noticeInvitingTenderDTO
createdTs1721375132827
version14
createdDateNone
modifiedDateNone
tenderTypeRFQ
evaluationTypeTWO_COVER
evaluationTypeTextTwo Cover
invitingStrategyOPEN
invitingStrategyTextOpen
taxTypeINCLUSIVE_TAX
tenderFee7500.00
emd2426000.00
bidValueTypeITEM_WISE
bidValueTypeTextItem wise
tenderReceiptClose31-07-2024 17:30:00
tenderQueryClose24-07-2024 10:30:00
technicalBidOpen03-08-2024 11:30:00
publishedDate20-07-2024 12:06:55
publishedByPostPWD_CE_SHDP
publishedByUserKPE14485 - PURUSHOTHAMA DAS HEGGADE
bidValidityPeriod90
noOfCalls2
preBidMeetingDate24-07-2024 11:30:00
preBidMeetingYnTrue
preQualificationBidOpenNone
denominationTypeRUPEES
denominationTypeTextRupees
retenderedYnTrue
percentageRateTypeTextNone
contactPersonChief Engineer
splitEmdRequiredYnTrue
emdBankGuarantee2326000.00
emdCash100000.00
bgValidityPeriod135
hideWeightageNone
multipleCurrencySelectionAllowedYnFalse
isTechWeightageAllowedFalse
highestBidderSelectionFalse
isVariableEmdAllowedNone
qcbsTenderYnNone
itemwiseEmdRequiredYnNone
sampleSubmissionDateNone
officeNumber08022224106
mobileNumberNone
tenderSupplierListNone
tenderSchedule
createdTs1721375132829
version32
createdDateNone
modifiedDateNone
tenderNumberPWD/2023-24/RD/WORK_INDENT9720/CALL-2
titlePKG-710 A) Improvements to road Malpe Molakalmuru SH 65 from Ch 253.10 KM to 261.70 KM (in selected reaches) in Davanagere Taluk of Davanagere District. (via NH4 to Rajanahalli Hanumnthappa Chowltry in Davanagere & Betur village limit) B) Improvements to road Davanagere Lokikere MDR from Ch 0.00 KM to 4.20 KM (in selected reaches) in Davanagere Taluk of Davanagere District.
descriptionPKG-710 A) Improvements to road Malpe Molakalmuru SH 65 from Ch 253.10 KM to 261.70 KM (in selected reaches) in Davanagere Taluk of Davanagere District. (via NH4 to Rajanahalli Hanumnthappa Chowltry in Davanagere & Betur village limit) B) Improvements to road Davanagere Lokikere MDR from Ch 0.00 KM to 4.20 KM (in selected reaches) in Davanagere Taluk of Davanagere District.
categoryWORKS
categoryTextWorks
ecv242565406.61
deptNamePublic Works Department
statusPUBLISHED
statusTextPublished
remarksNone
csrValueNone
ecvtenderYnFalse
location2196
locationNameState Highway Development Project SHDP
provisionalAmount250000000.0
groupOverheadTotal0.0
fileNumberCPO/PIU/SHDP/PH-5/STG-1/PKG-710/DVG(N)/2023-24
tenderSubEstimateList
createdTsversioncreatedDatemodifiedDateworkCategoryNamesubEstimateNameestimateTotalitemList
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. RIGID PAVEMENT CONSTRUCTION68731974.27
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549577128366Nonevol- 3, Item No: 16.29 , Page No: 149Item Description:Providing and fixing of typical SHDP informatory sign board with Logo as per, MORD specifications and drawing.The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3549578128366Nonevol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.7117.75008.05FalseNoneNoneFalseNoneFalse589447.4850
3549579128366Nonevol- 1, Item No: 1.7 , Page No: 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum147.44147.445742.78FalseNoneNoneFalseNoneFalse846715.48320
3549580128366Nonevol- 3, Item No: 4.20 , Page No: 27Construction of Median and Island with Soil Taken from Borrow Areas Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408 Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum672.78672.78804.6FalseNoneNoneFalseNoneFalse541318.7880
3549581128366Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3744.7FalseNoneNoneFalseNoneFalse331690.5390
3549582128366Nonevol- 3, Item No: 8.42.3 , Page No: 74Kerb StonesSupplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)600 x 300 x 150 mm size Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm573.66573.661380.0FalseNoneNoneFalseNoneFalse791650.80
3549583128366Nonevol- 3, Item No: 4.2 (v) , Page No: 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.82227.05FalseNoneNoneFalseNoneFalse6509221.740
3549584128366Nonevol- 1, Item No: 2.2.1 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.- M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9347.519347.5111.06FalseNoneNoneFalseNoneFalse103383.46060
3549585128366Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.630.28FalseNoneNoneFalseNoneFalse27410.49640
3549586128366Nonevol- 3, Item No: 4.17 , Page No: 26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.61178.17FalseNoneNoneFalseNoneFalse3735505.8020
3549587128366Nonevol- , Item No: 6.8.2 , Page No: 51Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1438.481438.483298.85FalseNoneNoneFalseNoneFalse4745329.7480
3549588128366Nonevol- 3, Item No: 10.16 , Page No: 96Removing & Resetting existing Heavy Duty Cobble/Interlocking stones/Pavers of thickness 60/75/80/100mm using Cement and 40mm thick sand bed ( average thickness ) and compactingwith plate vibrator to achieve final desired compaction & setting of paver to its final level , including cost of materials, labour and usage charges of machinery complete as per specifications. (The cost of new paver/stones required shall be added separately) Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm599.68599.682592.0FalseNoneNoneFalseNoneFalse1554370.560
3549589128366Nonevol- 3, Item No: 6.1 , Page No: 49Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing. Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum6095.886095.881342.0FalseNoneNoneFalseNoneFalse8180670.960
3549590128366Nonevol- 3, Item No: 6.2.1 , Page No: 49Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3 Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11226.5811226.583355.0FalseNoneNoneFalseNoneFalse37665175.90
3549591128366Nonevol- 3, Item No: 8.29 iii , Page No: 71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. iii) Triple row for Three utility service Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm7228.337228.33425.0FalseNoneNoneFalseNoneFalse3072040.250
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. WHITE TOPPING31834863.43
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549592128367Nonevol- 3, Item No: 6.7 , Page No: 51Pavement MillingMilling of existing Bituminous surface to a specified depth up to 40mm using Milling machine including disposal of removed material. Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm55.7655.7612180.0FalseNoneNoneFalseNoneFalse679156.80
3549593128367Nonevol- 3, Item No: 4.20 , Page No: 27Construction of Median and Island with Soil Taken from Borrow Areas Construction of median and Island above road level with approved material brought from borrow pits, spread, sloped and compacted as per clause 408 Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum672.78672.781303.2FalseNoneNoneFalseNoneFalse876766.8960
3549594128367Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24(Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3750.4FalseNoneNoneFalseNoneFalse373986.6480
3549595128367Nonevol- 3, Item No: 8.42.3 , Page No: 74Kerb StonesSupplying and fixing M15 grade precast cement concrete Kerb stones for Roadway, Sidewalls and gutters fixed with CM 1:3 fixed and finsihed in line as per direction of Engineer in charge. (The cost of PCC shall be paid extra)600 x 300 x 150 mm size Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm573.66573.661620.0FalseNoneNoneFalseNoneFalse929329.20
3549596128367NoneItem No: 5.6 C , Page No: 32Bituminous macadam Grading - i for traffic less than 20 msa Providing and laying Bituminous Macadam with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder VG-30 @ 3.3% byweight of mix, transported to site, laid over a previously prepared surface with mechanical paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 toachieve the desired compaction (rates inclusive of GST)Schedule of Rates PWD 2023-24 , (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9245.429245.42279.6FalseNoneNoneFalseNoneFalse2585019.4320
3549597128367Nonevol- 3, Item No: 6.4.2 , Page No: 50Thin White ToppingConstruction of Thin White Topping with M40 grade plain cement concrete pavement over existing Bituminous surface (Preparation to be done if necessary either by Milling or Levelling course with BM/DLC) with approved grade Cement as per IRC SP 76:2015, coarse and fine aggregate conforming to IS 383:2016, maximum size of fine aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, including fibre reinforcement @ 9.25 kg/m3, transported to site, laid with slip form paver finisher, spread, compacted and finished in a continuous operation with Texture Curing Machine including provision of contraction joint, joint filler, sealant primer, joint sealant, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing. (Cost of milling if necessary shall be paid seperately) OPC @ 315 kg/m3 & GGBS @ 105 kg/m3 Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10023.5110023.512436.0FalseNoneNoneFalseNoneFalse24417270.360
