through email to the Executive Engineer the email id for sending queries is eeknnlbgk(at)gmail.comNone
17200887820000NoneNoneELIGIBILITYLast Date & Time for tender queries, submission of completed e tendering documents, opening of technical bid and financial bid is as mentioned in the portal.None
17200888090000NoneNoneELIGIBILITYThe necessary certificates/documents in support of pre-qualification criteria fulfilled as stipulated shall be scanned and attached to e-tender document. The scanned signature of the bidder /authorized representatives of the bidder shall be attached while uploading the bid document.None
17200888290000NoneNoneELIGIBILITYThe Qualification Criterias are mentioned in the Detailed Tender Notification and the Bid DocumentNone
17200888500000NoneNoneELIGIBILITYThe bid shall be technically evaluated based on the specifications indicated in Section 3 in bid document.None
17200888830000NoneNoneELIGIBILITYThe Bidder or any of his partner shall not be under Corporate Debt Restructuring (CDR) / Strategic Debt Restructuring (SDR) or Bureau of Industrial and Financial Reconstruction (BIFR) in the last 5 Years prior to bid submission date. In this regard, the Bidder shall submit along with Bid, a certificate from their Statutory Auditor with a declaration that, the Bidder is not under CDR / SDR or BIFR.None
17200889050000NoneNoneELIGIBILITYDuring technical evaluation, if the employer finds that any certificates / information furnished is false, such bidders will be disqualified and barred from participation in the bid.None
17200889480000NoneNoneELIGIBILITYBids not satisfying minimum duty point parameters, efficiency parameters of pumps and motors and velocity parameters as specified in bid document shall be rejectedNone
17200889660000NoneNoneELIGIBILITYDuring technical evaluation, if the employer finds that any certificates / information furnished is false, such bidders will be disqualified and barred from participation in the bid.None
17200889840000NoneNoneELIGIBILITYIf any bidder fails to satisfy the conditions mentioned above, such bids will be rejected and their financial bids will not be opened.None
17200890020000NoneNoneELIGIBILITYFor laying M.S. pipe line the contractor shall engage only those agencies who have done similar job.None
17200890190000NoneNoneELIGIBILITYThe bidder should enclose the detailed methodology of execution of the scheme as per the scope of work.None
17200890340000NoneNoneELIGIBILITYThe Bidder shall be responsible for successful performance of the contractNone
17200890640000NoneNoneELIGIBILITYFor construction of Transmission line/Substation Works, the contractor shall engage only those agencies who are licensed to do the power line construction works in Karnataka. They should have constructed at least one similar single power line equal to 80 percent of the length (4 km) of power line for the work tendered in a single contract. The details of the transmission line construction contractor with registration certificate and certificates of experience signed by an officer of not below the rank of Executive Engineer of KPTCL shall be submitted for KNNLs verification post award of the work.None
17200890920000NoneNoneELIGIBILITYThe Bidder to participate in the tender under single bid basis only. Any violation will attract disqualification of the bid.None
17200891100000NoneNoneELIGIBILITYThe pump manufacturer shall not enter into a Tie-up with more than one bidder.None
17200891220000NoneNoneELIGIBILITYThe stamp duty amount for Joint Venture/ Tie-up etc. should be according to prevailing rules.None
17200891350000NoneNoneELIGIBILITYThe contractor/authorized signatory should attach his/her scanned signature to the Schedule-B before uploading and also submitting their tenders.None
17200891470000NoneNoneELIGIBILITYIf any of the dates mentioned above happen to be a general holiday, the next working day holds good.None
17200891700000NoneNoneELIGIBILITYThe work of the construction of transmission line should be got done through a Government Licensed, Super grade Electrical contractor CEIG approved, who have the experience of carrying out such works.None
17200891880000NoneNoneELIGIBILITYThe diameters of the rising main and thickness of the rising main shall not be less than the figures indicated in the enclosed schematic diagram. Further any discrepancies in the above shall not account to financial implications to the employer.None
17200896890000NoneNoneELIGIBILITYFurther information can be had from the undersigned during office hours on Telephone No 08354 297046None
17200897600000NoneNoneELIGIBILITYConditional tenders are liable to be rejected. The officer competent to accept the tender shall have the right to reject any or all the tenders without assigning any reason whatsoever.None
17200897810000NoneNoneELIGIBILITYCorrigendum will be published in the web site/ newspapers/e-portal of all modifications /corrections if any.None
