createdTsNone
versionNone
createdDateNone
modifiedDateNone
noticeInvitingTenderDTO
createdTs1721375313770
version16
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd1944000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose31-07-2024 17:30:00
tenderQueryClose24-07-2024 10:30:00
technicalBidOpen03-08-2024 11:30:00
publishedDate20-07-2024 12:07:49
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls2
preBidMeetingDate24-07-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee1844000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1721375313774
version28
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9725/CALL-2
titlePKG 711 A) Improvements to road Davanagere Malebennuru NEW SH from Ch 6.00 KM to 8.10 KM (Shamanuru to Jarikatte) (in selected reaches) in Davanagere Taluk of Davanagere District. B)Improvements to road Davanagere - Hunasekatte NEW SH from Ch 0.00 KM to 3.00 KM (Bambubajar to Basapura) (in selected reaches) in Davanagere Taluk of Davanagere District
descriptionPKG-711 A) Improvements to road Davanagere Malebennuru NEW SH from Ch 6.00 KM to 8.10 KM (Shamanuru to Jarikatte) (in selected reaches) in Davanagere Taluk of Davanagere District. B)Improvements to road Davanagere - Hunasekatte NEW SH from Ch 0.00 KM to 3.00 KM (Bambubajar to Basapura) (in selected reaches) in Davanagere Taluk of Davanagere District
categoryWORKS
categoryTextWorks
ecv194392482.95
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount200000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-711/DVG(S)/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. Road estimate69440158.2
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549840128394Noneitem code 16.29Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.The board will be a composite unit consisting of threeplates of Aluminium Composite Materials ACM materialspecifications as per Clause 1701.3.7. The top most platewillbe in Rectangular shape of 600mm x 600 mm size riveted overwelded M.S. angle iron frame of 25 mm x 25mm x 5 mm sizeon back on edges. The middle plate will be 1200 mm x 150mm size riveted over welded M.S. angle iron frame of 25mmx 25mmx 5 mm size on back on edges. The main lower mostplate will be 1500 mm x 600 mm size riveted over weldedM.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Weldingof all the sheets over angle iron frame will be done neatly tohave plain surface on one side. The angle iron frames of thelower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm 12 SWGsheet tubes posts placed at1125 mm apart centre to centre. The top of the middle platewill be flushed with the top of 75 mm dia medium steel tubeposts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm belowground level. The height of bottom of the lower most platewill be 1200 mm from normal ground level and the bottomof middle plate will be 100 mm above the top level of thelower most plate. The rectangular shaped plate mounted overangle iron frame will be connected to middle plate by squaremedium steel section of 47 mm x 47 mm thickness 12 SWGhaving a spacing of 100 mm between the rectangular shaped plate and middle plate and this square section will be weldedto the bottom point of the rectangular shaped plate.ii The lettering and borders etc. of middle and bottom plate SHDP logo on top plate shall be as per clause 1701.4.6essagesPerBorders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design painting and lettering shall be done as per approved drawing. iii For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. iv A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777 Per 2019 Per Dir Tech 7 Retro Reflective Trafic Sign As per IRC 67 Clause1701.3.8.1 Class A Type 1 Schedule of Rates PWD 2023 24 vol 3 Item No. 16.29Page No. 149 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3549841128394Noneitem code 2.5Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3 Item No. 2.5Page No. 9 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.9363.0FalseNoneNoneFalseNoneFalse30676.590
3549842128394Noneitem code 3.5Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead Schedule of Rates PWD 2023 24 vol 3 Item No. 3.5Page No. 17 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.435500.0FalseNoneNoneFalseNoneFalse40865.00
3549843128394Noneitem code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Rate Inclusive of GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.7115617.88FalseNoneNoneFalseNoneFalse1838380.65480
3549844128394Noneitem code 1.8Construction of Embankment by excavating the available approved Gravel Per Murrumdeposite dataplaceorborrowpitsduringorprior excavationwithallliftsandleadtransportationtositespreading grading to requiredslope and compacting to meet the requirement complete as per specifications including cost of labourrollingwaterall materialsusageand all other appurtenaces required to complete the work.Schedule of Rates PWD 2023 24 vol 1 Item No. 1.8Page No. 7 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.297470.0FalseNoneNoneFalseNoneFalse4387056.30
3549845128394Noneitem code 3.6Construction of sub grade and earthen shoulders with approvedmaterialCBR min 10 percentobtainedfromborrowpitswithallliftsand leads transporting to site spreading grading to required slope and compacted to meet requirement of table No. 300 2 Schedule of Rates PWD 2023 24 vol 3 Item No. 3.6Page No. 17 rates inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.839079.42FalseNoneNoneFalseNoneFalse5545982.11860
3549846128394Noneitem code 4.2 vBy Mix in Place Method Construction of Granular Sub Base of required grading as perdesign spreading in uniform layers with motor grader onprepared surface mixing by mix in place method with front endloader at OMC and compacting with vibratory roller to achievethe desired density complete as per clause 401For Grading V Material Schedule of Rates PWD 2023 24 vol 3 Item No. 4.2 v Page No. 23 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.812922.813732.24FalseNoneNoneFalseNoneFalse10908628.39440
3549847128394NoneItem code 6.1Dry Lean Cement Concrete Sub.base Construction of dry lean cement concrete Sub. base over a prepared sub.grade with coarse and fine aggregate conforming to IS. 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14.1, aggregate gradation after blending to be as per table 600.1, cement content not to be less than 140 kg per m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8.10 t vibratory roller, finishing and curing. Schedule of Rates PWD 2023.24 vol. 3, Item No. 6.1 , Page No. 49 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum6095.886095.881494.87FalseNoneNoneFalseNoneFalse9112548.13560
3549848128394NoneItem code 6.2.1Construction of M40 Grade un.reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383.2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC at 420 kg per m3 Schedule of Rates PWD 2023.24 vol. 3, Item No. 6.2.1 , Page No. 49 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11226.5811226.583343.67FalseNoneNoneFalseNoneFalse37537978.74860
17213753140001NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. Box Culvert 2x2, 1v(CH-7.905)1951469.39
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549849128395NoneItem code 2.10 (iv) aDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a. Rubble stone masonry in lime mortar Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv a , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum644.28644.281.8FalseNoneNoneFalseNoneFalse1159.7040
3549850128395NoneItem code 2.10 (iv) bDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar. Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv B , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.798.74FalseNoneNoneFalseNoneFalse6605.60460
3549851128395NoneItem code 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No . 1.14.1 , Page No . 8 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3885.37FalseNoneNoneFalseNoneFalse10789.06060
