createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1720530843357
version6
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee1630.00
emd153740.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose26-07-2024 17:30:00
tenderQueryClose17-07-2024 11:00:00
technicalBidOpen29-07-2024 11:00:00
publishedDate16-07-2024 13:42:45
publishedByPostTP_CO_BGN
publishedByUserKPE16250 - SURESH G BABLAD
bidValidityPeriod90
noOfCalls2
preBidMeetingDateNone
preBidMeetingYnFalse
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonSmt Shilpa G. JE
splitEmdRequiredYnFalse
emdBankGuaranteeNone
emdCashNone
bgValidityPeriodNone
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumberNone
mobileNumber9886634384
tenderSupplierListNone
tenderSchedule
createdTs1720530843360
version15
createdDateNone
modifiedDateNone
tenderNumberDMA/2023-24/OW/WORK_INDENT9113/CALL-2
titleP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL)
descriptionP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL)
categoryWORKS
categoryTextWorks
ecv6507921.14
deptNameDirectorate of Municipal Administration
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnTrue
location2358
locationNameDMA Town Panchayat Bhagyanagar
provisionalAmount7687000.0
groupOverheadTotalNone
fileNumberNo/BGYNR/SBM/2023/24/2
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17205308430000NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (1(LEACHATE TANK AND DRAIN)106551.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499802125038Nonecode01Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.659.375FalseNoneNoneFalseNoneFalse718.593750
3499803125038Nonecode02Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum214.2214.25.26FalseNoneNoneFalseNoneFalse1126.6920
3499804125038Nonecode03roviding and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.40.9375FalseNoneNoneFalseNoneFalse5638.50
3499805125038Nonecode04Providing and laying in position Reinforced cement concrete for all Foundation works. The granite / trap / basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6240.156240.154.125FalseNoneNoneFalseNoneFalse25740.618750
3499806125038Nonecode05Providing and removing centering, shutting, strutting, propping etc., for Foundation cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 8% of RAte of concrete)Cum499.21499.210.9375FalseNoneNoneFalseNoneFalse468.0093750
3499807125038Nonecode06Providing and removing centering, shutting, strutting, propping etc., for Retaining wall cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 10% of RAte of concrete)Cum624.02624.022.25FalseNoneNoneFalseNoneFalse1404.0450
3499808125038Nonecode07Providing and removing centering, shutting, strutting, propping etc., for Slab cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 50% of RAte of concrete)Cum3120.083120.080.9375FalseNoneNoneFalseNoneFalse2925.0750
3499809125038Nonecode08Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)t96.696.6495.0FalseNoneNoneFalseNoneFalse47817.00
3499810125038Nonecode09Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm276.9276.922.54FalseNoneNoneFalseNoneFalse6241.3260
3499811125038Nonecode10Providing and laying water proofing treatment to the Water tanks & Liquid Retaining structures with two component acrylic polymer modified cementitious waterproofing membrane with minimum elongation of 50% applied @ 1.5 kg/m2 for internal side waterproofing in two layers with waiting period of 4-6 hrs per layer and food grade epoxy coating in two coats certified by CFTRI Mysuru, including surface preparation completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In chargeCum477.75477.7522.54FalseNoneNoneFalseNoneFalse10768.4850
3499812125038Nonecode11Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:5:10 Using 40 mm nominal size graded crushed coarse aggregatesCum5101.955101.950.3375FalseNoneNoneFalseNoneFalse1721.9081250
3499813125038Nonecode12Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coat with black Japan paint etc. complete as directed by the engineer-in-charge. SOR CODE - V010CEach1981.351981.351.0FalseNoneNoneFalseNoneFalse1981.350
17205308430001NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (2LANDFILL AND DRAIN)465548.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499814125039Nonecode01Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.6571.38FalseNoneNoneFalseNoneFalse5471.2770
3499815125039Nonecode02Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.45.35FalseNoneNoneFalseNoneFalse32177.040