17200897960000NoneNoneELIGIBILITYThe intending bidders should note that, if any of lands either in part/ parts or in whole required for the work is not acquired by the Nigam, it shall be the responsibility of the bidder to take the possession of such land and start the work by obtaining consent of the land owners before commencement of work at no extra cost to the Nigam and no claim / delays whatsoever relating to on account of non-availability of land would be entertained.None
17200898150000NoneNoneELIGIBILITYAll the designs of the various components shall be as per the relevant IS Codes and specifications and are subject to approval of the Chief Engineer.The designs so submitted should comply with the locations of project components as detailed in Broad scope of Works in the Present tender.None
17200899760000NoneNoneELIGIBILITYIf the percentage quoted by the contractor for the work is below ninety percent of the updated recast estimated amount put to tender, then the contractor shall furnish an additional performance security in the form of Bank Guarantee for an amount equivalent to the difference between the cost as per quoted percentage and 90 percentage of the updated cost put to tender. In case of contractor quoting above 125 percentage of updated cost put to tender, then the over and above 125 percentage of the updated cost put to tender will be withheld during the progress of work. The additional performance will be released proportionately to the bill amount till the contractor achieves progress of the entire cost of the work as per agreement. The additional performance security and withheld amount in the later case will be released only after 30 days from the date of entire work contracted is fully completed and so certified by the competent. (If BG submitted while issuing fresh BG or extending any existing BG, claim period of a minimum one year from the date of expiry of validity period of BG is to be specified invariably)None
17200902080000NoneNoneELIGIBILITYThey should abide by the directions of Government towards recovery of 1% (or as modified by the Government from time to time) Cess from the contractors bill under the provisions of building and other constructions worker welfare cess Act 1996.None
17200902380000NoneNoneELIGIBILITYThe intending bidders are advised to visit the site of work, make themselves familiar with local situation about the availability of construction materials, work men, land required for construction activities, etc., and shall upload along with bid with details of references for visit of different parts of the scheme in the form of photographs of site.None
17200902520000NoneNoneELIGIBILITYThe contractor is responsible for any damages due to natural calamity the government or Nigam will not give any compensation for until the completion of maintenance period.None
17200902650000NoneNoneELIGIBILITYIf any additions/alteration of location of lifting pointinvolved during execution, it is the responsibility of the agency to execute the work as per contemplated scope of the work, without causing any damages to existing infrastructure. If any damages occur during execution, the same shall be restored to the original condition at no extra cost.None
17200902800000NoneNoneELIGIBILITYThe intending bidder/firm/company are advised to visit the work site before submission of the tenders.None
17200902920000NoneNoneELIGIBILITYThe contractor should mention their recent correct portal address & mail address in declaration forms.None
17200903050000NoneNoneELIGIBILITYThe tender processing charges paid by the bidder/firm/company are not refundable even if the tender is cancelled.None
17200903170000NoneNoneELIGIBILITYAll materials like steel, cement, MS pipe etc., required for successful completion of the above work should be procured by the contractor only. No supply of any materials shall be made by KNNLNone
17200903290000NoneNoneELIGIBILITYThe bidder/firm/company shall send the authorization letter for their representation duly attesting their signature.None
17200903540000NoneNoneELIGIBILITYOperation Maintenance period/Defect liability period for this work is 60 months from the date of completion of work. The contractor shall take the responsibility of 5 years O&M including 2 years defect liability period from the date of issue of certificate by the competent authority for successful commissioning of the project.None
17200903820000NoneNoneELIGIBILITYUseful rubble and Stone chips obtained from excavation shall be issued to the contractor for use on works including enabling works and aggregate crushing at the rates specified for those materials in the prevailing Schedule of RatesNone
17200903940000NoneNoneELIGIBILITYThe bidder/firm/company shall adhere to accepted execution plan submitted by him under any circumstances without linking to the pending payment of the work & also land acquisition problems if any.None
17200904050000NoneNoneELIGIBILITYTypographical errors if any will not be the ground for any claims by the bidder/firm/company.None