3549852128395NoneItem code 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1 .3 .6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.1.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.387420.389.31FalseNoneNoneFalseNoneFalse69083.73780
3549853128395NoneItem code 2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.11 h , Page No . 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6297894.623.98FalseNoneNoneFalseNoneFalse389620.58760
3549854128395NoneItem code 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.2.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.379420.3747.01FalseNoneNoneFalseNoneFalse442851.59370
3549855128395NoneItem code 2.5.2Providing and laying in position Cement Concrete for all Super structures ofbuilding , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.5.2 , Page No . 16 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1810174.1812.48FalseNoneNoneFalseNoneFalse126973.76640
3549856128395NoneItem code 2.4.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 Vol-3, Item No. 2.4.3 , Page No. 16 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.379420.3717.2FalseNoneNoneFalseNoneFalse162030.3640
3549857128395NoneItem code 12.2Providing weep holes in Brick masonryPerPlainPer Reinforced concrete abutment, wing wallPer return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V .20H towards drawing foce. Complete as per drawing and Technical Specifications Schedule of Rates PWD 2023-24 vol- 3, Item No . 12.2 , Page No . 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.13296.138.0FalseNoneNoneFalseNoneFalse2369.040
3549858128395NoneItem code 12.4Providing and laying of Filter media with granular materialsPer stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. Schedule of Rates PWD 2023-24 vol- 3, Item No . 12.4 , Page No . 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.813316.8115.57FalseNoneNoneFalseNoneFalse51642.73170
3549859128395NoneItem code 12.3ABack filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material(rates inclusive of GST) Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.161447.16115.5FalseNoneNoneFalseNoneFalse167146.980
3549860128395NoneItem code 2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.2.1 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7789.67789.62.54FalseNoneNoneFalseNoneFalse19785.5840
3549861128395NoneItem code 14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS . 280 & IS .4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No . 14.2 , Page No . 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.511.26FalseNoneNoneFalseNoneFalse3831.04260
3549862128395NoneItem code 4.2 vBy Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24 vol- 3, Item No . 4.2 v , Page No . 23 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.812922.818.4FalseNoneNoneFalseNoneFalse24551.6040
3549863128395NoneItem code 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.8 , Page No . 121 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8312.96FalseNoneNoneFalseNoneFalse109367.23680
3549864128395NoneItem code 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification Batching Plant Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.9 , Page No . 122 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14663.5714663.5721.0FalseNoneNoneFalseNoneFalse307934.970
3549865128395NoneItem code 13.16Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm in traffic direction, covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS . 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.Schedule of Rates PWD 2023-24 vol- 3, Item No . 13.16 , Page No . 124 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0124.0FalseNoneNoneFalseNoneFalse53376.240
3549866128395NoneItem code 8.10Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. MORTH Specification No. 803 Schedule of Rates PWD 2023-24 vol- 3, Item No . 8.1 , Page No . 66 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.06135.069.85FalseNoneNoneFalseNoneFalse1330.3410
3549867128395NoneItem code 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge.Schedule of Rates PWD 2023-24 vol- 3, Item No . 8.4 , Page No . 63 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.121.12910.0FalseNoneNoneFalseNoneFalse1019.20
17213753140001NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District.1200mm dia, 1V, Pipe Culvert(CH-6.419,6.823)1218894.12
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549868128396NoneItem code 2.8 ii aDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a Cement Concrete Grade M-15 & M-20 Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.8iiA , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum890.84890.843.6FalseNoneNoneFalseNoneFalse3207.0240
3549869128396NoneItem code 2.10 (iv) bDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar. Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.10 iv B , Page No. 10 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7921.6FalseNoneNoneFalseNoneFalse16325.0640
3549870128396NoneItem code 2.17 (ix) ADismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means C. upto 600 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 2.17 ix , A, Page No. 11 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1185.721185.7220.0FalseNoneNoneFalseNoneFalse23714.40
3549871128396NoneItem code 1.14.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No . 1.14.1 , Page No . 8 Rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38148.51FalseNoneNoneFalseNoneFalse18768.69380
3549872128396NoneItem code 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1 .3 .6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.1.3 , Page No . 15 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.387420.389.24FalseNoneNoneFalseNoneFalse68564.31120
3549873128396NoneItem code 2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No . 2.11 h , Page No . 18 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.81FalseNoneNoneFalseNoneFalse79294.65030
3549874128396NoneItem code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granitepertrapperbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.4.2 , Page No. 15 Rates inclusive of 18 percent GST, 8 percentage for form work ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9365.32FalseNoneNoneFalseNoneFalse552667.94760
3549875128396NoneItem code 9.1 iiLaying Reinforced Cement Concrete Pipe NP4 per Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4perprestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1.2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. i. 1200 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 9.1.ii , Page No. 87 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm13340.3213340.3224.0FalseNoneNoneFalseNoneFalse320167.680
3549876128396NoneItem code 12.3ABack filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material(rates inclusive of GST) Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.1542.84FalseNoneNoneFalseNoneFalse61995.9060
3549877128396NoneItem code 14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS . 280 & IS .4826 in 100mm x 100mm mesh weaved diagonally including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. Schedule of Rates PWD 2023-24 vol- 3, Item No . 14.2 , Page No . 129 Rates inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.5124.4FalseNoneNoneFalseNoneFalse74188.4440
17213753140001NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. Field Culverts105686.77
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549878128397NoneItem code 1.4.1Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 vol- 1, Item No. 1.14.1 , Page No. 8 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3822.75FalseNoneNoneFalseNoneFalse2875.1450
3549879128397NoneItem code 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1. 3. 6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.1.3 , Page No. 15 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.371.31FalseNoneNoneFalseNoneFalse9720.68470
3549880128397NoneItem code 2.11 hSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.11 h , Page No. 18 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.13FalseNoneNoneFalseNoneFalse12726.30190
