tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. Road estimate | 69440158.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549840 | 128394 | None | item code 16.29 | Providing and fixing of typical SHDP informatory sign board with Logo as per MORD
specifications and drawing.The board will be a composite unit consisting of threeplates of Aluminium Composite Materials ACM materialspecifications as per Clause 1701.3.7. The top most platewillbe in Rectangular shape of 600mm x 600 mm size riveted overwelded M.S. angle iron frame of 25 mm x 25mm x 5 mm sizeon back on edges. The middle plate will be 1200 mm x 150mm size riveted over welded M.S. angle iron frame of 25mmx 25mmx 5 mm size on back on edges. The main lower mostplate will be 1500 mm x 600 mm size riveted over weldedM.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Weldingof all the sheets over angle iron frame will be done neatly tohave plain surface on one side. The angle iron frames of thelower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm 12 SWGsheet tubes posts placed at1125 mm apart centre to centre. The top of the middle platewill be flushed with the top of 75 mm dia medium steel tubeposts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower most platewill be 1200 mm from normal ground level and the bottomof middle plate will be 100 mm above the top level of thelower most plate. The rectangular shaped plate mounted overangle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWGhaving a spacing of 100 mm between the rectangular shaped plate and middle plate and this square section will be weldedto the bottom point of the rectangular shaped plate.ii The lettering and borders etc. of middle and bottom plate SHDP logo on top plate shall be as per clause 1701.4.6essagesPerBorders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design painting and lettering shall be done as per approved drawing. iii For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. iv A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777 Per 2019 Per Dir Tech 7 Retro Reflective Trafic Sign As per IRC 67 Clause1701.3.8.1 Class A Type 1 Schedule of Rates PWD 2023 24 vol 3 Item No. 16.29Page No. 149 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 3549841 | 128394 | None | item code 2.5 | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3 Item No. 2.5Page No. 9 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 486.93 | 486.93 | 63.0 | False | None | None | False | None | False | 30676.59 | 0 | 3549842 | 128394 | None | item code 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023 24 vol 3 Item No. 3.5Page No. 17 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.43 | 7.43 | 5500.0 | False | None | None | False | None | False | 40865.0 | 0 | 3549843 | 128394 | None | item code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Rate Inclusive of GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 117.71 | 117.71 | 15617.88 | False | None | None | False | None | False | 1838380.6548 | 0 | 3549844 | 128394 | None | item code 1.8 | Construction of Embankment by excavating the available approved Gravel Per Murrumdeposite dataplaceorborrowpitsduringorprior excavationwithallliftsandleadtransportationtositespreading grading to requiredslope and compacting to meet the requirement complete as per specifications including cost of labourrollingwaterall materialsusageand all other appurtenaces required to complete the work.Schedule of Rates PWD 2023 24 vol 1 Item No. 1.8Page No. 7 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 587.29 | 587.29 | 7470.0 | False | None | None | False | None | False | 4387056.3 | 0 | 3549845 | 128394 | None | item code 3.6 | Construction of sub grade and earthen shoulders with approvedmaterialCBR min 10 percentobtainedfromborrowpitswithallliftsand leads transporting to site spreading grading to required slope and compacted to meet requirement of table No. 300 2 Schedule of Rates PWD 2023 24 vol 3 Item No. 3.6Page No. 17 rates inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 610.83 | 610.83 | 9079.42 | False | None | None | False | None | False | 5545982.1186 | 0 | 3549846 | 128394 | None | item code 4.2 v | By Mix in Place Method Construction of Granular Sub Base of required grading as perdesign spreading in uniform layers with motor grader onprepared surface mixing by mix in place method with front endloader at OMC and compacting with vibratory roller to achievethe desired density complete as per clause 401For Grading V Material Schedule of Rates PWD 2023 24 vol 3 Item No. 4.2 v Page No. 23 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.81 | 2922.81 | 3732.24 | False | None | None | False | None | False | 10908628.3944 | 0 | 3549847 | 128394 | None | Item code 6.1 | Dry Lean Cement Concrete Sub.base Construction of dry lean cement concrete Sub. base over a prepared sub.grade with coarse and fine aggregate conforming to IS. 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14.1, aggregate gradation after blending to be as per table 600.1, cement content not to be less than 140 kg per m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8.10 t vibratory roller, finishing and curing. Schedule of Rates PWD 2023.24 vol. 3, Item No. 6.1 , Page No. 49 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 6095.88 | 6095.88 | 1494.87 | False | None | None | False | None | False | 9112548.1356 | 0 | 3549848 | 128394 | None | Item code 6.2.1 | Construction of M40 Grade un.reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383.2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC at 420 kg per m3 Schedule of Rates PWD 2023.24 vol. 3, Item No. 6.2.1 , Page No. 49 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11226.58 | 11226.58 | 3343.67 | False | None | None | False | None | False | 37537978.7486 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. Box Culvert 2x2, 1v(CH-7.905) | 1951469.39 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549849 | 128395 | None | Item code 2.10 (iv) a | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a. Rubble stone masonry in lime mortar Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv a , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 644.28 | 644.28 | 1.8 | False | None | None | False | None | False | 1159.704 | 0 | 3549850 | 128395 | None | Item code 2.10 (iv) b | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar. Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv B , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 8.74 | False | None | None | False | None | False | 6605.6046 | 0 | 3549851 | 128395 | None | Item code 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No . 1.14.1 , Page No . 8 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 85.37 | False | None | None | False | None | False | 10789.0606 | 0 | 3549852 | 128395 | None | Item code 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1 .3 .6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.1.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.38 | 7420.38 | 9.31 | False | None | None | False | None | False | 69083.7378 | 0 | 3549853 | 128395 | None | Item code 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.11 h , Page No . 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.62 | 97894.62 | 3.98 | False | None | None | False | None | False | 389620.5876 | 0 | 3549854 | 128395 | None | Item code 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.2.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9420.37 | 9420.37 | 47.01 | False | None | None | False | None | False | 442851.5937 | 0 | 3549855 | 128395 | None | Item code 2.5.2 | Providing and laying in position Cement Concrete for all Super structures ofbuilding , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.5.2 , Page No . 16 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10174.18 | 10174.18 | 12.48 | False | None | None | False | None | False | 126973.7664 | 0 | 3549856 | 128395 | None | Item code 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 Vol-3, Item No. 2.4.3 , Page No. 16 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9420.37 | 9420.37 | 17.2 | False | None | None | False | None | False | 162030.364 | 0 | 3549857 | 128395 | None | Item code 12.2 | Providing weep holes in Brick masonryPerPlainPer Reinforced concrete abutment, wing wallPer return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V .20H towards drawing foce. Complete as per drawing and Technical Specifications Schedule of Rates PWD 2023-24 vol- 3, Item No . 