tenderSubEstimateList | createdTs | version | createdDate | modifiedDate | workCategoryName | subEstimateName | estimateTotal | itemList |
---|
1721373675000 | 1 | None | None | Roads | ESTIMATE OF ROAD | 189559070.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549105 | 128344 | None | 16.29 | Providing and fixing of typical PMGSY type informatory sign board with Logo as per MORD specifications and drawing (Retro Reflective Traffic sign as per IRC 67 Clause 1701.3.8.1 Class A Typlr-1). i) The board will be a composite unit consisting of three plates of Aluminium Composite Materials (ACM), material specifications as per Clause 1701.3.7. The top most platewill be in diamond shape of 600mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25mm x 5 mm size on back on edges. The middle plate will be 1200 mm x 150 mm size riveted over welded M.S. angle iron frame of 25mm x 25mmx 5 mm size on back on edges. The main lower most plate will be 1500 mm x 600 mm size, riveted over welded M.S. angle iron frame of 25 mm x 25 mm x 5 mm size. Welding of all the sheets over angle iron frame will be done neatly to have plain surface on one side. The angle iron frames of the lower most plate and the middle plate will be welded to two nos. 75 mm x 75 mm (12 SWG) sheet tubes posts placed at 1125 mm apart centre to centre. The top of the middle plate will be flushed with the top of 75 mm dia medium steel tube posts and these posts will be embedded in cement concrete M15 grade blocks of 450 mm x 450 mm x 600 mm below ground level. The height of bottom of the lower most plate will be 1200 mm from normal ground level and the bottom of middle plate will be 100 mm above the top level of the lower most plate. The diamond shaped plate mounted over angle iron frame will be connected to middle plate by square medium steel section of 47 mm x 47 mm thickness 12 SWG having a spacing of 100 mm between the diamond shaped plate and middle plate and this square section will be welded to the bottom point of the diamond shaped plate. (ii) The lettering and borders, etc. of middle and bottom plate, PMGSY logo on top plate shall be as per clause 1701.4.6 UNISR2023-24,V-3,PageNo.149Item No.16.29 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Nos | 19021.13 | 19021.13 | 2.0 | False | None | None | False | None | False | 38042.26 | 0 | 3549106 | 128344 | None | 2.5 (ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungleUNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 486.93 | 486.93 | 272.16 | False | None | None | False | None | False | 132522.8688 | 0 | 3549107 | 128344 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead. UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 7.43 | 7.43 | 39787.0 | False | None | None | False | None | False | 295617.41 | 0 | 3549108 | 128344 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 117.7 | 117.7 | 25595.59 | False | None | None | False | None | False | 3012600.943 | 0 | 3549109 | 128344 | None | 1.7 | Construction of Embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded with desired compaction. (Royalty shall be recovered @ Rs. 60.00/m3) UNI SR 2023-24, V-1,Page No. 7 Item No.1.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 147.44 | 147.44 | 7047.88 | False | None | None | False | None | False | 1039139.4272 | 0 | 3549110 | 128344 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work. If the height of embankment construction is more than 1.50 m add 5% per for every 1.50 m height or part there of Deduct 5 percentage per if rollers are not used and tamping is done manually Add 8 percentage per for works under foul & sullage situationUNI SR 2023-24, V-1,Page No. 7 Item No.1.8. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.28 | 587.28 | 6358.56 | False | None | None | False | None | False | 3734255.1168 | 0 | 3549111 | 128344 | None | 3.6 | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 610.83 | 610.83 | 38492.0 | False | None | None | False | None | False | 23512068.36 | 0 | 3549112 | 128344 | None | 4.2.(B) (5) | By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V Material UNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2922.8 | 2922.8 | 12248.52 | False | None | None | False | None | False | 35799974.256 | 0 | 3549113 | 128344 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3170.6 | 3170.6 | 12247.27 | False | None | None | False | None | False | 38831194.262 | 0 | 3549114 | 128344 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 50.8 | 50.8 | 48923.91 | False | None | None | False | None | False | 2485334.628 | 0 | 3549115 | 128344 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 17.35 | 17.35 | 47027.71 | False | None | None | False | None | False | 815930.7685 | 0 | 3549116 | 128344 | None | 5.13.(B) | Dense Graded Bituminous macadam Grading - ii for traffic 20 mSa Providing and laying Dense
Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of
specified grading, premixed with bituminousbinderVG-40, @ 4.5 per cent by weight of total mix
and filler, transporting the hot mix to work site, laying with mechanical paver finisher to the
required grade, level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete
in all respects PWD SR 2023-24, V-3,Pg. No. 35 I.
No.5.13.(B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 12102.55 | 12102.55 | 3297.54 | False | None | None | False | None | False | 39908642.727 | 0 | 3549117 | 128344 | None | 5.17(C) | Bituminous Concrete Grading II for traffic 20 MSA. Providing and laying Bituminous Concrete
with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed
with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work
site, laying with mechanical paver finisher to the requiredgrade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH PWD SR 2023-24, V-3,Pg. No. 38 I.
No.5.17(C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 14056.57 | 14056.57 | 1413.23 | False | None | None | False | None | False | 19865166.4211 | 0 | 3549118 | 128344 | None | 6.1 | Dry Lean Cement Concrete Sub- base
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine
aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate
cement ratio not to exceed 14:1, aggregate gradation after blending to be as per table 600-1, cement
content not to be less than 140 kg/ m3 , optimum moisture content to be determined during trial
length construction, concrete strength not to be less than 7 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 t vibratory
roller, finishing and curing PWD SR 2023-24, V-3,Pg. No. 49 I.
No.6.1. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 6095.88 | 6095.88 | 691.2 | False | None | None | False | None | False | 4213472.256 | 0 | 3549119 | 128344 | None | 6.2.1 | Pavement Quality Concrete using paver - M40 Grade Construction of M40 Grade un-reinforced,
dowel jointed, plain cement concrete pavement over a prepared sub base in recommended
proportions, coarse and fine aggregate conforming to IS 383:2016, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design
transported to site, laid with a slip form paver finisher, spread, compacted and finished in a
continuous operation including provision of contraction, expansion, onstruction and longitudinal
joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar,
tie rod, admixtures, curing compound, steel channels, finishing to lines and grades as per drawing
OPC @ 420 kg/m3. PWD SR 2023-24, V-3,Pg. No. 49 I.
No.6.2.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 11226.54 | 11226.54 | 1117.8 | False | None | None | False | None | False | 12549026.412 | 0 | 3549120 | 128344 | None | 8.2 (b) | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation
works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m
height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per
relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using
needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all
materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of
machinery, curing and all other appurtenances required to complete the work as per technical
specifications. Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates PWD SR 2023-24, V-3,Pg. No. 63 I.
No.8.2 (b) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8331.34 | 8331.34 | 72.9 | False | None | None | False | None | False | 607354.686 | 0 | 3549121 | 128344 | None | 6.8.2 | Providing and laying 80mm thick factory made precast M -30 grade Cement Concrete Paver Block
as per IRC SP 63:2018 & IS 15658 for Commercial Traffic Axle load repetitions upto 10MSA &
for Residential Streets of approved shape and colour, laid in required pattern and including over
40mm thick compacted bed
of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-incharge.
(WMM/WBM Base to be paid separately as per relevant technical specification) PWD SR 2023-24, V-3,Pg. No. 51 I.
