createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1720070632439
version4
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee5000.00
emd317480.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose24-07-2024 16:02:28
tenderQueryClose23-07-2024 16:01:16
technicalBidOpen25-07-2024 16:03:35
publishedDate10-07-2024 13:26:41
publishedByPostPWD_EE_DIV_BID
publishedByUserKPE14569 - SHIVSHANKER V KAMSHETTY
bidValidityPeriod90
noOfCalls1
preBidMeetingDate09-07-2024 16:00:39
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonShivshanker kamshetty
splitEmdRequiredYnTrue
emdBankGuarantee217480.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08482226440
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1720070632484
version4
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BR/WORK_INDENT11093
titleConstruction of Box Culvert on SH-34 to NH-50 Via Kuntesirsi, Siddeshwar, Tarnalli(MDR) at Km. 4.80 in Bhalki Taluka Bidar Dist.
descriptionConstruction of Box Culvert on SH-34 to NH-50 Via Kuntesirsi, Siddeshwar, Tarnalli(MDR) at Km. 4.80 in Bhalki Taluka Bidar Dist.
categoryWORKS
categoryTextWorks
ecv21165329.37
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location1692
locationNamePWD Division Office Bidar
provisionalAmount25000000.0
groupOverheadTotal0.0
fileNumberPWD/Bhalki/KKRDB/23-24/RY/SH34
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17200706320000NoneNoneBridges/CulvertsBox Cell Bridge12613842.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3448121122518NonePWD CSR 2023-24 VOL 1 ITEM NO 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 mCum107.1107.11214.83FalseNoneNoneFalseNoneFalse130108.2930
3448122122518NonePWD Uni SR 23-24 Vol-1 Item no. 1.23Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift complete as per specifications.Cum2816.12816.1272.6FalseNoneNoneFalseNoneFalse767668.860
3448123122518NonePWD Uni SR 23-24 Vol-1 Item no. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other ppurtenances required to complete the work as per technical specifications.Cum6288.456288.4582.25FalseNoneNoneFalseNoneFalse517225.01250
3448124122518NonePWD Uni SR 23-24 Vol-1 Item no. 2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.85115.45FalseNoneNoneFalseNoneFalse753640.28250
3448125122518NonePWD Uni SR 23-24 Vol-1 Item no. 2.1.4Providing and fixing of centering and shuttering work including labour material cost etc., (form work) centering charges 20 percentCum1305.571305.57115.46FalseNoneNoneFalseNoneFalse150741.11220
3448126122518NonePWD CSR 2023-24 Vol-1 Item no. 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.8222.27FalseNoneNoneFalseNoneFalse1478717.8560
3448127122518NonePWD Uni SR 23-24 Vol-1 Item no. 2.2.3Providing and fixing of centering and shuttering work including labour material cost etc., (form work) centering charge 20 percentCum1330.561330.56222.27FalseNoneNoneFalseNoneFalse295743.57120
3448128122518NonePWD CSR 23-24 Vol-1 Item no. 2.11 C Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. C Sub structure of BridgesMT90754.6590754.6538.77FalseNoneNoneFalseNoneFalse3518557.78050
3448129122518NonePWD CSR 2023-24 Vol-1 Item no. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.8176.61FalseNoneNoneFalseNoneFalse1174951.0080
3448130122518NonePWD CSR 23-24 Vol-1 Item no. 2.4.3Providing and fixing of centering and shuttering work including labour material cost etc., (framework) centering charges 20 percentCum1330.561330.56176.61FalseNoneNoneFalseNoneFalse234990.20160
3448131122518NonePWD CSR 2023-24 Vol-1 Item no. 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.15155.39FalseNoneNoneFalseNoneFalse1116500.45850
3448132122518NonePWD CSR 2023-24 Vol-1 Item no. 2.5.2Providing and fixing of centering and shuttering work including labour material cost etc., (form work) centering charges 20 percentCum1437.031437.03155.25FalseNoneNoneFalseNoneFalse223098.90750
3448133122518NonePWD Uni SR 23-24 Vol-3 Item no. 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specificationCum7151.557151.555.94FalseNoneNoneFalseNoneFalse42480.2070
3448134122518NonePWD Uni SR 23-24 Vol-3 Item no. 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)Cum12426.7512426.7522.87FalseNoneNoneFalseNoneFalse284199.77250