17200904150000NoneNoneELIGIBILITYThe amount put to tender is Inclusive of GST. The contractor shall quote the rates including GST.None
17200904270000NoneNoneELIGIBILITYThe contractor shall also abide by the other conditions as laid down in Bid document.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneEach tenderer in his or her name should have achieved in the last five years 2019-20 to 2023-24 should have satisfactorily completed or completed at least 90 percent of contract value if work is ongoing as a prime contractor, at least one lift irrigation scheme of value not less than Rs.99.40 crores. i. e usually not less than 50 percent estimated value of contract. Work done certificate issued by an officer not below the rank of EE of the concerned division and countersigned by the SE of the concerned circle is to be uploaded for the technical bid. The cost of completed works of the previous year shall be given a weightage of 10 percent per year to bring it to the price level of financial year in which tenders are invited.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe intending Bidder i. e Individual or JV or Tie-up partner should have supplied and successfully commissioned at least 4 numbers of VT pumps with a capacity or flow rate not less than 1.00 cumecs for each pump with a head not less than 100 mtrs for each pump during the last 5 years i.e., from 2019-20 to 2023-24. The necessary work done certificate issued by an officer not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circle should be uploaded.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe intending bidder i.e Individual or JV should have supplied, erected, tested, completed and commissioned MS pipes not less than 1000 mm inner diameter for a length of at least 9.00 kms in any one year during last 5 years i.e., from 2019-20 to 2023-24. The work done certificate should be obtained from a competent authority not below the rank of EE of the concerned division and countersigned by the SE of the concerned circle.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneThe intending Bidder i.e Individual or JV should have executed in any one year, the following minimum quantities of work usually 80 percent of the peak annual rate of construction during the last 5 years i.e., from 2019-20 to 2023-24. The necessary work done certificate issued by an officer not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circle should be uploaded. A. Earthwork Excavation of 84750 cum, B. Reinforced Cement Concrete of 5560 cum, C. TMT STeel of 670 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneEach Tenderer should further demonstrate Availability of the required or specified key and critical equipment for this work with the relevant documents like commitment agreements etc. for availability for this work are furnished. The following key and critical equipment for the work. Tipper-4 , 2 own 2 lease, Excavators-2, 1 own 1 lease, Mobile Crane-2, 1 own 1 lease, Water tanker-2, 1 own 1 lease and Self loading Concrete mixers- 2, 1 own 1 lease.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machineries and Equipments
NoneNoneNoneNoneTenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity as AXNX1.5 - BCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bid Capacity
NoneNoneNoneNoneAnnual turnover should not be less than Rs. 265.10 crores in any of the 2 FY during 19-20 to 23-24. In case of JV all partners combined satisfy the annual turnover. Lead partner should have at least 51 percent of Turnover in any of the Two yrs during the last 5 yrs. Audited P and L account certified by a practicing CA with the copy of ITR filed for the years indicated above should be furnished mentioning UDIN on TO certif. from CA. TO cert. without UDIN will not be considered.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid asset and/or availability of credit facilities of not less than Rs. 49.70 crores unconditional credit lines/letters of credits/certificates from nationalized/scheduled banks for meeting the fund requirement etc. The contractor should upload necessary documents issued by the nationalized/scheduled banks as per prescribed format enclosed in section 3 .valid for six months. Further the agency has to furnish the above credit facilities for the entire work period as per tender.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneThe number of JVs shall not exceed 3. All the partners should have achieved in at least two financial years 25 percent of prescribed annual turnover as in Qualification criteria in the last 5 years i.e., 2019-20 to 2023-24. The lead partner should have at least 51% partnershipOthersJoint Venture
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Joint Venture
NoneNoneNoneNoneIn case of JV all the partner are jointly and severely responsible for successful performance of the contract The lead partner shall enter in to a joint venture agreement on stamp Paper in the prescribed format which shall be concluded prior to bidding and enclosed to the bid document and submit along with the request for bid document. The stamp duty amount for Joint Venture or Tie-up etc. should be according to prevailing rules.OthersJoint Venture