No.6.8.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 1438.48 | 1438.48 | 1890.0 | False | None | None | False | None | False | 2718727.2 | 0 |
| 1721373675000 | 0 | None | None | Roads | Estimate of Traffic Saftey Measures | 3071069.64 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549122 | 128345 | None | 8.7 | Direction and Place Identification Signs upto 0.9 m2 Size Board. Providing and erecting direction and place identification retroreflectorised sign as per IRC:67:2022 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4mm with area not exceeding 0.9 m2 fixed over back support frame of min 35 x 35 x 3mm anglemounted on a mild steel circular pipe 65 NB, firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing UNI SR 2023-24, V-3,Pg. No. 65 I. No.8.7. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 11163.39 | 11163.39 | 5.4 | False | None | None | False | None | False | 60282.306 | 0 | 3549123 | 128345 | None | 8.6 (A) (ii) | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022. 90 cm equilateral triangle UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 5882.77 | 5882.77 | 24.0 | False | None | None | False | None | False | 141186.48 | 0 | 3549124 | 128345 | None | 8.6 (A) (xv) | Retro-Reflectorised Traffic SignsProviding and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 803.1, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.90 cm high octagon UNI SR 2023-24, V-3,Pg. No. 64 I. No.8.6 (A) (xv) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 8208.37 | 8208.37 | 6.0 | False | None | None | False | None | False | 49250.22 | 0 | 3549125 | 128345 | None | 8.15 | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 g/m2 area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35:2015.The finished surface to be level, uniform and free from streaks and holes. (Note : 1. A sealing primer may be applied in advance on cement concrete pavement to ensure proper bonding. Any laitance and/or curing compound to be removed where paint is required to be applied on concrete surface. 2. Cost of painter is already included in usage charges of road marking machine) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 656.67 | 656.67 | 2213.44 | False | None | None | False | None | False | 1453499.6448 | 0 | 3549126 | 128345 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers / Cat's Eye made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing total internal reflection of the light entering the lens face and shall support a load of 16000 kg tested in accordance to ASTM D 4280 Type H and complying to Specifications of Category A of MORTH Circular No RW/NH/33023/10-97 DO III Dt 11.06. 1997. The height, width and length shall not exceed 50 mm, 100 mm and 102 +/- 2 mm and with minimum reflective area of 13 cm2 on each side and the slope to the base shall be 35 +/- 5 degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19 +/- 2 mm and height not less than 30+/- 2 mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer.The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. UNI SR 2023-24, V-3,Pg. No. 74 I. No.8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Nos | 452.23 | 452.23 | 1200.0 | False | None | None | False | None | False | 542676.0 | 0 | 3549127 | 128345 | None | 8.16(i) | Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc5th kilometre stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 6295.36 | 6295.36 | 2.0 | False | None | None | False | None | False | 12590.72 | 0 | 3549128 | 128345 | None | 8.16(ii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(ii) Ordinary kilometer stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 3626.55 | 3626.55 | 7.0 | False | None | None | False | None | False | 25385.85 | 0 | 3549129 | 128345 | None | 8.16(iii) | Reinforced cement concrete M-15 Grade kilometer stone of Standard design as per IRC:8-1980, fixing in position including painting and printing etc(iii) 200 m stone (precast) UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.16(iii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 1043.24 | 1043.24 | 30.0 | False | None | None | False | None | False | 31297.2 | 0 | 3549130 | 128345 | None | 8.60.2 ii | Providing Speed Breakers/Raised pedestrian crossings in Trapezoidal section with 2.5 m Top width and transition length of 0.8 m length and height of 0.1 m as per IRC 99:2018 using Dense Bituminous Macadam (DBM) Gr II and Bituminous Concrete (BC) Gr II for entire formation width & WBM Gr II for Shoulder hump portion only (150 mm thick), completing with road marking paint with applied thermoplastic compound withreflecting glass beeds on bituminous surface and providing 2 Nos. retro reflective traffic signs as per IRC 67 -2022 Two lane with formation width of 7.50m UNI SR 2023-24, V-3,Pg. No. 80 I. No.8.60.2 ii ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 56317.51 | 56317.51 | 2.0 | False | None | None | False | None | False | 112635.02 | 0 | 3549131 | 128345 | None | 8.17 | Road Delineators: Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming to IRC-79-2019 and the drawings. UNI SR 2023-24, V-3,Pg. No. 67 I. No.8.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 2504.02 | 2504.02 | 16.0 | False | None | None | False | None | False | 40064.32 | 0 | 3549132 | 128345 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work.In all kinds of soils Depth upto 3 m UNI SR 2023-24, V-1,Pg. No. 8 I. No.1.14.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 234.0 | False | None | None | False | None | False | 29572.92 | 0 | 3549133 | 128345 | None | 8.29(i) | Cable Duct Across the RoadProviding and laying of a reinforced cement concrete pipe duct, 300 mm dia, across the road (new construction), extending from drain to drain in cuts and toe of slope to toe of slope in fills, constructing head walls at both ends, providing a minimum fill of granular material over top and sides of RCC pipe as per IRC:98-1997, bedded on a 0.3 m thick layer of granular material free of rock pieces, outer to outer distance of pipe at least half dia of pipe subject to minimum 450 mm in case of double and triple row ducts, joints to be made leak proof, invert level of duct to be above higher than ground level to prevent entry of water and dirt, all as per IRC: 98 - 1997 and approved drawings.UNI SR 2023-24, V-3,Pg. No. 71 I. No.8.29(i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 2740.67 | 2740.67 | 162.5 | False | None | None | False | None | False | 445358.875 | 0 | 3549134 | 128345 | None | 8.6 (A) (vi) | Retro-Reflectorised Traffic Signs
Providing and fixing of retro- reflectorised cautionary,mandatory and informatory sign as per
IRC:67:2022 madeof Class C Type XI retro reflective sheeting fixe over 2 mmthick
aluminiumsheetingvideclause801.3,3mm/4mmthickAluminiumcompositematerial sheet depending
on the size ofthe sign fixed over the back support frame of min 25 x 25 x3mm angle mounted on a
mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly
designed foundation with M25 grade cement concrete 45 cmx 45 cm x 60 cm, 60 cm below
ground level as per approved drawing. The sign shall be maintained as per section 12 of
IRC:67:2022.90 cm circular ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 7954.38 | 7954.38 | 16.0 | False | None | None | False | None | False | 127270.08 | 0 |
| 1721373675000 | 1 | None | None | Roads | ESTIMATE OF JUNCTIONS | 2470879.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549135 | 128346 | None | 2.5(ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle UNI SR 2023-24, V-3, Page No. 9 Item No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 486.75 | 486.75 | 2.04 | False | None | None | False | None | False | 992.97 | 0 | 3549136 | 128346 | None | 3.5 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material by Mechanical Means using Hydraulic excavator with in all lifts and lead.UNI SR 2023-24, V-3,Page No. 17 Item No.3.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 7.43 | 7.43 | 854.37 | False | None | None | False | None | False | 6347.9691 | 0 | 3549137 | 128346 | None | 1.12 | Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required to complete the work. In all kinds of soils upto 300 mm depth
UNI SR 2023-24, V-1,Page No. 8 Item No.1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 117.7 | 117.7 | 68.85 | False | None | None | False | None | False | 8103.645 | 0 | 3549138 | 128346 | None | 3.6 | Construction of Subgrade and Earthen ShouldersConstruction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
UNI SR 2023-24, V-3,Page No. 17 Item No.3.6. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 610.83 | 610.83 | 234.68 | False | None | None | False | None | False | 143349.5844 | 0 | 3549139 | 128346 | None | 4.2.(B) (5) | By Mix in Place MethodConstruction of Granular Sub-Base of required grading as per design spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with front end loader at OMC and compacting with vibratory roller to achieve the desired density, complete as per clause 401 B) For Grading -V MaterialUNI SR 2023-24, V-3,Page No. 23 Item No.4.2.(B) (5) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2922.8 | 2922.8 | 209.64 | False | None | None | False | None | False | 612735.792 | 0 | 3549140 | 128346 | None | 4.17 | Wet Mix Macadam (Plant mix method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver/grader in sub-base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. UNI SR 2023-24, V-3,Page No. 26 Item No.4.17 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3170.6 | 3170.6 | 219.97 | False | None | None | False | None | False | 697436.882 | 0 | 3549141 | 128346 | None | 5.1 A (i) | Prime Coat over WMM/WBMProviding and applying primer coat with SS1 grade Bitumen Emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/m2 using mechanical means.