3549598128367Nonevol- 3, Item No: 8.29 iii , Page No: 71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. iii) Triple row for Three utility service Schedule of Rates PWD 2023-24 (Rate inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm7228.337228.33273.0FalseNoneNoneFalseNoneFalse1973334.090
17213751330001NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. ROAD FURNITURES3882383.65
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549599128368NoneItem No.VOL-III-8.16-ii Page No. 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.553.0FalseNoneNoneFalseNoneFalse10879.650
3549600128368Nonevol- 3, Item No: 8.16 (iii) , Page No: 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1043.241043.247.0FalseNoneNoneFalseNoneFalse7302.680
3549601128368NoneItem No.VOL-III-8.15 Page No. 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67407.16FalseNoneNoneFalseNoneFalse267369.75720
3549602128368NonePage No.54 Item No.VOL-III-8.6 (ii) Page No. 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (rates inclusive of GST) Schedule of Rates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.7788.0FalseNoneNoneFalseNoneFalse517683.760
3549603128368Nonevol- 3, Item No: 8.6 iv , Page No: 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4465.364465.3642.0FalseNoneNoneFalseNoneFalse187545.120
3549604128368Nonevol- 3, Item No: 8.6 xiii , Page No: 65Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5388.415388.4120.0FalseNoneNoneFalseNoneFalse107768.20
3549605128368NoneItem No.VOL-III-8.7 Page No. 65Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.8911163.8913.5FalseNoneNoneFalseNoneFalse150712.5150
3549606128368NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach452.24452.242238.0FalseNoneNoneFalseNoneFalse1012113.120
3549607128368Nonevol- 3, Item No: 8.17 , Page No: 67Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.02310.0FalseNoneNoneFalseNoneFalse776246.20
3549608128368Nonevol- 3, Item No: 8.60.2 ii , Page No: 80Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound with reflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022. Intermediate lane with formation width of 7.50 m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach56317.5156317.5115.0FalseNoneNoneFalseNoneFalse844762.650
17213751330001NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. Construction of Box Cell Culvert (1 m X 1 m - 1 Vent)8245540.51
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549609128369NoneItem No. VOL-I-1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38306.86FalseNoneNoneFalseNoneFalse38780.96680
3549610128369NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3735.64FalseNoneNoneFalseNoneFalse264461.98680
3549611128369NoneItem No. VOL-I-2.11-h Page No.18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.6312.14FalseNoneNoneFalseNoneFalse1188440.80820
3549612128369Nonevol- 1, Item No: 2.4.2, Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 (inclusive of 8% Form work and 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8460.938460.9330.1FalseNoneNoneFalseNoneFalse254673.9930
3549613128369Nonevol- 1, Item No: 2.4.2 , Page No: 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 (inclusive of 20% Form work and 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.039401.03132.52FalseNoneNoneFalseNoneFalse1245824.49560
3549614128369Nonevol- 1, Item No: 2.5.2 , Page No: 15Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 (inclusive of 20% Form work and 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.1745.0FalseNoneNoneFalseNoneFalse457837.650
3549615128369Nonevol- 3, Item No: 12.2 , Page No: 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.12296.1220.0FalseNoneNoneFalseNoneFalse5922.40
3549616128369Nonevol- 3, Item No: 12.4 , Page No: 117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.857.9FalseNoneNoneFalseNoneFalse192042.720
3549617128369NoneItem No. VOL-III-12.3A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.15920.7FalseNoneNoneFalseNoneFalse1332391.0050
3549618128369Nonevol- 3, Item No: 14.2 , Page No: 129Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.514.64FalseNoneNoneFalseNoneFalse14107.96640
3549619128369Nonevol- 3, Item No: 4.2 (v) , Page No: 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.854.0FalseNoneNoneFalseNoneFalse157831.20
3549620128369Nonevol- 3, Item No: 13.8 , Page No: 121PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8438.838438.8383.7FalseNoneNoneFalseNoneFalse706330.0710
3549621128369Nonevol- 3, Item No: 13.9 , Page No: 122Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant) (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum14663.5714663.57135.0FalseNoneNoneFalseNoneFalse1979581.950
3549622128369Nonevol- 3, Item No: 13.16 , Page No: 124Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural stee conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications. Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.01180.0FalseNoneNoneFalseNoneFalse400321.80
3549623128369Nonevol- 3, Item No: 8.10 , Page No: 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.05135.0530.0FalseNoneNoneFalseNoneFalse4051.50
3549624128369Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.121.122625.0FalseNoneNoneFalseNoneFalse2940.00
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. Construction of RCC Drain & Road Crossings10461272.81
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549625128370NoneItem No.VOL-I-1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.383513.6FalseNoneNoneFalseNoneFalse444048.7680
3549626128370NoneItem No.VOL-I-2.1.3 Page No. 15Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.37185.6FalseNoneNoneFalseNoneFalse1377220.6720
3549627128370NoneItem No.VOL-I-2.11 h Page No. 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 Raft ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.6326.9FalseNoneNoneFalseNoneFalse2633365.5470
3549628128370NoneItem No.VOL-I-2.4.2 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. Schedule of Rates PWD 2023-24 Raft (inclusive of 35% Form work and 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10576.1710576.17307.2FalseNoneNoneFalseNoneFalse3248999.4240
3549629128370Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.2160.0FalseNoneNoneFalseNoneFalse1253472.00
3549630128370Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (rates inclusive of GST)Schedule of Rates PWD 2023-24 (inclusive of 20% Form work and 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.04160.0FalseNoneNoneFalseNoneFalse1504166.40
17213751330001NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. Entrance cover LHS and RHS and paver blocks10713517.33
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549631128371Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCable Km126.38126.38329.4FalseNoneNoneFalseNoneFalse41629.5720
3549632128371Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3717.4FalseNoneNoneFalseNoneFalse129114.4380
3549633128371Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.632.53FalseNoneNoneFalseNoneFalse247673.41390
3549634128371Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7834.27834.215.0FalseNoneNoneFalseNoneFalse117513.00
3549635128371Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10576.1710576.1743.2FalseNoneNoneFalseNoneFalse456890.5440
3549636128371Nonevol- 1, Item No: 2.4.2 , Page No: 15Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 (inclusive of 20% Form work and 18% GST ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9401.049401.0422.5FalseNoneNoneFalseNoneFalse211523.40
3549637128371NoneItem No 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.12 , Page No: 8 (Rates inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.711176.0FalseNoneNoneFalseNoneFalse138426.960
3549638128371Nonevol- 3, Item No: 4.17 , Page No: 26Providing, laying, spreading and compacting graded stone aggregate to Wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Schedule of Rates PWD 2023-24 vol- 3, Item No: 4.17 , Page No: 26 (Rates inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3170.63170.61050.0FalseNoneNoneFalseNoneFalse3329130.00