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Joint Venture
NoneNoneNoneNoneThe qualification criteria can be satisfied by Individually or Joint Venture by adding collectively the credentials of all JV partners. All the partners should have achieved at least 25 percent of prescribed annual turnover in the last five years i. e. 2019-20 to 2023-24. However the lead partner should have at least 51 percent partnership.OthersJoint Venture
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Joint Venture
NoneNoneNoneNoneThe intending bidder can submit bids as an Individual or Joint Venture bidder along with Tie up of pump manufacturer. The Tie up is to be formed prior to the bidding.Tenders from a Tie up proposed in this bid, the bidder shall upload an agreement with only one pump manufacturer on stamp paper in the prescribed format which shall be concluded prior to bidding and enclosed to the bid document. For proof of the Tie up, in the Technical bid, the prescribed format under section 11 Annexure II shall be followed. multiple tie up not allowed. The pump manufacturer shall not enter into a Tie up with more than one bidder. The stamp duty amount for Joint Venture or Tie-up etc. should be according to prevailing rules.OthersTie up
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Tie up
NoneNoneNoneNoneThe statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in-charge, not below the rank of an Executive Engineer or equivalent.Otherscommitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- commitments and ongoing works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
A copy of the PWD or CPWD Class I Registration CertificateTrueTechnical Bid
Copy of Valid Employees Provident Fund Registration Certificate with recently paid challan copyTrueTechnical Bid
Copy of Valid GST Registration Certificate and PAN cardTrueTechnical Bid
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded as in Section 3 Qualification Information.TrueTechnical Bid
The proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion as per milestones.TrueTechnical Bid
Contact address, scanned signature, contact number and email of the Tenderer.TrueTechnical Bid
The joint venture of the individual bidders shall be formed prior to the bidding and necessary agreement for having joint venture before bidding should be uploaded.TrueTechnical Bid
The individual bidders of joint venture should be Class I Contractor registered in Karnataka PWD/Central PWD separately. A copy of valid KPWD/CPWD Class I registration certificate of individual bidders of joint venture should be uploaded.TrueTechnical Bid
The number of JVs shall not exceed 3. All the partners should have achieved in at least two financial years 25 percent of prescribed annual turnover as in Qualification criteria in the last 5 years i.e., 2019-20 to 2023-24. The lead partner should have at least 51 percent partnershipTrueTechnical Bid
In case of JV all the partner are jointly and severely responsible for successful performance of the contract The lead partner shall enter in to a joint venture agreement on stamp Paper in the prescribed format which shall be concluded prior to bidding and enclosed to the bid document and submit along with the request for bid document. The stamp duty amount for Joint Venture or Tie-up etc. should be according to prevailing rules.TrueTechnical Bid
One of the partners of JV i. e. Lead Partner shall be duly authorized with a legally binding power of attorney to apply for tender forms and to sign the tender and to make further correspondences and deal with KNNL on behalf of JV.TrueTechnical Bid
The qualification criteria can be satisfied by Individually or Joint Venture by adding collectively the credentials of all JV partners. All the partners should have achieved at least 25 percent of prescribed annual turnover in the last five years i. e. 2019-20 to 2023-24. However the lead partner should have at least 51 percent partnership.TrueTechnical Bid
The intending bidder can submit bids as an Individual or Joint Venture bidder along with Tie up of pump manufacturer. The Tie up is to be formed prior to the bidding.Tenders from a Tie up proposed in this bid, the bidder shall upload an agreement with only one pump manufacturer on stamp paper in the prescribed format which shall be concluded prior to bidding and enclosed to the bid document in prescribed formatTrueTechnical Bid
multiple tie up not allowed. The pump manufacturer shall not enter into a Tie up with more than one bidder. The stamp duty amount for Joint Venture or Tie-up etc. should be according to prevailing rules.TrueTechnical Bid