UNI SR 2023-24, V-3,Page No. 31 Item No.5.1 A (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 50.8 | 50.8 | 854.37 | False | None | None | False | None | False | 43401.996 | 0 | 3549142 | 128346 | None | 5.4 (ii) | Tack Coat on Granular surface trated with primerProviding and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.25 kg/m2 on Granular surface
UNI SR 2023-24, V-3,Page No. 31 Item No.5.4 (ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 17.35 | 17.35 | 854.37 | False | None | None | False | None | False | 14823.3195 | 0 | 3549143 | 128346 | None | 5.13.(B) | Dense Graded Bituminous macadam Grading - ii for traffic 20 m Sa Providing and laying Dense
Graded Bituminous Macadam with 40/60 TPH capacity HMP using crushed aggregates of specified
grading, premixed with bituminous binder VG-40, @ 4.5 per cent by weight of total mix and filler,
transporting the hot mix to work site, laying with mechanical paver finisher to the requiredgrade,
level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MoRTH specification clause No. 505 complete in all respects PWD SR 2023-24, V-3,Pg. No. 35 I.
No.5.13.(B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 12102.55 | 12102.55 | 42.72 | False | None | None | False | None | False | 517020.936 | 0 | 3549144 | 128346 | None | 5.17(c) | Bituminous Concrete Grading II for traffic 20 MSA. Providing and laying Bituminous Concrete
with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, premixed
with bituminous binder VG-40, @ 5.4 per cent of mix and filler, transporting the hot mix to work
site, laying with mechanical paver finisher to the requiredgrade,
level and alignment, rollingwithsmoothwheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH
specification clause No. 507 complete in all respects PWD SR 2023-24, V-3,Pg. No. 38 I.
No.5.17(C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 14056.51 | 14056.51 | 25.63 | False | None | None | False | None | False | 360268.3513 | 0 | 3549145 | 128346 | None | 2.4.1 | Providing and laying in position Cement
Concrete for all Sub structures of building,
Irrigation works, Sub structure works of
bridges, Drain works & other parallel
works from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per
relevant IS Codes machine mixed with
super plasticisers, laid in layers, well
compacted using needle vibrators,
providing weep holes wherever necessary,
including all lead & lifts, cost of all
materials of quality, confirming to the
requirements of relevant IS codes, labour,
Usage charges of machinery, curing and all
other appurtenances required to complete
the work as per technical specifications.
Mix 1:2:4 (M15) Using 20 mm nominal
size graded crushed coarse aggregates
PWD SR 2023-24, V-1,Pg. No. 16 I.
No.2.4.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8331.34 | 8331.34 | 4.04 | False | None | None | False | None | False | 33658.6136 | 0 | 3549146 | 128346 | None | 4.19 | Construction of Median and Island with
Soil Taken from Roadway Cutting
Construction of Median and Island above
road level with approved material deposited
at site from roadway cutting and excavation
for drain and foundation of other structures,
spread, graded and compacted as per clause
408
PWD SR 2023-24, V-3,Pg. No. 27 I.
No.4.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 454.71 | 454.71 | 72.0 | False | None | None | False | None | False | 32739.12 | 0 |
| 1721373675000 | 1 | None | None | Roads | RECONSTRUCTION OF HUME PIPE CULVERT | 10176459.72 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549147 | 128347 | None | 2.8 (ii) a | Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material withall lifts and lead By Mechanical Means Cement Concrete Grade M-15 & M-20
UNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.8 (ii) (A)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 890.84 | 890.84 | 53.71 | False | None | None | False | None | False | 47847.0164 | 0 | 3549148 | 128347 | None | 2.10 (b) | Dismantling Stone Masonry. Rubble stone masonry in cement mortar.UNI SR 2023 - 24 ,V-3,Page No 10 Item No 2.10.(B)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 755.79 | 755.79 | 18.0 | False | None | None | False | None | False | 13604.22 | 0 | 3549149 | 128347 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
UNI SR 2023 - 24 ,V-1,Page No 8 Item No 1.14.1
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 529.35 | False | None | None | False | None | False | 66899.253 | 0 | 3549150 | 128347 | None | 1.23 | Providing and Filing in foundation with granite/ Trap broken metal 100 mm and down size & with approved sand including hand picking, ramming, watering including cost of all materials and labour with all lead and lift complete as per specification
UNI SR 2023 - 24 ,V-1,Page No 11 Item No 1.23
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3323.0 | 3323.0 | 61.89 | False | None | None | False | None | False | 205660.47 | 0 | 3549151 | 128347 | None | 1.8 | Construction of Embankment by excavating the available approved Gravel/ Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces required to complete the work.
UNI SR 2023 - 24 ,V-1,Page No 7 Item No 1.8.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 587.29 | 587.29 | 550.09 | False | None | None | False | None | False | 323062.3561 | 0 | 3549152 | 128347 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates
UNI SR 2023 - 24 ,V-1,Page No 15 Item No 2.1.3
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 55.08 | False | None | None | False | None | False | 408713.9796 | 0 | 3549153 | 128347 | None | 2.4.1 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications Mix 1:2:4 (M15) Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.1
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8331.28 | 8331.28 | 10.1 | False | None | None | False | None | False | 84145.928 | 0 | 3549154 | 128347 | None | 2.4.3 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.4.3
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 9420.36 | 9420.36 | 220.78 | False | None | None | False | None | False | 2079827.0808 | 0 | 3549155 | 128347 | None | 2.5.2 | Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers laid in layers, well compacted using needle vibrators. The cost includes all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications. M25 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No 2.5.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 10174.17 | 10174.17 | 64.92 | False | None | None | False | None | False | 660507.1164 | 0 | 3549156 | 128347 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Tonne | 97894.63 | 97894.63 | 18.79 | False | None | None | False | None | False | 1839440.0977 | 0 | 3549157 | 128347 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No 2.11.h
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Tonne | 97894.63 | 97894.63 | 7.58 | False | None | None | False | None | False | 742041.2954 | 0 | 3549158 | 128347 | None | 13.8 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.8.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8438.83 | 8438.83 | 21.6 | False | None | None | False | None | False | 182278.728 | 0 | 3549159 | 128347 | None | 13.9 | Reinforced cement concrete M30 grade for approach slab including reinforcement and formwork complete as per drawing and Technical specification (Batching Plant)
UNI SR 2023 - 24 ,V-3,Page No 122 Item No 13.9.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 15396.74 | 15396.74 | 36.0 | False | None | None | False | None | False | 554282.64 | 0 | 3549160 | 128347 | None | 13.16 | Asphaltic Plug joint Providing and laying of asphaltic plug joint to provide for horizontal movement of 25 mm and vertical movement of 2 mm, depth of joint varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm (in traffic direction), covered with a closure plate of 200mm x 6mm of weldable structural steel conforming to IS: 2062, asphaltic plug to consist of polymer modified bitumen binder, carefully selected single size aggregate of 12.5 mm nominal size and a heat resistant foam caulking/backer rod, all as per approved drawings and specifications.
UNI SR 2023 - 24 ,V-3,Page No 124 Item No 13.16
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 2224.01 | 2224.01 | 48.0 | False | None | None | False | None | False | 106752.48 | 0 | 3549161 | 128347 | None | 13.2 A | M2702 Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. (Batching Plant)
UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.2.A
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 18175.57 | 18175.57 | 20.7 | False | None | None | False | None | False | 376234.299 | 0 | 3549162 | 128347 | None | 14.2 | Boulder Apron Laid in Wire CratesProviding and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 40 kg each.