3549639128371NoneItem No: 6.8.2 , Page No: 51Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA & for Residential Streets of approved shape and colour, laid in required pattern and including over 40mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. (WMM/WBM Base to be paid separately as per relevant technical specification) Schedule of Rates PWD 2023-24 vol- , Item No: 6.8.2 , Page No: 51 (Rates inclusive of 18% GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm1438.481438.484200.0FalseNoneNoneFalseNoneFalse6041616.00
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District.Shifting of HDPE Water Supply Pipe Lines973111.6
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549640128372Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work. etc. inclusive of all lift and leads and all complete as per the direction of Engineer-in-charge. do all kinds of Soil by Mechanical Means. Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38891.0FalseNoneNoneFalseNoneFalse112604.580
3549641128372NoneItem code 4.2.3Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 110mm dia Coil shall be used . For :HDPE Grade ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr473.3473.3459.0FalseNoneNoneFalseNoneFalse217244.70
3549642128372NoneItem code 9.2.1Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 110mm dia Coil shall be used . For :HDPE Grade ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm271.34271.341700.0FalseNoneNoneFalseNoneFalse461278.00
3549643128372Nonevol- 5, Item No:1.10 , Page No: 96Refilling available earth around trenches/pipelines, cables in layers notexceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm198.24198.24918.0FalseNoneNoneFalseNoneFalse181984.320
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. UGD Line Shifting7008384.9
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549644128373Nonevol- 1, Item No: 1.6.1 , Page No: 6Earth work excavation for pipelines/cables by Manual means upto 600 mm trench width, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter, including dressing of excavated surfaces, disposing off or leveling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering and lift upto 1.5 m including cost of labour, tools, usage& other appurtenances required to complete the work. In all kinds of soils. Depth upto 1.50m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum599.68599.68812.26FalseNoneNoneFalseNoneFalse487096.07680
3549645128373NoneItem No: 1.10, Page No: 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications Schedule of Rates PWD 2023-24 vol- 1, Item No: 1.1 , Page No: 7 Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum198.42198.42158.65FalseNoneNoneFalseNoneFalse31479.3330
3549646128373NoneItem No: 16.3.2 , Page No 188Providing S&S RCC SPUN / VIBRATED CAST PIPES (REINFORCED) pipes NP-3 Class conforming to IS:458-1988 with latest amentments using ordinary portland cement, for sanitary works and conveying to work site, rolling and lowering into trenches, laying true to line and level including loading and unloading at both destinations and jointing of pipes and specials, perfect linking of joints with jack to correct position including cost of jointing materials, i.e, rubber rings conforming to IS: 5382 for S&S RCC pipes, with all leads and lifts as directed and giving necessary hydraulic test as per ISS to the required pressure and commissioning etc. complete. (Contractor will make his own arrangements for procuring water for testing). Before the execution of the work, the contractor shall carry out the survey.RCC NP3 Class pipe of 300 mm dia. Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1650.351650.35900.0FalseNoneNoneFalseNoneFalse1485315.00
3549647128373NoneItem No: 16.18.3 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.SR VConstructing Pre-cast RCC Machinehole 1.2 m internal dia. , 1.6 M depth& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach67778.2667778.2610.0FalseNoneNoneFalseNoneFalse677782.60
3549648128373NoneItem No: 16.19.2 , Page No: 194Construction of RCC Machinehole chambers of 1:1.5:3 proportion or approved type Cast-insitu / Pre-cast RCC Machinehole chambers, constructed using form vibrators of standard type, with barricading,danger lighting and using of sight rails and boning rods wherever necessary, shoring and strutting wherever required using Ordinary Port Land Cement, using 1:1.5:3 proportion RCC with 20 mm and down graded jelly, well graded sand and steel of approved quality, 200 mm thick top concrete slab, having wall thickness and raft thickness as in approved drawings and with an offset in raft alround the chamber as in approved drawing, benching concrete with 1:6 slope towards the central drain finished smooth, including fixing and grouting of pipes, including conveying to work spot supply and fixing SFRC Machinehole cover and frame (Heavy duty) conforming to IS:12592 with latest amendments, on a bed of CC 1:2:4 Providing and fixing of minimum 3 mm thick encapsulated plastic footsteps (as per IS 10910) on 12 mm dia. Grade Fe-500 steel bar (as per IS 1786) staggered at 300 mm apart asdetailed in Technical specifications, including stone grit beding wherever required, watering, curing, engraving Machinehole number with flow direction on the inner cylindrical surface etc., complete including cost of reinforcement steel and fabrication charges and also cost and conveyance of all materials, labour with all lead and lifts. The Pre-cast RCC Machinehole are for various diamters and depths as stated below and as per detailed drawings, specifications and direction of the Engineer.For 1.2m dia Machinehole: Constructing Pre-cast RCC Machinehole Constructing Pre-cast RCC Machinehole 1.5 m internal dia. , 2.0 M dept& SFRC cover & frame Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach92533.4892533.4835.0FalseNoneNoneFalseNoneFalse3238671.80
3549649128373NoneItem No: 16.14 , Page No: 191Conveying the new CI or RCC Machinehole frame and cover of 2 CMTS from divisional stores to the workspot and fixing the same in cement concrete and removing the old frame and cover and conveying back the old ones to stores. Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet500.56500.5624.0FalseNoneNoneFalseNoneFalse12013.440
3549650128373NoneItem No: 10.1.7 , Page No: 113Providing PVC ringtite pipes conforming to IS 4985:2000 with latestamendments and conveying to worksite, rolling and lowering intotrenches, laying true to line and level and perfect linking at joints, testingand commissioning, including loading unloading at both destinations and cuts of pipes wherever necessary including jointing of PVC pipes and specials (excluding cost of specials) with jointing of approved type, with all labour with all lead & lift including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving necessary hydraulic test to the required pressure as per ISS (Contractor will make his own arrangements for procuring water for testing) etc. complete For: PVC pipes 110mm dia., 6 kg/sqcm & class 3 Schedule of Rates BWSSB 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm509.23509.23240.0FalseNoneNoneFalseNoneFalse122215.20
3549651128373NoneVol-1, Item No: 2.2.3 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7850.37850.3121.5FalseNoneNoneFalseNoneFalse953811.450
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. Electric Pole Shifting1063937.8
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549652128374NoneI-1RCC Pole - 9 Mtr Long, 145 Kg WL Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8600.178600.1745.0FalseNoneNoneFalseNoneFalse387007.650
3549653128374NoneI-2LT 4 Pin Cross Arm with clamps, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet460.64460.6445.0FalseNoneNoneFalseNoneFalse20728.80
3549654128374NoneI-3No. 8 Strain Insulator Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo32.8232.82360.0FalseNoneNoneFalseNoneFalse11815.20
3549655128374NoneI-4Guy Set Complete with No. 8 Strain Insulator & Concreting materials Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1432.961432.9645.0FalseNoneNoneFalseNoneFalse64483.20
3549656128374NoneI-5Rabbit ACSR Conductor Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm56192.856192.87.31FalseNoneNoneFalseNoneFalse410769.3680
3549657128374NoneI-6Spiral Earth Electrode Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo290.48290.4845.0FalseNoneNoneFalseNoneFalse13071.60
3549658128374NoneI-7Anti Climbing Device (12 Mtr GI Barbed Wire) Material Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg108.17108.1745.0FalseNoneNoneFalseNoneFalse4867.650