3448135122518NonePWD Uni SR 23-24 Vol-3 Item no. 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2 , extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical SpecificationsCum250.95250.9583.2FalseNoneNoneFalseNoneFalse20879.040
3448136122518NonePWD CSR 23-24 Vol-3 Item no. 13.15.iiProviding & fixing 20 mm thick compressible fibre board in expansion joint complete as per drawing & Technical SpecificationRmtr143.85143.8516.53FalseNoneNoneFalseNoneFalse2377.84050
3448137122518NonePWD CSR 23-24 Vol-3 Item no. 13.16Asphaltic Plug Joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.Rmtr1884.751884.7518.0FalseNoneNoneFalseNoneFalse33925.50
3448138122518NonePWD CSR 23-24 Vol-3 Item no. 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.Cum2810.852810.85105.29FalseNoneNoneFalseNoneFalse295954.39650
3448139122518NonePWD CSR 23-24 Vol-3 Item no. 13.13.ACrash Barrier for Bridges Provision of an Reinforced cement concrete crash barrier at the bridge deck & approaches to bridge structure, constructed withReinforced cement concrete with TMT reinforcement conforming to MORT&H specificatios and as per details given in IRC-5 including dowel bars, 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board etc, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the and approved drawing and at locations directed by the Engineer, all as specified A Crash Barrier for Bridges (Height 950 mm) as per details given IRC-5 (fig-1) (Area 0.254 m2 for 1 m LengthRmtr4376.44376.456.4FalseNoneNoneFalseNoneFalse246828.960
3448140122518NonePWD CSR 23-24 Vol-3 Item no. 8.18Boundary pillar / Guard Stone Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding paintingNo785.4785.4124.0FalseNoneNoneFalseNoneFalse97389.60
3448141122518NonePWD CSR 23-24 Vol-3 Item no. 14.7.AToe protection A toe wall for toe protection can either be in dry rubble masonry in case of dry rubble pitching or pitching with stones in wire crates or it can be in PCC M15 nominal mix if cement concert block have been used for pitching . Rates for toe wall can be adopted from respective clauses depending upon approved design. The rate for excavation for foundation, dry rubble masonry and PCC M15 have been analysed and given in respective chapters of different volumes. Providing & Laying flooring complete over Cement Concrete bedding a Rubble Stone laid in CM 1:3Cum6193.956193.9545.65FalseNoneNoneFalseNoneFalse282753.81750
3448142122518NonePWD CSR 23-24 Vol-3 Item no. 14.1.aProviding and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. A Boulder Laid Dry Without Wire CratesCum2007.62007.6135.86FalseNoneNoneFalseNoneFalse272752.5360
3448143122518NonePWD CSR 23-24 Vol-3 Item no. 14.5Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specificationCum3187.83187.890.96FalseNoneNoneFalseNoneFalse289962.2880
3448144122518NonePWD CSR 23-24 Vol-3 Item no. 14.4.aProviding and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A Stone/BoulderCum2007.62007.6181.92FalseNoneNoneFalseNoneFalse365222.5920
3448145122518NonePWD CSR 23-24 Vol-3 Item no. 13.7Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specificationNo3434.553434.555.0FalseNoneNoneFalseNoneFalse17172.750
17200706320000NoneNoneBridges/CulvertsApproach Road5713826.94
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3448146122519NonePWD CSR 23-24 Vol-3 Item no.3.5 Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and leadSqm6.36.31117.5FalseNoneNoneFalseNoneFalse7040.250
3448147122519NonePWD CSR 23-24 Vol-1 Item no. 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.74500.01FalseNoneNoneFalseNoneFalse2239654.9770
3448148122519NonePWD CSR 23-24 Vol-3 Item no. 4.2.VBy Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 (v) For Grading -V MaterialCum2476.952476.95474.56FalseNoneNoneFalseNoneFalse1175461.3920
3448149122519NonePWD CSR 23-24 Vol-3 Item no. 4.17Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired densityCum2686.952686.95409.75FalseNoneNoneFalseNoneFalse1100977.76250
3448150122519NonePWD CSR 23-24 Vol-3 Item no. 5.1.A.iPrime Coat over WMM/WBM (i) Providing and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.Sqm43.0543.051639.0FalseNoneNoneFalseNoneFalse70558.950
3448151122519NonePWD CSR 23-24 Vol-3 Item no. 5.4.iiTack coat on Granular surface treated with primer Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular SurfaceSqm14.714.71639.0FalseNoneNoneFalseNoneFalse24093.30