3499816125039Nonecode03Providing and laying in position Reinforced cement concrete for all Foundation works. The granite / trap / basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6240.156240.1518.387FalseNoneNoneFalseNoneFalse114737.638050
3499817125039Nonecode04Providing and removing centering, shutting, strutting, propping etc., for Foundation cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 8% of RAte of concrete)Cum499.21499.215.35FalseNoneNoneFalseNoneFalse2670.77350
3499818125039Nonecode05Providing and removing centering, shutting, strutting, propping etc., for Retaining wall cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 10% of RAte of concrete)Cum624.02624.027.56FalseNoneNoneFalseNoneFalse4717.59120
3499819125039Nonecode06Providing and removing centering, shutting, strutting, propping etc., for Slab cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 50% of RAte of concrete)Cum3120.083120.085.35FalseNoneNoneFalseNoneFalse16692.4280
3499820125039Nonecode07Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)Kg96.696.62207.0FalseNoneNoneFalseNoneFalse213196.20
3499821125039Nonecode08Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm283.4283.488.1FalseNoneNoneFalseNoneFalse24967.540
3499822125039Nonecode09Providing and laying water proofing treatment to the Water tanks & Liquid Retaining structures with two component acrylic polymer modified cementitious waterproofing membrane with minimum elongation of 50% applied @ 1.5 kg/m2 for internal side waterproofing in two layers with waiting period of 4-6 hrs per layer and food grade epoxy coating in two coats certified by CFTRI Mysuru, including surface preparation completely as per specification & with a 10 years warranty on product & work from certified manufacturers as per the direction of the Engineer In chargeSqm477.75477.7588.1FalseNoneNoneFalseNoneFalse42089.7750
3499823125039Nonecode10Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils. Depth upto 1.50 mCum203.7203.72.03FalseNoneNoneFalseNoneFalse413.5110
3499824125039Nonecode11Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:5:10 Using 40 mm nominal size graded crushed coarse aggregatesCum5101.955101.950.45FalseNoneNoneFalseNoneFalse2295.87750
3499825125039Nonecode12Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 110mm dia., 6 kg/sqcm & class 3m413.7413.710.0FalseNoneNoneFalseNoneFalse4137.00
3499826125039Nonecode13Providing & fixing 455x610 mm cast iron cover with frame weight to be not less 38kgs (weight of cover 23 kgs and weight of frame 15 kgs)and necessary locking arrangements with M.S flats 32x6 mm etc & painting with two or more coat with black Japan paint etc. complete as directed by the engineer-in-charge. SOR CODE - V010CEach1981.351981.351.0FalseNoneNoneFalseNoneFalse1981.350
17205308430000NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (3COMPOUND WALL)1660948.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499827125040Nonecode01Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.6562.208FalseNoneNoneFalseNoneFalse4768.24320
3499828125040Nonecode02Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum214.2214.244.65FalseNoneNoneFalseNoneFalse9564.030
3499829125040Nonecode03Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.413.12FalseNoneNoneFalseNoneFalse78908.9280
3499830125040Nonecode04Providing and laying in position Reinforced cement concrete for all Foundation works. The granite / trap / basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6240.156240.1519.55FalseNoneNoneFalseNoneFalse121994.93250
3499831125040Nonecode05Providing and removing centering, shutting, strutting, propping etc., for Foundation cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 8% of RAte of concrete)Cum499.21499.218.75FalseNoneNoneFalseNoneFalse4368.08750
3499832125040Nonecode06Providing and removing centering, shutting, strutting, propping etc., for Column cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 70% of RAte of concrete)Cum4368.114368.111.863FalseNoneNoneFalseNoneFalse8137.788930
3499833125040Nonecode07Providing and removing centering, shutting, strutting, propping etc., for Plinth beams cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 50% of RAte of concrete)Cum3120.083120.088.94FalseNoneNoneFalseNoneFalse27893.51520
3499834125040Nonecode08Providing and laying in position Reinforced cement concrete (Columns) for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6495.36495.38.7032FalseNoneNoneFalseNoneFalse56529.894960
3499835125040Nonecode09Providing and removing centering, shutting, strutting, propping etc., for Columns cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 70% of RAte of concrete)Cum4546.714546.715.71FalseNoneNoneFalseNoneFalse25961.71410