12.2 , Page No . 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 296.13 | 296.13 | 8.0 | False | None | None | False | None | False | 2369.04 | 0 | 3549858 | 128395 | None | Item code 12.4 | Providing and laying of Filter media with granular materialsPer stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No . 12.4 , Page No . 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3316.81 | 3316.81 | 15.57 | False | None | None | False | None | False | 51642.7317 | 0 | 3549859 | 128395 | None | Item code 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material(rates inclusive of GST) Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.16 | 1447.16 | 115.5 | False | None | None | False | None | False | 167146.98 | 0 | 3549860 | 128395 | None | Item code 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.2.1 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7789.6 | 7789.6 | 2.54 | False | None | None | False | None | False | 19785.584 | 0 | 3549861 | 128395 | None | Item code 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS . 280 & IS .4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No . 14.2 , Page No . 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3040.51 | 3040.51 | 1.26 | False | None | None | False | None | False | 3831.0426 | 0 | 3549862 | 128395 | None | Item code 4.2 v | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No . 4.2 v , Page No . 23 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.81 | 2922.81 | 8.4 | False | None | None | False | None | False | 24551.604 | 0 | 3549863 | 128395 | None | Item code 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.8 , Page No . 121 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8438.83 | 8438.83 | 12.96 | False | None | None | False | None | False | 109367.2368 | 0 | 3549864 | 128395 | None | Item code 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification Batching Plant Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.9 , Page No . 122 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14663.57 | 14663.57 | 21.0 | False | None | None | False | None | False | 307934.97 | 0 | 3549865 | 128395 | None | Item code 13.16 | Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm in traffic direction, covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS . 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.16 , Page No . 124 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2224.01 | 2224.01 | 24.0 | False | None | None | False | None | False | 53376.24 | 0 | 3549866 | 128395 | None | Item code 8.10 | Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 803 Schedule of Rates PWD 2023-24 vol- 3, Item No . 8.1 , Page No . 66 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 135.06 | 135.06 | 9.85 | False | None | None | False | None | False | 1330.341 | 0 | 3549867 | 128395 | None | Item code 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Schedule of Rates PWD 2023-24 vol- 3, Item No . 8.4 , Page No . 63 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.12 | 1.12 | 910.0 | False | None | None | False | None | False | 1019.2 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District.1200mm dia, 1V, Pipe Culvert(CH-6.419,6.823) | 1218894.12 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549868 | 128396 | None | Item code 2.8 ii a | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.8iiA , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 890.84 | 890.84 | 3.6 | False | None | None | False | None | False | 3207.024 | 0 | 3549869 | 128396 | None | Item code 2.10 (iv) b | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar. Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv B , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 21.6 | False | None | None | False | None | False | 16325.064 | 0 | 3549870 | 128396 | None | Item code 2.17 (ix) A | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means C. upto 600 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.17 ix , A, Page No. 11 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 1185.72 | 1185.72 | 20.0 | False | None | None | False | None | False | 23714.4 | 0 | 3549871 | 128396 | None | Item code 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No . 1.14.1 , Page No . 8 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 148.51 | False | None | None | False | None | False | 18768.6938 | 0 | 3549872 | 128396 | None | Item code 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1 .3 .6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.1.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.38 | 7420.38 | 9.24 | False | None | None | False | None | False | 68564.3112 | 0 | 3549873 | 128396 | None | Item code 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.11 h , Page No . 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.81 | False | None | None | False | None | False | 79294.6503 | 0 | 3549874 | 128396 | None | Item code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granitepertrapperbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.4.2 , Page No. 15 Rates inclusive of 18 percent GST, 8 percentage for form work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8460.93 | 8460.93 | 65.32 | False | None | None | False | None | False | 552667.9476 | 0 | 3549875 | 128396 | None | Item code 9.1 ii | Laying Reinforced Cement Concrete Pipe NP4 per Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4perprestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1.2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. i. 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 9.1.ii , Page No. 87 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 13340.32 | 13340.32 | 24.0 | False | None | None | False | None | False | 320167.68 | 0 | 3549876 | 128396 | None | Item code 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material(rates inclusive of GST) Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117
Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.15 | 1447.15 | 42.84 | False | None | None | False | None | False | 61995.906 | 0 | 3549877 | 128396 | None | Item code 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS . 280 & IS .4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No . 14.2 , Page No . 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3040.51 | 3040.51 | 24.4 | False | None | None | False | None | False | 74188.444 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. Field Culverts | 105686.77 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549878 | 128397 | None | Item code 1.4.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No. 1.14.1 , Page No. 8 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 22.75 | False | None | None | False | None | False | 2875.145 | 0 | 3549879 | 128397 | None | Item code 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1. 3. 6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.1.3 , Page No. 15 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 1.31 | False | None | None | False | None | False | 9720.6847 | 0 | 3549880 | 128397 | None | Item code 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.11 h , Page No. 18 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.13 | False | None | None | False | None | False | 12726.3019 | 0 | 3549881 | 128397 | None | Item code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.4.2 , Page No. 16 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 6.95 | False | None | None | False | None | False | 54447.69 | 0 | 3549882 | 128397 | None | Item code 8.58 | Providing and laying Reinforced Cement Concrete pipe light duty NP2 for culverts, roadway utilities& crossingsas per IS 458. 2003 in Single row including pointing ends and fixing collars with cement mortar 1. 2 including cost of all materials, labour, curing complete as per specifications. (i). 