noticeInvitingTenderDTO
createdTs1720779878077
version7
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1837000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose16-08-2024 17:00:00
tenderQueryClose12-08-2024 11:00:00
technicalBidOpen17-08-2024 17:15:00
publishedDate16-07-2024 12:49:29
publishedByPostPWD_EE_DIV_KOD
publishedByUserKPE16346 - Y S SIDDEGOWDA
bidValidityPeriod90
noOfCalls1
preBidMeetingDate25-07-2024 11:00:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnNone
percentageRateTypeTextNone
contactPersonY S SIDDEGOWDA Executive Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1737000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08272225645
mobileNumber9449627780
tenderSupplierListNone
tenderSchedule
createdTs1720779878111
version8
createdDateNone
modifiedDateNone
tenderNumberPWD/2024-25/BD/WORK_INDENT11172
titleCONSTRUCTION OF COURT COMPLEX AT VIRAJPETE, KODAGU DISTRICT.
descriptionCONSTRUCTION OF COURT COMPLEX AT VIRAJPETE, KODAGU DISTRICT.
categoryWORKS
categoryTextWorks
ecv183631163.58
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location1679
locationNamePWD Division Office Kodagu
provisionalAmount185000000.0
groupOverheadTotal0.0
fileNumberPWD/AEE/Virajpet/CourtComplex
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17207798780000NoneNoneBuildingsCivil Stilt Floor30069758.62
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3515875126122NoneP-8, I.No-1.14.1, PWD SR VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum134.8134.83654.85FalseNoneNoneFalseNoneFalse492673.780
3515876126122NoneP-8, I.No-1.14.2, PWD SR VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth 3 m to 6 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum154.63154.631860.0FalseNoneNoneFalseNoneFalse287611.80
3515877126122NoneP-15, I.No-2.1.3, PWD SR VOL-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates For Column foundation, For flooring ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.067915.06231.84FalseNoneNoneFalseNoneFalse1835027.51040
3515878126122NoneP-15, I.No-2.2.3, PWD SR VOL-1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For columns footing, For Pedastal, For Columns upto plinth ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8373.668373.66628.3FalseNoneNoneFalseNoneFalse5261170.5780
3515879126122NoneP--9, I.No-5.3, PWD SR VOL-2Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8200.538200.5330.5FalseNoneNoneFalseNoneFalse250116.1650
3515880126122NoneP-16, I.No-2.3.2, PWD SR VOL-1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Plinth beam ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8563.978563.9725.32FalseNoneNoneFalseNoneFalse216839.72040
3515881126122NoneP-7, I.No-1.9, PWD SR VOL-1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum351.55351.551654.46FalseNoneNoneFalseNoneFalse581625.4130
3515882126122NoneP-5, I.No-1.1 PWD SR VOL-3Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 10 m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum157.29157.294864.1FalseNoneNoneFalseNoneFalse765074.2890
3515883126122NoneP-5, I.No-1.4-i-A PWD SR VOL-3 2021-22Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 10 t load and lead 10 km = 100 t.km ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Km15.8115.8124320.55FalseNoneNoneFalseNoneFalse384507.89550
3515884126122NoneP-7, I.No-1.8, PWD SR VOL-1Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum626.44626.443287.44FalseNoneNoneFalseNoneFalse2059383.91360
3515885126122NoneP-5, I.No-4.1, PWD SR VOL-2Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the topsurface ofconsolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm155.95155.95637.01FalseNoneNoneFalseNoneFalse99341.70950
3515886126122NoneP-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Columns ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.7112.65FalseNoneNoneFalseNoneFalse114402.93150
3515887126122NoneP-16, I.No-2.4.2, PWD SR VOL-1Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Retaining wall ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8356.488356.4858.27FalseNoneNoneFalseNoneFalse486932.08960
3515888126122NoneP-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof Beams ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.7175.05FalseNoneNoneFalseNoneFalse678730.43550
3515889126122NoneP-16, I.No-2.5.2, PWD SR VOL-1 2023-24)Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Staircase, Roof slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.179043.17113.8FalseNoneNoneFalseNoneFalse1029112.7460
3515890126122NoneP-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Lintel ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.212.28FalseNoneNoneFalseNoneFalse19977.83880
3515891126122NoneP-17, I.No-6.32, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1731.31731.348.48FalseNoneNoneFalseNoneFalse83933.4240
3515892126122NoneP-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates WPC - Portico ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.211.94FalseNoneNoneFalseNoneFalse16998.68740
3515893126122NoneP-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1079.751079.7525.84FalseNoneNoneFalseNoneFalse27900.740
3515894126122NoneP-117, I.No-12.1 PWD SR VOL-3Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m1079.751079.7526.0FalseNoneNoneFalseNoneFalse28073.50
3515895126122NoneP-18, I.No-2.11-a, PWD SR VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne118226.37118226.3789.96FalseNoneNoneFalseNoneFalse10635644.24520
3515896126122NoneP-100, I.No-12.13.1, PWD SR VOL-2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum130593.9130593.90.08FalseNoneNoneFalseNoneFalse10447.5120
3515897126122NoneP-104, I.No-12.51, PWD SR VOL-2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No1342.751342.751.0FalseNoneNoneFalseNoneFalse1342.750
3515898126122NoneP-105, I.No-12.57.8, PWD SR VOL-2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 40 mm thick one side teak and one side commercial ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm5682.885682.882.52FalseNoneNoneFalseNoneFalse14320.85760
3515899126122NoneP-103, I.No-12.49, PWD SR VOL-2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8620.88620.80.47FalseNoneNoneFalseNoneFalse4051.7760
3515900126122NoneP-110, I.No-12.91, PWD SR VOL-2Providing& fixing of Openable window made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 75mm and GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 5mm plain float glass, Standard hardware with friction hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm.Maximum possible size 900mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8011.548011.544.9FalseNoneNoneFalseNoneFalse39256.5460
3515901126122NoneP-86, I.No-11.34B, PWD SR VOL-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs241.85241.85163.28FalseNoneNoneFalseNoneFalse39489.2680
3515902126122NoneP-43, I.No-8.10, PWD SR VOL-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm278.86278.861362.04FalseNoneNoneFalseNoneFalse379818.47440
3515903126122NoneP-41, I.No-8.2.2, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm368.73368.73134.36FalseNoneNoneFalseNoneFalse49542.56280
3515904126122NoneP-50, I.No-8.51, PWD SR VOL-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm132.16132.161496.45FalseNoneNoneFalseNoneFalse197770.8320
3515905126122NoneP-42, I.No-8.9, PWD SR VOL-2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm508.82508.82310.49FalseNoneNoneFalseNoneFalse157983.52180
3515906126122NoneP-149, I.No-16.28 PWD SR VOL-3 2021-22Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including construction joints, , primer, sealant , curing of concrete slabs for 14- days, and water finishing to lines and grade as per drawing and technical specification clause 1501 with all lead, lifts, loading & unloading charges, cost and conveyance of all materials, labour, equipments etc., complete. as per the directions of the Engineer-in-charge of the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8926.118926.1191.72FalseNoneNoneFalseNoneFalse818702.80920
3515907126122NoneP-64, I.No-9.30, PWD SR VOL-2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints fin- ished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7041.487041.48119.4FalseNoneNoneFalseNoneFalse840752.7120
3515908126122NoneP-85, I.No-11.28, PWD SR VOL-2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs746.7746.7338.36FalseNoneNoneFalseNoneFalse252653.4120
3515909126122NoneP-48, I.No-8.39, PWD SR VOL-2Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm167.84167.841496.45FalseNoneNoneFalseNoneFalse251164.1680
3515910126122NoneP-46, I.No-8.32, PWD SR VOL-2Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g/L and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm206.17206.17310.49FalseNoneNoneFalseNoneFalse64013.72330
3515911126122NoneP-48, I.No-8.41, PWD SR VOL-2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm220.71220.716.63FalseNoneNoneFalseNoneFalse1463.30730
3515912126122NoneP.No-15, I.No-2.2.3, PWD SR VOL-1Form work for foundation work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregatescum ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum669.9669.9628.3FalseNoneNoneFalseNoneFalse420898.170
3515913126122NoneP.No-16, I.No-2.3.2, PWD SR VOL-1Form work for Plinth beam M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4281.984281.9825.32FalseNoneNoneFalseNoneFalse108419.73360
3515914126122NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6330.596330.5912.65FalseNoneNoneFalseNoneFalse80081.96350
3515915126122NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Retaining wall M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum835.65835.6558.27FalseNoneNoneFalseNoneFalse48693.32550
3515916126122NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Roof beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5426.235426.2375.05FalseNoneNoneFalseNoneFalse407238.56150
3515917126122NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Staircase & Roof slab M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4521.854521.85113.8FalseNoneNoneFalseNoneFalse514586.530
3515918126122NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Lintel M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5257.325257.322.28FalseNoneNoneFalseNoneFalse11986.68960
17207798780000NoneNoneBuildingsCivil Ground Floor45288322.4
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3515919126123NoneP.No-8, I.No-1.14.1, PWD SR VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum134.8134.82797.25FalseNoneNoneFalseNoneFalse377069.30
3515920126123NoneP.No-15, I.No-2.1.3, PWD SR VOL-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates For Column foundation, For flooring ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.067915.06209.75FalseNoneNoneFalseNoneFalse1660183.8350
3515921126123NoneP.No-15, I.No-2.2.3, PWD SR VOL-1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For columns footing, For Pedastal, For Columns upto plinth ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8373.668373.66551.43FalseNoneNoneFalseNoneFalse4617487.33380
3515922126123NoneP.No-9, I.No-5.3, PWD SR VOL-2Providing Coursed rubble masonry (second sort) with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8200.538200.5340.67FalseNoneNoneFalseNoneFalse333515.55510
3515923126123NoneP.No-7, I.No-1.9, PWD SR VOL-1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum351.55351.551260.13FalseNoneNoneFalseNoneFalse442998.70150
3515924126123NoneP.No-5, I.No-4.1, PWD SR VOL-2Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the topsurface ofconsolidated earth on which apron is to be laid, surrounding of pipes and conduits with Chlorpyriphos 20% E.C. / Lindane 20% E.C. @ 3.19 l/m2 including cost of chemical, diluting in water to one percent concentration, labour, usage charges of machinery, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm155.95155.95561.32FalseNoneNoneFalseNoneFalse87537.8540
3515925126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Columns ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.7139.43FalseNoneNoneFalseNoneFalse356593.48530
3515926126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof Beams ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.71116.39FalseNoneNoneFalseNoneFalse1052597.40690
3515927126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Staircase, Roof slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.71225.31FalseNoneNoneFalseNoneFalse2037638.30010
3515928126123NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Lintel, Cills ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.2125.12FalseNoneNoneFalseNoneFalse220106.71520
3515929126123NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Chajja ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.218.02FalseNoneNoneFalseNoneFalse70272.92420
3515930126123NoneP.No-14, I.No-6.8, PWD SR VOL-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum10531.8310531.837.05FalseNoneNoneFalseNoneFalse74249.40150
3515931126123NoneP-17, I.No-6.32, PWD SR VOL-2 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1731.31731.3953.56FalseNoneNoneFalseNoneFalse1650898.4280
3515932126123NoneP-44, I.No-8.16-a, PWD SR VOL-2 2023-24Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1636.141636.1425.63FalseNoneNoneFalseNoneFalse41934.26820
3515933126123NoneP.No-18, I.No-2.11-a, PWD SR VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs118226.37118226.37108.1FalseNoneNoneFalseNoneFalse12780270.5970
3515934126123NoneP.No-23, I.No-7.18, PWD SR VOL-2Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2665.672665.6714.18FalseNoneNoneFalseNoneFalse37799.20060
3515935126123NoneP.No-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1079.751079.7562.82FalseNoneNoneFalseNoneFalse67829.8950
3515936126123NoneP.No-100, I.No-12.13.1, PWD SR VOL-2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum130593.9130593.92.96FalseNoneNoneFalseNoneFalse386557.9440
3515937126123NoneP.No-104, I.No-12.51, PWD SR VOL-2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos1342.751342.7536.0FalseNoneNoneFalseNoneFalse48339.00
3515938126123NoneP.No-100, I.No-12.15, PWD SR VOL-2Providing and fixing in position fully panelled Honne wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and stiles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, usage charges complete as per specifications. ( excluding cost of fixtures ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm9837.999837.994.32FalseNoneNoneFalseNoneFalse42500.11680
3515939126123NoneP.No-105, I.No-12.57.8, PWD SR VOL-2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 40 mm thick one side teak and one side commercial ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm5682.885682.8885.44FalseNoneNoneFalseNoneFalse485545.26720
3515940126123NoneP.No-103, I.No-12.49, PWD SR VOL-2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8620.88620.813.52FalseNoneNoneFalseNoneFalse116553.2160
3515941126123NoneP.No-110, I.No-12.91, PWD SR VOL-2Providing& fixing of Openable window made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 75mm and GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 5mm plain float glass, Standard hardware with friction hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm.Maximum possible size 900mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8011.548011.54183.7FalseNoneNoneFalseNoneFalse1471719.8980
3515942126123NoneP.No-109, I.No-12.85, PWD SR VOL-2Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7558.237558.232.78FalseNoneNoneFalseNoneFalse21011.87940
3515943126123NoneP.No-86, I.No-11.34B, PWD SR VOL-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs241.85241.852946.1FalseNoneNoneFalseNoneFalse712514.2850
3515944126123NoneP.No-43, I.No-8.10, PWD SR VOL-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm278.86278.861681.22FalseNoneNoneFalseNoneFalse468825.00920
3515945126123NoneP.No-41, I.No-8.2.2, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm368.73368.732615.65FalseNoneNoneFalseNoneFalse964468.62450
3515946126123NoneP.No-50, I.No-8.51, PWD SR VOL-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm132.16132.164296.87FalseNoneNoneFalseNoneFalse567874.33920
3515947126123NoneP.No-41, I.No-8.2.1, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm389.87389.87148.78FalseNoneNoneFalseNoneFalse58004.85860
3515948126123NoneP.No-42, I.No-8.9, PWD SR VOL-2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm508.82508.821116.72FalseNoneNoneFalseNoneFalse568209.47040
3515949126123NoneP.No-64, I.No-9.30, PWD SR VOL-2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints fin- ished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7041.487041.48631.75FalseNoneNoneFalseNoneFalse4448454.990
3515950126123NoneP.No-60, I.No-9.12.2, PWD SR VOL-2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1513.231513.23773.32FalseNoneNoneFalseNoneFalse1170211.02360
3515951126123NoneP.No-71, I.No-10.14, PWD SR VOL-2Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1461.691461.69148.79FalseNoneNoneFalseNoneFalse217484.85510
3515952126123NoneP.No-60, I.No-9.9, PWD SR VOL-2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1422.041422.0452.5FalseNoneNoneFalseNoneFalse74657.10
3515953126123NoneP.No-85, I.No-11.28, PWD SR VOL-2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs746.7746.7851.91FalseNoneNoneFalseNoneFalse636121.1970