3499836125040Nonecode10Providing and removing centering, shutting, strutting, propping etc., for Chajja ,Lintel and Copping cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 60% of RAte of concrete)Cum3897.183897.182.99FalseNoneNoneFalseNoneFalse11652.56820
3499837125040Nonecode11Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)Kg96.696.62543.094FalseNoneNoneFalseNoneFalse245662.88040
3499838125040Nonecode12Providing Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand)Cum5065.25065.261.43FalseNoneNoneFalseNoneFalse311155.2360
3499839125040Nonecode13Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specificationsSqm1262.11262.1298.08FalseNoneNoneFalseNoneFalse376206.7680
3499840125040Nonecode14Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm399.0399.0780.0FalseNoneNoneFalseNoneFalse311220.00
3499841125040Nonecode15Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-chargeSqm85.885.8780.0FalseNoneNoneFalseNoneFalse66924.00
17205308430001NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (4SANITORY LANDFILL)2964050.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499842125041Nonecode01Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.651981.76FalseNoneNoneFalseNoneFalse151901.9040
3499843125041Nonecode02Supplying and providing Geosynthetic clay liner laying, anchoring in the trench, seaming, and testing complete as given in general specification complete to form an impervious barrier. The minimum width of the Liner shall be 4.9M. GCL must be anchored within the anchor trench and backfilling, compaction complete at the bottom portion. Rate to include the necessary lap for joining, wastage, and testing including bentonite powder at joints, etc. complete. Measurement will be made as per the finished surface area. GCL in the anchor trench will be taken in measurement.Sqm210.0210.02100.0FalseNoneNoneFalseNoneFalse441000.00
3499844125041Nonecode03Supply and installation of 1.5 mm thick HDPE smooth Geo - membrane Liner by blown / Flat die cast process as per list of companies approved in the detail specifications, laying, anchoring in trench, seaming testing complete as per given specification complete to form an impervious barrier . min width of liner shall be 5 M. Geo - membrane must be anchored with in anchor trench including excavation of trench and backfilling compaction complete, at bottom portion. Rate to be include the necessary lap for jointing, wastage testing and extrusion rods complete. Measurement will be made as per finished surface. Linear in the anchor trench will be taken in measurement.Cum273.0273.02100.0FalseNoneNoneFalseNoneFalse573300.00
3499845125041Nonecode04Providing and laying 20mm graded coarse aggregates / pebble stones ( for filter bed) as per drawing, specification with all leads and lifts complete etc. as directed by the Enginner. The rate includes cost of material, transportation, laying and compacting with all labour etc.(for drainage layers)Cum1417.51417.5210.0FalseNoneNoneFalseNoneFalse297675.00
3499846125041Nonecode05Supply & installation of Non-Woven Geotextile (GT) of 350/M2 made of polypropylene of TC Mirafi(USA)Sqm322.35322.35733.36FalseNoneNoneFalseNoneFalse236398.5960
3499847125041Nonecode06Supplying and filling in plinth with sand under floors, the foundation of bridges including watering, ramming, consolidating, and dressing complete.Cum2285.852285.85225.093FalseNoneNoneFalseNoneFalse514528.834050
3499848125041Nonecode07Header Pipe :Supplying and laying of 110mm confirmimng to IS 4984: 1955 with latest amendments & conveying to work site including lading & unloading at both destination & rolling, lowering into trenches, laying true to line & jointing of pipes & specials by electrofusion welding, including encasing the pipe around to a depth not less than 15cms with soft gravel or selected earth available from excavation etc. complete giving hydraulic test as per relevant ISS with all lead & lift including testing & commissioning. The rate is eclusive of required specials & fitting etc. complete NP 10(5% extra for perforation).m486.15486.15225.0FalseNoneNoneFalseNoneFalse109383.750
3499849125041Nonecode08Header Pipe :Supplying and laying of 160mm confirmimng to IS 4984: 1955 with latest amendments & conveying to work site including lading & unloading at both destination & rolling, lowering into trenches, laying true to line & jointing of pipes & specials by electrofusion welding, including encasing the pipe around to a depth not less than 15cms with soft gravel or selected earth available from excavation etc. complete giving hydraulic test as per relevant ISS with all lead & lift including testing & commissioning. The rate is eclusive of required specials & fitting etc. complete NP 10(5% extra for perforation).m970.2970.275.0FalseNoneNoneFalseNoneFalse72765.00