Each tenderer in his or her name should have achieved in the last five years satisfactorily completed or completed at least 90 percent of contract value if work is ongoing as a prime contractor, at least one lift irrigation scheme of value not less than Rs.99.40 crores. i. e usually not less than 50 percent estimated value of contract. Work done certificate issued not below the rank of EE of the concerned division and countersigned by the SE of the concerned circleTrueTechnical Bid
Annual turnover should not be less than Rs. 265.10 crores in any of the 2 FY during 19-20 to 23-24. In case of JV all partners combined satisfy the annual turnover. Lead partner should have at least 51 percent of Turnover in any of the Two yrs during the last 5 yrs. Audited P and L account certified by a practicing CA with the copy of ITR filed for the years indicated above should be furnished mentioning UDIN on TO certif. from CA. TO cert. without UDIN will not be considered.TrueTechnical Bid
Liquid asset and/or availability of credit facilities of not less than Rs. 49.70 crores unconditional credit lines/letters of credits/certificates from nationalized/scheduled banks for meeting the fund requirement etc. The contractor should upload necessary documents issued by the nationalized/scheduled banks as per prescribed format enclosed in section 3 .valid for six months. Further the agency has to furnish the above credit facilities for the entire work period as per tender.TrueTechnical Bid
The intending Bidder i. e Individual or JV or Tie-up partner should have supplied and successfully commissioned at least 4 numbers of VT pumps with a capacity or flow rate not less than 1.00 cumecs for each pump with a head not less than 100 mtrs for each pump during the last 5 years i.e., from 2019-20 to 2023-24. The necessary work done certificate issued by not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circleTrueTechnical Bid
The intending bidder i.e Individual or JV should have supplied, erected, tested, completed and commissioned MS pipes not less than 1000 mm inner diameter for a length of at least 9.00 kms in any one year during last 5 years i.e., from 2019-20 to 2023-24. The work done certificate should be obtained from a competent authority not below the rank of EE of the concerned division and countersigned by the SE of the concerned circle.TrueTechnical Bid
Each Tenderer should further demonstrate Availability of the required or specified key and critical equipment for this work with the relevant documents like commitment agreements etc. for availability for this work are furnished. The following key and critical equipment for the work. Tipper-4 , 2 own 2 lease, Excavators-2, 1 own 1 lease, Mobile Crane-2, 1 own 1 lease, Water tanker-2, 1 own 1 lease and Self loading Concrete mixers- 2, 1 own 1 lease.TrueTechnical Bid
The intending Bidder i.e Individual or JV should have executed in any one year during the last 5 years, the following minimum quantities of work. The necessary work done certificate issued by an officer not below the rank of Executive Engineer and countersigned by the Superintending Engineer of the same circle should be uploaded. A. Earthwork Excavation of 84750 cum, B. Reinforced Cement Concrete of 5560 cum, C. TMT STeel of 670 TonneTrueTechnical Bid
Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under Assessed available tender capacity as AXNX1.5 - BTrueTechnical Bid
The statements showing the value of existing commitments and on-going works as well as the stipulated period of completion remaining for each of the works listed should be countersigned by the Employer in-charge, not below the rank of an Executive Engineer or equivalent.TrueTechnical Bid
The Bidder or any of his partner shall not be under Corporate Debt Restructuring CDR/ Strategic Debt Restructuring SDR or Bureau of Industrial and Financial Reconstruction BIFR in the last 5 Years prior to bid submission date. In this regard, the Bidder shall submit along with Bid, a certificate from their Statutory Auditor with a declaration that, the Bidder is not under CDR / SDR or BIFR.TrueTechnical Bid
Any other document as per tender notification or Bid documentTrueTechnical Bid
tenderWorkLocationList
tenderSubEstimateNamedistrictNametaluqNameloksabhaContNameassemblyContNamelocationDescriptionlatitudeDegreeslatitudeMinuteslatitudeSecondslongitudeDegreeslongitudeMinuteslongitudeSeconds
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti- Byadara Aralikatti, Bagalkote District1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalkote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalkote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalkote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalkote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalkote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
Lift Irrigation SchemeBagalkoteBagalkoteBagalkotBILGIUdagatti-B Aralikatti Bagalakote dist1614775437
tenderAddress
createdTs1720182145000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Chief Engineer, KNNL, Irrigation (N) Zone, Club Road, Belagavi
streetNone
cityBelagavi
stateKarnataka
pin590001
tenderRecallDTONone