3448152122519NonePWD CSR 23-24 Vol-3 Item no. 5.8.ii.cProviding and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compactionCum8044.058044.0581.95FalseNoneNoneFalseNoneFalse659209.89750
3448153122519NonePWD CSR 23-24 Vol-3 Item no. 5.31Providing and laying Semi Dense Bituminous Concrete with 40/60 TPH capacity hot mix plant batch type using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 5% by weight of mix and filler, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per MoRTH V revision.Cum10659.610659.640.98FalseNoneNoneFalseNoneFalse436830.4080
17200706330000NoneNoneBridges/CulvertsRetaining wall upto Well1889833.21
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3448154122520NonePWD CSR 23-24 Vol-1 Item no. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 mCum107.1107.1234.08FalseNoneNoneFalseNoneFalse25069.9680
3448155122520NonePWD CSR 23-24 Vol-1 Item no. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.4514.63FalseNoneNoneFalseNoneFalse92000.02350
3448156122520NonePWD CSR 23-24 Vol-1 Item no. 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.842.14FalseNoneNoneFalseNoneFalse280348.9920
3448157122520NonePWD CSR 23-24 Vol-1 Item no. 2.11.CSteel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Sub structure of BridgesTonne90754.6590754.659.78FalseNoneNoneFalseNoneFalse887580.4770
3448158122520NonePWD CSR 23-24 Vol-1 Item no. 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6652.86652.873.64FalseNoneNoneFalseNoneFalse489912.1920
3448159122520None2.4.3Providing and fixing of Centering and shuttering work including labour material cost etc. (Frame work)Cum1330.561330.5673.64FalseNoneNoneFalseNoneFalse97982.43840
3448160122520NonePWD CSR 23-24 Vol-3 Item no. 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2 , extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical SpecificationsMtr250.95250.9567.5FalseNoneNoneFalseNoneFalse16939.1250
17200706330000NoneNoneBridges/CulvertsCC Drain417902.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3448161122521NonePWD CSR 23-24 Vol-1 Item no. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 mCum107.1107.198.8FalseNoneNoneFalseNoneFalse10581.480
3448162122521NonePWD CSR 23-24 Vol-1 Item no. 2.1.4Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregatesCum6527.856527.855.7FalseNoneNoneFalseNoneFalse37208.7450
3448163122521NonePWD CSR 23-24 Vol-1 Item no. 2.3.1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum6639.156639.1528.86FalseNoneNoneFalseNoneFalse191605.8690
3448164122521NonePWD CSR 23-24 Vol-1 Item no. 2.11.hSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structuresTonne82961.5582961.551.271FalseNoneNoneFalseNoneFalse105444.130050
3448165122521None2.3.1Providing and fixing of Centering and shuttering work including labour material cost etc.Cum2323.72323.728.86FalseNoneNoneFalseNoneFalse67061.9820
3448166122521Noneitem 1KKRDB LOGO BOARDEach6000.06000.01.0FalseNoneNoneFalseNoneFalse6000.00
17200706330000NoneNoneBridges/CulvertsDiversion of Road529924.37
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3448167122522NonePWD CSR 23-24 Vol-1 Item no. 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work 1.14.1 In all kinds of soils Depth upto 3 mCum107.1107.17.2FalseNoneNoneFalseNoneFalse771.120
3448168122522NonePWD CSR 23-24 Vol-1 Item no. 2.1.3Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregatesCum6288.456288.450.72FalseNoneNoneFalseNoneFalse4527.6840
3448169122522NonePWD CSR 23-24 Vol-3 Item no. 16.15.bProviding and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1101. B. 1000mm diaRmtr8355.98355.915.0FalseNoneNoneFalseNoneFalse125338.50
3448170122522NonePWD CSR 23-24 Vol-3 Item no. 5.1.1Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : 5.1.1 Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5891.555891.557.2FalseNoneNoneFalseNoneFalse42419.160
3448171122522NonePWD CSR 23-24 Vol-1 Item no. 1.8Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.7326.5FalseNoneNoneFalseNoneFalse162499.050
3448172122522NonePWD CSR 23-24 Vol-3 Item no. 2.8.ii.aDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead By Mechanical Means a Cement Concrete Grade M-15 & M-20Cum754.95754.95142.8FalseNoneNoneFalseNoneFalse107806.860