3499850125041Nonecode09Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.6576.02FalseNoneNoneFalseNoneFalse5826.9330
3499851125041Nonecode10Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.49.05FalseNoneNoneFalseNoneFalse54430.320
3499852125041Nonecode11Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separatelyCum6266.46266.430.77FalseNoneNoneFalseNoneFalse192817.1280
3499853125041Nonecode12Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour complete as per specifications. ( As per CSR the rate shuttering is 3% of Rate of concrete)Cum5784.515784.511.0FalseNoneNoneFalseNoneFalse5784.510
3499854125041Nonecode13Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)Kg96.696.61846.2FalseNoneNoneFalseNoneFalse178342.920
3499855125041Nonecode14Providing and supplying to the work site, Single phase Submersible pump Sets of 100mm dia suitable for bore will confirming to IS 8034-2000 specifications, with testing as per instructions of engineer in charge of work and latest amendments- 1.00 HP/0.75 KW - 18 STG (SOR CODE - P050E)No14376.614376.61.0FalseNoneNoneFalseNoneFalse14376.60
3499856125041Nonecode15Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Job6457.56457.51.0FalseNoneNoneFalseNoneFalse6457.50
3499857125041Nonecode16Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x2.5 m2m102.9102.9200.0FalseNoneNoneFalseNoneFalse20580.00
3499858125041Nonecode17Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe:For Heavy Duty GI pipe: Heavy Duty GI pipe of 50mm diam642.1642.1110.0FalseNoneNoneFalseNoneFalse70631.00
3499859125041Nonecode18Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type. NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter for outdoor Upto 6 HP pumpsEach13125.013125.01.0FalseNoneNoneFalseNoneFalse13125.00
3499860125041Nonecode19Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.Job1417.51417.51.0FalseNoneNoneFalseNoneFalse1417.50
3499861125041Nonecode20Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets.Kvar577.5577.51.0FalseNoneNoneFalseNoneFalse577.50
3499862125041Nonecode21Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box.Each1312.51312.51.0FalseNoneNoneFalseNoneFalse1312.50
3499863125041Nonecode22Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.Job1417.51417.51.0FalseNoneNoneFalseNoneFalse1417.50
17205308430000NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (5PLANTED GRAVEL FILTER)174199.02
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499864125042Nonecode01Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.Cum68.2568.2598.8125FalseNoneNoneFalseNoneFalse6743.9531250
3499865125042Nonecode02Supply and installation of 1.5 mm thick HDPE smooth Geo - membrane Liner by blown / Flat die cast process as per list of companies approved in the detail specifications, laying, anchoring in trench, seaming testing complete as per given specification complete to form an impervious barrier . min width of liner shall be 5 M. Geo - membrane must be anchored with in anchor trench including excavation of trench and backfilling compaction complete, at bottom portion. Rate to be include the necessary lap for jointing, wastage testing and extrusion rods complete. Measurement will be made as per finished surface. Linear in the anchor trench will be taken in measurement.Cum273.0273.098.0FalseNoneNoneFalseNoneFalse26754.00
3499866125042Nonecode03Providing and laying 40mm graded coarse aggregates / pebble stones ( for filter bed) as per drawing, specification with all leads and lifts complete etc. as directed by the Enginner. The rate includes cost of material, transportation, laying and compacting with all labour etc.(for drainage layers)Cum1312.51312.546.375FalseNoneNoneFalseNoneFalse60867.18750
3499867125042Nonecode04Providing and laying 20mm graded coarse aggregates / pebble stones ( for filter bed) as per drawing, specification with all leads and lifts complete etc. as directed by the Enginner. The rate includes cost of material, transportation, laying and compacting with all labour etc.(for drainage layers)Cum1417.51417.519.6FalseNoneNoneFalseNoneFalse27783.00
3499868125042Nonecode05Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.45.6FalseNoneNoneFalseNoneFalse33680.640
3499869125042Nonecode06Planting and Maintaining of Flowering PlantsSqm2.632.6398.0FalseNoneNoneFalseNoneFalse257.740