3515954126123NoneP.No-48, I.No-8.39, PWD SR VOL-2Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm167.84167.844296.87FalseNoneNoneFalseNoneFalse721186.66080
3515955126123NoneP.No-46, I.No-8.32, PWD SR VOL-2Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g/L and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm206.17206.171116.72FalseNoneNoneFalseNoneFalse230234.16240
3515956126123NoneP.No-48, I.No-8.41, PWD SR VOL-2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm220.71220.71255.21FalseNoneNoneFalseNoneFalse56327.39910
3515957126123NoneP-8, I.No-1.14.2, PWD SR VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work Depth 3 m to 6 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum154.63154.631403.18FalseNoneNoneFalseNoneFalse216973.72340
3515958126123NoneP-16, I.No-2.3.2, PWD SR VOL-1Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Plinth beam ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8563.978563.9728.09FalseNoneNoneFalseNoneFalse240561.91730
3515959126123NoneP-17, I.No-3.6 PWD SR VOL-3 2021-22Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 10 m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum157.29157.293704.8FalseNoneNoneFalseNoneFalse582727.9920
3515960126123NoneP-17, I.No-3.7 PWD SR VOL-3 2021-22Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 10 t load and lead 10 km = 100 t.km ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Km15.8115.8118523.95FalseNoneNoneFalseNoneFalse292863.64950
3515961126123NoneP-7, I.No-1.8, PWD SR VOL-1 2023-24Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum626.44626.442517.72FalseNoneNoneFalseNoneFalse1577200.51680
3515962126123NoneP-17, I.No-6.34, PWD SR VOL-2 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1459.051459.05307.63FalseNoneNoneFalseNoneFalse448847.55150
3515963126123NoneP.No-15, I.No-2.2.3, PWD SR VOL-1Form work for foundation work M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum669.9669.9551.43FalseNoneNoneFalseNoneFalse369402.9570
3515964126123NoneP.No-16, I.No-2.3.2, PWD SR VOL-1Form work for Plinth beam M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4281.984281.9828.09FalseNoneNoneFalseNoneFalse120280.81820
3515965126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6330.596330.5939.43FalseNoneNoneFalseNoneFalse249615.16370
3515966126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Roof beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5426.235426.23116.39FalseNoneNoneFalseNoneFalse631558.90970
3515967126123NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Staircase & Roof slab M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4521.854521.85225.31FalseNoneNoneFalseNoneFalse1018818.02350
3515968126123NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Lintel M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5257.325257.3225.12FalseNoneNoneFalseNoneFalse132063.87840
3515969126123NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Chajja M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3942.993942.998.02FalseNoneNoneFalseNoneFalse31622.77980
17207798780000NoneNoneBuildingsCivil First Floor30248357.52
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3515970126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Columns ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9134.119134.1135.36FalseNoneNoneFalseNoneFalse322982.12960
3515971126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof Beams ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9134.119134.11127.74FalseNoneNoneFalseNoneFalse1166791.21140
3515972126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Staircase, Roof Slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9134.119134.11231.5FalseNoneNoneFalseNoneFalse2114546.4650
3515973126124NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Lintel, Cills ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8849.838849.8326.16FalseNoneNoneFalseNoneFalse231511.55280
3515974126124NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Chajja ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8849.838849.838.94FalseNoneNoneFalseNoneFalse79117.48020
3515975126124NoneP.No-17, I.No-6.32, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1748.611748.611106.65FalseNoneNoneFalseNoneFalse1935099.25650
3515976126124NoneP.No-17, I.No-6.34, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1473.581473.58269.09FalseNoneNoneFalseNoneFalse396525.64220
3515977126124NoneP.No-44, I.No-8.16-a, PWD SR VOL-2Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1652.531652.5325.63FalseNoneNoneFalseNoneFalse42354.34390
3515978126124NoneP.No-18, I.No-2.11-a, PWD SR VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs119408.67119408.6763.44FalseNoneNoneFalseNoneFalse7575286.02480
3515979126124NoneP.No-23, I.No-7.18, PWD SR VOL-2Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2692.362692.3614.18FalseNoneNoneFalseNoneFalse38177.66480
3515980126124NoneP.No-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum1090.581090.5862.82FalseNoneNoneFalseNoneFalse68510.23560
3515981126124NoneP.No-100, I.No-12.13.1, PWD SR VOL-2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum131899.9131899.92.49FalseNoneNoneFalseNoneFalse328430.7510
3515982126124NoneP.No-104, I.No-12.51, PWD SR VOL-2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos1356.221356.2233.0FalseNoneNoneFalseNoneFalse44755.260
3515983126124NoneP.No-105, I.No-12.57.8, PWD SR VOL-2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 40 mm thick one side teak and one side commercial ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm5739.715739.7179.44FalseNoneNoneFalseNoneFalse455962.56240
3515984126124NoneP.No-103, I.No-12.49, PWD SR VOL-2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8706.968706.9611.59FalseNoneNoneFalseNoneFalse100913.66640
3515985126124NoneP.No-110, I.No-12.91, PWD SR VOL-2Providing& fixing of Openable window made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 75mm and GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 5mm plain float glass, Standard hardware with friction hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm.Maximum possible size 900mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8091.638091.63176.26FalseNoneNoneFalseNoneFalse1426230.70380
3515986126124NoneP.No-109, I.No-12.85, PWD SR VOL-2Providing & fixing of louvered ventilator made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the ventilator frame. The frame having overall size of 39mm x 39mm with GI reinforcement of 1mm thickness. Louver clip in Aluminium (powder coated in white) will be used on the frame along with plastic parts for fixing the 4 mm pin head glass. Wall thickness of frame shall be 2mm.Maximum possible size 1000mm x 1000mm.(The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7633.827633.822.78FalseNoneNoneFalseNoneFalse21222.01960
3515987126124NoneP.No-86, I.No-11.34B, PWD SR VOL-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs244.24244.243244.34FalseNoneNoneFalseNoneFalse792397.60160
3515988126124NoneP.No-43, I.No-8.10, PWD SR VOL-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm281.63281.631685.06FalseNoneNoneFalseNoneFalse474563.44780
3515989126124NoneP.No-41, I.No-8.2.2, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm372.43372.432567.7FalseNoneNoneFalseNoneFalse956288.5110
3515990126124NoneP.No-50, I.No-8.51, PWD SR VOL-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm133.48133.484252.79FalseNoneNoneFalseNoneFalse567662.40920
3515991126124NoneP.No-41, I.No-8.2.1, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm393.84393.84160.33FalseNoneNoneFalseNoneFalse63144.36720
3515992126124NoneP.No-42, I.No-8.9, PWD SR VOL-2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm513.97513.971286.74FalseNoneNoneFalseNoneFalse661345.75780
3515993126124NoneP.No-64, I.No-9.30, PWD SR VOL-2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints fin- ished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7111.937111.93576.16FalseNoneNoneFalseNoneFalse4097609.58880
3515994126124NoneP.No-60, I.No-9.12.2, PWD SR VOL-2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1528.431528.43771.62FalseNoneNoneFalseNoneFalse1179367.15660
3515995126124NoneP.No-71, I.No-10.14, PWD SR VOL-2Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1476.361476.36160.34FalseNoneNoneFalseNoneFalse236719.56240
3515996126124NoneP.No-60, I.No-9.9, PWD SR VOL-2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1436.321436.3252.5FalseNoneNoneFalseNoneFalse75406.80
3515997126124NoneP.No-85, I.No-11.28, PWD SR VOL-2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs754.23754.23591.97FalseNoneNoneFalseNoneFalse446481.53310
3515998126124NoneP.No-48, I.No-8.39, PWD SR VOL-2Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm169.57169.574252.79FalseNoneNoneFalseNoneFalse721145.60030
3515999126124NoneP.No-46, I.No-8.32, PWD SR VOL-2Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g/L and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm208.28208.281286.74FalseNoneNoneFalseNoneFalse268002.20720
3516000126124NoneP.No-48, I.No-8.41, PWD SR VOL-2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm222.95222.95253.38FalseNoneNoneFalseNoneFalse56491.0710
3516001126124NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates For WPC ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8849.838849.8347.48FalseNoneNoneFalseNoneFalse420189.92840
3516002126124NoneP.No-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1090.581090.58664.94FalseNoneNoneFalseNoneFalse725170.26520
3516003126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6393.96393.935.36FalseNoneNoneFalseNoneFalse226088.3040
3516004126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Roof beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5480.495480.49127.74FalseNoneNoneFalseNoneFalse700077.79260
3516005126124NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Staircase & Roof slab M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4567.084567.08231.5FalseNoneNoneFalseNoneFalse1057279.020
3516006126124NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Lintel M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5309.895309.8926.16FalseNoneNoneFalseNoneFalse138906.72240
3516007126124NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Chajja M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3982.433982.438.94FalseNoneNoneFalseNoneFalse35602.92420
17207798780000NoneNoneBuildingsCivil Second Floor17375067.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516008126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Columns ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9224.649224.6420.76FalseNoneNoneFalseNoneFalse191503.52640
3516009126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Roof Beams ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9224.649224.6460.65FalseNoneNoneFalseNoneFalse559474.4160
3516010126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Staircase, Roof Slab ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9224.649224.64101.92FalseNoneNoneFalseNoneFalse940175.30880
3516011126125NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Lintel, Cills ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8937.458937.4514.12FalseNoneNoneFalseNoneFalse126196.7940
3516012126125NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Chajja ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8937.458937.453.37FalseNoneNoneFalseNoneFalse30119.20650
3516013126125NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates WPC ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8937.448937.4449.9FalseNoneNoneFalseNoneFalse445978.2560
3516014126125NoneP.No-17, I.No-6.32, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1765.921765.92782.19FalseNoneNoneFalseNoneFalse1381284.96480
3516015126125NoneP.No-17, I.No-6.34, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x100x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1488.251488.25170.39FalseNoneNoneFalseNoneFalse253582.91750
3516016126125NoneP.No-18, I.No-2.11-a, PWD SR VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs120590.84120590.8430.34FalseNoneNoneFalseNoneFalse3658726.08560
3516017126125NoneP.No-23, I.No-7.18, PWD SR VOL-2Providing and laying cinder concrete in cement 1:15 ( 1 cement : 15 cinder of 12.5mm nominal gauge) on terraced roof or sunken slabs, laid to slope compacting, including cost of materials, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2718.932718.9314.18FalseNoneNoneFalseNoneFalse38554.42740
3516018126125NoneP.No-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1101.291101.29728.13FalseNoneNoneFalseNoneFalse801882.28770
3516019126125NoneP.No-100, I.No-12.13.1, PWD SR VOL-2Providing Salwood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete and side clamps), but including cost of materials, labour, usage charges complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum133205.79133205.791.71FalseNoneNoneFalseNoneFalse227781.90090
3516020126125NoneP.No-104, I.No-12.51, PWD SR VOL-2Fixing of door frame in an existing opening including embedding frame in floor and walls after cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required and disposal of the debris with lead upto 50 m. including cost of materials, labour charges, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos1369.581369.5824.0FalseNoneNoneFalseNoneFalse32869.920
3516021126125NoneP.No-105, I.No-12.57.8, PWD SR VOL-2Providing and fixing flush door shutter made out of solid core block board type, well seasoned , chemicaly treated hard wood battens and internal frame with minimum 45 mm wide wooden frame alround door shutters covered with cross bonded wooden sheets (core veneer) hot pressed and fastened on both sides of the door useing liquid phenol formaldehyde resin as per IS specifications 2202 (part-I) 1991. from manufacturer complete as per spcification. -do- 40 mm thick one side teak and one side commercial ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm5796.545796.5455.68FalseNoneNoneFalseNoneFalse322751.34720
3516022126125NoneP.No-103, I.No-12.49, PWD SR VOL-2Providing and fixing in position fully glazed shutters for ventilators side hung or central pivoted with Honne wood stiles and rails of 30mm thick 50mm wide and central divider of 30mm. wide, 3mm thick reeded glass fixed with wooden beading of size 10mm wide flushed to the thickness of the frame including cost of materials, labour charges, usage charges complete as per specifications. (excluding cost of fixtures) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8793.278793.278.08FalseNoneNoneFalseNoneFalse71049.62160
3516023126125NoneP.No-110, I.No-12.91, PWD SR VOL-2Providing& fixing of Openable window made out of multi chambered UPVC(Matching to RAL-9016) sections and with minimum TiO2(Titanium Dioxide) at 6PHR with TPV(Thermo Plastic Vulcanized) and lead free with gaskets -grey colour having isolated drainage and reinforced with Galvanized Iron profile through-out the openable frame. The frame having overall size of 60mm x 55mm with GI reinforcement of 1mm thickness and openable sash with overall size of 60mm x 75mm and GI reinforcement of 1.5mm thickness. Coextruded Glazing bead for fixing of glass shall be of size 20mm x 34 mm. Windows shall be provided with 5mm plain float glass, Standard hardware with friction hinge & Multi point locking system with Handle. Wall thickness of frame & sash shall be of 2mm-2.5mm.Maximum possible size 900mm x 1819mm. (The cost is inclusive of all fixtures and separate charges for minor T&P's shall not be made) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm8171.718171.7181.93FalseNoneNoneFalseNoneFalse669508.20030
3516024126125NoneP.No-86, I.No-11.34B, PWD SR VOL-2Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to openings /wooden frames with rawl plugs screws etc. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs246.74246.741350.21FalseNoneNoneFalseNoneFalse333150.81540
3516025126125NoneP.No-43, I.No-8.10, PWD SR VOL-2Providing 6 mm cement plaster with cement mortar 1:3 (1 cement : 3 fine sand) on concrete surface / ceilings including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm284.4284.4720.3FalseNoneNoneFalseNoneFalse204853.320
3516026126125NoneP.No-41, I.No-8.2.2, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix :1:6 (1 cement: 6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm376.13376.131341.62FalseNoneNoneFalseNoneFalse504623.53060
3516027126125NoneP.No-50, I.No-8.51, PWD SR VOL-2Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete as per specifications and as per directions of Engineer in charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm134.8134.82061.94FalseNoneNoneFalseNoneFalse277949.5120
3516028126125NoneP.No-42, I.No-8.9, PWD SR VOL-2Providing 18 mm cement plaster in two coats under layer 12 mm thick cement plaster with cement mortar 1:5 (1 cement : 5 coarse sand) and a top layer 6 mm thick cement plaster with cement mortar 1:3 (1 cement : 3 coarse sand) finished rough with sponge to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm518.99518.99570.75FalseNoneNoneFalseNoneFalse296213.54250
