1721319324000 | 0 | None | None | Irrigation and Other Works | Construction of culvert at Km 0.650 & 1.620 of Lateral 12 of Dy-06 and Construction of pier at km 1.900 culvert of lateral 12 of Dy-06 SBC and Restoration of breached embankment portion at km 7.150 of Lat 12 of Dy-06 of SBC | 845799.53 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3545891 | 128119 | None | code01 | Earth work excavation for Foundation by mechanical means for all works &depth upto 3 m, as per drawing and technical specifications, including settingout, shoring, strutting, barricading, caution lights, including dressing ofexcavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5m including cost of labour, tools, usage of machinery & other appurtenaces required to complete (In all kinds of soils Depth upto 3 m) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 107.1 | 107.1 | 56.4 | False | None | None | False | None | False | 6040.44 | 0 | 3545892 | 128119 | None | code02 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/ trap/ basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (Mix 1:4:8 Using 40 mm nominal size graded crushed coarse aggregates) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 5947.2 | 5947.2 | 5.78 | False | None | None | False | None | False | 34374.816 | 0 | 3545893 | 128119 | None | code03 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical Specifications.(2.4.2. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 7271.45 | 7271.45 | 29.24 | False | None | None | False | None | False | 212617.198 | 0 | 3545894 | 128119 | None | code04 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications..(2.5.2. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 8553.75 | 8553.75 | 12.0 | False | None | None | False | None | False | 102645.0 | 0 | 3545895 | 128119 | None | code05 | Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification.(h.All other type of structures) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Tonne | 82961.55 | 82961.55 | 1.37 | False | None | None | False | None | False | 113657.3235 | 0 | 3545896 | 128119 | None | code06 | Providing and constructing un-coursed rubble stone masonry with approved stones in CM 1 : 4 proportion by volume portions of return walls/ abutments/ similar structure including cost of all materials, labour, cleaning, batching and mixing mortar, packing mortar and wedging stone chips into joints, finishing, curing and all other ancillary operations complete. (for sub-structure) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 4528.65 | 4528.65 | 53.82 | False | None | None | False | None | False | 243731.943 | 0 | 3545897 | 128119 | None | code07 | Providing 20 mm cement plaster of mix :1:4 (1 cement: 4 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications and as per directions of Engineer-in-charge.with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Sqm | 371.7 | 371.7 | 172.8 | False | None | None | False | None | False | 64229.76 | 0 | 3545898 | 128119 | None | code08 | Providing casing embankment for breached / damaged portion of canal using approved pervious /semi-pervious soil in layers of 100 to 150 mm ( before compaction ) including cost of all materials, machinery, labour, all operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, sectioning sides / edges, watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller or pneumatic / vibrating plate compactors with all other ancillary operations complete. (from borrow areas) with all lead and lift as complete as per specificatjons and as directed by engineer in charge. | Cum | 691.95 | 691.95 | 99.0 | False | None | None | False | None | False | 68503.05 | 0 |
|