600 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 8.58 , Page No. 79 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2361.54 | 2361.54 | 7.5 | False | None | None | False | None | False | 17711.55 | 0 | 3549883 | 128397 | None | Item code 12.3A | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material rates are inclusive of 18 Percent GST Schedule of Rates PWD 2023-24 vol- 3, Item No. 12.3A , Page No. 117 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.16 | 1447.16 | 5.67 | False | None | None | False | None | False | 8205.3972 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. RCC Drain Mitlakatte Village | 1214580.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549884 | 128398 | None | Item code 2.8 ii a | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T and P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a Cement Concrete Grade M.15 and M.20 Schedule of Rates PWD 2023.24 vol.3, Item No. 2.8iiA , Page No. 10 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 890.84 | 890.84 | 26.4 | False | None | None | False | None | False | 23518.176 | 0 | 3549885 | 128398 | None | Item code 2.10 iv b | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T and P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar.Schedule of Rates PWD 2023.24 vol 3, Item No. 2.10 iv B , Page No. 10 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 26.4 | False | None | None | False | None | False | 19952.856 | 0 | 3549886 | 128398 | None | Item code 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or and stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023.24 vol.1, Item No. 1.14.1 , Page No. 8 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 171.6 | False | None | None | False | None | False | 21686.808 | 0 | 3549887 | 128398 | None | Item code 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead and lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1.3.6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.1.3 , Page No. 15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.38 | 7420.38 | 22.0 | False | None | None | False | None | False | 163248.36 | 0 | 3549888 | 128398 | None | Item code 2.11 h | Steel Fabrication Supplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023.24 vol 1, Item No. 2.11 h , Page No. 18 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 3.41 | False | None | None | False | None | False | 333820.6883 | 0 | 3549889 | 128398 | None | Item code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 17.6 | False | None | None | False | None | False | 137881.92 | 0 | 3549890 | 128398 | None | Item code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10576.17 | 10576.17 | 33.0 | False | None | None | False | None | False | 349013.61 | 0 | 3549891 | 128398 | None | Item code 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9401.04 | 9401.04 | 17.6 | False | None | None | False | None | False | 165458.304 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. Road furniture | 2546956.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549892 | 128399 | None | Item Code 8.16 ii | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC.8 1980 fixing in position including painting and printing etc ii Ordinary kilometer stone precast rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.16 ii Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 3626.55 | 3626.55 | 3.0 | False | None | None | False | None | False | 10879.65 | 0 | 3549893 | 128399 | None | Item Code 8.16 iii | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC.8 1980 fixing in position including painting and printing etc iii 200 m stone precast rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.16 iii Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1043.24 | 1043.24 | 7.0 | False | None | None | False | None | False | 7302.68 | 0 | 3549894 | 128399 | None | Item Code 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 g per m2 area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC.35.2015.The finished surface to be level uniform and free from streaks and holes. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.15 Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 656.67 | 656.67 | 441.06 | False | None | None | False | None | False | 289630.8702 | 0 | 3549895 | 128399 | None | Item Code 8.6 ii | Retro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. ii 90 cm equilateral triangle rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 ii Page No. 64 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5882.77 | 5882.77 | 32.0 | False | None | None | False | None | False | 188248.64 | 0 | 3549896 | 128399 | None | Item Code 8.6 iv | Retro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. ii 60 cm equilateral triangle rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 iv Page No. 64 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4465.36 | 4465.36 | 14.0 | False | None | None | False | None | False | 62515.04 | 0 | 3549897 | 128399 | None | Item Code 8.6 viii | Retro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. viii 60 cm circular rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 viii Page No. 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5388.41 | 5388.41 | 2.0 | False | None | None | False | None | False | 10776.82 | 0 | 3549898 | 128399 | None | Item Code 8.7 | Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC.67.2022 made of high intensity grade sheeting vide clause 801.3 fixed over aluminium sheeting 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm 60 cm below ground level as per approved drawing rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.7 Page No. 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11163.39 | 11163.39 | 3.6 | False | None | None | False | None | False | 40188.204 | 0 | 3549899 | 128399 | None | Item Code 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers per Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height width and length shall not exceed 50 mm 100 mm and 102 per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 per 5 degree. The strength of detachment of the integrated cylindrical shanks of diameter not less than 19 per 2 mm and height not less than 30 per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel to the Engineer. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.43 Page No. 74 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 452.24 | 452.24 | 282.0 | False | None | None | False | None | False | 127531.68 | 0 | 3549900 | 128399 | None | Item Code 8.17 | Road Delineators Supplying and installation of delineators road way indicators hazard markers object markers 80 100 cm high above ground level painted black and white in 15 cm wide strips fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top buried or pressed into the ground and conforming to IRC 79 2019 and the drawings. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.17 Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2504.02 | 2504.02 | 8.0 | False | None | None | False | None | False | 20032.16 | 0 | 3549901 | 128399 | None | Item Code 8.48 | Supply and installation of retro reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC.67.2022 ASTM D 4956 09 specification fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height firmly fixed to the ground by means of foundation with M 20 grade cement concrete foundation size of 45 cm x 45 cm x 60 cm including cost conveyance of all materials equipment machinery Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.48 Page No. 76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4443.05 | 4443.05 | 26.0 | False | None | None | False | None | False | 115519.3 | 0 | 3549902 | 128399 | None | Item Code 8.60.2 ii | Providing Speed BreakersperRaised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99.2018 using Dense Bituminous Macadam DBM Gr II and Bituminous Concrete BC Gr II for entire formation width WBM Gr II for Shoulder hump portion only 150 mm thick completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 2022. Intermediate lane with formation width of 7.50 m rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.60.2 ii Page No. 80 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 56317.51 | 56317.51 | 2.0 | False | None | None | False | None | False | 112635.02 | 0 | 3549903 | 128399 | None | Item Code 8.29 | Providing and laying of a reinforced cement concrete pipe duct 300 mm dia across the road new construction extending from drain to drain in cuts and toe of slope to toe of slope in fills constructing head walls at both ends providing a minimum fill of granular material over top and sides of RCC pipe as per IRC.98 1997 bedded on a 0.3 m thick layer of granular material free of rock pieces outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts joints to be made leak proof invert level of duct to be above higher than ground level to prevent entry of water and dirt all as per IRC. 98 1997 and approved drawings. Single row for one utility service rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.29 Page No. 71 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 2740.67 | 2740.67 | 504.0 | False | None | None | False | None | False | 1381297.68 | 0 | 3549904 | 128399 | None | Item Code 8.25 i | Metal Beam Crash Barrier i Type A W . Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail 70 cm above roadperground level fixed on ISMC series channel vertical post 150 x 75 x 5 mm spaced 2 m centre to centre 1.8 m high 1.1 m below groundperroad level all steel parts and fitments to be galvanised by hot dip process all fittings to conform to IS.1367 and IS.1364 metal beam rail to be fixed onthe vertical post with a spacer of channel section 150 x 75 x 5 mm 330 mm long complete as per clause 811 rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.25 i Page No. 69 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 4509.96 | 4509.96 | 40.0 | False | None | None | False | None | False | 180398.4 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. 1st Year Maintenance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549905 | 128400 | None | Item Code 2.5 (ii) a | Clearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY= 16.80 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549906 | 128400 | None | Item Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1260 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549907 | 128400 | None | Item Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 189 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549908 | 128400 | None | Item Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 630 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549909 | 128400 | None | Item Code 1.12 | NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 225 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. 2nd year Maintenance | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549910 | 128401 | None | Item Code 2.5 (ii) a | Clearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY 25.20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549911 | 128401 | None | Item Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1680 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549912 | 128401 | None | Item Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 189 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549913 | 128401 | None | Item Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 630 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549914 | 128401 | None | Item Code 1.12 | NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 225 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. 3rd Year | 257593.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549915 | 128402 | None | Item Code 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3, Item No 2.5 ii a , Page No 9 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 545.36 | 545.36 | 25.2 | False | None | None | False | None | False | 13743.072 | 0 | 3549916 | 128402 | None | Item Code 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3, Item No 16.19, Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.33 | 8.33 | 1680.0 | False | None | None | False | None | False | 13994.4 | 0 | 3549917 | 128402 | None | Item Code 10.3 | Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.3 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.12 | 54.12 | 189.0 | False | None | None | False | None | False | 10228.68 | 0 | 3549918 | 128402 | None | Item Code 10.2 | Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.2 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 134.61 | 134.61 | 630.0 | False | None | None | False | None | False | 84804.3 | 0 | 3549919 | 128402 | None | Item Code 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023 24 vol 3, Item No.16.22 , Page No.147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2753.16 | 2753.16 | 2.1 | False | None | None | False | None | False | 5781.636 | 0 | 3549920 | 128402 | None | Item Code 16.24I | Maintenance of 200 m and km stones Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol. 3, Item No.16.24i, Page No. 148 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 285.87 | 285.87 | 2.1 | False | None | None | False | None | False | 600.327 | 0 | 3549921 | 128402 | None | Item Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1, Item No 1.12 , Page No 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 235.41 | 235.41 | 225.0 | False | None | None | False | None | False | 52967.25 | 0 | 3549922 | 128402 | None | Item Code 8.1 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023 24 vol 3, Item No. 8.1, Page No. 66 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 270.11 | 270.11 | 217.5 | False | None | None | False | None | False | 58748.925 | 0 | 3549923 | 128402 | None | Item Code 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3, Item No. 8.4, Page No. 63 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 2.23 | 2.23 | 7500.0 | False | None | None | False | None | False | 16725.0 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. 4th Year Maintenance | 157883.81 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549924 | 128403 | None | Item Code 2.5 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3, Item No 2.5 ii a , Page No 9 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 564.84 | 564.84 | 25.2 | False | None | None | False | None | False | 14233.968 | 0 | 3549925 | 128403 | None | Item Code 16.19 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3, Item No 16.19 , Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.63 | 8.63 | 1680.0 | False | None | None | False | None | False | 14498.4 | 0 | 3549926 | 128403 | None | Item Code 10.3 | Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.3 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.06 | 56.06 | 189.0 | False | None | None | False | None | False | 10595.34 | 0 | 3549927 | 128403 | None | Item Code 10.2 | Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.2 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 139.42 | 139.42 | 630.0 | False | None | None | False | None | False | 87834.6 | 0 | 3549928 | 128403 | None | Item Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1, Item No 1.12 , Page No 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 136.54 | 136.54 | 225.0 | False | None | None | False | None | False | 30721.5 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-A in Davanagere Taluk of Davanagere District. 5th Year Maintenance | 773555.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549929 | 128404 | None | Item Code 2.5 | Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness. ii By Mechanical Means using Dozera In area of light jungle Schedule of Rates PWD 2023 24 vol 3 Item No. 2.5 Page No. 9 rates Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 584.32 | 584.32 | 25.2 | False | None | None | False | None | False | 14724.864 | 0 | 3549930 | 128404 | None | Item Code 16.19 | Maintenance of DrainsThe maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3 Item No 16.19 Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.93 | 8.93 | 1680.0 | False | None | None | False | None | False | 15002.4 | 0 | 3549931 | 128404 | None | Item Code 10.3 | Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials labour HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3 Item No 10.3 Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.98 | 57.98 | 189.0 | False | None | None | False | None | False | 10958.22 | 0 | 3549932 | 128404 | None | Item Code 10.2 | Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials labour HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3 Item No 10.2 Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 144.22 | 144.22 | 1260.0 | False | None | None | False | None | False | 181717.2 | 0 | 3549933 | 128404 | None | Item Code 16.22 | Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory per requlatory per cautionary per informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023 24 vol 3 Item No. 16.22 Page No. 