3516029126125NoneP.No-64, I.No-9.30, PWD SR VOL-2Providing and laying flooring and steps fine machine polished granite stone slabs 20 mm thick on cement mortar bed 1:6, 20 mm thick, and joints fin- ished with cement mortar 1:3 over existing cement concrete bed , including cost of materials, mortar, labour, curing complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm7182.377182.37244.17FalseNoneNoneFalseNoneFalse1753719.28290
3516030126125NoneP.No-48, I.No-8.39, PWD SR VOL-2Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade :Two coats on new work after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm171.15171.152061.94FalseNoneNoneFalseNoneFalse352901.0310
3516031126125NoneP.No-46, I.No-8.32, PWD SR VOL-2Finishing walls with 100% Premium acrylic emulsion paint having VOC less than 50 g/L and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives, New work (Two coats applied @ 1.43 L/ 10 m². Over and including priming coat of exterior primer applied @ 0.90 L/10 m² with paint of approved quality to give an even shade, after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm210.26210.26570.75FalseNoneNoneFalseNoneFalse120005.8950
3516032126125NoneP.No-48, I.No-8.41, PWD SR VOL-2Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm225.07225.07125.93FalseNoneNoneFalseNoneFalse28343.06510
3516033126125NoneP.No-44, I.No-8.16-a, PWD SR VOL-2Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja,facia, backing to cup boards including cost of all materials, labour, providing and removing form work usage charges, curing, complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1636.141636.1425.63FalseNoneNoneFalseNoneFalse41934.26820
3516034126125NoneP.No-41, I.No-8.2.1, PWD SR VOL-2Providing 15 mm cement plaster on the rough side of single or half brick wall of mix 1:4 (1 cement: 4 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm397.67397.67111.94FalseNoneNoneFalseNoneFalse44515.17980
3516035126125NoneP.No-60, I.No-9.12.2, PWD SR VOL-2Providing and laying vitrified floor tiles with thickness 9-10 mm in different sizes with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), jointing with grey cement slurry @ 3.3 kg/ m2 including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1543.51543.5344.35FalseNoneNoneFalseNoneFalse531504.2250
3516036126125NoneP.No-71, I.No-10.14, PWD SR VOL-2Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer- in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg/m2, including pointing in white cement mixed with pigment of matching shade complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1490.891490.89111.94FalseNoneNoneFalseNoneFalse166890.22660
3516037126125NoneP.No-60, I.No-9.9, PWD SR VOL-2Providing and laying Ceramic glazed floor tiles of size 300x300 mm (thickness to be specified by the manufacturer) of 1st quality conforming to IS : 15622 of approved make in colours such as White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick cement mortar 1:4 (1 Cement : 4 Coarse sand), Jointing with grey cement slurry @ 3.3 kg/m2 including pointing the joints with white cement and matching pigment etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1450.461450.4652.5FalseNoneNoneFalseNoneFalse76149.150
3516038126125NoneP.No-85, I.No-11.28, PWD SR VOL-2Providing and fixing stainless steel ( Grade 304) railing made of Hollow tubes, channels, plates etc., including welding, grinding, buffing, polishing and making curvature (wherever required) and fitting the same with necessary stainless steel nuts and bolts complete, i/c fixing the railing with necessary accessories & stainless steel dash fasteners, stainless steel bolts etc., of required size, on the top of the floor or the side of waist slab with suitable arrangement as per approval of Engineer-in- charge, (for payment purpose only weight of stainless steel members shall be considered excluding fixing accessories such as nuts, bolts, fasteners etc.) including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kg761.64761.64591.97FalseNoneNoneFalseNoneFalse450868.03080
3516039126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Columns M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6128.886128.8820.76FalseNoneNoneFalseNoneFalse127235.54880
3516040126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Roof beams M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5253.335253.3360.65FalseNoneNoneFalseNoneFalse318614.46450
3516041126125NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Form work for Staircase & Roof slab M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4377.774377.77101.92FalseNoneNoneFalseNoneFalse446182.31840
3516042126125NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Lintel M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5089.815089.8114.12FalseNoneNoneFalseNoneFalse71868.11720
3516043126125NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Chajja M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3817.353817.353.37FalseNoneNoneFalseNoneFalse12864.46950
3516044126125NoneP.No-82, I.No-11.16.1, PWD SR VOL-2Providing and fixing Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kg183.3183.31950.0FalseNoneNoneFalseNoneFalse357435.00
3516045126125NoneP.No-26, I.No-7.34, PWD SR VOL-2Providing and fixing 6mm Clear/opal white/solar bronze/blue/green tinted Multi wall poly carbonate sheet for Tubular structure. The work including cost of all materials, labour charges and usage charges of machinery for cutting, welding, grinding and erection equipments, with all lead, transportation, loading and unloading and all other incidental charges etc. complete as per specification and directions of the Engineer in charge of the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm4212.64212.6262.5FalseNoneNoneFalseNoneFalse1105807.50
17207798780000NoneNoneBuildingsWater Supply & Sanitary Works Basement Floor3143985.7
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516046126126NoneP.No-8, I.No-1.14.1, PWD SR VOL-1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum134.8134.8552.55FalseNoneNoneFalseNoneFalse74483.740
3516047126126NoneP.No-15, I.No-2.1.3, PWD SR VOL-1Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.067915.0618.97FalseNoneNoneFalseNoneFalse150148.68820
3516048126126NoneP.No-15, I.No-2.2.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8724.418724.4179.08FalseNoneNoneFalseNoneFalse689926.34280
3516049126126NoneP.No-14, I.No-6.8, PWD SR VOL-2Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of all materials, labour, scaffolding and usage charges of machinery & other incidental charges complete as per the direction of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum10531.8310531.833.5FalseNoneNoneFalseNoneFalse36861.4050
3516050126126NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.2114.11FalseNoneNoneFalseNoneFalse123634.78310
3516051126126NoneP.No-18, I.No-2.11-a, PWD SR VOL-1Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne118226.37118226.378.39FalseNoneNoneFalseNoneFalse991919.24430
3516052126126NoneP.No-85, I.No-7.3 BWSSB SRProviding and fixing MS inspection door of size 60 cms x 60 cms, including MS frame made of 50x50x6mm angle, shutters made of 3mm thick MS sheets, with hinges, locking arrangements at top etc. including painting with anticorrosive approved paint etc. complete including all lead and lifts etc. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos2828.222828.2213.0FalseNoneNoneFalseNoneFalse36766.860
3516053126126NoneP.No-149, I.No-15.1, PWD SR VOL-2Providing and laying water proofing treatment to the Roof with PU based single component elastomeric pure polyurethane based coating on New terrace/Chajjas/Sunken portion of WC:Bathroom, cold applied PU wa- terproofing membrane that is highly elastic with elongation greater than 400% and tensile strength greater than 2MPa as per ASTM D412. The waterproofing membrane to be applied in 2coats @ 1.6 kg/m2 to achieve final DFT (Dry Film Thickness) of 1mm including prime coat of epoxy primer @150 g/m2 and protection with 120gsm Geo-textile over the wa- terproofing membrane. The finished cost to include surface preparation, making coving at Junction, Bore Packing, treatment of construction joints completely as per specification. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1079.751079.75165.0FalseNoneNoneFalseNoneFalse178158.750
3516054126126NoneP.No-7, I.No-1.10, PWD SR VOL-1Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum211.46211.46129.37FalseNoneNoneFalseNoneFalse27356.58020
3516055126126NoneP No-114, I No-10.2.4 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 160mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m761.22761.22150.0FalseNoneNoneFalseNoneFalse114183.00
3516056126126NoneP No-191, I No-16.8 BWSSB SRConstructing brick masonry chamber of internal dimension 600x600mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos6331.766331.7610.0FalseNoneNoneFalseNoneFalse63317.60
3516057126126NoneP No-191, I No-16.10 BWSSB SRConstructing brick masonry chamber of internal dimension 450x450mm and depth of 600mm (inner dimensions) with modular bricks of CD 75 in cement mortar 1:6, bed concrete 150mm thick with 1:3:6, plastering 12 mm thick with cement mortar 1:4, CC 1:2:4 coping 75mm thk for fixing CI cover & frame etc. excluding the cost of CI frame and cover.. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos5598.275598.2710.0FalseNoneNoneFalseNoneFalse55982.70
3516058126126NoneP No-204, I No-16.46.1 BWSSB SRProviding and constructing of Machinehole chambers conical in shape at top with CC 1:3:6 foundation using 40mm and down size graded metal of approved quality and with an offset of 0.15m alround the chamber and brick masonry in C.M 1:4 plaster with bricks of approved quality and CM plaster 1:3 proportion 12mm thick inside and outside except for the conical surface outside where the thickness of plaster shall be 20 mm thick, with 1 to 6 slope in the concrete towards the central drain, finished smooth and fixing of pipes in CC 1:2:4 with graded metal of 20 mm and down size including supplying and fixing SFRC Machinehole frame and cover confoming to IS 12592(Part-I): 1988 & IS 12592(Part-II) :1991 with latest amendments in CC 1:2:4, supplying and fixing of plastic foot steps staggered at 30cms apart as directed, watering, curing,barricading, danger lighting, pouring tar over M.H. frame and cover, cost of tar,shoring, strutting, dewatering, engraving Machinehole No. on the inner and outer conical surface etc. as per the drawing with all lead and lift for various diameters and depths noted below. Constructing Table Moulded Bricks Machinehole 1.2 m internal dia. , 1.0 M depth & Heavy duty SFRC cover & frame ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos33038.733038.73.0FalseNoneNoneFalseNoneFalse99116.10
3516059126126NoneP No-34, I No-2.52.1 BWSSB SR VOL-5Supplying and fixing Multijet class B inferential type, AMR compatible water meters with IP 68 protection totalizer confoming to IS 779 with its latest amendments of following size to service connections including conveying and fixing of necessary G.I. specials with appurtenances. complete, with all lead and lift. 15mm dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos2246.722246.721.0FalseNoneNoneFalseNoneFalse2246.720
3516060126126NoneP.No-122, I.No-13.33.2, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m286.79286.7930.0FalseNoneNoneFalseNoneFalse8603.70
3516061126126NoneP.No- 151, I.No-13.10.1 BWSSB SR VOL-5Providing, supplying to work site,Single Phase Submersible Pump Sets of 100mm dia (4 inch) suitable for bore well confirming to IS 8034-2000 specifications,with testing of as per instructions of engineer incharge of work and latest amendments. 5.00 HP/3.7KW - 25 STG ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos34890.2434890.242.0FalseNoneNoneFalseNoneFalse69780.480
3516062126126NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Staircase & Roof slab M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4381.14381.114.11FalseNoneNoneFalseNoneFalse61817.3210
3516063126126NoneP.No-123, I.No-13.33.5, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 40 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m630.4630.450.0FalseNoneNoneFalseNoneFalse31520.00
3516064126126NoneP.No-122, I.No-13.33.3, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m391.19391.1950.0FalseNoneNoneFalseNoneFalse19559.50
3516065126126NoneP No-114, I No-10.2.1 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 75mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m286.74286.7430.0FalseNoneNoneFalseNoneFalse8602.20
3516066126126NoneI-21Provision for Sewage treatment works ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.LS300000.0300000.01.0FalseNoneNoneFalseNoneFalse300000.00
17207798780000NoneNoneBuildingsWater SUpply & Sanitary Works Ground Floor308439.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516067126127NoneP No-114, I No-10.2.1 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 75mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m286.74286.7450.0FalseNoneNoneFalseNoneFalse14337.00
3516068126127NoneP No-114, I No-10.2.2 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 110mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m380.67380.6750.0FalseNoneNoneFalseNoneFalse19033.50
3516069126127NoneP.No-122, I.No-13.33.3, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m391.19391.1950.0FalseNoneNoneFalseNoneFalse19559.50
3516070126127NoneP.No-122, I.No-13.33.2, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m286.79286.7950.0FalseNoneNoneFalseNoneFalse14339.50
3516071126127NoneP.No-131, I.No-14.2.2, PWD SR VOL-2Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked black solid plastic seat and lid ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6389.946389.9410.0FalseNoneNoneFalseNoneFalse63899.40
3516072126127NoneP.No-132, I.No-14.7.1, PWD SR VOL-2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit4073.174073.1710.0FalseNoneNoneFalseNoneFalse40731.70
3516073126127NoneP.No-131, I.No-14.4.1, PWD SR VOL-2Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit5886.415886.4112.0FalseNoneNoneFalseNoneFalse70636.920
3516074126127NoneP.No-71, I.No-10.18, PWD SR VOL-2Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 (1 cement : 3 coarse sand) proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including cost of all materials, mortar, labour, curing etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm4439.254439.259.0FalseNoneNoneFalseNoneFalse39953.250
3516075126127NoneP.No-136, I.No-14.31, PWD SR VOL-2Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit1612.351612.358.0FalseNoneNoneFalseNoneFalse12898.80
3516076126127NoneP.No-136, I.No-14.29, PWD SR VOL-2Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each62.1262.1222.0FalseNoneNoneFalseNoneFalse1366.640
3516077126127NoneP.No-120, I.No-13.22.1.1, PWD SR VOL-2Providing and fixing PTMT grating of approved quality and colour. Circular type 100 mm nominal dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each54.1954.1926.0FalseNoneNoneFalseNoneFalse1408.940
3516078126127NoneP.No-117, I.No-13.3.1, PWD SR VOL-2Providing and fixing brass stop cock of approved quality : 15 mm nominal bore ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each395.16395.1626.0FalseNoneNoneFalseNoneFalse10274.160
17207798780000NoneNoneBuildingsWater Supply & Sanitary Works First Floor438119.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516079126128NoneP No-114, I No-10.2.1 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 75mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m289.69289.6980.0FalseNoneNoneFalseNoneFalse23175.20
3516080126128NoneP No-114, I No-10.2.2 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 110mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m384.46384.4680.0FalseNoneNoneFalseNoneFalse30756.80
3516081126128NoneP.No-122, I.No-13.33.3, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m395.16395.16100.0FalseNoneNoneFalseNoneFalse39516.00
3516082126128NoneP.No-122, I.No-13.33.2, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m289.69289.69100.0FalseNoneNoneFalseNoneFalse28969.00
3516083126128NoneP.No-131, I.No-14.2.2, PWD SR VOL-2Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked black solid plastic seat and lid ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6453.96453.910.0FalseNoneNoneFalseNoneFalse64539.00
3516084126128NoneP.No-132, I.No-14.7.1, PWD SR VOL-2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit4113.884113.8810.0FalseNoneNoneFalseNoneFalse41138.80
3516085126128NoneP.No-131, I.No-14.4.1, PWD SR VOL-2Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit5945.225945.2212.0FalseNoneNoneFalseNoneFalse71342.640
3516086126128NoneP.No-71, I.No-10.18, PWD SR VOL-2Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 (1 cement : 3 coarse sand) proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including cost of all materials, mortar, labour, curing etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm4483.664483.669.0FalseNoneNoneFalseNoneFalse40352.940
3516087126128NoneP.No-136, I.No-14.31, PWD SR VOL-2Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit1628.471628.478.0FalseNoneNoneFalseNoneFalse13027.760
3516088126128NoneP.No-136, I.No-14.29, PWD SR VOL-2Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each62.7862.7822.0FalseNoneNoneFalseNoneFalse1381.160
3516089126128NoneP.No-120, I.No-13.22.1.1, PWD SR VOL-2Providing and fixing PTMT grating of approved quality and colour. Circular type 100 mm nominal dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each54.7254.7226.0FalseNoneNoneFalseNoneFalse1422.720
3516090126128NoneP.No-117, I.No-13.3.1, PWD SR VOL-2Providing and fixing brass stop cock of approved quality : 15 mm nominal bore ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each399.12399.1226.0FalseNoneNoneFalseNoneFalse10377.120
3516091126128NoneP.No-123, I.No-13.34, PWD SR VOL-2Providing and placing on terrace (at all floor levels) polyethylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.l12.0212.026000.0FalseNoneNoneFalseNoneFalse72120.00
17207798780000NoneNoneBuildingsWater Supply & Sanitary Works Second Floor230283.22
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516092126129NoneP No-114, I No-10.2.1 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 75mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m292.47292.4750.0FalseNoneNoneFalseNoneFalse14623.50
3516093126129NoneP No-114, I No-10.2.2 BWSSB SR VOL-5Supplying UNPLASTICISED PVC pipes conforming to IS 16098:2013 with latest amendments ended with integral sockets with ISI mark and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading and unloading at both destinations and cuts of pipes wherever necessary including jointing of UPVC pipes (with cost of elastomeric sealing rings) and specials (excluding cost of specials) with jointing of approved type, with all labour, lead & lifts, including encasing the pipes alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (contractor will make his own arrangements for procuring water for testing) etc. for: Pipes of SN4, 110mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m388.29388.2950.0FalseNoneNoneFalseNoneFalse19414.50
3516094126129NoneP.No-122, I.No-13.33.3, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 25 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m398.99398.9950.0FalseNoneNoneFalseNoneFalse19949.50
3516095126129NoneP.No-122, I.No-13.33.2, PWD SR VOL-2Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 20 mm nominal dia Pipes ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m292.47292.4750.0FalseNoneNoneFalseNoneFalse14623.50
3516096126129NoneP.No-131, I.No-14.2.2, PWD SR VOL-2Providing and fixing white vitreous china pedestal type water closet (European type W.C. pan) with seat and lid, 10 litre low level white P.V.C. flushing cistern, including flush pipe, with manually controlled device (handle lever), conforming to IS : 7231, with all fittings and fixtures complete, including cutting and making good the walls and floors wherever required : W.C. pan with ISI marked black solid plastic seat and lid ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6517.736517.738.0FalseNoneNoneFalseNoneFalse52141.840
3516097126129NoneP.No-132, I.No-14.7.1, PWD SR VOL-2Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brass pillar taps, 32 mm C.P. brass waste of standard pattern, including painting of fittings and brackets, cutting and making good the walls wherever require: White Vitreous China Wash basin size 630x450 mm with a pair of 15 mm C.P. brass pillar taps ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit4154.584154.588.0FalseNoneNoneFalseNoneFalse33236.640
3516098126129NoneP.No-131, I.No-14.4.1, PWD SR VOL-2Providing and fixing white vitreous china flat back or wall corner type lipped front urinal basin of 430x260x350 mm and 340x410x265 mm sizes respectively with automatic flushing cistern with standard flush pipe and C.P. brass spreaders with brass unions and G.I clamps complete, including painting of fittings and brackets, cutting and making good the walls and floors wherever required : One urinal basin with 5 litre white P.V.C. automatic flushing cistern ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit6004.166004.165.0FalseNoneNoneFalseNoneFalse30020.80
3516099126129NoneP.No-71, I.No-10.18, PWD SR VOL-2Providing and fixing of wall cladding using 20mm thick gang saw water cut Shiva gold granite, grey granite in CM 1:3 (1 cement : 3 coarse sand) proportion cut to required shape, pattern with paper joints, finished with cement mortal using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mmx12mm grooves in joints including cost of all materials, mortar, labour, curing etc., complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm4528.064528.064.5FalseNoneNoneFalseNoneFalse20376.270
3516100126129NoneP.No-136, I.No-14.31, PWD SR VOL-2Providing and fixing 600x450 mm beveled edge mirror of superior glass (of approved quality) complete with 6 mm thick hard board ground fixed to wooden cleats with C.P. brass screws and washers complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit1644.61644.68.0FalseNoneNoneFalseNoneFalse13156.80
3516101126129NoneP.No-136, I.No-14.29, PWD SR VOL-2Providing and fixing 100 mm sand cast Iron grating for gully trap. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each63.3163.3113.0FalseNoneNoneFalseNoneFalse823.030
3516102126129NoneP.No-120, I.No-13.22.1.1, PWD SR VOL-2Providing and fixing PTMT grating of approved quality and colour. Circular type 100 mm nominal dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each55.2555.2526.0FalseNoneNoneFalseNoneFalse1436.50
3516103126129NoneP.No-117, I.No-13.3.1, PWD SR VOL-2Providing and fixing brass stop cock of approved quality : 15 mm nominal bore ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each403.09403.0926.0FalseNoneNoneFalseNoneFalse10480.340
17207798780000NoneNoneBuildingsApproach Road9199922.89
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516104126130NoneP.No-9, I.No-2.5 PWD SR VOL-3 2023-24Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical means using dozerA In area of light jungle ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.100 Sqm519.44519.4421.0FalseNoneNoneFalseNoneFalse10908.240
3516105126130NoneP.No-144, I.No-16.8-b PWD SR VOL-3 2023-24Construction of unlined surface drains of average cross- sectional area 0.40 m2 in soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3m and lead of 50 m (average lead 25 m) as per Technical Specification Clause 307.B) Mechanical Means ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m33.0433.04700.0FalseNoneNoneFalseNoneFalse23128.00
3516106126130NoneP.No-17, I.No-3.7 PWD SR VOL-3 2023-24Loosening, leveling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Table 300-2 for embankment construction. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum138.77138.77742.5FalseNoneNoneFalseNoneFalse103036.7250
3516107126130NoneP.No-5.31, I.No-43 PWD SR VOL-3Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.4% by weight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum13416.8413416.84186.25FalseNoneNoneFalseNoneFalse2498886.450
3516108126130NoneP.No-43, I.No-6.1 PWD SR VOL-3 2023-24Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ m3, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6502.276502.2793.12FalseNoneNoneFalseNoneFalse605491.38240
3516109126130NoneP.No-24, I.No-4.17 PWD SR VOL-3Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3382.03382.0931.25FalseNoneNoneFalseNoneFalse3149487.50
3516110126130NoneP.No-17, I.No-3.6 PWD SR VOL-3Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum651.6651.61942.5FalseNoneNoneFalseNoneFalse1265733.00
3516111126130NoneP.No-19, I.No-4.2-B-v PWD SR VOL-3Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3117.683117.68495.0FalseNoneNoneFalseNoneFalse1543251.60
17207798780000NoneNoneBuildingsCC Drain2454486.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516112126131NoneP.No-8, I.No-1.14.1 PWD SR VOL-1 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum134.8134.8398.01FalseNoneNoneFalseNoneFalse53651.7480
3516113126131NoneP.No-15, I.No-2.1.3 PWD SR VOL-1 2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.067915.0665.04FalseNoneNoneFalseNoneFalse514795.50240
3516114126131NoneP.No-16, I.No-2.4.2 PWD SR VOL-1 2023-24Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8356.488356.4826.28FalseNoneNoneFalseNoneFalse219608.29440
3516115126131NoneP.No-18, I.No-2.11-h PWD SR VOL-1 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Sub structure of Bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne104420.94104420.940.49FalseNoneNoneFalseNoneFalse51166.26060
3516116126131NoneP.No-17, I.No-6.32, PWD SR VOL-2Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1731.31731.3660.0FalseNoneNoneFalseNoneFalse1142658.00
3516117126131NoneP.No-42, I.No-8.5.2, PWD SR VOL-2Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm461.24461.24858.0FalseNoneNoneFalseNoneFalse395743.920
3516118126131NoneP.No-16, I.No-2.4.2, PWD SR VOL-1Form work for CC drain M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum2924.772924.7726.28FalseNoneNoneFalseNoneFalse76862.95560
17207798780000NoneNoneBuildingsFormation of Ground & Constructon of Retaining wall25042683.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516119126132NoneP.No-9, I.No-2.5 PWD SR VOL-3 2023-24Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness.(ii) By Mechanical means using dozerA In area of light jungle ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.100 Sqm519.44519.4447.15FalseNoneNoneFalseNoneFalse24491.5960
3516120126132NoneP.No-8, I.No-1.14.1 PWD SR VOL-1 2023-24Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum134.8134.87860.75FalseNoneNoneFalseNoneFalse1059629.10
3516121126132NoneP.No-15, I.No-2.1.3 PWD SR VOL-1 2023-24Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately)Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.097915.09143.88FalseNoneNoneFalseNoneFalse1138823.14920
3516122126132NoneP.No-16, I.No-2.4.2 PWD SR VOL-1 2023-24Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately)M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8356.488356.48662.75FalseNoneNoneFalseNoneFalse5538257.120
3516123126132NoneP.No-18, I.No-2.11-h PWD SR VOL-1 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.Sub structure of Bridges ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne104420.94104420.9459.65FalseNoneNoneFalseNoneFalse6228709.0710
3516124126132NoneP.No-117, I.No-12.1 PWD SR VOL-3 2023-24Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m182.43182.4394.5FalseNoneNoneFalseNoneFalse17239.6350
3516125126132NoneP.No-7, I.No-1.8 PWD SR VOL-1Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum626.44626.443819.11FalseNoneNoneFalseNoneFalse2392443.26840
3516126126132NoneP.No-7, I.No-1.7 PWD SR VOL-1 2023-24Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum157.29157.292358.22FalseNoneNoneFalseNoneFalse370924.42380
3516127126132NoneP.No-130, I.No-14.10 PWD SR VOL-3 2023-24Providing and construction of a gabion structure for retaining earth with segments of wire crates of size 7 m x 3 m x 0.6 m each divided into 1.5 m compartments by cross netting, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum3233.913233.911880.0FalseNoneNoneFalseNoneFalse6079750.80
3516128126132NoneP.No-5, I.No-1.1 PWD SR VOL-3Loading and Unloading of Stone Boulder/Stone aggregates/ Sand/Kankar/Moorum. (Tipper 10 m3) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum157.29157.296933.18FalseNoneNoneFalseNoneFalse1090519.88220
3516129126132NoneP.No-5, I.No-1.14.(i)a PWD SR VOL-3Cost of Haulage Excluding Loading and Unloading Case-1 : Surfaced Road Taking output 10 t load and lead 10 km = 100 t.km ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum15.8115.8134665.95FalseNoneNoneFalseNoneFalse548068.66950
3516130126132NoneP.No-16, I.No-2.4.2, PWD SR VOL-1Form work for Retaining wall M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum835.65835.65662.75FalseNoneNoneFalseNoneFalse553827.03750
17207798780000NoneNoneBuildingsCompound Wall4024666.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516131126133NoneP.No-5, I.No-1.4.1, PWD SR VOL-1 2023-24Earth work excavation by manual means for drains, canals, waste weir, draft, approach channels, key trenches, foundation of Buildings & bridges and such simillar works in all kinds of soils, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, excavated surface leveled and sides neatly dressed disposing off the excavated stuff or sorting & stacking the selected stuff for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools & other appurtenaces required to complete the work. In all kinds of soils Depth upto 1.5 m ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum319.78319.78165.08FalseNoneNoneFalseNoneFalse52789.28240
3516132126133NoneP.No-15, I.No-2.1.3, PWD SR VOL-1 2023-24Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum7915.097915.0925.83FalseNoneNoneFalseNoneFalse204446.77470
3516133126133NoneP.No-9, I.No-5.4, PWD SR VOL-2 2023-24Providing Size Stone masonry with hard stone in foundation & plinth with Cement mortar 1:6 (1 cement : 6 coarse sand) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8443.78443.7133.2FalseNoneNoneFalseNoneFalse1124700.840
3516134126133NoneP.No-16, I.No-2.3.1, PWD SR VOL-1 2023-24Providing and laying in Cement Concrete for all Basement & surface level works, return walls, retaining walls, sunken floors etc. The granite/trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8356.488356.4812.49FalseNoneNoneFalseNoneFalse104372.43520
3516135126133NoneP.No-17, I.No-6.32, PWD SR VOL-2 2023-24Providing and constructing load bearing wall with Solid Concrete blocks of size 400x200x200mm having block density more than 1800kg/m3 and minimum compressive strength of 4.00 N/mm2 conforming to IS 2185 (Part - I) - 2005 and constructed with CM 1:4 as per IS 2572:2005 including cost of all materials, labour, scaffolding and curing, usage charges of machinery etc complete as per specifications. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm1731.31731.3251.28FalseNoneNoneFalseNoneFalse435041.0640
3516136126133NoneP.No-84, I.No-11.25.2, PWD SR VOL-2 2023-24Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in- Charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kgs179.74179.743435.55FalseNoneNoneFalseNoneFalse617505.7570
3516137126133NoneP.No-16, I.No-2.5.2, PWD SR VOL-1Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum9043.719043.7112.54FalseNoneNoneFalseNoneFalse113408.12340
3516138126133NoneP.No-18, I.No-2.11-a, PWD SR VOL-1 2023-24Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. Buildings ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Tonne118226.37118226.373.13FalseNoneNoneFalseNoneFalse370048.53810
3516139126133NoneP.No-16, I.No-2.5.1, PWD SR VOL-1 2023-24Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum8762.218762.214.36FalseNoneNoneFalseNoneFalse38203.23560
3516140126133NoneP.No-42, I.No-8.5.2, PWD SR VOL-2 2023-24Providing 15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix: 1:4 (1 cement: 4 fine sand) to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm461.24461.24494.0FalseNoneNoneFalseNoneFalse227852.560
3516141126133NoneP.No-45, I.No-8.27, PWD SR VOL-2 2023-24Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm70.0470.04494.0FalseNoneNoneFalseNoneFalse34599.760
3516142126133NoneP.No-45, I.No-8.28, PWD SR VOL-2 2023-24Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm117.62117.62494.0FalseNoneNoneFalseNoneFalse58104.280
3516143126133NoneP.No-44, I.No-8.19.1, PWD SR VOL-2 2023-24Providing Flush/ Ruled pointing: Pointing on stone work with cement mortar 1:3 (1 cement : 3 fine sand) after raking joints to depth nicely lin- ing, including cost of materials, labour, curing as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm337.01337.01148.0FalseNoneNoneFalseNoneFalse49877.480
3516144126133NoneP.No-48, I.No-8.41, PWD SR VOL-2 2023-24Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :Two coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture after thoroughly brooming the surface to remove all dirt, dust, mortar drops and foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour complete as per specifications and as per directions of Engineer-in-charge. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sqm220.71220.7185.26FalseNoneNoneFalseNoneFalse18817.73460
3516145126133NoneP.No-95, I.No-11.56, PWD SR VOL-2Fencing with G.I. barbed wire R.C.C. post placed at required distance, embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post one side only, provided with horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per metre cost of total length of barbed wire used. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m15.8615.863000.0FalseNoneNoneFalseNoneFalse47580.00
3516146126133NoneP.No-96, I.No-11.62, PWD SR VOL-2Providing and fixing RCC precast fencing pole of size 0.15mx0.15mx2.0m casted in M 20 with 20mm down size aggregates making holes for drawing barbed wire at 30 cm c/c using 8 mm dia vertical 4 TMT steel rods and 6 mm dia stirups at 15 cm c/c fixed 1.5 m above Ground level using steel moulding , curing , transportation to work spot including excavation in all types of soil, fixing in plain cement concrete M15 using 20 mm downsize aggregate including aligning to plumb and line providing including cost of all materials, labour,usage charges of machinery complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos1433.941433.94260.0FalseNoneNoneFalseNoneFalse372824.40
3516147126133NoneP.No-16, I.No-2.3.1, PWD SR VOL-1Form work for Plinth M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum4178.244178.2412.49FalseNoneNoneFalseNoneFalse52186.21760
3516148126133NoneP.No-16, I.No-2.3.1, PWD SR VOL-1Form work for Columns M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum6330.596330.5912.54FalseNoneNoneFalseNoneFalse79385.59860
3516149126133NoneP.No-16, I.No-2.5.1, PWD SR VOL-1Form work for Coping M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Cum5257.325257.324.36FalseNoneNoneFalseNoneFalse22921.91520
17207798780000NoneNoneBuildingsFURNISHING WORKS6080563.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516150126134NoneSl. No 2, Pg No-1 KSFICLTeak Wood Damaru Sofa Set : 1+3+1 with teapoy and cushion, front and back 4"x4" with turning. Sofa side bars 3.5'x1.25". Handle support patti 4"x1.25" and 2"x3", handle 6"x1.25". Seat and back support patti 2.5"x1.25". Sofa set shall be neatly finished and polished. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos114200.4114200.44.0FalseNoneNoneFalseNoneFalse456801.60
3516151126134NoneSl. No 19, Pg No-2 KSFICLTeak Wood Side Teapoy : Size 1.3/4' x1.3/4 ' x1.5' made out of 2"x2" legs 2"x1.1/4" and 3"x1.1/4" side bars. Top with 8mm glass & reapers shelf with polish. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos9841.29841.24.0FalseNoneNoneFalseNoneFalse39364.80
3516152126134NoneSl. No 20, Pg No-2 KSFICLTeak Wood Nagin Teapoy : Of size 3'x2'. Made out of Teak Wood leg size 3"x3" with carving. Top glass frame of size 3"x1.1/4" & 2"x 1.5" with 8mm tinted glass. Bottom magzine shelf required with 1.5'x3/4" pattis. Teapoy shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos14702.814702.84.0FalseNoneNoneFalseNoneFalse58811.20
3516153126134NoneSl. No 21, Pg No-2 KSFICLTeak Wood 'C' Model Teapoy: ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos16850.416850.44.0FalseNoneNoneFalseNoneFalse67401.60
3516154126134NoneSl. No 33, Pg No-3 KSFICLTeak Wood Mosquito Frame : Of size 3'x6.5' Made out of two vertical bars on the either side of size 4'x3"x1.5" upper side frame should be made with 2"x1.5" patties on all the 4 sides, such that it can be openable wherever required ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos9180.49180.425.0FalseNoneNoneFalseNoneFalse229510.00
3516155126134NoneSl. No 33, Pg No-3 KSFICLTeak Wood Mosquito Frame : Of size 6'x6.5'. Made out of two vertical bars on the either side of size 4'x3"x1.5" upper side frame should be made with 2"x1.5" patties on all the 4 sides, such that it can be openable wherever required ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos10738.010738.025.0FalseNoneNoneFalseNoneFalse268450.00
3516156126134NoneSl. No 40, Pg No-4 KSFICLTeak Wood Dinning Table Size 8'X4' : Made out of Teak wood using 4" X 4" plain or turning leg, Table frame 4" X 1.25" Top 18mm plywood with sunmica with 3" Teak Wood Border. Table shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos44368.044368.04.0FalseNoneNoneFalseNoneFalse177472.00
3516157126134NoneSl. No 44, Pg No-4 KSFICLServing Table: Made out of Teak Wood frame with 2"X2" legs and frame patti of size 3"X1.25" and bottom patti of size 2" X 1.25". Closed on all 3 sides with 12mm ply/PLPB and top made out of 18mm ply/PLPB. All visible surface to have 1mm thick laminate and inner surface 0.8mm laminate. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos17393.217393.24.0FalseNoneNoneFalseNoneFalse69572.80
3516158126134NoneSl. No 45, Pg No-4 KSFICLTeak Wood Dinning Chair Seat with Cushion & back with patties : With curved legs - Front legs of size 3"x3" with curve . Rear legs of size 2.5"x1.5" with shape . Seat pattis of size 3"x1.25" with cushion. Back top pattis to be with turning of size -2"x2". Back to be with patties. Chair shall be neatly finished and polished. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos12543.412543.44.0FalseNoneNoneFalseNoneFalse50173.60
3516159126134NoneSl. No 49, Pg No-4 KSFICLTeak Wood Table (Size 3'X2') : With Teak Wood Beading. Made out of teak wood leg size 2" x 2" . Table upper side patti 4" x 1.25" . Lower side H shape middle 1 patti . The Table shall be neatly finished and polished. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos13192.413192.44.0FalseNoneNoneFalseNoneFalse52769.60
3516160126134NoneSl. No 55, Pg No-5 KSFICLTeak Wood Executive Table : Laminated Top of size 6' X 2.5' or 6'x3', all patties below the top to be of 4”x1.25”. Leg size 2.25”x2.25”. One side 2(or 3) drawers and another side 1 cabinet with shelf. Table 3 side closed with OST pre laminated sheet 12mm thickness. Complete with all accessories like 2 locks and handles with polish. Table shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos49371.249371.24.0FalseNoneNoneFalseNoneFalse197484.80
3516161126134NoneSl. No 58, Pg No-5 KSFICLTeak Wood Typist & Computer Table (Size 4'X2') : Size: 121.92 L x 60.9cm B x 76.2cm H, Legs 4.44cm x 4.44 cm 6 nos. Side cross bars 10.16 x 2.54 cm Bottom portion 5.08 x 2.54 cm with 3 drawers or one small drawer and one cupboard on right side with 12mm OST Coverage. Top shall be made out of 1.90cm OST locking arrangements shall be provided. With Key board. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos29901.229901.24.0FalseNoneNoneFalseNoneFalse119604.80
3516162126134NoneSl. No 59, Pg No-5 KSFICLTeak Wood Officer Table : (Accounts Officer Table) Of size 7'x3'x30". Made out of 2.25"x2.25" Teak Wood legs. Table upper side patti 4"x1.25" and lower side 2"x1.25" and 12mm Commercial ply with 1mm laminate wherever visible. Table to have one drawer and one cupboard on either side. Along with one Key board. Doors and Drawers to be provided with SS handles and good quality locks and channels ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos49394.849394.84.0FalseNoneNoneFalseNoneFalse197579.20
3516163126134NoneSl. No 60, Pg No-5 KSFICLComputer Table: Of size 3' x 2' made out of PLPB. Table should consist of 1 Drawer with lock on right side and 1 keyboard . Table should be provided with 12" Modesty panel on the back side. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos12331.012331.010.0FalseNoneNoneFalseNoneFalse123310.00
3516164126134NoneSl. No 61, Pg No-5 KSFICLComputer Table: Of size 4' x 2' made out of PLPB. Table should consist of 1 Keyboard, Right side 1 Drawer with 1 Cupboard inner side one shelf ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos14726.414726.410.0FalseNoneNoneFalseNoneFalse147264.00
3516165126134NoneSl. No 63, Pg No-6 KSFICLOffice Table MDF ( Suprident Table, Size 6'X3' ) : Of size 6'x3' or 5'x3'. Made out of 18mm MDF one key board and 3 drawers on the right side. Table to be covered with 1mm laminate wherever visible. Hardware of the drawer should be telescopic channels S S handle with one lock. The Table top should be covered with 25 mm MDF edge bending. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos39412.039412.03.0FalseNoneNoneFalseNoneFalse118236.00
3516166126134NoneSl. No 64, Pg No-6 KSFICLOffice Table : Of size 4'x2.5'. Made out of 12/18 mm MDF one key board and 3 drawers on the right side . Table to be covered with 1mm laminate wherever visible. Hardware of the drawer should be telescopic channels SS handle with one lock. The Table top should be made with 25 mm MDF along with edge bending. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos26314.026314.05.0FalseNoneNoneFalseNoneFalse131570.00
3516167126134NoneSl. No 64, Pg No-7 KSFICLTeak Wood 'S' Model visitor chair: Front & Back legs made of 2" x 1.5" section along with design . Seat made of 3x 1.25" frames , Handles made of 2.5" x 1.5" section. Seat with 1.5" x 3/4" pattis. Along with polish as per design. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos15104.015104.04.0FalseNoneNoneFalseNoneFalse60416.00
3516168126134NoneSl. No 84, Pg No-7 KSFICLWardrobe : Made out of 18mm OSR PLPB (good quality)/Ply with lamination. (One side raw Prelaminated particle board) on three sides and back of 12mm PLPB. Inner design should have drawers in the center with lock. Top 3 ft should be open with 1 hanger rod. Bottom portion should have 1 shelf. Exterior to be finished with laminate/ veneer as per requirement. (Rate per Sqfeet) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sft2478.02478.0200.0FalseNoneNoneFalseNoneFalse495600.00
3516169126134NoneSl. No 86, Pg No-8 KSFICLComputer Work Station size 3' x 2' per user : Providing and fixing of straight line work station. Made out of 18mm ply with 1mm laminate or 18mm PLPB. Each work station should be of size 3'x2'. (W xD) and should be closed on three sides with 18mm 3.5' or 4' height verticals and back. Each work station should have provision for Keyboard, CPU and wire manager to be provided ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos13711.613711.65.0FalseNoneNoneFalseNoneFalse68558.00
3516170126134NoneSl. No 88, Pg No-8 KSFICLComputer Work Station of size 4' x 2' per user : Providing and fixing of straight line work station. Made out of 18mm ply with 1mm laminate or 18mm PLPB. Each work station should be of size 3'x2'. (W xD) and should be closed on three sides with 18mm thick 3.5' height or 4' verticals and back. Each work station should have provision for Keyboard, 1 Drawer, CPU and wire manager to be provided ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos15458.015458.05.0FalseNoneNoneFalseNoneFalse77290.00
3516171126134NoneSl. No 89, Pg No-8 KSFICLComputer Work Station of size 4' x2' per person : Providing and fixing of straight line work station. Made out of 18mm ply with 1mm laminate or 18mm PLPB. Each work station should be of size 3'x2'. (W xD) and should be closed on three sides with 18mm thick 3.5' height or 4' verticals and back. Each work station should have provision for Keyboard, CPU and 3 drawers to be provided on right side ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos18667.618667.63.0FalseNoneNoneFalseNoneFalse56002.80
3516172126134NoneSl. No 91, Pg No-8 KSFICLWooden Rack : (Teak Wood) 4' x 3' x1.5'. Made out of teak wood frame of section 2"x2" and supporting patties of thickness 3"x1.25". Panel to be made out of 8mm plywood with veneer on the outer side . 18mm plywood shelves will be provided inside . Entire rack to be polished outer side and painted inside. Front teak wood beading. Rack shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos32874.832874.85.0FalseNoneNoneFalseNoneFalse164374.00
3516173126134NoneSl. No 93, Pg No-8 KSFICLCorner Table : Of size height 2', width 3'. Made out of MDF/ply with veneer. Front with glass. Top closed with MDF/ply with veneer. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos23552.823552.84.0FalseNoneNoneFalseNoneFalse94211.20
3516174126134NoneSl. No 94, Pg No-8 KSFICLDressing Table With Stool : Teak wood dressing Table height 6'and middle 2.5'. Table should be of 2' height with 3 drawers on one side and door with lock on right side made out of complete teak wood. Top tobe of 1" thickness. Mirror frame to be of 4' height with 18" width. Mirror should be in 3"x1.25" frame, with stool. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos35140.435140.44.0FalseNoneNoneFalseNoneFalse140561.60
3516175126134NoneSl. No 96, Pg No-8 KSFICLNotice Board : Of size 5'x3' using 18mm plywood for body, back 8mm plywood and 12mm soft board with cloth. And 5mm plain glass for door with lock, and alluminium chanal with teak wood beading. Outerside laminated sheet or veneer with polish, inner side paint or polish. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos23364.023364.05.0FalseNoneNoneFalseNoneFalse116820.00
3516176126134NoneSl. No 104, Pg No-9 KSFICLTeak Wood Horse Shoe Table : Of size overall Length 20'. L-16' x Width 2' or 2.5'x Height 2.5' =2 Nos. & 4' one "U" shape Table, such that when three table joined together and make one Horse shoe table. Leg size 2.5"x2.5" turning legs. Table upper portion patti of 4"x1.25" and bottom patti 2"x1.5". Top should be OST covered with Green cloth on top and front portion. Top should be provided with 8mm glass with Diamond polish. The Table shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos235764.0235764.04.0FalseNoneNoneFalseNoneFalse943056.00
3516177126134NoneSl. No 105, Pg No-9 KSFICLTeak Wood Dias Table : Of size L-6'xW-36"xH-30". Made out of Teak wood Dias Table leg size-3"x3". Table Top patti- 4"x1.25" and bottom portion shall be 2"x1". The top of the Table shall be provided with 18mm OST. Table top and Front should be provided with Blazer Cloth. Table top should be provided with 6mm plain glass with Diamond polish. Table shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos35223.035223.04.0FalseNoneNoneFalseNoneFalse140892.00
3516178126134NoneSl. No 106, Pg No-9 KSFICLTeak Wood Dias Reiling :- Made out of 3"x3" turning legs, affixed together in 2"x1" patti at top & bottom maintaining a distance of 12" between every leg. Further finished with 3"x1.5" pattis on top and bottom, such that the flat surface is seen above. To be fixed on site with necessary screws, embeded in the floor. (Per Running Meter ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos10738.010738.04.0FalseNoneNoneFalseNoneFalse42952.00
3516179126134NoneSl. No 107, Pg No-9 KSFICLTeak Wood Witness Box : Length 4'xWidth 2.5'xHeight 4', made out of Teak wood legs (turning) size 4"x4" with side bars 3"x2". The Height from the ground shall be 6" with 18mm OST . Back Jungle wood support. All the sides shall be covered by 2"x2" reapers with suitable gap in between. The Witness Box shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos51825.651825.64.0FalseNoneNoneFalseNoneFalse207302.40
3516180126134NoneSl. No 108, Pg No-9 KSFICLTeak Wood Easy Chair : Made out of Teak Wood Front legs of size 3"x3", back legs of size 4"x2", side patties should be in curved shape of size 6"x1.25". Handle should be of size 2.5'x4"x1.25" on either sides. When opened becomes 5' in length. Chair head side patti of size 2"x6"x1.25". Seat and back covered with Teak Wood with cane or batten of size 1.25"x0.75". ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos25936.425936.45.0FalseNoneNoneFalseNoneFalse129682.00
3516181126134NoneSl. No 109, Pg No-10 KSFICLTeak Wood Accused Dock : Of size Length 8'xwidth 3'xHeight 4' with wooden platform. Made out of Teak wood leg size 4"x4". Side bars shall be 2"x2" . All the side shall be covered with 2"x1" reapers with suitable gap in between. A side door shall also be provided with locking device. The height of the Accused Dock from the ground shall be 6". The Accused Dock shall be neatly finished and polished. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos84936.484936.44.0FalseNoneNoneFalseNoneFalse339745.60
3516182126134NoneSl. No 112, Pg No-10 KSFICLTeak Wood Bench Without Back : Size 182.88cm L x 46cm W x 46cm H Legs 4.4 x 4.44cm. Patties at top and bottom around 5.68 x 2.54cm in section and polished seat shall be provided with 18mm block board with laminated sheet on the top of the Block board. Bench shall be neatly finished and polished ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos24166.424166.48.0FalseNoneNoneFalseNoneFalse193331.20
3516183126134NoneSl. No 114, Pg No-10 KSFICLTeak Wood Rocking Chair Wheel Model ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos36757.036757.04.0FalseNoneNoneFalseNoneFalse147028.00
3516184126134NoneSl. No 117, Pg No-10 KSFICLBook Rack with glass : Of size 6'x3'x18". Made out of 18mm thick black board with 3 shelves laminated glass sheters, Inner side paint. Outer surface polish ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos39341.239341.24.0FalseNoneNoneFalseNoneFalse157364.80
17207798780000NoneNoneBuildingsBorewell Works834553.73
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516185126135NoneS R 2023-24, Page No: 140, Item No:12.4 V-5Geophysical investigation at site for sinking borewells for Providing drinking water to the habitation either through the Hand Pump MWS or P.W.S.S, by vertical electrical sounding by adopting Venner or Schlumbergers's method, including reconnaissance survey of geological formation. Geophysical investigation of existing ground water in the vicinity, its quality, quantity and acceptability of the users, indicating the location of the site, recommended depth of casing pipe required to seal the top unconsolidated formation including an extra depth of 1.0 metre in consolidated formation for proper seating of casing pipe, depth of drilling required to cover full depth of aquifer proposed to be tapped, probable yield and other information required including transportation of instruments and accessories to work site, engaging technical personal and labour required etc. NOTE: 1) Additional rate on item 1&2 is allowed for drilling in over burden and fixing Casing pipes beyond 20 M (for fixing Casing pipes only) a) Above 20 M and upto 30 M - 15%, b) Above 30 M - 30% (Measurement of overburden is restricted to the depth of casing pipe fixed excluding initial depth of 20M and projection above ground level). 2) A sum of Rs. 100/- is to be deducted for Dry Borewell towards yield test. etc. complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6988.626988.621.0FalseNoneNoneFalseNoneFalse6988.620
3516186126135NoneS R 2023-24, Page No: 139, Item No: 12.1.1 V-5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) 0-50 Mtrs. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m488.99488.9950.0FalseNoneNoneFalseNoneFalse24449.50
3516187126135NoneS R 2023-24, Page No: 139, Item No: 12.1.2 V-5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) 50-100Mtrs. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m613.22613.2250.0FalseNoneNoneFalseNoneFalse30661.00
3516188126135NoneS R 2023-24, Page No: 139, Item No: 12.1.3 V-5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) 100-150 Mtrs. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m651.55651.5550.0FalseNoneNoneFalseNoneFalse32577.50
3516189126135NoneS R 2023-24, Page No: 139, Item No: 12.1.4 V-5Sinking of Borewell of 165mm dia clear using super fast hydraulic rig of capacity 300 PSIG & above 1100 CMF & above in all strata including over burdern upto 20 m. Fixing of casing pipes, collars and cap with necessary cutting, threading and welding including transportation of rig and supporting vehicle, crew charges and cost of consumables etc., complete including yield testing at the final depth with a minimum working of compressor for one hour (Excluding cost of casing pipes, collars, cap etc., complete ) (Above 450m of drilling add 10% for every 50m depth) 150-200 Mtrs. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m755.96755.9650.0FalseNoneNoneFalseNoneFalse37798.00
3516190126135NoneS R 2023-24, Page No:139, Item No: 12.32 V-5Supply of ISI mark 175mm nominal bore,plain and steel casing pipe grade of steel Fe 410 of wall thickness conforming to IS 4270-2001 and latest ammendments, electrical resistance welded steel tubes, material and conforming to IS 1387-1993 and manufactured by basic open hearth electric or basic oxygen process in random length of 5-7m both ends.threaded conforming to IS 554-1985 one end fixed with socket conforming to IS 4270-2001 and the other end with screwed pipes all shall be responsibaly free from defects. The tubes shall be responsible straight end should be with ISI marking weighing 25.10kg/m.prices include Collar-Medium duty. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m2554.652554.6530.0FalseNoneNoneFalseNoneFalse76639.50
3516191126135NoneS R 2023-24, Page No: 143, Item No: 12.34 V-5Providing and laying at site of work MS casing caps as per IS 1239 (part-II) 1982 with all latest amendments if any for any dia. The thickness of plate used for covering one end shall be 3mm (minimum). The dimensions of caps and colars shall be strictly as per IS 1239 (Part-II) 1982 with all amendments including cost of material and labour charges for fixing, if any etc. complete with all lead and lifts and as directed by the Engineer in charge ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each216.74216.741.0FalseNoneNoneFalseNoneFalse216.740
3516192126135None2023-24, P-152, I-13.15.7 V-5Supply, Erection and Commissioning of pumpset. Providing Submersible Pump Set of 150mm dia suitable for bore well and confirming to IS 8034-2000;3Phase, SS Bowl & Impeller with Low volt Motor as per specifications, to work site as per necessary ammendments and instructions of engineer incharge of work. For 3 HP etc. complete. Head - 165 mtrs, Discharge - 90 LPM, 7.5 HP / 15 stage ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Set53934.553934.51.0FalseNoneNoneFalseNoneFalse53934.50
3516193126135NoneSR 2023-24, P-154, I-13.22.5 V-5SUBMERSIBLE CABLE : Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 3 C x 10 Sqmm. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m370.05370.05600.0FalseNoneNoneFalseNoneFalse222030.00
3516194126135None2023-24, P-127, I-11.2.6 V-5GI PIPE: Providing, Laying and Fixing of GI pipes conforming to IS 1239:1990 with latest amendments complete with GI fittings (excluding the cost of fittings) with cuts and threads wherever necessary, including testing for water tightness, with all lead and commissioning. (contractor will make his own arrangements for procuring water for testing) For:Heavy Duty GI Pipe etc. complete. Medium Duty GI pipe of 50mm dia ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m771.81771.81310.0FalseNoneNoneFalseNoneFalse239261.10
3516195126135NoneSR 2023-24, P-129, I-11.6.6 V-5Providing wrought mild steel (galvanized) GI collar confirming to IS 1239-II, 1991 with latest amendments if any For 50 mm dia GI collar: ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos.352.87352.8730.0FalseNoneNoneFalseNoneFalse10586.10
3516196126135NoneSR 2023-24, P-130, I-11.8.6 V-5Supply and delivery at site wrought middle steel (galvanized) GI bend confirming to IS 1239-II, 1991 with latest amendments if any. For 50 mm dia GI BEND ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No.473.13473.134.0FalseNoneNoneFalseNoneFalse1892.520
3516197126135NoneSR 2023-24, P-131, I-11.12.6 V-5Supply and delivery at site wrought middle steel (galvanized) GI union confirming to IS 1239-II, 1991 with latest amendments if any. For 50 mm dia GI Union ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No.352.87352.871.0FalseNoneNoneFalseNoneFalse352.870
3516198126135NoneM.RPRESSURE GAUGE Supply and Delivery of brand new make with GM stop cock and GM Tee and 2 Nos of nipples ISI certified suitable range pressure gauge with best quality 1 ampere. Pressure Gauge 50mm size, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No528.64528.641.0FalseNoneNoneFalseNoneFalse528.640
3516199126135NoneSR 2023-24, P-154, I-13.24.1 V-5GATE VALVE : GATE VALVE : Supply and delivery at site of brand new best make gate valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No1652.01652.01.0FalseNoneNoneFalseNoneFalse1652.00
3516200126135NoneSR 2023-24, P-154, I-13.25.1 V-NON RETURN VALVE : NON RETURN VALVE : Supply and delivery at site of brand new best make non-return valve as per IS 778/1984 with ISI Mark and as per its latest amendments Size 50 mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No1652.01652.01.0FalseNoneNoneFalseNoneFalse1652.00
3516201126135NoneSR 2023-24, P-154, I-13.23.3 V-5COMBINED ENERGY METER AND CONTROL PANEL BOARD UNIT: OUTDOOR TYPE : Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog Voltmeter 1ni with Phase selector switch, Isolating switch OUTGOING for Main Electrical Pump: 1 No. MCB 1 No. DOL of S/D Starter suitable for respective HP 1 No. Electrcal Protection Like single Phase preventor, under voltage over Volage, under current over current & dry run protection suitable for the pump described above 1 no Indoor type NOTE: 1) DOL- Direct Online Starter 2) S-D- Star Delta Starter etc. complete. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Unit21013.4421013.441.0FalseNoneNoneFalseNoneFalse21013.440
3516202126135NoneSR 2023-2024, V-5, Page No:155, I-13.25 V-56 to 15 HP pumps POWER SHUNT CAPACITORS : Supply and delivery at site best indigenous brand new power capacitor as per IS 2834/1986 with latest amendments with KPTCL authorities and erection, electrification and commissioning of the same at the location of respective pump sets. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Kvar726.88726.883.0FalseNoneNoneFalseNoneFalse2180.640
3516203126135NoneSR 2023-2024, V-5, Page No:156, I-13.32Labour charges for Erection, Electrification and commissioning of Pump sets, including aligning and balancing of all items including supply and erection of two pair of supporting clamps, bore well caps, cable clips and water tight gland cable protectors, bolts, nuts, valve and gauges,tools and equipments etc., involved in the job as per specifications, with necessary tests as per specifications, with testing of as per instructions of engineer incharge of work. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Job8590.48590.41.0FalseNoneNoneFalseNoneFalse8590.40
3516204126135NoneSR 2023-2024, V-5, Page No:156, I-13.34ERECTION OF PANEL BOARD AND METER BOARD UNIT : ERECTION OF PANEL BOARD AND METER BOARD UNIT : Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., complete as per specification, with testing of as per instructions of engineer incharge of work. Outdoor type ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Set1916.321916.321.0FalseNoneNoneFalseNoneFalse1916.320
3516205126135NoneSR 2023-2024, V-5, Page No:157, I-13.38.3MAIN CONNECTIONS : MAIN CONNECTIONS : Providing and fixing suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps,bolts,nuts and washers etc. with necessary materials and labour tools and equipments as per instructions of engineer incharge of work. 3halfx25 Sqm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m742.74742.7460.0FalseNoneNoneFalseNoneFalse44564.40
3516206126135NoneSR 2023-2024, V-5, Page No:A-44, I-642Providing main connection from pole PVC insulated sheathed steel wire cable in GI pipe ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m112.34112.3412.0FalseNoneNoneFalseNoneFalse1348.080
3516207126135NoneSR 2023-2024, V-5, P-157, I-13.39Earthing: Providing and fixing and wiring earth electrode for grounding circuits IC cutouts and other equipments on the meter board in the pit. The pits should be filled up with equal proportion of salt and charcoal 150mm around the pipe to complete depth. The connection from the pipe to the conduits etc. is to established through GI wire of sizes as per clause 7.3.3 of IS 732 using 12mm bolts, nuts, washers and check nuts, the pipe shall have 16 through holes of 12mm dia. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Pit4956.04956.01.0FalseNoneNoneFalseNoneFalse4956.00
3516208126135NoneSR 2021-22, Part- I P-14, I- 5.35Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 A three phase 4 wire whole current class-1 Accuracy Energy Meter. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each7111.867111.861.0FalseNoneNoneFalseNoneFalse7111.860
3516209126135NoneM.RSupplying, fixing and wiring of Auto start equipment for automatic switch off/ switch on of the pump set during power failure. The above equipment should be housed in the control panel (out door) and necessary control wiring between auto starter. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Nos.1652.01652.01.0FalseNoneNoneFalseNoneFalse1652.00
17207798780000NoneNoneBuildingsElectrical Works8891953.31
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3516210126136None1.2.2Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 25mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m103.08103.085200.0FalseNoneNoneFalseNoneFalse536016.00
3516211126136None1.2.3Concealed Conduit System Supplying heavy gauge PVC conduit pipe ...... mm dia..........mm thick confirming to IS 2509 with suitable size bends, metal/PVC Junction boxes, adhesive paste etc., and running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18SWG GI fish wire wherever necessary. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 32mm dia 2.5mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m136.12136.122100.0FalseNoneNoneFalseNoneFalse285852.00
3516212126136None1.3.2Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 25mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m104.41104.414400.0FalseNoneNoneFalseNoneFalse459404.00
3516213126136None1.3.3Supplying heavy gauge PVC Conduit Pipe .... dia ....... mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering upto the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 32mm dia 2.5mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m130.84130.84450.0FalseNoneNoneFalseNoneFalse58878.00
3516214126136None1.1.1Open Conduit System Supplying heavy gauge PVC conduit pipe …….dia .......mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc., and fixing using inverted wood plugs in case of RCC ceiling and RCC wall stone structure or rawl plugs in case of brick walls and cement plastering damaged portion using heavy gauge saddles at an interval of 700mm using NF screws..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 19/20mm dia 2mm thick ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m91.1991.19200.0FalseNoneNoneFalseNoneFalse18238.00
3516215126136NoneI-1.13Supplying And Fixing Metal Fan Box with Round Hook..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No.154.63154.63122.0FalseNoneNoneFalseNoneFalse18864.860
3516216126136None1.5.2Supplying and fixing PVC/metal conduit Deep junction box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Deep junction box,25mm deep junction box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each74.0174.01520.0FalseNoneNoneFalseNoneFalse38485.20
3516217126136None5.19.11Supplying and fixing regular MCB distribution boards on wall/ood board / flush mounting using required clA, bolts, nuts etc., with provision for fixing suitable type capacity MCB's single phase/3 phase/single door with powder coated painting Made out of 14 SWG MS enclosure..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) III - Double Door,4Way TP &N ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each5336.625336.6222.0FalseNoneNoneFalseNoneFalse117405.640
3516218126136None3.4.1Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 1-2 Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each182.38182.38100.0FalseNoneNoneFalseNoneFalse18238.00
3516219126136None3.4.3Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 4-5Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each233.92233.92100.0FalseNoneNoneFalseNoneFalse23392.00
3516220126136None3.4.4Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each290.75290.7550.0FalseNoneNoneFalseNoneFalse14537.50
3516221126136None3.4.5Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 8Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each344.94344.94130.0FalseNoneNoneFalseNoneFalse44842.20
3516222126136None3.4.6Supplying and flush mounting powder coated metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 10-12Way ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each421.59421.5974.0FalseNoneNoneFalseNoneFalse31197.660
3516223126136None3.5.1Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 1 to 2 Module ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each181.06181.06100.0FalseNoneNoneFalseNoneFalse18106.00
3516224126136None3.5.3Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 4Moudule ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each231.28231.28100.0FalseNoneNoneFalseNoneFalse23128.00
3516225126136None3.5.4Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Moudule ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each309.25309.2550.0FalseNoneNoneFalseNoneFalse15462.50
3516226126136None3.5.5Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 8Moudule ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each375.33375.33130.0FalseNoneNoneFalseNoneFalse48792.90
3516227126136None3.5.6Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., complete on the existing metal/PVC box..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 12Moudule ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each454.63454.6374.0FalseNoneNoneFalseNoneFalse33642.620
3516228126136None2.2.1Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Short point up to 3Mtr from tapping point to out let via switch box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point344.94344.94116.0FalseNoneNoneFalseNoneFalse40013.040
3516229126136None2.2.2Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Medium point above 3Mtr up to 6Mtr from tapping point to out let via switch box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point500.89500.89160.0FalseNoneNoneFalseNoneFalse80142.40
3516230126136None2.2.3Point wiring using Copper wire without switch. Supplying and wiring adopting loop system in existing PVC Conduit /casing capping casing capping using 2x1.5mm2 (Phase & Neutral) & 1x1.0 mm2 (Earth wire) FRLS multi strand PVC insulated copper wire (confirming to IS-694: and latest amendments) without control switch shall be fixed on the existing plastic sheet/ gang box, the other end of the wires shall be terminated with sufficient loose length in a wood/PVC round block. complete for each outlet.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Long point above 6Mtr up to 10Mtr from tapping point to out let via switch box ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Point733.49733.49292.0FalseNoneNoneFalseNoneFalse214179.080
3516231126136None3.6.1Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Amps one way. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each134.8134.8723.0FalseNoneNoneFalseNoneFalse97460.40
3516232126136None3.6.2Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Amps Two way. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each219.39219.3912.0FalseNoneNoneFalseNoneFalse2632.680
3516233126136None3.6.3Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Amps 3way socket. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each225.99225.99270.0FalseNoneNoneFalseNoneFalse61017.30
3516234126136None3.6.4Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Stepped Fan Regulator Two Module. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each471.81471.81132.0FalseNoneNoneFalseNoneFalse62278.920
3516235126136None3.6.8Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6Amps Bell push ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each233.92233.9212.0FalseNoneNoneFalseNoneFalse2807.040
3516236126136None3.6.10Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 32Amps DP switch ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each430.84430.84100.0FalseNoneNoneFalseNoneFalse43084.00
3516237126136None3.6.11Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6/16Amps universal socket ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each311.9311.990.0FalseNoneNoneFalseNoneFalse28071.00
3516238126136None3.6.12Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) TV/Telephone socket ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each206.17206.1770.0FalseNoneNoneFalseNoneFalse14431.90
3516239126136None3.6.13Supplying and fixing of modular switch/ Socket/stepped electronic fan regulator/ dimmer/telephone socket etc on existing modular switch plate as per IS 3854 and IS 1293 .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) RJ45/ I.O. outlet ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each445.38445.3894.0FalseNoneNoneFalseNoneFalse41865.720
3516240126136None2.3.2Wiring for lighting/power circuit using one of FR PVC insulated 1100V grade, multistrand Copper conductor single core cable in open or concealed system of wiring with specified IS-694:1990 & confirming to the attached GTP of GROUP -A. .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 1.5 mm2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m34.3634.3610000.0FalseNoneNoneFalseNoneFalse343600.00
3516241126136None2.3.3Wiring for lighting/power circuit using one of FR PVC insulated 1100V grade, multistrand Copper conductor single core cable in open or concealed system of wiring with specified IS-694:1990 & confirming to the attached GTP of GROUP -A. .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 2.5 mm2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m55.5155.519200.0FalseNoneNoneFalseNoneFalse510692.00
3516242126136None2.3.4Wiring for lighting/power circuit using one of FR PVC insulated 1100V grade, multistrand Copper conductor single core cable in open or concealed system of wiring with specified IS-694:1990 & confirming to the attached GTP of GROUP -A. .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 4 mm2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m83.2683.267800.0FalseNoneNoneFalseNoneFalse649428.00
3516243126136None2.3.5Wiring for lighting/power circuit using one of FR PVC insulated 1100V grade, multistrand Copper conductor single core cable in open or concealed system of wiring with specified IS-694:1990 & confirming to the attached GTP of GROUP -A. .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6 mm2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m121.59121.592300.0FalseNoneNoneFalseNoneFalse279657.00
3516244126136None2.3.6Wiring for lighting/power circuit using one of FR PVC insulated 1100V grade, multistrand Copper conductor single core cable in open or concealed system of wiring with specified IS-694:1990 & confirming to the attached GTP of GROUP -A. .( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 10 mm2 ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m220.71220.71230.0FalseNoneNoneFalseNoneFalse50763.30
3516245126136NoneI-3.8Supplying 4mm thick plastic sheet with necessary nitches for fixing switches, regulators etc, and fixing on existing wooden or metal box using N.F. screws.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sq CM0.540.5452000.0FalseNoneNoneFalseNoneFalse28080.00
3516246126136None3.10.3Extra for supplying 4mm thick white plastic plate and covering for junction boxes of size ……mm conduit using necessary machine screws..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 110mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each27.7527.75320.0FalseNoneNoneFalseNoneFalse8880.00
3516247126136None3.14.7Supplying And fixing/replacing of 6/16/32A electrical accessories on existing switch board..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6A Batten Holder ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each97.897.850.0FalseNoneNoneFalseNoneFalse4890.00
3516248126136None12.2.1Supplying and fixing one of 230 V Ding dong bell and a flush type bell push with gang box fixed on necessary wooden or rawl plugs using NF screws with Remote..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Ding Dong Bell ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each325.11325.1112.0FalseNoneNoneFalseNoneFalse3901.320
3516249126136None11.5.3Supply of round/square recess/surface mounted rolling type LED Down light with ...... W GU 10 LED Lamp Rib Fabricated from diecast aluminium with white powder coated prewired to mains connector & has swivelling unit of aluminium die cast eye ball & LED Lamp position retained by circular wire spring, with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power Input: 220-240V @50/60Hz & Power factor greater than 0.9 along with CE approved. 2years Warranty against any manufacturing defect working under standard electrical condition.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) LED square or round down light 15-18W ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1749.81749.862.0FalseNoneNoneFalseNoneFalse108487.60
3516250126136None11.3.2Supplying of .....feet -PVC Batten with integrated LED tube .... W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI greater than 80. Power 20-240V@ 50/60Hz & Power factor greater than 0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) LED light fitting 1 x 4' - 20/22 W ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each911.9911.9210.0FalseNoneNoneFalseNoneFalse191499.00
3516251126136None11.11.4Supplying & fixing of retrofit type - LED bulb ...... W with OPAL acrylic diffuser comprising of LED source with CCT 6500 degree K, CRI greater than 70%. efficacy greater than 80 lumen per W, life greater than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The LED are driven by HF electronic driver integrated in the system, with PF greater than 0.95, power loss should lesser than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 9 W, 6500K ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each203.53203.5350.0FalseNoneNoneFalseNoneFalse10176.50
3516252126136None11.6.2Supplying of recess mounting non integral type ........ LED w luminaire comprising of pressure decast/extruded aluminium housing, with spring loaded false ceiling clA, Power LEDs with CCT 6500 degree K, CRI greater than 70%. efficacy greater than 100 lumen per W, 120degree beam spread, life greater than 25000 burning hours and Compliance to IS 10322/IEC 60598, LM 79 & LM 80. The lamp compartment is enclosed with anti glare opal diffuser which enhances the lighting level LEDs are driven by HF electronic driver integrated in a separate control gear assembly., with PF greater than 0.95, power loss should lesser than 5% of lamp Wage., short circuit & open circuit protection to be integrated in the circuit, THD less than 20%, Life as per LM 79. The operating input voltage should be between 130 to 275 V. BIS Approved and Tested by NABL/CPRI accredited laboratory with 2 years Warranty against any manufacturing defect working under standard electrical condition.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) LED modular down light 2'x2' /1'x4' 34-36 W ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each6017.246017.246.0FalseNoneNoneFalseNoneFalse36103.440
3516253126136None11.8.4Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT greater than 5500K, IP66 optical and electrical compartment & impact resistance of complete luminaire greater than IK08. Power Factor greater than 0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency greater than1301m/w, nominal CRI greater than75. Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008. Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) LED Streetlight 90W ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each11709.3811709.385.0FalseNoneNoneFalseNoneFalse58546.90
3516254126136None6.5.2Supplying wall mounting fan suitable to operate at single- phase 230v AC. supply.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 400mm Sweep ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each4244.984244.9816.0FalseNoneNoneFalseNoneFalse67919.680
3516255126136None6.3.1Supplying capacitor type ceiling fan complete with down rod blades, shackle, canopies etc, for operation on 230 volts, 50 cycles. Single phase AC supply conforming to ISS-374- 1979 and with double ball bearing system.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 48" Sweep (1200mm) Regular model ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each3943.653943.65122.0FalseNoneNoneFalseNoneFalse481125.30
3516256126136None13.2.2Supplying and Fixing........mm dia class A GI pipe bracket upto 2.7 meters long terminated with a reducing collar of 40x25mm to which extra pipe of 175mm length is fixed for fixing MV/SV/MH/FTL street light fitting of all capacities on rail/RCC/wall/tubular pole, using suitable clA, bolts, nuts and wiring using suitable capacity wires.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Using 32mm dia G.I.pipe ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each1711.471711.475.0FalseNoneNoneFalseNoneFalse8557.350
3516257126136NoneI-13.7Fixing all types and all capacities of fluorescent /false ceiling /spot light / CFL / LED fittings indoor on the wall/ ceiling / rafters / girders using 23/0.0076" twin twisted PVC insulated wires, required Nos of round blocks and clA..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each161.24161.24346.0FalseNoneNoneFalseNoneFalse55789.040
3516258126136NoneI-13.11Fixing a ceiling /wall mounting fan of all capacities and all types, with necessary clamps and 'S' hook made out of 15mm dia MS rod, with 5 amps. ceiling rose of approved quality with necessary length of 23/0.0076 inch PVC insulated twin twisted wire of approved quality, mounted on a suitable size wooden board and wired..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each416.3416.3122.0FalseNoneNoneFalseNoneFalse50788.60
3516259126136NoneI-13.12Extra length of GI pipe of class B 19mm dia for down rod..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each260.36260.36122.0FalseNoneNoneFalseNoneFalse31763.920
3516260126136NoneI-13.14Fixing one exhaust fan in the nitch already left in the wall with bolts and nuts and 5 A. ceiling rose with sufficient length of 23/0.0076 inch PVC insulated twin core wire..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each650.23650.2320.0FalseNoneNoneFalseNoneFalse13004.60
3516261126136None5.18.4Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898...( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6-32 A DP ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each976.66976.66144.0FalseNoneNoneFalseNoneFalse140639.040
3516262126136None5.18.7Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898...( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 6-32 A TPN ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each2348.482348.4820.0FalseNoneNoneFalseNoneFalse46969.60
3516263126136None5.18.9Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898...( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 50-63 A TPN ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each2759.52759.520.0FalseNoneNoneFalseNoneFalse55190.00
3516264126136NoneI-5.31Supplying and fixing Electronic Trivector Meter (ETV) suitable for operation LT operation and -CT operated meter in polycarbonate body in class 0.5 accuracy as per IS 14697 and completely wired..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each7328.277328.272.0FalseNoneNoneFalseNoneFalse14656.540
3516265126136NoneI-5.38Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each680.62680.629.0FalseNoneNoneFalseNoneFalse6125.580
3516266126136NoneI-5.33Supplying of multi function digital meter with three line back light LCD type display for voltage, Current, frequency, Power, power factor, KVA, KWH, KVAR suitable for 3 phase, 4 wire LT network with IP 54 degree of protection and completely wired as required with communication Port and Class 0.5s accuracy,.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each12310.712310.72.0FalseNoneNoneFalseNoneFalse24621.40
3516267126136None5.12.,4Supplying of on load change over switches 4 poles, AC- 23A Duty, 415V, 50Hz, AC Supply. With all accessories. (SM Enclosure Sheet Metal Execution.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 200 A ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each20153.0820153.081.0FalseNoneNoneFalseNoneFalse20153.080
3516268126136None13.8.5Fixing of ..... A TPST / change over switch / Contactor along with neutral link with screws, bolts, nuts and wiring using required capacity wires and circuit labelling..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 100A to 250A TPDT/COS ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each622.47622.471.0FalseNoneNoneFalseNoneFalse622.470
3516269126136None5.14.9Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) FOUR POLE. 100Amps 25kA. ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each11216.4211216.4224.0FalseNoneNoneFalseNoneFalse269194.080
3516270126136None5.14.13Supplying and fixing Moulded Case Circuit Breaker (MCCB) over the existing wood/panel board using necessary screws, bolts, nuts, necessary phase separators, handle and wiring complete. Protection of Overload and Short circuit in Thermal Magnetic Release. Micro processor release shall have Earth Fault as per IS-13947. (Icu=100% lcs). In 4P MCCB, all Poles should have protection for Short-Cicrcuit/Over Load. For Microprocessor MCCBS Facility for segregating Priority and Non-Priority loads must be available in the MCCB. MCCB shall be provided with double insulation (insulation between front cover and internal power circuits to avoid any accidental contact with live current carrying path with the front cover open). Multi-pole breakers shall be designed to break all the poles simultaneously and they shall have a single mechanism..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) FOUR POLE. 250 A 35 kA , ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each28270.3528270.356.0FalseNoneNoneFalseNoneFalse169622.10
3516271126136NoneI-5.15Supplying and fixing of Shunt trip suitable for MCCB.CBCT. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each2250.682250.681.0FalseNoneNoneFalseNoneFalse2250.680
3516272126136NoneI-5.21Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage current, programmable delay/auto/ manual reset facility suitable to mount on DIN rail/ flush mounting on panel board. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each12231.4112231.412.0FalseNoneNoneFalseNoneFalse24462.820
3516273126136NoneI-8.1Supplying and drawing UTP-CAT 6E LAN cable..( COMMON SR of 2022-23 PWD , Chapter No.1 ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m50.2250.223600.0FalseNoneNoneFalseNoneFalse180792.00
3516274126136None8.2.2Supplying and drawing PVC flexible one pair telephone unarmoured tinned copper cable..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 2Pair ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Rmtr27.7527.751400.0FalseNoneNoneFalseNoneFalse38850.00
3516275126136None8.4.11Supplying & Fixing of switch mounting rack with power manager & Cable manager..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 42 U with 850mm depth, ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each59737.6459737.643.0FalseNoneNoneFalseNoneFalse179212.920
3516276126136None8.9.2Supplying fixing of Network Switches,.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 24 Port Gigabyte (manageable),( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each54780.3254780.326.0FalseNoneNoneFalseNoneFalse328681.920
3516277126136None8.10.2Supplying & fixing of I/O socket with back box,.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) Double I/O ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each726.88726.88300.0FalseNoneNoneFalseNoneFalse218064.00
3516278126136None8.11.2Supplying & Fixing of ... Mtrs Cat 6 Patch Cable,.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 2mtr ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each339.65339.65300.0FalseNoneNoneFalseNoneFalse101895.00
3516279126136None8.12.1Supplying & Fixing of Patch panel for LAN cabling,( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 48 Port 10/100 patch panel ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each18660.9918660.9910.0FalseNoneNoneFalseNoneFalse186609.90
3516280126136None9.3.3Supplying, erecting, testing & commissioning of ON-LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with isolation transformer all accessories complete and Excluding batteries and wiring complete. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 5 kVA ON LINE UPS , ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each90374.9790374.971.0FalseNoneNoneFalseNoneFalse90374.970
3516281126136None9.3.5Supplying, erecting, testing & commissioning of ON-LINE UPS system suitable for operation on 230V, 50Hz, A/C supply, with isolation transformer all accessories complete and Excluding batteries and wiring complete. ( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 10 kVA ON LINE UPS , ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each136878.11136878.111.0FalseNoneNoneFalseNoneFalse136878.110
3516282126136None9.5.8Supplying, installation, testing & commissioning of 12V DC, AH batteries in poly propylene container for U.P.S. Sealed maintenance free batteries..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 120 AH capacity ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Each20503.320503.344.0FalseNoneNoneFalseNoneFalse902145.20
3516283126136None5.41.2Supplying and fixing angle iron frame work fabricated out of M.S. angle iron.. and M.S. Flat......with bolts, washers etc., and painted with 2 coats of red oxide and then two coats of approved paint..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 50x50x6mm ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Mtr522.03522.0325.0FalseNoneNoneFalseNoneFalse13050.750
3516284126136None5.42.2Fabricating supplying and mounting MS box made out ....SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped with tamper proof locking arrangements, with suitable size clamps with necessary cable entry pipe with gland and box should be finished with 7tanks treatment with powder coated paint and finally finished with approved colour etc., complete..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 16SWG ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Sq CM0.570.57260000.0FalseNoneNoneFalseNoneFalse148200.00
3516285126136None5.40.1Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 100Amps 4x30x6 mm Aluminium Strips ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Mtr3257.743257.7410.0FalseNoneNoneFalseNoneFalse32577.40
3516286126136None5.40.2Supplying ......... amps rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are mounted on powder coated 40x6mm M.S.flat frame work in existing panel board. The bus bar shall have suitable holes for termination of incoming and outgoing cables as per IS specification with necessary bolts, nuts and washers etc., complete..( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) 250Amps 4x30x10mm Aluminium Strips ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.Mtr4539.74539.74.0FalseNoneNoneFalseNoneFalse18158.80
3516287126136NoneI-12.57Supplying fixing and wiring earth electrode for grounding of lifts, transformers, DG sets etc. using 40 mm dia 2.9 mm thick 2.5m long GI pipe with GI funnel with mesh and suitable size reducer fixed on the top of the earth electrode.The funnel should be enclosed in a CC chamber of 400x400x400 mm with a cast iron cover. The earth electrode shall have staggered holes of 12 mm dia and the electrode should be covered 150 mm all-round with alternate layers of salt and charcoal from the bottom of the CC chamber. The connection from the electrode is to be established through GI strip using GI bolts and nuts.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.No5624.735624.738.0FalseNoneNoneFalseNoneFalse44997.840
3516288126136None12.58.2GI/Copper strips for grounding connections, using necessary fixing materials as required.( COMMON SR of 2023-24 PWD ,PART - III Utilization ( PWD Electrical ) GI/Copper strips 25 x 3 mm GI strip ---- With all lead and lift including cost and conveyance of all materials,labour, hire charges of all machineries and equipments and all other incidental charges etc.,complete as per standard technical specification and directions of the Engineer-in-charge of work.m108.37108.37100.0FalseNoneNoneFalseNoneFalse10837.00
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17207798790001NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17207798790001NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by any State Government / Government of India /Union Territory.None
17207798790001NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17207798790000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17207798790000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17207801550000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17207802450000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees of 0.025% of the contact value (Min Rs.500/- & Max Rs.7500/-) soon after contract has been issued to bidder.None
17207802550000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of KarnatakaNone
17207802630000NoneNoneELIGIBILITYConditional tenders are not accepted.None
17207802710000NoneNoneELIGIBILITYThe employer reserves the right to reject one and all tenders without assigning any reason thereof.None
17207802790000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E-procurement portalNone
17207802870000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt Orders.None
17207802980000NoneNoneELIGIBILITYAs per Karnataka State Government order LD/300/LET/2006 Blore dated 01-01-07 and Government letter no PW/134/BMS/2007 dated 27-07-07, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17207803080000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejectedNone
17207803150000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Executive Engineer reserves the right to verify the documents before approval.None
17207803240000NoneNoneELIGIBILITYAll the items in the tender are inclusive of cost and conveyance of all materials, all lead, lift, loading, unloading, transportation, labour, hire charges of machinery, curing for concrete works.None
17207803310000NoneNoneELIGIBILITYContractors should follow strictly prevailing rules of labour act.None
17207803410000NoneNoneELIGIBILITYIn case of the death of a contractor, after executing the agreement/ commencement of the work, his legal heir, is an eligible registered contractor and is willing, can execute and complete the work, at the accepted tender rates, irrespective of the cost of the work.None
17207803490000NoneNoneELIGIBILITYDepartment will not supply any materialsNone
17207803580000NoneNoneELIGIBILITYThe tenderer should submit proposed methodology and programme of construction backed with equipment and material planning, & deployment duly supported with broad calculation and quality management, plan, proposed to be adopted justifying their capability of execution and completion of the work as per technical specifications and within the stipulated period of completion.None
17207803820000NoneNoneELIGIBILITYPERFORMANCE SECURITY: The successful tenderer shall furnish Performance Security Deposit (Achievement Guarantee) at 5% of the amount put to tender with in 20 days after approve of tender as per rule 29.5 of the tender and clause 44 of the Agreement in the form of cash/Bankers Cheque, D.D, pay order Bank Guarantee or N.S.C.s duly pledged in the nature of EXECUTIVE ENGINEER, PWD, Kodagu Division.None
17207805290000NoneNoneELIGIBILITYContractor should take all precautions to ensure that no damage is caused to the existing similar structures which have been constructed by other agencies during project execution. If any damage is caused, it has to be rectified at his own risk and cost.None
17207805420000NoneNoneELIGIBILITYAll safety precautions, warning signs, night illumination, reflectors, deployment of security guards has to be ensured so that no untoward incident happens on account of negligence or any project activity. Contractor should indemnify the client to that extentNone
17207805610000NoneNoneELIGIBILITYThe bidders should submit the Bid capacity compulsorily. The details of balance work B value (works on hand & works for which tender submitted). Should be submitted in the prescribed format & should be signed by the concerned Executive Engineer / District level officer.None
17207805690000NoneNoneELIGIBILITYTo qualify for award of this Contract, each tenderer should give all details and documents as per KW-4None
17207805780000NoneNoneELIGIBILITYGST will not be paid to the tendered amount separately because GST 18% is included in the each rate in the estimate.None
17207805870000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17207805940000NoneNoneELIGIBILITYThe Tender processing fee shall not be refundable.None
17207806000000NoneNoneELIGIBILITYThe intending contractors are requested to note that they should abide by the detailed instructions and conditions contained in the Standard Tender documents KW-4None
17207806080000NoneNoneELIGIBILITYIncrease in GST shall not be paid in the extended period (If any) of the contract for which the contractor alone is responsible for delay as determined by the authority while granting the extension of time.None
17207806150000NoneNoneELIGIBILITYBidder Should Establish a field LaboratoryNone
17207806240000NoneNoneELIGIBILITYAll the originals of uploaded documents in e-portal should be produced within 7 working days from the date of opening of Technical Bid at the Division Office, failing which the tender is liable for rejection and action may be initiated as per tender conditions and registration rules. No separate communication will be made in this regard.None
17207806330000NoneNoneELIGIBILITYThe bidder who participates in tenders for more than one work for which tenders are invited in this IFT, the renderer must fulfill all the conditions and criteria cumulatively for the participated works.None
17207806410000NoneNoneELIGIBILITYThe returns submitted to the Income Tax Department shall be uploaded or shall be produced at the time of verification of original documents at Division office.None
17207806520000NoneNoneELIGIBILITYFor the vehicles / Machineries /equipments for which RTO registration is statutory, for such vehicles / machineries / equipments the contractor should upload the registration Certificate documents issued by RTO. For machineries and other equipments for which RTO registration is not applicable, for such machineries and equipments, purchase invoice document should be uploaded. If there is sale deed for such machineries and equipments, Original invoice along with registered sale deed should be uploaded. Otherwise tender is liable for rejection.None
17207806630000NoneNoneELIGIBILITYLOC/ K-form for the stipulated amount should be submitted in the format as prescribed in the bid document only. Otherwise tender is liable for rejection.None
17207807380000NoneNoneELIGIBILITYThe full EMD Can be paid through e-payment in any one of the form mentioned in clause 13.1 of Bid Document or One Lakh Rupees of the specified EMD should be paid in any one of the forms mentioned in Clause 13.1 of Bid Document Bank Guarantee must be given for the remaining amount in prescribed format. The Bank Guarantee must be scanned and uploaded along with the Technical bid. The original bank Guarantee should be produced at the office of the The Executive Engineer, Karnataka Public Works Department, Kodagu Division, Madikeri before the stipulated time of opening of Technical bid. Otherwise tender is liable for rejection.None
17207807460000NoneNoneELIGIBILITYContractors should be registered with KPWD Class-I RegistrationNone
17207807530000NoneNoneELIGIBILITYAll the Unit of TMT FE 550 / 550D Steel Reinforcement shall be read as Tonne and In all the Items read the unit as per the Schedule of rate 2023-24.None
17207807620000NoneNoneELIGIBILITYThe contractor should maintain the work during the defective liability period, i.e. for 1 year after the completion of work at his own cost.None
17207807730000NoneNoneELIGIBILITYThe Tenderer (agency) should arrange to obtain (get) structural designs & drawings on his own from Government approved empanelled structural consultants and get scrutinized, proof checked & vetted either by IISc, Bangalore or IIT Bombay/ Chennai and same has to be furnished to department for approval.None
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years 2019-20 to 2023-24 (c) executed in any one financial year the following minimum quantities of work 1. Earth work Excavation / Embankment/Filling:27625.00 cum 2. Cement concrete (RCC/PCC):3425.00 cum 3. Masonry (SSM /BBM/Solid concrete):895.00 cum 4. Reinforcement Steel:291.00 Tonne 5. Plastering :13735.00sqm 6. Flooring (All Types of Flooring)/Skirting/Dadoing :3250.00cum 7.Painting: 13686.00sqmPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in his name should have in the last five years i.e., 2019-20 to 2023-24) (b) satisfactorily completed(at least 50% of the contract value) as prime contractor, at least one similar work such as Building Works of value not less than Rs 918.16 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2: To qualify for award of this contract, each Tenderer in its name should have in the last five years (i.e. 2019-20 to 2023-24) (e) The Tenderer or his identified sub-contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar water supply / sanitary engineering works for an amount not less than Rs.20.60 Lakhs (in any one year) along with Plumbing License / Registration copy along with concent letter and work done certificate.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNone3.2: To qualify for award of this contract, each Tenderer in its name should have in the last five years (i.e. 2019-20 to 2023-24) (d) The Tenderer or his identified sub-contractor should possess required valid electrical license for executing building electrification works and should have executed similar electrical works for an amount not less than Rs.44.46 Lakhs (in any one year) along with Electrical License / Registration copy and Concent letter and work done certificate.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneSection 2 : ITT 3.3-Each Tenderer should further demonstrate (a) Availability by owning and that can be deployed on hire / lease / owning the following key and critical machineries / Equipments for this work (a) Machineries / Equipments to be owned:1) Concrete Batch mix plant/Rotavator of suitable specification 1No 2) Transit mixer-1 No 3) Tipper- 2 No 4) Excavator- 1 No 5) Steel Centering Material - 750.00 Sqm 6) Water Tanker-2 Nos 7) Vibratory needle- 2 Nos (b) Machineries / equipments could be on Lease/Hire/Own : 1) Transit mixer-1No 2) Tipper- 2 No 3) Excavator - 1 No 4) Steel Centering Material - 750.00 Sqm 5) Water Tanker-1 Nos 6) Vibratory needle- 2 NosCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Machinery Documents
NoneNoneNoneNoneSection 2: ITT 3.6 Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value amounting of Rs.1836.32LAKHS. The available tender capacity will be calculated as under: Assessed available tender capacity : (AXNX1.5 - B)Should be greater than or equal to Rs.1836.32 Lakhs where A : Maximum value of civil engineering works executed in any one year during the last five years (updated to FY 2024-25 price level) taking into account the completed as well as works in progress. N : Number of years prescribed for completion of the works for which tenders are invited. B: Value, at FY 2024-25 price level, of existing commitments and on-going works to be completed during the next 24 MonthsCapabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneSatisfactory Performance Certificate
NoneNoneNoneNoneSection 2: ITT 3.3 - Each Tenderer should further demonstrate : (b) Liquid assets and /or availability of credit facilities of no less than Rs.229.54 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneLine of Credit
NoneNoneNoneNone3.2 To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e. 2019-20 To 2023-24 (a) achieved in at least Two financial years a minimum financial turnover (in all classes of civil engineering construction works only) of Rs.3672.64 lakhsFinancial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
Annual Turnover Certificate & balance sheet issued by Approved Chartered Accountant with UDIN last five years as per KW-4 i.e. 2019-20,2020-21, 2021-22, 2022-23 & 2023-24 Updated to 2024-25 price levelTrueTechnical Bid
KPWD Class-1 Registration CertificateTrueTechnical Bid
Work Done Certificate-Satisfactorily completed as prime contractor, at least one similar work such as Building Works of value not less than Rs 918.16 Lakhs issued by an 0fficer not below the rank of Executive Engineer.TrueTechnical Bid
Tenderers will only be qualified, if their available tender capacity is more than the total tender value amounting of Rs.1836.32 LAKHS. The available tender capacity will be calculated as under Assessed available tender capacity AXNX1.5-B Should be greater than or equal to Rs.1836.32 Lakhs as per KW-4 Document.TrueTechnical Bid
Work done certificate in support of similar nature of workdone & quantity excuted in any one year during last 5 years 2019-20 to 2023-24TrueTechnical Bid
Line of credit /Bankers Certificate in prescribed format.TrueTechnical Bid
Work done certificate, license/ registration copy along with concent letter of watersupply/sanitary engineering work.TrueTechnical Bid
Work done certificate, license/ registration copy along with concent letter of Electrical work.TrueTechnical Bid
Details of ongoing works & work in hand.TrueTechnical Bid
Documents of MachineryTrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1721043708000
version0
createdDateNone
modifiedDateNone
blockNumberOffice of the Executive Engineer, Public Works Department, Kodagu Division, Madikeri
streetNone
cityKodagu
stateKarnataka
pin571201
tenderRecallDTONone