3549881128397NoneItem code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Schedule of Rates PWD 2023-24 vol- 1, Item No. 2.4.2 , Page No. 16 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.26.95FalseNoneNoneFalseNoneFalse54447.690
3549882128397NoneItem code 8.58Providing and laying Reinforced Cement Concrete pipe light duty NP2 for culverts, roadway utilities& crossingsas per IS 458. 2003 in Single row including pointing ends and fixing collars with cement mortar 1. 2 including cost of all materials, labour, curing complete as per specifications. (i). 600 mm dia Schedule of Rates PWD 2023-24 vol- 3, Item No. 8.58 , Page No. 79 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2361.542361.547.5FalseNoneNoneFalseNoneFalse17711.550
3549883128397NoneItem code 12.3ABack filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material rates are inclusive of 18 Percent GST Schedule of Rates PWD 2023-24 vol- 3, Item No. 12.3A , Page No. 117 rates are inclusive of 18 Percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.161447.165.67FalseNoneNoneFalseNoneFalse8205.39720
17213753140001NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. RCC Drain Mitlakatte Village1214580.72
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549884128398NoneItem code 2.8 ii aDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T and P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means a Cement Concrete Grade M.15 and M.20 Schedule of Rates PWD 2023.24 vol.3, Item No. 2.8iiA , Page No. 10 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum890.84890.8426.4FalseNoneNoneFalseNoneFalse23518.1760
3549885128398NoneItem code 2.10 iv bDismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T and P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii By Mechanical Means b. Rubble stone masonry in cement mortar.Schedule of Rates PWD 2023.24 vol 3, Item No. 2.10 iv B , Page No. 10 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7926.4FalseNoneNoneFalseNoneFalse19952.8560
3549886128398NoneItem code 1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or and stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023.24 vol.1, Item No. 1.14.1 , Page No. 8 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38171.6FalseNoneNoneFalseNoneFalse21686.8080
3549887128398NoneItem code 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granitePertrapPerbasalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead and lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.Mix 1.3.6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.1.3 , Page No. 15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.387420.3822.0FalseNoneNoneFalseNoneFalse163248.360
3549888128398NoneItem code 2.11 hSteel Fabrication Supplying, fitting and placing TMT FE 550 Per 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapingPerwelding joints, tying with binding wire Per soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023.24 vol 1, Item No. 2.11 h , Page No. 18 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.633.41FalseNoneNoneFalseNoneFalse333820.68830
3549889128398NoneItem code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.217.6FalseNoneNoneFalseNoneFalse137881.920
3549890128398NoneItem code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10576.1710576.1733.0FalseNoneNoneFalseNoneFalse349013.610
3549891128398NoneItem code 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works and other parallel works from 0.50m to 3.50 m height. The granitePertrapPerbasalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead and lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023.24 vol.1, Item No. 2.4.2 , Page No.15 rates are inclusive of 18 percent GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.0417.6FalseNoneNoneFalseNoneFalse165458.3040
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. Road furniture2546956.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549892128399NoneItem Code 8.16 iiKilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC.8 1980 fixing in position including painting and printing etc ii Ordinary kilometer stone precast rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.16 ii Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos3626.553626.553.0FalseNoneNoneFalseNoneFalse10879.650
3549893128399NoneItem Code 8.16 iiiKilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC.8 1980 fixing in position including painting and printing etc iii 200 m stone precast rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.16 iii Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1043.241043.247.0FalseNoneNoneFalseNoneFalse7302.680
3549894128399NoneItem Code 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 g per m2 area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC.35.2015.The finished surface to be level uniform and free from streaks and holes. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.15 Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67441.06FalseNoneNoneFalseNoneFalse289630.87020
3549895128399NoneItem Code 8.6 iiRetro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. ii 90 cm equilateral triangle rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 ii Page No. 64 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.7732.0FalseNoneNoneFalseNoneFalse188248.640
3549896128399NoneItem Code 8.6 ivRetro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. ii 60 cm equilateral triangle rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 iv Page No. 64 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4465.364465.3614.0FalseNoneNoneFalseNoneFalse62515.040
3549897128399NoneItem Code 8.6 viiiRetro Reflectorised Traffic SignsProviding and fixing of retro reflectorised cautionary mandatory and informatory sign as per IRC.67.2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3 3mmper4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC.67.2022. viii 60 cm circular rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.6 viii Page No. 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5388.415388.412.0FalseNoneNoneFalseNoneFalse10776.820
3549898128399NoneItem Code 8.7Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC.67.2022 made of high intensity grade sheeting vide clause 801.3 fixed over aluminium sheeting 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm 60 cm below ground level as per approved drawing rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.7 Page No. 65 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.3911163.393.6FalseNoneNoneFalseNoneFalse40188.2040
3549899128399NoneItem Code 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers per Cats Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height width and length shall not exceed 50 mm 100 mm and 102 per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 per 5 degree. The strength of detachment of the integrated cylindrical shanks of diameter not less than 19 per 2 mm and height not less than 30 per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as per manufacturers recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel to the Engineer. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.43 Page No. 74 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos452.24452.24282.0FalseNoneNoneFalseNoneFalse127531.680
3549900128399NoneItem Code 8.17Road Delineators Supplying and installation of delineators road way indicators hazard markers object markers 80 100 cm high above ground level painted black and white in 15 cm wide strips fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top buried or pressed into the ground and conforming to IRC 79 2019 and the drawings. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.17 Page No. 67 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.028.0FalseNoneNoneFalseNoneFalse20032.160