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2949.82 | 2949.82 | 2.1 | False | None | None | False | None | False | 6194.622 | 0 | 3549934 | 128404 | None | Item Code 16.24i | Maintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023 24 vol 3 Item No. 16.24 i Page No. 148 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 306.29 | 306.29 | 2.1 | False | None | None | False | None | False | 643.209 | 0 | 3549935 | 128404 | None | Item Code 8.1 | Painting two coats on New Concrete Surface . Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 Schedule of Rates PWD 2023 24 vol 3 Item No. 8.1 Page No. 66 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 162.07 | 162.07 | 15.0 | False | None | None | False | None | False | 2431.05 | 0 | 3549936 | 128404 | None | Item Code 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3 Item No. 8.4 Page No. 63 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.34 | 1.34 | 7500.0 | False | None | None | False | None | False | 10050.0 | 0 | 3549937 | 128404 | None | Item Code 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gperm2 area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC.35.2015.The finished surface to be level uniform and free from streaks and holes. Schedule of Rates PWD 2023 24 vol 3 Item No. 8.15 Page No. 67 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 788.01 | 788.01 | 441.06 | False | None | None | False | None | False | 347559.6906 | 0 | 3549938 | 128404 | None | Item Code 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers per Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height width and length shall not exceed 50 mm 100 mm and 102 +per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +per 5 degree. The strength of detachment of the integrated cylindrical shanks of diameter not less than 19 +per 2 mm and height not less than 30+per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel to the Engineer. Schedule of Rates PWD 2023 24 vol 3 Item No. 8.43 Page No. 74 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 542.68 | 542.68 | 281.0 | False | None | None | False | None | False | 152493.08 | 0 | 3549939 | 128404 | None | Item Code 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1 Item No. 1.12 Page No. 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 141.25 | 141.25 | 225.0 | False | None | None | False | None | False | 31781.25 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. RIGID PAVEMENT CONSTRUCTION WORK | 78602761.3 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549940 | 128405 | None | vol- 3, Item No: 16.29 , Page No: 149 | i) Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 messages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 3549941 | 128405 | None | vol- 3, Item No: 3.5 , Page No: 17 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 7.43 | 7.43 | 7315.0 | False | None | None | False | None | False | 54350.45 | 0 | 3549942 | 128405 | None | vol- 3, Item No: 2.5 , Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 486.93 | 486.93 | 31.14 | False | None | None | False | None | False | 15163.0002 | 0 | 3549943 | 128405 | None | vol- 1, Item No: 1.12 , Page No: 8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 117.71 | 117.71 | 6296.35 | False | None | None | False | None | False | 741143.3585 | 0 | 3549944 | 128405 | None | vol- 1, Item No: 1.8 , Page No: 7 | Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 587.29 | 587.29 | 6550.0 | False | None | None | False | None | False | 3846749.5 | 0 | 3549945 | 128405 | None | vol- 3, Item No: 3.6 , Page No: 17 | Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 610.83 | 610.83 | 3100.0 | False | None | None | False | None | False | 1893573.0 | 0 | 3549946 | 128405 | None | vol- 3, Item No: 4.2 (v) , Page No: 23 | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.8 | 2922.8 | 2467.26 | False | None | None | False | None | False | 7211307.528 | 0 | 3549947 | 128405 | None | vol- 3, Item No: 4.17 , Page No: 26 | Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3170.6 | 3170.6 | 2197.8 | False | None | None | False | None | False | 6968344.68 | 0 | 3549948 | 128405 | None | vol- 3, Item No: 6.2.1 , Page No: 49 | Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 11226.58 | 11226.58 | 3233.34 | False | None | None | False | None | False | 36299350.1772 | 0 | 3549949 | 128405 | None | vol- 3, Item No: 2.19 , Page No: 12 | Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 697.56 | 697.56 | 660.0 | False | None | None | False | None | False | 460389.6 | 0 | 3549950 | 128405 | None | vol- 3, Item No: 6.1 , Page No: 49 | Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 6095.88 | 6095.88 | 2055.45 | False | None | None | False | None | False | 12529776.546 | 0 | 3549951 | 128405 | None | vol , Item No 6.8.2 , Page No 51 | Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1438.48 | 1438.48 | 5940.0 | False | None | None | False | None | False | 8544571.2 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. ROAD FURNITURES. | 3419849.64 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549952 | 128406 | None | Item No.VOL-III-8.16-ii Page No. 67 | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 3626.55 | 3626.55 | 2.0 | False | None | None | False | None | False | 7253.1 | 0 | 3549953 | 128406 | None | vol- 3, Item No: 8.16 (iii) , Page No: 67 | Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 1043.24 | 1043.24 | 6.0 | False | None | None | False | None | False | 6259.44 | 0 | 3549954 | 128406 | None | Item No.VOL-III-8.15 Page No. 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 656.67 | 656.67 | 470.06 | False | None | None | False | None | False | 308674.3002 | 0 | 3549955 | 128406 | None | Item No.-8.6 (ii) Page No. 64 | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (rates inclusive of GST) Schedule of Rates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5882.77 | 5882.77 | 68.0 | False | None | None | False | None | False | 400028.36 | 0 | 3549956 | 128406 | None | vol- 3, Item No: 8.6 iv , Page No: 64 | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 4465.36 | 4465.36 | 32.0 | False | None | None | False | None | False | 142891.52 | 0 | 3549957 | 128406 | None | vol- 3, Item No: 8.6 viii , Page No: 65 | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 5388.41 | 5388.41 | 4.0 | False | None | None | False | None | False | 21553.64 | 0 | 3549958 | 128406 | None | Item No.VOL-III-8.7 Page No. 65 | Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 11163.89 | 11163.89 | 5.4 | False | None | None | False | None | False | 60285.006 | 0 | 3549959 | 128406 | None | Item No.VOL-III-8.43 Page No. 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | No | 452.24 | 452.24 | 620.0 | False | None | None | False | None | False | 280388.8 | 0 | 3549960 | 128406 | None | vol- 3, Item No: 8.17 , Page No: 67 | Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 2504.02 | 2504.02 | 14.0 | False | None | None | False | None | False | 35056.28 | 0 | 3549961 | 128406 | None | vol- 3, Item No: 8.48 , Page No: 76 | Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint nd two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 4443.05 | 4443.05 | 48.0 | False | None | None | False | None | False | 213266.4 | 0 | 3549962 | 128406 | None | Item No.VOL-III-8.31 Page No. 71 | Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 232.93 | 232.93 | 157.5 | False | None | None | False | None | False | 36686.475 | 0 | 3549963 | 128406 | None | vol- 3, Item No: 8.29 , Page No: 71 | Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2740.67 | 2740.67 | 696.0 | False | None | None | False | None | False | 1907506.32 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. Construction of Box Cell Culvert (1.5 m X 1.5 m - 1 Vent) and Construction of Box Cell Culvert (2 m X 2 m - 1 Vent)CH 0.910 | 4405972.03 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549964 | 128407 | None | Item No: 2.10 (iv) (a) | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. a. Rubble stone masonry in lime mortar(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 644.28 | 644.28 | 1.8 | False | None | None | False | None | False | 1159.704 | 0 | 3549965 | 128407 | None | Item No: 2.10 (iv) (B) | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. b. Rubble stone masonry in cement mortar.