None | None | None | None | Each tender in its name should have Executed and completed successfully in Urban Conditions, DPR for at least one Work for Comprehensive Development of Storm Water Drain and Road works for any govt body which the total Value of project is not less than Rs. 193.00 Lakhs. During last 3 financial year i.e., 2020-21 to 2023-24. In support of this, the Tenderer shall furnish a Certificate duly certified by the Competent Authority of Rank not below the Executive Engineer along with the Technical Bid. Further, the Value of the Completed Works shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-24. | None | Past Experience | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Work Done Certificate |
|
None | None | None | None | Satisfactorily completed as prime Consultant, at least One Single similar nature works i.e. in Proof checking of Detailed Engineering Design & Drawings and Project management & Quality assurance for Comprehensive Development of Storm Water Drain and Road work in Urban Conditions value not less than Rs. 193.00 Lakhs in single work. During last 3 financial year i.e., 2020-21 to 2023-24. In support of this, the Tenderer shall furnish a Certificate duly certified by the Competent Authority of Rank not below the Executive Engineer along with the Technical Bid | None | Past Experience | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Work Done Certificate |
|
None | None | None | None | Laboratory with NABL or NAAC Accreditation (Both Mechanical & Chemical). (The Consultant / Firm participating in the bid should have their own lab with NABL/NACC and ISO certified current date validity and shall have Mobile Lab facility) | None | Capabilities of Vendor | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- NABL CERTIFICATE |
|
None | None | None | None | Consultants must have Key professional required (as detailed in Terms of Reference) having experience in Roads & Drain works to be deployed exclusively for this consultancy contract. The consultant shall furnish the CVs of the personnel and the availability of the personnel for the project till completion of the assignment and proof of permanent employment in consultancy shall submit with bid | None | Capabilities of Vendor | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Valid EPF Certificate |
|
None | None | None | None | Achieved at least in two Financial Years a minimum Average Financial Turnover (in all classes of Civil Engineering Consultation Works only) of Rs. 20.00 Lakhs. During last 3 financial year i.e. 2020-21 to 2023-24. Further, the Financial Turnover of the Previous Years shall be given a Weightage of 10% per year to bring them to the Price Level of 2023-24. In support of this, the Consultant shall furnish the Certificate from Chartered Accountant along with the Technical Proposal. | None | Financial Status | None | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Audited CA Certificate of Annual Turnover |
|
None | None | None | None | A brief description of the consultants organization and an outline of recent experience on assignments (Section 3B) of a similar nature. For each assignment, the outline should indicate, inter alia, the profiles and names of the staff provided, duration of the assignment, contract amount, and firms involvement. | None | Others | list of similar nature of work done | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- list of similar nature of work done |
|
None | None | None | None | Any comments or suggestions on the Terms of Reference and on the data, a list of services, and facilities to be provided by the Client (Section 3C). | None | Others | Any comments or suggestions | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- Any comments or suggestions |
|
None | None | None | None | A description of the methodology and work plan for performing the assignment (Section 3D). | None | Others | methodology and work plan | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- methodology and work plan |
|
None | None | None | None | The list of the proposed staff team by specialty, the tasks that would be assigned to each staff team member, and their timing (Section 3E). | None | Others | proposed staff team | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- proposed staff team |
|
None | None | None | None | CVs recently signed by the proposed key professional staff and the authorized representative submitting the proposal (Section 3F). Key information should include number of years working for the firm/entity, and degree of responsibility held in various assignments during the last ten (10) years. | None | Others | CV of key professional staff | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- CV of key professional staff |
|
None | None | None | None | Estimates of the total staff effort (professional and support staff, staff time) to be provided to carry out the Assignment, supported by bar chart diagrams showing the time proposed for each key professional staff team member. (Sections 3E and 3G). | None | Others | bar chart | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- bar chart |
|
None | None | None | None | A detailed description of the proposed methodology, staffing, and monitoring of training, if the Data Sheet specifies training as a major component of the assignment. | None | Others | staffing, and monitoring of training | TECHNICAL_QUALIFICATION | createdTs | version | createdDate | modifiedDate | documentTypeText | documentName |
---|
None | None | None | None | None | Others -- staffing, and monitoring of training |
|