3499870125042Nonecode07Supply and delivery at site 50mm dia heavy duty UPVC Column pipes with heavy-duty collars,rubber profile ring vibration control profile ring, freezing and turbulence free leak proof EPDM ring with ISI mark with its latest amendments ( SOR CODE 320A)m603.75603.7530.0FalseNoneNoneFalseNoneFalse18112.50
17205308430001NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (6POND)70000.35
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499871125043Nonecode01Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.65176.31FalseNoneNoneFalseNoneFalse13514.16150
3499872125043Nonecode02Providing and Laying Stone boulders 300mm( For Filter bed) as per drawing, specifications with all leads and lifts complete, etc. as directed by the engineer. The rate includes the cost of material, transportation, laying and compacting with all labour, etc. ( For drainage layers):Cum735.0735.035.0FalseNoneNoneFalseNoneFalse25725.00
3499873125043Nonecode03Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications A)Stone/BoulderCum1716.751716.7513.014FalseNoneNoneFalseNoneFalse22341.78450
3499874125043Nonecode04Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 20 mm nominal size graded crushed coarse aggregatesCum6014.46014.40.41FalseNoneNoneFalseNoneFalse2465.9040
3499875125043Nonecode05Providing and laying 20mm graded coarse aggregates / pebble stones ( for filter bed) as per drawing, specification with all leads and lifts complete etc. as directed by the Enginner. The rate includes cost of material, transportation, laying and compacting with all labour etc.(for drainage layers)Cum1417.51417.54.2FalseNoneNoneFalseNoneFalse5953.50
17205308440001NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (7WEIGHT BRIDGE ROOM)303959.08
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499876125044Nonecode01Earth work excavation for Foundation by mechanical means In all kinds of soils Depth upto 3 m for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the workCum76.6576.6537.17FalseNoneNoneFalseNoneFalse2849.08050
3499877125044Nonecode02Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.Cum214.2214.220.22FalseNoneNoneFalseNoneFalse4331.1240
3499878125044Nonecode03Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:4:8 (M5) Using 40 mm nominal size graded crushed coarse aggregatesCum5466.35466.31.4634FalseNoneNoneFalseNoneFalse7999.383420
3499879125044Nonecode04Providing and laying in position Reinforced cement concrete for all Foundation works. The granite / trap / basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6240.156240.151.02FalseNoneNoneFalseNoneFalse6364.9530
3499880125044Nonecode05Providing and removing centering, shutting, strutting, propping etc., for Plinth beams cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 50% of RAte of concrete)Cum3120.083120.081.02FalseNoneNoneFalseNoneFalse3182.48160
3499881125044Nonecode06Providing and laying in position Reinforced cement concrete (Columns) for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes finsishing concrete structure in line, all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement, dowel bars & formwork to be paid separately) M25 Design Mix Using 20 mm and down size graded crushed coarse aggregates.Cum6495.36495.32.43FalseNoneNoneFalseNoneFalse15783.5790
3499882125044Nonecode07Providing and removing centering, shutting, strutting, propping etc., for Beams cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 60% of RAte of concrete)Cum3897.183897.181.02FalseNoneNoneFalseNoneFalse3975.12360
3499883125044Nonecode08Providing and removing centering, shutting, strutting, propping etc., for Slabs cost of all materials, labour complete as per specifications. Specification ( As per CSR the rate shuttering is 50% of RAte of concrete)Cum3897.183897.181.41FalseNoneNoneFalseNoneFalse5495.02380
3499884125044Nonecode09Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)Kg96.696.6500.0FalseNoneNoneFalseNoneFalse48300.00
3499885125044Nonecode10Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work.Cum7030.87030.816.19FalseNoneNoneFalseNoneFalse113828.6520
3499886125044Nonecode11Providing 12 mm cement plaster with cement mortar 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. (Sqm276.9276.927.5635FalseNoneNoneFalseNoneFalse7632.333150
3499887125044Nonecode12Providing 20 mm cement plaster with cement mortar 1:3 (1 cement: 3 coarse sand) finished with a floating coat of neat cement to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.Sqm386.4386.433.849FalseNoneNoneFalseNoneFalse13079.25360
3499888125044Nonecode13Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mmSqm1062.61062.64.0FalseNoneNoneFalseNoneFalse4250.40