3448173122522NonePWD CSR 23-24 Vol-3 Item no. 2.17.ix.cRemoving all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 900 mmRmtr1442.71442.760.0FalseNoneNoneFalseNoneFalse86562.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17200706330000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17200706330000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17200706330000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17200706330000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17200706330000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17200706460000NoneNoneELIGIBILITYThe Tenderer shall furnish, as part of his tender, earnest money deposit in the amount as shown in column 4 of the Table of IFT for this particular work. Tenderer can pay the full EMD amount of Rs. 3,17,480/- through e-payment or the Earnest Money Deposit shall be in two parts. Part(1): Rs. 1,00,000/- by e-payment, Part-(2): Rs. 2,17,480/- EMD shall be in favour of Executive Engineer, PWD, Bidar Division, Bidar, and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD, Bidar Division, Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD, Bidar DivisionNone
17200706550000NoneNoneELIGIBILITYPeriod for completion of this work is 11(Eleven) months including Monsoon.None
17200706660000NoneNoneELIGIBILITYPart (2) Rs. 2,17,480/- EMD shall be in favour of Executive Engineer, PWD , Bidar Division, Bidar and may be in the form of Bankers Cheque/Demand Draft/Pay order in favour of Executive Engineer, PWD Divn. Bidar, payable at Bidar or cash or specified Small Savings Instruments pledged to the Executive Engineer, PWD.Division, Bidar or Bank Guarantee in the prescribed format obtained form any Nationaled / Scheduled Banks.None
17200706760000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 423.30 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.None
17200706870000NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (b) satisfactorily completed as prime contractor, at least one similar work such as construction of Box Culvert,/ bridge cum barrage of value not less than Rs 105.83 Lakhs/-None
17200706950001NoneNoneELIGIBILITYTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (c) executed in any one year, the following minimum quantities of work1) EWE: 5323 cum (2) RCC/PCC: 752.00cum (3) GSB: 380.00 cum (4) WMM/WBM: 328.00 Sqm (5) BM/SDBC:98.00 sqm (6) TMT Steel: 39.86 TonneNone
17200707060000NoneNoneELIGIBILITYLiquid assets and/or availability of credit facilities of no less than Rs. 57.73 Lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (b) satisfactorily completed as prime contractor, at least one similar work such as construction of Box Culvert,/ bridge cum barrage of value not less than Rs 105.83 Lakhs/-Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (c) executed in any one year, the following minimum quantities of work1) EWE: 5323 cum (2) RCC/PCC: 752.00cum (3) GSB: 380.00 cum (4) WMM/WBM: 328.00 Sqm (5) BM/SDBC:98.00 sqm (6) TMT Steel: 39.86 TonnePast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
NoneNoneNoneNoneList of existing commitments and ongoing worksPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
NoneNoneNoneNoneList of works for which tenders already submittedPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of works for which tenders already submitted
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20 ,2020-21 ,2021-22 ,2022-23 and 2023-24 (a) achieved in at least two financial years a minimum financial turn over (in all cases of civil engineering construction works only) Rs. 423.30 Lakhs/- Turnover certificate must have UDI number , otherwise it will not be considered for further bid evaluation.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneLiquid assets and/or availability of credit facilities of no less than Rs. 57.73 Lakhs Credit lines/letter of credit/ certificates from the banks for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five yearsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneITR Filed Copy (Mentioning PAN)
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover CertificateTrueTechnical Bid
Company Registration CertificateTrueTechnical Bid
Work done CertificateTrueTechnical Bid
Line of CreditTrueTechnical Bid
Other DocumentsFalseTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1720086018000
version0
createdDateNone
modifiedDateNone
blockNumberExecutive Engineer PWD Division Bidar
streetNone
cityBidar
stateKarnataka
pin585401
tenderRecallDTONone