| 1721290726000 | 0 | None | None | Other Works | Construction of Drain at SWM site | 3649601.6 | | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
|---|
| 3540931 | 127805 | None | ITEM01 | Earth work excavation for foundation of structure upto 3 mtrs. By mechanicle means as per drawing and technicalspecification,includingsettingout,providingshoring,struttingandbracing,removalofstumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth to the extent requiredandutilising/transportingtheremainingearthupto1.00kmlead.includingcostoflabour, materials and HOM of machineries etc., completeOrdinary/Hard Soil. In all kinds of soils Depth upto 3 m (
CMSR2021-22P.No.8/Vol-1/1.14.1) | Cum | 88.72 | 88.72 | 400.0 | False | None | None | False | None | False | 35488.0 | 0 | | 3540932 | 127805 | None | ITEM02 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laidinlayersnot exceeding 400mm thickness, well compactedusing plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as pertechnical specifications. (The cost of steel reinforcement& formwork shall be paid separately) Mix 1:4:8( M5) Using 40 mm nominal size graded crushed coarse aggregates ( CM SR 2021-22 P.No.15/Vol-1/2.1.2 ) | Cum | 6327.37 | 6327.37 | 50.0 | False | None | None | False | None | False | 316368.5 | 0 | | 3540933 | 127805 | None | ITEM03 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works,Substructureworksofbridges,Drainworks&otherparallelworksfrom0.50mto3.50mheight. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codesmachine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances requiredtocompletetheworkaspertechnicalspecifications.(Thecostofsteelreinforcement&formwork to be paid separately) (CM SR 2021-22/P.No.17/Vol-1/2.4.2) | Cum | 10264.78 | 10264.78 | 160.0 | False | None | None | False | None | False | 1642364.8 | 0 | | 3540934 | 127805 | None | ITEM04 | Providing Thermo-Mechanically Treated bars of grade Fe-500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (CM SR 2021- 22/P.No.84/Vol-2/11.32) | Kg | 113.28 | 113.28 | 13600.0 | False | None | None | False | None | False | 1540608.0 | 0 | | 3540935 | 127805 | None | ITEM05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CM SR 2021-22/P.No.115/Vol-1/1.9) Filling. | Cum | 247.94 | 247.94 | 70.0 | False | None | None | False | None | False | 17355.8 | 0 | | 3540936 | 127805 | None | ITEM06 | Earth work excavation for foundation of structure upto 3 mtrs. By mechanicle means as per drawingand technical specification, including setting out, providing shoring, strutting and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, filling back the excavated earth tothe extent required and utilising / transporting the remaining earth upto 1.00km lead. including cost of labour, materials and HOM of machineries etc., completeOrdinary/Hard Soil. In all kinds of soils Depth upto 3 m ( CM SR 2021-22 P.No. 8/Vol-1/ 1.14.1 ) | Cum | 88.72 | 88.72 | 10.08 | False | None | None | False | None | False | 894.2976 | 0 | | 3540937 | 127805 | None | ITEM07 | KSRB 2.8 : Providing and filling in foundation with granite/trap broken metal 100mm and down size, with approved sand including hand packing, ramming, watering, including cost of all materials and labour with all lead and lift. complete as per specifications. specification. No.KBS ( PWD SR 2018-19 P.No.7/2.15) | Cum | 2862.26 | 2862.26 | 2.52 | False | None | None | False | None | False | 7212.8952 | 0 | | 3540938 | 127805 | None | ITEM08 | Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 400 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as pertechnical specifications. (The costofsteelreinforcement&formworkshallbepaidseparately)Mix1:4:8(M5)Using40mmnominal size graded crushed coarse aggregates ( CM SR 2021-22 P.No.15/Vol-1/2.1.2 ) | Cum | 6327.37 | 6327.37 | 0.72 | False | None | None | False | None | False | 4555.7064 | 0 | | 3540939 | 127805 | None | ITEM09 | Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to
3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necesary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery,curing and all other appurtenances required to complete the work as per technical specifications. (The costofsteelreinforcement&formworktobepaidseparately)(CMSR2021- 22/P.No.17/Vol-1/2.4.2) | Cum | 10264.78 | 10264.78 | 3.84 | False | None | None | False | None | False | 39416.7552 | 0 | | 3540940 | 127805 | None | ITEM10 | ProvidingThermo-MechanicallyTreatedbarsofgradeFe-500DormoreSteelreinforcementfor
R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacentmemberswhereevernecessary completeasperDesignincludingcostofmaterial,labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately) (CM SR 2021-22/P.No.84/Vol-2/11.32) | Kg | 116.67 | 116.67 | 384.0 | False | None | None | False | None | False | 44801.28 | 0 | | 3540941 | 127805 | None | ITEM11 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. (CM SR 2021-22/P.No.115/Vol-1/1.9) Filling. | Cum | 247.94 | 247.94 | 2.16 | False | None | None | False | None | False | 535.5504 | 0 |
|