UNI SR 2023 - 24 ,V-3,Page No 129 Item No 14.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3040.51 | 3040.51 | 31.04 | False | None | None | False | None | False | 94377.4304 | 0 | 3549163 | 128347 | None | 12.4 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.4.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 3316.8 | 3316.8 | 106.2 | False | None | None | False | None | False | 352244.16 | 0 | 3549164 | 128347 | None | 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
UNI SR 2023 - 24 ,V-3,Page No 117 Item No 12.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 296.12 | 296.12 | 36.0 | False | None | None | False | None | False | 10660.32 | 0 | 3549165 | 128347 | None | 8.18 | Boundary pillar / Guard stoneReinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting
UNI SR 2023 - 24 ,V-3,Page No 67 Item No 8.18
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 926.77 | 926.77 | 92.0 | False | None | None | False | None | False | 85262.84 | 0 | 3549166 | 128347 | None | 13.7 | Drainage Spouts using 100 mm GI pipe complete as per drawing and Technical specification UNI SR 2023 - 24 ,V-3,Page No 121 Item No 13.7.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 6 Mtrs | 4052.77 | 4052.77 | 6.0 | False | None | None | False | None | False | 24316.62 | 0 | 3549167 | 128347 | None | 13.14 | Painting on concrete surfaceProviding and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 m2. UNI SR 2023 - 24 ,V-3,Page No 123 Item No 13.14
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 104.08 | 104.08 | 161.5 | False | None | None | False | None | False | 16808.92 | 0 | 3549168 | 128347 | None | 16.15 C | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6. 750 mm dia
UNI SR 2023 - 24 ,V-3,Page No 146 Item No 16.15.C.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 4132.07 | 4132.07 | 30.0 | False | None | None | False | None | False | 123962.1 | 0 | 3549169 | 128347 | None | 8.5 (A) (xi) | Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC:67:2022 made of Class C Type XI retro reflective sheeting fixed over 2 mm thick aluminium sheeting vide clause 801.3, 3mm/4mm thick Aluminium composite material sheet depending on the size of the sign fixed over the back support frame of min 25 x 25 x 3mm angle mounted on a mild steel circular pipe 65 NB, 3.2 mm thickness firmly fixed to the ground by means of properly designed foundation with M25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing.The sign shall be maintained as per section 12 of IRC:67:2022.UNI SR 2023 - 24 Page No 64 Item No8.5 (A) (xii)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 5233.54 | 5233.54 | 4.0 | False | None | None | False | None | False | 20934.16 | 0 | 3549170 | 128347 | None | 2.17(ix) (B) | Removing all type of Hume Pipes and Stacking including Earthwork and Dismantling of Masonry Works. Above 600 mm to
900 mm dia PWD SR 2023 - 24 ,V-3,Page No
11 Item No 2.17(ix) (B) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 1357.94 | 1357.94 | 30.0 | False | None | None | False | None | False | 40738.2 | 0 | 3549171 | 128347 | None | 12.3 (A) | Back filling behind abutment, wing wall and return wall complete including compaction as per drawing and Technical
Specification. Granular material PWD SR 2023 - 24 ,V-3,Page No
117 Item No 12.3 (A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 1329.15 | 1329.15 | 57.42 | False | None | None | False | None | False | 76319.793 | 0 | 3549172 | 128347 | None | 2.17 (IX) (a) | Removing all type of Hume Pipes and
Stacking including Earthwork and Dismantling
of Masonry Works.PWD SR 2023 - 24 ,V-3,Page No 11 Item
No2.17(ix) (A)
(b) Above 600 mm to 900 mm dia Hume pipe ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 1357.94 | 1357.94 | 15.0 | False | None | None | False | None | False | 20369.1 | 0 | 3549173 | 128347 | None | 2.4.2 | Providing and laying in position Cement
Concrete for all Sub structures of building,
Irrigation works, Sub structure works of
bridges, Drain works & other parallel works
from 0.50m to 3.50 m height. The
granite/trap/basalt crushed graded coarse
aggregates and fine aggregates as per
relevant IS Codes machine mixed with super
plasticisers, laid in layers, well compacted
using needle vibrators, providing weep holes
wherever necessary, including all lead & lifts,
cost of all materials of quality, confirming to the
requirements of relevant IS codes, labour,
Usage charges of machinery, curing and all
other appurtenances required to complete the
work as per technical specifications M20
Design Mix Using 20 mm nominal size graded
crushed coarse aggregates including cost of
formwork.
PWD SR 2023 - 24 ,V-1,Page No 16 Item
No2.4.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 102.06 | False | None | None | False | None | False | 863522.5158 | 0 | 3549174 | 128347 | None | 9.1.(ii) | Providing and laying Reinforced Cement
Concrete Pipe NP4 as per design
Laying Reinforced Cement Concrete Pipe NP4
/ Prestressed Concrete Pipe on First Class
Bedding in Single Row
Laying Reinforced cement concrete pipe
NP4/prestressed concrete pipe for culverts on
first class bedding of granular material in single
row including fixing collar with cement mortar
1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in
head walls and parapets .
ii. 1200mm dia
PWD SR 2023 - 24 ,V-3,Page No 87 Item
No 9.1.(ii) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 13340.31 | 13340.31 | 37.5 | False | None | None | False | None | False | 500261.625 | 0 | 3549175 | 128347 | None | 14.1(A) | Providing and laying boulders apron on river
bed for protection against scour with stone
boulders weighing not less than 40 kg each
complete as per drawing and Technical
specification.
A)Boulder Laid Dry Without Wire Crates.
PWD SR 2023 - 24 ,V-3,Page No 129 Item
No 14.1(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 10.9 | False | None | None | False | None | False | 25821.773 | 0 | 3549176 | 128347 | None | 14.4(A) | Providing and laying Pitching on slopes laid
over prepared filter media including boulder
apron laid dry in front of toe of embankment
complete as per drawing and Technical
specifications
A)Stone /Boulder
PWD SR 2023 - 24 ,V-3,Page No 129 Item
No.14.4(A) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 2368.97 | 2368.97 | 90.0 | False | None | None | False | None | False | 213207.3 | 0 | 3549177 | 128347 | None | 8.10 | Painting Two Coats on New Concrete
Surfaces
Painting two coats after filling the surface with
synthetic enamel paint in all shades on new
plastered concrete surfaces
PWD SR 2023 - 24 ,V-3,Page No 66 Item
No8.10. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 135.05 | 135.05 | 121.11 | False | None | None | False | None | False | 16355.9055 | 0 |
| 1721373675000 | 0 | None | None | Roads | ESTIMATE OF DRAIN | 3375348.27 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549178 | 128348 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m UNI SR 2023 - 24 ,V-1,Page No 38 Item No1.14.1
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 375.0 | False | None | None | False | None | False | 47392.5 | 0 | 3549179 | 128348 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork. UNI SR 2023 - 24 ,V-1,Page No 15 Item No2.1.3
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 34.0 | False | None | None | False | None | False | 252292.58 | 0 | 3549180 | 128348 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
UNI SR 2023 - 24 ,V-1,Page No 16 Item No2.4.2
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 10576.17 | 10576.17 | 196.2 | False | None | None | False | None | False | 2075044.554 | 0 | 3549181 | 128348 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
UNI SR 2023 - 24 ,V-1,Page No 18 Item No2.11.h
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Tonne | 97894.63 | 97894.63 | 9.81 | False | None | None | False | None | False | 960346.3203 | 0 | 3549182 | 128348 | None | 12.2 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with PVC Pipe 110mm outer dia at 2 kg
per m2, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
SpecificationsPWD SR 2023 - 24 ,V-3,Page No 117 Item No12.2 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 296.12 | 296.12 | 136.0 | False | None | None | False | None | False | 40272.32 | 0 |
| 1721373675000 | 1 | None | None | Roads | CONSTRUCTION OF FIELD APPROACH | 844750.4 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549183 | 128349 | None | 1.14.1 | Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution lights, including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenaces required to complete the work In all kinds of soils Depth upto 3 m
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 126.38 | 126.38 | 56.26 | False | None | None | False | None | False | 7110.1388 | 0 | 3549184 | 128349 | None | 16.15.c | Providing and Laying Reinforced Cement Concrete
Pipe NP3 as per design in Single Row. Providing
and laying reinforced cement concrete pipe NP3
for culverts on first class bedding of granular
material in single row including fixing collar with
cement mortar 1:2 but excluding excavation,
protection works, backfilling, concrete and
masonry works in head walls and parapets Clause
1101.6
750 mm dia
PWD SR 2023 - 24 ,V-3,Page No 146 Item
No 16.15.c ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 4132.07 | 4132.07 | 60.0 | False | None | None | False | None | False | 247924.2 | 0 | 3549185 | 128349 | None | 2.1.3 | Providing and laying in position Cement Concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machinery, curing, and all the other appurtenances required to complete the work as per technical specifications Mix 1:3:6 Using 40 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 7420.37 | 7420.37 | 4.4 | False | None | None | False | None | False | 32649.628 | 0 | 3549186 | 128349 | None | 2.4.2 | Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticisers, laid in layers, well compacted using needle vibrators, providing weep holes wherever necessary, including all lead & lifts, cost of all materials of quality, confirming to the requirements of relevant IS codes, labour, Usage charges of machinery, curing and all other appurtenances required to complete the work as per technical specifications M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates including cost of formwork.