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 6.0 | False | None | None | False | None | False | 4534.74 | 0 | 3549966 | 128407 | None | Item No: 2.17 (ix) B | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 1357.94 | 1357.94 | 10.0 | False | None | None | False | None | False | 13579.4 | 0 | 3549967 | 128407 | None | Item No: 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 62.56 | False | None | None | False | None | False | 7906.3328 | 0 | 3549968 | 128407 | None | Item No: 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 6.87 | False | None | None | False | None | False | 50977.9419 | 0 | 3549969 | 128407 | None | Item No: 2.11 H | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 2.32 | False | None | None | False | None | False | 227115.5416 | 0 | 3549970 | 128407 | None | Item No: 2.2.3 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9420.36 | 9420.36 | 22.75 | False | None | None | False | None | False | 214313.19 | 0 | 3549971 | 128407 | None | Item No: 2.2.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 8 percent for formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8478.33 | 8478.33 | 6.02 | False | None | None | False | None | False | 51039.5466 | 0 | 3549972 | 128407 | None | Item No: 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10174.17 | 10174.17 | 8.4 | False | None | None | False | None | False | 85463.028 | 0 | 3549973 | 128407 | None | Item No: 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 296.12 | 296.12 | 4.0 | False | None | None | False | None | False | 1184.48 | 0 | 3549974 | 128407 | None | Item No: 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3316.8 | 3316.8 | 11.58 | False | None | None | False | None | False | 38408.544 | 0 | 3549975 | 128407 | None | Item No: 2.2.1 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) 5 percent formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8179.07 | 8179.07 | 2.26 | False | None | None | False | None | False | 18484.6982 | 0 | 3549976 | 128407 | None | Item No: 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3040.51 | 3040.51 | 1.08 | False | None | None | False | None | False | 3283.7508 | 0 | 3549977 | 128407 | None | Item No: 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.8 | 2922.8 | 7.2 | False | None | None | False | None | False | 21044.16 | 0 | 3549978 | 128407 | None | Item No: 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8438.83 | 8438.83 | 11.16 | False | None | None | False | None | False | 94177.3428 | 0 | 3549979 | 128407 | None | Item No: 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14663.57 | 14663.57 | 18.0 | False | None | None | False | None | False | 263944.26 | 0 | 3549980 | 128407 | None | Item No: 12.3 A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 (rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.15 | 1447.15 | 104.94 | False | None | None | False | None | False | 151863.921 | 0 | 3549981 | 128407 | None | Item No: 13.16 | Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2224.01 | 2224.01 | 24.0 | False | None | None | False | None | False | 53376.24 | 0 | 3549982 | 128407 | None | Item Code : 8.1 | Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 135.05 | 135.05 | 7.75 | False | None | None | False | None | False | 1046.6375 | 0 | 3549983 | 128407 | None | Item No: 8.4 | Printing New Letter and Figures of any Shade
Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman
(rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63"
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.12 | 1.12 | 700.0 | False | None | None | False | None | False | 784.0 | 0 | 3549984 | 128407 | None | Item No: 2.10 (IV) (A) | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. a. Rubble stone masonry in lime mortar(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | cm | 644.28 | 644.28 | 3.6 | False | None | None | False | None | False | 2319.408 | 0 | 3549985 | 128407 | None | Item No: 2.10 (iv) (B) | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. b. Rubble stone masonry in cement mortar.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 11.37 | False | None | None | False | None | False | 8593.3323 | 0 | 3549986 | 128407 | None | Item No: 1.14.1 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 170.77 | False | None | None | False | None | False | 21581.9126 | 0 | 3549987 | 128407 | None | Item No: 2.1.3 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 18.64 | False | None | None | False | None | False | 138315.6968 | 0 | 3549988 | 128407 | None | Item No: 2.11 H | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 7.94 | False | None | None | False | None | False | 777283.3622 | 0 | 3549989 | 128407 | None | Item No: 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9401.04 | 9401.04 | 58.95 | False | None | None | False | None | False | 554191.308 | 0 | 3549990 | 128407 | None | Item No: 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with
super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical
specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8074.6 | 8074.6 | 6.02 | False | None | None | False | None | False | 48609.092 | 0 | 3549991 | 128407 | None | Item No: 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10174.17 | 10174.17 | 7.2 | False | None | None | False | None | False | 73254.024 | 0 | 3549992 | 128407 | None | Item No: 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 296.12 | 296.12 | 16.0 | False | None | None | False | None | False | 4737.92 | 0 | 3549993 | 128407 | None | Item No: 12.4 | Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3316.8 | 3316.8 | 16.74 | False | None | None | False | None | False | 55523.232 | 0 | 3549994 | 128407 | None | Item No: 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates
(rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 5.08 | False | None | None | False | None | False | 39797.736 | 0 | 3549995 | 128407 | None | Item No: 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 3040.51 | 3040.51 | 2.52 | False | None | None | False | None | False | 7662.0852 | 0 | 3549996 | 128407 | None | Item No: 4.2 (v) | By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 2922.8 | 2922.8 | 16.8 | False | None | None | False | None | False | 49103.04 | 0 | 3549997 | 128407 | None | Item No: 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 8438.83 | 8438.83 | 25.92 | False | None | None | False | None | False | 218734.4736 | 0 | 3549998 | 128407 | None | Item No: 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 14663.57 | 14663.57 | 42.0 | False | None | None | False | None | False | 615869.94 | 0 | 3549999 | 128407 | None | Item No: 12.3A | Back filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material (Rate Inclusive of GST)
Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.15 | 1447.15 | 207.9 | False | None | None | False | None | False | 300862.485 | 0 | 3550000 | 128407 | None | Item No: 13.16 | Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 2224.01 | 2224.01 | 24.0 | False | None | None | False | None | False | 53376.24 | 0 | 3550001 | 128407 | None | Item Code : 8.1 | Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 135.05 | 135.05 | 19.7 | False | None | None | False | None | False | 2660.485 | 0 | 3550002 | 128407 | None | Item No: 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman(rates inclusive of GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.12 | 1.12 | 1820.0 | False | None | None | False | None | False | 2038.4 | 0 | 3550003 | 128407 | None | Item No: 8.23 (II) | Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-25 grade concrete with TMT reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at ocations directed by the Engineer, all as specified. (Area = 0.243 m2/m, single face) (rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 6388.52 | 6388.52 | 20.0 | False | None | None | False | None | False | 127770.4 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. Construction of Field Culverts | 1058475.69 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550004 | 128408 | None | vol- 1, Item No: 1.14.1 , Page No: 8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 120.76 | False | None | None | False | None | False | 15261.6488 | 0 | 3550005 | 128408 | None | vol- 1, Item No: 2.1.3 , Page No: 15 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 7.39 | False | None | None | False | None | False | 54836.5343 | 0 | 3550006 | 128408 | None | vol- 1, Item No: 2.11 h , Page No: 18 | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.5 | False | None | None | False | None | False | 48947.315 | 0 | 3550007 | 128408 | None | vol- 1, Item No: 2.4.2 , Page No: 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7834.2 | 7834.2 | 27.79 | False | None | None | False | None | False | 217712.418 | 0 | 3550008 | 128408 | None | vol- 3, Item No: 9.1.ii , Page No: 87 | Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (i). 1200 mm dia (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 13340.31 | 13340.31 | 50.0 | False | None | None | False | None | False | 667015.5 | 0 | 3550009 | 128408 | None | vol- 3, Item No: 12.3A , Page No: 117 | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 1447.15 | 1447.15 | 37.8 | False | None | None | False | None | False | 54702.27 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. onstruction of RCC Drain & Road Crossings (CH-400 TO 1400) | 20059795.25 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550010 | 128409 | None | Item No.VOL-I-1.14.1 Page No. 8 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 5236.25 | False | None | None | False | None | False | 661757.275 | 0 | 3550011 | 128409 | None | Item No.VOL-I-2.1.3 Page No. 15 | Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 268.0 | False | None | None | False | None | False | 1988659.16 | 0 | 3550012 | 128409 | None | Item No.VOL-I-2.11 h Page No. 18 | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 Raft ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 39.81 | False | None | None | False | None | False | 3897185.2203 | 0 | 3550013 | 128409 | None | Item No.VOL-I-2.4.2 Page No. 16 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (rates inclusive of GST) Schedule of Rates PWD 2023-24 Raft ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 10576.17 | 10576.17 | 995.2 | False | None | None | False | None | False | 10525404.384 | 0 | 3550014 | 128409 | None | vol- 3, Item No: 2.8(ii)A , Page No: 10 | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 890.84 | 890.84 | 45.0 | False | None | None | False | None | False | 40087.8 | 0 | 3550015 | 128409 | None | vol- 3, Item No: 2.10 (iv) (B) , Page No: 10 | Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 755.79 | 755.79 | 36.0 | False | None | None | False | None | False | 27208.44 | 0 | 3550016 | 128409 | None | vol- 1, Item No: 2.4.2 , Page No: 15 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9401.04 | 9401.04 | 310.55 | False | None | None | False | None | False | 2919492.972 | 0 |
| 1721375314000 | 1 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. Pedastal for Electric Poles | 563714.59 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550017 | 128410 | None | vol- 1, Item No: 1.14.1 , Page No: 8 | Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 19.14 | False | None | None | False | None | False | 2418.9132 | 0 | 3550018 | 128410 | None | vol- 1, Item No: 2.1.3 , Page No: 15 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7420.37 | 7420.37 | 5.22 | False | None | None | False | None | False | 38734.3314 | 0 | 3550019 | 128410 | None | vol- 1, Item No: 2.11 h , Page No: 18 | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Tonne | 97894.63 | 97894.63 | 0.37 | False | None | None | False | None | False | 36221.0131 | 0 | 3550020 | 128410 | None | vol- 1, Item No: 2.4.2 , Page No: 15 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 9401.04 | 9401.04 | 24.36 | False | None | None | False | None | False | 229009.3344 | 0 | 3550021 | 128410 | None | vol- 5, Item No: 10.1.12 , Page No: 120 | Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 315mm dia., 6 kg/sqcm & class 3 Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 83.01 | 83.01 | 3100.0 | False | None | None | False | None | False | 257331.0 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. UGD Line Shifting | 5175469.95 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550022 | 128411 | None | vol- 1, Item No: 1.6.1 , Page No: 6 | Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 599.68 | 599.68 | 502.25 | False | None | None | False | None | False | 301189.28 | 0 | 3550023 | 128411 | None | Item No: 2.24.2 , Page No: 7 | Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.1 , Page No: 7 Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 178.42 | 178.42 | 95.65 | False | None | None | False | None | False | 17065.873 | 0 | 3550024 | 128411 | None | Item No: 16.3.2 , Page No 188 | Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.RCC NP3 Class pipe of 300 mm dia. Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 1650.35 | 1650.35 | 500.0 | False | None | None | False | None | False | 825175.0 | 0 | 3550025 | 128411 | None | Item No: 16.18.1 , Page No 194 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.0 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 54295.46 | 54295.46 | 5.0 | False | None | None | False | None | False | 271477.3 | 0 | 3550026 | 128411 | None | Item No: 16.18.2 , Page No: 194 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.3 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 60974.91 | 60974.91 | 5.0 | False | None | None | False | None | False | 304874.55 | 0 | 3550027 | 128411 | None | Item No: 16.18.3 , Page No: 194 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.6 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 67778.26 | 67778.26 | 5.0 | False | None | None | False | None | False | 338891.3 | 0 | 3550028 | 128411 | None | Item No: 16.18.4 , Page No: 194 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.9 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 72304.32 | 72304.32 | 5.0 | False | None | None | False | None | False | 361521.6 | 0 | 3550029 | 128411 | None | Item No: 16.18.5 , Page No: 194 | Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 2.0 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Each | 75977.96 | 75977.96 | 5.0 | False | None | None | False | None | False | 379889.8 | 0 | 3550030 | 128411 | None | Item No: 16.4 , Page No: 191 | Conveying the new CI or RCC Machinehole frame and cover of 2 CMTS from divisional stores to the workspot and fixing the same in cement concrete and removing the old frame and cover and conveying back the old ones to stores. Schedule of Rates BWSSB 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Set | 500.56 | 500.56 | 25.0 | False | None | None | False | None | False | 12514.0 | 0 | 3550031 | 128411 | None | PE80-PN6.0,450 mm dia | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water fort e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 1 1 0 m m d i a C o i l s h a l l b e u s e d . For :HDPE PE 80 PN 6.0 HDPE Grade