3549659128374NoneI-8RCC Pole - 9 Mtr Long, 145 Kg WL Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1352.741352.7445.0FalseNoneNoneFalseNoneFalse60873.30
3549660128374NoneI-9LT 4 Pin Cross Arm with clamps, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet194.46194.4645.0FalseNoneNoneFalseNoneFalse8750.70
3549661128374NoneI-10Guy Set Complete with No. 8 Strain Insulator & Concreting materials Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet544.5544.545.0FalseNoneNoneFalseNoneFalse24502.50
3549662128374NoneI-11Rabbit ACSR Conductor Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm5300.365300.367.31FalseNoneNoneFalseNoneFalse38745.63160
3549663128374NoneI-12Spiral Earth Electrode Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo113.03113.0345.0FalseNoneNoneFalseNoneFalse5086.350
3549664128374NoneI-13Guy concreting with Boulders, Mud and Sand Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo243.08243.0845.0FalseNoneNoneFalseNoneFalse10938.60
3549665128374NoneI-14Anti Climbing Device (12 Mtr GI Barbed Wire) Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg51.0551.0545.0FalseNoneNoneFalseNoneFalse2297.250
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. First Year Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549666128375Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 26.76) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549667128375Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 1784) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549668128375Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 200.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549669128375Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 669) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549670128375Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 112.50) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. 2ND YEAR Maintenance0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549671128376Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 26.76) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549672128376Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 1784) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549673128376Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 200.70) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549674128376Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 669) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
3549675128376Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 (Qty 225) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.001FalseNoneNoneFalseNoneFalse1e-050
17213751330000NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. 3RD YEAR Maintenance130352.74
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549676128377Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3623.16FalseNoneNoneFalseNoneFalse12630.53760
3549677128377Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.338.331544.0FalseNoneNoneFalseNoneFalse12861.520
3549678128377Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12173.7FalseNoneNoneFalseNoneFalse9400.6440
3549679128377Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.6134.6115.8FalseNoneNoneFalseNoneFalse15586.680
3549680128377Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.161.93FalseNoneNoneFalseNoneFalse5313.59880
3549681128377Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.861.93FalseNoneNoneFalseNoneFalse551.70980
3549682128377Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.04141.04225.0FalseNoneNoneFalseNoneFalse31734.00
3549683128377Nonevol- 3, Item No: 8.1 , Page No: 66Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.26151.26217.5FalseNoneNoneFalseNoneFalse32899.050
3549684128377Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.251.257500.0FalseNoneNoneFalseNoneFalse9375.00
17213751330001NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. 4TH YEAR Maintenance228284.91
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549685128378Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.83564.8323.16FalseNoneNoneFalseNoneFalse13081.46280
3549686128378Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.628.621544.0FalseNoneNoneFalseNoneFalse13309.280
3549687128378Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05173.7FalseNoneNoneFalseNoneFalse9735.8850
3549688128378Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.411158.0FalseNoneNoneFalseNoneFalse161436.780
3549689128378Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.54225.0FalseNoneNoneFalseNoneFalse30721.50
17213751330001NoneNoneRoadsPKG-710-A in Davanagere Taluk of Davanagere District. 5TH YEAR Maintenance2068058.79
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549690128379Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3123.16FalseNoneNoneFalseNoneFalse13532.61960
3549691128379Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.928.921544.0FalseNoneNoneFalseNoneFalse13772.480
3549692128379Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9957.99173.7FalseNoneNoneFalseNoneFalse10072.8630
3549693128379Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.221158.0FalseNoneNoneFalseNoneFalse167006.760
3549694128379Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2949.812949.811.93FalseNoneNoneFalseNoneFalse5693.13330
3549695128379Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm306.28306.281.93FalseNoneNoneFalseNoneFalse591.12040
3549696128379Nonevol- 3, Item No: 8.10 , Page No 66Painting Two Coats on New Concrete Surfaces Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm162.06162.0630.0FalseNoneNoneFalseNoneFalse4861.80
3549697128379Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.341.3415000.0FalseNoneNoneFalseNoneFalse20100.00
3549698128379Nonevol- 3, Item No: 8.15 , Page No: 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm788.0788.0467.06FalseNoneNoneFalseNoneFalse368043.280
3549699128379Nonevol- 3, Item No: 8.43 , Page No: 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos548.68548.682611.0FalseNoneNoneFalseNoneFalse1432603.480
3549700128379Nonevol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST)Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.25225.0FalseNoneNoneFalseNoneFalse31781.250
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. RIGID PAVEMENT CONSTRUCTION WORK87784892.26
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549701128380Nonevol- 3, Item No: 16.29 , Page No: 149Item Description:Providing and fixing of typical SHDP informatory sign board with Logo as per, MORD specifications and drawing.The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in Rectangular shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The Rectangular shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the Rectangular shaped plate and middle plate and this square section will be welded to the bottom point of the Rectangular shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, SHDP logo on top plate shall be as per clause 1701.4.6 essages/Borders. All the sections of frame and posts will be painted with primer and two coats of Epoxy paint. The steel tube below ground level will be painted with three coats of Epoxy paint. The design, painting and lettering shall be done as per approved drawing. (iii) For warranty and durability the clause 1701.5 and for maintenance the clause 1911 shall be applicable. (iv) A reference number along with the month and year of installation should be placed on the back of a sign in a contrasting colour or by stamping in characters not exceeding 50 mm in height.485777/2019/Dir(Tech) 7Retro Reflective Trafic Sign As per IRC 67 Clause 1701.3.8.1 Class A Type 1 Schedule of Rates PWD 2023-24 (rates inclusive of GST) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos19021.1319021.132.0FalseNoneNoneFalseNoneFalse38042.260
3549702128380Nonevol- 3, Item No: 3.5 , Page No: 17Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm7.437.4317683.5FalseNoneNoneFalseNoneFalse131388.4050
3549703128380Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm486.93486.9369.86FalseNoneNoneFalseNoneFalse34016.92980
3549704128380Nonevol- 1, Item No: 1.12 , Page No: 8Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum117.71117.714169.55FalseNoneNoneFalseNoneFalse490797.73050
3549705128380Nonevol- 1, Item No: 1.7 , Page No: 7Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum147.44147.442501.73FalseNoneNoneFalseNoneFalse368855.07120
3549706128380Nonevol- 1, Item No: 1.8 , Page No: 7Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum587.29587.294108.27FalseNoneNoneFalseNoneFalse2412745.88830