3549901128399NoneItem Code 8.48Supply and installation of retro reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC.67.2022 ASTM D 4956 09 specification fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board 60 cm below ground level. The sign post should be painted with one coat of red oxide paint and two coats of synthetic enamel paint of black and white colour with bands of 30 cm height firmly fixed to the ground by means of foundation with M 20 grade cement concrete foundation size of 45 cm x 45 cm x 60 cm including cost conveyance of all materials equipment machinery Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.48 Page No. 76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4443.054443.0526.0FalseNoneNoneFalseNoneFalse115519.30
3549902128399NoneItem Code 8.60.2 iiProviding Speed BreakersperRaised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99.2018 using Dense Bituminous Macadam DBM Gr II and Bituminous Concrete BC Gr II for entire formation width WBM Gr II for Shoulder hump portion only 150 mm thick completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 2022. Intermediate lane with formation width of 7.50 m rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.60.2 ii Page No. 80 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos56317.5156317.512.0FalseNoneNoneFalseNoneFalse112635.020
3549903128399NoneItem Code 8.29Providing and laying of a reinforced cement concrete pipe duct 300 mm dia across the road new construction extending from drain to drain in cuts and toe of slope to toe of slope in fills constructing head walls at both ends providing a minimum fill of granular material over top and sides of RCC pipe as per IRC.98 1997 bedded on a 0.3 m thick layer of granular material free of rock pieces outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts joints to be made leak proof invert level of duct to be above higher than ground level to prevent entry of water and dirt all as per IRC. 98 1997 and approved drawings. Single row for one utility service rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.29 Page No. 71 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm2740.672740.67504.0FalseNoneNoneFalseNoneFalse1381297.680
3549904128399NoneItem Code 8.25 iMetal Beam Crash Barrier i Type A W . Metal Beam Crash Barrier Providing and erecting a W metal beam crash barrier system comprising of 3 mm thick corrugated sheet metal beam rail 70 cm above roadperground level fixed on ISMC series channel vertical post 150 x 75 x 5 mm spaced 2 m centre to centre 1.8 m high 1.1 m below groundperroad level all steel parts and fitments to be galvanised by hot dip process all fittings to conform to IS.1367 and IS.1364 metal beam rail to be fixed onthe vertical post with a spacer of channel section 150 x 75 x 5 mm 330 mm long complete as per clause 811 rates inclusive of GST Schedule of Rates PWD 2023 24 vol 3 Item No. 8.25 i Page No. 69 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm4509.964509.9640.0FalseNoneNoneFalseNoneFalse180398.40
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. 1st Year Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549905128400NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY= 16.80 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549906128400NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1260 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549907128400NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 189 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549908128400NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 630 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549909128400NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 225 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. 2nd year Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549910128401NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY 25.20 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549911128401NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1680 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549912128401NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 189 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549913128401NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 630 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549914128401NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 225 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. 3rd Year257593.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549915128402NoneItem Code 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3, Item No 2.5 ii a , Page No 9 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3625.2FalseNoneNoneFalseNoneFalse13743.0720
3549916128402NoneItem Code 16.19Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3, Item No 16.19, Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.338.331680.0FalseNoneNoneFalseNoneFalse13994.40
3549917128402NoneItem Code 10.3Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.3 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12189.0FalseNoneNoneFalseNoneFalse10228.680
3549918128402NoneItem Code 10.2Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.2 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.61134.61630.0FalseNoneNoneFalseNoneFalse84804.30
3549919128402NoneItem Code 16.22Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory requlatory cautionary informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023 24 vol 3, Item No.16.22 , Page No.147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.162.1FalseNoneNoneFalseNoneFalse5781.6360
3549920128402NoneItem Code 16.24IMaintenance of 200 m and km stones Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023-24 vol. 3, Item No.16.24i, Page No. 148 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.87285.872.1FalseNoneNoneFalseNoneFalse600.3270
3549921128402NoneItem Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery and other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1, Item No 1.12 , Page No 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum235.41235.41225.0FalseNoneNoneFalseNoneFalse52967.250
3549922128402NoneItem Code 8.1Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023 24 vol 3, Item No. 8.1, Page No. 66 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm270.11270.11217.5FalseNoneNoneFalseNoneFalse58748.9250
3549923128402NoneItem Code 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3, Item No. 8.4, Page No. 63 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter2.232.237500.0FalseNoneNoneFalseNoneFalse16725.00
17213753140000NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. 4th Year Maintenance157883.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549924128403NoneItem Code 2.5Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. Schedule of Rates PWD 2023 24 vol 3, Item No 2.5 ii a , Page No 9 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8425.2FalseNoneNoneFalseNoneFalse14233.9680
3549925128403NoneItem Code 16.19Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3, Item No 16.19 , Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.638.631680.0FalseNoneNoneFalseNoneFalse14498.40
3549926128403NoneItem Code 10.3Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.3 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0656.06189.0FalseNoneNoneFalseNoneFalse10595.340
3549927128403NoneItem Code 10.2Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3, Item No 10.2 , Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.42139.42630.0FalseNoneNoneFalseNoneFalse87834.60
3549928128403NoneItem Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1, Item No 1.12 , Page No 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.54225.0FalseNoneNoneFalseNoneFalse30721.50
17213753140001NoneNoneRoadsPKG 711-A in Davanagere Taluk of Davanagere District. 5th Year Maintenance773555.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549929128404NoneItem Code 2.5Clearing and grubbing road land including uprooting rank vegetation grass bushes shrubs saplings and trees girth up to 300 mm removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned including removal and disposal of top organic soil not exceeding 150 mm in thickness. ii By Mechanical Means using Dozera In area of light jungle Schedule of Rates PWD 2023 24 vol 3 Item No. 2.5 Page No. 9 rates Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.32584.3225.2FalseNoneNoneFalseNoneFalse14724.8640