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 8460.93 | 8460.93 | 52.43 | False | None | None | False | None | False | 443606.5599 | 0 | 3549187 | 128349 | None | 2.11 h | Steel FabricationSupplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tying with binding wire / soft annealed steel wire and other ancilary operations complete as per drawing and technical specification. h. All other type of structures
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Tonne | 97894.63 | 97894.63 | 1.159 | False | None | None | False | None | False | 113459.87617 | 0 |
| 1721373675000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 1st Year | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549188 | 128350 | None | 2.6 | Clearing & grubbing road land including vegetation,
bushes, shrubs, saplings by using weed cutter / minor
equipment. 100 m2 2 6710.00 2.000 26840.00 20% 53.68 357.000 0.000
PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.6 (Quantity to be executed 53.68) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549189 | 128350 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 (Quantity to be executed 4026.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549190 | 128350 | None | 16.19 | Maintenance of Earthen Shoulder (filling with fresh
soil) - Making up loss of material I irregularities on
shoulder to a minimum depth of 150mm to the design
level by adding fresh approved soil and compacting it
with appropriate equipment including cost of
materials, labour, HOM complete as per specifications.
PWD SR 2023-24, V-3,Pg. No. 147 I. No.16.19 (Quantity to be executed =2013.00) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721373675000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 2nd Year | 0.0 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549191 | 128351 | None | 2.6 | Clearing & grubbing road land including
vegetation, bushes, shrubs, saplings by using weed
cutter / minor equipment PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.6(Quantity to be executed =120.780) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549192 | 128351 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19(Quantity to be executed =5368.000) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549193 | 128351 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2.(Quantity to be executed =603.900) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 | 3549194 | 128351 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the potholes with hot bituminous material as per clause 504 using HMP 40/60 TPH Capacity compacting, trimming and finishing the surface to form a smooth continuous surface ,all as perclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5(Quantity to be executed =469.700) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 0.01 | 0.01 | 0.01 | False | None | None | False | None | False | 0.0001 | 0 |
| 1721373676000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 3rd Year | 893263.07 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549195 | 128352 | None | 2.5(ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 545.35 | 545.35 | 120.78 | False | None | None | False | None | False | 65867.373 | 0 | 3549196 | 128352 | None | 16.19 | Maintenance of Drains-The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.33 | 8.33 | 5368.0 | False | None | None | False | None | False | 44715.44 | 0 | 3549197 | 128352 | None | 10.3 | Maintenance of Earth Shoulder (stripping excess soil)-Stripping excess soil from the shoulder surface to a minimum depth of 150 mm to achieve the approved level and compacting with plate compactor including cost of materials, labour, HOM complete as per specifications. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.3. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 54.12 | 54.12 | 1006.5 | False | None | None | False | None | False | 54471.78 | 0 | 3549198 | 128352 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil)-Making up loss of material Irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 134.6 | 134.6 | 3355.0 | False | None | None | False | None | False | 451583.0 | 0 | 3549199 | 128352 | None | 16.22 | Maintenance of Road Signs- Maintenance of road signs by way
of cleaning and repainting of mandatory / requlatory / cautionary
/ informatory and place identifications sign board as
perdrawings and technical specification Clause 1910 PWD SR 2023-24, V-3,Pg. No. 147 I. No.16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 2753.16 | 2753.16 | 46.0 | False | None | None | False | None | False | 126645.36 | 0 | 3549200 | 128352 | None | 10.5 | Filling Pot-holes and Patch Repairs with Bituminous concrete,
40mm (using Vg-30 grade Bitumen)- Removal of all failed
material, trimming of completed excavation to provide firm
vertical faces, cleaning of surface,
painting of tack coat on the sides and base of excavation as per
clause 503, back filling the pot holes with hot bituminous
material as per clause 504 using HMP 40/60 TPH Capacity
compacting, trimming and finishing the surface to form a
smoothcontinuous surface, all as per clause 3004.2 PWD SR 2023-24, V-3,Pg. No. 91 I. No.10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 591.15 | 591.15 | 234.85 | False | None | None | False | None | False | 138831.5775 | 0 | 3549201 | 128352 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 285.86 | 285.86 | 39.0 | False | None | None | False | None | False | 11148.54 | 0 |
| 1721373676000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 4th Year | 409657.49 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549202 | 128353 | None | 2.5(ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 564.83 | 564.83 | 120.78 | False | None | None | False | None | False | 68220.1674 | 0 | 3549203 | 128353 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.62 | 8.62 | 5368.0 | False | None | None | False | None | False | 46272.16 | 0 | 3549204 | 128353 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 139.41 | 139.41 | 1006.5 | False | None | None | False | None | False | 140316.165 | 0 | 3549205 | 128353 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmoothcontinuoussurface,allasperclause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 612.26 | 612.26 | 234.85 | False | None | None | False | None | False | 143789.261 | 0 | 3549206 | 128353 | None | 1.12 | NalaTraining:Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthan foundation in all kinds of soils & upto depthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&other appurtenances required to complete the work.
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12
-do- in all kinds of soil by mechanical means. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 136.54 | 136.54 | 81.0 | False | None | None | False | None | False | 11059.74 | 0 |
| 1721373676000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 5th Year | 564925.29 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549207 | 128354 | None | 2.5(ii) a | Clearing and Grubbing Road Land.Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Mechanical Means using Dozer A) In area of light jungle. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
PWD SR 2023-24, V-3,Pg. No. 9 I. No.2.5(ii) a ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | 100 Sqm | 584.31 | 584.31 | 120.78 | False | None | None | False | None | False | 70572.9618 | 0 | 3549208 | 128354 | None | 16.19 | Maintenance of Drains - The maintenance of drains include erosion, repair, clearing, cleaning, reshaping, regrading, deepening of side drains as well as catch water drains as per technical specification Clause 1908. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.19 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Rmtr | 8.92 | 8.92 | 5368.0 | False | None | None | False | None | False | 47882.56 | 0 | 3549209 | 128354 | None | 10.2 | Maintenance of Earthen Shoulder (filling with fresh soil) - Making up loss of material I irregularities on shoulder to a minimum depth of 150mm to the design level by adding fresh approved soil and compacting it with appropriate equipment including cost of materials, labour, HOM complete as per specifications etc. MORTH Specification No.3003. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.2. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 144.22 | 144.22 | 1006.5 | False | None | None | False | None | False | 145157.43 | 0 | 3549210 | 128354 | None | 10.5 | Filling Pot-holes and Patch Repairs with BituminousRemovalofallfailedmaterial,trimmingofcompletedexcavationtoprovidefirmverticalfaces,cleaningofsurface,paintingoftackcoatonthesidesandbaseofexcavationasperclause503,backfillingthepotholeswithhotbituminousmaterialasperclause504usingHMP40/60TPHCapacitycompacting,trimmingandfinishingthesurfacetoformasmooth continuous surface, all as per clause 3004.2
UNI SR 2023-24, V-3, Page No. 91, Item No. 10.5. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 633.38 | 633.38 | 469.7 | False | None | None | False | None | False | 297498.586 | 0 | 3549211 | 128354 | None | 1.12 | NalaTraining:Earthworkinsurfaceexcavationbymechanicalmeansforlowering&levelingthegroundforallworksotherthan foundation in all kinds of soils & upto depthnotexceeding300mmasperdrawingandtechnicalspecifications,includingsettingout,shoring,strutting,barricading,cautionlights,removalofstumpsandotherdeleteriousmatterincludingdressingofexcavatedsurfaces,disposingofforlevellingtheexcavatedearthorsorting&stackingtheselectedearthforreuseinaradiusof50mandliftupto1.5mincludingcostoflabour,tools,usageofmachinery&other appurtenances required to complete the work.
UNI SR 2023-24, V-1, Page No. 8, Item No. 1.12 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 141.25 | 141.25 | 27.0 | False | None | None | False | None | False | 3813.75 | 0 |
| 1721373676000 | 0 | None | None | Roads | Estimates for periodicity of routine Maintenance 6th Year | 27275181.75 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549212 | 128355 | None | 16.22 | Maintenance of Road Signs-Maintenance of road signs by way of cleaning and repainting of mandatory / requlatory/ cautionary/ informatory and place identifications sign board as per drawings and technical specification Clause 1911. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 147, Item No. 16.22 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 3048.14 | 3048.14 | 46.0 | False | None | None | False | None | False | 140214.44 | 0 | 3549213 | 128355 | None | 16.24 (i) | Maintenance of 200 m and km stones-Maintenance of 200 metre and km stones by way of refiting of tilted stones repairing with cement mortar, cleaning, repairing and lettering on 200m & km stone and 5th km stone as per drawing and technical specification Clause 1913. Inclusive of all lift and lead sand all complete as per direction of Engineer-in-charge.Painting two coats with synthetic enamel paint
UNI SR 2023-24, V-3, Page No. 148, Item No. 16.24 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 316.49 | 316.49 | 39.0 | False | None | None | False | None | False | 12343.11 | 0 | 3549214 | 128355 | None | 8.1 | Painting two coats on New Concrete Surface : Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces complete as per specifications. MORTH Specification No. 803. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 66, Item No. 8.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Nos | 167.46 | 167.46 | 9.0 | False | None | None | False | None | False | 1507.14 | 0 | 3549215 | 128355 | None | 8.4 | Printing New Letter and Figures of any ShadePrinting new letter and figures of any shade with synthetic enamel paint black or any other approved colour to give an even shadeEnglish and Roman
UNI SR 2023-24, V-3, Page No. 63, Item No. 8.4. ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | cm | 1.38 | 1.38 | 700.0 | False | None | None | False | None | False | 966.0 | 0 | 3549216 | 128355 | None | 5.3 (i) | Providing and applying tack coat with RS1 Bituminous Emulsion using emulsion pressure distributor at the rate of 0.20kg /m2 on the prepared bituminous surface cleaned with mechanical broometc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.UNI SR 2023-24, V-3, Page No. 31, Item No. 5.3 (i) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 18.44 | 18.44 | 46970.0 | False | None | None | False | None | False | 866126.8 | 0 | 3549217 | 128355 | None | 5.16 (C) | Providing and laying Bituminous Concrete with 40/60 TPH capacity hot mix plant using crushed aggregates of specified grading, pre mixed with bituminous binder VG-30, @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with mechanical paver finisher to there quired grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects.
UNI SR 2023-24, V-3, Page No. 38, Item No. 5.16 (C) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 16829.29 | 16829.29 | 1409.1 | False | None | None | False | None | False | 23714152.539 | 0 | 3549218 | 128355 | None | 8.15 | Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflecto rising glass beads @ 250g/ m2 area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35:2015. The finished surface to be level, uniform and free from streaks and holes etc. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 67, Item No. 8.15 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Sqm | 814.27 | 814.27 | 2348.57 | False | None | None | False | None | False | 1912370.0939 | 0 | 3549219 | 128355 | None | 8.43 | Supplying and Fixing of Molded Shank Raised Pavement Markers/ Cat's Eye made of poly carbonate and ABS moulded body and reflective panels with micro pris matic lens capable of providing to tal internal reflection of the lightentering the lens face and shall support a load of 16000 kg tested in accordance to ASTMD4280 Type Hand complying to Specifications of Category A of MORTH Circular NoRW/ NH/ 33023/ 10-97 DOIII Dt11.06.1997. The height, width and length shall not exceed 50mm, 100mm and 102+/-2mm and with minimum reflective are a of 13cm 2 on each side and the slope to the base shall be 35+/- 5 degree. The strength of detachment of the integrated cylindrical shanks,(of dia meter not less than 19+/-2 mm and height not less than 30+/-2mm) from the body is to be a minimum value of 500Kg. Fixing will be by drilling holes on the road for the shankstogo inside, without nails and using epoxy resin based adhesive as per manufacturer's recommendation and complete as directed by the engineer. The contractor shall submit a two year warranty for satisfactory field performance including stipulated retro-reflectance of the reflecting panel, to the Engineer. Inclusive of all lift and leads and all complete as per direction of Engineer-in-charge.
UNI SR 2023-24, V-3, Page No. 72, Item No. 8.43 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 560.77 | 560.77 | 1119.0 | False | None | None | False | None | False | 627501.63 | 0 |
| 1721373676000 | 0 | None | None | Roads | Water Supply | 1629391.2 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549220 | 128356 | None | 1.17.1 | Earth work excavation for pipeline trenches in all kinds of soils by mechanical means as per drawing and technical specifications, including setting out, construction of shoring, strutting, barricading, caution lights, bracing, using sight rails & bonding rods at every 100 mm wherever necessary as directed, removal of stumps and other deleterious matter, dressing of sides and levelling the bottom of trench to the extent required , utilising the available excavated earth locally for the work etc., and all other appurtenances complete in the following strata. UNI SR 2023-24 , V - 5 Pg No. ,10 I.No 1.17.1 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 324.5 | 324.5 | 864.0 | False | None | None | False | None | False | 280368.0 | 0 | 3549221 | 128356 | None | 9.2.3 | Providing, laying and jointing HDPE pipes of specified grade and conforming to IS 4984-2016 with latest ammendments and conveying to work site including loading and unloading at both destinations androlling and lowering into trenches, laying true to line and jointing of pipes and specials with electrofusion welding, giving hydraulic test as per relevant ISS with all lead and lifts including encasing the pipealround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excation, testing and commissioning. The rate is exclusive of required specials and fittings wherever necessarylike saddle Tee, stub ends, flanged sets, bedns, reducers etc. complete (Contractor will make his own arrangements for procuring water for testing) etc. complete. NOTE: Upto 110mm dia Coil shall be used. For HDPE Grade PE80-PN8.0,90mm diaUNI SR 2023-24 , V - 5 Pg No. ,965 I.No 9.2.3 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 473.3 | 473.3 | 1600.0 | False | None | None | False | None | False | 757280.0 | 0 | 3549222 | 128356 | None | 10.14.10 | Providing and installing at site of work P.V.C. pipes including cost of pipes and specials and labour, including lowering into trenches, laying
true to line, level and perfect linking at joints leak proof including jointing
of approved type with all labour charges and all lift charges, handling charges including encasing the pipe around to a depth not less than 15
cms with gravel or selected earth available from the excavation etc. complete PWD WS & UW 2023-24 , V-5 Pg No. ,120 I.No
10.14.10 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | m | 319.66 | 319.66 | 1600.0 | False | None | None | False | None | False | 511456.0 | 0 | 3549223 | 128356 | None | 10.15.6 | Lowering, laying true to line and level of PVC Ringtite / PVC Pipes and cuts of pipes wherever necessary including jointing of pipes and