3549707128380Nonevol- 3, Item No: 3.6 , Page No: 17Construction of sub-grade and earthen shoulders with approved material ( CBR min 10 %) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum610.83610.834033.19FalseNoneNoneFalseNoneFalse2463593.44770
3549708128380Nonevol- 3, Item No: 4.2 (v) , Page No: 23By Mix in Place Method Construction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 For Grading -V Material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2922.82922.84664.51FalseNoneNoneFalseNoneFalse13633429.8280
3549709128380Nonevol- 3, Item No: 6.1 , Page No: 49Dry Lean Cement Concrete Sub-base Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory roller, finishing and curing.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum6095.886095.882298.86FalseNoneNoneFalseNoneFalse14013574.69680
3549710128380Nonevol- 3, Item No: 6.2.1 , Page No: 49Construction of M40 Grade un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base in recommended proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design transported to site, laid with a slip form paver finisher, spread, compacted and finished in a continuous operation including provision of contraction, expansion, onstruction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing OPC @ 420 kg/m3(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum11226.5811226.584827.69FalseNoneNoneFalseNoneFalse54198448.00020
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. ROAD FURNITURES1426280.82
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549711128381NoneItem No.VOL-III-8.16-ii Page No. 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (ii) Ordinary kilometer stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach3626.553626.554.0FalseNoneNoneFalseNoneFalse14506.20
3549712128381Nonevol- 3, Item No: 8.16 (iii) , Page No: 67Kilometre StoneReinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc- (iii) 200 m stone (precast) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos1043.241043.2412.0FalseNoneNoneFalseNoneFalse12518.880
3549713128381NoneItem No.VOL-III-8.15 Page No. 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm656.67656.67600.96FalseNoneNoneFalseNoneFalse394632.40320
3549714128381NonePage No.54 Item No.VOL-III-8.6 (ii) Page No. 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 90 cm equilateral triangle (rates inclusive of GST) Schedule of Rates ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5882.775882.7728.0FalseNoneNoneFalseNoneFalse164717.560
3549715128381Nonevol- 3, Item No: 8.6 iv , Page No: 64Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (ii) 60 cm equilateral triangle (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach4465.354465.3510.0FalseNoneNoneFalseNoneFalse44653.50
3549716128381Nonevol- 3, Item No: 8.6 viii , Page No: 65Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. (viii) 60 cm circular(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach5388.415388.412.0FalseNoneNoneFalseNoneFalse10776.820
3549717128381NoneItem No.VOL-III-8.7 Page No. 65Direction and Place Identification Signs upto 0.9 m2 SizeBoard.Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm angle mounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm11163.8911163.893.6FalseNoneNoneFalseNoneFalse40190.0040
3549718128381NoneItem No.VOL-III-8.43 Page No. 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach452.24452.24404.0FalseNoneNoneFalseNoneFalse182704.960
3549719128381Nonevol- 3, Item No: 8.17 , Page No: 67Road DelineatorsSupplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTEach2504.022504.028.0FalseNoneNoneFalseNoneFalse20032.160
3549720128381Nonevol- 3, Item No: 8.48 , Page No: 76Supply and installation of retro- reflective Chevron signboards of 600x450mm made out of cube corner micro prismatic grade sheeting confirming to Type XI standards of IRC:67:2022 & ASTM D 4956-09 specification & fixed over 3 mm thick Aluminium Composite Panel sheet having minimum 0.30 mm thick aluminum skin on both sides & fixed over back support frame of 25x25x 3mm MS angle frame. Supported on 75 mm dia OR 75x75x6mm Mild steel with clear height of not less than 2.1 m from the ground level to the bottom of the Sign board & 60 cm below ground level. The sign post should be painted with one coat of red oxide paint nd two coats of synthetic enamel paint of black and white colour with bands of 30 cm height, firmly fixed to the ground by means of foundation with M 20 grade cement, concrete foundation size of 45 cm x 45 cm x 60 cm including cost & conveyance of all materials, equipment,machinery & Labour with all leads and lifts for satisfactory completion of the work as directed by Engineer incharge. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos4443.054443.0520.0FalseNoneNoneFalseNoneFalse88861.00
3549721128381NoneItem No.VOL-III-8.31 Page No. 71Provision of 15 nos rumble strips covered with premix bituminous carpet, 15-20 mm high at center, 250 mm wide placed at 1 m center to center at approved locations to control speed, marked with white strips of road marking paint. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm232.93232.93105.0FalseNoneNoneFalseNoneFalse24457.650
3549722128381Nonevol- 3, Item No: 8.29 , Page No: 71Providing and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings. Single row for one utility service (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2740.672740.67156.25FalseNoneNoneFalseNoneFalse428229.68750
17213751330001NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. Construction of New RCC Retaining wall782841.98
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549723128382Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38107.1FalseNoneNoneFalseNoneFalse13535.2980
3549724128382Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.375.85FalseNoneNoneFalseNoneFalse43409.16450
3549725128382Nonevol- 1, Item No: 2.2.5 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8857.488857.4833.74FalseNoneNoneFalseNoneFalse298851.37520
3549726128382Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.633.38FalseNoneNoneFalseNoneFalse330883.84940
3549727128382Nonevol- 3, Item No: 12.2 , Page No: 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos296.1296.190.0FalseNoneNoneFalseNoneFalse26649.00
3549728128382Nonevol- 3, Item No: 12.4 , Page No: 117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.818.0FalseNoneNoneFalseNoneFalse59702.40
3549729128382Nonevol- 1, Item No: 1.10 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum198.24198.2449.49FalseNoneNoneFalseNoneFalse9810.89760
17213751330001NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. Construction of New RCC Retaining wall (5m Height above GL)1586528.41
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549730128383Nonevol- 1, Item No: 1.14.1 , Page No: 8Earth work excavation for Foundation depth upto 3 m, as per drawing and technical out, shoring, strutting, barricading, excavated surfaces, disposing off or & stacking the selected earth for reuse m including cost of labour, tools, usage required to complete the work In all kinds of soils Depth upto 3 m(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38137.6FalseNoneNoneFalseNoneFalse17389.8880
3549731128383Nonevol- 1, Item No: 2.1.3 , Page No: 15Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.377.4FalseNoneNoneFalseNoneFalse54910.7380
3549732128383Nonevol- 1, Item No: 2.2.5 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. M30 Design Mix Using 20 mm nominal size graded crushed coarse aggregates(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8856.488856.4874.9FalseNoneNoneFalseNoneFalse663350.3520
3549733128383Nonevol- 1, Item No: 2.11 h , Page No: 18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.637.49FalseNoneNoneFalseNoneFalse733230.77870
3549734128383Nonevol- 3, Item No: 12.2 , Page No: 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos296.1296.160.0FalseNoneNoneFalseNoneFalse17766.00
3549735128383Nonevol- 3, Item No: 12.4 , Page No: 117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.830.0FalseNoneNoneFalseNoneFalse99504.00
3549736128383Nonevol- 1, Item No: 1.10 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum198.24198.241.9FalseNoneNoneFalseNoneFalse376.6560
17213751330001NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. Culvert (1 m X 1 m - 1 Vent)3029395.68
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549737128384Nonevol- 3, Item No: 2.10 (iv) (a) , Page No: 10Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Means a. Rubble stone masonry in lime mortar(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum644.28644.283.8FalseNoneNoneFalseNoneFalse2448.2640
3549738128384Nonevol- 3, Item No: 2.10 (iv) (B) , Page No: 10Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead ii) By Mechanical Meansb. Rubble stone masonry in cement mortar.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum755.79755.7915.0FalseNoneNoneFalseNoneFalse11336.850
3549739128384NoneItem No. VOL-I-1.14.1 Page No.8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38183.11FalseNoneNoneFalseNoneFalse23141.44180
3549740128384NoneItem No. VOL-I-2.1.3 Page No.15Providing and laying in position Cement Concrete for levelling course forall works in foundation. The granite/trap/basalt crushed graded coarseaggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators,including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications.- Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates (inclusive of 8% Form work and 18% GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum7420.377420.3718.49FalseNoneNoneFalseNoneFalse137202.64130
3549741128384NoneItem No. VOL-I-2.11-h Page No.18Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. All other type of structures (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTTonne97894.6397894.636.13FalseNoneNoneFalseNoneFalse600094.08190
3549742128384NoneItem No.VOL-I-2.4.3 Page No. 16Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (inclusive of 20% Form work and 18% GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum9420.369420.3661.56FalseNoneNoneFalseNoneFalse579917.36160
3549743128384NoneItem No.VOL-I-2.4.3 Page No. 16Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates ((inclusive of 8% Form work and 18% GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8478.338478.3322.36FalseNoneNoneFalseNoneFalse189575.45880
3549744128384Nonevol- 1, Item No: 2.5.2 , Page No: 16Providing and laying in position Cement Concrete for all Super structures ofbuilding , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (inclusive of 20% Form work and 18% GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum10174.1710174.1722.74FalseNoneNoneFalseNoneFalse231360.62580
3549745128384Nonevol- 3, Item No: 12.2 , Page No: 117Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm296.12296.1216.0FalseNoneNoneFalseNoneFalse4737.920
3549746128384Nonevol- 3, Item No: 12.4 , Page No: 117Providing and laying of Filter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3316.83316.826.73FalseNoneNoneFalseNoneFalse88658.0640
3549747128384NoneItem No. VOL-III-12.3A Page No.117Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical Specification- A. Granular material (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum1447.151447.15267.3FalseNoneNoneFalseNoneFalse386823.1950
3549748128384Nonevol- 1, Item No: 2.2.1 , Page No: 15Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications.-M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates (inclusive 18% GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum8179.078179.076.56FalseNoneNoneFalseNoneFalse53654.69920
3549749128384Nonevol- 3, Item No: 14.2 , Page No: 129Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum3040.513040.513.12FalseNoneNoneFalseNoneFalse9486.39120
3549750128384Nonevol- 3, Item No: 13.16 , Page No: 124Asphaltic Plug JointProviding and laying of asphaltic plug joint to provide for orizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steelconforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/ backer rod, all as per approved drawings and specifications.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm2224.012224.0160.0FalseNoneNoneFalseNoneFalse133440.60
3549751128384NoneItem No. VOL-III-8.10 Page No.66Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm135.05135.0521.85FalseNoneNoneFalseNoneFalse2950.84250
3549752128384NoneItem No. VOL-III-8.4 Page No.63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTPer cm Height Per Letter1.121.121960.0FalseNoneNoneFalseNoneFalse2195.20
3549753128384NoneItem No. VOL-III-14.4(a) Page No.129Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical Stone/Boulder (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum2368.972368.97235.88FalseNoneNoneFalseNoneFalse558792.64360
3549754128384Nonevol- 3, Item No: 2.17 (ix) B , Page No: 11Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceablematerial and stacking the serviceable material with all lifts and lead . ii) By Mechanical Means . B. Above 600 mm to 900 mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm1357.941357.9410.0FalseNoneNoneFalseNoneFalse13579.40
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. ELECTRICAL717961.36
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549755128385NoneI-1RCC Pole - 9 Mtr Long, 145 Kg WL Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo8767.168767.1630.0FalseNoneNoneFalseNoneFalse263014.80
3549756128385NoneI-3LT 4 Pin Cross Arm with clamps, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet469.58469.5830.0FalseNoneNoneFalseNoneFalse14087.40
3549757128385NoneI-6No. 8 Strain Insulator Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo33.4533.45240.0FalseNoneNoneFalseNoneFalse8028.00
3549758128385NoneI-7Guy Set Complete with No. 8 Strain Insulator & Concreting materials Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet1460.781460.7830.0FalseNoneNoneFalseNoneFalse43823.40
3549759128385NoneI-8Rabbit ACSR Conductor Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm57283.9357283.934.87FalseNoneNoneFalseNoneFalse278972.73910
3549760128385NoneI-9Spiral Earth Electrode Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo296.12296.1230.0FalseNoneNoneFalseNoneFalse8883.60
3549761128385NoneI-11Anti Climbing Device (12 Mtr GI Barbed Wire) Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg110.27110.2730.0FalseNoneNoneFalseNoneFalse3308.10
3549762128385NoneI-12RCC Pole - 9 Mtr Long, 145 Kg WL Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo1313.341313.3430.0FalseNoneNoneFalseNoneFalse39400.20
3549763128385NoneI-3LT 4 Pin Cross Arm with clamps, bolts, nuts and washers for RCC Pole - 9 Mtr Long, 145 Kg WL Material cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet188.8188.830.0FalseNoneNoneFalseNoneFalse5664.00
3549764128385NoneI-18Guy Set Complete with No. 8 Strain Insulator & Concreting materials Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSet528.64528.6430.0FalseNoneNoneFalseNoneFalse15859.20
3549765128385NoneI-19Rabbit ACSR Conductor Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm5145.985145.984.87FalseNoneNoneFalseNoneFalse25060.92260
3549766128385NoneI-20Spiral Earth Electrode Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo109.74109.7430.0FalseNoneNoneFalseNoneFalse3292.20
3549767128385NoneI-21Guy concreting with Boulders, Mud and Sand Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNo236.0236.030.0FalseNoneNoneFalseNoneFalse7080.00
3549768128385NoneI-22Anti Climbing Device (12 Mtr GI Barbed Wire) Labour Cost ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKg49.5649.5630.0FalseNoneNoneFalseNoneFalse1486.80
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. HDPE Water Supply256474.69
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549769128386NoneItem No.VOL-1 1.14.1 Page No. 8Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum126.38126.38175.5FalseNoneNoneFalseNoneFalse22179.690
3549770128386NoneItem No. VOL-5 - 9.2.3 Page No.96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE : Upto 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,90mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr473.3473.3250.0FalseNoneNoneFalseNoneFalse118325.00
3549771128386Nonevol- 5, Item No: 9.2.1 , Page No: 96Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations and rolling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipe alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessary like saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for t e s t i n g ) e t c . c o m p l e t e . N O T E : U p t o 110mm dia Coil shall be used . For :HDPE Grade PE80-PN8.0,63mm dia (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum271.34271.34400.0FalseNoneNoneFalseNoneFalse108536.00
3549772128386Nonevol- 1, Item No: 1.10 , Page No: 7Refilling available earth around trenches/pipelines, cables in layers notexceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m, and lift upto 1.5 m. Including cost of all labour complete as per specifications (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum198.24198.2437.5FalseNoneNoneFalseNoneFalse7434.00
