1721114647000 | 0 | None | None | Roads | Construction of Roads and Drains from Vadi House to Medical and Bhaskar house to Brahmin street in ward no 12 of gubbi town panchayath limits. | 1498523.79 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3532074 | 127148 | None | PWD CSR 2023-24, VOL-1, Page No -8, Item No 1.14 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. In all kinds of soils Depth upto 3 m ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 123.97 | 123.97 | 57.8 | False | None | None | False | None | False | 7165.466 | 0 | 3532075 | 127148 | None | PWD SRRB 2023-24, VOL-3, Page -15, Item No 3.1 | Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 103.3 | 103.3 | 160.3999 | False | None | None | False | None | False | 16569.30967 | 0 | 3532076 | 127148 | None | PWD CSR 2023-24, VOL-1, Page -15, Item No 2.1.3 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thick ness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appur tenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)
Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 7279.03 | 7279.03 | 6.8 | False | None | None | False | None | False | 49497.404 | 0 | 3532077 | 127148 | None | PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 | Providing and laying in Reinforced cement concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)
M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 7684.97 | 7684.97 | 12.4 | False | None | None | False | None | False | 95293.628 | 0 | 3532078 | 127148 | None | PWD CSR 2023-24, VOL-1, Page -16, Item No 2.3.1 | Formwork
As per the Recommendation of Technical working group rates for formwork shall be added on percentage basis to the finished concrete item rate.
For Drain works consider 35% of item concrete rate ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 2689.74 | 2689.74 | 12.4 | False | None | None | False | None | False | 33352.776 | 0 | 3532079 | 127148 | None | PWD SRRB 2023-24, VOL-1, Page -8, Item No 2.11(a) | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Tonne | 108726.03 | 108726.03 | 0.744 | False | None | None | False | None | False | 80892.16632 | 0 | 3532080 | 127148 | None | PWD CSR 2023-24, VOL-1, Page -7, Item No 1.9 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 323.29 | 323.29 | 7.2 | False | None | None | False | None | False | 2327.688 | 0 | 3532081 | 127148 | None | PWD CSR 2023-24, VOL-1, Page No -8, Item No 1.12 | Mechanical Means
Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.
In all kinds of soils upto 300 mm depth ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 115.46 | 115.46 | 102.6 | False | None | None | False | None | False | 11846.196 | 0 | 3532082 | 127148 | None | PWD CSR 2023-24, VOL-1, Page No -7, Item No 1.8 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour, rolling, water,all materials,usage& all other appurtenaces required to complete the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 576.09 | 576.09 | 68.4 | False | None | None | False | None | False | 39404.556 | 0 | 3532083 | 127148 | None | PWD SRRB 2023-24, VOL-3, Page -26, Item No 4.17 | Wet Mix Macadam (Plant mix method),
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including pre mixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 3110.2 | 3110.2 | 102.6 | False | None | None | False | None | False | 319106.52 | 0 | 3532084 | 127148 | None | PWD SRRB 2023-24, VOL-3, Page -149, Item No16.28 | PQC
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design,Mix laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 8208.81 | 8208.81 | 97.1999 | False | None | None | False | None | False | 797895.511119 | 0 | 3532085 | 127148 | None | PWD SRRB 2023-24, VOL-3, Page -17, Item No 3.6 | Construction of Subgrade and Earthen Shoulders
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 599.19 | 599.19 | 43.2 | False | None | None | False | None | False | 25885.008 | 0 | 3532086 | 127148 | None | PWD SRRB 2023-24, VOL-2, Page -13, Item No 6.2 | Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 9696.46 | 9696.46 | 0.6786 | False | None | None | False | None | False | 6580.017756 | 0 | 3532087 | 127148 | None | PWD SRB 2023-24, VOL-2, Page -42, Item No 8.6.1 | Providing 12 mm cem+B79:L89ent plaster with Cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Sqm | 392.57 | 392.57 | 2.38 | False | None | None | False | None | False | 934.3166 | 0 | 3532088 | 127148 | None | PWD CSR 2021-22, VOL-1, Page No -10, Item No 1.17 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 m ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 318.43 | 318.43 | 6.48 | False | None | None | False | None | False | 2063.4264 | 0 | 3532089 | 127148 | None | KUWS&DB 2021-22, VOL-5, Page -113, Item No10.1.6 | Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with
all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Rmtr | 357.32 | 357.32 | 24.0 | False | None | None | False | None | False | 8575.68 | 0 | 3532090 | 127148 | None | PWD CSR 2021-22, VOL-1, Page -7, Item No 1.10 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m.
Including cost of all labour complete as per specifications ---- Etc., complete including all lead and lift as per the instruction of the officer in Charge of the work. | Cum | 194.46 | 194.46 | 5.832 | False | None | None | False | None | False | 1134.09072 | 0 |
|