| 1721058807000 | 1 | None | None | Buildings | CONSTRUCTION OF BALANCE COMPOUND WALL TO PARK AREA AT KOTNOOR (D) (ATAL BIHARI VAJPAYEE) LAYOUT ALONG JEWARAGI TO KALABURAGI NATIONAL HIGHWAY ROAD (NEAR OLD BRIDGE) IN KALABURAGI CITY. | 395144.6 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3528665 | 126924 | None | code01 | Clearing and grubbing road land including uprooting rank vegetation grass, bushes, shrubs, saplings and trees girth upto 300mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150mm in thickness. PWD CSR 2021-22 Vol-3, SR It. No.2.5 ii(A) Pg. No. 7 (A) By Mechanical means using Dozer, in area of light jungle. | ha | 165946.2 | 165946.2 | 0.4 | False | None | None | False | None | False | 66378.48 | 0 | | 3528666 | 126924 | None | code02 | Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, excavated surface leveled and sides neatly dressed disposing off or leveling the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage & other appurtenances required to complete the work. In ordinary/soft rock without blasting upto 1.5 m depth. PWD CSR 2021-22 Chapter-1 Vol-1, It. No. 1.5.1 Pg. No. 6 | Cum | 240.45 | 240.45 | 13.0 | False | None | None | False | None | False | 3125.85 | 0 | | 3528667 | 126924 | None | code03 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS codes machne mixed laid in layers of not exceeding 150mm thickness well cmpacted using plate vibrators, including all lead and lifts cost of all materials of quality labour usage charges of machineries curing and all the other appurtenances required to complete the work as per technical specifications (The cost of steel reinforcement and form work shall be paid seperately) - Mix 1:4:8 (M5) Using 40mm nominal size graded crushed coarse agregates. PWD CSR 2021-22 Vol-1, It. No. 2.1.2 Pg. Pg. No. 15 Chapter -2 | Cum | 5466.3 | 5466.3 | 1.95 | False | None | None | False | None | False | 10659.285 | 0 | | 3528668 | 126924 | None | code04 | Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand). PWD CSR 2021-22 Vol-2, It. No. 5.1.1, Pg. No. 9 Chapter -5. | Cum | 4987.5 | 4987.5 | 7.9 | False | None | None | False | None | False | 39401.25 | 0 | | 3528669 | 126924 | None | code05 | Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix using 20mm nominal size graded crushed coarse aggregate - PWD CSR 2021-22 Vol-1, It. No. 2.2.1.1 Pg. No 15 Chapter 2 | Cum | 6240.15 | 6240.15 | 4.14 | False | None | None | False | None | False | 25834.221 | 0 | | 3528670 | 126924 | None | code06 | Following additional percentage to be added to the finished rates of concrete of buildings, irrigation works, water supply works, roads and bridges depending upon the type of structure, these percentage are worked out based on empirical mathematical approaches and exhaustive studies on the common standard sizes of the type of the structure of buildings, irrigationworks ridges, water works etc.The use of shuttering material is considered at 40 repetitions and type of material to be used is steel centering - PWD CSR 2021-22 Vol-1, Pg. No. 15, Sl. No. 12 | Cum | 1248.03 | 1248.03 | 4.14 | False | None | None | False | None | False | 5166.8442 | 0 | | 3528671 | 126924 | None | code07 | Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand). PWD CSR 2021-22 Vol-2 Sl. No. 5.4 Pg. No. 9. | Cum | 5619.6 | 5619.6 | 12.77 | False | None | None | False | None | False | 71762.292 | 0 | | 3528672 | 126924 | None | code08 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately). Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregates. PWD CSR 2021-22 Vol-1, Sl. No. 2.1.4 Pg. No. 15 | Cum | 6014.4 | 6014.4 | 1.8 | False | None | None | False | None | False | 10825.92 | 0 | | 3528673 | 126924 | None | code09 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel windows by welding. PWD CSR 2021-22 Vol-2, Sl. No. 11.34A Pg. No. 85 | Cum | 152.25 | 152.25 | 537.81 | False | None | None | False | None | False | 81881.5725 | 0 | | 3528674 | 126924 | None | code10 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more steel reinforcement for RCC work including straighteing utting ending placing in position binding and anchoring to adjaent members whereer necessary complete as per Design ncluding cost of materials labour usage charges complete as per specifications (The laps and wastages shall not be measured seperately). PWD CSR 2021-22 Vol-2, Sl. No. 11.32, Pg. No. 84 | Kgs | 96.6 | 96.6 | 338.56 | False | None | None | False | None | False | 32704.896 | 0 | | 3528675 | 126924 | None | code11 | Providing Raised and cut pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lining, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. PWD CSR 2021-22 Vol-2, Sl. No. 8.19.2, Pg. No. 44 | Sqm | 379.05 | 379.05 | 87.0 | False | None | None | False | None | False | 32977.35 | 0 | | 3528676 | 126924 | None | code12 | Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade :New work (two coats) over and including water thinnable priming coat with cement primer after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD CSR 2021-22 Vol-2, Sl. No. 8.25, Pg. No. 45 | Sqm | 110.25 | 110.25 | 105.0 | False | None | None | False | None | False | 11576.25 | 0 | | 3528677 | 126924 | None | code13 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture including preparing the surface after thorougly cleaning oil, grease, dirt and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. PWD CSR 2021-22 Vol-2, Sl. No. 8.33.3, Pg. No. 47 | Sqm | 111.3 | 111.3 | 25.61 | False | None | None | False | None | False | 2850.393 | 0 |
|