1720172700000 | 0 | None | None | Buildings | Construction of Single Class Room Building of Government Lower Primary School at Kondliganahalli village in Chintamani Taluk, Chickballapur District | 1380912.34 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3459014 | 123212 | None | Page - 8, Item - 1.12, Vol 1 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, includingsetting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all Kinds of Soils upto 300mm depth ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 76.7 | 76.7 | 24.0 | False | None | None | False | None | False | 1840.8 | 0 | 3459015 | 123212 | None | Page - 8, Item - 1.14, Vol 1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all Kinds of Soil Depth upto 3 m ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 86.14 | 86.14 | 57.77 | False | None | None | False | None | False | 4976.3078 | 0 | 3459016 | 123212 | None | Page 15, Sl No 2.1.2, Vol 1 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 6143.08 | 6143.08 | 14.83 | False | None | None | False | None | False | 91101.8764 | 0 | 3459017 | 123212 | None | Page 9, Sl No 5.4, Vol 2 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 6315.36 | 6315.36 | 16.56 | False | None | None | False | None | False | 104582.3616 | 0 | 3459018 | 123212 | None | Volume-1, P-7 Sl.No. 1.9 | KSRB 2.3 : Filling available excavated earth (excluding rock) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5 m. including cost of all labour complete as per specifications. specification. No. KBS 2.9 ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 240.72 | 240.72 | 28.89 | False | None | None | False | None | False | 6954.4008 | 0 | 3459019 | 123212 | None | Page 15, S.No 2.2.1.1, Vol 1 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 7573.24 | 7573.24 | 11.42 | False | None | None | False | None | False | 86486.4008 | 0 | 3459020 | 123212 | None | Volume-1, P-16 Sl.No.2.3.1 | Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 10563.36 | 10563.36 | 2.26 | False | None | None | False | None | False | 23873.1936 | 0 | 3459021 | 123212 | None | Item No. 2.5.2 Vol-I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M25 design mix ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 12400.62 | 12400.62 | 4.81 | False | None | None | False | None | False | 59646.9822 | 0 | 3459022 | 123212 | None | Item No. 2.5.1 Vol-I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately M20 DESIGN MIX ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 11671.38 | 11671.38 | 2.39 | False | None | None | False | None | False | 27894.5982 | 0 | 3459023 | 123212 | None | Item No. 2.5.1 Vol-I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M20 Design mix ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 10942.14 | 10942.14 | 8.6 | False | None | None | False | None | False | 94102.404 | 0 | 3459024 | 123212 | None | Item No. 2.5.1 Vol-I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 design mix ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 11671.38 | 11671.38 | 1.16 | False | None | None | False | None | False | 13538.8008 | 0 | 3459025 | 123212 | None | Item No. 2.5.1 Vol-I | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately)M20 design mix ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 10576.34 | 10576.34 | 0.21 | False | None | None | False | None | False | 2221.0314 | 0 | 3459026 | 123212 | None | Page 96, S.No 12.55, Vol 3 | Supplying, Fitting and Placing un-coated TMT Fe 500 & above bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | MT | 92596.96 | 92596.96 | 0.57 | False | None | None | False | None | False | 52780.2672 | 0 | 3459027 | 123212 | None | Page 99, S.No 13.1, Vol 3 | Supplying, Fitting and Placing un-coated TMT bar Reinforcement in sub-structure complete as per Drawing and Technical Specifications ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | MT | 92821.16 | 92821.16 | 0.16 | False | None | None | False | None | False | 14851.3856 | 0 | 3459028 | 123212 | None | Item No. 14.1 vol-III | Supplying fitting & placing TMT bar reinforcement to super structure complete as per Specifications ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | MT | 93044.18 | 93044.18 | 2.13 | False | None | None | False | None | False | 198184.1034 | 0 | 3459029 | 123212 | None | Page 14, S.No 6.8, Vol 2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 7894.2 | 7894.2 | 19.8 | False | None | None | False | None | False | 156305.16 | 0 | 3459030 | 123212 | None | Page 100, S.No 12.13.2 Vol 2 | Providing Red Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 72691.54 | 72691.54 | 0.05 | False | None | None | False | None | False | 3634.577 | 0 | 3459031 | 123212 | None | Page 106, S.No 12.57.9 Vol | Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per specification. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 3401.94 | 3401.94 | 2.52 | False | None | None | False | None | False | 8572.8888 | 0 | 3459032 | 123212 | None | Page 111, S.No 12.86, Vol 2 | Providing & fixing of 2-track x 2-panel sliding windows made out of multi chambered UPVC (Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free, gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the window frame. The outer frame having an overall size of 50mm width x 42mmheight with reinforcement of 1mm thickness and Sash with overall size of 31mm X 57mm with Gi reinforcement of 1mm for the frame and 1.5 mm for the sash. Coextruded Glazing bead for fixing of glass shall be of size 21.5mm x 9.5 mm. Windows shall be provided with 5mm plain float glass, standard hardware& single point locking system with touch lock. Wall thickness of frame & sash shall be of 1.80.2 mm. aximum possible size 1519mm x 1519mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 6893.56 | 6893.56 | 8.0 | False | None | None | False | None | False | 55148.48 | 0 | 3459033 | 123212 | None | Page 85, S.No 11.34.b, Vol 2 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Kgs | 187.62 | 187.62 | 168.0 | False | None | None | False | None | False | 31520.16 | 0 | 3459034 | 123212 | None | Page A14, S.No 120,1 Vol 3 | Wire mesh 50mm x 50mm size of 3mm wire ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 40.12 | 40.12 | 80.0 | False | None | None | False | None | False | 3209.6 | 0 | 3459035 | 123212 | None | Page 17, S.No 2.5.1, Vol 1 | Providing and laying in position Reinforced cement concrete for allSuper structures of building , Road works, Water works, Irrigation works& super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregatesas per relevant IS Codes machine mixed with super plasticisers laid inlayers, well compacted using needle vibrators. The cost includes alllead & lifts, cost of all materials, quality confirming to the requirementsof relevant IS codes , labour, Usage charges of machinery, curing andall other appurtenances required to complete the work as per technicalspecifications. (The cost of steel reinforcement, dowel bars & formworkto be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Cum | 7294.76 | 7294.76 | 4.84 | False | None | None | False | None | False | 35306.6384 | 0 | 3459036 | 123212 | None | Page 41, S.No 8.1.1, Vol 2 | Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 251.34 | 251.34 | 51.66 | False | None | None | False | None | False | 12984.2244 | 0 | 3459037 | 123212 | None | Page 41, S.No 8.2.1, Vol 2 | Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 292.64 | 292.64 | 126.11 | False | None | None | False | None | False | 36904.8304 | 0 | 3459038 | 123212 | None | Page 41, S.No 8.3.1, Vol 2 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonary including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 352.82 | 352.82 | 130.75 | False | None | None | False | None | False | 46131.215 | 0 | 3459039 | 123212 | None | Page A15, S.No 114, Vol 2 | Chicken mesh for Plastering at columns corners ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 14.16 | 14.16 | 119.95 | False | None | None | False | None | False | 1698.492 | 0 | 3459040 | 123212 | None | Page 44, S.No 8.19.1, Vol 2 | Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 234.82 | 234.82 | 18.98 | False | None | None | False | None | False | 4456.8836 | 0 | 3459041 | 123212 | None | Page 60, S.No 9.12.1, Vol 2 | Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete Size of Tile 500x500 mm ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 1194.16 | 1194.16 | 54.94 | False | None | None | False | None | False | 65607.1504 | 0 | 3459042 | 123212 | None | Page 50, S.No 8.51, Vol 2 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 97.94 | 97.94 | 177.77 | False | None | None | False | None | False | 17410.7938 | 0 | 3459043 | 123212 | None | Page 50 S.No 8.54.2, Vol 2 | Wall painting with premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour. Twocoats as per specifications and as per directions of Engineer in charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 93.22 | 93.22 | 177.77 | False | None | None | False | None | False | 16571.7194 | 0 | 3459044 | 123212 | None | Page 46, S.No 8.30, Vol 2 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 160.48 | 160.48 | 130.75 | False | None | None | False | None | False | 20982.76 | 0 | 3459045 | 123212 | None | Page 48, S.No 8.41, Vol 2 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 153.4 | 153.4 | 5.67 | False | None | None | False | None | False | 869.778 | 0 | 3459046 | 123212 | None | Page A15, S.No 106, Vol 2 | Cement Board ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Sqm | 277.3 | 277.3 | 5.25 | False | None | None | False | None | False | 1455.825 | 0 | 3459047 | 123212 | None | Page 49, S.No 8.49, Vol 2 | Lettering with black Japan paint of approved brand and manufacture to give an even shade including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | cm | 3.54 | 3.54 | 2000.0 | False | None | None | False | None | False | 7080.0 | 0 | 3459048 | 123212 | None | Volume-3 SLNo:003 Page no:A-9 | PVC Pipe 110mm outer dia at 2kg per cm2. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Rmtr | 179.36 | 179.36 | 8.0 | False | None | None | False | None | False | 1434.88 | 0 | 3459049 | 123212 | None | Volume-2, P-83 Sl.No.11.28 | Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts,.bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. PWD SR-2021-22, ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Kgs | 590.0 | 590.0 | 65.65 | False | None | None | False | None | False | 38733.5 | 0 | 3459050 | 123212 | None | PWD Electrical SR 2022-23 Item No: 1.2.2 P.No.1 | Supplying heavy gauge PVC conduit pipe . mm dia.mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary- 25mm dia 2mm thick ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | m | 82.6 | 82.6 | 20.0 | False | None | None | False | None | False | 1652.0 | 0 | 3459051 | 123212 | None | PWD Electrical SR 2022-23 Item No: 1.3.2 P.No.1 | Supplying heavy gauge PVC Conduit Pipe . dia . mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | m | 94.4 | 94.4 | 20.0 | False | None | None | False | None | False | 1888.0 | 0 | 3459052 | 123212 | None | PWD Electrical SR 2022-23 Item No: 1.5.2 P.No.1 | Supplying and fixing PVC/metal conduit Deep junction box 25mm deep junction box ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Nos | 60.18 | 60.18 | 4.0 | False | None | None | False | None | False | 240.72 | 0 | 3459053 | 123212 | None | PWD Electrical SR 2022-23 Item No: 1.12 P.No.2 | Supplying And Fixing Metal Fan Box with Round Hook. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Nos | 192.34 | 192.34 | 2.0 | False | None | None | False | None | False | 384.68 | 0 | 3459054 | 123212 | None | PWD Electrical SR 2022-23 Item No: 2.1.2 P.No.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet. Medium point above 3m upto 6m from tapping point to out letvia switch ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Point | 455.48 | 455.48 | 4.0 | False | None | None | False | None | False | 1821.92 | 0 | 3459055 | 123212 | None | PWD Electrical SR 2022-23 Item No: 2.1.3 P.No.3 | Supplying and wiring adopting loop system in existing PVC Conduit /casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) with a 6A flush type SP control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outletLong point above 6m upto 10m from tapping point to out let via switch. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Point | 669.06 | 669.06 | 4.0 | False | None | None | False | None | False | 2676.24 | 0 | 3459056 | 123212 | None | PWD Electrical SR 2022-23 Item No: 2.3.1 P.No.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. 1 sqmm ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Mtr | 21.24 | 21.24 | 30.0 | False | None | None | False | None | False | 637.2 | 0 | 3459057 | 123212 | None | PWD Electrical SR 2022-23 Item No: 2.3.3 P.No.3 | Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments. - 2.5 sqmm. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Mtr | 47.2 | 47.2 | 30.0 | False | None | None | False | None | False | 1416.0 | 0 | 3459058 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.1.2 P.No.5 | Supplying 6A flush type socket and 6 A flush type SP switch either surface/flush mounting in existing gang box or in 4mm thick plastic sheet and fixing over a flush mounted wooden box and wiring using necessary capacity wires as required as per IS 1293 and IS 3654 - 6Amps 3/5 Way ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 168.74 | 168.74 | 2.0 | False | None | None | False | None | False | 337.48 | 0 | 3459059 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.4.4 P.No.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall - 8Way ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 295.0 | 295.0 | 1.0 | False | None | None | False | None | False | 295.0 | 0 | 3459060 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.4.5 P.No.5 | Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall - 10-12 Way ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 383.5 | 383.5 | 1.0 | False | None | None | False | None | False | 383.5 | 0 | 3459061 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.8 P.No.6 | Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 0.34 | 0.34 | 1500.0 | False | None | None | False | None | False | 510.0 | 0 | 3459062 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.6.4 P.No.5 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. -Stepped Fan Regulator Two Module ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 369.34 | 369.34 | 2.0 | False | None | None | False | None | False | 738.68 | 0 | 3459063 | 123212 | None | PWD Electrical SR 2022-23 Item No: 3.6.1 P.No.5 | Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293. -6A One Way Switch ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 103.84 | 103.84 | 8.0 | False | None | None | False | None | False | 830.72 | 0 | 3459064 | 123212 | None | PWD Electrical SR 2022-23 Item No: 11.5.3 P.No.34 | Supply of round/square recess/surface mounted rolling type LED Down light with . W GU 10 LED Lamp Rib Fabricated from diecast aluminium with white powder coated prewired to mains connector & has swivelling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70 lumen maintenance with CRI 80. Power Input: 220-240V @50/60Hz & Power factor 0.9 along with CE approved. 2years Warranty against any manufacturing defect working under standard electrical condition ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 1473.82 | 1473.82 | 3.0 | False | None | None | False | None | False | 4421.46 | 0 | 3459065 | 123212 | None | PWD Electrical SR 2022-23 Item No:6.4.1 P.No.22 | Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS: 1709/1984 with latest amendment, Rated voltage 220 V/50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value 4.2 CMM / W, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201, as per IS specification, Motor winding. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 V, Insulation resistance Shall not be less than Two Mega Ohms (2M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, W& current, Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty.48" Sweep 5 Star (1200 mm) ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 3479.82 | 3479.82 | 2.0 | False | None | None | False | None | False | 6959.64 | 0 | 3459066 | 123212 | None | PWD Electrical SR 2022-23 Item No: 5.17.1 P.No.1 | Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.6-32 A SP ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 617.14 | 617.14 | 1.0 | False | None | None | False | None | False | 617.14 | 0 | 3459067 | 123212 | None | PWD Electrical SR 2022-23 Item No: 5.35 P.No.14 | Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 Accuracy Energy Meter. ---- including the cost and conveyance of all materials, Curing, cost of labour hire charges of equipment and machinery, all lead and lift, loading and unloading charges, transportation and all other incidental charges etc., complete the work shall be carried out as per standard technical specifications and as per the directions of the Engineer-in-charge of the work. | Each | 6047.5 | 6047.5 | 1.0 | False | None | None | False | None | False | 6047.5 | 0 |
|