noticeInvitingTenderDTO
createdTs1720771885726
version3
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee690.00
emd55080.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-07-2024 17:00:00
tenderQueryClose25-07-2024 16:00:00
technicalBidOpen29-07-2024 11:00:00
publishedDate12-07-2024 15:33:06
publishedByPostTP_CO_KBR
publishedByUserKPE17185 - HALASIDDA YALLAPPA SULLANAVAR
bidValidityPeriod180
noOfCalls1
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonH Y Sulannavar
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08338297097
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1720771885755
version6
createdDateNone
modifiedDateNone
tenderNumberDMA/2024-25/OW/WORK_INDENT21688
titleConstruction of Aerobic Composting Pad (Windrow Platform) at SWM Site in Kabbur TP Limit.
descriptionConstruction of Aerobic Composting Pad (Windrow Platform) at SWM Site in Kabbur TP Limit.
categoryWORKS
categoryTextWorks
ecv2754138.90
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2509
locationNameDMA Town Panchayat Kabbur
provisionalAmount3250000.0
groupOverheadTotalNone
fileNumberSBM-1-2-02
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17207718860000NoneNoneOther WorksConstruction of Aerobic Composting Pad (Windrow Platform) at SWM Site in Kabbur TP Limit.2754138.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3514415126025Nonecode01Compacting original ground supporting embankment Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction.Sqm110.25110.25257.4FalseNoneNoneFalseNoneFalse28378.350
3514416126025Nonecode02Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum446.25446.2584.4799FalseNoneNoneFalseNoneFalse37699.1553750
3514417126025Nonecode03Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5947.25947.215.78FalseNoneNoneFalseNoneFalse93846.8160
3514418126025Nonecode04Providing and laying in position Reinforced cement concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatesCum7185.157185.1538.524FalseNoneNoneFalseNoneFalse276800.71860
3514419126025Nonecode05Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. Drain 35% CSR 2023-24Cum2514.82514.813.5FalseNoneNoneFalseNoneFalse33949.80
3514420126025Nonecode06Form Work: As per recommendations of Technical working group, rates for formwork shall be added on percentage basis to the finished concrete item rate. Plinth Beams, 50% CSR 2023-24Cum3592.573592.5725.024FalseNoneNoneFalseNoneFalse89900.471680
3514421126025Nonecode07Providing Thermo-Mechanically Treated bars of grade Fe 500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)Tonne93929.8593929.851.4812FalseNoneNoneFalseNoneFalse139128.893820
3514422126025Nonecode08Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum279.3279.319.693FalseNoneNoneFalseNoneFalse5500.25490
3514423126025Nonecode09Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.Cum497.7497.7227.1537FalseNoneNoneFalseNoneFalse113054.396490
3514424126025Nonecode10Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density,complete as per clause 401Cum2478.02478.0136.292FalseNoneNoneFalseNoneFalse337731.5760
3514425126025Nonecode11Wet Mix Macadam (Plant mix method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with Grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.Cum2686.952686.95136.292FalseNoneNoneFalseNoneFalse366209.78940
3514426126025Nonecode12Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 m3 capacity and appropriate weigh batcher using approved mix design, laid inapproved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, primer, sealant , curing of concrete slabs for 14-days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work.Cum5166.05166.0237.0FalseNoneNoneFalseNoneFalse1224342.00
3514427126025Nonecode13Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two coat applied @ 1.67 ltr/10 m² over and including priming coat of exterior primer applied @ 2.20 kg/10 m²) with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge.Sqm182.7182.741.58FalseNoneNoneFalseNoneFalse7596.6660
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17207718870000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17207718870000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17207718870000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17207718870000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17207718870000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17207718950000NoneNoneELIGIBILITYAccepted Contractor to be Submitted of Tender Deference amount at the time of LOA.None
17207730510000NoneNoneELIGIBILITYQuantity wise similar type of work done certificate to be submitted Minimum 80% of BOQNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneMinimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)NoneNone
NoneNoneNoneNoneSatisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)NoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of existing commitments and ongoing worksNoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneQualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneProposals for subcontracting components of works amounting to more than 20% of the contract price (for each, the qualifications and experience of the identified sub-contractor in the relevant fields should be attached)NoneNone
NoneNoneNoneNoneWork Done CertificateFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNoneLine of CreditFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNoneAudited CA Certificate of Annual TurnoverFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAttach scan copy of Pan card and Aadhaar cardFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Other
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Contractor Registration CertificateTrueTechnical Bid
5year Annual Turnover CertificateTrueTechnical Bid
PAN Card and GST RegistrationTrueTechnical Bid
Similar Nature of work done Certificate counter signed by EETrueTechnical Bid
Line of credit Certificate from Nationalized bankTrueTechnical Bid
Aadhar Card or Address Proof Document For CommunicationTrueTechnical Bid
work done cost of 50percentage of Tender AmountTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone