1721193082000 | 0 | None | None | Water supply/sewage lines | Construction work of new pipeline from Santhosh Godan to Tank of Benakanahalli Village under Benakanahalli Gram Panchayat. | 211714.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3536981 | 127470 | None | BENPIPE01 | Cutting of road surface for pipeline trenches and disposing of the excavated stuff as directed including barricading, danger lighting etc. in the following classification.for cutting asphalt road surface by machine cutting to demarcate the trench width of the surface (UNI SOR 2021-22. Vol -01 Chapter no.1 Item no.1. Page no. 63. ---- Work done cirtificate | Cum | 951.0 | 951.0 | 3.38 | False | None | None | False | None | False | 3214.38 | 0 | 3536982 | 127470 | None | BENPIPE02 | Earth work excavation for pipelines/cables by Manual means upto 600 mmtrench width, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, removal of stumps andother deleterious matter, including dressing of excavated surfaces, disposing
off or leveling the excavated earth or sorting & stacking the selected earth forreuse in a radius of 50 m. Filling available excavated earth (excluding rock)in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift
upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work.In all kinds of soils. Depth upto 1.50m (UNI SOR 2023-24. Vol -01 Chapter no.1 Item no.1.6.1 Page no. 06. " ---- Work done cirtificate | Cum | 484.0 | 484.0 | 78.75 | False | None | None | False | None | False | 38115.0 | 0 | 3536983 | 127470 | None | BENPIPE03 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated
earth locally for the work etc., and all other appurtenances complete in the following strata.(UNI SOR 2023-24. Vol -01 Chapter no.1 Item no.1.17.1 Page no. 06. "
---- Work done cirtificate | Cum | 262.0 | 262.0 | 117.0 | False | None | None | False | None | False | 30654.0 | 0 | 3536984 | 127470 | None | BENPIPE04 | Providing, laying and jointing HDPE pipes of specified grade andconforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For :HDPE PE 100 PN 8.0(BWSSB SOR 2023-24. Vol.- 05. Chapter no.9 Item no.9.11.4 ) Page no. - 102
---- Work done cirtificate | Rmtr | 322.0 | 322.0 | 100.0 | False | None | None | False | None | False | 32200.0 | 0 | 3536985 | 127470 | None | BENPIPE05 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying true to line, level and perfect linking at joints leak proof including jointing of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15 cms with gravel or selected earth available from the excavation etc, complete. (BWSSB SOR 2023-24. Vol.- 05. Chapter no.10 Item no.10.14.10) Page no. - 120
---- Work done cirtificate | Rmtr | 258.0 | 258.0 | 335.0 | False | None | None | False | None | False | 86430.0 | 0 | 3536986 | 127470 | None | BENPIPE06 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,
including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications. (BWSSB SOR 2023-24. Vol.- 01. Chapter no.2 Item no.2.6) Page no. - 108.
"
---- Work done cirtificate | Cum | 6243.0 | 6243.0 | 3.38 | False | None | None | False | None | False | 21101.34 | 0 |
|