3499889125044Nonecode14Providing skirting, dadooing, rises of steps with white glazed tiles 6mm thick on 10mm thick cement plaster 1:3 and jointed with white cement slurry over existing rough plaster surface using glazed tiles of approved make and size including cost of materials, labour, complete as per specifications.Sqm1022.71022.72.16FalseNoneNoneFalseNoneFalse2209.0320
3499890125044Nonecode15Wall painting with plastic emulsion paint of approved brand and manufacture to give an even shade: One coats on old work as per specifications and as per directions of Engineer in charge.Sqm80.680.627.5635FalseNoneNoneFalseNoneFalse2221.61810
3499891125044Nonecode16Finishing walls with textured exterior paint of required shade :Old work (Two coats on existing cement paint surface applied @ 3.28 ltr/10 m² including preparing the surface after thoroughly cleaning the surface to remove all dirt, dust and foreign matter, cost of materials, labour complete as per specifications and as per directions of Engineer-incharge.Sqm201.5201.533.849FalseNoneNoneFalseNoneFalse6820.57350
3499892125044Nonecode17Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications.Cum64683.1564683.150.73FalseNoneNoneFalseNoneFalse47218.69950
3499893125044Nonecode18Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures )Sqm5327.75327.71.58FalseNoneNoneFalseNoneFalse8417.7660
17205308440000NoneNoneOther WorksP2Construction of SWM site Belongs to Bhagyanagar TP at Koppal (LEACHATE TANK AND DRAIN, LANDFILL AND DRAIN, COMPOUND WALL, SANITORY LANDFILL, PLANTED GRAVEL FILTER, POND, WEIGHT BRIDGE ROOM, BORE WELL) (8BORE WELL)762664.5
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3499894125045Nonecode01Geophysical investigation at site for sinking borewells for supplying drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers’s method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test.Each5398.055398.054.0FalseNoneNoneFalseNoneFalse21592.20
3499895125045Nonecode02Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 0 to 50 mm304.5304.5200.0FalseNoneNoneFalseNoneFalse60900.00
3499896125045Nonecode03Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 50 to 100 mm382.2382.2200.0FalseNoneNoneFalseNoneFalse76440.00
3499897125045Nonecode04Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) Borewell depth of 50 to 100 mm345.45345.45200.0FalseNoneNoneFalseNoneFalse69090.00
3499898125045Nonecode05Supplying PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. for: PVC pipes 160mm dia., 6 kg/sqcm & class 3m628.95628.9524.0FalseNoneNoneFalseNoneFalse15094.80
3499899125045Nonecode06Providing,supplying to work site, Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications,as per necessary ammendments and instructions of engineer incharge of work. For 5.00 HP - 120 LPM @ 88 m = 8 STG Outlet Dia - 2.00”Each36519.036519.02.0FalseNoneNoneFalseNoneFalse73038.00
3499900125045Nonecode07Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work.Job6457.56457.52.0FalseNoneNoneFalseNoneFalse12915.00
3499901125045Nonecode08Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x2.5 m2m102.9102.9400.0FalseNoneNoneFalseNoneFalse41160.00
3499902125045Nonecode09Providing, Laying and Fixing GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For Heavy Duty GI pipe:For Heavy Duty GI pipe: Heavy Duty GI pipe of 50mm diam642.1642.1220.0FalseNoneNoneFalseNoneFalse141262.00
3499903125045Nonecode10Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type. NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter for outdoor Upto 6 HP pumpsEach13125.013125.02.0FalseNoneNoneFalseNoneFalse26250.00
3499904125045Nonecode11Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.Job1417.51417.52.0FalseNoneNoneFalseNoneFalse2835.00
3499905125045Nonecode12Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets.Kvar577.5577.52.0FalseNoneNoneFalseNoneFalse1155.00
3499906125045Nonecode13Supply and delivery at site delivery of best indigenous brand new MCB (Miniature Circuit Breakers) of required capacity as per IS 88228/1978 and its latest amendments and with ISI Mark of 6/10/16/20/25/40 Amps with scalable box.Each1312.51312.52.0FalseNoneNoneFalseNoneFalse2625.00
3499907125045Nonecode14Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work.Job1417.51417.52.0FalseNoneNoneFalseNoneFalse2835.00
3499908125045Nonecode15Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & boning rods at every 100 mm whevere necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. All kinds of soils.Cum378.0378.0225.0FalseNoneNoneFalseNoneFalse85050.00