specials with jointing of approved type, with all labour with encasing the pipe
alround to a depth of not less than 15 cms. with soft gravel or selected earth available from the excavation etc. complete and giving
necessary hydraulic test to the required pressure as per ISS and commissioning
(Contractor will make his own arrangements for procuring water for testing) etc. complete for:PWD WS & UW 2023-24 , V-5 Pg No. ,121 I.No 10.15.6 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Cum | 111.51 | 111.51 | 720.0 | False | None | None | False | None | False | 80287.2 | 0 |
| 1721373676000 | 1 | None | None | Roads | Electrical Estimate | 1123960.18 | id | tenderSubEstimateId | categoryName | itemCode | description | uomName | baseRate | finalRate | quantity | modifyQuantityYn | minQuantity | maxQuantity | buyBackYn | buyBackValue | hideYn | netAmount | taxCount |
---|
3549224 | 128357 | None | 1.1.1 | Digging of Pit 1.8 Mtr depth for errection of 9 to 10 Mtr LongSteel/RCC/PSCC supports as per approved Drawing. Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pit | 779.33 | 779.33 | 24.0 | False | None | None | False | None | False | 18703.92 | 0 | 3549225 | 128357 | None | 1.01 | RCC Pole - 9 Mtr Long, 145 Kg WL
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/02 Dtd 24.11.2018) as per IS-785 ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 8767.16 | 8767.16 | 24.0 | False | None | None | False | None | False | 210411.84 | 0 | 3549226 | 128357 | None | 1.06 | PSCC Pole - 9 Mtr Long, 200 Kg WL
(Dwg No. For KPTCL & ESCOMs /GM/QS&S/50 Dtd 24.11.2018)
as per REC Standards ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 5202.56 | 5202.56 | 6.0 | False | None | None | False | None | False | 31215.36 | 0 | 3549227 | 128357 | None | 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1379.01 | 1379.01 | 6.0 | False | None | None | False | None | False | 8274.06 | 0 | 3549228 | 128357 | None | 2.03 | 11 kV, Special 3 Pin Cross Arm - MS
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/03 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1089.08 | 1089.08 | 24.0 | False | None | None | False | None | False | 26137.92 | 0 | 3549229 | 128357 | None | 3.01 | 11 kV, Cross Arm with HT Top Support
(glass reinforced hot pressed SMC compound) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 890.84 | 890.84 | 24.0 | False | None | None | False | None | False | 21380.16 | 0 | 3549230 | 128357 | None | 6.05 | 11 kV, 5 kN Composite/Polymeric Pin Insulator (24 mm dia FRP Rod) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 254.0 | 254.0 | 72.0 | False | None | None | False | None | False | 18288.0 | 0 | 3549231 | 128357 | None | 6.08 | DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 631.89 | 631.89 | 8.0 | False | None | None | False | None | False | 5055.12 | 0 | 3549232 | 128357 | None | 1.7.1 | Digging of Pit for GUY SET Ordinary Soil ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pit | 405.15 | 405.15 | 6.0 | False | None | None | False | None | False | 2430.9 | 0 | 3549233 | 128357 | None | 6.05 | Releasing of Rabbit Conductor ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Km | 4970.87 | 4970.87 | 3.24 | False | None | None | False | None | False | 16105.6188 | 0 | 3549234 | 128357 | None | 7.02 | ACSR Conductor as per IS-398 (Part - 2/1996)Rabbit ACSR(6/3.35 mm Al + 1/3.35 mm St), Std Wt: 214 Kg/KM ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Km | 57283.93 | 57283.93 | 3.24 | False | None | None | False | None | False | 185599.9332 | 0 | 3549235 | 128357 | None | 6.02 | Stringing of Rabbit Conductor (including pin binding, providing
jumps, dead ending, etc.,) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Km | 6483.69 | 6483.69 | 3.24 | False | None | None | False | None | False | 21007.1556 | 0 | 3549236 | 128357 | None | 9.03 | PG Clamp Rabbit to Rabbit ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 126.38 | 126.38 | 72.0 | False | None | None | False | None | False | 9099.36 | 0 | 3549237 | 128357 | None | 10.06 | T - Clamp for Rabbit conductor with hot dipped galvanized bolts, nuts and washers ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 391.52 | 391.52 | 72.0 | False | None | None | False | None | False | 28189.44 | 0 | 3549238 | 128357 | None | 2.05 | LT 4 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/ GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 358.07 | 358.07 | 2.0 | False | None | None | False | None | False | 716.14 | 0 | 3549239 | 128357 | None | 2.07 | LT 2 Pin Cross Arm - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/32 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 163.55 | 163.55 | 2.0 | False | None | None | False | None | False | 327.1 | 0 | 3549240 | 128357 | None | 5.02 | Labour charges fixing of LT 4 Pin Cross Arm with clamps, bolts, nuts & washers with brace - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 151.16 | 151.16 | 2.0 | False | None | None | False | None | False | 302.32 | 0 | 3549241 | 128357 | None | 5.01 | Labour charges Fixing of LT 2 Pin Cross Arm with clamps, bolts, nuts & washers with braces - MSa) For RCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 151.16 | 151.16 | 2.0 | False | None | None | False | None | False | 302.32 | 0 | 3549242 | 128357 | None | 6.03 | 1.1 kV Ceramic Pin Insulator (Shell only) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 38.41 | 38.41 | 10.0 | False | None | None | False | None | False | 384.1 | 0 | 3549243 | 128357 | None | 6.06 | No. 8 Strain Insulator ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 33.45 | 33.45 | 10.0 | False | None | None | False | None | False | 334.5 | 0 | 3549244 | 128357 | None | 2.16 | Spiral Earth Electrode ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 296.12 | 296.12 | 30.0 | False | None | None | False | None | False | 8883.6 | 0 | 3549245 | 128357 | None | 4.03 | Guarding for Road crossing, Telephone Line Crossing, between HT & LT Line Crossing ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Mtr | 115.23 | 115.23 | 33.6 | False | None | None | False | None | False | 3871.728 | 0 | 3549246 | 128357 | None | 24.01 | 11 kV, GOS
a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 11708.55 | 11708.55 | 1.0 | False | None | None | False | None | False | 11708.55 | 0 | 3549247 | 128357 | None | 13.02 | Labour for 11 kV, GOS
a) 200 Amps, Single Break ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 1367.86 | 1367.86 | 1.0 | False | None | None | False | None | False | 1367.86 | 0 | 3549248 | 128357 | None | 1.8.1.a | A) Base Concreting with CC 1:4: 8 a) Pole base for 11/9.5/9/8 Mtr supports (500x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 338.25 | 338.25 | 30.0 | False | None | None | False | None | False | 10147.5 | 0 | 3549249 | 128357 | None | 1.8.1.b | b Pole base for 9 Mtr Square Pole (650x650x150mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 438.61 | 438.61 | 30.0 | False | None | None | False | None | False | 13158.3 | 0 | 3549250 | 128357 | None | 1.8.2.a | B) Pole Concreting with CC 1:2:4 (without coping) 9 Mtr support (650x500x1700mm) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 3912.76 | 3912.76 | 30.0 | False | None | None | False | None | False | 117382.8 | 0 | 3549251 | 128357 | None | 1.8.2.g | Guy concreting with Boulders, Mud & SandAs per Drawing No. For KPTCL & ESCOMs/GM/CP/7/dt: 24.10.07.(with out cement) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 247.8 | 247.8 | 1.0 | False | None | None | False | None | False | 247.8 | 0 | 3549252 | 128357 | None | 21.02 | Transporation by Head Load where ever there is no
accessability for transporation by vechicle for Poles 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Pole | 353.12 | 353.12 | 24.0 | False | None | None | False | None | False | 8474.88 | 0 | 3549253 | 128357 | None | 22.02 | For ACSR Conductors 25 to 105 Mtr
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Km | 152.4 | 152.4 | 3.24 | False | None | None | False | None | False | 493.776 | 0 | 3549254 | 128357 | None | 26.02 | Loading and unloading of Pole (loading of Pole to vehicles at stores and unloading at workspot)
NOTE:- Consolidated amount for both loading and unloading. 9 Mtr RCC/PSCC Pole ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 175.94 | 175.94 | 24.0 | False | None | None | False | None | False | 4222.56 | 0 | 3549255 | 128357 | None | 5.06 | Fixing of HT/LT Single Top Support
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 138.77 | 138.77 | 24.0 | False | None | None | False | None | False | 3330.48 | 0 | 3549256 | 128357 | None | 3.01 | Erection of Double Pole Transformer Structure using
9 Mtr Long RCC (145 Kg WL)/PSCC (300 Kg WL) Pole
including fixing of Structure Materials, Erection of
Poles etc., complete for mounting of Transformer
as per approved drawing For 25/63/100 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Per Structure | 7093.28 | 7093.28 | 3.0 | False | None | None | False | None | False | 21279.84 | 0 | 3549257 | 128357 | None | 21.04 | Double Pole TC Set for erection of Transformer on RCC/PSCC 9 Mtr Long Poles as per IS-1977
For 25/63/100 kVA 4/5 Star Rated Transformer on RCC Pole - 9 Mtr Long, 145 Kg WL - GI ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 29815.3 | 29815.3 | 3.0 | False | None | None | False | None | False | 89445.9 | 0 | 3549258 | 128357 | None | 6.08 | 11KV, 5KN Polymeric Pin insulators (24mm Dia FRP Rod) DISC Insulator 45 kN Porcelain ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 631.89 | 631.89 | 8.0 | False | None | None | False | None | False | 5055.12 | 0 | 3549259 | 128357 | None | 19.02 | 10 kV, 5 kA Lightning Arrester Polymeric type with GROUND DISCONNECTOR
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1962.58 | 1962.58 | 9.0 | False | None | None | False | None | False | 17663.22 | 0 | 3549260 | 128357 | None | 26.01 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC
Pole - 9 Mtr Long, 300Kg WL - MS
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63
Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 7930.84 | 7930.84 | 3.0 | False | None | None | False | None | False | 23792.52 | 0 | 3549261 | 128357 | None | 67.2 | Supplying & Fixing Chemical earthling for grounding. Conduits, IC cut-outs & other equipments backfill compound which is non-corrosive, thermally conductive, potential to permissible limits, superior Fault conduction capacity, non toxic, weather resistance & capable of achieving ohmic value less than one ohm (44/6.19)Using 6ft. Copper bonded rod with backfill compound (44/6.19.2) Caution/Danger Board ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 185.85 | 185.85 | 3.0 | False | None | None | False | None | False | 557.55 | 0 | 3549262 | 128357 | None | 4.02 | Anti Climbing Device (12 Mtr GI Barbed wire)
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 110.27 | 110.27 | 3.0 | False | None | None | False | None | False | 330.81 | 0 | 3549263 | 128357 | None | 6.18.3 | Supplying and running GI/Copper conductor for grounding and (along with other wires in conduit system of wiring) using necessary suitable size clamps, nails, guttas/spacers etc. (43/6.18) 8 SWG GI Wire (44/6.18.3) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Mtr | 23.54 | 23.54 | 450.0 | False | None | None | False | None | False | 10593.0 | 0 | 3549264 | 128357 | None | 17.01 | LT Protection Kit
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/10 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 2506.5 | 2506.5 | 3.0 | False | None | None | False | None | False | 7519.5 | 0 | 3549265 | 128357 | None | 15.17.1 | LT Wiring Kit 63/100 KVA (87/15.17.1) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 5263.52 | 5263.52 | 3.0 | False | None | None | False | None | False | 15790.56 | 0 | 3549266 | 128357 | None | 20.01 | 11 kV, HG Fuse Unit with Solid Core Insulator 302122 852
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/21 Dtd 24.11.2018) (3 Nos) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 1324.49 | 1324.49 | 3.0 | False | None | None | False | None | False | 3973.47 | 0 | 3549267 | 128357 | None | 24.01 | GOS as per IS-9921, IS-1977
174 11 kV, 200 Amps Single Break GOS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/23 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 11708.55 | 11708.55 | 1.0 | False | None | None | False | None | False | 11708.55 | 0 | 3549268 | 128357 | None | 24.04 | H - Frame Set for fixing 11 kV, 200 Amps Single Break GOS - (For DP structure for providing
New GOS for sectionalisation) - MS
(Dwg No. For KPTCL & ESCOMs/GM/QS&S/61 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 5367.35 | 5367.35 | 3.0 | False | None | None | False | None | False | 16102.05 | 0 | 3549269 | 128357 | None | 27.02 | 27 Loading & Unloading of Transformer (when maintaince
men for loading and unloading are not available in store)
Loading 63 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 353.12 | 353.12 | 3.0 | False | None | None | False | None | False | 1059.36 | 0 | 3549270 | 128357 | None | 27.07 | Un loading 63 kVA ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 353.12 | 353.12 | 3.0 | False | None | None | False | None | False | 1059.36 | 0 | 3549271 | 128357 | None | 24.02 | Transporation by Head Load where ever there is no accessability for transporation by vechicle Distribution Transformer 63 kVA & 100 kVA 25 to 105 Mtr ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 1172.09 | 1172.09 | 3.0 | False | None | None | False | None | False | 3516.27 | 0 | 3549272 | 128357 | None | 54.01 | GI Grounding pipe, B - Class, 42 mm dia, 2.5 Mtr long, 3.2 mm thick with bolt, nut, GI Strips and washer complete Minimum Weight of GI Pipe: 7.3 Kg ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 920.58 | 920.58 | 12.0 | False | None | None | False | None | False | 11046.96 | 0 | 3549273 | 128357 | None | 54.02 | Good Quality well burnt Charcoal for grounding purposes packed in non returnable gunny bag of 30 Kg each
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 837.56 | 837.56 | 12.0 | False | None | None | False | None | False | 10050.72 | 0 | 3549274 | 128357 | None | 54.03 | Good Quality Salt for grounding purposes packed in 50 Kg gunny bag
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 384.09 | 384.09 | 12.0 | False | None | None | False | None | False | 4609.08 | 0 | 3549275 | 128357 | None | 54.04 | Rod type of earthing using 40 mm Dia, 3 Mtr long MS rod as ground rod, in earth pit of 300 mm width and 3300 mm depth and using 50x6 mm flat welded to ground rod as terminal & connected to equipment ground terminal using PVC Al wire as specified
---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Each | 2691.11 | 2691.11 | 12.0 | False | None | None | False | None | False | 32293.32 | 0 | 3549276 | 128357 | None | 26.01 | DP Set (2 Pole Strucrure Kit) as per IS-1977 For RCC Pole - 9 Mtr Long, 145KG WL/PSCC Pole - 9 Mtr Long, 300Kg WL - MS (Dwg No. For KPTCL & ESCOMs/GM/QS&S/35 & 63 Dtd 24.11.2018) ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | Set | 7930.84 | 7930.84 | 2.0 | False | None | None | False | None | False | 15861.68 | 0 | 3549277 | 128357 | None | 2.02 | Erection of RCC/PSCC Pole of 9 to 10 Mtr long in a pit of 1.8 Mtr depth ---- Including cost and conveyance of all materials. labour, hire charges of machineries and equipments with all lead and lifts, loading and unloading charges etc... complete as directed as per the specification and direction of Engineer-in-charge of the work and all items are inclusive of GST | No | 1379.01 | 1379.01 | 24.0 | False | None | None | False | None | False | 33096.24 | 0 |
|
|
---|