3549930128404NoneItem Code 16.19Maintenance of DrainsThe maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drainsas well as catch water drains as per technical specification Clause 1908. Schedule of Rates PWD 2023 24 vol 3 Item No 16.19 Page No 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.938.931680.0FalseNoneNoneFalseNoneFalse15002.40
3549931128404NoneItem Code 10.3Maintenance of Earth Shoulder stripping excess soil Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials labour HOM complete as per specifications. MORTH Specification No. 3003 Schedule of Rates PWD 2023 24 vol 3 Item No 10.3 Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9857.98189.0FalseNoneNoneFalseNoneFalse10958.220
3549932128404NoneItem Code 10.2Maintenance of Earthen Shoulder filling with fresh soil Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials labour HOM complete as per specifications. MORTH Specification No.3003 Schedule of Rates PWD 2023 24 vol 3 Item No 10.2 Page No 91 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.221260.0FalseNoneNoneFalseNoneFalse181717.20
3549933128404NoneItem Code 16.22Maintenance of Road Signs Maintenance of road signs by way of cleaning and repainting of mandatory per requlatory per cautionary per informatory and place identifications sign board as perdrawings and technical specification Clause 1910 Schedule of Rates PWD 2023 24 vol 3 Item No. 16.22 Page No. 147 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2949.822949.822.1FalseNoneNoneFalseNoneFalse6194.6220
3549934128404NoneItem Code 16.24iMaintenance of 200 m and km stones Maintenance of 200 metre and km stones Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar cleaning repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint Schedule of Rates PWD 2023 24 vol 3 Item No. 16.24 i Page No. 148 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm306.29306.292.1FalseNoneNoneFalseNoneFalse643.2090
3549935128404NoneItem Code 8.1Painting two coats on New Concrete Surface . Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803 Schedule of Rates PWD 2023 24 vol 3 Item No. 8.1 Page No. 66 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm162.07162.0715.0FalseNoneNoneFalseNoneFalse2431.050
3549936128404NoneItem Code 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade English and Roman Schedule of Rates PWD 2023 24 vol 3 Item No. 8.4 Page No. 63 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.341.347500.0FalseNoneNoneFalseNoneFalse10050.00
3549937128404NoneItem Code 8.15Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads at 250 gperm2 area thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC.35.2015.The finished surface to be level uniform and free from streaks and holes. Schedule of Rates PWD 2023 24 vol 3 Item No. 8.15 Page No. 67 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm788.01788.01441.06FalseNoneNoneFalseNoneFalse347559.69060
3549938128404NoneItem Code 8.43Supplying and Fixing of Molded Shank Raised Pavement Markers per Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RWperNHper33023per10 97 DO III Dt 11.06. 1997. The height width and length shall not exceed 50 mm 100 mm and 102 +per 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +per 5 degree. The strength of detachment of the integrated cylindrical shanks of diameter not less than 19 +per 2 mm and height not less than 30+per 2 mm from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro reflectance of the reflecting panel to the Engineer. Schedule of Rates PWD 2023 24 vol 3 Item No. 8.43 Page No. 74 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos542.68542.68281.0FalseNoneNoneFalseNoneFalse152493.080
3549939128404NoneItem Code 1.12Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth Schedule of Rates PWD 2023 24 vol 1 Item No. 1.12 Page No. 8 Rates inclusive of 18 percent GST. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.25225.0FalseNoneNoneFalseNoneFalse31781.250
17213753140001NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. RIGID PAVEMENT CONSTRUCTION WORK78602761.3
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549940128405Nonevol- 3, Item No: 16.29 , Page No: 149i) Providing and fixing of typical SHDP informatory sign board with Logo as per MORD specifications and drawing.The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangle shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 messages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3549941128405Nonevol- 3, Item No: 3.5 , Page No: 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.437315.0FalseNoneNoneFalseNoneFalse54350.450
3549942128405Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.9331.14FalseNoneNoneFalseNoneFalse15163.00020
3549943128405Nonevol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.716296.35FalseNoneNoneFalseNoneFalse741143.35850
3549944128405Nonevol- 1, Item No: 1.8 , Page No: 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.296550.0FalseNoneNoneFalseNoneFalse3846749.50
3549945128405Nonevol- 3, Item No: 3.6 , Page No: 17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.833100.0FalseNoneNoneFalseNoneFalse1893573.00
3549946128405Nonevol- 3, Item No: 4.2 (v) , Page No: 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.82467.26FalseNoneNoneFalseNoneFalse7211307.5280
3549947128405Nonevol- 3, Item No: 4.17 , Page No: 26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.62197.8FalseNoneNoneFalseNoneFalse6968344.680
3549948128405Nonevol- 3, Item No: 6.2.1 , Page No: 49Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11226.5811226.583233.34FalseNoneNoneFalseNoneFalse36299350.17720
3549949128405Nonevol- 3, Item No: 2.19 , Page No: 12Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantled materials and stacking serviceable and unserviceable materials separately (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum697.56697.56660.0FalseNoneNoneFalseNoneFalse460389.60
3549950128405Nonevol- 3, Item No: 6.1 , Page No: 49Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum6095.886095.882055.45FalseNoneNoneFalseNoneFalse12529776.5460
3549951128405Nonevol , Item No 6.8.2 , Page No 51Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1438.481438.485940.0FalseNoneNoneFalseNoneFalse8544571.20
17213753140001NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. ROAD FURNITURES.3419849.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549952128406NoneItem No.VOL-III-8.16-ii Page No. 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.552.0FalseNoneNoneFalseNoneFalse7253.10
3549953128406Nonevol- 3, Item No: 8.16 (iii) , Page No: 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1043.241043.246.0FalseNoneNoneFalseNoneFalse6259.440
3549954128406NoneItem No.VOL-III-8.15 Page No. 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67470.06FalseNoneNoneFalseNoneFalse308674.30020
3549955128406NoneItem No.-8.6 (ii) Page No. 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (rates inclusive of GST) Schedule of Rates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.7768.0FalseNoneNoneFalseNoneFalse400028.360
3549956128406Nonevol- 3, Item No: 8.6 iv , Page No: 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4465.364465.3632.0FalseNoneNoneFalseNoneFalse142891.520
3549957128406Nonevol- 3, Item No: 8.6 viii , Page No: 65Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5388.415388.414.0FalseNoneNoneFalseNoneFalse21553.640
3549958128406NoneItem No.VOL-III-8.7 Page No. 65Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.8911163.895.4FalseNoneNoneFalseNoneFalse60285.0060
3549959128406NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo452.24452.24620.0FalseNoneNoneFalseNoneFalse280388.80