3499909125045Nonecode16Supplying, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc.Note: Upto 110mm dia Coil shall be used. For Grade PE80 PN6.0 : HDPE Grade PE80-PN6.0, 63mm diam195.2195.2500.0FalseNoneNoneFalseNoneFalse97600.00
3499910125045Nonecode17Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5 m. Including cost of all labour complete as per specifications (Valume-1, P.No. 7, I.No. 1.10)Cum128.1128.1225.0FalseNoneNoneFalseNoneFalse28822.50
3499911125045Nonecode18EarthingNos2000.02000.02.0FalseNoneNoneFalseNoneFalse4000.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17205308430000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17205308430000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17205308430000NoneNoneELIGIBILITYBidders shall ensure upload of relevant document certifying his/her status as Scheduled Caste/ Scheduled Tribe/other reserved category as prescribed in the tender document.None
17205308430000NoneNoneELIGIBILITYThe GST of 18% shall be added separately to the estimate as per Govt Order No. PWD 51 RDF 2019, Bengaluru Dated : 18-03-2022.None
17205308430000NoneNoneELIGIBILITYAll Terms and Conditions as per bid documentsNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one yearNoneNone
NoneNoneNoneNoneOwning the following key and critical equipment for this work (xxxx, xxxx, xxxx)NoneNone
NoneNoneNoneNoneTotal value of civl engineering works executed and payments received in the last five years (year-wise)NoneNone
NoneNoneNoneNoneList of works for which tenders already submittedNoneNone
NoneNoneNoneNoneBanker Details for referenceNoneNone
NoneNoneNoneNoneConstruction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awardedNoneNone
NoneNoneNoneNoneReports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five yearsNoneNone
NoneNoneNoneNoneList of Financial Resources with CertificatesNoneNone
NoneNoneNoneNone3.2 To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 b. Satisfactory completed, at least one similar nature of Sanitary Land Fill Site Work Workdone Certificate certified by an officer of rank than Executive Engineer in the last 5 years. Value not less than Rs. 32.54 Lakhs as prime contractor, with Indent NoPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 c Executed in one year for a continuous period of 12 months the following minimum quantities of workPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNonePWD Class-1 Registration CertificateCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNonePWD Registration Certificate (Class I/II/III/IV)
NoneNoneNoneNone3.2 To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 a Achieved in at least two financial years a minimum annual financial turnover of Rs. 65.08 lakhs. with valid UDIN NoFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNonea liquid assets and or availability of credit facilities of no less than Rs. 23.06 Lakhs (Credit lines/ letters of credit/ certificates from banks for meeting the fund requirement etc. (with e-mail ID)Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNoneGST & PAN CARDOthersGST & PAN CARD
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- GST & PAN CARD
NoneNoneNoneNoneList of existing commitments and ongoing worksOthersList of existing commitments and ongoing works
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- List of existing commitments and ongoing works
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
3.2To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 a Achieved in at least two financial years a minimum annual financial turnover of Rs. 65.08 lakhs. with valid UDIN NoTrueTechnical Bid
PWD Class - 1 Registration CertificateTrueTechnical Bid
3.2To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 b Satisfactory completed, at least one similar nature of Sanitary Land Fill Site Work Workdone Certificate certified by an officer of rank than Executive Engineer in the last 5 years. Value not less than Rs. 32.54 Lakhs as prime contractor, with Indent NoTrueTechnical Bid
3.2To qualify for award of this contract, each tenderer in its name should have in the last five years i.e., 2019-20 to 2023-24 c Executed in one year for a continuous period of 12 months the following minimum quantities of workTrueTechnical Bid
a liquid assets and or availability of credit facilities of no less than Rs. 23.06 Lakhs Credit lines/ letters of credit/ certificates from banks for meeting the fund requirement etc. with e-mail IDTrueTechnical Bid
Principal place of businessTrueTechnical Bid
List of Existing commitments & ongoing worksTrueTechnical Bid
GST & PAN CARDTrueTechnical Bid
tenderWorkLocationList
tenderAddressNone
tenderRecallDTONone