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 9164.88 | 9164.88 | 200.0 | False | None | None | False | None | False | 1832976.0 | 0 | 3550032 | 128411 | None | Vol-3, Item No: 2.2.3 , Page No: 15 | Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 7850.3 | 7850.3 | 67.5 | False | None | None | False | None | False | 529895.25 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. Water Supply Line Shifting | 1575098.64 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550033 | 128412 | None | Item No.VOL-I-1.17 Page No. 10 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 126.38 | 126.38 | 972.0 | False | None | None | False | None | False | 122841.36 | 0 | 3550034 | 128412 | None | Item No. VOL-5 - 9.2.3 Page No.96 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE : Upto 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,90mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 473.3 | 473.3 | 1400.0 | False | None | None | False | None | False | 662620.0 | 0 | 3550035 | 128412 | None | vol- 5, Item No: 9.2.1 , Page No: 96 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,63mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 271.34 | 271.34 | 2200.0 | False | None | None | False | None | False | 596948.0 | 0 | 3550036 | 128412 | None | vol- 1, Item No: 1.1 , Page No: 7 | Refilling available earth around trenches/pipelines, cables in layers notexceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 198.24 | 198.24 | 972.0 | False | None | None | False | None | False | 192689.28 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. 1ST YEAR MAINTAINANCE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550037 | 128413 | None | Item Code 2.5 (ii) a | Clearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY= 20.76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550038 | 128413 | None | Item Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1384 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550039 | 128413 | None | Item Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 519 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550040 | 128413 | None | Item Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 155.70 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550041 | 128413 | None | Item Code 1.12 | NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 405 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. 2ND YEAR MAINTAINANCE | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550042 | 128414 | None | Item Code 2.5 (ii) a | Clearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY 20.76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550043 | 128414 | None | Item Code 16.19 | Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1384 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550044 | 128414 | None | Item Code 10.3 | Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 155.70 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550045 | 128414 | None | Item Code 10.2 | Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 519 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3550046 | 128414 | None | Item Code 1.12 | NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 405 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. 3RD YEAR MAINTAINANCE | 173712.14 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550047 | 128415 | None | vol- 3, Item No: 2.5 , Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 545.36 | 545.36 | 20.76 | False | None | None | False | None | False | 11321.6736 | 0 | 3550048 | 128415 | None | vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.37 | 8.37 | 1384.0 | False | None | None | False | None | False | 11584.08 | 0 | 3550049 | 128415 | None | vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 54.12 | 54.12 | 155.7 | False | None | None | False | None | False | 8426.484 | 0 | 3550050 | 128415 | None | vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 134.61 | 134.61 | 519.0 | False | None | None | False | None | False | 69862.59 | 0 | 3550051 | 128415 | None | vol- 3, Item No: 16.22 , Page No: 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2753.16 | 2753.16 | 1.73 | False | None | None | False | None | False | 4762.9668 | 0 | 3550052 | 128415 | None | vol- 3, Item No: 16.24i , Page No: 148 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 285.86 | 285.86 | 1.73 | False | None | None | False | None | False | 494.5378 | 0 | 3550053 | 128415 | None | vol- 1, Item No: 1.12 , Page No: 8 | Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 131.83 | 131.83 | 405.0 | False | None | None | False | None | False | 53391.15 | 0 | 3550054 | 128415 | None | vol- 3, Item No: 8.1 , Page No: 66 | Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 151.26 | 151.26 | 78.3 | False | None | None | False | None | False | 11843.658 | 0 | 3550055 | 128415 | None | vol- 3, Item No: 8.4 , Page No: 63 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.25 | 1.25 | 1620.0 | False | None | None | False | None | False | 2025.0 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. 4TH YEAR MAINTAINANCE | 160035.63 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550056 | 128416 | None | vol- 3, Item No: 2.5 , Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 564.84 | 564.84 | 20.76 | False | None | None | False | None | False | 11726.0784 | 0 | 3550057 | 128416 | None | vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.62 | 8.62 | 1384.0 | False | None | None | False | None | False | 11930.08 | 0 | 3550058 | 128416 | None | vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 56.05 | 56.05 | 155.7 | False | None | None | False | None | False | 8726.985 | 0 | 3550059 | 128416 | None | vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 139.41 | 139.41 | 519.0 | False | None | None | False | None | False | 72353.79 | 0 | 3550060 | 128416 | None | vol- 1, Item No: 1.12 , Page No: 8 | Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 136.54 | 136.54 | 405.0 | False | None | None | False | None | False | 55298.7 | 0 |
| 1721375314000 | 0 | None | None | Roads | PKG 711-B in Davanagere Taluk of Davanagere District. 5TH YEAR MAINTAINANCE | 1530819.76 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3550061 | 128417 | None | vol- 3, Item No: 2.5 , Page No: 9 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | 100 Sqm | 584.31 | 584.31 | 20.76 | False | None | None | False | None | False | 12130.2756 | 0 | 3550062 | 128417 | None | vol- 3, Item No: 16.19 , Page No: 147 | Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | m | 8.92 | 8.92 | 1384.0 | False | None | None | False | None | False | 12345.28 | 0 | 3550063 | 128417 | None | vol- 3, Item No: 10.3 , Page No: 91 | Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 57.99 | 57.99 | 155.7 | False | None | None | False | None | False | 9029.043 | 0 | 3550064 | 128417 | None | vol- 3, Item No: 10.2 , Page No: 91 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 144.22 | 144.22 | 795.0 | False | None | None | False | None | False | 114654.9 | 0 | 3550065 | 128417 | None | vol- 3, Item No: 16.22 , Page No: 147 | Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 2949.81 | 2949.81 | 1.73 | False | None | None | False | None | False | 5103.1713 | 0 | 3550066 | 128417 | None | vol- 3, Item No: 16.24i , Page No: 148 | Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Km | 306.28 | 306.28 | 1.73 | False | None | None | False | None | False | 529.8644 | 0 | 3550067 | 128417 | None | vol- 3, Item No: 8.1 , Page No 66 | Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 162.06 | 162.06 | 78.3 | False | None | None | False | None | False | 12689.298 | 0 | 3550068 | 128417 | None | vol- 3, Item No: 8.4 , Page No: 63 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Per cm Height Per Letter | 1.34 | 1.34 | 1620.0 | False | None | None | False | None | False | 2170.8 | 0 | 3550069 | 128417 | None | vol- 3, Item No: 8.15 , Page No: 67 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Sqm | 788.0 | 788.0 | 1229.06 | False | None | None | False | None | False | 968499.28 | 0 | 3550070 | 128417 | None | vol- 3, Item No: 8.43 , Page No: 74 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Nos | 542.68 | 542.68 | 620.0 | False | None | None | False | None | False | 336461.6 | 0 | 3550071 | 128417 | None | vol- 1, Item No: 1.12 , Page No: 8 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST)Schedule of Rates PWD 2023-24
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST | Cum | 141.25 | 141.25 | 405.0 | False | None | None | False | None | False | 57206.25 | 0 |
|
|
---|