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. 1ST YEAR MAINTENANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549773128387NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY= 38.40 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549774128387NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 2560 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549775128387NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 1440 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549776128387NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 288 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549777128387NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 270 cum ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. 2ND YEAR MAINTENANCE0.0
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549778128388NoneItem Code 2.5 (ii) aClearing and grubbing road land including vegetation bushes shrubs saplings by using weed cutter or minor equipment. PWD SR 2023-24 Volume 3 Pg no .9 Item Code.2.5A Rates are inclusive of GST 18 percentage LBD QTY 38.40 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549779128388NoneItem Code 16.19Maintenance of Drains - The maintenance of drains include erosion repair clearing cleaning reshaping regrading deepening of side drains as well as catch water drains as per technical specification Clause 1908. PWD SR 2023-24 Volume 3 Pg no .147 Item Code.16.19 Rates are inclusive of GST 18 percentage LBD QTY 2560 m ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTRmtr0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549780128388NoneItem Code 10.3Maintenance of Earth Shoulder (stripping excess soil) Stripping excess soil from the shoulder surface to achieve the approved level and compacting with plate compactor PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.3 Rates are inclusive of GST 18 percentage LBD QTY 288 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549781128388NoneItem Code 10.2Maintenance of Earthen Shoulder (filling with fresh soi) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment PWD SR 2023-24 Volume 3 Pg no .91 Item Code.10.2 Rates are inclusive of GST 18 percentage LBD QTY 1440 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
3549782128388NoneItem Code 1.12NALA Training Earth work in surface excavation by mechanical means for lowering and leveling the ground for all works other than foundation in all kinds of soils and upto depth not exceeding 300mm as per drawing and technical specifications including setting out shoring strutting barricading caution lights removal of stumps and other deleterious matter including dressing of excavated surfaces disposing off or levelling the excavated earth or sorting and stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour tools usage of machinery and other appurtenances required to complete the work. PWD Bangalore PWD SR 2023-24 Volume 1 Pg no .8 Item Code.1.12 Rates are inclusive of GST 18 percentage LBD QTY 270 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum0.010.010.01FalseNoneNoneFalseNoneFalse0.00010
17213751330001NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. 3RD YEAR MAINTENANCE179627.92
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549783128389Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm545.36545.3638.4FalseNoneNoneFalseNoneFalse20941.8240
3549784128389Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.328.322560.0FalseNoneNoneFalseNoneFalse21299.20
3549785128389Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm54.1254.12288.0FalseNoneNoneFalseNoneFalse15586.560
3549786128389Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm134.61134.61192.0FalseNoneNoneFalseNoneFalse25845.120
3549787128389Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2753.162753.163.2FalseNoneNoneFalseNoneFalse8810.1120
3549788128389Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm285.86285.863.2FalseNoneNoneFalseNoneFalse914.7520
3549789128389Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum131.83131.83270.0FalseNoneNoneFalseNoneFalse35594.10
3549790128389Nonevol- 3, Item No: 8.10 , Page No: 66Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm151.25151.25261.0FalseNoneNoneFalseNoneFalse39476.250
3549791128389Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.241.249000.0FalseNoneNoneFalseNoneFalse11160.00
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. 4TH YEAR MAINTENANCE364432.46
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549792128390Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm564.84564.8438.4FalseNoneNoneFalseNoneFalse21689.8560
3549793128390Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.628.622560.0FalseNoneNoneFalseNoneFalse22067.20
3549794128390Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm56.0556.05288.0FalseNoneNoneFalseNoneFalse16142.40
3549795128390Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm139.41139.411920.0FalseNoneNoneFalseNoneFalse267667.20
3549796128390Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum136.54136.54270.0FalseNoneNoneFalseNoneFalse36865.80
17213751330000NoneNoneRoadsPKG-710-B in Davanagere Taluk of Davanagere District. 5TH YEAR MAINTENANCE1095288.29
idtenderSubEstimateIdcategoryNameitemCodedescriptionuomNamebaseRatefinalRatequantitymodifyQuantityYnminQuantitymaxQuantitybuyBackYnbuyBackValuehideYnnetAmounttaxCount
3549797128391Nonevol- 3, Item No: 2.5 , Page No: 9Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GST100 Sqm584.31584.3138.4FalseNoneNoneFalseNoneFalse22437.5040
3549798128391Nonevol- 3, Item No: 16.19 , Page No: 147Maintenance of DrainsThe maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTm8.928.922560.0FalseNoneNoneFalseNoneFalse22835.20
3549799128391Nonevol- 3, Item No: 10.3 , Page No: 91Maintenance of Earth Shoulder (stripping excess soil) - Stripping excess soil from the shoulder surface to a minimum depth of 150mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No. 3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm57.9957.99288.0FalseNoneNoneFalseNoneFalse16701.120
3549800128391Nonevol- 3, Item No: 10.2 , Page No: 91Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm144.22144.221920.0FalseNoneNoneFalseNoneFalse276902.40
3549801128391Nonevol- 3, Item No: 16.22 , Page No: 147Maintenance of Road Signs- Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory / cautionary / informatory and place identifications sign board as perdrawings and technical specification Clause 1910 (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm2949.812949.813.2FalseNoneNoneFalseNoneFalse9439.3920
3549802128391Nonevol- 3, Item No: 16.24i , Page No: 148Maintenance of 200 m and km stones - Maintenance of 200 metre and km stones-Maintenance of 200 metre km stone by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200 metre km stone and 5th km stone as per drawing and technical specification Clause 1912 Painting two coats with synthetic enamel paint (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTKm306.28306.283.2FalseNoneNoneFalseNoneFalse980.0960
3549803128391Nonevol- 3, Item No: 8.10 , Page No: 66Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm162.06162.0618.0FalseNoneNoneFalseNoneFalse2917.080
3549804128391Nonevol- 3, Item No: 8.4 , Page No: 63Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shade-English and Roman (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTcm1.341.349000.0FalseNoneNoneFalseNoneFalse12060.00
3549805128391Nonevol- 3, Item No: 8.15 , Page No: 67Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTSqm788.0788.0601.06FalseNoneNoneFalseNoneFalse473635.280
3549806128391Nonevol- 3, Item No: 8.43 , Page No: 74Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer.(Rates inclusive of GST)" Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTNos542.68542.68404.0FalseNoneNoneFalseNoneFalse219242.720
3549807128391Nonevol- 1, Item No: 1.12 , Page No: 8Nala Training Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work.-In all kinds of soils upto 300 mm depth) (rates inclusive of GST) Schedule of Rates PWD 2023-24 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and item rates are inclusive of 18 percent GSTCum141.25141.25270.0FalseNoneNoneFalseNoneFalse38137.50
generalCriterionList
createdTsversioncreatedDatemodifiedDatecriterionTypedescriptiontenderEligibilityCriterionDocumentList
17213751330000NoneNoneELIGIBILITYTenders from Joint ventures are not acceptable.None
