1720439108000 | 0 | None | None | Buildings | Construction of compound wall to ST post metric women hostel near halageri road at SRK extension continue work | 344802.5 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3483717 | 124508 | None | code01 | Earth work in surface excavation by mechanical means for lowering & leveling the ground without blasting for all works other than foundation in Ordinary/ Soft rock & depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work PWD Common DSR 2023-24 Volume 1 I No 1.13 P.No 8 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 372.86 | 372.86 | 24.5883 | False | None | None | False | None | False | 9167.993538 | 0 | 3483718 | 124508 | None | code02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed raded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregatesPWD Common DSR 2023-24 Volume 1 I No 2.1.2 P.No 15 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 5833.92 | 5833.92 | 2.523 | False | None | None | False | None | False | 14718.98016 | 0 | 3483719 | 124508 | None | code03 | Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesPWD Common DSR 2023-24 Volume 1 I No 2.5.1P.No 16 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 6828.9 | 6828.9 | 4.8137 | False | None | None | False | None | False | 32872.27593 | 0 | 3483720 | 124508 | None | code04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) PWD Common DSR 2023-24 Volume 1 I No 5.1.1 P.No 9 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 5779.33 | 5779.33 | 14.5636 | False | None | None | False | None | False | 84167.850388 | 0 | 3483721 | 124508 | None | code05 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate Foundation upto Plinth. All other types 3% PWD Common DSR 2021-22 Volume 1 P No: 111 I.No 1.b ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 204.87 | 204.87 | 2.7 | False | None | None | False | None | False | 553.149 | 0 | 3483722 | 124508 | None | code06 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For Plinth beams of Buildings 50%PWD S.R. 2023-24Volume 1 (P No: 111 SL.No 3 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 3414.45 | 3414.45 | 1.2443 | False | None | None | False | None | False | 4248.600135 | 0 | 3483723 | 124508 | None | code07 | Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate For RCC Columns / Shaft (Slip Centering) 70% PWD Common PWD S.R. 2023-24Volume 1(P No: 111 SL.No 9 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 4780.23 | 4780.23 | 1.7388 | False | None | None | False | None | False | 8311.863924 | 0 | 3483724 | 124508 | None | code08 | Providing Brick work withcommonburntclayNonModular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.PWD Common DSR 2023-24 Volume 2 I No 6.8 P.No 14 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 8208.07 | 8208.07 | 6.7206 | False | None | None | False | None | False | 55163.155242 | 0 | 3483725 | 124508 | None | code09 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed raded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness,well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing,and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 Using 20 mm nominal size graded crushed coarse aggregatesPWD Common DSR 2023-24 Volume 1 I No 2.1.4 P.No 15 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Cum | 6403.51 | 6403.51 | 0.6222 | False | None | None | False | None | False | 3984.263922 | 0 | 3483726 | 124508 | None | code10 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding (Vol:2 P.NO.86 I.No: 11.34APWD S.R. 2023-24 21KG/SQM ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Kg | 173.04 | 173.04 | 319.095 | False | None | None | False | None | False | 55216.1988 | 0 | 3483727 | 124508 | None | code11 | Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.(Vol:2 P.NO.41 I.No: 8.3.2PWD S.R. 2023-24 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Sqm | 342.99 | 342.99 | 24.345 | False | None | None | False | None | False | 8350.09155 | 0 | 3483728 | 124508 | None | code12 | Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials,labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Vol:2 P.NO.41 I.No: 8.1.2PWD S.R. 2023-24) ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Sqm | 248.23 | 248.23 | 76.054 | False | None | None | False | None | False | 18878.88442 | 0 | 3483729 | 124508 | None | code13 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications: Two coats applied on walls @ 1.25 ltr/10 m² over and including one coat of Special primer applied @ 0.75 ltr /10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Percentage on finished rate of concrete per m3 Plastering & Painting of New walls & Ceiling 25% (Vol:2 P.NO.46 I.No: 8.33.1PWD S.R. 2023-24 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Sqm | 162.74 | 162.74 | 100.399 | False | None | None | False | None | False | 16338.93326 | 0 | 3483730 | 124508 | None | code14 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90L/10 m² over an under coat of primer applied @ 0.80 L/10 m² of approved brand and manufacture including preparing th surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.PWD Common DSR 2023-24 Volume 2 I No 8.33.3 P.No 47 ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Sqm | 143.17 | 143.17 | 24.62 | False | None | None | False | None | False | 3524.8454 | 0 | 3483731 | 124508 | None | code15 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structuresPWD SR 2023-24 Vol: 1 P.NO.18 I.No:2.11.h ---- The work shall be carried out as per the detailed specifications, drawings and directions of the Engineer in charge of the work | Tonne | 81381.33 | 81381.33 | 0.3601 | False | None | None | False | None | False | 29305.416933 | 0 |
|