3549960128406Nonevol- 3, Item No: 8.17 , Page No: 67Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.0214.0FalseNoneNoneFalseNoneFalse35056.280
3549961128406Nonevol- 3, Item No: 8.48 , Page No: 76Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint nd two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4443.054443.0548.0FalseNoneNoneFalseNoneFalse213266.40
3549962128406NoneItem No.VOL-III-8.31 Page No. 71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm232.93232.93157.5FalseNoneNoneFalseNoneFalse36686.4750
3549963128406Nonevol- 3, Item No: 8.29 , Page No: 71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2740.672740.67696.0FalseNoneNoneFalseNoneFalse1907506.320
17213753140001NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. Construction of Box Cell Culvert (1.5 m X 1.5 m - 1 Vent) and Construction of Box Cell Culvert (2 m X 2 m - 1 Vent)CH 0.9104405972.03
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549964128407NoneItem No: 2.10 (iv) (a)Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. a. Rubble stone masonry in lime mortar(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum644.28644.281.8FalseNoneNoneFalseNoneFalse1159.7040
3549965128407NoneItem No: 2.10 (iv) (B)Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. b. Rubble stone masonry in cement mortar.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.796.0FalseNoneNoneFalseNoneFalse4534.740
3549966128407NoneItem No: 2.17 (ix) BDismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1357.941357.9410.0FalseNoneNoneFalseNoneFalse13579.40
3549967128407NoneItem No: 1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3862.56FalseNoneNoneFalseNoneFalse7906.33280
3549968128407NoneItem No: 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.376.87FalseNoneNoneFalseNoneFalse50977.94190
3549969128407NoneItem No: 2.11 HSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.632.32FalseNoneNoneFalseNoneFalse227115.54160
3549970128407NoneItem No: 2.2.3Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.369420.3622.75FalseNoneNoneFalseNoneFalse214313.190
3549971128407NoneItem No: 2.2.3Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 8 percent for formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8478.338478.336.02FalseNoneNoneFalseNoneFalse51039.54660
3549972128407NoneItem No: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.178.4FalseNoneNoneFalseNoneFalse85463.0280
3549973128407NoneItem No: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.12296.124.0FalseNoneNoneFalseNoneFalse1184.480
3549974128407NoneItem No: 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.811.58FalseNoneNoneFalseNoneFalse38408.5440
3549975128407NoneItem No: 2.2.1Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) 5 percent formwork ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8179.078179.072.26FalseNoneNoneFalseNoneFalse18484.69820
3549976128407NoneItem No: 14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.511.08FalseNoneNoneFalseNoneFalse3283.75080
3549977128407NoneItem No: 4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.87.2FalseNoneNoneFalseNoneFalse21044.160
3549978128407NoneItem No: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8311.16FalseNoneNoneFalseNoneFalse94177.34280
3549979128407NoneItem No: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14663.5714663.5718.0FalseNoneNoneFalseNoneFalse263944.260
3549980128407NoneItem No: 12.3 ABack filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 (rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.15104.94FalseNoneNoneFalseNoneFalse151863.9210
3549981128407NoneItem No: 13.16Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0124.0FalseNoneNoneFalseNoneFalse53376.240
3549982128407NoneItem Code : 8.1Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.05135.057.75FalseNoneNoneFalseNoneFalse1046.63750
3549983128407NoneItem No: 8.4Printing New Letter and Figures of any Shade Printing new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 3, Item No: 8.4 , Page No: 63" ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.121.12700.0FalseNoneNoneFalseNoneFalse784.00
3549984128407NoneItem No: 2.10 (IV) (A)Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. a. Rubble stone masonry in lime mortar(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm644.28644.283.6FalseNoneNoneFalseNoneFalse2319.4080
3549985128407NoneItem No: 2.10 (iv) (B)Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead. ii) By Mechanical Means. b. Rubble stone masonry in cement mortar.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7911.37FalseNoneNoneFalseNoneFalse8593.33230
3549986128407NoneItem No: 1.14.1Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38170.77FalseNoneNoneFalseNoneFalse21581.91260
3549987128407NoneItem No: 2.1.3Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3718.64FalseNoneNoneFalseNoneFalse138315.69680
3549988128407NoneItem No: 2.11 HSteel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.637.94FalseNoneNoneFalseNoneFalse777283.36220
3549989128407NoneItem No: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.0458.95FalseNoneNoneFalseNoneFalse554191.3080
3549990128407NoneItem No: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.5.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8074.68074.66.02FalseNoneNoneFalseNoneFalse48609.0920
3549991128407NoneItem No: 2.5.2Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(rates inclusive of GST) 20 percent for formwork. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.177.2FalseNoneNoneFalseNoneFalse73254.0240
3549992128407NoneItem No: 12.2Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.12296.1216.0FalseNoneNoneFalseNoneFalse4737.920
3549993128407NoneItem No: 12.4Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.816.74FalseNoneNoneFalseNoneFalse55523.2320
3549994128407NoneItem No: 2.4.2Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 vol- 1, Item No: 2.4.2 , Page No: 15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.25.08FalseNoneNoneFalseNoneFalse39797.7360
3549995128407NoneItem No: 14.2Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.512.52FalseNoneNoneFalseNoneFalse7662.08520
3549996128407NoneItem No: 4.2 (v)By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.816.8FalseNoneNoneFalseNoneFalse49103.040
3549997128407NoneItem No: 13.8PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8325.92FalseNoneNoneFalseNoneFalse218734.47360
3549998128407NoneItem No: 13.9Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14663.5714663.5742.0FalseNoneNoneFalseNoneFalse615869.940
3549999128407NoneItem No: 12.3ABack filling behind abutment, wing wall and return wal complete including compaction as per drawing and Technical Specification- A. Granular material (Rate Inclusive of GST) Schedule of Rates PWD 2023-24 vol- 3, Item No: 12.3A , Page No: 117 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.15207.9FalseNoneNoneFalseNoneFalse300862.4850
3550000128407NoneItem No: 13.16Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0124.0FalseNoneNoneFalseNoneFalse53376.240
3550001128407NoneItem Code : 8.1Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces(rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.05135.0519.7FalseNoneNoneFalseNoneFalse2660.4850
3550002128407NoneItem No: 8.4Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman(rates inclusive of GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.121.121820.0FalseNoneNoneFalseNoneFalse2038.40
3550003128407NoneItem No: 8.23 (II)Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-25 grade concrete with TMT reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at ocations directed by the Engineer, all as specified. (Area = 0.243 m2/m, single face) (rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm6388.526388.5220.0FalseNoneNoneFalseNoneFalse127770.40
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. Construction of Field Culverts1058475.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550004128408Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38120.76FalseNoneNoneFalseNoneFalse15261.64880