17213751330000NoneNoneELIGIBILITYBidders shall not be under a declaration of ineligibility for corrupt and fraudulent practices issued by Government of Karnataka None
17213751330000NoneNoneELIGIBILITYThe bidder is required to ensure browser compatibility of the computer well in advance to the last date and time for receipt of tenders. The departments shall not be responsible for non-accessibility of e-Procurement portal due to internet connectivity issues and technical glitches at bidders end.None
17213751330000NoneNoneELIGIBILITYIt shall be the responsibility of the Bidder to ensure credit of Tender Processing Fee and EMD into the respective receiving bank accounts of e-Procurement on or before the last date and time of bid submission.None
17213751330000NoneNoneELIGIBILITYEMD Payments through e-Payment mode shall be made as one single transaction and payments made in part are liable for rejection.None
17213751330000NoneNoneELIGIBILITYBidder shall pay Contract Management Module processing fees prescribed as per E procurement soon after contract has been issued to bidder.None
17213751330000NoneNoneELIGIBILITYConditional tenders will not be accepted.None
17213751330000NoneNoneELIGIBILITYThe tenderer shall bear all costs associated with the preparation and submission of his tender, and the employer will in no case be responsible and liable for those costsNone
17213751330000NoneNoneELIGIBILITYThe cost of the Tender form shall not be refundable.None
17213751330000NoneNoneELIGIBILITYThe employer is not responsible for any delay in accessing E - Procurement Portal.None
17213751330000NoneNoneELIGIBILITYContractors Should be registered with KPWD Class I Registration.None
17213751330000NoneNoneELIGIBILITYRoyalty on construction materials and other taxes will be deducted as per prevailing Govt orders.None
17213751330000NoneNoneELIGIBILITYTo qualify for award of this contract, each tenderer should upload all details and documents as per Technical and Financial bid attached to this tender.None
17213751330000NoneNoneELIGIBILITYMaterials like bitumen, steel, cement etc.,required for the work shall be procured by the tenderer themselves and should got them tested by the quality control authority before use in the work.None
17213751330000NoneNoneELIGIBILITYAs per Karnataka state Government order LD/300/LET/2006 Bangalore dated 01.01.2007 and Government letter no PW/134/BMS/2007 dated 27.07.2007, a sum amounting to 1% of the bill amount will be deducted towards constructions labour welfare fund.None
17213751330000NoneNoneELIGIBILITYAll the formats prescribed in the bid document shall be filled by the tenderer in complete manner otherwise it will be rejected.None
17213751330000NoneNoneELIGIBILITYAll scanned documents to be uploaded shall be in original and the Chief Engineer reserves the right to verify the documents before approval.None
17213751330000NoneNoneELIGIBILITYIf the tenderer fails to comply with any of the conditions in the technical bid, their financial bid will be liable to be rejected.None
17213751330000NoneNoneELIGIBILITY0riginal documents / Certificates shall be produced by the Tenderer as mentioned in the Bid document.None
17213751330000NoneNoneELIGIBILITYItem rates are inclusive of 18% GST. Hence the Bidders must Quote the Rates inclusive of GST.None
17213751330000NoneNoneELIGIBILITYGST Shall not be paid separatelyNone
17213751330000NoneNoneELIGIBILITYPot holes shall be rectified irrespective of quantities during DLP & Maintenance period.None
17213751330000NoneNoneELIGIBILITYAll the items includes all Leads and Lifts, Loading and Unloading, transportation charges, Cost of all materials, Labour, HOM of machineries as per Standard specifications and as directed by the Engineer-in-charge of the work and all other incidental items which are necessary for the successful completion of the workNone
17213751330000NoneNoneELIGIBILITYThe employer reserves the rights to reject one or all tender without assigning any reason.None
17213751330000NoneNoneELIGIBILITYFinancial year will be reckoned as the period between first day of April and thirty first day of March inclusiveNone
preQualCriterionListNone
technicalCriterionList
createdTsversioncreatedDatemodifiedDatedescriptioncriterionCategoryTextcriterionTypeOthersValuetenderTechnicalCriterionDocumentList
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 ,2022-23 & 2023-24 (b) Satisfactorily completed as prime contractor, at least one similar nature of work value not less than Rs.1212.83 Lakhs.Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneWork Done Certificate
NoneNoneNoneNone3.2 c) - To qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 ,2022-23 & 2023-24 Executed in any one financial year, the following minimum quantities of work: Earth Work for Embankment/ Subgrade/ Shoulders : 30935.87 Cum, Granular Sub-Base (GSB)/ Wet Mix Macadam (WMM) : 7338.98 Cum, Bituminous Base and Surface Course (DBM, BM, BC & SDBC): 223.68, Pavement Quality Concrete (PQC) M30/M40: 8494.95 Cum, PCC/DLC M10 & M15: 3272.03 Cum, Reinforced Cement, Concrete (RCC) M20 & higher grades: 1123.95 CumPast ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNone3.3 - Each Tenderer should further demonstrate (c) liquid assets and/or availability of credit facilities of not less than Rs.727.70 Lakhs (Credit lines/ letter of credit/ certificates from nationalized banks for meeting the fund requirement etc.)Past ExperienceNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4
NoneNoneNoneNoneSection 2 ITT 3.2 - Each Tenderer should further demonstrate:a) Availability by owning(a) Machineries to be owned: Concrete Batching Plant:1 Concrete Road Paving Machine:1 Transit Truck Agitator 5m3capacity :2 Static RoadRoller/Vibratory road roller/soil compactor: 2 Tippers :4Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Original purchase invoice, Rc book for own
NoneNoneNoneNoneii) Machineries could be on Lease/Hire: Wet Mix Plant / Pug mill: 1 No. Motor Grader: 1 No. Excavator 0.90 Cum Bucket Capacity: 2 No Tipper Trucks: 6 No. Transit Truck Agitator 5m3capacity: 2 No.Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Hire / Lease agreement with original invoice of the original owner and specifying period of lease / hire
NoneNoneNoneNone3.7 - Tenderers who meet the above specified minimum qualifying criteria, will only be qualified, if their available tender capacity is more than the total tender value. The available tender capacity will be calculated as under:-Assessed available tender capacity (AxNx1.5 - B) Where, A Maximum value of civil engineering works executed in any one year during the last five years (updated to 2019-20 to 2023-24 price level) taking into account the completed as well as works in progress. N Number of years prescribed for completion of the works for which tenders are invited. B Value, at 2023-24 price level, of existing commitments and on-going works to be completed during the next 11months (period of completion of the works for which Tenders are invited)Capabilities of VendorNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Work done, Balance work done certificate issued by an officer of rank not below the rank of EE or equivalent
NoneNoneNoneNoneTo qualify for award of this contract, each Tenderer in its name should have in the last five years i.e., 2019-20, 2020-21, 2021-22 , 2022-23 & 2023-24 (a) Achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only of Rs.4851.30 Lakhs.Financial StatusNone
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneAudited CA Certificate of Annual Turnover
NoneNoneNoneNoneAffidavit as per KW4OthersAffidavit as per KW4
createdTsversioncreatedDatemodifiedDatedocumentName
NoneNoneNoneNoneOthers -- Affidavit as per KW4
tenderCriterionDocumentList
documentNameoptionaldocumentTypeText
PWD Registration CertificateTrueTechnical Bid
Annual turnover certificate along with UDINTrueTechnical Bid
Details of Committed WorksTrueTechnical Bid
Bid Capacity Calculation as per KW DocumentTrueTechnical Bid
Bankers certificate in the prescribed format issued by Nationalized bank as per KW-4TrueTechnical Bid
Workdone Certificate issued by not below rank of Executive EngineerTrueTechnical Bid
Copies of GST/Tax RegistrationTrueTechnical Bid
AFFIDAVIT AS PER KW4TrueTechnical Bid
tenderWorkLocationList
tenderAddress
createdTs1721457208000
version0
createdDateNone
modifiedDateNone
blockNumberO/o Chief Project Officer Project Implementation Unit, State Highway Development Project, PWD Annex Building, K.R.Circle,Bengaluru-560 001.
streetNone
cityBengaluru
stateKarnataka
pin560001
tenderRecallDTONone