3550005128408Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.377.39FalseNoneNoneFalseNoneFalse54836.53430
3550006128408Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.5FalseNoneNoneFalseNoneFalse48947.3150
3550007128408Nonevol- 1, Item No: 2.4.2 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.227.79FalseNoneNoneFalseNoneFalse217712.4180
3550008128408Nonevol- 3, Item No: 9.1.ii , Page No: 87Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row .Laying Reinforced cement concrete pipe NP4/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets. (i). 1200 mm dia (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr13340.3113340.3150.0FalseNoneNoneFalseNoneFalse667015.50
3550009128408Nonevol- 3, Item No: 12.3A , Page No: 117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.1537.8FalseNoneNoneFalseNoneFalse54702.270
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. onstruction of RCC Drain & Road Crossings (CH-400 TO 1400)20059795.25
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550010128409NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.385236.25FalseNoneNoneFalseNoneFalse661757.2750
3550011128409NoneItem No.VOL-I-2.1.3 Page No. 15Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.37268.0FalseNoneNoneFalseNoneFalse1988659.160
3550012128409NoneItem No.VOL-I-2.11 h Page No. 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 Raft ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.6339.81FalseNoneNoneFalseNoneFalse3897185.22030
3550013128409NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. (rates inclusive of GST) Schedule of Rates PWD 2023-24 Raft ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10576.1710576.17995.2FalseNoneNoneFalseNoneFalse10525404.3840
3550014128409Nonevol- 3, Item No: 2.8(ii)A , Page No: 10Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a Cement Concrete Grade M-15 & M-20 (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum890.84890.8445.0FalseNoneNoneFalseNoneFalse40087.80
3550015128409Nonevol- 3, Item No: 2.10 (iv) (B) , Page No: 10Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means b. Rubble stone masonry in cement mortar. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7936.0FalseNoneNoneFalseNoneFalse27208.440
3550016128409Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.04310.55FalseNoneNoneFalseNoneFalse2919492.9720
17213753140001NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. Pedastal for Electric Poles563714.59
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550017128410Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.3819.14FalseNoneNoneFalseNoneFalse2418.91320
3550018128410Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.375.22FalseNoneNoneFalseNoneFalse38734.33140
3550019128410Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.37FalseNoneNoneFalseNoneFalse36221.01310
3550020128410Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.0424.36FalseNoneNoneFalseNoneFalse229009.33440
3550021128410Nonevol- 5, Item No: 10.1.12 , Page No: 120Providing PVC ringtite pipes conforming to IS 4985:2000 with latest amendments and conveying to worksite, rolling and lowering into trenches, laying true to line and level and perfect linking at joints, testing and commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 315mm dia., 6 kg/sqcm & class 3 Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm83.0183.013100.0FalseNoneNoneFalseNoneFalse257331.00
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. UGD Line Shifting5175469.95
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550022128411Nonevol- 1, Item No: 1.6.1 , Page No: 6Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum599.68599.68502.25FalseNoneNoneFalseNoneFalse301189.280
3550023128411NoneItem No: 2.24.2 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.1 , Page No: 7 Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum178.42178.4295.65FalseNoneNoneFalseNoneFalse17065.8730
3550024128411NoneItem No: 16.3.2 , Page No 188Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.RCC NP3 Class pipe of 300 mm dia. Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1650.351650.35500.0FalseNoneNoneFalseNoneFalse825175.00
3550025128411NoneItem No: 16.18.1 , Page No 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.0 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach54295.4654295.465.0FalseNoneNoneFalseNoneFalse271477.30
3550026128411NoneItem No: 16.18.2 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.3 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach60974.9160974.915.0FalseNoneNoneFalseNoneFalse304874.550
3550027128411NoneItem No: 16.18.3 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.6 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach67778.2667778.265.0FalseNoneNoneFalseNoneFalse338891.30
3550028128411NoneItem No: 16.18.4 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.9 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach72304.3272304.325.0FalseNoneNoneFalseNoneFalse361521.60
3550029128411NoneItem No: 16.18.5 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 2.0 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach75977.9675977.965.0FalseNoneNoneFalseNoneFalse379889.80
3550030128411NoneItem No: 16.4 , Page No: 191Conveying the new CI or RCC Machinehole frame and cover of 2 CMTS from divisional stores to the workspot and fixing the same in cement concrete and removing the old frame and cover and conveying back the old ones to stores. Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet500.56500.5625.0FalseNoneNoneFalseNoneFalse12514.00
3550031128411NonePE80-PN6.0,450 mm diaProviding, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water fort e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 1 1 0 m m d i a C o i l s h a l l b e u s e d . For :HDPE PE 80 PN 6.0 HDPE Grade ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm9164.889164.88200.0FalseNoneNoneFalseNoneFalse1832976.00
3550032128411NoneVol-3, Item No: 2.2.3 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7850.37850.367.5FalseNoneNoneFalseNoneFalse529895.250
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. Water Supply Line Shifting1575098.64
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550033128412NoneItem No.VOL-I-1.17 Page No. 10Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38972.0FalseNoneNoneFalseNoneFalse122841.360
3550034128412NoneItem No. VOL-5 - 9.2.3 Page No.96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE : Upto 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,90mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr473.3473.31400.0FalseNoneNoneFalseNoneFalse662620.00
3550035128412Nonevol- 5, Item No: 9.2.1 , Page No: 96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,63mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum271.34271.342200.0FalseNoneNoneFalseNoneFalse596948.00
3550036128412Nonevol- 1, Item No: 1.1 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers notexceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum198.24198.24972.0FalseNoneNoneFalseNoneFalse192689.280
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. 1ST YEAR MAINTAINANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550037128413NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY= 20.76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550038128413NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1384 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550039128413NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 519 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550040128413NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 155.70 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550041128413NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 405 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. 2ND YEAR MAINTAINANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550042128414NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY 20.76 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550043128414NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 1384 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550044128414NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 155.70 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550045128414NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 519 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3550046128414NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 405 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. 3RD YEAR MAINTAINANCE173712.14
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550047128415Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3620.76FalseNoneNoneFalseNoneFalse11321.67360
3550048128415Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.378.371384.0FalseNoneNoneFalseNoneFalse11584.080
3550049128415Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12155.7FalseNoneNoneFalseNoneFalse8426.4840
3550050128415Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.61134.61519.0FalseNoneNoneFalseNoneFalse69862.590
3550051128415Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.161.73FalseNoneNoneFalseNoneFalse4762.96680
3550052128415Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.861.73FalseNoneNoneFalseNoneFalse494.53780
3550053128415Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.83405.0FalseNoneNoneFalseNoneFalse53391.150
3550054128415Nonevol- 3, Item No: 8.1 , Page No: 66Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.26151.2678.3FalseNoneNoneFalseNoneFalse11843.6580
3550055128415Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.251.251620.0FalseNoneNoneFalseNoneFalse2025.00
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. 4TH YEAR MAINTAINANCE160035.63
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550056128416Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8420.76FalseNoneNoneFalseNoneFalse11726.07840
3550057128416Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.628.621384.0FalseNoneNoneFalseNoneFalse11930.080
3550058128416Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05155.7FalseNoneNoneFalseNoneFalse8726.9850
3550059128416Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.41519.0FalseNoneNoneFalseNoneFalse72353.790
3550060128416Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.54405.0FalseNoneNoneFalseNoneFalse55298.70
17213753140000NoneNoneRoadsPKG 711-B in Davanagere Taluk of Davanagere District. 5TH YEAR MAINTAINANCE1530819.76
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3550061128417Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3120.76FalseNoneNoneFalseNoneFalse12130.27560
3550062128417Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.928.921384.0FalseNoneNoneFalseNoneFalse12345.280
3550063128417Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9957.99155.7FalseNoneNoneFalseNoneFalse9029.0430
3550064128417Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.22795.0FalseNoneNoneFalseNoneFalse114654.90
3550065128417Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2949.812949.811.73FalseNoneNoneFalseNoneFalse5103.17130
3550066128417Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm306.28306.281.73FalseNoneNoneFalseNoneFalse529.86440
3550067128417Nonevol- 3, Item No: 8.1 , Page No 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm162.06162.0678.3FalseNoneNoneFalseNoneFalse12689.2980
3550068128417Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.341.341620.0FalseNoneNoneFalseNoneFalse2170.80
3550069128417Nonevol- 3, Item No: 8.15 , Page No: 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm788.0788.01229.06FalseNoneNoneFalseNoneFalse968499.280
3550070128417Nonevol- 3, Item No: 8.43 , Page No: 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos542.68542.68620.0FalseNoneNoneFalseNoneFalse336461.60
3550071128417Nonevol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.25405.0FalseNoneNoneFalseNoneFalse57206.250
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17213753140000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17213753140000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17213753140000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17213753140000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17213753140000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17213753140000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17213753140000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17213753140000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17213753140000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17213753140000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17213753140000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17213753140000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17213753140000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17213753140000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17213753140000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17213753140000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17213753140000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17213753140000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17213753140000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17213753140000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17213753140000NoneNoneELIGIBILITYGST Shall not be paid separately.None
17213753140000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17213753140000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17213753140000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17213753140000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22,2022-23 & 2023-24 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.971.96 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent Bill copies shall not be accepted
NoneNoneNoneNone3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 , 2022-23 & 2023-24 Executed in any one financial year, the following minimum quantities of work: 1. Earth Work for Embankment/ Subgrade/ Shoulder: 45682.38 Cum, 2. Granular Sub-Base (GSB)/ Wet Mix Macadam (WMM): 6743.76 Cum3. 3. Pavement Quality Concrete (PQC) M30/M40: 5261.61 Cum, 4. PCC/DLC M10 & M15: 3143.76 Cum, 5. Reinforced Cement Concrete (RCC) M20, M25 & M30: 1474.22 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.3(b) - Each Tenderer should further demonstrate: Availability by owning(i) Machineries to be owned: Concrete Batching Plant: 1 No. Concrete Road Paving Machine: 1 No, Transit Truck Agitator 5m3capacity: 2 No, Static Road Roller/Vibratory Road Roller/SOIL COMPACTOR: 2 No, Tippers : 4 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own
NoneNoneNoneNoneii) Machineries could be on Lease/Hire: Wet Mix Plant / Pug mill: 1 No, Motor Grader: 1 No, Excavator 0.90 Cum Bucket Capacity: 2 No, Tipper Trucks: 6 No,Transit Truck Agitator 5m3capacity: 2 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNone3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2019-20 to 2023-24 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.2 - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22, 2022-23 & 2023-24. (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.3887.85 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Turnover certificate from Registered Chartered Accountant, Balance sheet and Income tax returns
NoneNoneNoneNone3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.583.18 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneAffidavit as per KW4OthersAffidavit as per KW4
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit as per KW4
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Copies of GST/Tax Registration certificateTrueTechnical Bid
AFFIDAVIT AS PER KW4TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1721456995000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer Project Implementation Unit, State Highway Development Project,PWD Annex Building, K.R.Circle,Bengaluru-560001.
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone